PRESTON LIBRARY - DESIGN DRAWINGS

Page 1

PRESTON CITY LIBRARY 266 GOWER STREET, PRESTON

General Notes

The Builder shall check all dimensions and levels on site prior to construction. Notify any errors, discrepancies or omissions to the architect. Drawings shall not be used for construction purposes until issued for construction. Do not scale drawings. All boundaries and contours subject to survey.

NG BUILDING DESIGN AND DRAFTING ABN #Contact ID Address: #Contact Full Address P +#Contact Phone Number | F +#Contact Fax | E #Contact E-mail | W #Contact Web

Project Name:

PRESTON LIBRARY Site:

266 GOWER STREET PRESTON VICTORIA 3072 Client:

DAREBIN CITY COUNCIL DRAWING TITLE:

DRAWING NO::

D00 OF 8 SCALE:

DATE:

6/10/2016 DRAWN BY:

NAOMI GRAHAM LEGEND

CONTENTS D01DO2DO3D04DO5DO6DO7DO8GSEducationalVersion

SITE PLAN SITE RESPONSE FLOOR PLAN ELEVATIONS ELEVATIONS SCHEMATIC SECTION PERSPECTIVES PERSPECTIVES


PUBLIC PARKING LOT. CONCRETE FOOTPATH.

AREA ANALYSIS

P8

HOT NORTHERLY WINDS IN SUMMER

SITE AREA: TOTAL BUILD AREA: WALKWAY AREA: CARPARK AREA: SITE COVERAGE:

P9

TOWN HALL AVENUE

3,518.86m2 1,057.40m2 890.81m2 333.08m2 55.4%

SEPTEMBER SUN 12PM

General Notes

The Builder shall check all dimensions and levels on site prior to construction. Notify any errors, discrepancies or omissions to the architect. Drawings shall not be used for construction purposes until issued for construction. Do not scale drawings. All boundaries and contours subject to survey.

P6 50,000

P10

0 37 0.

0 28 1.

74.680 (90° 35')

ABN #Contact ID

D04 E02

18,056

EXISTING CONCRETE PATHWAY.

Y

A

B

DD

C

FENCED OUTDOOR AREA

SEPTEMBER SUN 3PM

LIBRARY STAFF PARKING. BITUMEN

←2°

1

STAFF STAFFCARPARK CARPARK

12°→ CHILDRENS COLLECTION

2

COMPUTERS

LADIES TOILET

YOUNG ADULT COLLECTION

PRINT & COPY AREA

NEIGHBOURING PUBLIC PARKING (24 BAYS) BITUMEN

Client: ADJOINING PROPERTY No. 262 DOUBLE STOREY BRICK UNITS

DELIVERY / LOADING AREA

SERVERS / IT ROOM

CUSTOMER SERVICE

12°→

MAINTENANCE ROOM

5°→

COMPUTERS

0 21 1.

DRAWING NO::

3.05 (270° 36')

D01 OF 8

6,528

STORE STAFF MENS TOILET

4,672

←8°

SCALE:

4

STAFF LADIES TOILET

STAFF ROOM

1:200, 1:100

STAFF LUNCHROOM

ADULT COLLECTION

DW

F

FOYER

DRAWING TITLE:

P13 0 21 1.

E-03 D05

REFRESH -MENT STATION

DAREBIN CITY COUNCIL

1,830 3

BORROWING KIOSKS

4a

266 GOWER STREET PRESTON VICTORIA 3072

SITE RESPONSE, FLOOR PLAN

MENS TOILET

RETURNS ROOM

Site:

DISABLED TOILET/ BABY CHANGE

PERIODICALS

3a

PRESTON LIBRARY SEPTEMBER SUN 9AM

←8°

F

SITE BOUNDARY - 72.42M

D05 E-04

SITE BOUNDARY - 72.42M

2a

Project Name:

SITE BOUNDARY

72.420 (359° 46')

PROPOSED PUBLIC PARK AREA

SITE BOUNDARY

KELVIN GROVE

1a

TEEN/YOUTH AREA

Address: #Contact Full Address P +#Contact Phone Number | F +#Contact Fax | E #Contact E-mail | W #Contact Web

34.440 (179° 46')

SITE BOUNDARY

P7

NG BUILDING DESIGN AND DRAFTING

5 5a STAFF OUTSIDE AREA

CARPET TILES CARPET TILES CARPET TILES SYNTHETIC TURF / RUBBER FLOORING POLISHED ONCRETE POLISHED CONCRETE POLISHED CONCRETE CARPET TILES POLISHED CONCRETE POLISHED CONCRETE CARPET TILES POLISHED CONCRETE POLISHED CONCRETE

EXISTING CONCRETE PATHWAY.

