vol 13 - SC23

Page 1

TABLE NO:1 GENERAL DESCRIPTION CATCHMENT

WATERSHED NO

Satluj

Subcatchments

MICRO WATERSHED NO Subcatchment No 23

LATITUDE 31'28'36"

LONGITUDE 78'18'26"

ALTITUDE 2105 to 5712 m

8600 SLOPE IN DEGREE 30' to 85'

POPULATION 2878

MALE 1442

FEMALE 1436

MILTCH 399

AREA(HA)

DISTRICT NAME

TEHSIL/BLOCK

VILLAGE

Kinnaur

Morang/ pooh

Rispa, Ribba, Holding

RAINFALL(mm) NA

SNOWFALL(mm) NA PROPOSED NO/NAME NA

TEMPERATURE(Cen) NA PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA

CATTLE OTHER 3421

TABLE 1 PHOTO SubCatchment No 23

Volume: XIII Part: 1 Chapter: 4 Page No:

253

PHOTO C:\MWS_21\Photo\SC23\Table 1\Table1.jpg NO OF HOUSE HOLD 500 DESCRIPTION NA


TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND

GOVT AREA

WASTE LAND OTHERS LAND TOTAL

PRIVATE AREA

B.AREA UNDER FOREST CATEGORY WISE :

COMMU AREA

TOTAL

CATEGORY

DPF/RESERVE

UPF

NAME AREA (HA)

Ribba, Rispa 1374.18 Neoza, Deodar, Kail, Robinia 0 to 0.9

0 1374

205 0

0 0

205 1374

2615 4406 8395

0 0

0 0

2615 4406 8600

205

0

SPECIES DENSITY

OTHERS

NA NA

PASTURE Dhar Duba, Dhar Sharmo, Kalkatang, Dhar Kushkar 3956

NA NA

NA NA

NA NA

NA 445.67

TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS TOTA L AREA (HA)

NAME

LATITUDE AND LONGITUDE

Holdu-I

31'57'77" 78'40'19"

2

Holdu-II

31'57'79" 78'40'25"

5

Payakut ang Rispa-I Rispa-II Rokelcha n-I Rokelcha n-II

31'57'89" 78'37'27" 31'57'86" 78'42'12" 31'57'88" 78'42'08" 31'58'90" 78'35'00" 31'58'88" 78'35'27"

SAMPL E AREA (HA)

3 3 3 152

5 8

Rokelcha n-III

31'58'88" 78'35'40"

2

Rokelcha n-IV

31'58'90" 78'35'48"

5

Tirung

31'57'90" 78'43'62"

5

TOTAL :

152

41

FENCI NG REQUI RED(R M)

SURVI VAL %

0

100

Due to drought and grazing.

3

40

Due to drought and grazing.

1

66.67

2

33.33

1

66.67

Deodar

0

100

Neoza

1

87.5

1

50

Deodar, Neoza Robinia, Alunthus , Neoza Neoza Deodar, Neoza Alunthus , Neoza

Neoza, Robinia, Alunthus Neoza, Robinia, Alunthus Neoza, Deodar, Robinia

TOTAL GAP FILLING AREA(HA)

AREA NEEDED NEW PLANTATIO N(HA)

SAMPLE GAP FILLING AREA(HA)

SPECIES PLANTED

30

40

33000

REASONS FOR FAILURE

Due to drought and grazing. Due to drought and grazing. Due to drought and grazing. Due to drought and grazing. Due to drought and grazing. Due to drought and grazing.

2

60

Due to drought and grazing.

2

60

Due to drought and grazing.

