Work Samples

Page 1

mf

milena fabicka work samples



rĂŠsumĂŠ work experience WHAT_architecture - architectural assistant -residential project in Peckham, london, UK -residential project in Shoreditch, london, UK -practice research symposium, barcelona, ES -building physical models -social media -graphic design

languages 2015 - current

english fluent, ACERT certificate german indermediate polish fluent

freelance architect -concept proposal for a conversion of old sheep sheds to commercial and residential use, Machnice, PL -direct contact with the investor and constructor

2014

skills

kubit architecture - intern -apartment condition survey, wroclaw PL -building site assistance

2013

autodesk autoCAD 2014 3ds max 2013 revit architecture 2014

ch+ architects - intern -allMoney bank branch interior design, lodz, PL -drawing details of equipment -contact with investors and contractors

2012

adobe photoshop cs6 illustrator cc

MODUL school of art - watercolor instructor -teaching watercolor painting technique, warsaw, PL

2010

trimble sketchUP

education and training master of science in architecture wroclaw university of technology, wroclaw, PL

2014 - 2015

bachelor of science in architecture wroclaw university of technology, wroclaw, PL

2010 - 2014

arch4all workshop - architecture for disabled awarded for the best group project, wroclaw, PL drawing and painting course MODUL school of art, warsaw, PL

2011 2008 - 2010

graphisoft archicad 18 chaos group v-ray for sketchUP v-ray for 3ds max nemetschek vectorworks 2015

interests jazz - music critic for JazzPress and Jazzarium film festivals - volunteer at New Horozons IFF conceptual art - volunteer at SLOT Art Festival

c1 level b2 level native


01. 245zer_Airbnb hotel

year: 2016 location: Shoreditch, London authors: WHAT_architecture : a. hoete, m. szerla goncalves, m. akita, m.fabicka

2230

A

2

43

44

45

46 47 48

A

49 50

42

B 5-71

5

B 5-71

433

ROOM 3 25 m2 B 34 90

B

1380

1150

1500

1150

1500

1150

8895 1

1065

2

A 5-70

level +3

1

A

2230

12

13

14 15 16

2

A

17 18

11

B 5-71

B 5-71 24

23 22

21

20

19

00

10

433

5

25

ROOM 2 25 m2

90

34

00

10

B

00

10

B

1380

1150

1500

1150

1500

1150

8895

2

A 5-70

1

1065

A 5-70

level +2

1

A

12

13

14 15 16

2

A

17 18

11

B 5-71

B 5-71 24

23 22

21

20

19

10

433 5

25

00

ROOM 1 25 m2

10

B

90

34

00 10

B

00

1380

1150

1500

1150

1500

1150

8895

2

A 5-70

1

1065

A 5-70

level +1 1

2

A

A RECEPTION 1

B 5-71

B 5-71

2 10

9

8

7

6

5

4

3

434

0

COMMERCIAL 25 m2 B 90

34

B

400

3930

448

2820

812

8895

485

A 5-70

245zer developed through time. At first it supposed to be a billboard, later a dwelling and finally an airbnb hotel. Designing on such limited space needed a big amount of calculations and studies. Because the project is located in a conservation area there was a lot of restrictions for the outside apperance, that’s why the inside was mainly our subject of research and a chance to bring new ideas.

1

2230

Project is located in Shoreditch in London, in the junction of Kingsland Rd and Hackney Rd. It’s an infill above the existing fast food restaurant called Kebab Zero.

1

2

level 0


5-61 W

1

2

1 double + 1 single bedroom flat

1 double + 1 single bedroom flat

300300

RL 13250

WETROOM 3

RETAIL 24 sqm

2800

BEDROOM 3

RETAIL 28 m2

0

50

FFL 9860

300

49 48 47 46 45 44 43

BEDROOM 2

2800

42 41

WETROOM 2

40

STO RAGE TOILET 2.2 m2

39 38

LIVING ROOM

37

STRAGE

36

toilet

35

300

33 32 31

KITCHEN & DINING

13250

34

FFL 6760

LIVING ROOM

DINING & KITCHEN

30 29 28

1

27 25

BEDROOM 1

24

2800

26

WETROOM 1

23 22 21 20 19

FFL 3660

STO RAGE

18

TOILET 2.2 m2

550

17 16 15

SINGLE BEDROOM

14

STRAGE

13

BEDROOM 1

12

STUDY 1

11

STUDY 1

LIVING AREA

10 8

3000

9

COMMERCIAL

7 6

5-50

5

2

5-50

5-50

4 3 2 1

5-61 W

100

FFL 100 RL 0

1

STO RAGE

2 424

10118

BATHROOM

317

10882

BATHROOM 3.5 m2 STUDY 2

DOUBLE BEDROOM

WORKING AREA BEDROOM 2

section B-B

3 house layout studies 2

RL 13250

RL 13250

FFL 9860

FFL 9860

FFL 6760

FFL 6760

REVISIONS:

