TABLE NO:1 GENERAL DESCRIPTION CATCHMENT
WATERSHED NO
Satluj
Subcatchment
MICRO WATERSHED NO Subcatchment No 18
LATITUDE NA
LONGITUDE NA
ALTITUDE 2365 to 5905 m
AREA(HA) 66400 SLOPE IN DEGREE 40' to 85'
DISTRICT NAME
TEHSIL/BLOCK
Kinnaur RAINFALL(mm) NA
CATTLE POPULATION 2940
MALE 1406
FEMALE 1534
MILTCH 440
OTHER 14516
Pooh
VILLAGE Pooh, Ropa, Sunam, Shila, Rushlang, Taling, Chiaso
PHOTO C:\MWS_21\Photo\SC18\Table 1\Table1.jpg
SNOWFALL(mm) NA PROPOSED NO/NAME NA
TEMPERATURE(Cen) NA PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA
NO OF HOUSE HOLD
TABLE 1 PHOTO Subcatchment No 18
Volume: XIII Part: 1 Chapter: 4 Page No:
209
706 DESCRIPTION NA
TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND WASTE LAND OTHERS LAND TOTAL
GOVT AREA 5 693 15580 49613 65891
PRIVATE AREA 509 0 0 0 509
B.AREA UNDER FOREST CATEGORY WISE :
COMMU AREA 0 0 0 0 0
TOTAL 514 693 15580 49613 66400
CATEGORY NAME AREA (HA) SPECIES DENSITY
DPF/RESERVE Cibba, Behrang, Ropa 693.38 Deodar, Neoza, Kail, Junifur 0 to 0.6
UPF NA NA NA NA
PASTURE Giabon, Taling, Sunam 21020 NA NA
OTHERS NA 28592.82 NA NA
TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS NAME
Bralam Riskula ng
LATITUDE AND LONGITUD E
TOTAL AREA (HA)
31'75'60" 78'46'78" 31'76'77" 78'45'67"
SPECIES PLANTED
SAMPLE GAP FILLING AREA (HA)
SURVIV AL %
10
Robinia
7
30
4
Robinia
2
50
3
40
Due to Drought.
2
60
Due to Drought.
2
33.33
1
50
Due to Drought.
2
0
Due to Drought.
2
33.33
Due to Drought.
SAMPL E AREA (HA)
Ropa
31'78'68" 78'43'38"
5
Tam
31'79'44" 78'42'43"
5
Tinku Nala-I
31'75'26" 78'55'63"
Tinku Nala-II
31'75'21" 78'55'82"
UF Pooh-I
31'73'24" 78'54'94"
2
UF PoohII
31'73'24" 78'54'94"
3
TOTAL :
136
3
2
136
34
Deodar, Neoza, Konifur Deodar, Neoza, Konifur Seabuckth orn, Robinia Seabuckth orn, Robinia Chuli, Alunthus, Robinia Chuli, Alunthus, Robinia, Neoza, Bemi
21
TOTAL GAP FILLIN G AREA (HA)
AREA NEEDED NEW PLANTATION (HA)
FENCING REQUIRED (RM)
REASONS FOR FAILURE
FINAL PRESCRIPTIO N(Enrichmen t(HA))
RATE/ HAC
COST (Rs)
Enrichment = 100
35000
3500000
Energy Plantation = 7
138000
966000
Due to Drought. Due to Drought.
80
80
40
40
66000
Due to Drought.
