portfolio 2016-2021
Mylena Oliveira . ARCHITECTURE + DESIGN .
MYLENA OLIVEIRA Experienced Architectural Designer with a passion for quality design and the technical skills to translate big ideas into constructible details. Skilled in 3D modeling, technical drawing, detailing, and rendering. Strong communication, organizational skills, and experience in monitoring the design process from the conceptual phase through construction administration. International experience working independently and collaboratively on all stages of multiple architectural projects.
EDUCATION
PROFESSIONAL EXPERIENCE CONTACT
Oct 2021
ONSITE OFFICE COORDINATOR
2011
Dec 2021
Structural Modeling & Analysis, Kansas City, MO Worked as Onsite Office Coordinator collaborating on the Ford Land Kansas City Assembly Plant Administration Building renovation project overseen by Alberici. Assisted the Project Manager and office Engineer to create RFIs, and communicate project changes with contractors.
2016
Kansas City, MO mylena.lo@gmail.com
SOCIAL
Jan 2021 Current
Online portfolio
Issuu publications
mylenaoliveira.arq
ARCHITECTURAL INTERN Urban Prairie Architectural Collaborative, Kansas City, MO Participated in the design process, development, rendering, detailing, and revision of a number of residential and commercial projects / Collaborated in the technical detailing of The Red Door Woodfired Grill and a number of other commercial and residential projects / Contributed to updating the firm’s website and Instagram account for marketing purposes.
Nov 2017
PROJECT ARCHITECT - Construction Drawings Coordinator
Sep 2021
StudioM4 Arquitetura e Obras EIRELI, Brasília - Brazil Worked in conception, development, technical drawings, detailing, and construction administration of more than 75 small and medium scale residential projects / Helped set up project team software and organizational parameters, and manage standards / Coordinated and supervised construction documentation and trained less experienced members of the team / Participated in meetings with clients and partners.
2014 2015
BACHELOR OF ARCHITECTURE AND URBAN PLANNING Universidade de Brasília / Brasília, DF
EXCHANGE UNDERGRADUATE FULL SCHOLARSHIP IN ARCHITECTURE University of Toronto / Toronto,ON
SKILLS Native Portuguese Advanced English Basic French AutoCAD Revit Sketchup
Sket. Layout Ill-Pho-InD Lumion Enscape Microsoft Office
Bluebeam Revu
AWARDS OR CERTIFICATIONS Honorable Mention (Scientific Initiation - Research) UnB - Dec/2013 Publication of Final Project – Revista Arqui - Jul/2017
TABLE OF CONTENT
1 THE SUMMIT HOUSE DESIGN 2021
2 CEP INTERIOR RENOVATION 2020
3 TOR HOUSE DESIGN 2018
4 TEG INTERIOR RENOVATION 2019
5 GRADUATION PROJECT NORTH LOCAL COMMERCE 2016
6 BANDEIRA 3D WALL TILE 2019
1
The Summit Architecture Office: Urban Prairie Architectural Collaborative Position: Architectural Intern Year: 2021 City: Kansas City, MO Softwares: Revit
2' - 6" line of roof above
3'-4" side yard setback
Projection Allowed per 88-820-12: Steps no more than 6' above grade C.I.P. concrete stair
14' - 3"
95' - 0"
57' - 0"
23' - 9" rear setback 833
3' - 6" Basement floor slab 832'-0"
830
4" reinforced concrete drive
A3
NORTH
Site Plan 6
12
13
8
9
10
11
I T E CT U R AL
CH AR
2. Concrete: A. All footing concrete shall develop a minimum compressive design strength of 3,500 psi in 28 days, All formed wall concrete and interior flat work shall develop a minimum compressive design strength of 4,000 psi in 28 days. B. Concrete for basement walls, raised structural deck, exterior flatwork shall have a minimum design compressive strength of 4,000 psi in 28 days with 6% +/- 1% air entrainment. C. Contractor shall verify that all concrete inserts, reinforcing and embedded items are correctly located and rigidly secured prior to concrete placement. D. No aluminum items shall be embedded in any concrete.
12
13
4. Structural Steel: A. All structural steel beams shall be ASTM A570 grade 50 and all miscellaneous steel shall be ASTM A36 grade steel. Fabrication and erection shall be in accordance with the 9th of the AISC Manual of Steel G Construction, except as follows: B. HSS to be Fy=46 KSI; Round columns to be 35 KSI Min. C. All welding shall conform to the recommendations of the AWS D1.1, with E70XX electrodes. 5. Foundations: A. Spread footings and grade beams are designed to bear on undisturbed soil capable of safely sustaining 2,000 psf. B. Contractor shall provide for dewatering at excavations from either surface water or seepage. C. All concrete in the structural portion retaining the backfill shall have attained its design strength prior to being backfilled.
23. Where continuous insulation is required/provided at the exterior face of foundation walls or footings, provide pre-finished metal flashing/termite shield set in cont. bed of sealant. Place shield under sill plate and over rigid insulation to point below grade. All gypsum board/drywall shall be 1/2" thick, typ. unless noted otherwise. surface water or seepage. 24. Supply ductwork shall be R-8 insulated minimum. e attained its design strength prior to being . New materials and construction move (expand and/or shrink). Make allowances for pansion and/or contraction of the new materials or equipment or building components subject 25. Stairs: maximum riser height = 7 3/4", minimum tread depth = 10". Refer to the movement, particularly where dissimilar materials meet. construction documents for specific stair design criteria. All stair treads shall have 1" nosing typ. ners for load supporting purposes not . Coordinate the work of the different trades. Install the necessary parts, sleeves, recesses e 2018 IRC . 26. Contractor shall provide pre-engineered wood roof truss shop drawings and structural d/or openings in work which receives, contacts or connects to other work installed by other e No. 2 or better, visually graded lumber, with calculations signed & sealed by engineer lisenced in the state of Missouri. ades. The first guy in isn't always right. astic modulus of 1,600,000 psi. ne No. 2. 27. Carbon monoxide detectors shall be providedper IRC section R315 and provide hing plywood joints. interconected smoke alarms per IRC 2018 section R314. Smoke alarms shall be linked gms shall be edge nailed with 8d nails at 6" together so that when one alarm sounds, all sound.
6. Timber and Wood Framing: A. Quality and construction of wood framing members and their fasteners for load supporting purposes not otherwise indicated on the drawings shall be in accordance with the 2018 IRC . B. Joists and rafters to be Douglas Fir-Larch or Southern Yellow Pine No. 2 or better, visually graded lumber, with an allowable fiber stress in bending of 900 psi minimum and an elastic modulus of 1,600,000Fpsi. C. Wall studs to be Hem-fit, Douglas Fir-Larch or Southern Yellow Pine No. 2. D. Bridging of stud bearing walls and shear walls shall be solid, matching plywood joints. E. Plywood or OSB sheathing of shear (braced) walls or roof diaphragms shall be edge nailed with 8d nails at 6" on center and nailed to intermediate framing and/or blocking members with 8d nails at 12" on center unless otherwise noted on the drawings. F. Sill plates to be ACQ or equal with 1 2" Dia.x10" spaced at 32" on center at top of foundation walls and 48"OC, 12" from ends, Unless Noted Otherwise; Anchor bolts to be galvanized, or compatible with treated lumber. G. Joist hangers shall have ICC approval and shall be equal to Simpson Strong Tie as specified in the plans. 7. Laminated veneer lumber to provide a minimum Fb = 2,650 psi and 1.9E, Unless noted otherwise. 8. Structural Design Criteria A. Applicable Code: 2018 International Residential Code (IRC) B. Floor Design Live Loads: · Ground floor, slab on grade: 40 psf · Second Floor 30 psf E C. Snow Loads:
s with 8d nails at 12" on center unless
48"OC, 12" d, or compatible with treated lumber. son Strong Tie as specified in the plans. less noted otherwise.
7 J
G
The Timms
22. Per 2018 IECC Section 402.4, "the building thermal envelope shall be constructed to limit air leakage"...refer to Section 402.4.1.1 for a list of applicable items. Additionally, "other sources of infiltration" to be sealed shall include, but are not limited to: double 2x wall top plates, 2x wall base plates, and where gyp. bd. sheathing meets 2x top and base plates, typ.
6
H
3. Reinforcing Steel: H A. All reinforcing steel shall conform to the requirements of ASTM A615 grade 40 or 60, or A706 (weld-able) grade 60 steel. Welded plain wire fabric shall conform to the requirements of ASTM A185. B. Clear minimum coverage of concrete over reinforcing steel shall be as follows: Concrete placed against earth 3" Formed concrete against earth 2" Slabs 1" Other 2" C. All dowels shall be the same size and spacing as adjoining main bars (splice lap 40 bar diameters or 24" minimum unless noted otherwise). D. At corners of all of grade beams supply corner bars (minimum 2'-6" in each direction or 40 bar diameters) in outside face of wall, matching size and spacing of horizontal bars. Bars marked continuous and all vertical steel shall be lapped 40 bar diameters (24" minimum) at splices and embedments, unless shown otherwise.
The dimensions are typically made from face of stud to face of stud, unless noted herwise. urbed soil capable of safely sustaining 2,000
F
E
· Design roof live load: 20 psf
23' - 9"
2' - 6" line of roof above
front setback
rear setback
Zoning R-1.5
35
833
83
D
95' - 0"
57' - 0" 36
834
14' - 3" 37
835
3'-4" side yard setback
Projection Allowed per 88-820-12: Steps no more than 6' above grade C.I.P. concrete stair
23' - 10" rear setback
to remain
34
D
8
9
10
COLLABORATIVE, P.C.
5
L
4
I T E CT U R A
not to scale 3230sq.ft
Do not scale drawings. Follow the written dimensions. 1, with E70XX electrodes.