FFL 3660

FFL 3660

BROWNS

CHECK FROM WHAT_architecture

FFL 100 RL 0

RL 100 RL 0

south elevation

west elevation


02. 265cos_synopsis on Peckham

year: 2016 location: Peckham, London authors: WHAT_architecture: a. hoete, m. szerla goncalves, m.fabicka density Southwark key facts:

Greater London

-GLA estimated population in 2015 : 306 700

Census 2011 Population 8 173 941

-young population -ethnically diverse population

Housing units 3 266 173

-high turnover of the population

Land area 1 572 km2

-predicted 15% increase in population in over 10 years

Population density 5 200 / km2

-30% of the population born outside EU

People per hectare

-12th most deprived borough in London

0 - 24 25 - 50 50 - 75 75 - 100 100 or over

-9th most densely populated local authoritiy in England -2 times more densely populated than London and 25 times more than England

Borough: Southwark

Ward: The Lane

MSOA Southwark 025

LSOA Southwark 025C

Census 2011 population 288 283

Census 2011 population 15 565

Census 2011 population 9 378

Census 2011 population 2 077

Housing units 120 422

Housing units

Housing units 3 918

Housing units 847

Land area 29 km2

Land area: 1,4 km2 139 ha

Land area 0.8 km2

Land area 17,6 ha

Population density 11 640 / km2

Population density

Population density 9 990 / km2 100 / ha

Population density 11 198 / km2

2015 population projection 16 797

2015 population projection 306 700 2015 population density projection 10,626 / km2 106,3 / ha

2015 population density projection 12 084 / km2 120,8

Considerable majority of people living in Southwark are renting a flat. -20% less lower professionals -25% less full-time students -20% less samll employers -30% less Europeans -25% more Africans -35%less Carribean

Nearly a half of people living in Southwark are professionals.

-30% less socially rented -30% more mortage owners

Southwark is overly represented by middle aged people

-15% less young people -15% more middle aged people

(70% socially and privately rented)

(45% higher and lower)

Sources: 1. http://vis.oobrien.com/thisplace/ 2. http://londondatastore-upload.s3.amazonaws.com/instant-atlas/msoa-atlas/atlas.html 3. http://londondatastore-upload.s3.amazonaws.com/instant-atlas/lsoa-atlas1/atlas.html 4. http://www.ons.gov.uk/ons/rel/regional-trends/region-and-country-profiles/index.html 5. http://data.london.gov.uk/dataset/land-area-and-population-density-ward-and-borough 6. http://drawingrings.blogspot.co.uk/2013/01/a-better-map-of-population-density.html

Africans are the biggest non british ethnic group in Southwark.

core strategies

Activity

The site is located near the Peckham Action Area Core

Family homes

Affordable and private housing requirements

Design and Conservation

The site is located in an area whereby a min. 20% of a development > 10+ units must have 3+ bedroom units. Since our site is unlikely to sustain 10 units this policy does not apply.

The site is located in an area whereby a min. 35% of a development > 10+ units must be affordable and min. 35% must be private. Since our site is unlikely to sustain 10 units this policy does not apply.

The site is located 450m from the Holly Grove Conservation Area which has its Southern boundary on Choumert Road. The site is not in the "Locations where Tall Buildings are possible".

Shopping, leasure and entertainment

.

The site is located near the Major Town Centre.

Flood zone

Greenery

The site is located 1.3 km South of the River Thames Flood Risk Zone and near the possible District Energy Schemes. No implications for the site's development.

The site is adjacent to the McDermott Road Nature Garden Protected Open Space and 600 m North West from Peckham Rye Park and Common. TPO no 469, status: inividual, species : Lime.


transport Southwark Public Transport Accessibility Levels

Car parks and controlled parking zone

Public transport Peckham Rye Multistorey Car Park Bus stop Peckham Rye

Peckham Rye Multistorey Car Park Choumert Grove Car Park

5 min walk

Copeland Road Car Park

Classified road A

The site is located in the controlled parking zone.