ENTRY AIRLOCK

B

C

BIKE RACK

BIKE RACK

P5

D

D

BIKE RACK CONCRETE WALKWAY, STEPS UP TO ENTRY

EASEMENT

SITE BOUNDARY .400

71.630 (270° 36')

0

EASEMENT

PARALLEL STREET PARKING

GSEducationalVersion

SHRUBS EXISTING MATURE TREES CONCRETE WALKWAYS GRASS AREA. TREE PLANTER BOXES. WATER TANKS. PUBLIC RUBBISH BINS. LIBRARY DUMP BINS. PUBLIC SEATING.

PARALLEL STREET PARKING

P11

GOWER STREET P4

NAOMI GRAHAM LEGEND

0 20 . 1

47,000

SITE RESPONSE 1:200

ADJOINING PROPERTY No. 262 DOUBLE STOREY BRICK UNITS

CONCRETE FOOTPATH.

COLD WINDS IN WINTER

1

DRAWN BY:

TIMBER PALING FENCE

A

SITE BOUNDARY

Z

EASEMENT

No. 270 BRICK VENEER DWELLING M.C.H.N. CENTRE.

00 0.

6/10/2016

6a

25480

PUBLIC TOILETS

38M (179° 46')

DATE: POLISHED CONCRETE POLISHED CONCRETE CARPET TILES CARPET TILES POLISHED CONCRETE POLISHED CONCRETE CARPET TILES CARPET TILES

P3

P2

P1

P12


N PUBLIC PARKING LOT. CONCRETE FOOTPATH.

AREA ANALYSIS SITE AREA: TOTAL BUILD AREA: WALKWAY AREA: CARPARK AREA: SITE COVERAGE:

TOWN HALL AVENUE

SEPTEMBER SUN 12PM

0 37 0.

74.680 (90° 35')

18,056

EXISTING CONCRETE PATHWAY.

D

0 21 . 1 12°→

266 GOWER STREET PRESTON VICTORIA 3072

NEIGHBOURING PUBLIC PARKING (24 BAYS) BITUMEN

Client: ADJOINING PROPERTY No. 262 DOUBLE STOREY BRICK UNITS

DAREBIN CITY COUNCIL DRAWING TITLE:

0 21 . 1

DRAWING NO::

3.05 (270° 36')

5°→

6,528

D02 OF 8

4,672

SCALE:

←8°

1:200

CONCRETE WALKWAY, STEPS UP TO ENTRY

SITE BOUNDARY .400 0

71.630 (270° 36')

0 20 1. CONCRETE FOOTPATH.

PARALLEL STREET PARKING

PARALLEL STREET PARKING

GOWER STREET

SITE BOUNDARY

25480

D

BIKE RACK

GSEducationalVersion

Site:

SITE PLAN

No. 270 BRICK VENEER DWELLING M.C.H.N. CENTRE.

SITE PLAN 1:200

PRESTON LIBRARY

SEPTEMBER SUN 9AM

←8°

EXISTING CONCRETE PATHWAY.

1

Project Name:

DATE:

38M (179° 46')

SITE BOUNDARY - 72.42M

12°→

PUBLIC TOILETS

COLD WINDS IN WINTER

Address: #Contact Full Address P +#Contact Phone Number | F +#Contact Fax | E #Contact E-mail | W #Contact Web

SITE BOUNDARY

72.420 (359° 46')

LIBRARY STAFF PARKING. BITUMEN

←2°

SITE BOUNDARY

KELVIN GROVE

SEPTEMBER SUN 3PM

00 0.