7
3
A Document A201, General Conditions of the Contract for Construction. this AIA document kitchen, bar, &/or mechanical equipment. This may be different from the items actually e architect/engineer of any discrepancies, ts out the rights, responsibilities and relationships of the owner, contractor and architect, and provided by the contractor. The sooner shop drawings for proposed items are presented and ding. all be incorporated by this reference into the contractual obligation of the parties noted approved, the less likely something will need to be taken apart. cation of all openings. All conflicts, erein. be called to the attention of the architect or 13. If you have a question or discover conflicting information, please get clarification from he following notes are a partial list of requirements/instructions that are to supplement these the architect. Thank you. quirements of the 2018 International eneral conditions of the contract for construction". Where one is more restrictive, it shall take ed. ecedence. 14. Glazing in areas subject to human impact in hazardous locations shall comply with the uthorized. requirements of section 2406 of the IBC or section 308 of the IRC as applicable. The architect appreciates your experience and perspective. If you have questions or servations please bring them to our attention. In a competitive bidding arrangement, we will 15. Emergency escape and rescue windows shall have a sill height of not more than 44", strength of 3,500 psi in 28 days, All formed ake public all comments or clarifications so that everyone bidding the work is equally with min. height 24", min. width 20" and net clear opening of 5.7 sq. ft. and shall comply with ressive design strength of 4,000 psi in 28 ucated. The last thing we want is the bidder with the least information to be awarded the all other applicable provisions of Section 310 of the IRC. ork. ork shall have a minimum design 16. All exterior walls of this structure shall be continuously sheathed with min. 1/2" APA Means and methods are the perogative of the contractor; the intent of the documents and rated sheathing and nailed per structural calculations provided and anchored with hold e dictated results are not. While we understand there is usually more than one way to skin a downs per braced wall information per structural. bedded items are correctly located and rigidly t, just because that's the way you've always done it may not make it right for this project. et answers to your questions, seek clarification and/or a review of your ideas BEFORE you 17. The exterior sheathing of the house shall have a prefinished fluid-applied vapor ace a bid. Because we respect you and the others who bid this work, once you enter into a impermeable air and mositure barrier, typical. Joints at sheathing shall be taped w/ ntract, we'll hold your feet to the fire. BID IT AND BUILD IT LIKE IT IS SHOWN OR GET manufacturer's self-adhered membrane tape. All foundation walls retaining earth shall LTERNATIVES APPROVED IN WRITING BEFORE YOU MAKE A COMMITMENT. receive a fluid-applied waterproofing membrane, typical. 15 grade 40 or 60, or A706 (weld-able) grade ts of ASTM A185. There is never perfect weather for the entire duration of a project. The corps of engineers 18. Unless specifically stated otherwise, install products and materials per manufacturer's e as follows: blishes "anticipated" days of inclement weather for specific areas of country. That instructions. ormation will be used to gauge contractor's claims of "unanticipated" weather related creases to construction time and/or construction costs 19. Hazardous materials abatement shall be the responsibility of the owner where applicable. Contractor shall notify homeowner if hazardous materials including but not limited Make allowances in the construction time and/or costs for these "anticipated" weather to mold, asbestos, lead paint, etc. are suspected and/or detected. ars (splice lap 40 bar diameters or 24" ated disruptions. This includes but is not limited to protecting the project during inclement eather or making seasonal adjustments to the construction process. Contractors who have 20. Window and door sizes shown are based on Mi Windows and Doors. Glazing U-factor 6" in each direction or 40 bar diameters) in t lived in this part of the Midwest for the past few years need not submit a bid. shall be 0.40 or better. Bars marked continuous and all vertical steel bedments, unless shown otherwise. The work shall be performed by the contractor in accordance with applicable building codes, 21. Exterior decorative millwork and trim to be painted with high density polyurethane, gulations and ordinances. factory primed.
iscellaneous steel shall be ASTM A36 grade The contractor shall be responsible for applicable fees, permits, inspections, testing and/or of the AISC Manual of Steel Construction, enses unless specifically noted otherwise.
asphalt street
Structural Notes:
1. General A. The contractor shall verify dimensions and conditions and notify the architect/engineer of any discrepancies, inconsistencies, or difficulties affecting cost of work before proceeding. B. The contractor shall coordinate all disciplines, verifying size and location of all openings. All conflicts, inconsistencies, or other difficulties affecting structural work shall be called to the attention of the architect or J engineer for direction before proceeding. C. All design and construction for this project shall conform to the requirements of the 2018 International Residential Code (IRC 2018 as required), as adopted and amended. D. These drawings are for this specific project, and no other use is authorized.
CH AR
11
2 12. The drawings are in part based on the sizes/relationships of anticipated furnishings,
Development of the conceptual design, project approval documentation, and construction drawings for two houses in a residential district in Kansas City.
4515 Summit St 64111
5
Description: All of th of lot 42 and all of th HILL NO. 2, in Kans
5' - 6" property line 31' - 11"
existing conc. curb and gutter to remain
The Son
10
T.O. footing elev. = Basement T.O. slab First Floor T.O. subf
Site Plan
1/8" = 1'-0"
8'
COLLABORATIVE, P.C.
4
9
1 he execution of this project and acceptance thereof shall be governed by the criteria stated in
4'
4511 Summit St 64111
3
8
eneral Notes:
2'
min. lot width: front setback: rear setback: side setback: height: concrete coverage at rear yard:
align
830
95' - 0"
0
Zoning R-1.5 min lot area:
829
83 1
832
833
3' - 6"
5' - 6"
1' - 0" 834
48' - 9"
2' - 6" line of roof abobe
835
83 6
14' - 4"
3' - 4" side yard setback
remove existing curb cut and adjacent sidewalk. Replace w/ new concrete curb and concrete sidewalk
Match existing concrete curb and gutter elevations ea. end.
13' - 0"
830
831
21' - 9"
property line
remove curb
balcony above
4515 Summit
16' - 4"
9 5/8"
837
Existing power pole to remain
n. mi 0" 3'-
82 9
31' - 11"
27' - 0"
34' - 0"
Line of balcony roof eave (above)
18' - 6"
7' - 0" 7T @ 12"
34' - 0"
First floor subfloor 841'-7 1/2"
10' - 0"
1' - 0"
7' - 4"
832
12' - 2"
4' - 2" 8' - 1"
Summit Street (50' Public R/W)
new concrete sidewalk
831
property line
Headwood Drive (50' Public R/W)
834
835
837
838
836
front setback
The two designs are similar in layout and functions but differ in the exterior design, roof, and finishings.
I was responsible for modeling in Revit both projects, produce the technical drawings and details with supervision. I also collaborated on small design decisions and revised the project and documentation for approval.
11
A03 A03 4
A03 A03
4
4
4
27' - 0" 27' - 0" 17' - 3" 17' - 3"
3' - 10"
3' - 10"
6' - 0"
6' - 0"
awning 26"x26"
awning 26"x26"
9' - 10"
9' - 10"
3' - 6"
single-hung 36"x48"
6' - 7"
single-hung 36"x48"
2
2
2
beams beams in the 1st in the floor1st aligned floor aligned with with the basement the basement plan beams plan beams (typical)(typical)
3' - 5"
3' - 5"
A03 A03
1 1
1/4" =1/4" 1'-0"= 1'-0"
Basement/Foundation Plan Plan T OBasement/Foundation TFO F
Property Property line line
1
A03 A03
2 2
1/4" =1/4" 1'-0"= 1'-0"
1st Floor 1st Floor
3 3 A05 A05 Property Property line line
Property line
1 1 A04 A04
1
1st Floor Plan AREAS AREAS
18' - 0" 18' - 0" 27' - 0" 27' - 0"
Property line
not to scale
UP UP 9' - 0" 9' - 0"
Property line
Property line
Property line
Property line
1
Basement/ Foundation Plan
Property line
floor porch to prov. steps
floor porch7'to- 5" prov. steps field verify height between
Property line
steps 8'-0" steps wide 8'-0" w/o wide w/o stone top stone trimtop trim
slope top slope of wall top to of follow wall to follow nose ofnose stair of treads stair treads
1
3" projection 3" projection typical typical
decorative decorative 36" ht. 36" ht. metal guard metalrail guard rail
27' - 0" 27' - 0"
1 1 A04 A04
6' - 0"
2"
3"
2"
3"
CONC.CONC. PORCHPORCH 27'-6"x6'-2 27'-6"x6'-2 1/4" 1/4"
1 1 A05 A05
6' - 0"
slab slope of 1/8"/1'
10 10 A04 A04
awning 40"x18"
awning 40"x18"
6' - 6 1/2"
9' - 1"
fixed fixed Double Double Doors Active-Passive Doors Active-Passive fixed fixed 30"x86"30"x86" 4'-11 1/4"x7'-2" 4'-11 1/4"x7'-2"30"x86"30"x86" 9' - 0" 9' - 0" 9' - 0" 9' - 0"
4' - 2" 4' - 2"
18' - 2 1/2" 18' - 2 1/2"
48' - 9"
2
slab slope of 1/8"/1'
2" 4' - 10" 4' - 10"
Full Bearing Full Bearing Stud Pack Stud Pack
built-in built-in cabinetscabinets
6' - 11"
6' - 11"
6' - 11"
awning 6' 26"x26" - 11"
awning 26"x26"
8' - 3"
2"
8x8 cedar 8x8post cedar post
8' - 9 1/2" 8' - 9 1/2"
42' - 6"
9' - 6"
42' 9' - -6"6"
3' - 6" 12' - 0" 6' - 7"
15' - 4"
15' - 4"
48' - 9"
2
ReduceReduce openingopening to as small to asassmall possible. as possible. Contractor/framer Contractor/framer to coordinate to coordinate exact size exact of size of openingopening with HVAC with duct HVAC size duct andsize orientation. and orientation.
Full Bearing Full Bearing Stud Pack Stud Pack
decorative decorative 36" ht. 36" ht. paintedpainted wood guard woodrail guard rail
12' - 1"
3
2
built-in built-in cabinetscabinets
3 A03 A03
awning 40"x18"
4
3
LIVINGLIVING ROOM ROOM 21'-0"x18'-1" 21'-0"x18'-1"
4' - 0" 4' - 0" awning 40"x18"
4
2' - 0"
5
-5 -6
6' - 6 1/2"
6
5
3
5' - 10"
6
2' - 0"
-9
1-hour fire-resistance 1-hour fire-resistance rated wall rated wall (exposure (exposure from both from sides) both sides)
2
3' - 11" 3' - 11" 6' - 6 1/2" 12' - 0"
-8
-9
13' - 11"13' - 11"
12' - 0"
-8
2
2
5' - 10"
-7
12' - 0"
3' - 3"
3' - 3"
30"x84"
30"x84" -7
12' - 6"
12' - 6"
18' - 4"
5' - 6"
5' - 6"
4' - 6"
4' - 6" 4' - 1"
REF.
ovens
5' - 9 1/2"
awning 5'26"x26" - 9 1/2"
awning 26"x26"
unexcavated/compacted unexcavated/compacted gravel fill gravel fill
5' - 8"
5' - 8"
5' - 8"
REF.
12' - 10"
12' - 10" 40' - 6"
40' - 6" 48' - 9"
3' - 11"
2' - 0"
2' - 0"
-4
30"x80"30"x80"
Full Bearing Full Bearing Stud Pack Stud Pack
wrap column wrap column with with paintedpainted wood trim wood trim
18' - 4" 18' - 4" 5' - 8"
-2
2
COATSCOATS 1'-11 1/2"x3'-5" 1'-11 1/2"x3'-5"
28"x80"28"x80"
fixed fixedSingle Door Single Doorfixed fixed 10"x86"10"x86" 10"x86"10"x86" 36"x86"36"x86"
8' - 8" 8' - 8" 7' - 8"
-2
DININGDINING ROOM ROOM 13'-3"x8'-11 13'-3"x8'-11 1/2" 1/2"
2
1 1 UP 17R UP 17R
1 1 A05 A05
7' - 8"
2
OFFICEOFFICE 7'-4 1/2"x5'-11" 7'-4 1/2"x5'-11"
3' - 11"
5/8" Type-X 5/8" Type-X gyp. board gyp. board ceiling through ceiling through basement basement
ovens
28' - 6" 48' - 6"
18' - 4"
4' - 4"
4' - 4"
5' - 0"
CONDITIONED CONDITIONED BASEMENT BASEMENT 25'-0"x17'-4" 25'-0"x17'-4"
1
-1 -3
2
BP.
8' - 3"
7' - 5"
7' - 3"
7' - 3"
1
BP.
14' - 4"
12' - 4"
BP.
