TABLE NO:1 GENERAL DESCRIPTION CATCHMENT
WATERSHE D NO
MICRO WATERSHED NO
Satluj
Sh1
Sh1c
LATITUDE 31'19' to 31'22'
LONGITUDE 76'56' to 76'61'
AREA(HA)
DISTRICT NAME
TEHSIL/BLOCK
Mandi
Sundernagar
ALTITUDE
1680 SLOPE IN DEGREE
VILLAGE Karla, Bartha, Dhanora, baddu, Cheori, Duka, narala, Pati
RAINFALL(mm)
SNOWFALL(mm)
TEMPERATURE(Cen)
559m to 2370m
40' to 85'
NA
NA
NA PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA
CATTLE POPULATION 953
MALE 496
FEMALE 457
MILTCH 109
OTHER 568
PROPOSED NO/NAME NA
TABLE 1 PHOTO Sh1c
Volume: IV Chapter: 4 Page No:
45
PHOTO C:\MWS_21\Photo\SH1C\ Table 1\Table1.jpg NO OF HOUSE HOLD 238 DESCRIPTION NA
TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND WASTE LAND OTHERS LAND TOTAL
GOVT AREA 0 1170 184 300 1654
PRIVATE AREA 26 0 0 0 26
B.AREA UNDER FOREST CATEGORY WISE :
COMMU AREA 0 0 0 0 0
TOTAL 26 1170 184 300 1680
CATEGORY NAME AREA (HA) SPECIES DENSITY
DPF/RESERVE Karla, Bartha, Thungdhar, Chouri, Jalah 1170.05 Lucinia, Daru, Drake, Khair 0 to 0.3
UPF NA NA NA NA
PASTURE NA NA NA NA
OTHERS NA NA NA NA
TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS NAME
Chouri Tungdhar TOTAL :
LATITUD E AND LONGITU DE 31'32'84" 76'96'16" 31'32'77" 76'96'52"
TOTA L AREA (HA)
SAMPL E AREA (HA)
SPECI ES PLANT ED
SAMPLE GAP FILLING AREA (HA)
6
BL
4
52 6 52
BL
12
4 8
SUR VIVA L% 33.3 3 33.3 3
TOTAL GAP FILLING AREA (HA) 28 28
AREA NEEDED NEW PLANTATI ON(HA)
FENCING REQUIRED (RM)
REASONS FOR FAILURE
FINAL PRESCRIPTION( Enrichment (HA))
29400
Due to drought. Due to drought.
Enrichment = 40 Energy Plantation = 10
30 30
RATE/HAC
COST(Rs)
27900
1116000
112300
1123000
29400
2239000
TABLE 3 PHOTOS Chouri
Tungdhar
Volume: IV Chapter: 4 Page No:
46
TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA
LATITUDE/L ONGITUDE
Chouri
31'32'84" 76'96'16"
Tangdha r
31'32'73" 76'96'52"
PRESCRIPTION Live Hedge Trenching CheckDams Trenching Live Hedge CheckDams
QUANTITY 300 Rms 1x.50x.30m=2000Nos 2x1.5x1.5m=30Nos 3x1.5x1.5m=20Nos 1x.50x.30m=2000Nos 200 Rms 3x1.5x1.5m=20Nos 2x1.5x1.5m=30Nos
AVAILABILT Y OF LOCAL MATERIAL
OLD WORK NEED REPAIRING (QUANTITY)
FINAL PRESCRIPTION NEW NEW PRESCRIPTION QUANTITY
Stone & Local Species
NA
Trenching
Stone & Local Species
NA
Trenching
RATE/CUM
COST (Rs)
1x.30x.30m = 8000 Nos
9.9
79200
1x.30x.30m = 8000 Nos
9.9
79200
TABLE 4 PHOTOS Chouri
Tungdhar
Volume: IV Chapter: 4 Page No:
47
TABLE NO:5 AGROFORESTRY TYPE OF TREE TREES WILD FRUIT
MEDICINAL
PRESENT STATUS PRESENT NOs PRESENT SPECIES Khair, Tuni, Sheesham, Drake, Lucinia, 200 Kachnar Amla, Daru, Bahera, Fegra, Trimbal, 150 Paja Timber, Kashmal, Aloevera, Bhekal, Banafsha, Kakkarsingi, Moun Lathi, 600 Inder Jow, Rati
FUTURE REQUIREMENT FUTURE NOs FUTURE SPECIES Khair, Tuni, Sheesham, Drake, Lucinia, 700 Kachnar 600
1700
NEED FOR EXTENSION
SOURCE OF PLANTING STOCK(Nearest Nursery)
Y
Bekhal & Pafan Nursery.
