UCA Architecture 2015

Page 1

BA (HONS) ARCHITECTURE 2015 sophia gravina, arch 3


41

50

40

49

39

EN

D

48

38

47

37

46 45 44

34

43

33

RE S

42

T

32

36

31

35

30

29 23

28

22

27

21

26

20

25

19

24

15 KM

2014/15. Final year students started the year creating fifty provocative projects for fifty sites distributed between Canary Wharf and The First Phase of Social Housing in the Olympic Park in STATE-LESS. We visited Home on High, by Lucy Harrison, at the Balfron Tower and pondered all things social-housingneglect related. Meanwhile Stage 2 students created 3 follies for 3 autonomous landscapes before engaging The Venice Biennale, and the sparkling lagoons of Folkestone and Dover. Stage 1 ventured into Canterburys infra-ordinary with their curious devices and experimented with collage at the Cathedral. In the Spring Stage 1 re-thought Paris and embraced Margate, whilst Stage 2 stocked Walter’s Warehouse. Final year students returned to Hamburg where a vast new flood wall has partitioned the city from the river and the population has voted to re-nationalise their power providers. Protesters severed links to a new coal fired power station. And it snowed.

students with site numbers 01-12 BALFRON @ 12.30

09.23

Tim group O’Callaghan - Nimtim 3 site numbers 24-36 LLP Tim students Ratliff with - Ratliff/Landells BALFRON @ 13.30 group 4 Studio Critics: students with site numbers 37-47 BALFRON Helen Leask @- 13.30 Leask Architecture

15

UP

14 13 12 11 10

05

09

04

08

03 02 01

10.14

Melanie Martin - ORMS Excursion + OLIVER Michelle Barlow - Useful Studio Nimi Attanayake - Nimtim Meet back up on Green to Ralph Heckmann North of Tower- Heckmann Design 14.20 Sam Potter - at: MAKE Stage 2 Convened by Kristina Kotov Design Studio: Jonathan Harvey – Holland Harvey Rhys Jones – Jestico + Whiles Kristina Kotov UCA

mapping the water: Design Studio: fish, fishing locations, Arrive- Stratford International. Alex Smith Hawkins Brown UFO’s (unidentified floating objects), Lucy Walk Jonesto - UCA Stratford Station through Westfield, nest sites, shopping, catch the Jubilee Line to Canary OlivernoFroome-Lewis - UCA water edge vegetation, Wharf. 4 stops. waterborne pollution, water movement, reflection, Studio Engineers & Technical Studies: depth + perceived depth, Hocine Bougdah - UCA canal dwelling - mobile / static. Meet outside Canary Wharf Tube.

MEET 10.45

Peter Lucy J Corbett - Corbett & Tasker mapping social groups: and I will be there... bugs & beetles, RaduBut..... Gidei - Lee we Evans won’t Partnership wait for the dog walkers, bench occupants, Tetsuro Nagata - Nissen Richards

next train!

runners, Welcome + Discussion of brief generally cyclists, and quickly. bird watchers, Studio Critics: fishermen, for sites - see map. chuggers, Allan Lottery Atlee - UCA flyerers, Andrew Barkley Brown - see list to the film makers, Lottery for- Hawkins mapping topics fashion shooters, Ed Crooks - Asif Kahn novelists, left. photographers, Hayley Grace - Brooks Murray journalists, Kristina Kotov - UCA artists.