The site is located in 5 min or less walking distance to the nearest public transport. Useful bus central bound routes incl. 78 to Shoreditch (stop on Peckham Rye)

Cycle routes map

Parking map

image source: www.tfl.gov.uk

PTAL 0 1a(Low) 1b 2 3 4 5 6a 6b (High)

RANGE OF INDEX 0.01-2.50 2.51-5.00 5.01-10.00 10.01-15.00 15.01-20.00 20.01-25.00 25.01-30.00 30.01-35.00

MAP COLOUR

DESCRIPTION Little or no access Very poor Very poor Poor Moderate Good Very Good Excellent Excellent

The site has a very good Public Transport Accessibility Level (nr 5). It's located 5 minutes walk from the National Rail Station (Peckham Rye - East London Line, TfL zone 2) and 3-5 minute walk from the nearest bus stops.

The site is located on a junction of two forms of designated parking: Costa St Permit B Mon-Sat 08h30-18h30 and paid parking max stay 4 Hours McDermott Road Permit B Mon-Sat 08h30-18h30 No parking permits will be given to residents of new developments.

The site is located between two major cycle routes. The nearest TfL Santander Cycles docking station is Rodney Road 3.5km away to the North Noith West

relevant policies Listed buildings

Map of 1949-56

Map of 1896

Originally the site was a part of a terrace housing development.

CA42 Rye Lane Peckham Conservation Area CA31 Holly Grove Conservation Area

"SE15 , Dulwich/Camberwell, V1, Peckham, Costa Street, 02/07/1944, 11:50 3 houses were demolished and 30 badly damaged in Costa Street. 4 demolished and 30 badly damaged in Wag horn Street."

No listed buildings on the site.

Peckham Area Action Plan (Plan) and Peckham Core Action Area (Core)

Protected open spaces

Core CA42 CA31 OS115

Plan

No conservation area on the site.

Site located in the Plan and 500m to the West of the Core. Geographical areas identified by the LPA that are expected to undergo significant strategic land use changes in the coming years.

Major city centre and protected shopping frontage

Map of 2014

Site adjacent to the protected open space OS 115- McDermott Grove Nature Garden(0,13 ha) There is a Tree Preservation Order no 469 for the garden of inividual status. Species: Lime. Made: 11/08/14, Confirmed: 11/02/15 Peckham Rye Station Post Office DocklandsCollege Thomas Carlton Adult Education Bellenden Primary School Universal Church Baptist Tabernacle Evangelical Fellowship Faith Chapel Peckham Islamic Centre Child Care Sternall Ln Surgery ASDA Supermarket Restaurants, Cafes, Bars Shopping frontage

Site located 200m to the South West from the 'major city centre'.

Allotment is located in a walking distance to all the basic needs services.


03. 179prs_practice research symposium

year: 2016 location: Barcelona, Spain authors: WHAT_architecture : a. hoete, m. szerla goncalves, m.fabicka, j. espada padilla, e. hernandes, a. lancellotti, ch. kuan-ting, b. atzeri, e.bosque The following practice based research is called the Game of Architecture. Architects play with information as a means to legitimise expression. Two movements to demonstrate: Deconstructivism and Informationalism. Each with its own influence, styles of representation and formal expression: the former a high game referencing French literature and philosophy and formally characterised by fragmentation; the latter a low game more inclusive in its info-graphic language and deployment of social media communications. The model consists of five pieces, each of which represents one of the five rules and five roles in the game of architecture. ROLE:

RULE STYLE SIZE DENSITY HERITAGE USE

1 2 3 4 5

DEVELOPER CONTRACTOR COMMUNICATOR PLANNER AGENT

The rubicon model was a composition of a number of WHAT_projects manifest in the game of housing. it was an ambitious undertaking as the rubicon was made specifically for the prs examination in barcelona. the rubicon was enormous in physical dimensions (measuring a cubic metre) although extremely fragile in weight (it was made from high density styrofoam). the rubicon was built in the office by a team of seven working fulltime for six weeks. this required detailed planning of its fabrication with check points. there was a certain amount of last minute improvisation. innovation begs for greater spontaneous performativity.