The Builder shall check all dimensions and levels on site prior to construction. Notify any errors, discrepancies or omissions to the architect. Drawings shall not be used for construction purposes until issued for construction. Do not scale drawings. All boundaries and contours subject to survey.

ABN #Contact ID

34.440 (179° 46')

SITE BOUNDARY

General Notes

NG BUILDING DESIGN AND DRAFTING

0 28 . 1

6/10/2016 ADJOINING PROPERTY No. 262 DOUBLE STOREY BRICK UNITS

DRAWN BY:

NAOMI GRAHAM LEGEND SHRUBS EXISTING MATURE TREES

TIMBER PALING FENCE

HOT NORTHERLY WINDS IN SUMMER

3,518.86m2 1,057.40m2 890.81m2 333.08m2 55.4%

CONCRETE WALKWAYS GRASS AREA. TREE PLANTER BOXES. WATER TANKS. PUBLIC RUBBISH BINS. LIBRARY DUMP BINS. PUBLIC SEATING.


A

Y

B

C

N

D

FENCED OUTDOOR AREA

General Notes

The Builder shall check all dimensions and levels on site prior to construction. Notify any errors, discrepancies or omissions to the architect. Drawings shall not be used for construction purposes until issued for construction. Do not scale drawings. All boundaries and contours subject to survey.

1a

1

TEEN/YOUTH AREA

NG BUILDING DESIGN AND DRAFTING ABN #Contact ID Address: #Contact Full Address P +#Contact Phone Number | F +#Contact Fax | E #Contact E-mail | W #Contact Web

STAFF CARPARK

CHILDRENS COLLECTION

Project Name:

PRESTON LIBRARY

2

2a

Site:

YOUNG ADULT COLLECTION

266 GOWER STREET PRESTON VICTORIA 3072

PERIODICALS

MENS TOILET

PRINT & COPY AREA

3a

3 BORROWING KIOSKS

DELIVERY / LOADING AREA

SERVERS / IT ROOM

MAINTENANCE ROOM COMPUTERS

DRAWING NO::

STORE

4a

D03 OF 8 4

STAFF LADIES TOILET

STAFF ROOM

FLOORING

ENTRY / AIRLOCK AREA FOYER AREA CUSTOMER SERVICE RETURNS ROOM BORROWING AREA REFRESHMENTS ADULT COLLECTION COMPUTER AREA NEWSPAPER, MAGAZINES READING AREA TEEN/YOUTH AREA CHILDRENS AREA FENCED OUTDOOR AREA LADIES TOILETS MENS TOILETS DISABLED TOILETS STAFF OFFICE STAFF LUNCH ROOM STAFF TOILETS SEVER IT ROOM LOADING AREA MAINTENANCE ROOM

19.62m2 88.62m2 27.72m2 23.09m2 30.55m2 10m2 201.32m2 46.23m2

POLISHED CONCRETE POLISHED CONCRETE CARPET TILES CARPET TILES POLISHED CONCRETE POLISHED CONCRETE CARPET TILES CARPET TILES

45.26m2 192.5m2 109.29m2 136.02m2 12.69m2 10.10m2 6.52m2 44.05m2 21.64m2 11.2m2 15.03m2 19.31m2 7.84m2

CARPET TILES CARPET TILES CARPET TILES SYNTHETIC TURF / RUBBER FLOORING POLISHED ONCRETE POLISHED CONCRETE POLISHED CONCRETE CARPET TILES POLISHED CONCRETE POLISHED CONCRETE CARPET TILES POLISHED CONCRETE POLISHED CONCRETE

DATE:

6/10/2016

DW

STAFF LUNCHROOM

ADULT COLLECTION

FOYER

DRAWN BY:

NAOMI GRAHAM 5 5a LEGEND

STAFF OUTSIDE AREA

ENTRY AIRLOCK

6a FLOOR PLAN 1:100

Z

A

BIKE RACK

GSEducationalVersion

B

C

D

EASEMENT

2.

