TABLE NO:1 GENERAL DESCRIPTION CATCHMENT
WATERSHED NO
Satluj
Subcatchments
MICRO WATERSHED NO Subcatchment No 23
LATITUDE 31'28'36"
LONGITUDE 78'18'26"
ALTITUDE 2105 to 5712 m
8600 SLOPE IN DEGREE 30' to 85'
POPULATION 2878
MALE 1442
FEMALE 1436
MILTCH 399
AREA(HA)
DISTRICT NAME
TEHSIL/BLOCK
VILLAGE
Kinnaur
Morang/ pooh
Rispa, Ribba, Holding
RAINFALL(mm) NA
SNOWFALL(mm) NA PROPOSED NO/NAME NA
TEMPERATURE(Cen) NA PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA
CATTLE OTHER 3421
TABLE 1 PHOTO SubCatchment No 23
Volume: XIII Part: 1 Chapter: 4 Page No:
253
PHOTO C:\MWS_21\Photo\SC23\Table 1\Table1.jpg NO OF HOUSE HOLD 500 DESCRIPTION NA
TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND
GOVT AREA
WASTE LAND OTHERS LAND TOTAL
PRIVATE AREA
B.AREA UNDER FOREST CATEGORY WISE :
COMMU AREA
TOTAL
CATEGORY
DPF/RESERVE
UPF
NAME AREA (HA)
Ribba, Rispa 1374.18 Neoza, Deodar, Kail, Robinia 0 to 0.9
0 1374
205 0
0 0
205 1374
2615 4406 8395
0 0
0 0
2615 4406 8600
205
0
SPECIES DENSITY
OTHERS
NA NA
PASTURE Dhar Duba, Dhar Sharmo, Kalkatang, Dhar Kushkar 3956
NA NA
NA NA
NA NA
NA 445.67
TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS TOTA L AREA (HA)
NAME
LATITUDE AND LONGITUDE
Holdu-I
31'57'77" 78'40'19"
2
Holdu-II
31'57'79" 78'40'25"
5
Payakut ang Rispa-I Rispa-II Rokelcha n-I Rokelcha n-II
31'57'89" 78'37'27" 31'57'86" 78'42'12" 31'57'88" 78'42'08" 31'58'90" 78'35'00" 31'58'88" 78'35'27"
SAMPL E AREA (HA)
3 3 3 152
5 8
Rokelcha n-III
31'58'88" 78'35'40"
2
Rokelcha n-IV
31'58'90" 78'35'48"
5
Tirung
31'57'90" 78'43'62"
5
TOTAL :
152
41
FENCI NG REQUI RED(R M)
SURVI VAL %
0
100
Due to drought and grazing.
3
40
Due to drought and grazing.
1
66.67
2
33.33
1
66.67
Deodar
0
100
Neoza
1
87.5
1
50
Deodar, Neoza Robinia, Alunthus , Neoza Neoza Deodar, Neoza Alunthus , Neoza
Neoza, Robinia, Alunthus Neoza, Robinia, Alunthus Neoza, Deodar, Robinia
TOTAL GAP FILLING AREA(HA)
AREA NEEDED NEW PLANTATIO N(HA)
SAMPLE GAP FILLING AREA(HA)
SPECIES PLANTED
30
40
33000
REASONS FOR FAILURE
Due to drought and grazing. Due to drought and grazing. Due to drought and grazing. Due to drought and grazing. Due to drought and grazing. Due to drought and grazing.
2
60
Due to drought and grazing.
2
60
Due to drought and grazing.