04. AllMoney Bank

year: 2012 location: Gdansk, Poland authors: CH+ Architects : w. chrzanowski, a. chrzanowska, m. smolenski, m. fabicka, a. czupkiewicz This projects is a part of a bigger idea of rebranding bank branches in Poland. Former Getin Bank agency located needed to be converted into one of the AllMoney branches. The stands, screens and front desk were designed by the office and needed to be custom made. Desks, sofas, tables and chairs used in that project were designed by polish designers who we were more than happy to support by using their products. The project required a certain amount of market research and working outside the office, which included contacting the manufacturers and checking the fabrics and materials in person.

459,5

160

87,5

56

2 1

1

1

8

180

7 2

Back Officel : 19,3 m2 podłoga : WYKŁADZINA sufit : G-K h=280cm

522,5

9

1

1

7

48,2

5 1,8

1,8

41,4

2

10

10

60

7

83,5

160

65 180

200

A 4

WC:2,9m2 do renowacji wg dotychczasowego

1,8 48,2

POM. TECH .: 1,7m2 do renowacji

SPRZET IT

90

45 10

MEBEL RECEPCYJNY lamnowana płyta MDF gr 40mm, kolor biały płyty łączone na konfirmaty

176,5

SZAFKI zamknięcie typu tip-on

AKSONOMETRIA

2 80

1

OBSŁUGA SIEDZĄCA 2 1

270

2

2 80

FB

3

3

1 120 2

możliwość kontroli wejścia funkcja recepcjonisty

3

3

1

3

1

5

121,5

1

5 1

180

1

180

SALA OPERACYJNA : 37,2m2, 39,4m2 z wnękami podok. podłoga : WYKŁADZINA DYWANOWA sufit G-K, h=300cm klimatyzator sufitowy DAIKIN, 60x60

4

LOGO ALL MONEY litery, symbole przestrzenne , podświetlane

COKÓŁ aluminiowy lub wykończony wykładziną

FB

1

6a

180

36

45 10

widok od strony pracownika

ŚCIANA KORPORACYJNA Z LOGO ALL MONEY, MALOWANA NA KOLOR NIEBIESKI WZDŁUŻ ŚCIANY KORPORACYJNEJ OŚWIETLENIE ŚWIETLÓWKOWE SCHOWANE ZA KOŁNIERZEM GK PRZY SUFICIE [WG DETALU ]

RAL????

4

47 1,8

1,8

90

OBSŁUGA SIEDZĄCA 1

180

WYCIERACZKA 1

WPUSZCZANA

6

185x150 1

1

65

OBSŁUGA SIEDZĄCA 3

2

180

4 36

47

4

4

90

4

ŚCIANA MALOWANA W KOLORZE NIEBIESKIM WG PANTONE 'A WZDŁUŻ ŚCIANY KORPORACYJNEJ OŚWIETLENIE ŚWIETLÓWKOWE SCHOWANE ZA KOŁNIERZEM G-K PRZY SUFICIE [WG DETALU ]

75

kołnierz na suficie G-K wg rys. detalu

200

4

80/200 DRZWI PEŁNE GŁADKIE MALOWANE NA NIEBIESKO KOLOR NCS ...

przekrój A-A

A

kołnierz na suficie G-K wg rys. detalu

10

FB 3

335 3

3

2

1

1

1

5

ŚCIANA Z PLAKATEM - ELEMENTEM MARKETINGOWYM . WZDŁUŻ ŚCIANY KORPORACYJNEJ OŚWIETLENIE ŚWIETLÓWKOWE SCHOWANE ZA KOŁNIERZEM GK PRZY SUFICIE [WG DETALU ]

40 60

kołnierz na suficie G-K wg rys. detalu

widok z przodu

10

50

10

150

180 200

widok z boku

1,8 36,4 1,8

4 10

10

100 180

10 4 40 60

10

10

układu

1

150

36

5

1

155

54

54

80 72 10

80 72

80 10

36

10

50

4

4

170

75

192

4

60

65

widok z góry 60


05. the old sheep shed

year: 2013 location: machnice, PL authors: m.fabicka, t.bojec, p.chimczak,k.madrecki,m.fret spa unit and holiday houses

spa

Space between the buildings naturally created a big courtyard. This area was transformed to sport and lesure complex. The flat terrain was reshaped to an undulating and attractive space with small hills and enclaves. Additional cubatures weren’t designed, because of the desire to design a natural landscape with sport coutrs immersed in greenery. Outdoor facilities included tennis, volleyball and basketball courts, playground, places for campfire and a summer scene (podium).