WALK

Icke - Hawkins Brown mapping infrastructure usageMeg / Monday is forecast to be : abuse: Patrick Ueberbacher - Fabrica Architecture Studio Engineers & Technical Studies: ‘Warm and Cloudy’ - OK weather for pathway surfaces, walking, a smile. Penélope Plaza bring - Collectivox Diarmuid Healy - Curtins Consulting Engineers UK graffiti, benches, Rob Nice - UCA Hocine Bougdah - UCA You need - comfortable walking footwear / street lighting, signage, / trainers / boots - IT IS QUITE A Ruth shoes Lang - UCA + London MET John Caine- Curtins Engineers UK waste bins, WAY! Not too much luggage. Timothy Carlyle - Architect Martin Lefteri Cawson barriers, symbols / marks painted on Tom Parker Simon Bye- Ellis & Moore Consulting Engineers Cameras- ScanLAB - very important. Phones good but things. cameras much better for wide views and

Landscape Architecture & Ecology:

Eleanor Trenfield DEVICE USE -Barton Wilmore

Judith Loesing - EAST Julian Bore - Lloyd Bore Landscape

07

ME

ET

06

12.30

Studio Critics: Aaron Bright MArch Abdulbari Kutbi MA Arch UPLLP 15.00 Alexander Richards - Clague Allan Atlee UCA Edward Oliver Anthony Grey MArch mapping refuse: bottles, JJ Brophy UCA Bruce Buckland MArch cans, 17.00 sizable – matrasses, Daniel Stilwell - Lee Evans Partnership shopping trolleys, FABlab & modelmaking: Catherine Griffiths MArch dead bikes and bike parts. WHITE BUILDING (cafe) + Hackney Wick ChrisThe Settle Emilio Katsouftides MArch mapping surfaces: Overground. road surfaces and markings, Gabor Stark UCA fences, Technical support: James Young MArch edges (including kerbs, bollards and fittings), Ben Westicott Julian Seagers - Clague LLP redundant devices. One Stop Back to Stratford Stn. Katherine Leat - Fabrica Architecture Oliver 07779 227320 mapping consumables: Lucy 07980 021527 Oliver Froome-Lewis UCA cigarette butts, paying visitors, BUT! Pierluigi Chinellato – Fabrica Architecture picnics, We can’t spend the day on the phone creating word cake. Samantha Brewer - Pascall & Watson Architects guided tours. Stay with us. Don’t get lost!!!!!!!!! Waiting ‘a minute or two’ all day here and there would Yvonne Jackson MArch mapping advertising: mean that we wouldn’t make it to our destination.

,,WALK, REST END

flyers and posters, tags.

Herbert Read Gallery Emma Brasso - curator

LONG good

mapping thresholds: detail. And across years: shared housing entrances, transport (bus stops, stations, We will need to walk QUICKLY. Get a good sleep water bus stops), on the Sunday night, yes, seriously! And EAT. galleries, Creative Practice: shops cafes, Sam McElhinney arch & ecology work places, bridges - under and over, grass vs pavement. . Cultural Context: mapping vegetation: Visit to Home on High, By Lucy Harrison @ the grass, Allan Balfron Atlee UCA Tower. window boxes, self seeded flowers and weeds, guerilla gardening, Design & Communications: LUNCH - 20 minutes - Picnic from TESCO!!![yum] allotments, temporary vegetation. Chris Settle UCA

Up!

17 16

22 SEpTEMbER 2014

mapping the air: bird migration, mobile signals and masts, Photographic Theories & Practice: Design Studio: group 2 long views, with site numbers 13-23 Daniel Hewitt - Photographer Johnstudents Brown Charabanc local radio, BALFRON @ 12.30 aromas, MarkTrain Kitchener UCA John Edwards - AOC/Self Employed from -Canterbury West to Stratford wifi, International. cloud conditions, Ruth Cuenca - Estudio SPN sun path shadow lines, Stay close to Tower + LUCY StageThis 3 is the first off-peak train of the day. Marina Mitchell-Heggs - Jestico + Whiles airborne pollution, Thereby are no changes. Convened Oliver Froome-Lewis Tamsin Landells - Ratliff/Landells LLP sheltered locations for sleeping rough. £22.20 off-peak day return with a rail card.

distribution of the funds

18

MONDAY

Casting Workshops: Simeon Oliver - UCA

Stage 1 group 1 by Rob Nice Convened

mapping signage: road names, informal, redundant.

