TABLE NO:1 GENERAL DESCRIPTION
Satluj
WATERSHED NO Sub catchments
MICRO WATERSHED NO Subcatchment No 21
LATITUDE 31'31' to 31'41'
LONGITUDE 78'25' to 78'58'
CATCHMENT
AREA(HA)
DISTRICT NAME
TEHSIL/BLOCK
VILLAGE
Kinnaur
Moorang/ Pooh
Nesang
ALTITUDE
40200 SLOPE IN DEGREE
PHOTO C:\MWS_21\Photo\SC21\Table 1\Table1.jpg
RAINFALL(mm)
SNOWFALL(mm)
TEMPERATURE(Cen)
NO OF HOUSE HOLD
2259 to 6095 m
45' to 90'
NA
NA
NA PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA
CATTLE POPULATION 640
MALE 330
FEMALE 310
MILTCH 152
OTHER 2653
PROPOSED NO/NAME NA
122 DESCRIPTION NA
TABLE 1 PHOTO Subcatchment No 21
Volume: XIII Part: 1 Chapter: 4 Page No:
234
TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND WASTE LAND OTHERS LAND TOTAL
GOVT AREA
PRIVATE AREA
0 442 680 38993 40115
B.AREA UNDER FOREST CATEGORY WISE :
COMMU AREA 85 0 0 0 85
0 0 0 0 0
TOTAL
CATEGORY
DPF/RESERVE
UPF
PASTURE Dhar Rothan, Dhar Taplu, Dhar Tuprang, Dhar Kobrang 22996 NA NA
85 442 680 38993 40200
NAME AREA (HA) SPECIES DENSITY
Nesang 441.54 NA 0 to 0.3
NA NA NA NA
AREA NEEDED NEW PLANTATION (HA)
FENCIN G REQUIR ED (RM)
REASONS FOR FAILURE
21000
Due to grazing and drought. Atlease 6 years of maintainance is requir Due to grazing and drought. Atlease 6 years of maintainance is requir
OTHERS NA 15996.77 NA NA
TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS NAM E
Nesa ng
LATITUDE AND LONGITU DE
TOTAL AREA (HA)
31'64'94" 78'50'38"
SAMPL E AREA (HA)
SPECIES PLANTED
5
Chuli, Bemi, Robinia, Alunthus
5
Chuli, Bemi, Robinia, Alunthus
SAMPL E GAP FILLIN G AREA (HA)
2
SURVI VAL %
60
25 Nesa ng TOTA L :
31'64'94" 78'50'38"
25
TOTAL GAP FILLING AREA (HA)
10
5
2
2
40
60
10
40
FINAL PRESCRIPTI ON(Enrichm ent(HA))
RATE/ HAC
COST (Rs)
Energy Plantation = 6
138000
828000
Enrichment = 20
35000
700000
21000
Volume: XIII Part: 1 Chapter: 4 Page No:
1528000
235
TABLE 3 PHOTO Nesang
TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA
LATITUDE/ LONGITUDE
PRESCRIPTION
Nesang
31'64'94" 78'50'38"
CheckDams Brushwood Live Hedge
QUANTITY 3x1.5x1.5m=40 Nos 2x1.5x1.5m=46 Nos 600 Rms 1200 Rms
AVAILABILTY OF LOCAL MATERIAL
OLD WORK NEED REPAIRING(QUANTITY)
FINAL PRESCRIPTION NEW NEW PRESCRIPTION QUANTITY
RATE/ CUM
COST(Rs)
stone & local species
NA
NA
NA
NA
NA
Volume: XIII Part: 1 Chapter: 4 Page No:
236
TABLE 4 PHOTO Nesang
TABLE NO:5 AGROFORESTRY TYPE OF TREE TREES WILD FRUIT
MEDICINAL
PRESENT STATUS PRESENT NOs PRESENT SPECIES 150 Poplar, Neoza, Deodar 200 Bemi, Chuli, Walnut Dhup, Karu, Chukri, Hathpanja, Kala Jeera, Patish, Kashmal, Guchi, 3000 Diascoriya, Salam Mishri
FUTURE REQUIREMENT FUTURE NOs FUTURE SPECIES 600 Poplar, Neoza, Deodar 1000 Bemi, Chuli, Walnut Dhup, Karu, Chukri, Hathpanja, Kala Jeera, Patish, Kashmal, Guchi, 10000 Diascoriya, Salam Mishri
NEED FOR EXTENSION Y Y
SOURCE OF PLANTING STOCK(Nearest Nursery) Moorang Nursery. Moorang Nursery.