In case of the sheep sheds, the most valuable thing to keep was the wooden construction. Rest of the elements were ineligible to reuse, so the whole idea was to fit new building into the construction frames. Modules of the same shape but various lenght were designed to divide one long shed to a couple smaller buildings. Shed remained in an old shape because of the wooden beams between the modules. They main task was to mark the entrance and give shade in the summer. They could be also used as a frame for the greenery. The proposal consist 5 different ideas for the summer houses for different groups of people, hotel unit with single, double and twin orom sand spa unit fitted with saunas, jacuzzis, massage rooms and a space for joga and exercise.

section A-A

ground floor

section B-B

first floor

B

A

Machnice village concept was made for a private investor, who wanted to adapt old farm buildings for tourist purposes. The complex constisted of three buildings: one stone storehouse and two long sheep sheds. Functions proposed for the buildings included hotel and restaurant, holiday houses, hostel and spa unit.


type I

5 4 3 1

14 x 19 = 2,700 m

7 6

type II

8 9 10 11 13

14 x 19 = 2,700 m

7 6

8

5

9

4

10

3

11

2

12

1

13

type III

type IV

type V


06. extremes of sound year: 2015 location: wroclaw, PL author: m. fabicka

„Extremes of sound” project concerns the sound issues in architecture and urbanism. Its purpose is to draw attention to the important role of sound in perception of space. The subject of architectural study is a complex of eight pavilions with dimensions of 10 m x 10 m x 8 m, each of which relates to one sound phenomena. Pavilions are placed on the existing rail tracks and can change their position thanks to a driving mechanism. They can form a variety of urban compositions with specific acoustic properties. Architectural project provides service functions, public service, and cultural functions. Pavilions have the following features: 1 - anechoic chamber, 2 - cafe, 3 - restaurant, 4 - bar,

5 - club, 6 - sound museum, 7 - summer music scene, 8 - cognitive pavilion.

Project is located in Wroclaw City Harbour – an attractive area in the city center, which is in a poor condition and needs revitalization.

acoustic barrier

closed barrier

alternate system The project contains a proposal of urban scale harbour cultivation and architectural study of its part, which includes the southern spit. In its center, there is a wide pedestrian route leading to the pavilions. Equipment necessary to the needs of open public space is located in the central part of the route, on its longitudinal axis. In addition, the waterfront is developed for recreation purposes.

poszycie z płyt g-k 1,25cm wełna min./ ruszt wsporczy 3 cm folia paroizolacyjna termoizolacja z wełny mineralnej/ konstrukcja z dwuteowników 26 cm poszycie ze sklejki 1 cm wiatroizolacja ruszt stalowy 3cm elewacja ze stali cor- ten 5 mm

beton cementowy 15cm podbudowa zasadnicza z kruszywa 25 cm piasek

czop sk

klapa podłogowa 45x45 cm przyłącze elektryczne (wtyczka wodoszczelna wyciągana ze zwijacza) klapa dolna 40x40 cm wyjmowana puszka elektryczna obudowa betonowa


krętu

posadzka 1 cm szlichta betonowa 6 cm/ kable grzejne na siatce montażowej izolacja z twardej wełny szklanej 2cm płyta wiórowa 1,5 cm termoizolacja z wełny mineralnej/ konstrukcja z dwuteowników 26 cm poszycie z płyt g-k 1,25 cm hydroizolacja blacha 1,4 mm

zawór

przyłącze wodne przyłącze kanalizacyjne ostoja

rura elastyczna O 3 cm z ociepleniem rura elastyczna O 10 cm

belka bujakowa sprężyna stalowo-gumowa oś rama wózka- podłużnica koło O 60 cm

szyna kolejowa sprężysta otulina szyny- masa zalewowa powierzchnia zagruntowana / kształtownik stalowy rura z PCV kotwa stalowa

rura O 3 cm rura kanalizacyjna O 10 cm wypełnienie z kamieni skrzynka stalowa 45x45x55 cm