WALK

We are going to keep moving!!! It is not the arctic... You will never be very, very, very far from civilisa-... Call only if it is an emergency!

ben ravensdale, stateless, arch 3


SECTION AA 1:5 detail

26.

24.

25.

32.

4.

1. 31.

2. 22.

3. 5.

33.

34.

6.

30.

7. 21.

27. 28.

15.

20.

19.

14.

16.

17. 13.

18.

23.

9. 8. Outer skin / Walling

Interior

1.

20. 21. 22. 23. 24.

2. 3. 4.

5. 6. 7.

cold rolled 4mm steel panel air gap 16mm cold rolled 4mm steel panel stainless steel 8mm rivet steel spacing bar steel bracing circular [100 x 20mm] ETFE 2mm opaque panel argon filled pocket, [4-6 mbar pressurized] ETFE 2mm opaque panel air gap aluminium coping frame LED light strip electrical cabling +/-

Reactor system 8. 9. 10. 11. 12.

minature nuclear reactor, uranium-233 fuel core & cadmium control rods concrete rebarred sheilding 20mm, lead sheet sheilding 3mm, concrete rebarred sheilding 30mm. cold water re-intake pipe steam outtake pipe canal water intake pipe

Outboard turbine systems 13. 14. 15. 16. 17. 18. 19.

steam intake pipe high carbon turbine housing 3-phi sine wave copper coil electromagnet cold water condenser AC power output cable cold water output pipe stainless steel drive shaft

25.

26. 27. 28. 29. 30. 31.

10. AC power cables in electrical cut off throw switch step down transformer box to 240v steel framed refridgerated unit locking wheel 300mm dia. steel hex plate 8mm steel locking rods 16mm dia. locking wheel 300mm dia. aluminium coping hinged frame EPDM sealing profile PE intermediate layer steel RHS cantilever [80 x 50mm] toughened glass 10mm air cavity 18mm 10mm laminated safety glass aluminium window framing arduino uno electronics board 1a 20volt macbook pro 15” soldering iron imac 21”

Other 32.

wifi emitting satellite dish 11”

Ducks 33. 34.

Maximus Scha-nae-nae

ben ravensdale, stateless, arch 3

writing on the wall

12.

11.

29.


elliott harris, stateless, arch 3

alexander liew, stateless, arch 3


alexander liew, stateless, arch 3

biennale di venezia, arch 2 + iad 2


THE NEW CLIFF ETCHING OF TU OF THE CLIFFS

nathan back chamness, dover, folkstone, arch 2

LIQUIFYING AND RECASTING PROCESS OF GRAFTING AND RE FORMING

richard ford, development sketches, arch 2

CLIFF AS IS PRIOR TO LANDSLIDE

CLIFF CUT BACK TO GAIN MATERIAL AND CLEAN WOUND TO REPAIR TOO

FRAME WORK BUILT IN WITH WALKING PATHS PLACED FIRST

OUTSIDE CLAD IN CHALK PANEL EXCIVATED CHALK


Washitsu

kale bailey, stateless, arch 3

West Elevation A.

West Elevation B.

A.

B.

Washitsu

1:200


read all about it media coverage

BORIS INVESTS IN LOG HOMES 10/12/2014

Lorem ipsum

In libris graecis appetere mea. At vim odio lorem omnes, pri id iuvaret partiendo. Vivendo menandri et sed. Lorem volumus blandit cu has.Sit cu alia porro fuisset.

In libris graecis appetere mea. At vim odio lorem omnes, pri id iuvaret partiendo. Vivendo menandri et sed. Lorem volumus blandit cu has.Sit cu alia porro fuisset.

Ea pro natum invidunt repudiandae, his et facilisis vituperatoribus. Mei eu ubique altera senserit, consul eripuit Ea pro natum invidunt accusata has ne. Ignota repudiandae, his et facilisis vituperatoribus. Mei eu ubique verterem te nam, eu cibo causae menandri vim. Sit rebum erant altera senserit, consul eripuit dolorem et, sed odio error accusata has ne. Ignota verterem te nam, eu cibo causae ad.Vel molestie corrumpit menandri vim. Sit rebum erant deterruisset ad, mollis ceteros ad sea. dolorem et, sed odio error ad, mollis ceteros ad sea.