13

30

40

FINAL PRESCRIPT ION(Enrich ment(HA))

RATE/ HAC

COST (Rs)

Enrichment = 40

35000

1400000

Energy Plantation = 20

138000

2760000

33000

4160000

Volume: XIII Part: 1 Chapter: 4 Page No:

254


TABLE 3 PHOTOS Holdu-I

Rispa-II

Holdu-II

Rokelchan-I

Rokelchan-IV

Payakutang

Rokelchan-II

Rispa-I

Rokelchan-III

Tirung

Volume: XIII Part: 1 Chapter: 4 Page No:

255


TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA

Holdu-I

Holdu-II

Payakutang

LATITUDE/ LONGITUDE

31'57'77" 78'40'19"

31'57'79" 78'40'25"

31'57'89" 78'37'27"

PRESCRIPTION CheckDams Live Hedge Brushwood CheckDams Brushwood CheckDams Live Hedge CheckDams Brushwood CheckDams Live Hedge Brushwood CheckDams

Rispa-I

Rispa-II

31'57'86" 78'42'12"

31'57'86" 78'42'08"

RokelchanI

31'58'90" 78'35'00"

RokelchanII

31'58'88" 78'35'27"

RokelchanIII

31'58'88" 78'35'40"

RokelchanIV

31'58'90" 78'35'48"

Live Hedge CheckDams Live Hedge CheckDams Brushwood CheckDams Live Hedge Brushwood Live Hedge CheckDams Brushwood Live Hedge CheckDams Brushwood CheckDams Brushwood CheckDams Live Hedge

QUANTITY 3x1.5x1.5m=26 2x1.5x1.5m=18 420 Rms 200 Rms 2x1.5x1.5m=20 100 Rms 3x1.5x1.5m=18 410 Rms 2x1.5x1.5m=18 200 Rms 3x1.5x1.5m=22 400 Rms 200 Rms 2x1.5x1.5m=15 3x1.5x1.5m=23 480 Rms 480 Rms 2x1.5x1.5m=20 450 Rms 3x1.5x1.5m=24 150 Rms 3x1.5x1.5m=19 2x1.5x1.5m=17 380 Rms 170 Rms 390 Rms 3x1.5x1.5m=23 2x1.5x1.5m=20 200 Rms 400 Rms 3x1.5x1.5m=20 100 Rms 2x1.5x1.5m=18 170 Rms 3x1.5x1.5m=20 2x1.5x1.5m=15 450 Rms

AVAILABILTY OF LOCAL MATERIAL

OLD WORK NEED REPAIRING(QUANTITY)

FINAL PRESCRIPTION NEW NEW PRESCRIPTION QUANTITY

RATE/ CUM

COST (Rs)

Stone & local species

NA

NA

NA

NA

NA

Stone & local species

NA

NA

NA

NA

NA

Stone & local species

NA

NA

NA

NA

NA

Stone & local species

NA

NA

NA

NA

NA

Stone & local species

NA

NA

NA

NA

NA

Stone & local species

NA

NA

NA

NA

NA

Stone & local species

NA

NA

NA

NA

NA

Stone & local species

NA

NA

NA

NA

NA

Stone & local species

NA

NA

NA

NA

NA

Nos Nos

Nos Nos Nos Nos

Nos Nos

Nos Nos Nos Nos

Nos Nos

Nos Nos Nos Nos

Volume: XIII Part: 1 Chapter: 4 Page No:

256


Tirung

Brushwood CheckDams Live Hedge CheckDams

31'57'90" 78'43'62"

150 Rms 2x1.5x1.5m=15 Nos 380 Rms 3x1.5x1.5m=18 Nos

Stone & local species

NA

NA

NA

TABLE 4 PHOTOS Holdu-I

Rispa-II

Holdu-II

Rokelchan-I

Payakutang

Rokelchan-II

Volume: XIII Part: 1 Chapter: 4 Page No:

Rispa-I

Rokelchan-III

257

NA

NA


Rokelchan-IV

Tirung

TABLE NO:5 AGROFORESTRY PRESENT STATUS TYPE OF TREE TREES

PRESENT NOs 300

WILD FRUIT

700

MEDICINAL

13000

FUTURE REQUIREMENT FUTURE NOs 1200

PRESENT SPECIES Neoza, Deodar, Kail Chuli, Bemi, Walnut, Jamun, Wild Strawberry

2500

Salam Mishri, Kut, Karu, Dhoop, Kala Jeera, Diascoriya, Hathpanja, Guchi, Chukri, Patthartod, Rattanjot, Kashmal