-1 -3
handrailhandrail
2
1/2 BATH 1/2 BATH 5'-3 1/2"x5'-1 5'-3 1/2"x5'-1 1/2" 1/2"
-4 5' - 2" 5' --52" -6
5' - 0" 5' - 0"
2
5' - 10" 5' - 10"
28"x80"28"x80"
2
Full Bearing Full Bearing Stud Pack Stud Pack
12' - 0"
-13
5/8" drywall 5/8" drywall enclosure enclosure @ soffit@above soffitas above as requiredrequired to separate to separate HVAC ducts HVACfrom ducts garage. from garage. ReduceReduce openingopening to as small to asassmall possible. as possible. Contractor/framer Contractor/framer to coordinate to coordinate exact size exact of size of openingopening with HVAC with duct HVAC size duct andsize orientation. and orientation.
furnacefurnace
12' - 0"
-13
H2O
floor floor drain drain
"future""future" walls forwalls for bath & mech. bath & closet mech. closet
-14 -14 UP 16RUP-15 16R -15
2' - 0" 2' - 0"
2
9' - 5"
-12
H2O
9' - 5"
-11
-12
8' - 0" 8' - 0"
9' - 5"
-11
16' - 10"
-9 -10
9' - 5"
-8
-9
5' - 0" 5' - 0"
20min rated 20min rated
7' - 5"
-8
-10
8' - 10" 8' - 10" 5' - 0"
-7
16' - 10"
-6
-7
12'-6"
12'-6" 15T@10"
15T@10"
-5
-6
projection projection of ductsofabove ducts above
A03 A032
48' - 9"
-4 32"x80"32"x80"
48' - 6"
-3
-4
BP.
3 A03 A03
42' - 10"
-2
-3
42' - 10"
-2
BP.
4' - 2"
-1
4' - 2"
-1
5' - 2" 5' --52"
28' - 6"
12' - 0"
12' - 0"
garage slab slope of 2% or 1/4"/1'
garage slab slope of 2% or 1/4"/1'
24' - 0"
19' - 10"
24' - 0" 19' - 10"
28' - 6"
28' - 6" 40' - 10"
48' - 6"
BP.
12' - 4"
3
PANTRY PANTRY 5'-3 1/2"x5'-0" 5'-3 1/2"x5'-0"
6' - 1 1/2" 6' - 1 1/2"
2x6@16"o.c. 2x6@16"o.c.
1-hour fire-resistance 1-hour fire-resistance rated wall rated wall (exposure (exposure from both from sides) both sides)
GARAGE GARAGE 25'-0"x22'-11 25'-0"x22'-11 1/2 1/2
1
2x6@16"o.c. 2x6@16"o.c.
2' - 0" 2' - 0"
7' - 5" field verify height between
48' - 6"
2
7' - 8"
A03 A032
40' - 10"
1
8' - 7 1/2" 8' - 7 1/2"
D.W. D.W.
BP. Full Bearing Full Bearing Stud Pack Stud Pack
5/8" Type-X 5/8" Type-X gyp. board gyp. board ceiling through ceiling through garage garage
2
KITCHEN KITCHEN 20'-4"x14'-5 20'-4"x14'-5 1/2" 1/2"
4' - 1"
2 BP.
3' - 10" 3' - 10"
15' - 3 1/2"
1
BP.
14' - 4"
1 BP.
single-hung 15' - 3 1/2" 24"x42"
single-hung 24"x42"
27' - 0" 27' - 0"
30"x80"30"x80"
Cooktop Cooktop
2' - 7" 2' - 7"
2-Panel2-Panel sliding door sliding door 70 7/8"x84" 70 7/8"x84"
9' - 5"
5' - 5"
5' - 5"
min 4" perforated min 4" perforated PVC drain PVCtiledrain tile coveredcovered with washed with washed gravel or gravel or crushedcrushed rock all rock wrapped all wrapped with with 8oz filter8oz fabric filterdrain fabrictodrain daylight to daylight
9' - 5"
9' - 5"
garage garage door door 16"x8" 16"x8"
single-hung single-hung 24"x42"24"x42"
4' - 0"
single-hung single-hung 24"x42"24"x42"
9' - 5"
2' - 0" 2' - 0"
2' - 7"
8' - 2" 8' - 2"
Single Door Single Door 32"x80"32"x80"
DECK DECK 17'x3'-11 17'x3'-11 1/2" 1/2"
2' - 0" 2' - 0"
13' - 2" 13' - 2"
2' - 7"
23' - 0" 23' - 0"
2' - 0" 2' 1' - 0"- 8" 1' - 8"
9' - 9" 9' - 9"
4' - 0"
27' - 0" 27' - 0" 2' - 0" 2' - 0"
1' - 6 1/2" 1' - 6 1/2"
7' - 3" 7' - 3"
7' - 8"
5' - 8" 5' - 8"
7' - 8"
4' - 4" 4' - 4"
6' - 6 1/2" 9' - 1"
balconybalcony above above
12' - 1"
8 8 A04 A04
ProvideProvide Full Height Full Concrete Height Concrete Panel For Panel Bracing For Bracing
8' - 2 1/2" 8' - 2 1/2"
GARAGE GARAGE PLANPLAN LEVEL: LEVEL: 1112.00 1112.00 SF SF 1ST FLOOR 1ST FLOOR PLAN:PLAN: 1061.00 1061.00 SF SF 2ND FLOOR 2ND FLOOR PLAN:PLAN: 1091.50 1091.50 SF SF
TOTAL: 3264.50 3264.50 SF SF notTOTAL: to scale
2
Ridge
Ridge
Re: Structural
2x10 rafters @ 24" o.c. (spray foam insulation @ all vaulted ceilings)
2x10 rafters @ 24" o.c. (spray foam insulation @ all vaulted ceilings)
Re: Structural
pre-engineered truss @ 24" o.c. (blown batt insulation @ all 8'-0" ht. ceilings and R-19 batts @ unprotected/vertical surfaces)
Re: Structural
Re: Structural
2x10 rafters @ 24" o.c. (spray foam insulation @ all vaulted ceilings)
8'-0" PL
2x10 rafters @ 24" o.c. (spray foam insulation @ all vaulted ceilings)
Re: Structural
2' - 0"
Gutter
8"8" / 12" / 12"
Gutter
Gutter
8" / 12"
2'-0" rake extension 2'-0" rake extension typical at gable ends typical at gable ends
Property line Property line
UP
not to scale
FSD= 2' - 0"
Roof Plan
UP
FSD= 2' - 0"
FSD= 2' - 0"
FSD= 5' - 0"
FSD= 5' - 0"
FSD= 5' - 0"
FSD= 5' - 0"
FSD= 2' - 0"
Property line
2nd Floor Plan
Property line
Property line
3 A05
1
A03
8" / 12"
8'-0" PL
Gutter
1' - 0"
1' - 0"
3 A05
8" / 12" 8" / 12"
Gutter
8" / 12"
18' - 0"
8" / 12"
2' - 6"
vault CLG.
8'-0" PL
8'-0" PL
8'-0" PL
1 A05
27' - 0"
1 A04
vault CLG.
Ridge
9 A04
cantilever floor truss cantilever floor truss Re: Structural Re: Structural
3' - 0"
vault CLG.
2' - 0" 2' - 0"
1 A05
pre-engineered truss @ 24" o.c. (blown batt insulation @ all 8'-0" ht. ceilings and R-19 batts @ unprotected/vertical surfaces) Re: Structural
6" / 12"
2' - 6"
Gutter
8" / 12"
18' - 0"
not to scale
Property line Property line
3 2nd Floor2nd Floor 3
2' - 6"
8'-0" PL
vault CLG. 8:12
3' - 0"6' - 0"
1
2
1' - 11 1/4"
6" / 12"
2' - 6"
2' - 0"
vault CLG. 8:12
face of 2x6 stud below
pre-engineered girder pre-engineered truss girder truss
4
1/4" = 1'-0" 1/4" = 1'-0" 1
6" / 12"
9' - 11"
42' - 6" Full Bearing Stud Pack
9 A04
7' - 2"
vault CLG. 8:12
face of 2x6 stud below
Gutter
bench
5' - 8"
Ridge
Gutter
3' -5'4"- 8"
casement-double casement-double awning awning 72"x72" 72"x72" 6' - 0" 6' - 0" 6' - 0"3' - 0"
3' - 0"
A03
1
6" / 12"
single-hung 36"x48"
9' - 11"
42' - 6"
Ridge
9' - 5"
4' - 4"
A03
Gutter
Property line
1 A04
3
A03
Gutter
9' - 0"
upper cabinets
3
Property line
9' - 0"
upper cabinets
Property line
9' - 0"
8" / 12"
Ridge
3' - 4"
7' - 2"
9' - 0"
16' - 0"
16' - 0"
vault CLG. 6:12
2' - 7" 3' - 6" 4' - 11 1/2"
D.
face of 2x6 stud below
Reduce opening toReduce as small opening as possible. to as small as possible. Contractor/framerContractor/framer to coordinate exact to size coordinate of exact size of opening with HVAC opening duct size withand HVAC orientation. duct size and orientation.
MASTER BEDROOM MASTER BEDROOM 17'-4"x13"-11 1/2"17'-4"x13"-11 1/2" vault CLG. 8:12 30"x80"
8" /8" 12" / 12"
1-hour fire-resistance 1-hour rated fire-resistance rated projection (underside) projection (underside)
vault CLG.
30"x80"
8'-0" PL
8" / 12"
10' - 6 1/2"
10' - 6 1/2" vault CLG. 6:12
2' - 7"
2' - 0"
D. W.
8'-0" ht. CLG.
27' - 0"
Property line
W.
Property line
W.I.C 8'-7 1/2"x7'-4" 8'-0" ht. CLG.
Gutter
pre-engineered girder pre-engineered truss girder truss
face of 2x6 stud below
Full Bearing Stud Pack
11' - 0"
W.I.C 8'-7 1/2"x7'-4" 8'-0" ht. CLG.
5' - 8"
LAUNDRY ROOMLAUNDRY ROOM 5'-3 1/2"x8'-1" 5'-3 1/2"x8'-1" 8'-0" ht. CLG. 8'-0" ht. CLG.
28"x80"
5 4 8'-0"3ht. CLG. Down 16R
8'-0" PL 8" / 12"
awning 40"x18"
4' - 0"
cricket @ porch roof cricket @ porch roof
3
3' - 6"
MASTER BATH MASTER BATH 17'-4"x5'-5" 17'-4"x5'-5" 8'-0" ht. CLG. 8'-0" ht. CLG. 8' - 10" 8' - 10"
28"x80" 30"x80"
7 30"x80" 6
8" / 12"
3' - 11 1/2" awning 26"x26" 1' - 11 1/2"
Down 16R
30"x80"
5' - 8"
2x6@ 16"o.c.
8' - 0 1/2"
4 3
30"x80"
9' - 5"
9 5' - 2" 4' - 0" 8
8'-0" PL / 12" 8" 8" / 12"
Gutter
Full Bearing Stud Pack
casement 72"x56"
9 8
10
BATH 11'-8"x5' 8'-0" ht. CLG.