detail of the driving mechanism

land development


absolute silence

1

2

17

110

43

45

A

140

17 40

music in various environments

570

325

klapa w podłodze toaleta dla niepełnosprawnych 5,5 m2

354

237

240

skrzynka z przyłączem wodnokanalizacyjnym

120

143

250

lodów 18 x 17,5 27

cloud of sounds

kasa 1

145

1 008 200 860

strefa wejściowa 41,0 m2

kasa 2

125

130

355

143

141

podnośnik hydrauliczny w konstrukcji samonośnej

puszka elektryczna

170

240

A

240

reverbation

285 540

klapa w podłodze

B

17 40

24

43

182

sound column

8% 253

17

325

140 570

110

350

600

112

236

string forrest

160

134

28

resonance

eavesdropping

17 1

344

571

244

798

2


3

3000

1920

4

475

2 430

17

120 18 x 17,5 27

353

bar 152,2 m2

magazyn 11,5 m2

wka

blat roboczy

lodówka

blat roboczy

kostkarka

lodówka

kasa 3

8

pojemnik na lód

1 205

zmywarka

lodówka

suszarka na naczynia

magazyn 7,5 m2

110

8

329

34 8

30

239

lodówka

umywalka 2,5 m2

225

wiatrołap 9,5 m2

A

toaleta dla pracowników 2,5 m2

210

płyty odbijające dźwięk

8

114

8

106

110

180

stelaż stalowy

2 026

30

1920

87 180

1 326

317 475

264

17

pavillion no. 4 ground flor plan

3 003

320 1 920

802

244

3

478

251

17 4

pavillion no. 4 section A-A


07. hotel without windows

24.taras 120 m2

N

stojaki na rowery

1.administracja

8m

The most important and basic function of a hotel is a possibilty of an overnight stay. Therefore a hotel room is is a fundamental unit of a hotel in some way. Even though it is an equivallent of a home for short stay, still it can follow slightly different rules of design. The main idea of the project is to create various types of rooms with an unusual type of lighting, dimensions and arrangement. The area is not very attractive, so the interior has to be an attraction itself and provide unique experiences for the guests.

z

year: 2014 location: wroclaw, PL author: m. fabicka

17.kawiarnia/bar

There are six types of rooms. The light gets inside through the ceiling, balcony or floor. Rooms are long and narrow or square and regular, one or two storrey, with or without balcony and so on. They form a square rim, and the space inside is left empty to create an atrium.

ochrona

23.klatka ewak. II

16.magazyn

hotspot 19.recepcja

15a. 15.pom.soc.

18.wspólna przestrzeń 1a.

14.wiatrołap/droga ewakuacyjna 20.hall/lobby/komunikacja

40 m 24 m

obsługa

Y

13.restauracja

12.bufet

Y

2.sala konf. I

21.windy

3.sala konf. II

9a.zmyw.

22.klatka ewakuacyjna II 6.toalety ogólnodostępne

10.magazyn

5.sala konf. IV

6c.

8m

9.kuchnia

6a. 8a.

4.sala konf. III

11.lodówka 6b.

8.pom. socjalne 7.wiatrołap stojaki na rowery

z

zjazd do parkingu

8m

20 m 36 m

8m

level 0

Project is located in Wroclaw, quite far from the city centre but relatively close to the airport. This area is dominated by blocks of flats from the late XX century, which don’t represent any aesthetic value. Hotel is an element of 16 buildings, which have the same diamensions and they are supposed to create frontage. On the south side of the building there is a block of flats and on the north a busy street with tram tracks. 14 meteres on the west and east side there are the neighbouring elements (buildings) of the frontage.

25.00

19.00

16.00

13.00

10.00

7.00

4.00

Main access for guest is located in the northern part. Southern part is meant to be for vehicles, workers and service.

0.00 -2.50 -5.00

section Y-Y

25.00

19.00

16.00

13.00

10.00

7.00

4.00

Rooms are composed from the first to the last level. It depens on the basic level how others will look like. Arrangment of the room modules has an influence on the look of the facades. That’s why they are strictly causal and therefore unpredictable but also honest.

0.00 UL.LOTNICZA

-2.50 -5.00

section Z-Z


Z

Z

Z Y

Y

Y

Y

Z

Z

Z

level +1

Y

Y

level +2

level +3 Z

Z

Z Y

Y

level +5

Y

Y

Z

Z

Z

level +4

Y

Y

level +6



[ special thanks to: ] roman rutkowski, tomasz bojec, przemek chimczak, mateusz fret, karol madrecki, przemek ptaszynski, anthony hoete and many others who worked with me and taught me a lot


contact [ milena fabicka ] address: 113 Commercial St, E1 6BE London mobile: 07478528769 email: milenafabicka@gmail.com skype: milena.fabicka website: www.behance.net/milenafabicka linked in: uk.linkedin.com/in/milenafabicka instagram: milena_fabicka


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.