66000
Volume: XIII Part: 1 Chapter: 4 Page No:
4466000
210
TABLE 3 PHOTOS Bralam
Tinku Nala-I
Riskulang
Ropa
Tinku Nala-II
UF Pooh-I
Volume: XIII Part: 1 Chapter: 4 Page No:
Tam
UF Pooh-II
211
TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA
LATITUDE/ LONGITUDE
Bralam
31'75'60" 78'46'78"
Riskulang
31'76'77" 78'45'67"
Ropa
31'78'68" 78'43'38"
Tam
31'79'44" 78'42'43"
Tinki Nala-I
31'75'26" 78'55'63"
Tinki Nala-II
31'75'26" 78'55'82"
UF Pooh-I
31'73'24" 78'54'94"
UF Pooh-II
31'73'24" 78'54'94"
PRESCRIPTIO N CheckDams Live Hedge CheckDams Brushwood CheckDams Brushwood Live Hedge CheckDams Live Hedge CheckDams Brushwood Live Hedge CheckDams Brushwood CheckDams CheckDams Live Hedge CheckDams Brushwood CheckDams Live Hedge Brushwood Live Hedge Brushwood CheckDams CheckDams Live Hedge CheckDams Brushwood
QUANTITY 2x1.5x1.5m=18 Nos 215 Rms 2x1.5x1.5m=10 Nos 100 Rms 3x1.5x1.5m=15 Nos 150 Rms 200 Rms 2x1.5x1.5m=16 Nos 240 Rms 2x1.5x1.5m=14 Nos 3x1.5x1.5m=12 Nos 70 Rms 260 Rms 2x1.5x1.5m=12 Nos 150 Rms 3x1.5x1.5m=11 Nos 2x1.5x1.5m=18 Nos 200 Rms 3x1.5x1.5m=16 Nos 50 Rms 2x1.5x1.5m=12 Nos 3x1.5x1.5m=11 Nos 260 Rms 70 Rms 280 Rms 100 Rms 3x1.5x1.5m=9 Nos 2x1.5x1.5m=22 Nos 2x1.5x1.5m=13 Nos 240 Rms 3x1.5x1.5m=10 Nos 120 Rms
AVAILABILTY OF LOCAL MATERIAL
OLD WORK NEED REPAIRING (QUANTITY)
FINAL PRESCRIPTION NEW NEW PRESCRIPTION QUANTITY
RATE/ CUM
COST (Rs)
Stone & local species
NA
NA
NA
NA
NA
Stone & local species
NA
NA
NA
NA
NA
Stone & local species
NA
NA
NA
NA
NA
Stone & local species
NA
NA
NA
NA
NA
Stone & local species
NA
NA
NA
NA
NA
Stone & local species
NA
NA
NA
NA
NA
Stone & local species
NA
NA
NA
NA
NA
Stone & local species
NA
NA
NA
NA
NA
Volume: XIII Part: 1 Chapter: 4 Page No:
212
TABLE 4 PHOTOS Bralam
Tinku Nala-I
Riskulang
Ropa
Tinku Nala-II
UF Pooh-I
Tam
UF Pooh-II
TABLE NO:5 AGROFORESTRY TYPE OF TREE TREES WILD FRUIT
MEDICINAL
PRESENT STATUS PRESENT NOs PRESENT SPECIES 150 Neoza, Kunish, Poplar 300 Chuli, Bemi, Walnut Karu, Patish, Chora, Dhoop, Somlata, Hathpanja, Rattanjot, 10000 Guchi, Jeera
FUTURE REQUIREMENT FUTURE NOs FUTURE SPECIES 2300 Neoza, Kunish, Poplar 3500 Chuli, Bemi, Walnut Karu, Patish, Chora, Dhoop, Somlata, Hathpanja, Rattanjot, 12000 Guchi, Jeera
Volume: XIII Part: 1 Chapter: 4 Page No:
NEED FOR EXTENSION Y Y
SOURCE OF PLANTING STOCK(Nearest Nursery) Ropa Nursery Ropa Nursery
Y
Ropa Nursery
213
TABLE NO:6 GRAZING LANDS Name
LATITUDE/LONGITUDE
AREA(HA)
Pasumche Thanmch e
31'76'85"78'58'41"
250
31'76'04"78'56'80"
250
SPECIES Bushes & Grasses Bushes & Grasses
WEED REMOVAL
SEEDING
CLOSURE S
No
Yes
Yes
No
Yes
Yes
PEOPLES SUGGESTION
Other Seeding of grasses Seeding of grasses
Rate/ Hac (Rs)
Cost (Rs)
NA
27000
6750000
NA
27000
6750000
TABLE NO:7
TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA
AREA(HA) 0
LATITUDE/LONGITUDE NA
SPECIES NA
GAP FILLING NA
MAINTENANCE NA
NEW PLANTATION NA
SOIL CONSERVATION MEASURES(QUANTITY) NA
TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads)
NAME OF AREA
LATITUDE/ LONGITUD E
PRESCRIPTI ON Live Hedge
Bhagat Nala (2.5 Kms) Chiaso Khad bank stablization near Rushkulam village (5 Chiaso Khad bank stablization near Sunam village (2Kms)
Darbong Nala (4 Kms)
QUANTITY
AVAILABI LITY OF LOCAL MATERIA L
OLD WORKS NEEDING REPAIR(Q UANTITY)
LIFT IRRIGA TION(H T/ACER AGE)
340 Rms 4x1.5x1.5m=22 Nos 3x1.5x1.5m=18 Nos
Stone & local species
NA
20x3x4m=250 Nos
Stone & local species
Stone & local species
31'73'24" 78'54'94"
Check Walls
31'76'20" 78'46'31"
Retaining Wall Gabion