4' - 7"
11
10
Gutter
1-hour fire-resistance 1-hour rated fire-resistance wall rated wall (exposure from both (exposure sides) from both sides)
4' - 4"
12
11
Full Bearing Stud Pack
11' - 0"
13
12
12' - 2"
4' - 11 1/2"
13
Gutter
1-hour fire-resistance 1-hour rated fire-resistance rated projection (underside) projection (underside)
8' - 9" 72"x78"
28"x80"
4' - 7"
14
13' - 1"
14
5
3' - 11 1/2"
4' - 10"
4' - 10"
15
16 2x6@ 15 16"o.c.
13' - 1"
fixed 26"x26" fixed 26"x26" fixed 26"x26"
40' - 6 1/2"
fixed 3' - 5" fixed 3' - 5" fixed 26"x26" 26"x26" 26"x26"
16
6
1' - 11 1/2"
28"x80"
8'-0" PL 8" / 12"
30"x80"
HALL 8'-0" ht. CLG. 12' - 2"
Gutter
vault CLG. 8:12
8'-0" ht. CLG.
30"x80" 30"x80"
BATH 11'-8"x5' 8'-0" ht. CLG.
8' - 0 1/2"
handrail
5' - 2"
36"x84"
awning 26"x26"
handrail
HALL 8'-0" ht. CLG. 4' - 2"
5' - 0" 4' - 2"
Gutter
cantilever floor truss cantilever floor truss Re: Structural Re: Structural
8' - 9"
2' - 0"
CLOSET 4'-4"x1'-4"
7
10' - 2"
Full Bearing Stud Pack
10' - 2"
Full Bearing Stud Pack
42' - 6"
40' - 6 1/2"
3' - 5" 3' - 5"
42' - 6"
decorative 36" ht. decorative 36" ht. painted wood guard painted rail wood guard rail
4' - 9"
8'-0"8'-0" ht. CLG. ht. CLG.
30"x80"
1' - 5 1/2"
1' - 5 1/2"
CLOSET 4'-4"x1'-4"
2
4' - 9"
72"x78" 8'-0" ht. CLG.
36"x84"
A03
vault CLG. vault CLG. 8:128:12
72"x78"
5' - 0"
2
4' - 9"
24"x80"
72"x78"
Full Bearing Stud Pack
4' - 9"
3' - 0"
BEDROOM #3 BEDROOM #3 12'-11 3/4"x13'-1112'-11 1/2" 3/4"x13'-11 1/2"
vault CLG. 6:12
8' - 9"
3' - 0"
3' - 0" 9"
bench
8' - 9"
fire-resistance 1-hour rated fire-resistance wall rated wall xposure from both (exposure sides) from both sides)
A03
vault CLG. 6:12 14' - 7 1/2"
19' - 7"
19' - 7" Full Bearing Stud Pack
vault CLG. 8:12
vault CLG. 8:12
BEDROOM #2 BEDROOM #2 12'-11 3/4"x13'-1112'-11 1/2" 3/4"x13'-11 1/2"
3' - 0"
casement 72"x56"
1' - 6"
1' - 6" vaultCLG. CLG. vault 8:12 8:12
14' - 7 1/2"
vault CLG. 8:12
7' - 6" 3' - 9"
Ridge
7' - 6" casement 72"x56"
1' - 11 1/4"
13' - 6"
Ridge
6' - 0"
13' - 6" casement 72"x56"
single-hung 36"x48"
3' - 9" casement 72"x56"
1' - 6"
27' - 0"
6' - 0"
awning 40"x18"
3' - 9" 0"
27' - 0" 7' - 6"
casement 72"x56"
3' - 0"
7' - 6"
4
1' - 6"
3' - 0"
A03
4
24"x80"
3' - 0"
A03
4 Roof PlanRoof Plan
1/4" = 1'-0" 1/4" = 1'-0" 3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
2
3
4
5
6
7
8
9
10
11
12
13
1-hour fire-resistance rated wall (exposure from both sides) LP Smartside Lap siding with 6-7/8' exp. and cedar wood grain finish
6"
2' - 0"
J
6"x12" cedar corbels typical 12"
2' - 0"
12" 8"
TOP 7
8
9
cricket @ porch roof
LP Smartside Lap siding with 6-7/8' exp. and cedar wood grain finish
8' - 0"
6' - 8"
8' - 0"
casement-double awning 72"x72"
10
fixed 26"x26"
fixed 26"x26"
11
12"
12"
6"
6"
13 H
1-hour fire-resistance rated wall (exposure from both sides) LP Smartside Lap siding with 6-7/8' exp. and cedar wood grain finish
12"
J
12
awning 26"x26"
fixed 26"x26"
1' - 0" 2' - 0"
J
1' - 0"
T.O.P
12" 12"
12" cedar brackets
8" 8"
T.O.P
H
6' - 8"
awning 26"x26"
1' - 0"
2 fixed 10"x86"
1
Double Doors Active-Passive 4'-11 1/4"x7'-2"
F
fixed 30"x86"
single-hung 24"x42"
TOF
awning 26"x26"
36"h metal guardrail
Front Elevation
1' - 0" 12"
12"
1/4" = 1'-0"
6"
6"
Front Elevation
IRC 2018 Table R302.1(1) - openings in wall = 25% max. of wall area at 3ft. Total wall area _____________ 1271.35 SF Total unprotected Openings ___31.94 SF Total percentage ____________2.51% of wall area
awning 26"x26"
3' - 0"
9' - 1 1/8"
Single Door 36"x80"
1st Floor T.O.W
Left Elevation
2" stone cap at front stair
F
fixed 26"x26"
11 1/2"8' - 0"
6' - 8"
2nd Floor
fixed 30"x86"
8x8 cedar post
fixed 26"x26"
8"
12" cedar brackets
11 1/2"
1st Floor T.O.W
E
1st Floor T.O.W
12"
2" stone cap at front stair 1' - 0"
2 fixed 10"x10 1/2" and 1 fixed 36"x10 1/2"
TOF
LP Smartside Lap siding with 6-7/8' exp. and cedar wood grain finish
G
2
1' - 0" E
Left Elevation
gable and louver vent w/ insect screen behind
1/4" = 1'-0"
not to scale
9' - 0"
12"
IRC 2018 Table R302.1(1) - openings in wall = 25% max. of wall area at 3ft. Total wall area _____________ 1271.35 SF Total unprotected Openings ___31.94 SF Total percentage ____________2.51% of wall area
TTOOFP
1' - 0"
6"
2
1/4" = 1'-0"
1-hour fire-resistance rated wall (exposure from both sides)
2nd Floor
1' - 4 3/4"
T.O.P
LP Smartside Lap siding with 6-7/8' exp. and cedar wood grain finish
Smartside Lap siding with 6-7/8' LeftLP Elevation exp. and cedar wood grain finish
2nd Floor
T.O.P
1' - 0"
casement 72"x56" egress
12" cedar bracket
C
E
gable and louver vent w/ insect screen behind
2' - 2"
12" 6"
casement 72"x56" egress
8' - 0"
single-hung 36"x48" 12"
1' - 4 3/4"
Front Elevation
1/4" = 1'-0"
D
12" cedar bracket
awning 40"x18"
casement 72"x56" egress
6' - 8"
8' - 0"
1
E
TOP
TOF
3' - 0"
8"
D
F
9' - 0"
not to scale
G
7' - 0"
G
fixed 26"x26"
36"h metal guardrail casement-double awning 72"x72"
awning 26"x26"
9' - 0" 1' - 4 3/4"
T.O.P
awning 26"x26"
9' - 1 1/8"
9' - 1 1/8" F
9' - 0" 1' - 4 3/4"
2nd Floor
single-hung 24"x42"
TOP
8x8 cedar post
11 1/2"8' - 0"
H
2 fixed 10"x86"
7' - 0"
Single Door 36"x80"
TOP
2' - 0"
fixed 30"x86"
9' - 1 1/8"
2 fixed 10"x10 1/2" and 1 fixed 36"x10 1/2"
1st Floor cricket @ porch roof T.O.W
Double Doors Active-Passive 4'-11 1/4"x7'-2"
fixed 30"x86"
2' - 0"
G
2nd Floor
1' - 4 3/4"
6"x12" cedar corbels typical
11 1/2"
T.O.P
1' - 4 3/4"
8"
2nd Floor
4515 Summit St 64111 COLLABORATIVE, P.C.
6
4515 Summit St 64111
5
1' - 0"
I T E CT U R AL
4
CH AR
3
1' - 0"
6' - 8"
2
2' - 0"
TOP 1 H
CH AR
8"
I T E CT U R AL
12"
12" 6"
J
COLLABORATIVE, P.C.
1' - 0"
The Son
1' - 0"
The Son
1
C 12"
awning 40"x18"
awning 26"x26"
3' - 0"
single-hung 36"x48"
TOF
A
36"h metal guardrail
3
4
Right Elevation
1
2
3
4
5
6
7
8
bevel top of treated 2x10's framing to drain
7' - 0"
9' - 1 1/8"
architectural
1st Floor T.O.W 1/4" = 1'-0"
LP Smartside Lap siding with 6-7/8' exp. and cedar wood grain finish
B
4523 Mercier Street Kansas City, Missouri 64111 p 816.304.7416 pminto@urbanprairiekc.com Missouri Certificate of Authority: # PROJECT NUMBER: ISSUE DATE:
garage door 16'-0"x8'-0"
2-Panel sliding door 70"x84"
painted metal single door 32"x96" single-hung 24"x42"
single-hung 24"x42"
REVISIONS
A
architectural Exterior Elevations
B 11
12
13
DATE
URBAN PRAIRIE ARCHITECTURAL COLLABORATIVE, P.C.
A03
4523 Mercier Street Kansas City, Missouri 64111 p 816.304.7416 pminto@urbanprairiekc.com c Copyright 2021 Missouri Certificate of Authority: # PROJECT NUMBER: ISSUE DATE:
garage door 16'-0"x8'-0"
9' - 0" 3' - 0"
IRC 2018 Table R302.1(1) - openings in wall = 25% max. of wall area at 3ft. Total wall area _____________ 1300.00 SF Total unprotected Openings ___65.87 SF Total percentage ____________5.07% of wall area
TOF
4
Right Elevation
Right Elevation
1/4" = 1'-0"
2
not to scale
3
Rear Elevation
Rear Elevation
1/4" = 1'-0" 4
5
DATE
TOF A
1
00000 01 January 2013
REVISIONS
painted metal single door 32"x96"
A
3
00000 01 January 2013
C
Rear Elevation 10
9
URBAN PRAIRIE ARCHITECTURAL COLLABORATIVE, P.C.