13
30
40
FINAL PRESCRIPT ION(Enrich ment(HA))
RATE/ HAC
COST (Rs)
Enrichment = 40
35000
1400000
Energy Plantation = 20
138000
2760000
33000
4160000
Volume: XIII Part: 1 Chapter: 4 Page No:
254
TABLE 3 PHOTOS Holdu-I
Rispa-II
Holdu-II
Rokelchan-I
Rokelchan-IV
Payakutang
Rokelchan-II
Rispa-I
Rokelchan-III
Tirung
Volume: XIII Part: 1 Chapter: 4 Page No:
255
TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA
Holdu-I
Holdu-II
Payakutang
LATITUDE/ LONGITUDE
31'57'77" 78'40'19"
31'57'79" 78'40'25"
31'57'89" 78'37'27"
PRESCRIPTION CheckDams Live Hedge Brushwood CheckDams Brushwood CheckDams Live Hedge CheckDams Brushwood CheckDams Live Hedge Brushwood CheckDams
Rispa-I
Rispa-II
31'57'86" 78'42'12"
31'57'86" 78'42'08"
RokelchanI
31'58'90" 78'35'00"
RokelchanII
31'58'88" 78'35'27"
RokelchanIII
31'58'88" 78'35'40"
RokelchanIV
31'58'90" 78'35'48"
Live Hedge CheckDams Live Hedge CheckDams Brushwood CheckDams Live Hedge Brushwood Live Hedge CheckDams Brushwood Live Hedge CheckDams Brushwood CheckDams Brushwood CheckDams Live Hedge
QUANTITY 3x1.5x1.5m=26 2x1.5x1.5m=18 420 Rms 200 Rms 2x1.5x1.5m=20 100 Rms 3x1.5x1.5m=18 410 Rms 2x1.5x1.5m=18 200 Rms 3x1.5x1.5m=22 400 Rms 200 Rms 2x1.5x1.5m=15 3x1.5x1.5m=23 480 Rms 480 Rms 2x1.5x1.5m=20 450 Rms 3x1.5x1.5m=24 150 Rms 3x1.5x1.5m=19 2x1.5x1.5m=17 380 Rms 170 Rms 390 Rms 3x1.5x1.5m=23 2x1.5x1.5m=20 200 Rms 400 Rms 3x1.5x1.5m=20 100 Rms 2x1.5x1.5m=18 170 Rms 3x1.5x1.5m=20 2x1.5x1.5m=15 450 Rms
AVAILABILTY OF LOCAL MATERIAL
OLD WORK NEED REPAIRING(QUANTITY)
FINAL PRESCRIPTION NEW NEW PRESCRIPTION QUANTITY
RATE/ CUM
COST (Rs)
Stone & local species
NA
NA
NA
NA
NA
Stone & local species
NA
NA
NA
NA
NA
Stone & local species
NA
NA
NA
NA
NA
Stone & local species
NA
NA
NA
NA
NA
Stone & local species
NA
NA
NA
NA
NA
Stone & local species
NA
NA
NA
NA
NA
Stone & local species
NA
NA
NA
NA
NA
Stone & local species
NA
NA
NA
NA
NA
Stone & local species
NA
NA
NA
NA
NA
Nos Nos
Nos Nos Nos Nos
Nos Nos
Nos Nos Nos Nos
Nos Nos
Nos Nos Nos Nos
Volume: XIII Part: 1 Chapter: 4 Page No:
256
Tirung
Brushwood CheckDams Live Hedge CheckDams
31'57'90" 78'43'62"
150 Rms 2x1.5x1.5m=15 Nos 380 Rms 3x1.5x1.5m=18 Nos
Stone & local species
NA
NA
NA
TABLE 4 PHOTOS Holdu-I
Rispa-II
Holdu-II
Rokelchan-I
Payakutang
Rokelchan-II
Volume: XIII Part: 1 Chapter: 4 Page No:
Rispa-I
Rokelchan-III
257
NA
NA
Rokelchan-IV
Tirung
TABLE NO:5 AGROFORESTRY PRESENT STATUS TYPE OF TREE TREES
PRESENT NOs 300
WILD FRUIT
700
MEDICINAL
13000
FUTURE REQUIREMENT FUTURE NOs 1200
PRESENT SPECIES Neoza, Deodar, Kail Chuli, Bemi, Walnut, Jamun, Wild Strawberry
2500
Salam Mishri, Kut, Karu, Dhoop, Kala Jeera, Diascoriya, Hathpanja, Guchi, Chukri, Patthartod, Rattanjot, Kashmal
1500
FUTURE SPECIES Neoza, Deodar, Kail Chuli, Bemi, Walnut, Jamun, Wild Strawberry Salam Mishri, Kut, Karu, Dhoop, Kala Jeera, Diascoriya, Hathpanja, Guchi, Chukri, Patthartod, Rattanjot, Kashmal
NEED FOR EXTENSION Y
SOURCE OF PLANTING STOCK(Nearest Nursery) Ribba Nursery.