SCALE:

1:100

F

SIZE

DAREBIN CITY COUNCIL

FLOOR PLAN

STAFF MENS TOILET

ROOM

Client:

DRAWING TITLE:

REFRESH -MENT STATION

CUSTOMER SERVICE

RETURNS ROOM

EASEMENT

DISABLED TOILET/ BABY CHANGE

F

SITE BOUNDARY - 72.42M

COMPUTERS

LADIES TOILET


A METAL MESH ROOF SHADE PROVIDED TO REAR WEST SIDE OF THE BUILDING. SEATING PROVIDED UNDER THE SHADE AND LONG THE WEST SIDE TO OVERLOOK THE PARK AREA.

B

C

D

General Notes

M1

The Builder shall check all dimensions and levels on site prior to construction. Notify any errors, discrepancies or omissions to the architect. Drawings shall not be used for construction purposes until issued for construction. Do not scale drawings. All boundaries and contours subject to survey.

R.L PEAK

R.L PEAK

4,340

4,462

6,685

NG BUILDING DESIGN AND DRAFTING ABN #Contact ID Address: #Contact Full Address P +#Contact Phone Number | F +#Contact Fax | E #Contact E-mail | W #Contact Web

F.L

F.L

G.L

Project Name: M2

EO1

M4

M4

M3

PRESTON LIBRARY

200X200MM SQUARE STEEL POSTS POWDERCOATED IN YELLOW FORM THE FENCE TO THE OUTSIDE AREAS AND ARE USED IN THE FRONT FACADE OF THE BUILDING.

Site:

266 GOWER STREET PRESTON VICTORIA 3072

SOUTH ELEVATION 1:100

Client:

DAREBIN CITY COUNCIL DRAWING TITLE:

SOUTH ELEVATION, NORTH ELEVATION C

M1

M1

M1

METAL MESH ROOF SHADE PROVIDED TO REAR WEST SIDE OF THE BUILDING. SEATING PROVIDED UNDER THE SHADE AND LONG THE WEST SIDE TO OVERLOOK THE PARK AREA. R.L PEAK

DRAWING NO::

D04 OF 8 SCALE:

R.L PEAK 6,800

DATE:

4,462

5,700

1:100 6/10/2016

F.L 300

F.L

M3

M3

DRAWN BY:

NAOMI GRAHAM

M2

LEGEND

E02

GSEducationalVersion

200X200MM SQUARE STEEL POSTS POWDERCOATED IN YELLOW FORM THE FENCE TO THE OUTSIDE AREAS AND ARE USED IN THE FRONT FACADE OF THE BUILDING.

NORTH ELEVATION 1:100

M1 -

COLORBOND ROOF SHEETING IN SURFMIST FINISH.

M2 -

DULUX WEATHERSHIELD 'MONK' FINISH. EXTERIOR COVERING FOR THE CONCRETE PANELS ON THE WEST SIDE.

M3 -

SCYON AXON SMOOTH 133MM VERTICAL CLADDING - JAMES HARDIE. EXTERIOR CLADDING SYSTEM TO THE EAST SIDE OF THE BUILDING.

M4 -

TIMBA METAL CLADDING WITH 20MM STYROFOAM BACKING FOR INSULATION. EXTERIOR CLADDING FOR THE SOUTH FACE OF BUILDING.


4 M1

3

2

1

M1

General Notes

M1

The Builder shall check all dimensions and levels on site prior to construction. Notify any errors, discrepancies or omissions to the architect. Drawings shall not be used for construction purposes until issued for construction. Do not scale drawings. All boundaries and contours subject to survey.

R.L PEAK

NG BUILDING DESIGN AND DRAFTING

5,700

6,630

R.L PEAK

ABN #Contact ID Address: #Contact Full Address P +#Contact Phone Number | F +#Contact Fax | E #Contact E-mail | W #Contact Web

F.L

F.L

Project Name:

PRESTON LIBRARY 200X200MM SQUARE STEEL POSTS POWDERCOATED IN YELLOW FORM THE FENCE TO THE OUTSIDE AREAS AND ARE USED IN THE FRONT FACADE OF THE BUILDING.