36"h metal guardrail
36"h metal guardrail
11 1/2"
B
1st Floor T.O.W 1/4" = 1'-0"
D
casement 72"x56" egress
7' - 0"
T.O.P IRC 2018 Table R302.1(1) - openings in wall = 25% max. of wall area at 3ft. Total wall area _____________ 1300.00 SF awning Total unprotected Openings ___65.8740"x18" SF Total percentage ____________5.07% of wall area 36"h metal guardrail
7' - 0"
TOF
2nd Floor
12" cedar bracket
9' - 1 1/8"
T.O.P
9' - 0" 1' - 4 3/4"
2nd Floor
C
1st Floor T.O.W
single-hung 24"x42"
2' - 2"
6' - 8"
1-hour fire-resistance rated wall (exposure from both sides) LP Smartside Lap siding with 6-7/8' exp. and cedar wood grain finish bevel top of treated 2x10's framing to drain
single-hung 24"x42"
casement 72"x56" egress
11 1/2"8' - 0"
B
36"h metal guardrail
9' - 0" 1' - 4 3/4"
11 1/2"8' - 0"
1st Floor T.O.W
TOP 12" cedar bracket
single-hung 36"x48"
2-Panel sliding door 70"x84"
9' - 1 1/8"
awning 40"x18"
casement 72"x56" egress
11 1/2"
36"h metal guardrail
8"
awning 26"x26"
single-hung 36"x48"
9' - 0"
C:\Users\moliveira\Documents\Tim Wahl_The Jefferson_Central_adsklic05.rvt C:\Users\moliveira\Documents\Tim Wahl_The Jefferson_Central_adsklic05.rvt
awning 40"x18"
7' - 0"
TOP
D
9' - 1 1/8"
awning 40"x18"
6
7
8
9
10
not to scale
11
12
13
Exterior Elevations
A03
c Copyright 2021
1/2' gyp. board soffit
H
4'
7 1/4"
" -0
1x6 smart trim fascia - typical
2' - 1 1/4"
8' - 3"
7 1/4"
10
FSD= 5' - 0" atic insulation R=49
2x6 @ 16" o.c. with min. 5 1/2" glass fiber or mineral wool batt insulation R-20
FSD= 5' - 0" FSD= 2' - 0"
FSD= 5' - 0" FSD= 3' - 0"
vault ceiling to 13'-9"
1' - 0"
Property line
G
foamed in place insulation
LP Smartside Lap siding with 6-7/8' exp. and cedar wood grain finish with Tyvek air barrier over 7/16" O.S.B sheathing.
Eave detail-entry porch
1/2" = 1'-0"
H
5/8" gyp. board
3/4x6 smart trim frieze board typical
J
FSD= 2' - 0"
2x6 double top plate wood studs
gutter 5"x5"
8x8 cedar post
A
cedar bracket cut from 8x12
2
4
1' - 0"
A05 ventilated soffit (non-rated)
Property line G
1" = 1'-0" H 1-Hour CFR @ soffit (from bottom): 2x4 wood studs @16" o.c. = 20min. 5/8" Type-X gyp. board = 40min Total = 60min required rating.
5
backfill
4' - 5 1/4"
2x12 stringer B
garage door 1' - 0"
8R @ 6.6'
1st Floor T.O.W
11 1/2"
FSD= 3' - 0" 3/4" riser
Foundation drainage mat
Column base detail
A04
1" = 1'-0" door trim drop threshold
W10x30
2x8 treated studs
2
1" tread with 1" nosing 3/4" plywood T&G subfloor
1
6 A04
1
2
3
4
5
6
7
9
10
1 1/2" = 1'-0"
3/4" riser
insulation
12
G new 4" concrete sidewalk 13
vault ceiling
5
12" 6"
8"
16"x36" concrete footing 1 1/2"subfloor vent chute 3/4" plywood T&G at each rafter bay 2x10 at 16 o.c.
-2 Column base detail
T.O.P
7
1st Floor
4"
treated 2x10
3' - 2"
1/2" gyp. board CLG.
6"
T.O.W gutter 5"x5" 1/2" notch 17 1x6 smart trim 16Fluid-applied foundation E fascia - typical 15 damp proofing 14 3/4x6 smart trim 13 8" conc. wall frieze board foundation typical 12
4"
2x6 double top 5/8" Type-X gyp. board plate wood studs ceiling through garage
4"
W10x22
2
front porch slab
T.O.W
treated sill plate
5/8" gyp.atboard R-13 cavity insulation the cantilever truss interior of basement wall 2x6 @ 16" o.c. with min. 5 1/2" glass fiber or mineral wool batt insulation R-20
7
3/4" plywood T&G 1" =subfloor 1'-0" 8
insulation R-49 floor insulationatic R-19
4"
11 1/2"
6
F
2
9
1" = 1'-0"
3/4" riser 8" conc. foundation wall
-7
-6
-5
-4
-3
-2
4
-1
1" = 1'-0" 7
garage door
drop threshold
10
door trim
G
W10x30
2x8 treated studs
D
1st Floor
drop
A
floor insulation R-19
1" tread with 1" nosing 3/4" plywood T&G subfloor
The Son
CH AR
COLLABORATIVE, P.C.
8" conc. foundation wall
Footing detail
R-13 cavity insulation at the interior of basement wall
2x8 treated studs
11
12
4515 Summit St REVISIONS
A
Exte
A
D
min 4" perforated PVC drain tile covered with washed13gravel or crushed rock all wrapped with 8" conc. foundation wall 8oz filter fabric drain to daylight
c Cop
2x4 treated studs
decorative 36" ht. metal guard rail
3 A04
2x10 at 16 o.c.
Stair detail-1stT.O.W floor
I T E CT U R AL
8" 4"
11 1/2"
E
TOF
garage slab slope of 2% or 1/4"/1'
D
R-13 cavity insulation at the interior of basement wall 1/2" gypsum board on garage side of wall
treated 2x10
1
1/2" = 1'-0"
C
4" conc. slab at front porch 8 Garage door jamb detail Wall section (1-hour rated on either side) 1" = 1'-0"
Constructive details treated sill plate
5/8" Type-X gyp. board ceiling through garage
1
ventilated soffit (non-rated)
3
PROJECT NUMBER ISSUE DATE:
sloped 4" concrete slab
Foundation drainage mat clean gravel
door trim
4523 Mercier S Kansas City, M p 816.304.7416 pminto@urbanp
Missouri Certific
E
2" rigid insulation Fluid-applied foundation 16"x36" damp proofing concrete footing
1" =threshold 1'-0"
4" concrete slab over 4" clean gravel and 15 Mil Underslab Vapor Barrier
B
backfill
fixed 30"x86"
3/4" plywood T&G subfloor W10x30 beam
1" = 1'-0"
D
frontT porch slab OF
header
2x10 double header
1st Floor
6
12" cedar brackets
garage door
B
R-13 cavity insulation at the interior of basement garagewall slab slope of 2% or 1/4"/1'
cantilever floor truss 1'-0"
1" = 1'-0"
Stair detail-basement/1st floor 3/4" riser 1 2x12 stringer
drop threshold exterior concrete driveway
2
URBAN PRAIR COLLABORAT
floor insulation R-19
intern insulated wall 5/8" Type-X gyp. board 2x treated sill plate with 1/2" ceiling through garage casing DIAx10" anchor bolts at 36" OC 7" embedment) treated sill plate(min garage door
F
door trim beyond
1/2" gypsum board on garage side of wall 1' - 0"
and 2x10 double header
5/8" Type-X gyp. board H through garage ceiling
E
5/8" Type-X gyp. board ceiling through garage C
2x4 double plate 1/2" gypsum board interior wall floor insulationadjustable stringer galvanized R-19 at truss connector between stringer
1" = 1'-0"2x12 stringer
J with 1" nosing 1" tread
4"
L 2x10 double header
2nd Floor -1
5/8" Type-X gyp. board ceiling through garage
batt insulation R-20 thickened slab wood grain smart continuous flexiblesoffit membrane panels flashing
LP Smartside Lap siding with 6-7/8' exp. and cedar wood grain finish with Tyvek air barrier over 7/16" O.S.B sheathing.
8' - 0"
4" clean gravel
ventilated soffit (non-rated) 2 1-hour rated soffit and wall foamed in place
Fluid-applied 2x10foundation at 16 o.c. damp proofing 5/8" Type-X gyp. board 8"ceiling conc. foundation wall through garage
The Son
L 1st Floor
architectura
floor insulation R-19 3/4" plywood T&G subfloor
treated 2x10
2x6 @ 16" o.c. with min. 5 1/2" glass fiber or mineral wool batt insulation R-20 4" 4" 5/8" gyp. board
1/2" notch
3/4" plywood T&G subfloor 16" Pre-engineered Floor Trusses @ 16 o.c.
8" conc. foundation wall
roof trusses @ 24" O.C.
T.O.W
T.O.W
Garage door jamb detail
LP Smartside Lap siding with 6-7/8' exp. and cedar wood grain finish with Tyvek air barrier over 7/16" O.S.B sheathing.
1st Floor
1st Floor
7/16" FlameBlock 1E O.S.B sheathing 2" thin stone veneer
W10x30
G
8
4" conc. slab at front porch slope of 1/8"/1' 3/4" plywood T&G subfloor 1" tread with 1" nosing
1/2" gypsum on Intertek Designboard No.LPB/WPPS 60-01 / garage side (on of wall 1-Hour Rated both sides): 1A- 2x6 wood studs @ 16" o.c. 1B- Type X 5/8" thick UL classified gypsum C board 1C- 5 1/2" glass fiber or mineral wool batt insulation R-20 3/4" plywood T&G 1E- subfloor 7/16" FlameBlock O.S.B sheathing 2E- LP Smartside Lap siding with 6-7/8' exp. and 2x10 at 16 o.c. cedar wood grain finish with Tyvek F air barrier over wall sheathing
1" = 1'-0"
continuous flexible membrane flashing
G
2x4 treated studs
window trim R-13 cavity insulation at the interior of basement wall
garage slab slope of 2% or 1/4"/1'
3 A04
batt insulation R-20
4" conc. slab at front porch slope of 1/8"/1' D
2"LPstone cap at Lap frontsiding stair with 6-7/8' Smartside exp. and cedar wood grain finish with 2E 3"x6" projection - typical 3" Tyvek air barrier over wall sheathing
5 1/2" glass fiber or mineral wool batt insulation R-20
11
Stair detail-1st floor
T.O.W
2x6 wood studs @ 16" o.c.
8" conc. foundation wall
6"x12" cedar corbels typical
Typesiding X 5/8" thick UL LP Smartside Lap with 6-7/8' gypsum exp. andclassified cedar wood grain board finish
1' - 4 3/4"
9'-7 1/2"
H
3/4x6 smart trim frieze board typical
W10x30 beam
LP Smartside grain smart 1" wood = 1'-0" metal post base soffit panels 1st Floor 3/4x6 smart trim frieze board typical
2x6 @ 16" o.c. with min. 5 1/2" glass fiber or mineral wool batt insulation R-20
D
TOP
9' - 1 1/8"
3' - 2"
4515 Summit St 64111
1C
6
1" = 1'-0"
H
2x6 @ 16" o.c. with min. 5 1/2" glass fiber or mineral wool batt insulation R-20
ventilated soffit (non-rated)
header
LP Smartside wood grain smart soffit panels
2x10 double header
1-Hour CFR @ soffit (from bottom): fascia board 2x4 wood studs @16" o.c. = 20min.5/8" Type-X gyp. board 5/8" Type-X gyp. board = 40min ceiling through garage Totaltruss = 60min required rating. 1-Hour CFR @ soffit (from cantilever bottom): LP Smartside wood grain 2x4 wood studs @16" o.c. = post 20min. 8x8 Cedar smart soffit panels 5/8" Type-X gyp. board = 40min Total = 60min required rating.
5/8" gyp. board
Type X 5/8" thick UL 1B classified gypsum board
cont. eave flashing5 4" conc. slab at front porch T O P slope of 1/8"/1'
11
COLLABORATIVE, P.C.