Y
Ribba Nursery.
Y
Ribba Nursery.
TABLE NO:6 GRAZING LANDS Name Pasture Area
LATITUDE/LO NGITUDE
AREA(HA)
NA
70
SPECIES Grass & Bushes
WEED REMOVAL
SEEDING
CLOSURES
No
Yes
Yes
Other Seeding of local & improved grass
PEOPLES SUGGESTION
Rate/ Hac (Rs)
NA
Cost (Rs)
27000
1890000
TABLE NO:7
TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA
AREA(HA) 0
LATITUDE/LONGITUDE NA
SPECIES NA
GAP FILLING NA
MAINTENANCE NA
NEW PLANTATION NA
SOIL CONSERVATION MEASURES(QUANTITY) NA
Volume: XIII Part: 1 Chapter: 4 Page No:
258
TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads) NAME OF AREA
LATITUDE /LONGITU DE
Chring Khad (7 Kms)
31'57'69" 78'40'13"
PRESCRIPTIO N Retaining Wall Gabion Brushwood Live Hedge
31'58'47" 78'37'21"
Retaining Wall Gabion Brushwood Live Hedge
Rialding Khad (12 Kms) Satluj River Bank from Rispa to Ribba (1.5 Kms each side
Toe Walls
31'58'18" 78'40'66"
DeflectingSpur
QUANTITY 15x3x4m=12 Nos 10x3x4m=18 Nos 400 Rms 320 Rms 5x2x2.5m=45 Nos 15x3x4m=30 Nos 10x3x4m=40 Nos 600 Rms 400 Rms 15x4x6m=80 Nos 20x4x6m=75 Nos
8x2x3m=60 Nos
AVAILABILI TY OF LOCAL MATERIAL
OLD WORKS NEEDING REPAIR(QUA NTITY)
LIFT IRRIGATION (HT/ACERA GE)
Stone & local species
NA
NA
Stone & local species
All Retaining Walls Crate Wire washed
NA
Stone & local species
NA
NA
FINAL PRESCRIPTION NEW PRESCRIPTIO N NEW QUANTITY 15x3x4m=4 Nos Retaining Wall Gabion 10x3x4m=6 Nos Brushwood 350 Rms Live Hedge 2100 Rms 5x2x2.5m=15 Nos 15x3x4m=10 Nos Retaining Wall Gabion 10x3x4m=13 Nos Brushwood 600 Rms Live Hedge 3600 Rms 15x4x6m=27 Nos Toe Walls 20x4x6m=25 Nos
RATE/ UNIT 29131 29131 62 9.6 17277 29131 29131 62 9.6 0 0
COST (Rs) 1747860 1747860 21700 20160 1295775 4369650 3787030 37200 34560 0 0
DeflectingSp ur
20177
3228320
8x2x3m=20 Nos
TABLE 8 PHOTOS Chring Khad
Rialding Khad
Satluj River Bank from Rispa to Ribba
Volume: XIII Part: 1 Chapter: 4 Page No:
259
TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/ LOCATIO N
LATITUDE LONGITU DE
Ribba Slip (50x60 m)
31'58'27" 78'37'48"
DAMAGE /RISK TO LIFE & PROPERT Y
Property
MEAS URES TAKE N
TYPE OF SOIL AND ROCK
DEGRE E OF SLOPES /SEVER ITY
NA
LOSE STONE
VERY SEVERE
FINAL PRESCRIPTION OCCU RREN CE(Se ason)
Rainy
ROAD CONST RUCTI ON
No
QUA RRY
No
OTHER CONSTR UCTIONS
No
NATU RAL
NEW PRESCRIPT ION
NEW QUANTITY
RATE/ UNIT
COST (Rs)
Yes
Retaining Wall Gabion
5x2x2.5m=10 Nos
17277
863850
TABLE 9 PHOTO Ribba Slip
Volume: XIII Part: 1 Chapter: 4 Page No:
260
TABLE NO:9A
INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Apple Pears Apricot Almond Plum Chuli Khurmani Grapes