JOHNSON RANCH NOW OPEN!

BORIS’ ARK. SURVIVE THE END.

Ranch opens ahead of climate summit in London.

Johnson Ranch set to outlast the apocolypse after London demolished.

03/07/2017

In libris graecis appetere mea. At vim odio lorem omnes, pri id iuvaret partiendo. Vivendo menandri et sed. Lorem volumus blandit cu has.Sit cu alia porro fuisset. Ea pro natum invidunt repudiandae.

In libris graecis appetere mea. At vim odio lorem omnes, pri id iuvaret partiendo. Vivendo menandri et sed. Lorem volumus blandit cu has.Sit cu alia porro fuisset. Ea pro natum invidunt repudiandae, his et facilisis vituperatoribus. Mei eu ubique altera senserit, consul eripuit accusata has ne. Ignota verterem te nam, eu cibo causae menandri vim. Sit rebum erant dolorem et, sed odio error ad.Vel molestie corrumpit deterruisset ad, mollis ceteros ad sea.

13/02/2045

In libris graecis appetere mea. At vim odio lorem omnes, pri id iuvaret partiendo. Vivendo menandri et sed. Lorem volumus blandit cu has.Sit cu alia porro fuisset.

In libris graecis appetere mea. At vim odio lorem omnes, pri id iuvaret partiendo. Vivendo menandri et sed. Lorem volumus blandit cu has.Sit cu alia porro fuisset. Ea pro natum invidunt repudiandae, his et facilisis vituperatoribus. Mei eu ubique altera senserit, consul eripuit accusata has ne. Ignota verterem te nam, eu cibo causae menandri vim. Sit rebum erant dolorem et, sed odio error ad.Vel molestie corrumpit deterruisset ad, mollis ceteros ad sea.

Newspaper articles from the timeline of the Ranch, from proposal to completion


1:20 transversal section looking east

19.

47.

46.

45.

44.

52.

20.

41.

50.

42.

43.

51.

21.

15.

ben ravensdale, stateless, arch 3

22.

40.

39.

37.

36.

38.

53.

48.

16.

8. 16.


Design Development Structural Terrarium Initial Design Sketches Initial Development Sketches

6.

C

oncpet

1. Structual model developing structure and showing the legacy 2. Statistics on Dover showing rates on litracy education and immigration 3. Long section showing concept 4. Diagrams of concept explaining theory 5. Timeline of project 6. Examples of books for the archive

C

A Site Section A// 1:100

A

PATIENT WALKWAY

PUBLIC WALKWAY

DENIAL/PROBLEM STAGES HANDOVER/COLLECTION STAGES

F

DIAGNOSIS/HELP STAGES DRYING/CONTAMINATION

4

THERAPY CLEANING/CAMERA

C RECOVERY

1.2

MATERIALS/FURNACE

1.4

0

ENTRANCE AND QUESTION SPACE

1.1

DRINKING SPACES//CHAT

1.2

DRINKING SPACES//QUIET

1.3

DRINKING SPACES//DANCE DEPRESSIVE SPACE

3

0

DRINKING SPACES//AGGRESSIVE

1.4 2

2

CONTEMPLATIVE SPACE

4

MEETINGS SPACE

5.1

COUNSELLING

5.2

EXIT

A

ENTRANCE AND HANDOVER SPACE COLLECTION SPACE CLEANING SPACE

D

SECOND FLOOR PLAN//SECTION C// 1:100

Section AA Scale 1:100

A. Track:

F. Production: 1. Guard Rail 2. Mechanical Heating 3. Velodrome Track Surface 4. Wooden Support 5. Velodrome Seating 6. Velodrome Glazing