1500

FUTURE SPECIES Neoza, Deodar, Kail Chuli, Bemi, Walnut, Jamun, Wild Strawberry Salam Mishri, Kut, Karu, Dhoop, Kala Jeera, Diascoriya, Hathpanja, Guchi, Chukri, Patthartod, Rattanjot, Kashmal

NEED FOR EXTENSION Y

SOURCE OF PLANTING STOCK(Nearest Nursery) Ribba Nursery.

Y

Ribba Nursery.

Y

Ribba Nursery.

TABLE NO:6 GRAZING LANDS Name Pasture Area

LATITUDE/LO NGITUDE

AREA(HA)

NA

70

SPECIES Grass & Bushes

WEED REMOVAL

SEEDING

CLOSURES

No

Yes

Yes

Other Seeding of local & improved grass

PEOPLES SUGGESTION

Rate/ Hac (Rs)

NA

Cost (Rs)

27000

1890000

TABLE NO:7

TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA

AREA(HA) 0

LATITUDE/LONGITUDE NA

SPECIES NA

GAP FILLING NA

MAINTENANCE NA

NEW PLANTATION NA

SOIL CONSERVATION MEASURES(QUANTITY) NA

Volume: XIII Part: 1 Chapter: 4 Page No:

258


TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads) NAME OF AREA

LATITUDE /LONGITU DE

Chring Khad (7 Kms)

31'57'69" 78'40'13"

PRESCRIPTIO N Retaining Wall Gabion Brushwood Live Hedge

31'58'47" 78'37'21"

Retaining Wall Gabion Brushwood Live Hedge

Rialding Khad (12 Kms) Satluj River Bank from Rispa to Ribba (1.5 Kms each side

Toe Walls

31'58'18" 78'40'66"

DeflectingSpur

QUANTITY 15x3x4m=12 Nos 10x3x4m=18 Nos 400 Rms 320 Rms 5x2x2.5m=45 Nos 15x3x4m=30 Nos 10x3x4m=40 Nos 600 Rms 400 Rms 15x4x6m=80 Nos 20x4x6m=75 Nos

8x2x3m=60 Nos

AVAILABILI TY OF LOCAL MATERIAL

OLD WORKS NEEDING REPAIR(QUA NTITY)

LIFT IRRIGATION (HT/ACERA GE)

Stone & local species

NA

NA

Stone & local species

All Retaining Walls Crate Wire washed

NA

Stone & local species

NA

NA

FINAL PRESCRIPTION NEW PRESCRIPTIO N NEW QUANTITY 15x3x4m=4 Nos Retaining Wall Gabion 10x3x4m=6 Nos Brushwood 350 Rms Live Hedge 2100 Rms 5x2x2.5m=15 Nos 15x3x4m=10 Nos Retaining Wall Gabion 10x3x4m=13 Nos Brushwood 600 Rms Live Hedge 3600 Rms 15x4x6m=27 Nos Toe Walls 20x4x6m=25 Nos

RATE/ UNIT 29131 29131 62 9.6 17277 29131 29131 62 9.6 0 0

COST (Rs) 1747860 1747860 21700 20160 1295775 4369650 3787030 37200 34560 0 0

DeflectingSp ur

20177

3228320

8x2x3m=20 Nos

TABLE 8 PHOTOS Chring Khad

Rialding Khad

Satluj River Bank from Rispa to Ribba

Volume: XIII Part: 1 Chapter: 4 Page No:

259


TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/ LOCATIO N

LATITUDE LONGITU DE

Ribba Slip (50x60 m)

31'58'27" 78'37'48"

