Environmental Design - Market House

Page 1

Context: Shading

Market house, North Main Entrance is facing North East with taller surrounding buildings wrapped around the north, south. The sun path indicates that the site receives most sunlight in the latter part of the day. The south west opening of the site will receive the most sun light of all, and will likely have over-heating in the hot summer afternoons.


Context: Radiation Map

Radiation Map Cooling Period May 15- Oct 15

Radiation Map Heating Period Oct 15 - May 15 of following year


Context: Radiation Map

Annual Radiation Map Annual radiation map reiterates that the amount of sunlight on the south west face is significantly greater than the northeast face.


Building Analysis: Envelope


Building Analysis: Envelope

Facade Roof: Material + Thickness Slate Tile - 0.03m Plywood Panels - 0.03m Pulpboard Paper Plaster - 0.03m

Facade: Material + Thickness Brick Fired Clay 2400kgm3 - 0.15m Air Layer Wall 25mm - 0.012m Brick Fired Clay 2400kgm3 - 0.15m

Window: Material + Thickness Clear Single Pane - 0.006m

Roof U Factor Slate Tile - 0.03m C=k/x 1.59 / 0.03 = 53 R = 1 / 53 = 0.018 Plywood Panels - 0.03m C=k/x 0.12 / 0.03 = 4 R = 1 / 4 = 0.25 Pulpboard Paper Plaster - 0.03m C=k/x 0.7 / 0.03 = 23.3 R = 1 / 23.3 = 0.043 U FACTOR ROOF= 1 / 0.018 + 0.25 + 0.043 U = 3.215 Facade U Factor Brick Fired Clay 2400kgm3 - 0.15m C=k/x 1.34 / 0.15 = 8.93 R = 1 / 8.93 = 0.111 Air Layer Wall 25mm - 0.012m C=k/x 0.139 / 0.012 = 11.583 R= 1 / 11.583 = 0.086 Brick Fired Clay 2400kgm3 - 0.15m C=k/x 1.34 / 0.15 = 8.93 R = 1 / 8.93 = 0.111 U FACTOR FACADE= 1 / 0.111 + 0.086 + 0.111 U = 3.24 Window U Factor Clear Single Pane - 0.006m C=k/x 0.9 / 0.006 = 150 R = 1 / 150 = 0.006 U FACTOR WINDOW = 0.006


Building Analysis: Program

Space 1

Studio/ Classroom Space Office Space Bathroom/Storage Vertical Circulation

Space 2


Room Analysis: SeasonalTemperatures

Space One Winter Hourly Temperature

(Original) January1- January 7

Space One Summer Hourly Temperature

(Original) June 1- June 7

Space One Zone Mean Air Temperature

Space One Zone Mean Air Temperature

Outside Zone Mean Air Temperature

Outside Zone Mean Air Temperature



Iterations 1 : Improving Insulation

Space One Winter Hourly Temperature (Original) January1- January 7

Space One Winter Hourly Temperature (With Insulation) January1- January 7

Space One Zone Mean Air Temperature

Space One Zone Mean Air Temperature

Outside Zone Mean Air Temperature

Outside Zone Mean Air Temperature

Issue:

Strategy:

Cold interior temperatures in winter and High Heating Loads

Improve insulation in wall construction with Cellulose.

BUILDING MEMBER VAPOR-PERM FELT 0.006 m AIR GAP 25mm 0.02 m

SAND/CEMENT/ LIME PLASTER CONDIT 0.006 m

2X4 STUD

FINISH

SERVICE CAVITY

BRICK FIRED CLAY 2400kgm3 0.19 m

BRICK FIRED CLAY 2400kgm3 0.19 m CELLULOSIC/MILLED PAPER/ WOOD PULP 0.23 m

SERVICE CAVITY WITH OPTIONAL INSULATION


Iteration 1: Improving Insulation X Overheating

Space One Summer Hourly Temperature

(Original) June 1- June 7 Space One Zone Mean Air Temperature Outside Zone Mean Air Temperature

Space One Summer Hourly Temperature

(With Insulation) June 1- June 7 Space One Zone Mean Air Temperature Outside Zone Mean Air Temperature