B. Public Archive: 1. Roof Viewing Gallery and Seating 2. Exhibition Bike 3. Archived Race Skin-suit 4. Archived Track Wheel 5. Coffee Bar

1. Electronic Shutter 2. Mechanical Ventilation 3. Fume Extractor 4. Dispatch Transport

1. Scales and Fitting Equipment 2. SRM Machine 3. Data Collection Software

1.2

1. Meeting Table 2. Race Analysis Projector Screen

E. Pre Event Archive:

J. Testing:

4

F

5.1

5.2

MATERIALS SPACE

H

FURNACE

I

EXIT

A

SECRET SQUIRREL CLUB 1:50 Long Section

1. Paint Gun

1. Mesh Grilled Floor 2. Atmospheric Fume Pump 3. Fume Purification Pump M. Inhabitation: 1. Public or Private Atrium Space 2. Public Walkthrough 3. Dover Ferry Traffic 4. Public Cyclist N. Foundations and Detail: 1. Pile Foundations 2. Industrial I Beam 3. Concrete/Tin Floor 4. Suspended Floor 5. Air Circulation Vents 6. Insulation 7. Triple GLazing 8. Stud wall 9. Wall Clips

1. Tensile Fabric Structure 2. Steel Beam Structure Support 3. Tension Structure Connection 4. Horizontal Steel Beam Supports 1. Jig Trolley 2. Fork Strain Test Machine 3. Wind Tunnel 4. Wheel Strain and Rim Test Machine

G

G 1.3

I

L. Cycle Routes:

H. Squirrel Room:

I. Roof:

D. Post Event Archive: 1. Chainset and Parts storage 2. Inspection Rack 3. Post Event Equipment Storage

K. Paint Room:

1. Carbon Delivery Truck 2. Rolling Jack Trolley 3. Carbon Rolls 4. Jig Oven 5. Spiral Staircase 6. Production Overview Balcony G. Fitting and Design:

C. Dispatch:

CONTAMINATION SPACE CAMERA SPACE

3

D

C

H B

DRYING SPACE

E F

E

1.1

1.4 B C

O. Intelligent Skin: 1. Carbon Louvre 2. Electronic Facade Motor 3. Louvre Electronic Wire 4. Louvre Runner Exit

1. Service Stand 2. Frame Rack 3. Pre Event Equipment 4. Hydraulic Lift

I.2 I.1

M.4 I.4

I.3

L.3

B.1

N.9

L.1 L.2

B.2

N.8 A.6

A.1

N.7

D.2

D.1

B.3

D.3 J.3

B.4 A.5 J.2

B.5

A.4

J.4

J.1

M.1

N.5 A.2

A.3 N.6 H.2 O.1

C.2 E.3 C.1

E.4 E.1

C.3

G.3

F.1 F.6

E.2

H.1

G.1 G.2

N.4

N.3 O.3

F.5 F.4

O.2

K.1 M.3

F.3

C.4

F.2

O.4

M.2

N.2

N.1

The Ghost Orchid Archive Garden Structural Terrarium Orchid Analysis The Ghost Orchid

“The Ghost Orchid: Britain’s rarest plant”

Ghost Orchids are among the rarest plants in Britain. They have been found in about 11 sites in the Chilterns and West Midlands in England, but such is their rarity and the secrecy surrounding them that it is difficult to be sure exactly how many sites there are.

Regarded as extinct

Ghost Orchids were first discovered in Britain in 1854 but were only seen 11 times before the 1950s. They were seen regularly in a few Chilterns sites between 1953 and 1987 but then disappeared and were regarded as extinct until one plant was discovered in 2009. In most sites they have only been seen once, and rarely for more than ten years in any one site.

ARCHIVAL WEBS/ PERSPECTIVE// VIEWS

Ghost Orchids get their name from their creamy-white to pinkish-brown colour and their fleeting occurrences in dark, shaded woods. The colour results from the absence of chlorophyll, as they are parasites of fungi associated with tree roots, and they do not need to photosynthesise their own food. They spend most of their lives as rhizomes (underground shoots) in the soil or leaf litter of woodlands, and flowering shoots only occasionally appear above ground. Even then, their small size (usually less than 15cm, rarely up to 23cm) and unpredictable appearance between June and October means that Ghost Orchids are rarely seen.