Amla, Daru, Bahera, Fegra, Trimbal, Paja
Y
Bekhal & Pafan Nursery.
Timber, Kashmal, Aloevera, Bhekal, Banafsha, Kakkarsingi, Moun Lathi, Inder Jow, Rati
Y
Bekhal & Pafan Nursery.
TABLE NO:6 GRAZING LANDS Name Bartha
LATITUDE/LONGITUDE 31'32'85"76'96'16"00601-714Sh1c
AREA(HA) 30
SPECIES Grass & Bushes
WEED REMOVAL
SEEDING
CLOSURES
Yes
Yes
Yes
Other 9000 Fodder Plants Requirment
PEOPLES SUGGESTION No suggestion.
Rate/ Hac (Rs) 21700
TABLE 6 PHOTOS Bartha
Volume: IV Chapter: 4 Page No:
48
Cost (Rs) 651000
TABLE NO:7
TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA
AREA(HA) NA
LATITUDE/LONGITUDE NA
SPECIES NA
GAP FILLING NA
MAINTENANCE NA
NEW PLANTATION NA
SOIL CONSERVATION MEASURES(QUANTITY) NA
TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads) NAME OF AREA
LATITUDE /LONGITU DE
Bartha (6Kms)
31'33'02" 76'95'96"
Kerla Khad (10 Kms)
PRESCRIPTION Live Hedge
CheckDams Brushwood
Live Hedge DropStructure Gabion 31'33'55" 76'94'88"
CheckDams
QUANTITY 600Rms 8x1.5x1.5m=18Nos 15x1.5x1.5m=26Nos 10x1.5x1.5m=32Nos 38Rms
AVAILABI LITY OF LOCAL MATERIAL
OLD WORKS NEEDING REPAIR(QUAN TITY)
LIFT IRRIGATIO N(HT/ACER AGE)
Stone & Local Species
4 Check Dams
NA
1200Rms 15x3x3m=4Nos 15x1.5x1.5m=36Nos 10x1.5x1.5m=40Nos
Stone & Local Species
10 Check Dams
NA
FINAL PRESCRIPTION NEW PRESCRIPTIO N NEW QUANTITY Live Hedge 1800 Rms 8x1.5x1.5m=6 Nos 15x1.5x1.5m=9 Nos CheckDams 10x1.5x1.5m=10 Nos Brushwood 300 Rms Live Hedge 3000 Rms DropStructur eGabion 15x3x3m=1 Nos
RATE/ UNIT 9.6 10033 10033 10033 62 9.6
COST(Rs) 17280 481584 1354455 1003300 18600 28800
41593
623895
15x1.5x1.5m=12 Nos 10x1.5x1.5m=13 Nos 500 Rms
10033 10033 62
1805940 1304290 31000
CheckDams Brushwood
TABLE 8 PHOTOS Kerla Khad
Bartha
Volume: IV Chapter: 4 Page No:
49
TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/LOC ATION NA
LATITUDE/L ONGITUDE NA
DAMAGE/ RISK TO LIFE & PROPERTY NA
MEASU RES TAKEN NA
TYPE OF SOIL AND ROCK NA
DEGREE OF SLOPES/ SEVERIT Y NA
OCCURRENCE (Season) NA
ROAD CONSTRU CTION NA
QUA RRY NA
OTHER CONSTRUC TIONS NA
NATU RAL NA
FINAL PRESCRIPTION NEW NEW PRESCRI QUAN PTION TITY NA NA
RATE/ UNIT
COST (Rs)
TABLE NO:9A
INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Almond Mango Citrus Grapes Peach Pears
VARIETY(LOCAL/IMPROVED) Drek, Semi Drek, IXL Local Local Local Local Local
USE OF FERTILISERS Yes Yes Yes Yes Yes Yes
USE OF INSECTICIDES Yes No No No No No
Banana
Local
No
No
PROBLEMS FACED Technical guidence is required. Seeds & fertilisers are not being provided in time. Irrigated water shortage exists. Wild animals destroys the crops.