3' - 2" 10'-6"
17R@7.4"
2x6 double top plate wood studs
5/8" gyp. board
F
E
H
5/4x10 smart trim fascia - typical
4
R-13 cavity insulation at the interior of basement wall 1/2" gyp. board CLG. 2x6 @ 16" o.c. with batt insulation R-20 2x6 double top plate wood studs
2x8 treated studs
drop threshold
1/2" gypsum board
E
vault ceiling
front porch slab
door trim
2x12 stringer
C:\Users\moliveira\Documents\Tim Wahl_The Jefferson_Central_adsklic05.rvt
DIAx10" anchor bolts at 36" OC (min 7" embedment)FSD= 5' - 0"
8
1/2" gyp. board CLG.
1/2" gyp. board
2
1" = 1'-0"
16" Pre-engineered Floorgarage door Trusses @ 16 o.c.
3/4" riser
foamed in place insulation
11 1/2"
front porch slab
Eave detail-entry porch2 2x treated sill plate with 1/2"
atic insulation R-49
W10x22
foamed in place insulation
4" soffit1st vent Floor
R-13 cavity insulation at the interior of basement wall
J
T.O.W solid 2x blocking 2x6 double top plate wood studs
1
"
1/2" = 1'-0"
vault ceiling 2
2
= 1'-0" floor insulation 1" R-19
7 A04
1" tread with 1" nosing 3/4" plywood T&G subfloor
1' - 0"
6"
LP Smartside Lap siding with 6-7/8' exp. and cedar wood grain finish with Tyvek air barrier over T.O.P 7/16" O.S.B sheathing.
2
FSD= 5' - 0"
1 1/2" vent chute at each rafter bay
12"
1A
10'-6"
10
F
treated sill plate1/2' gyp. board soffit13'-4"
7 1/4"
-2
13
LP Smartside Lap siding with 6-7/8' exp. and cedar wood grain finish
5/4x7" smart trim 5/8" Type-X gyp. board ceiling throughfascia garage- typical 16T@10"
3"
-4
-3
-1
4
4
gutter 5"x5"
-5
Eave detail-entry porch
treated sill plate atic insulation R-49
J
3/4x6 smart trim frieze 2nd board typical Floor
1st Floor
1" = 1'-0"
4" conc. slab at front porch floor insulation R-19 slope of 1/8"/1' cont. eave flashing
3
-6
10
1/2" = 1'-0"
TOP
17R@7.4"
foamed in place insulation
ridge -7 G vent -8 -9
15T@10" 10 12'-6"
treated 2x10
14
"
9' - 1 1/8"
roof trusses C @ 24" O.C.
-10
-16
7 1/4" 1' - 0"
metal post base
2' - 2"
7 1/4"
-11
2x6 blocking
1st Floor
1C- 5 1/2" glass fiber or mineral wool batt T.O.W Fluid-applied foundation insulation R-20 damp proofing O.S.B sheathing 1E- 7/16" FlameBlock 2E- LP Smartside Lap siding with 6-7/8' exp. and 2" thin stone veneer 8" cedar conc. foundation wood grainwall finish with Tyvek air barrier 8" conc. foundation wall " over wall sheathing -0 2' - 1 1/4" 4' 4" clean gravel 8' - 3" 3/4" plywood T&G subfloor
F
7 1/4"
FSD= 3' - 0"
17
1x6 smart trim fascia - typical
LP Smartside Lap siding with 6-7/8' exp. and cedar wood grain finish with Tyvek air barrier over 7/16" O.S.B sheathing.
-12
-13
-14
8
12 11 10 gutter 5"x5"
9
13
16
3/4x6 smart trim frieze board typical
3/4" plywood T&G subfloor 5/4x7 smart trim 2x10 at 16 o.c.
6"
8' - 0" 8x8 cedarT.O.P post
1' - 4 3/4"
cedar bracket cut from 8x12
2nd Floor
COLLABORATIVE, P.C.
L 3' - 10"
7
6'-8" clear headroom
4' - 5 1/4"
7" House section
Column base detail
1" = 1'-0"
3' - 2"
3' - 10"
Intertek Design No.LPB/WPPS 60-01 / 2 1-Hour T.O.W Rated (on both sides): 1A- 2x6 wood studs @ 16" o.c. 2" stone cap at front stair 4" 4" 1B- Type X 5/8" thick UL classified gypsum 3"x6" projection - typical 1/2" notch board
8x8 cedar beam
11 1/2"
1st Floor
window trim 4" conc. slab at front porch slope of 1/8"/1'
-15
8"
1
1
on_Central_adsklic05.rvt
8R @ 6.6'
LP Smartside Lap siding with 6-7/8' exp. and cedar wood grain finish 1-Hour CFR @ soffit (from bottom):4 min 4" perforated PVC drain tile 2x4 wood studs @16" o.c. = 20min. A04 12" Type-X gyp. board = 40min covered with washed gravel R-20 or 5/8" batt insulation 16"x8" concrete footing .c. crushed rock all wrapped with16" o Total = 60min required rating. 8" @ 8oz filter fabricmembrane drain to daylight continuous flexible 2x6flashing LP Smartside wood grain 8x8 Cedar post smart soffit panels
H
6
5
6 A04
blow-in place R=49 in vented attic @ 9gyp board
8
1/4" = 1'-0"
ase detail
"
7
1' - 0" 7 1/4"
T.O.P
7 1/4"
1" = 1'-0"
4"
TOF
2x6 @ 16" o.c. with min. 5 1/2" glass fiber or mineral wool batt insulation R-20 4 3 2 W10x30 1
TOP
15
12
10' - 9 11/16"
1/2' gyp. board soffit
5/8" gyp. board
1' - 0"
4"
6
6'-8" clear headroom
2' - 2"
3' - 0"
cont. eave flashing
2x6 double toptrim 5/4x7" smart plate studs fasciawood - typical
ventilated soffit (non-rated)
11 1/2"
1/2" = 1'-0"
4
CH AR
1' - 4 3/4"
9' - 1 1/8"
D
11 1/2"
Roof section FSD=
4" soffit vent
gutter 5"x5" 1/2" gyp. board CLG.
9' - 1 1/8"
9
B
A 4" conc. slab at front porch slope of 1/8"/1' hurricane clips @ eachTjoist OP
3"
insulation R-20 FSD= 5' - 0"
16T@10" wood grain smart 13'-4"soffit panels
atic insulation R-49 cont. eave flashing
2 A04
vault ceiling to 13'-9"
I T E CT U R A
8' - 0"
2x6 blocking
7 1/4" 1' - 0"
Eave2x6detail-entry @ 16" o.c. with batt porch
1/2" = 1'-0"
9' - 0"
C:\Users\moliveira\Documents\Tim Wahl_The Jefferson_Central_adsklic05.rvt
8' - 0"
1' - 4 3/4"
E
10
1st Floor T.O.W
foamed in place J insulation
1 1/2" vent chute at eachsmart raftertrim bay 5/4x7
The Son
atic insulation 12" .c. 12" R=49 "o wood grain smart @16 8" 6" soffit panels 2x6 1' - 0" double top plate Property line cont. G @eave 4" soffit vent fascia board hurricane clips eachflashing joist 1' - 0" 7 1/4" 3' - 10" 7" 3' - 10" gutter 5"x5" cont. eave flashing 1-Hour CFR @ soffit (from bottom): 2x4 wood studs @16" o.c. = 20min. 5/4x7" smart trim T.O.P TOP 2nd Floor 5/8" Type-X gyp. board = 40min fascia - typical Total = 60min required rating. 1-Hour CFR @ soffit (from bottom): T.O.P 1/2' gyp. board soffit LP Smartside wood grain smart soffit panels 2x4 wood studs @16" o.c. = 20min. 5/8" Type-X gyp. board = 40min Total = 60min required rating. gutter 5"x5" 3/4x6 smart trim frieze board typical 8x8 cedar beam C LP Smartside wood grain1x6 smart trim smart soffit panelsfascia - typical cedar bracket cut from 8x12 3/4x6 smart trim frieze board typical TOP " -0 8'-0" ft F8x8 cedar post 2' - 1 1/4" 4' LP Smartside Lap siding with 7 1/4" 8' - 3" 6-7/8' exp. and cedar wood grain finish with Tyvek air barrier over 7/16" O.S.B sheathing.
2x6 blocking
11
16R@7.2"
FSD= 5' - 0"
FSD= 2' - 0"
6'-8" clear headroom
D
10
9
'-8" clear headroom
5/4x7 smart trim
8
5
2' - 1 1/4"
floor insulation R-19 at truss gutter 5"x5" 3/4" plywood T&G subfloor 1x6 smart trim fascia - typical
J
5/8" Type-X gyp. board ceiling through garage
8" conc. foundation wall
13
Property line
T O P7
" -0
8' - 3"
A
2 A05
6
12
4'
vault ceiling
7 1/4"
4515L Summit St 64111
11
8x8 cedar post
The Son
10
9
4 A04
4"
Fluid-applied foundation damp proofing
TOP
1/2' gyp. board soffit
I T E CT U R A
FSD= 2' - 0"
foamed in place insulation
4"
4515 Summit St 64111
FSD= 5' - 0"
10' - 9 11/16"
blow-in place R=49 in vented attic @ gyp board
6"13
1/2" notch
cont. eave flashing
5/4x7" smart trim fascia - typical
2' - 2"
E
4" soffit vent
gutter 5"x5"
4" clean gravel
T.O.W
I T E CT U R A
8" conc. foundation wall
ridge vent roof trusses 8x8 cedar beam @ 24" O.C. cedar bracket cut from 8x12
H
cont. eave flashing
2" thin stone veneer
treated 2x10 1 1/2" vent chute at each rafter bay
12"
wood grain smart soffit panels12
11
CH AR
T.O.P
10
9
The Son
Roof section
1/2" = 1'-0"
8
G
3" blocking 2x6
T.O.W
3/4x6 smart trim frieze board typical floor insulation R-19
4"
7
3"x6" projection - typical 7 1/4" 1' - 0"
at 16 o.c. LP2x10 Smartside wood grain smart soffit panels
3"
6
2" stone cap at front stair
3' - 10"
CH AR
9
5
7"
5/4x7 smart trim
2x6 @ 16" o.c. with min. 5 slab at front porch 1/2" glass fiber4"orconc. mineral wool batt insulation R-20 slope of 1/8"/1'
6"
4
3' - 10"
1st Floor
it St
3
8"
I T E CT U R A RCH
2
1' - 0" 7 1/4"
1st Floor
12"
8"
hurricane clips @ each joist
J
. o.c
4"
6" @1 2x6
1-Hour CFR @ soffit (from bottom): 2x4 wood studs @16" o.c. = 20min. 13 5/8" Type-X gyp. board = 40min 3/4" =plywood T&G subfloor Total 60min required rating.
12
Type X 5/8" thick membrane UL continuous flexible flashing classified gypsum board
4" conc. slab at front porch slope of 1/8"/1'
metal post base
8'-0" ft
11 batt insulation R-20
TOP
4"
TOP F
10
6"
8
8' - 0"
7
1' - 4 3/4"
6
fascia board
9' - 1 1/8"
5
11 1/2"
4
8x8 Cedar post 9
11 1/2"
3
foamed in place insulation LP Smartside Lap siding with 6-7/8' 1/2"and gyp.cedar boardwood grain finish exp.
