LODAYA BADMINTON CENTRE LENGKONG,BANDUNG
STRUCTURECONSTRUCTIONIV|WIDESPANBUILDING VECTORACTIVESYSTEM
Location
Jl LodayaNo20, Malabar,Kec Lengkong,KotaBandung,JawaBarat40262
BANDUNG
Lodaya Badminton Centre is a building designed by Muhammad Farhat Naja which is located in Malabar, Lengkong, Bandung. This building serves as a sport centre for badminton. With a land area of +11000 square meters, the building area reaches 45927 square meters
The use of environmentally friendly and recyclable construction materials is one of the ideas taken from the building design.
The use of a strong space curved truss construction system can support the loads and forces received by the building
t the standard requirements of a etes and other visitors can use it e shape of the roof is made of terraces by ming a symmetrical hierarchy with three riations in height
SECTION -A GroundFloor
SECTION -B
The roof frame of the building uses a space truss beam structure system with main steel pipes with a diameter of 30 cm and 20 cm The roof cover uses corrugated metal sheet material covered with an EPDM membrane underneath
This building uses a reinforced concrete structure with 100 x 100 cm for main columns that support the roof frame, 40 x 40 cm columns on other structures, 35/70 main beams and 30/55 joists. The foundation used is a pile foundation, with the casting of poer together with a 35/70 cm sloof The wall uses a secondary wall made of ACP for easy recycling with hollow steel frame support
Building openings are placed in optimal areas so that the building has natural air ventilation and installing small plants as dust absorbers from the road so that it does not enter the site While maintaining the optimal wind speed for the standard badminton area
DrainageSystem PlumbingSystem
Determine
Installation of piles using heavy equipment Excavation of soil for foundation preparation Installing the formwork for the foundation poer along with the poer reinforcement Perform installation of floor plate reinforcement column and sloof on the reinforcement reinforcement Casting simultaneously. The method used in this construction is starting from the bottom of the foundation to the roof in sequence
Finishing work is the final work of a development activity in order to cover, coat and beautify a building or construction. Finishing works include plaster and coating, ceramic walls, installation of natural granite walls, aluminum composite panel (ACP) wall cladding work, wallpaper work, paint work. In addition the installation of utility devices is carried out before the finishing process is complete