2.CROPS : CROPS NAME Wheat Paddy Barley Rajmash Kolth Potato Moong Urad
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local Local
USE OF FERTILISERS No No No No No No No No
USE OF INSECTICIDES No No No No No No No No
PROBLEMS FACED Technical guidence is required. Seeds & fertilisers are not being provided in time. Irrigated water shortage exists. Wild animals destroys the crops.
Volume: IV Chapter: 4 Page No:
50
3.VEGETABLE : VEGETABLE NAME Capsicum French Beans Ladyfinger Radish Cauliflower Cabbage Peas Brinjal
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local Local
USE OF FERTILISERS No No No No No No No No
USE OF INSECTICIDES No No No No No No No No
PROBLEMS FACED Technical guidence is required. Seeds & fertilisers are not being provided in time. Irrigated water shortage exists. Wild animals destroys the crops.
4. LIVE STOCK : LIVE STOCK(NO) Cow - 109 Ox - 96 Goat/Sheep - 460 Buffalo - 12
BREED Local & Jersey Local Local Local
WHETHER SELLING THE PRODUCT Yes No No Yes
PROBLEM FACED Shortage of staff and accomodation exist in the vaterinary. Shortage of staff and accomodation exit in the vaterinary.
5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER
REQUIREMENT Yes Yes
AVAILABILITY
GAP PERCENTAGE 25% 30%
75% 70%
SOURCE LPG & Forest Forests
MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Timber Kashmal Aloevera Bhekal Banafsha Kakkarsingi Moun Lathi Inder Jow Rati
EXISTING NAME Timber Kashmal Aloevera Bhekal Banafsha Kakkarsingi Maun Lathi Inder Jow Rati
SUGGESTIONS
Education regarding production and use of MFPs be imparted to the locals.
Volume: IV Chapter: 4 Page No:
51
PEOPLES PARTICIPATION: MAIN PROBLEMS The health care Centre is not available in the nearest areas. The condition of village paths is poor. There is shortage of staff in school and vaterinary. No banking facilities are available in the nearest areas. No govt accomodation is held for Vaterinary, Community Hall and Anganbari. There are many areas blank available for plantation. The shortage of irrigated water exists as the existing Kuhl is in poor condition. No playground and drinking water is available in Primary School Karla. There is no central shelter in agriculture land in the area. Storage of water at natural resources is not avaiable.
PEOPLES PRIORITIES
SUGGESTION FOR IMPROVEMENT Health care Centre be opened at Nehri. Maintenance of village paths is required. Adequate staff be posted to schools and vaterinary. Branch of any Nationalised bank be opened at Nehri. Govt accomodation be made for Vaterinary, Community Hall and Anganbari. All the blank areas be planted with suitable speicies.
Priority.
Maintenance and repair of existing Kuhl is required. Provision of playground and drinking water be made in all the Schools. A rain shelter be made at the central place of agriculture land. Storage tank is required at Panhar Nala for natural resources.
Top priority. Priority.
PEOPLES PARTICIPATION
COSTING: TABLES COST
TABLE 3 2239000
TABLE 4 158400
TABLE 6 651000
TABLE 8 6669144
TABLE 9 0
TOTAL 9717544
Volume: IV Chapter: 4 Page No:
52