DAMAGE /RISK TO LIFE & PROPERT Y

Property

MEAS URES TAKE N

TYPE OF SOIL AND ROCK

DEGRE E OF SLOPES /SEVER ITY

NA

LOSE STONE

VERY SEVERE

FINAL PRESCRIPTION OCCU RREN CE(Se ason)

Rainy

ROAD CONST RUCTI ON

No

QUA RRY

No

OTHER CONSTR UCTIONS

No

NATU RAL

NEW PRESCRIPT ION

NEW QUANTITY

RATE/ UNIT

COST (Rs)

Yes

Retaining Wall Gabion

5x2x2.5m=10 Nos

17277

863850

TABLE 9 PHOTO Ribba Slip

Volume: XIII Part: 1 Chapter: 4 Page No:

260


TABLE NO:9A

INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Apple Pears Apricot Almond Plum Chuli Khurmani Grapes

VARIETY(LOCAL/IMPROVED) Royal, Red Royal, Golden, Red Golden, Spur, Rich Red, Delicious Local Local Drake, Semi Drake, Kagzi, IXL Sentaroza Local Local Local

USE OF FERTILISERS

USE OF INSECTICIDES

Yes No No Yes No No No No

Yes No No Yes No No No No

PROBLEMS FACED Requirement of technical guidance.

Monkeys destroys the crops.

2.CROPS : CROPS NAME Rajmaha Maize Wheat Barley Karu Ogla Fafda Kale Peas Tulsi Potato

VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local Local Local Local

USE OF FERTILISERS No No No No No No No No No No

USE OF INSECTICIDES No No No No No No No No No No

PROBLEMS FACED

Monkeys destroys the crops.

3.VEGETABLE : VEGETABLE NAME Cabbage Cauliflower Brinjal Capsicum Tomato Peas Raddish

VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local

USE OF FERTILISERS No No No No No No No

USE OF INSECTICIDES No No No No No No No

Volume: XIII Part: 1 Chapter: 4 Page No:

261

PROBLEMS FACED

Monkeys destroys the crops.


4. LIVE STOCK : LIVE STOCK(NO) Cow=399 Ox=39 Goat/ Sheep=3376 Yak=6

BREED Jersy & Local Local Local Local

WHETHER SELLING THE PRODUCT Yes No No No

PROBLEM FACED No Problems.

5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER

REQUIREMENT Yes Yes

AVAILABILITY

GAP PERCENTAGE 10 30

90 70

SOURCE LPG & Forests Purchase

MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Salam Mishri Kut Karu Dhoop Kala Jeera Diascoriya Hathpanja Guchi Chokri Patthartod Rattanjot Kashmal

EXISTING NAME Salam Mishri Kut Karu Dhoop Kala Jeera Diascoriya Hathpanja Guchi Chokri Patthartod Rattanjot Kashmal

SUGGESTIONS

Requirement of technical guidance for medicinal plants.

PEOPLES PARTICIPATION: MAIN PROBLEMS All departments’ doesnot pay attention towards maintenance of earlier work done. Shortage of staff in schools. Village path is in poor condition. No accommodation for aganwadi. Absence of ground for village functions and games. There is no crematorium place. Shortage of water for irrigation.

PEOPLES PRIORITIES

SUGGESTION FOR IMPROVEMENT Regular maintenance of earlier done works to be look after. Staff should be increased in educational institutes. Maintenance of village path. Construction of accommodation for aganwadi. Construction of such a facility at Charta. Construction of crematorium shed and path leading to it. Requirement of water storage tanks at Choring and Rispa. Kool at Kanda as well as from nearest nala from about 1 Km.

Volume: XIII Part: 1 Chapter: 4 Page No:

Priority.

Top Priority.

262


PEOPLES PARTICIPATION

COSTING: TABLES COST

TABLE 3 4160000

TABLE 4 0

TABLE 6 1890000

TABLE 8 58652205

TOTAL 67084707

TABLE 9 2382502

Volume: XIII Part: 1 Chapter: 4 Page No:

263


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.