E-03

M4

M4

M3

M3

M3

Site:

EAST ELEVATION 1:100

266 GOWER STREET PRESTON VICTORIA 3072 Client:

DAREBIN CITY COUNCIL METAL MESH ROOF SHADE PROVIDED TO REAR WEST SIDE OF THE BUILDING. SEATING PROVIDED UNDER THE SHADE AND LONG THE WEST SIDE TO OVERLOOK THE PARK AREA.

DRAWING TITLE:

1

M1

2

M1

3

4

M1

EAST ELEVATION, WEST ELEVATION

5

R.L PEAK

R.L PEAK

DRAWING NO::

R.L PEAK

SCALE:

6,685

6,800

5,700

D05 OF 8 1:100 DATE: F.L

F.L

M2

M2

200X200MM SQUARE STEEL POSTS POWDERCOATED IN YELLOW FORM THE FENCE TO THE OUTSIDE AREAS AND ARE USED IN THE FRONT FACADE OF THE BUILDING.

6/10/2016 DRAWN BY:

NAOMI GRAHAM LEGEND

E-04

GSEducationalVersion

WEST ELEVATION 1:100

M1 -

COLORBOND ROOF SHEETING IN SURFMIST FINISH.

M2 -

DULUX WEATHERSHIELD 'MONK' FINISH. EXTERIOR COVERING FOR THE CONCRETE PANELS ON THE WEST SIDE.

M3 -

SCYON AXON SMOOTH 133MM VERTICAL CLADDING - JAMES HARDIE. EXTERIOR CLADDING SYSTEM TO THE EAST SIDE OF THE BUILDING.

M4 -

TIMBA METAL CLADDING WITH 20MM STYROFOAM BACKING FOR INSULATION. EXTERIOR CLADDING FOR THE SOUTH FACE OF BUILDING.


SUMMER SUN

150MM PRECAST CONCRETE PANEL SYSTEM. PLEASE REFER TO CONSTRUCTION DRAWINGS. CONCRETE PANEL EXTERNALLY PAINTED DULUX WEATHERSHIELD GLOSS, VARIOUS COLOURS IN ZONES.

General Notes

16MM COLORBOND SHEET ROOFING @ 8 DEGREE PITCH IN SURFMIST FINISH SUPPORTED BY PURLINS ON 310X32 UNIVERSAL BEAMS @ SPECIFIED SPACINGS (REFER TO STRUCTURAL DRAWINGS).

The Builder shall check all dimensions and levels on site prior to construction. Notify any errors, discrepancies or omissions to the architect. Drawings shall not be used for construction purposes until issued for construction. Do not scale drawings. All boundaries and contours subject to survey.

CURTAIN WALL FLOOR TO CEILING HEIGHT WITH REMOTE CONTROLLED LOUVRE WINDOWS ALONG TOP FOR CROSS VENTILATION.

PLASTERBOARD CEILING LNING ATTACHED TO C PURLINS @ SPECIFIED SPACINGS (REFER TO STRUCTURAL DRAWINGS.

WINTER SUN

NG BUILDING DESIGN AND DRAFTING ABN #Contact ID Address: #Contact Full Address P +#Contact Phone Number | F +#Contact Fax | E #Contact E-mail | W #Contact Web

C.L PEAK

Project Name: 6,135

CROSS VENTILATION AIR FLOW

PRESTON LIBRARY Site:

266 GOWER STREET PRESTON VICTORIA 3072

G.L

150

F.L

POLISHED CONCRETE FLOORING ON 150MM REINFORCED CONCRETE SLAB ON GROUND.

Client:

DAREBIN CITY COUNCIL WINDOW NOTES

ESD CONCEPTS

CAPRAL ALUMINIUM WINDOWS IN EXCEL 'IRONSTONE' FINISH TO WINDOWS AND CURTAIN WALLS ON SOUTH, WEST AND NORTH. EXCEL 'CHARCOAL' USED ON EAST SIDE OF BUILDING. ALL WINDOWS ARE OPENED/OPERATED WITH REMOTE CONTROL OR FROM A TOUCH PAD DUE TO HEIGHTS OF SOME WINDOWS FOR MORE CONTROL IN WEATHER CHANGES.