9" 3/4"
2
double top plate
COLLABORATIVE, P.C.
1
LP Smartside wood grain smart soffit panels
8' - 0"
LP Smartside wood grain smart soffit panels
9' - 0"
1-Hour CFR @ soffit (from bottom): 2x4 wood studs @16" o.c. = 20min. 5/8" Type-X gyp. board = 40min Total = 60min required rating.
not to scale
2 8" conc. foundation wall R-13 cavity insulation at the interior of basement wall
1/2" gypsum board on door trim beyond garage side of wall
architectural C
URBAN 4 PRAIRIE ARCHITECT COLLABORATIVE, P.C.
3
intern insulated wall casing garage door
B
4523 Mercier Street Kansas City, Missouri 64111 p 816.304.7416 pminto@urbanprairiekc.com
2
CEP Apartment Architecture Office: StudioM4 Arquitetura Position: Project Architect Year: 2020 City: Brasília, DF - Brazil Softwares: AUTOCAD, SKETCHUP, LUMION
Quarto de hóspedes 12.04m² 0.00 pd 2.45m
Quarto 1 13.47m² 0.00 pd 2.45m
Sala de estar e jantar 29.95m² 0.00 pd 2.47m Banheiro social 3.17m² 0.00 pd 2.30m
Circulação 5.87m² 0.00 pd 2.57m Banheiro 1 5.10m² 0.00 pd 2.28m
Quarto Suíte 20.44m² 0.00 pd 2.44m
Cozinha 19.28m² 0.00 pd 2.37m
Floor plan . layout not to scale 147,85m² (1591.44sq.ft)
Área de serviço 9.11m² 0.00 pd 2.60m
Banheiro Suíte 7.20m² 0.00 pd 2.30m
master suite’s bathroom. I rendered the four design studies on LumiON, developed the technical drawings for construction in collaboration with the Intern Melissa Lima on AutoCAD and Sketchup Layout, besides being responsible for the supervision and reviewing of the design documentation.
Apartment interior renovation focusing on open, modern, and elegant finishes for a retired couple and their son. The apartment is 1591.44sq.ft and was all remodeled. I participated in the design conception and modifications on Sketchup of the kitchen, laundry room, the three bedrooms, and the
52 280
10
50
18
10
147,85m²
fixo
1300
18
75
fixo
gaveta
580
80
Elevation . bedroom 1 . woodwork not to scale
autor do desenho MELISSA LIMA
sapateira
NICOLAS FLEISCHMANN
125
sapateira
CAU A131864-0
gaveta
CAU A59388-5 ANNA SZCEPANSKI BENTO
gaveta
CAU 214525-0
2095
desenho
125
gaveta
MYLENA OLIVEIRA
gaveta
IMIRA DE HOLANDA
gaveta
CAU A177408-5
2450
gaveta
1100
nicho
500
1960
20 480
gaveta
20
gaveta
125
520
prateleira
MARCENARIA . QUARTO 1
18 409
2450
18
prateleira
20
105 95 137 137 137 15
133 133
gaveta
área do projeto
arquitetos responsáveis
not to scale
gaveta
escala
INDICADA
MILÍMETROS
Elevation . bedroom 1 . woodwork
gaveta
133
20 80
500
1100
cabeceira da cama dimensão: 235x110cm espessura 50mm
409
500
409
20
460
prateleira
CLN 412 bloco D sl. 208 Brasília-DF Tel.: 3546.1446
prateleira
prateleira
480
2356
cabideiro
1075
2450
chapa de MDF Noce Amêndoa, Duratex de 6mm colada na parede dimensão: 235x135cm
maleiro
prateleira
409
18
1300
1350
15
prateleira
fixo
fixo
fixo
409
15
18 18
409
50
Final project: 113 A3 pages of technical drawings and detailing.
900
not to scale prateleira
prateleira prateleira
painel da tv nicho
prateleira prateleira
prateleira
prateleira
prateleira
prateleira
prateleira
prateleira
prateleira
prateleira acesso closet prateleira
prateleira
prateleira
prateleira
prateleira
prateleira
prateleira
prateleira
painel fixo prateleira
h3
h4
h3
h4
1020
04.03.2020
MYLENA OLIVEIRA
87 / 107
IMIRA DE HOLANDA
arquitetos responsáveis
491
desenho
451
2440
MARCENARIA . QUARTO SUÍTE
100 20 20
15
1020
880
491
20 331
Tel.: 3546.1446
projeto PROJETO EXECUTIVO
h2
20 331 100 40
h1
2440
880
h1
MEDIDAS EM MILÍMETROS
100 20 20
pilar
929
455
h2
929
455
autor do desenho MELISSA LIMA
h2
20
h3
20
20
h1
435
h4
435
CAU 214525-0
872
350
310
escala
20
20
CAU A177408-5
20
MARCENARIA . QUARTO SUÍTE
desenho
538
147,85m²
451
not to scale
2440
Floor plan . master suite . woodwork
15 15 15 15 15 15 15 15 15 15 80 209 209 209 209 209 209 209 209 209 191 140
prateleira
SQS 312, Bloco B, apt 401, BRASÍLIA/DF
2910 NICOLAS FLEISCHMANN
MYLENA OLIVEIRA CAU A131864-0
15
15
INDICADA
CONFERIR MEDIDAS NO LOCAL
Sections . master suite . closet woodwork 140
pilar
6
IMIRA DE HOLANDA
2220
1425
300
2290
prateleira
594
CAU A59388-5 ANNA SZCEPANSKI BENTO
873
872
20
arquitetos responsáveis
20
30
410
MEDIDAS EM MILÍMETROS
382
20
20 21
370
20
10
380 900
RESIDÊNCIA CRIS E PEDRO
prateleira
penteadeira
projeto PROJETO EXECUTIVO
prateleira 695
620
20
CONFERIR MEDIDAS NO LOCAL
vazio
594
410
prateleira
2440
760
22
prateleira
15 15 15 15 15 15 15 15 15 15 80 209 209 209 209 209 209 209 209 209 191 100
370 1510
20 260 15
A
20 20
2020 286 25 140
280
porta do banheiro 70 30 180
710
20 20 100
200 100 40 250 30 594
20 535
2440 2090
6
20 335
10
área do projeto
CLN 412 blo Brasíl Tel.: 354
INDIC
esc
área do
147,8
04.03
86 /
3
TOR House Architecture Office: StudioM4 Arquitetura Position: Project Architect Year: 2019 City: Brasília, DF - Brazil Softwares: REVIT, AUTOCAD, SKETCHUP, LUMION
Ground floor plan
First floor plan
Roof plan
not to scale
not to scale
not to scale
181,38m² (1591.44sq.ft)
147,41m² (1586.70sq.ft)
Single-family house near Brasília, Brazil with a total of 3540.03sq.ft built in a 7872.93sq.ft site. The twostory house was designed to have a fresh clean look while facing the best view angle of a natural reserve nearby. The project was composed of the house conception and interior design of the five bathrooms, kitchen, laundry room, and barbecue area.
I collaborated in the whole design conception and development. I was also responsible for all the technical drawings and renderings. Final project: 58 A3 pages and 2 A2 sheets of technical drawings and detailing.
Site plan not to scale 731,42m² (7872.93sq.ft)
Key plan not to scale
Section A not to scale
Section B
Construction detail . sliding doors
not to scale
not to scale
150
300
60
85
150
100
5 10
30
100150
5 10
fundo removível
85
420
60
5 10
10 25 10
120
30
100
85
150
fundo removível
60
150 300
150
60
10
150
420
acabamento em meia esquadria
acabamento em meia esquadria
100
750
900
10
150
150 150
ver Detalhe A
5 10
inclinação para escoamento da água
válvula inclinação para escoamento da água
projeto
RESIDÊNCIA TORSTEN SCHWAB PROJETO EXECUTIVO
Detalhe A
projeto
IMIRA DE HOLANDA
RESIDÊNCIA TORSTEN SCHWAB
CAU A59388-5
PROJETO EXECUTIVO IMIRA DE HOLANDA
válvula
100
85
MEDIDAS EM MILÍMETROS
57 / 57
inclinação para escoamento da água
projeto
not to scale
RESIDÊNCIA TORSTEN SCHWAB PROJETO EXECUTIVO IMIRA DE HOLANDA CAU A59388-5
autores do projeto
ANNA SZCEPANSKI
MARMORARIA . BANHO CHURRASQUEIRA
revisão data 29/04/2020
MEDIDAS EM MILÍMETROS
CAU A131864-0
MYLENA OLIVEIRA
autor do desenho desenho
MYLENA OLIVEIRA
CAU 177408-5
área de projeto escala
INDICADA
351.75 m²
folha
STUDIO M4 ARQUITETURA | CLN 412 bloco D sl. 208 | Brasília-DF Tel.: 3546.1446 | Cel.: 99153.5762
escala
INDICADA
351.75 m²
folha
STUDIO M4 ARQUITETURA | CLN 412 bloco D sl. 208 | Brasília-DF Tel.: 3546.1446 | Cel.: 99153.5762
5 10
Construction details . bathroom 1
MARMORARIA . BANHO CHURRASQUEIRA área de projeto
data 29/04/2020
351.75 m² área de projeto
CAU A131864-0
MYLENA OLIVEIRA
60
Tel.: 3546.1446 | Cel.: 99153.5762
100
85
desenho
MYLENA OLIVEIRA
CAU 177408-5
revisão
10 25 10
120
fundo removível
ANNA SZCEPANSKI
autor do desenho
MARMORARIA . BANHO CHURRASQUEIRA
acabamento em INDICADA 30 escala folha data 29/04/2020 meia esquadria STUDIO M4 ARQUITETURA | CLN 412 bloco D sl. 208 | Brasília-DF
MEDIDAS EM MILÍMETROS
300
5 10
revisão
420
60
CAU A131864-0
MYLENA OLIVEIRA10
150
desenho
MYLENA OLIVEIRA
CAU 177408-5
150
ANNA SZCEPANSKI
150
autores do projeto autor do desenho
150
CAU A59388-5
autores do projeto
57 / 57
57 / 57
Pintura acetinada e super lavável sobre massa corrida, cor Nórdico, Coral
forro de gesso
armário em MDF, sem fundo e com base de alvenaria, ver marcenaria
armário em MDF, ver marcenaria
varal de varetas individuais 150cm
43
56
60
37
267
72
265
280
280
95
10
92
15
15
92
72
157
4 15
início de paginação
73
280
59
40
265
armário em MDF, ver marcenaria
13
5
armários em MDF, sem fundo e com base de alvenaria, ver marcenaria
armário em MDF com base de alvenaria, ver marcenaria
quadro Abacaxi e azul 45x45cm, Urban Arts
Elevation 1 . laundry area
Elevation 2 . laundry area not to scale
1.80
.15
ML(13w),9
1.01
RESIDÊNCIA TORSTEN SCHWAB .15
.80
1.05
17
.93
ML(13w), 8(3w)
revestimento interno
6
.95
1.70
PROJETO EXECUTIVO
6,8(3w)
IMIRA DE HOLANDA .18
3
.55
.52
.33
1(4w), CAU A59388-5 16(3w),17ralo sifonado 2(4w), 4 MYLENA OLIVEIRA ANNA SZCEPANSKI oculto 15x15cm 2.38 3(4w),4.15 .31 .31 .31 .31.18 autores do projeto .23 CAU 177408-5 CAU A131864-0 2.38 3(4w) MYLENA OLIVEIRA autor do desenho ver Detalhe A 1.02 .68 7
2.05
.15 soleira em 7 granito
.95
8(3w)
1.86
.20 1.96
.15
eixo da ducha higiênica 10(3w) 11,12
.82
11
.15
Detalhe A . trilho da cortina de vidro .76
.30 .30
.25 .21 .42 .42 12
.99
7
soleira em granito
16(3w) contrapiso
Escala 1/5 projeto
13
1.17
.93
2
1.50
.75
ralo linear de 60cm
201
.85 .50
15
16(3w)
.50
eixo do gás 40
1.00 1.35
1.29
.61
.90
13
.35.15
eixo do gás 135
1.80
9
51,55
55
51,55
eixo do filtro
.50 .30 .87 .71
199
2.19