31'75'95" 78'46'98"
Retaining Wall in Gabion
20x3x4m=100 Nos
Live Hedge
450 Rms
CheckDams
8x1.5x1.5m=30 Nos 10x1.5x1.5m=20 Nos
31'76'46" 78'46'12"
Stone & local species
FINAL PRESCRIPTION
NA
NEW PRESCRIPTIO N Live Hedge Retaining Wall Gabion Brushwood
NEW QUANTITY 750 Rms 4x1.5x1.5m=7 Nos 3x1.5x1.5m=6 Nos 125 Rms
RATE/ UNIT 9.6 10033 10033 62
COST(Rs) 7200 280924 180594 7750
NA
NA
Retaining Wall Gabion
20x3x4m=82 Nos
29131
47774840
NA
NA
Retaining Wall Gabion
29131
20391700
10033
802640
CheckDams Brushwood
20x3x4m=35 Nos 8x1.5x1.5m=10 Nos 10x1.5x1.5m=6 Nos 200 Rms
10033 62
601980 12400
Live Hedge
1200 Rms
9.6
11520
NA
NA
Volume: XIII Part: 1 Chapter: 4 Page No:
214
Gurakh Nala (1.5 Kms)
31'77'22" 78'45'25"
Pooh Nala (500 m)
31'76'85" 78'58'41"
Ranam Khad (12 Kms)
31'77'36" 78'45'10"
Check Walls Live Hedge Check Walls Retaining Wall in Gabion Live Hedge
10x3x4m=10 Nos 150 Rms 6x3x4m=12 Nos 8x1.5x1.5m=13 Nos
Live Hedge Check Walls
1000 Rms 10x3x4m=60 Nos
Check Walls
5x1.5x1.5m=11 Nos 260 Rms
Retaining Wall Gabion
8x3x4m=55 Nos 10x3x4m=12 Nos 15x3x4m=18 Nos 20x3x4m=22 Nos 8x3x4m=14 Nos 320 Rms
Ropa Nala (7 Kms) Satluj River Bank near Bhagat Nala (1.5 Kms) Satluj River Bank near Ropa (5 Kms)
31'79'49" 78'42'25"
Live Hedge
31'73'24" 78'54'94"
Retaining Wall Gabion
20x3x4m=75 Nos
31'79'24" 78'42'68"
Retaining Wall Gabion Live Hedge Check Walls
20x3x4m=250 Nos 500 Rms 8x3x4m=18 Nos
Shangthal Nala (5 Kms)
31'75'60" 78'46'79"
Talengi Nala (4 Kms)
31'74'10" 78'48'11"
Tinku Nala (2.5 Kms)
31'75'27" 78'55'64"
Check Walls CheckDams Live Hedge
Check Walls Live Hedge Check Walls
6x3x4m=22 Nos 6x3x4m=12 Nos 8x3x4m=28 Nos 400 Rms
5x1.5x1.5.m=25 Nos 3x1.5x1.5m=15 Nos 260 Rms 4x1.5x1.5m=12 Nos
Stone & local species Stone & local species
Stone & local species
NA
NA
NA
NA
NA
NA
Live Hedge Brushwood Retaining Wall Gabion Retaining Wall Gabion Live Hedge Retaining Wall Gabion Brushwood Live Hedge Retaining Wall Gabion Live Hedge
NA
NA
Retaining Wall Gabion Brushwood
NA
NA
Retaining Wall Gabion
NA
NA
Stone & local species
NA
NA
Stone & local species
NA
NA
Stone & local species Stone & local species Stone & local species
Stone & local species
NA
NA
Retaining Wall Gabion Retaining Wall Gabion Live Hedge Brushwood Brushwood CheckDams Live Hedge Live Hedge Retaining Wall Gabion Brushwood Retaining Wall Gabion
Volume: XIII Part: 1 Chapter: 4 Page No:
450 Rms 75 Rms 6x3x4m=4 Nos 10x3x4m=3 Nos 8x1.5x1.5m=4 Nos
9.6 62 29131 29131 10033
4320 4650 699144 873930 321056
5x1.5x1.5m=3 Nos 300 Rms
10033 9.6
150495 2880
8x3x4m=18 Nos 600 Rms 3600 Rms
29131 62 9.6
4194864 37200 34560
10x3x4m=20 Nos 2100 Rms 10x3x4m=4 Nos 15x3x4m=6 Nos 20x3x4m=6 Nos 8x3x4m=4 Nos 350 Rms
29131 9.6 29131 29131 29131 29131 62
5826200 20160 1165240 2621790 3495720 932192 21700
20x3x4m=25 Nos
29131
14565500
20x3x4m=82 Nos 8x3x4m=6 Nos 6x3x4m=7 Nos 1500 Rms 250 Rms 200 Rms 6x3x4m=14 Nos 8x3x4m=29 Nos 1200 Rms 750 Rms
29131 29131 29131 9.6 62 62 29131 29131 9.6 9.6
47774840 1398288 1223502 14400 15500 12400 2447004 6758392 11520 7200
4x1.5x1.5m=3 Nos 125 Rms 5x1.5x1.5.m=5 Nos 3x1.5x1.5m=5 Nos
10033 62 10033 10033
120396 7750 250825 150495
215
TABLE 8 PHOTOS Bhagat Nala
Pooh Nala
Chiaso Khad bank stablization Chiaso Khad bank stablization near Rushkulam village near Sunam village
Ranam Khad
Ropa Nala
Darbong Nala
Gurakh Nala
Satluj River Bank near Bhagat Nala
Volume: XIII Part: 1 Chapter: 4 Page No:
216
Satluj River Bank near Ropa
Shangthal Nala
Talengi Nala
Tinku Nala
TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/ LOCATION Ropa Village (500x500m )
LATITUDE/ LONGITUDE
31'79'58" 78'42'21"
DAMAGE/R ISK TO LIFE & PROPERTY
NA
MEAS URES TAKEN
TYPE OF SOIL AND ROCK
DEGREE OF SLOPES/ SEVERITY
NA
LOSE STONE
VERY SEVERE
OCCU RREN CE(Se ason)
Rainy
ROAD CONS TRUC TION
No
QUA RRY
No
OTHER CONSTR UCTION S
No
NAT URA L
FINAL PRESCRIPTION NEW NEW PRESCRI QUANTIT PTION Y
Yes
Retaining Wall Gabion
Volume: XIII Part: 1 Chapter: 4 Page No:
217
1x1.5x1. 5m=70 Nos
RATE/ UNIT
10033
COST (Rs)
702310
TABLE 9 PHOTO Ropa Village
TABLE NO:9A
INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Apple Pears Kurmani Almond Chuli Grapes Bemi
VARIETY(LOCAL/IMPROVED) Royal, Red Royal, Golden, Red Golden, Delicious, Spur, Rich Red Local Local Drake, Semi Drake, Kagzi, IXL Local Local Local
USE OF FERTILISERS
USE OF INSECTICIDES
PROBLEMS FACED
Yes No No Yes No No No
Yes No No Yes No No No
Monkeys and Rochs destroys the crop.
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local Local
USE OF FERTILISERS No No No No No No No No
USE OF INSECTICIDES No No No No No No No No
2.CROPS : CROPS NAME Barley Rajmash Maize Tulsi Koda Fafra Ogla Potato
Volume: XIII Part: 1 Chapter: 4 Page No:
PROBLEMS FACED
Monkeys and wild animlas destroys the crops.
218
3.VEGETABLE : VEGETABLE NAME Cabbage Cauliflower Brinjal Capsicum Peas Tomato Raddish Mustard
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local Local
USE OF FERTILISERS No No No No No No No No
USE OF INSECTICIDES No No No No No No No No
PROBLEMS FACED
Monkeys and wild animals destroys the crop.
4. LIVE STOCK : LIVE STOCK(NO) Cow=440 Ox=121 Goat/ Sheep=14125 Mule/ Donkey=254 Yak=10
BREED Jersy & Local Local Local Local Local
WHETHER SELLING THE PRODUCT Yes No No No No
PROBLEM FACED
No Problems.
5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER
REQUIREMENT Yes Yes
AVAILABILITY
GAP PERCENTAGE 10 15
90 85
SOURCE LPG & Depot Purchase
MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Karu Patish Dhoop Somlata Rattanjot Guchi Chora Hathpanja
EXISTING NAME Karu Patish Dhoop Somlata Rattanjot Guchi Chora Hathpanja
SUGGESTIONS
Technical guidance required about the use of MFPs.
Volume: XIII Part: 1 Chapter: 4 Page No:
219
PEOPLES PARTICIPATION: MAIN PROBLEMS Rolling of stones is causing damage to the village. Rolling of stones is causing damage to the village. No facility to cross Rop Khas Nala. Shortage of staff in dispensary. No facility for water harvesting. No accommodation for aganwadi, youth club, mahila mandal. Lack of knowledge about medicinal plants. Condition of village paths is very poor. No facility to cross Rop Khas Nala. Shortage of staff in dispensary.
SUGGESTION FOR IMPROVEMENT Requirement of check dams behind the village and net with plantation infront of village. Requirement of check dams behind the village and net with plantation infront of village. Requirement of foot bridge to cross the nala. Additional staff to be brought in dispensary. Requirement of water harvesting structure at the top of village.
PEOPLES PRIORITIES Top Priority.
Construction of accommodation for such socities. Technical guidance and awareness about the benefit of medicinal plants. Village paths to be well maintained. Requirement of foot bridge to cross the nala. Additional staff to be brought in dispensary.
Priority.
PEOPLES PARTICIPATION:
COSTING: TABLES COST
TABLE 3 4466000
TABLE 4 0
TABLE 6 13500000
TABLE 8 165235661
TABLE 9 705190
Volume: XIII Part: 1 Chapter: 4 Page No:
TOTAL 183906851
220