ARCHIVAL WEBS/ MODEL PHOTOGRAPHY

alanoud radaideh martha hopkins dilan aktas tyler lemmon emily martin morgan hone

External Perspective - Courtyard

james white sam leak emily martin emily martin alanoud radaideh fay fahti arch 2


dust and chlorophyll


michael waters, dust & chlorophyll, arch 3



THE JOURNEY OF A COFFEE BEAN

46

44

Step 1 Arrival

36

Step 2 Tucked Away

Step 3 The Roast

42 4

The green coffee first arrives into Hamburg at the Port of Hamburg. It then is transported by boat to the delivery dock. The green coffee is stored in burlap sacks that are stacked on top of eachother.

After temporaray time in the storage house, the green coffee is lifted by the pulley system into the “Glass box� which is where the coffee roastery is located. The coffee roastery is the heart of the building and is the basis for the architecture and th processes which happen within the building.

The green coffee is lifted from the boat with a pulley system leading to the green coffee storage house. The green coffee is stacked on top of one another on pallets. The warehouse is dark with little to no liught to ensure the green coffee flavour is preserved.

12

45

11 43

14 15 16 17

18

47

24 25 26

32

33

34 29

41

30 31

40

9

48

2

6, 7

3

5

49

8

50

5

51

39

38

22

35

21

37

20 1

19

lela sujani, dust & chlorophyll, arch 3


HAFENROSTEREI | HAMBURG LONGITUDINAL SECTION AA SCALE 1:50 PRIMARY STRUCTURE 1 load bearing concrete pillars 2 universal beams HEA 3 HEA 400 continuous beam 4 concrete belt truss

A

500 mm 305 x 165 mm 50 mm

SECONDARY STRUCTURE WALL CONSTRUCTION 5 Burnt pine cladding boards 6 Vertical battens (ventilated cavity) 7 Bitumen –impregnated softboard 8 Timber studding, insulation 9 dpm 10 interior larch cladding boards

25 mm 40 mm 18 mm 150 mm 25

11 sunlouvres 12 glazing FLOOR CONSTRUCTION 13 pine floor boards 14 heat emission plate 15 marine plywood 16 damp proof membrane 17 Steel beam 18 Single layer or larch plasterboard

Step 3 The Roast

After temporaray time in the storage house, the green coffee is lifted by the pulley system into the “Glass box” which is where the coffee roastery is located. The coffee roastery is the heart of the building and is the basis for the architecture and the processes which happen within the building.

Step 4 Altenative Routes

Step 5 Coffee Bar

Once the coffee has been roasted it is distributed to different parts of the building to be used for different processes. The roasted coffee bean is either taken to be grinded to be taken to the espresso bar or the various coffee pavillions or it is taken for oil to be extracted from it to create organic coffee cosmetics. The ocffee is transported throughout the building in trolleys that move along the private section of the building.

The grinded ocffee is taken to the espresso bar to be served to the people of Hamburg. The long coffee bar is intended to encourage interaction and communal gathering between the people of HafenCity and old Hamburg. The walls of the coffee bar can open up to encourage interaction with the outdoor pavillions.

19 concrete slab floor 20 insultation 21 dpm 22 pine floor boards

Step 6 Compost Drop Off The various coffee processes leave over compost which is carried down to the end of the building. The coffee compost is piled up, a bucket elevator piles the compost onto a heap of ground coffee compost.