Y
Moorang Nursery.
TABLE NO:6 GRAZING LANDS Name
LATITUDE/L ONGITUDE
AREA (HA)
SPECIES
WEED REMOVAL
SEEDING
CLOSURES
Kandas
NA
250
Grass & Bushes
No
Yes
Yes
SPECIES NA
GAP FILLING NA
Other Seeding of local and improved grasses
PEOPLES SUGGESTION
Rate/ Hac (Rs)
NA
27000
TABLE NO:7
TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA
AREA(HA) 0
LATITUDE/LONGITUDE NA
MAINTENANCE NA
NEW PLANTATION NA
Volume: XIII Part: 1 Chapter: 4 Page No:
237
SOIL CONSERVATION MEASURES(QUANTITY) NA
Cost (Rs)
6750000
TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads)
NAME OF AREA
LATITUDE/ LONGITUDE
Gurik Nala (500 m)
31'66'05" 78'48'87"
Kerumdh ar Nala (5 Kms)
Kerumdh ar Nala-II (2 Kms) Nesang Khad Bank (3 Kms)
Tumnang Nala (2.5 Kms)
31'64'73" 78'50'69"
PRESCRIPTION CheckDams
QUANTITY 5x3x4m=6 Nos 7x3x4m=5 Nos
Live Hedge Brushwood
300 Rms 500 Rms
CheckDams Live Hedge Brushwood
31'65'31" 78'49'81"
CheckDams Live Hedge Retaining Wall in Gabion
31'65'23" 78'50'29"
Retaining Wall in Gabion
31'64'38" 78'51'96"
CheckDams Brushwood Live Hedge
5x2x2.5m=37 Nos 15x3x4m=28 Nos 13x3x4m=30 Nos 450 Rms 200 Rms 5x3x4m=32 Nos 7x3x4m=30 Nos 500 Rms 7x3x4m=3 Nos
20x3x4m=150 Nos 12x3x4m=18 Nos 10x2.5x3m=15 Nos 15x3x4m=20 Nos 5x3x4m=24 Nos 300 Rms 600 Rms
AVAILABIL ITY OF LOCAL MATERIAL
OLD WORKS NEEDING REPAIR(QUA NTITY)
LIFT IRRIGATI ON (HT/ACE RAGE)
Stone & local species
NA
NA
Stone & local species
NA
NA
FINAL PRESCRIPTION
NEW PRESCRIPTION Brushwood CheckDams Live Hedge CheckDams Brushwood
CheckDams Live Hedge Brushwood
Stone & local species
NA
NA
CheckDams Live Hedge Retaining Wall Gabion
Stone & local species
NA
NA
Retaining Wall Gabion
Stone & local species
Check Dams=55 Nos
NA
CheckDams Brushwood Live Hedge
RATE/ UNIT 62 29131 9.6 29131 62
COST(Rs) 1550 291310 1440 407834 31000
17277 29131 29131 9.6 62 29131 29131 9.6
1036620 4369650 3495720 14400 12400 1456550 2039170 5760
7x3x4m=1 Nos
29131
203917
20x3x4m=50 Nos 12x3x4m=6 Nos 10x2.5x3m=5 Nos 15x3x4m=6 Nos 5x3x4m=8 Nos 300 Rms 750 Rms
29131 29131
29131000 2097432
20177 29131 29131 62 9.6
1008850 2621790 1165240 18600 7200
NEW QUANTITY 25 Rms 5x3x4m=2 Nos 150 Rms 7x3x4m=2 Nos 500 Rms 5x2x2.5m=12 Nos 15x3x4m=10 Nos 12x3x4m=10 Nos 1500 Rms 200 Rms 5x3x4m=10 Nos 7x3x4m=10 Nos 600 Rms
Volume: XIII Part: 1 Chapter: 4 Page No:
238
TABLE 8 PHOTOS Gurik Nala
Kerumdhar Nala
Nesang Khad Bank
Kerumdhar Nala-II
Tumnang Nala
Volume: XIII Part: 1 Chapter: 4 Page No:
239
TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/LOC ATION Road from Nesang Bridge to Nesang village (400 m)
LATITUDE/ LONGITUD E
DAMAGE/ RISK TO LIFE & PROPERTY
NA
Property
FINAL PRESCRIPTION
MEAS URES TAKEN
TYPE OF SOIL AND ROCK
DEGREE OF SLOPES/ SEVERIT Y
OCCU RREN CE(Se ason)