MINIMAL WINDOWS HAVE BEEN USED ON THE WEST SIED IF THE BUILDING, THE USE OF A STEEL SHADE SHADE STRUCTURE HAS BEEN USED TO PROVIDE SHADE AND SHELTER FOR THE PUBLIC OUTSIDE AS WELL AS INSIDE.. ALL WINDOWS ARE OPENED/OPERATED WITH REMOTE CONTROL OR FROM A TOUCH PAD TO WORK WITH THE CROSS VENTILATION OF THE BUILDING.

DRAWING TITLE:

SECTION

LOUVRE SHADES HAVE BEEN PLACED ABOVE THE WEST FRONT WINDOWS TO ALLOW NATURAL SUNLIGHT IN BUT SHADE IN THE AFTERNOON SUN.

S01

SECTION 1:100

EXTERNAL MATERIALS

CLERESTORY WINDOWS HAVE BEEN DESIGNED TO HAVE OPENING LOUVRES TO ALLOW FOR CROSS VENTILATION. A METAL SHADE STRUCTURE HAS BEEN PROVIDED TO THE NORTH OF THE BUILDING TO GIVE SHADE TO THE CHILDRENS AREA THROUGH THE CURTAIN WALL. AS WELL AS BEING A SHADE STUCTURE IT LINKS BACK TO THE USE OF THE SAME 200X200 POSTS USED AT THE FRONT AND SIDE OF THE BUILDING.

DRAWING NO::

D06 OF 8 SCALE:

1:100 DATE:

M1 -

COLORBOND ROOF SHEETING IN SURFMIST FINISH.

6/10/2016 DRAWN BY:

M2 -

DULUX WEATHERSHIELD 'MONK' FINISH. EXTERIOR COVERING FOR THE CONCRETE PANELS ON THE WEST SIDE.

NAOMI GRAHAM LEGEND

GSEducationalVersion

M3 -

SCYON AXON SMOOTH 133MM VERTICAL CLADDING - JAMES HARDIE. EXTERIOR CLADDING SYSTEM TO THE EAST SIDE OF THE BUILDING.

M4 -

TIMBA METAL CLADDING WITH 20MM STYROFOAM BACKING FOR INSULATION. EXTERIOR CLADDING FOR THE SOUTH FACE OF BUILDING.


General Notes

The Builder shall check all dimensions and levels on site prior to construction. Notify any errors, discrepancies or omissions to the architect. Drawings shall not be used for construction purposes until issued for construction. Do not scale drawings. All boundaries and contours subject to survey.

NG BUILDING DESIGN AND DRAFTING ABN #Contact ID Address: #Contact Full Address P +#Contact Phone Number | F +#Contact Fax | E #Contact E-mail | W #Contact Web

Project Name:

PRESTON LIBRARY Site:

266 GOWER STREET PRESTON VICTORIA 3072 Client:

DAREBIN CITY COUNCIL

SOUTH PERSPECTIVE

DRAWING TITLE:

DRAWING NO::

D07 OF 8 SCALE:

WEST PERSPECTIVE DATE:

6/10/2016 DRAWN BY:

SOUTH-EAST PERSPECTIVE

NAOMI GRAHAM LEGEND

GSEducationalVersion


General Notes

The Builder shall check all dimensions and levels on site prior to construction. Notify any errors, discrepancies or omissions to the architect. Drawings shall not be used for construction purposes until issued for construction. Do not scale drawings. All boundaries and contours subject to survey.

NG BUILDING DESIGN AND DRAFTING ABN #Contact ID Address: #Contact Full Address P +#Contact Phone Number | F +#Contact Fax | E #Contact E-mail | W #Contact Web

Project Name:

PRESTON LIBRARY Site:

266 GOWER STREET PRESTON VICTORIA 3072 Client:

DAREBIN CITY COUNCIL NORTH EAST PERSPECTIVE DRAWING TITLE:

DRAWING NO::

D08 OF 8 SCALE:

NORTH PERSPECTIVE

DATE:

6/10/2016 DRAWN BY:

NAOMI GRAHAM LEGEND

INTERIOR PERSPECTIVE

GSEducationalVersion


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.