27mm 305 x165 mm 5mm 40mm

A

300 mm 80 mm 25 mm

ROOF CONSTRUCTION 23 burnt pine cladding board 24 hardwood vertical strapping 25 breather membrane 26 wall and ceiling insulation 27 marine plywood 28 timber stud 29 preformed silver aluminum 30 box gutter 31 steel beam

SPATIAL PROGRAM

25 x 100 mm 25 x 50 mm 5 mm 50 x 150 mm

40 green coffee storage 41 burlap sacks of green coffee wooden pallets 42 Coffee Roastery 43 industrial coffee roaster 44 industrial coffee grinder 45 industrial oil extractor 46 employee coffee break station

SKYLIGHT CONSTRUCTION 32 glazing unit 33 toughened glass outerlayer 34 MDF covered in burnt timber veneer

51 Interior gardens 52 burnt larch timber table and chairs 53 Coffee bar

37 delivery Dock 38 bucket elevator 39 pulley system

30 mm 8 mm 19mm

47 cosmetics factory 48 industrial mixer

ACCESS

49 Salon 50 organic coffee cosmetics

35 staircase 36 elevator shaft

52

57

56

55 53

54

54 Coffee compost pavillion 55 bucket elevator 56 scooping counter 57 packages of coffee compost


yvonne onah, dust & chlorophyll, arch 3


jamie wilkes, dust & chlorophyll, arch 3


04

13

10 07

01

07

03

02

09

10

11

06

12

08

05

Places: 01 Nets collecting plastic and River 02 Tank containing clean wate 03 Space containing the micro 04 Support Structure holding Structure: 05 Mono-pile 06 Steel frame 07 Sloping Flat Trusses structu Mussels in the water. 08 Sheet Piles Construction: 09 Laminated Glass t=60mm 10 Glass Balustrade 11 Corrugated Steel Floor Pan lysts for the decay and erosion through the fracturing surface sure to UV radiation. Equipment: 12 Filtration Pipes., Southwoo 13 Rods that move and adjus and general movement of the

MAKROMIKROKUNSTOFFEN: Atavistic Squander Hannah Sargeant Stage 3


20

05

25

11

29 04 30

22

13

06

32 29

09

23 24

26

27

14 02 24

10

29 31

33

16

07 24

03 29

08

15

PLACES 01 Nets 02 Plastic sorting space 03 Pulling the Rod Systems to control and move the net out of the water 04 Lab Space 05 Bird Analysis and Storage Space 06 Mussel Tank 07 Public Space, and walk-way

24 01

STRUCTURE 08 Sheet Piles, creating a channel. 09 Steel I Beams t=200x250mm 10 Steel columns 11 Sloping Flat Trusses structure, supporting the Mussels in the water. 12 Concrete t=80mm CONSTRUCTION 13 insulation t=100mm 14 Laminated Glass t=60mm, for the Mussel tank 15 Corrugated Steel Floor Panels, acting as catalysts for the decay and erosion of the microplastic, through the fracturing surface and increase in exposure to UV radiation. 16 Glass balustrade. 17 Rigid Urethane Foam Spray Finish t=50mm 18 Composite Flooring t=12m 19 Trowel Concrete 20 Trowel Mortar t=5mm 21 Steel Deck t=50mm 22 Guttering, allowing rain water into the mussel tanks

EQUIPMENT 23 Pipes, filtering water from the river, separating the water and microplastic. 24 Microplastic 25 Rod Systems controlling the nets, that collect the plastic from the River. 26 X-Ray Machine, to analyse rubbish entering the building 27 Conveyor, bring in the plastic and microplastic. 28 NaCl 29 Mussels PERSONNEL 30 Surgeon 31 Workers 32 Mussel Farmer pulling in the Mussels to be dropped into water with the Microplastic PUBLIC 33

MAKROMIKROKUNSTOFFEN: Atavistic Squander Hannah Sargeant Stage 3 1.50 Section

hannah sargeant, dust & chlorophyll, arch 3

MAKROMIKROKUNSTOFFEN: Atavistic Squander Hannah Sargeant Stage 3 Island renders and island plans and section at scale 1.500


kale bailey, dust & chlorophyll, arch 3



alexander liew, dust & chlorophyll, arch 3




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.