4Sh1e

Page 1

TABLE NO:1 GENERAL DESCRIPTION CATCHMENT

WATERSHE D NO

MICRO WATERSHED NO

Satluj

Sh1

Sh1e

LATITUDE 31'16' to 31'20'

LONGITUDE 77'00 to 77'04'

AREA(HA)

DISTRICT NAME

TEHSIL/BLOCK

Mandi

Sundernagar

ALTITUDE

1432 SLOPE IN DEGREE

VILLAGE Karangal, Bhali, Baragat, Patli, Bui, Harah, Ropru, Dalal

RAINFALL(mm)

SNOWFALL(mm)

TEMPERATURE(Cen)

571m to 2063m

30' to 85'

NA

NA

NA PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA

CATTLE POPULATION 2304

MALE 1035

FEMALE 1269

MILTCH 867

OTHER 1070

PROPOSED NO/NAME NA

PHOTO C:\MWS_21\Photo\SH1 E\Table 1\Table1.jpg NO OF HOUSE HOLD 403 DESCRIPTION NA

TABLE 1 PHOTO Sh1e

TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND WASTE LAND OTHERS LAND TOTAL

GOVT AREA 0 752 0 394 1146

PRIVATE AREA 286 0 0 0 286

COMMU AREA 0 0 0 0 0

B.AREA UNDER FOREST CATEGORY WISE : TOTAL 286 752 0 394 1432

CATEGORY NAME AREA (HA) SPECIES DENSITY

DPF/RESERVE Bragal, Mared, Bindloo, Hara 752.31 Drake, Daru, Lucinia 0 to 0.1

UPF NA NA NA NA

Volume: IV Chapter: 4 Page No:

PASTURE NA NA NA NA

61

OTHERS NA NA NA NA


TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS

NAME

Brakta Harah Karan gal Khelin d Mared TOTAL :

LATITUDE AND LONGITUD E 31'29'69" 77'02'66" 31'31'01" 77,01'37" 31'26'77" 77'05'71" 31'31'31" 77'01'02" 31'28'54" 77'03'04"

TOTA L AREA (HA)

296

SAMPL E AREA (HA)

SPECIES PLANTED

SAMPL E GAP FILLIN G AREA (HA)

10

Lucinia, Daru, Kachnar

6

40

5

Lucinia, Daru,

2

60

10

37.5

12

40

13

48

16 20 25

296

76

Daru, Sheesham, Lucinia Daru, Kachnar, Lucinia, Drake Lucinia, Daru, Kachnar

43

SURV IVAL %

TOTAL GAP FILLIN G AREA (HA)

170

170

AREA NEEDED NEW PLANTATI ON(HA)

90

90

FENCIN G REQUIR ED(RM)

REASONS FOR FAILURE

102000

Due to drought. Due to drought. Due to drought and fire. Due to drought. Due to drought.

FINAL PRESCRIPTION (Enrichment (HA))

RATE/ HAC

COST(Rs)

Enrichment = 80

27900

2232000

Energy Plantation = 30

112300

3369000

102000

5601000

TABLE 3 PHOTOS Khelind

Harah

Brakta

Volume: IV Chapter: 4 Page No:

62


Mared

Karangal

TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA

LATITUDE/ LONGITUD E

Barakta

31'29'69" 77'02'66"

Hadah

31'31'01" 77'01'37"

Karanga l

31'26'77" 77'05'71"

Kheland

31'31'31" 77'01'01"

CheckDams Live Hedge Trenching Trenching

Mared

31'28'54" 77'03'04"

CheckDams Live Hedge

PRESCRIPTION CheckDams Live Hedge Trenching CheckDams CheckDams Live Hedge Trenching Live Hedge CheckDams Trenching CheckDams

QUANTITY 2x1.5x1.5m=15 Nos 400 Rms 1x.50x.30m=3000 Nos 3x1.5x1.5m=20 Nos 3x1.5x1.5m=15 Nos 2x1.5x1.5m=20 Nos 300 Rms 1x.50x.30m=2000 Nos 100 Rms 2x1.5x1.5m=30 Nos 1x.50x.30m=1000 Nos 3x1.5x1.5m=20 Nos 3x1.5x1.5m=20 Nos 2x1.5x1.5m=20 Nos 200 Rms 1x.50x.30m=2000 Nos 1x.50x.30m=1000 Nos 2x1.5x1.5m=20 N0s 3x1.5x1.5m=15 N0s 200 Rms

AVAILABILT Y OF LOCAL MATERIAL

OLD WORK NEED REPAIRING (QUANTITY)

FINAL PRESCRIPTION NEW PRESCRIPTION

NEW QUANTITY

RATE/CUM

COST(Rs)

Stone & local species

NA

Trenching

1x.30x.30m= 8800 Nos

9.9

87120

Stone & local species

NA

Trenching

1x.30x.30m= 10400 Nos

9.9

102960

Stone & local species

NA

Trenching

1x.30x.30m= 9600 Nos

9.9

95040

Stone & local species

NA

Trenching

1x.30x.30m= 9600 Nos

9.9

95040

Stone & local species

NA

Trenching

1x.30x.30m= 9600 Nos

9.9

95040

Volume: IV Chapter: 4 Page No:

63


TABLE 4 PHOTOS Khelind

Harah

Mared

Brakta

Karangal

TABLE NO:5 AGROFORESTRY TYPE OF TREE TREES WILD FRUIT

MEDICINAL

PRESENT STATUS PRESENT NOs PRESENT SPECIES 400 Bheod, Tuni, Khair, Lucinia, Sheesham 350 Amla, Behra, Daru, fegra, Trimbal, Amaltas, Timber, Kashmal, Bhekal, Aloevera, Bel Patti, Kakkarsingi, 600 Banafsha

FUTURE REQUIREMENT FUTURE NOs FUTURE SPECIES 3200 Bheod, Tuni, Khair, Lucinia, Sheesham 2600 Amla, Behra, Daru, fegra, Trimbal, Amaltas, Timber, Kashmal, Bhekal, Aloevera, Bel Patti, Kakkarsingi, 6000 Banafsha

NEED FOR EXTENSION Y Y

SOURCE OF PLANTING STOCK(Nearest Nursery) Dehra Nal & Tahli Nursery. Dehra Nal & Tahli Nursery.

Y

Dehra Nal & Tahli Nursery.

Volume: IV Chapter: 4 Page No:

64


TABLE NO:6 GRAZING LANDS Name

Kargan Mahad a

LATITUDE/LO NGITUDE 31'27'18"77'0 4'84"006-02780Sh1e 31'29'94"77'0 2'18"006-01766Sh1e

AREA(HA)

SPECIES

WEED REMOVAL

SEEDING

CLOSURES

40

Grass & Bushes

Yes

Yes

Yes

40

Grass & Bushes

Yes

Yes

Yes

Other Requirement of 12000 fodder plants. Requirement of 12000 fodder plants.

PEOPLES SUGGESTION Seeding and plantation of fodder speices be done in grazing lands and Ghasnis. Seeding and plantation of fodder speices be done in grazing lands and Ghasnis.

Rate/ Hac (Rs)

Cost (Rs)

21700

868000

21700

868000

TABLE 6 PHOTOS Mahada

Kargan

TABLE NO:7

TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA

AREA(HA) NA

LATITUDE/LONGITUDE NA

SPECIES NA

GAP FILLING NA

MAINTENANCE NA

NEW PLANTATION NA

SOIL CONSERVATION MEASURES(QUANTITY) NA

Volume: IV Chapter: 4 Page No:

65


TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads) NAME OF AREA

LATITUDE/ LONGITUD E

Bahali Nala (3 Kms)

31'27'91" 77'03'73"

Barad Nala (4 Kms)

31'28'44" 77'03'49"

Batali Nala (5 Kms)

31'31'33" 77'01'48"

Mared Nala (4 Kms)

31'28'69" 77'03'31"

PRESCRIPT ION CheckDams Live Hedge Brushwood Live Hedge Brushwood

CheckDams

CheckDams Live Hedge Brushwood Live Hedge Brushwood CheckDams

QUANTITY 6x1.5x1.5m=12 Nos 8x1.5x1.5m=18 Nos 250 Rms 12 Rms 400 Rms 15 Rms 10x1.5x1.5m=12 Nos 6x1.5x1.5m=12 Nos 8x1.5x1.5m=14 Nos 10x1.5x1.5m=10 Nos 12x1.5x1.5m=12 Nos 15x1.5x1.5m=19 Nos 8x1.5x1.5m=21 Nos 600 Rms 25 Rms 500 Rms 18 Rms 10x1.5x1.5m=22 Nos 8x1.5x1.5m=20 Nos

AVAILABIL ITY OF LOCAL MATERIAL

OLD WORKS NEEDING REPAIR(QUAN TITY)

LIFT IRRIGATI ON(HT/A CERAGE)

Stone & local species

Check dams=2 Nos

NA

Stone & local species

Check dams=7 Nos

NA

Stone & local species

Check dams=4 Nos

NA

Stone & local species

Check dams=5 Nos

NA

FINAL PRESCRIPTION NEW PRESCRIPTIO N NEW QUANTITY 6x1.5x1.5m=4 Nos CheckDams 8x1.5x1.5m=6 Nos Live Hedge 900 Rms Brushwood 150 Rms Live Hedge 1200 Rms Brushwood 200 Rms 10x1.5x1.5m=4 Nos 6x1.5x1.5m=4 Nos CheckDams 8x1.5x1.5m=5 Nos 10x1.5x1.5m=3 Nos 12x1.5x1.5m=4 Nos 15x1.5x1.5m=6 Nos CheckDams 8x1.5x1.5m=7 Nos Live Hedge 1500 Rms Brushwood 250 Rms Live Hedge 1200 Rms Brushwood 200 Rms 10x1.5x1.5m=7 Nos CheckDams 8x1.5x1.5m=6 Nos

RATE/UN IT 10033 10033 9.6 62 9.6 62 10033 10033 10033 10033 10033 10033 10033 9.6 62 9.6 62 10033 10033

TABLE 8 PHOTOS Batali Nala

Mared Nala

Barad Nala

Bahli Nala

Volume: IV Chapter: 4 Page No:

66

COST(R s) 240792 481584 8640 9300 11520 12400 401320 240792 401320 300990 481584 902970 561848 14400 15500 11520 12400 702310 481584


TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/LOCATIO N Road from Saror to Hadah (3 Kms)

LATITU DE/LO NGITU DE

DAMAGE/R ISK TO LIFE & PROPERTY

NA

Property

FINAL PRESCRIPTION

MEAS URES TAKEN

TYPE OF SOIL AND ROCK

DEGRE E OF SLOPE S/SEVE RITY

OCCURR ENCE(Se ason)

ROAD CONSTR UCTION

NA

CLAY

MODER ATE

Rainy

Yes

QUAR RY

OTHER CONSTR UCTION S

NA TU RAL

No

No

Yes

NEW PRESCRIP TION Retaining Wall Gabion

NEW QUANTITY 20x2x2.5 m=150 Nos

RATE/ UNIT

COST(Rs)

17277

51831000

TABLE NO:9A

INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Almond Mango Citrus Guava Banana Papita Jamun Apricot Peach Pears

VARIETY(LOCAL/IMPROVED) Drake, Semi Drake, Kagzi, IXL Local Local Local Local Local Local Local Local Local

USE OF FERTILISERS Yes No No No No No No No No No

USE OF INSECTICIDES Yes No No No No No No No No No

PROBLEMS FACED

Technical guidence is required. Wild animals destroys the crops. Seeds and fertilisers supply is not satisfactory. Irrigated water shortage exist.

2.CROPS : CROPS NAME Koda Kawani Rajmash Kolth Moong Potato Wheat Barley Maize Bithu

VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local Local Local Local

USE OF FERTILISERS No No No No No No No No No No

USE OF INSECTICIDES No No No No No No No No No No

Volume: IV Chapter: 4 Page No:

PROBLEMS FACED

Technical guidence is required. Wild animals destroys the crops. Seeds and fertilisers supply is not satisfactory. Irrigated water shortage exist.

67


3.VEGETABLE : VEGETABLE NAME Cabbage Cauliflower Brinjal Capsicum Radish Ladyfinger Tomato

VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local

USE OF FERTILISERS No No No No No No No

USE OF INSECTICIDES No No No No No No No

PROBLEMS FACED Technical guidence is required. Wild animals destroys the crops. Seeds and fertilisers supply is not satisfactory. Irrigated water shortage exist.

4. LIVE STOCK : LIVE STOCK(NO) Cow - 850 Ox - 420 Goat/Sheep - 640 Mule/Horse - 10 Buffalo - 17

BREED Local & Jersey Local Local Local Local

WHETHER SELLING THE PRODUCT Yes No Yes No Yes

PROBLEM FACED Vaterinary be upgraded to Hospital as services are not satisfactory.

5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER

REQUIREMENT Yes Yes

AVAILABILITY

GAP PERCENTAGE 10% 15%

90% 85%

SOURCE LPG & Forest Forests

MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Amaltas Timber Kashmal Bhekal Aloevera Bel Patti Kakkarsingi Banafsha

EXISTING NAME Amaltas Timber Kashmal Bhekal Aloevera Bel Patti Kakkarsingi Banafsha

SUGGESTIONS

More MFP plants be planted in the forest areas and education about its production and use be imparted to the locals.

Volume: IV Chapter: 4 Page No:

68


PEOPLES PARTICIPATION: MAIN PROBLEMS There is shortage of education staff and accommodation at High School Harah Boi. There is shortage of irrigated water and storage tanks are not available for the same. Drainage of waste water in the villages is spreading all around. There is shortage of accommodation for Temple, Patwar, Community Hall and Anganbari. All the villages are not linked with the roads. There are no trees available in the area defined for TD to the villages. Banking facilities are not available in the nearest areas. Veterinary facilities are not satisfactory.

SUGGESTION FOR IMPROVEMENT

PEOPLES PRIORITIES

Accommodation be made and staff be posted to the School. Irrigated water be provided through lift from Satluj to Harah Boi at height of 3 Kms and Large storage tanks be made. Existing irrigation Kuhl is required to be repaired. Proper drainage system for the villages be made. Accommodation be made for Temple, Patwar, Community Hall and Anganbari. Link roads be made (Chardekar to Harah Boi - 5 Kms), Chalog to Bavela - 4 Kms), (Harah Boi to Rochi - 5 Kms) and (Mahadu to Badu - 5 Kms).

Top Priority.

Priority.

Rationalization of Areas for TD is required. Branch of any Nationalized bank be opened at Harah Boi. Harah Boi vaterinary be upgraded to Hospital and sufficient staff and medicines be provided.

PEOPLES PARTICIPATION

COSTING: TABLES COST

TABLE 3 5601000

TABLE 4 475200

TABLE 6 1736000

TABLE 8 5292774

TOTAL 64935974

TABLE 9 51831000

Volume: IV Chapter: 4 Page No:

69


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.