BUILDING MEMBER VAPOR-PERM FELT 0.006 m AIR GAP 25mm 0.02 m

SAND/CEMENT/ LIME PLASTER CONDIT 0.006 m

2X4 STUD

FINISH

Issue: Improved insulation may increase over heating issues in winter. Temperature go beyod 50 degrees SERVICE CAVITY

BRICK FIRED CLAY 2400kgm3 0.19 m

BRICK FIRED CLAY 2400kgm3 0.19 m CELLULOSIC/MILLED PAPER/ WOOD PULP 0.23 m

SERVICE CAVITY WITH OPTIONAL INSULATION


Iteration 2: Solving Overheating- Window

Space One Summer Hourly Temperature

(With Insulation) June 1- June 7

Space One Summer Hourly Temperature

(Increase operable window area) June 1- June 7

Space One Zone Mean Air Temperature

Space One Zone Mean Air Temperature

Outside Zone Mean Air Temperature

Outside Zone Mean Air Temperature

Issue: Improved insulation may increase over heating issues in winter.

Strategy: Improve Ventilation by Increasing Operable Window Area: Buoyancy Driven


Iteration 2: Solving Overheating-Roof Vent

Space One Summer

Space One Summer

Hourly Temperature

Hourly Temperature

(With Insulation) June 1- June 7

(With Insulation and Chimney Vent) June 1- June 7

Space One Zone Mean Air Temperature

Space One Zone Mean Air Temperature

Outside Zone Mean Air Temperature

Outside Zone Mean Air Temperature

Issue: Improved insulation may increase over heating issues in winter.

Strategy: Improve Ventilation with Roof Vent system: Wind Driven in addition to


Iteration 2: Solving Overheating-Roof Vent


Extreme Heat: Mechanical Ventilation

Space One Summer Hottest Week

Space One Summer Hottest Week

Hourly Temperature

Hourly Temperature

(Natural Ventilation) July 15- July 21

(Additional Mechanical Ventilation) July 15- July 21

Space One Zone Mean Air Temperature

Space One Zone Mean Air Temperature

Outside Zone Mean Air Temperature

Outside Zone Mean Air Temperature


All Interventions Summer

Winter

BUILDING MEMBER VAPOR-PERM FELT 0.006 m AIR GAP 25mm 0.02 m

SAND/CEMENT/ LIME PLASTER CONDIT 0.006 m

2X4 STUD

FINISH

SERVICE CAVITY

BRICK FIRED CLAY 2400kgm3 0.19 m

BRICK FIRED CLAY 2400kgm3 0.19 m CELLULOSIC/MILLED PAPER/ WOOD PULP 0.23 m

SERVICE CAVITY WITH OPTIONAL INSULATION


All Interventions: Overheating

Overheating Graph

140 120

(Y) Hours

100 80 60 40 20

Baseline

Nat. Vent.

Operable Windows

(X)Modifications

Roof Vent


Before and After: Energy Balance

-1000,000,000 -5000,000,000 Space One Heating Period (Oct 15- May 15) Monthly Energy Balance Original

Space One Heating Period (May 15-Oct 15) Monthly Energy Balance With Insulation


Additional Iterations: Room Two Insulation

Space 2

Space 2

Space Two Winter Week

Space Two Winter Week

Hourly Temperature

Hourly Temperature

(Original) Jan 1 - Jan 7

(Insulation) Jan 1 - Jan 7

Space Two Zone Mean Air Temperature

Space Two Zone Mean Air Temperature

Outside Zone Mean Air Temperature

Outside Zone Mean Air Temperature

BUILDING MEMBER VAPOR-PERM FELT 0.006 m AIR GAP 25mm 0.02 m

SAND/CEMENT/ LIME PLASTER CONDIT 0.006 m

2X4 STUD

FINISH

SERVICE CAVITY

BRICK FIRED CLAY 2400kgm3 0.19 m

BRICK FIRED CLAY 2400kgm3 0.19 m CELLULOSIC/MILLED PAPER/ WOOD PULP 0.23 m

SERVICE CAVITY WITH OPTIONAL INSULATION


Additional Iterations: Room Two- Ventilation

Space Two SummerWeek

Space Two SummerWeek

Hourly Temperature

Hourly Temperature

(Original) July15- July 21

(Window Improvement) July15- July 21

Space Two Zone Mean Air Temperature

Space Two Zone Mean Air Temperature

Outside Zone Mean Air Temperature

Outside Zone Mean Air Temperature


Before and After