fazer previsão da tubulação de gás para forno e fogão. O
.72
.40 .83
.80
1.42 .70
88
88
b
15
60
252
220
218
197 87
.50
base de alvenaria h=10cm
357
eixo da pia 97
início de paginação
ça
33
211
202
b,k 277
114
início de paginação 157
54
i base de alvenaria h=10cm
.15
eixo da torneira
.50
15
eixo do chuveiro eixo da máquina eixoPorcelanato da de lavar Externo bacia Esmaltado act ret 60x60cm eixo do Gotham Wind, Portobello tanque .23 eixo do mictório .60 .10
174
67
199
35
15 30
87
15
1.12 65
k
50
início eixode da ducha higiênica paginação ralo sifonado oculto 15x15cm
5 vista vista 6
80
90 77
17
55
158
32
base de alvenaria h=15cm
15
79
eixo do ar condicionado (previsão . h=230cm)
92
247
110
68
190
Cement, Natural, 60x60cm, Portobello
35 67
67 10
15
77
80
61
17
55
base de
1 aArtsy Porcelanato 1
150
256
40
82
58
início de paginação
alvenaria not to scale h=15cm
155
vista 2
vista 1
133
Floor plans . tiling, hidraulic, electrical
150
115
214
Porcelanato Artsy Cement, Natural, 60x60cm, Portobello
4 vista
81
3 vista 58
ralo linear de 60cm centralizado no box
87
base de alvenaria h=15cm
as alturas 15 das saídas de água e esgoto devem ser determinadas conforme manual técnico do equipamento adquirido .20
583
98
piso da calçada em cimento com desnível de 3,5cm em relação ao interior
vidro temperado trilhoLED, U fixado na e circuito 17 . duas fitas em cima soleira de granito do espelho, com revestimentoembaixo do suporte 15 comprimento de 1,05m+1,05m; externo h=1,17m 6 3e 1,78m. 6 Esconder driver no suporte do espelho
25
analisar em obra melhor direcionamento para o dreno do ar condicionado; deixar espera para ar condicionado com previsão do ponto elétrico, dreno e tubulação própria
.92
not to scale
360
bancada em granito, ver marmoraria
rodapé h=10cm em porcelanato semelhante ao piso
1.50
rodapé h=10cm em porcelanato semelhante ao piso
44
4
TEG Apartment Architecture Office: StudioM4 Arquitetura Position: Project Architect Year: 2019 City: Brasília, DF - Brazil Softwares: AUTOCAD, SKETCHUP, LUMION
Varanda 11.88m² 0.00 pd 2.44m
Quarto 1 9.20m² 0.00 pd 2.44m
Cozinha 9.54m² 0.00 pd 2.44m
Escritório 7.95m² 0.00 pd 2.44m
Circulação 3.17m² 0.00 pd 2.44m
Suíte 25.84m² 0.00 pd 2.44m Banheiro suíte 4.17m² -0.01 pd 2.29m
Área de serviço 3.91m² 0.00 pd 2.29m
Sala 18.76m² 0.00 pd 2.44m
Banheiro social 3.63m² -0.01 pd 2.29m
Floor plan . layout not to scale 106,66m² (1148.07sq.ft)
99
8
113 205
131
remover porta 80 15
160
remover bancada
297
335
deixar livre um vão de 2,29x71cm para porta e bandeira para passagem de luz, ver vista 1
vista 1
86
46 225
2
18
deixar livre um vão de 2,10x19cm para passagem de luz, ver vista 2
171
66
remover porta
17 22
Floor plan . demolition
20
15
14 54
210
construir parede em bloco de vidro Clean semi fosco incolor 20x20x8cm, Artens, LeroyMerlin
20 20 20 20
81
92
tubulação de 50mm embutida na parede ver vista 3 55
217
15
134
8
30
7
45
remover porta e parede
12
178
87 12
15 vista 3
171
106
22 12 33
remover porta e parede
85
verificar possibilidade de deixar instalações para o tanque aparentes embaixo da bancada (ficarão dentro do armário) ou fazer enchimento da parede abaixo da bancada, alinhado com o pilar, para embutir essas instalações
not to scale
deixar livre vão de 39x74cm a h=100cm para nicho, em gesso acartonado hidrofugante, ver corte A
demolir vão de 166x40cm a h=100cm para nicho, ver corte B
Full apartment interior renovation focusing on open and modern spaces for a young couple buying their first home. The apartment is 1148.07sq.ft and was all renewed.
38
7 B
8
15 8
15 7 32
166
A
49
580
80
5
6
15 4
84 67
365
genda rodapé em porcelanato Pietra Di Firenze Off White, Portobello com h=15cm
86
91 6
73
232
167
87
60
6
275 6
51
31
212
75
160
326 Porcelanato Golden Calacata, Natural 60x120cm, Portobello
Porcelanato Bianco Carrara, Natural 60x60cm, Portobello
87
82
Revestimento hexagonal Portobello, ver legenda
I participated in the design conception, rendering, and production of technical drawings of the entire project in collaboration with four other members of the team. I also worked with the construction planning and administration in collaboration with Anna Szczepanski. Final project : 53 pages A3 of technical drawings and detailing.
manter piso existente
15 210
ralo linear
171
213 286
18
150
142
18
217
344
356
66
26
14
498
87
15
170
77
5
210
7
77
327
4
379
77
694
213
15
56
52
105
80 15
15 23
139
126 9
44
93
31
103
120
131 313
313
107
203
232
33
26
13
171
22
6
184
183
160 113
254 99
294
78
4
614 578
23 13
184
Piso vinílico linha Eucaflor parede a permanecer Decore Classic New, parede a construir em gesso acartonado Porcelanato Pietra di 3x228x1219mm, Eucatex Firenze Off White, Natural, parede a demolir com paginação intercalada parede a construir em bloco de vidro60x60cm, 20x20cm Portobello
28
15 29
182
Legenda
8
26
Floor plan . floor tiling not to scale
This project was published in the Quartzolit 20th birthday commemorative edition and was the first project to use the 3D tile Bandeira designed by StudioM4, produced by Munó Revestimentos.
40
200 40
860
900
900
860
prateleiras em MDF Ipê Amarelo, Masisa gaveteiro em MDF Ipê Amarelo, Masisa; com 2 gavetões e puxador perfil Y
10
40
10
ver Detalhe A
estrutura para prateleiras em ferro maciço preto 10x10mm
190
200
190
gaveteiro em MDF Ipê Amarelo, Masisa; com 4 gavetas e puxador perfil Y
20
20
Construction details
armário para forno de embutir em MDF Ipê Amarelo, Masisa
not to scale
porta condimentos tipo gaveta em MDF Ipê Amarelo, Masisa
10
31 120 15
gavetão
10
31 120 15
18
projeto
C forno vão porta embutido condimentos
D 702
1815
37 10580
vão forno embutido 770
580
gaveta talheres 605
30
70
563
702
15
70
10 702
2170
gavetão
10
30 320 380
vão adega 15
730
25
18
gaveta talheres
18
autores do p
18
337 15015 15015
A
605 610
770
C
autor do des
D
desenho
porta condimentos
revisão
data 25/04
gavetão
Section . kitchen woodwork not to scale
695 150 15 900
gaveta
vão forno embutido
150 15
gaveta
gavetão
658150 52
gavetão
gaveta gaveta
695 900
658
porta condimentos vão forno embutido
150 52
337
190
gaveta
358 190
gaveta talheres gaveta
A B gavetão
15
730
porta condimentos
gaveta talheres prateleira
30
vão adega
380
B
563
702 18
prateleira
25
30
610
37 10
2170
prateleira
358
177 15015160 17740 177
h3
not to scale
177
h3
Kitchen woodwork specifications
prateleira
15015 177
h2
640160 40 177
10
407 640
h2 h1
10 10473407
h1
10
473
rodapé em MDF revestido com o mesmo porcelanato do piso
320
200
150
150
acabamento em meia esquadria
ver Detalhe A
200
10
vidro incolor 150x20cm, 10 engastado na bancada; fazer friso com 10mm a 15mm de profundidades para encaixe dessa peça
Cabinet plan . kitchen woodwork not to scale
MEDIDAS EM MILÍMETROS
STUDIO M4 Tel.: 3546.14
5
North Local Commerce FINAL THESIS PROJECT - University of Brasília Architecture and Urbanism Degree Program Professor: Eduardo Rossetti Year: 2016 Softwares: REVIT, SKETCHUP, LUMION, PHOTOSHOP, INDESIGN, ILLUSTRATOR
Concept diagrams two new mixed use buildings
Longitudinal section not to scale
Ed. 105 NORTH
Ed. 105 NORTH
Ed. 105 NORTH
Ed. 105 NORTH
West Block - Entrance D
West Block - Entrance C
East Block - Entrance B
East Block - Entrance A
The proposal consisted of the design of four buildings and the renovation of the adjacent public area in the North Local Commerce area (CLN 105) in Brasília, Brazil. The blocks are connected 2-by-2 with a total of 38 stores on the ground floor, and 84 units for apartments or offices on the first and second floors, and the underground garage and rooftop with a recreation area and photovoltaic system. The underground stores were replaced by two floors of covered garage connecting the four buildings. For the solar protection of the units and stores, a retractable brise-soleil system was developed, besides cross ventilation in all units; intervention in the local street to create a continuously accessible sidewalk throughout the entire complex and a bus stop. The micro public plazas between the buildings were formulated as attraction zones to the local neighborhood while also serving as seating for locals and visitors seeking a moment of respite, aspiring to carve a small yet more positive urban space.
Construction detail Scheme of air and sun movement
Retractable brise-soleil system
6
BANDEIRA 3D wall tile designed by StudioM4 Arquitetura and produced by Munó Position: Project Architect - designer Year: 2019 City: Brasília, DF - Brazil Softwares: SKETCHUP
Picture of my parents living room . my design
Examples os pattern configuration
1 cm
2 cm
2 cm The 3D wall tile called Bandeira was designed by StudioM4 Arquitetura from the firm’s visual identity and produced by Munó. The studio’s logo was the main inspiration to create a geometrical cement-based piece with elegant relief that allows many different pattern configurations.
2 cm
StudioM4 logo . inspiration . design
1 cm
30 cm
30 cm
Surface: Satin Tiles/m²: 22,2 Place of use: Internal and external