ROAD CONST RUCTIO N
NA
CLAY
MODERA TE
Rainy
Yes
QU AR RY
OTHER CONST RUCTIO NS
NATU RAL
NEW PRESCRIPTI ON
NEW QUANTITY
RATE/ UNIT
COST(Rs)
No
No
Yes
Retaining Wall Gabion
15x2x2.5 m=10 Nos
17277
2591550
TABLE NO:9A
INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Apple Almond Pears Kurmani Chuli Bemi Walnut Grapes
VARIETY(LOCAL/IMPROVED) Royal, Red Royal, Golden, Red Golden, Rich Red, Spur, Delicious Drake, Semi Drake, Kagzi, IXL Local Local Local Local Local Local
USE OF FERTILISERS Yes No No No No No No No
USE OF INSECTICIDES Yes No No No No No No No
PROBLEMS FACED
No Problems.
3.VEGETABLE : VEGETABLE NAME Cabbage Cauliflower Brinjal Peas Tomato Raddish Ladyfinger
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local
USE OF FERTILISERS No No No No No No No
USE OF INSECTICIDES No No No No No No No
PROBLEMS FACED
No Problems.
Volume: XIII Part: 1 Chapter: 4 Page No:
240
4. LIVE STOCK : LIVE STOCK(NO) Cow=152 Ox=11 Goat/ Sheep=2600 Mule=38 Yak=4
BREED Jersy & Local Local Local Local Local
WHETHER SELLING THE PRODUCT Yes No Yes No No
PROBLEM FACED
No Problems.
5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER
REQUIREMENT Yes Yes
AVAILABILITY
GAP PERCENTAGE 5 25
95 75
SOURCE LPG & Supply Depot Purchase
MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Dhoop Karu Chukri Hathpanja Kala Jeera Patish Kashmal Guchi Salam Mishri Diascoriya
EXISTING NAME Dhoop Karu Chukri Hathpanja Kala Jeera Patish Kashmal Guchi Salam Mishri Diascoriya
SUGGESTIONS
Requirement of technical guidance about medicinial plants.
PEOPLES PARTICIPATION: MAIN PROBLEMS Due to barren land soil erosion is huge. There is no accommodation for aganwadi, mahila mandal, and community hall and youth club. Playground is very small and in poor condition. Village path is in poor condition. Crematorium shed is not available. There are no drinking water taps in the village. There are no street light around the village. Electricity lines are not in proper way. There are no water storage tanks.
SUGGESTION FOR IMPROVEMENT Plantation of fruits, deodar, kail, poplar needs to be donein barren land. Authorities should provide accommodation for such things. Need for extension and fencing of playground. Maintenance of village path. Construction of crematorium shed. IPH dept. should provide drinking water taps. Authorities should provide street lights. Proper planning and execution should be done. Water storage tank at Khanocha.
Volume: XIII Part: 1 Chapter: 4 Page No:
241
PEOPLES PRIORITIES
Priority.
Top Priority.
PEOPLES PARTICIPATION
COSTING: TABLES COST
TABLE 3 1528000
TABLE 4 0
TABLE 6 6750000
TABLE 8 49417433
TABLE 9 6910800
TOTAL 64606233
Volume: XIII Part: 1 Chapter: 4 Page No:
242