VARIETY(LOCAL/IMPROVED) Royal, Red Royal, Golden, Red Golden, Spur, Rich Red, Delicious Local Local Drake, Semi Drake, Kagzi, IXL Sentaroza Local Local Local
USE OF FERTILISERS
USE OF INSECTICIDES
Yes No No Yes No No No No
Yes No No Yes No No No No
PROBLEMS FACED Requirement of technical guidance.
Monkeys destroys the crops.
2.CROPS : CROPS NAME Rajmaha Maize Wheat Barley Karu Ogla Fafda Kale Peas Tulsi Potato
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local Local Local Local
USE OF FERTILISERS No No No No No No No No No No
USE OF INSECTICIDES No No No No No No No No No No
PROBLEMS FACED
Monkeys destroys the crops.
3.VEGETABLE : VEGETABLE NAME Cabbage Cauliflower Brinjal Capsicum Tomato Peas Raddish
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local
USE OF FERTILISERS No No No No No No No
USE OF INSECTICIDES No No No No No No No
Volume: XIII Part: 1 Chapter: 4 Page No:
261
PROBLEMS FACED
Monkeys destroys the crops.
4. LIVE STOCK : LIVE STOCK(NO) Cow=399 Ox=39 Goat/ Sheep=3376 Yak=6
BREED Jersy & Local Local Local Local
WHETHER SELLING THE PRODUCT Yes No No No
PROBLEM FACED No Problems.
5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER
REQUIREMENT Yes Yes
AVAILABILITY
GAP PERCENTAGE 10 30
90 70
SOURCE LPG & Forests Purchase
MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Salam Mishri Kut Karu Dhoop Kala Jeera Diascoriya Hathpanja Guchi Chokri Patthartod Rattanjot Kashmal
EXISTING NAME Salam Mishri Kut Karu Dhoop Kala Jeera Diascoriya Hathpanja Guchi Chokri Patthartod Rattanjot Kashmal
SUGGESTIONS
Requirement of technical guidance for medicinal plants.
PEOPLES PARTICIPATION: MAIN PROBLEMS All departments’ doesnot pay attention towards maintenance of earlier work done. Shortage of staff in schools. Village path is in poor condition. No accommodation for aganwadi. Absence of ground for village functions and games. There is no crematorium place. Shortage of water for irrigation.
PEOPLES PRIORITIES
SUGGESTION FOR IMPROVEMENT Regular maintenance of earlier done works to be look after. Staff should be increased in educational institutes. Maintenance of village path. Construction of accommodation for aganwadi. Construction of such a facility at Charta. Construction of crematorium shed and path leading to it. Requirement of water storage tanks at Choring and Rispa. Kool at Kanda as well as from nearest nala from about 1 Km.
Volume: XIII Part: 1 Chapter: 4 Page No:
Priority.
Top Priority.
262
PEOPLES PARTICIPATION
COSTING: TABLES COST
TABLE 3 4160000
TABLE 4 0
TABLE 6 1890000
TABLE 8 58652205
TOTAL 67084707
TABLE 9 2382502
Volume: XIII Part: 1 Chapter: 4 Page No:
263