1.0_Tensile Folly

Page 1

1.0 Tensile Folly

14/09/15 - 02/10/15 1.1 Brief

In collaboration with Nick Westby of Westby and Jones and Mike Hutchison of Momentum Engineering, you will be lead participants in the construction of a full scale pavilion on the lawn at the heart of UCA’s Canterbury campus. As part of an extended workshop you will competitively prepare design proposals for the assembly of a series of geometric building blocks into a novel structure. These will be reviewed and critiqued and a final proposal selected.

1.2 Requirements

We will begin to prepare primary pavilion pieces on Monday 14th September, and continue during the following two weeks. You will form six small teams and with the assistance of UCA technicians will complete a mass fabrication of 240 basic structural elements. Subsequently you will work with other members of the architecture department and the wider university to construct one selected proposal for a modular combination of the elements into an overall form by the workshop finale. Be prepared for messy intensive working practices, including extended gloss painting. Dress appropriately; no ball gowns or similar precious outfits!!

1.3 Outcomes

Preparation of the modular parts will provide you with an immediate introduction to CSA’s making culture and act as a context for your ongoing advanced inductions into the facilities available to you in the year ahead. [continued...] UCA Canterbury School of Architecture // MA Architecture // MA Interior Design // 2015-16


1.4 Assessment

Completion of the Folly project will contribute 50% of the grade for the MA Interior Design ‘Studio Practice, Theory and Analysis’ unit (CIND 7008) and the MA Architecture ‘Context and Method’ unit (CARC 7001). Both units are valued at 30 credits. Students will be continually assessed and monitored throughout with respect to: - individual attendance, - individual effort and contribution - team and group collaboration - design ambitions - presentation ability Feedback will be verbal only for this project.

DESIGN & BUILD PERIOD

PREPARATION PERIOD

1.6 Key Events

The project will run from the outset of induction week until the completion and opening date of 02/10/2015 as per the schedule provided below. PREPARATION PERIOD

1.5 Duration

1.7 Staff/Guests

Monday 14/09

Tuesday 15/09

Wednesday 16/09

Thursday 17/09

Friday 18/09

13.00-18.00

10.00-17.00

10.00-17.00

10.00-17.00

10.00-17.00

WHERE

MA STUDIO

MA STUDIO

MA STUDIO

CAMPUS

MA STUDIO

WHAT

WORKSHOP INDUCTION + MODULE FABRICATION

MODULE FABRICATION

FAB LAB INDUCTION + MODULE FABRICATION

ENROLMENT & WELCOME EVENTS

MODULE FABRICATION

WHO

SIMON NIMMO SAM MCELHINNEY

SAM MCELHINNEY BEN WESTACOTT

CHRIS SETTLE SAM MCELHINNEY

REGISTRY/OTHER STAFF

SAM MCELHINNEY BEN WESTACOTT

WHEN

Monday 21/09

Tuesday 22/09

Wednesday 23/09

Thursday 24/09

Friday 25/09

WHEN

13.00-18.00

10.00-17.00

10.00-17.00

10.00-17.00

10.00-17.00

WHERE

MA STUDIO

MA STUDIO

MA STUDIO

CAMPUS

MA STUDIO

WHAT

MEET THE IAD STAGE THREE + MODULE FABRICATION

MODULE FABRICATION

MODULE FABRICATION

LONDON FIELD TRIP

MODULE FABRICATION

WHO

SIMON NIMMO SAM MCELHINNEY

SAM MCELHINNEY BEN WESTACOTT

CHRIS SETTLE SAM MCELHINNEY

REGISTRY/OTHER STAFF

SAM MCELHINNEY BEN WESTACOTT

WHEN

Monday 28/09

Tuesday 29/09

Wednesday 30/10

Thursday 01/10 Friday 02/10

Friday 02/10

10.00-17.00

10.00-17.00

15.00-18.00

10.00-17.00

15.00-18.00

WHERE

IAD STUDIO G14A 1st FLOOR G BLOCK

FOYER G-FLOOR G BLOCK

FOYER G-FLOOR G BLOCK

LAWN

FOYER G-FLOOR G BLOCK

DESIGN CHARETTE

INITIAL TESTING OF ASSEMBLY

INTERIM REVIEW

FINAL BUILD

FINAL REVIEW

DAVID DI DUCA NICK WESTBY SAM MCELHINNEY

DAVID DI DUCA MIKE HUTCHISON NICK WESTBY

GUESTS TBC

SAM MCELHINNEY DAVID DI DUCA NICK WESTBY

GUESTS TBC

WHAT

WHO

The project will be run by Sam McElhinney (MA Course Leader) and assisted by David Di Duca, visiting design tutor. Technical support will be provided by Chris Settle and Ben Westacott when required. During the course of the workshop we will be joined by: Nick Westby (Westby and Jones) Mike Hutchison (Momentum Engineering) Allan Atlee (Head of School) JJ Brophy (TrakLab Coordinator) Other guests to be confirmed... [ends] UCA Canterbury School of Architecture // MA Architecture // MA Interior Design // 2015-16