4Sh2c

Page 1

TABLE NO:1 GENERAL DESCRIPTION CATCHMENT

WATERSHED NO

MICRO WATERSHED NO

Satluj

Sh2

Sh2c

LATITUDE 31'16' to 331'21'

LONGITUDE 77'03' to 77'06'

ALTITUDE 983M to 2001m

AREA(HA)

DISTRICT NAME

TEHSIL/BLOCK

1936 SLOPE IN DEGREE

Mandi

Karsog

VILLAGE Jabel, Durkmu, Bashlaun, Chalaun, Kahaun, Jamnu, Kot

RAINFALL(mm)

SNOWFALL(mm)

TEMPERATURE(Cen)

45' to 85'

NA

NA

NA PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA

CATTLE POPULATION 1355

MALE 700

FEMALE 655

MILTCH 502

OTHER 2345

PROPOSED NO/NAME NA

PHOTO

NO OF HOUSE HOLD 282 DESCRIPTION NA

TABLE 1 PHOTO Sh2c

Volume: IV Chapter: 4 Page No:

C:\MWS_21\Photo\SH2C\Table 1\Table1_2.jpg

91


TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND WASTE LAND OTHERS LAND TOTAL

GOVT AREA 0 1479 51 208 1738

PRIVATE AREA 198 0 0 0 198

B.AREA UNDER FOREST CATEGORY WISE :

COMMU AREA 0 0 0 0 0

TOTAL 198 1479 51 208 1936

CATEGORY NAME AREA (HA) SPECIES DENSITY

DPF/RESERVE Praven, Chatkar, Rishtadhar 1478.9 Kail, Deodar, Robinia, Khair 0 to .5

UPF NA NA NA NA

PASTURE NA NA NA NA

OTHERS NA NA NA NA

TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS NAME

Parvani-I Parvani-II Ristadhar TOTAL :

LATITUD E AND LONGITU DE 31'30'90" 77'09'28" 31'29'08" 77'06'45" 31'31'17" 77'09'24"

TOTA L AREA( HA)

SAMP LE AREA (HA)

SPECIES PLANTE D

SAMPLE GAP FILLING AREA(H A)

SUR VIVA L%

5

Deodar

0

100

15

BL

9

40

5

Deodar & Cheel

0

100

108

108

25

9

TOTAL GAP FILLING AREA(HA )

36

36

AREA NEEDED NEW PLANTAT ION(HA)

80

80

FENCIN G REQUIR ED(RM)

REASONS FOR FAILURE

55800

Due to drought. Due to drought. Due to drought.

FINAL PRESCRIPTION(E nrichment(HA))

RATE/HAC

COST(Rs)

Enrichment = 70

27900

1953000

Energy Plantation = 2

112300

224600

55800

2177600

TABLE 3 PHOTOS Parvani-I

Ristadhar

Parvani-II

Volume: IV Chapter: 4 Page No:

92


TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA

LATITUDE/L ONGITUDE

Parvani -I

31'30'90" 77'09'28"

Parvani -II

31'29'08" 77'06'45"

Rishta Dhar

31'31'17" 77'09'24"

PRESCRIPTION Trenching LIve Hedge CheckDams Trenching Live Hedge CheckDams Trenching Live Hedge CheckDams

QUANTITY 1x.50x.30m=2000 Nos 200 Rms 2x1.5x1.5m=30 Nos 3x1.5x1.5m=20 Nos 1x.50x.30m=2000 Nos 500 Rms 2x1.5x1.5m=45 Nos 3x1.5x1.5m=30 Nos 1x.50x.30m=1000 Nos 100 Rms 3x1.5x1.5m=30 Nos 2x1.5x1.5m=40 Nos

AVAILABILT Y OF LOCAL MATERIAL

OLD WORK NEED REPAIRING (QUANTITY)

FINAL PRESCRIPTION NEW PRESCRIPTION NEW QUANTITY

Stone & local species

NA

Trenching

Stone & local species

NA

Stone & local species

NA

RATE/ CUM

COST( Rs)

1x.30x.30m= 7000 Nos

9.9

69300

Trenching

1x.30x.30m= 6500 Nos

9.9

64350

Trenching

1x.30x.30m= 6500 Nos

9.9

64350

TABLE 4 PHOTOS Parvani-I

Ristadhar

Parvani-II

Volume: IV Chapter: 4 Page No:

93


TABLE NO:5 AGROFORESTRY TYPE OF TREE TREES WILD FRUIT MEDICINAL

PRESENT STATUS PRESENT NOs PRESENT SPECIES Cheel, Deodar, Baan, 320 kakkarsingi, Bheod, Kharar Daru, Amla, Chulli, Walnut, 400 Fegra, Amla, Kashmal, Timber, 850 Banafsha, Barja

FUTURE REQUIREMENT FUTURE NOs FUTURE SPECIES Cheel, Deodar, Baan, 1800 kakkarsingi, Bheod, Kharar Daru, Amla, Chulli, Walnut, 2000 Fegra, Amla, Kashmal, Timber, 9000 Banafsha, Barja

NEED FOR EXTENSION

SOURCE OF PLANTING STOCK(Nearest Nursery)

Y

Katli Nursery.

Y

Katli Nursery.

Y

Katli Nursery.

TABLE NO:6 GRAZING LANDS Name Jamnu Rista

LATITUDE/LONGITUDE 331'29'07"77'06'44"00 6-02-456Sh2c 31'30'90"77'09'28"006 -01-351Sh2c

AREA(HA) 18 32

SPECIE S Grass & Bushes Grass & Bushes

WEED REMOVAL

SEEDIN G

CLOSURE S

Yes

Yes

Yes

Yes

Yes

Yes

Other Requirement of 15000 fodder plants Requirement of 15000 fodder plants

PEOPLES SUGGESTION

Rate/ Hac (Rs)

Cost (Rs)

No suggestion.

21700

390600

No suggestion.

21700

694400

TABLE 6 PHOTOS Rista

Jamnu

TABLE NO:7

TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA

AREA(HA) NA

LATITUDE/LONGITUDE NA

SPECIES NA

GAP FILLING NA

MAINTENANCE NA

NEW PLANTATION NA

SOIL CONSERVATION MEASURES(QUANTITY) NA

Volume: IV Chapter: 4 Page No:

94


TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads) NAME OF AREA

LATITUDE /LONGITU DE

PRESCRIPTI ON Live Hedge DropStructu reGabion

Dhaun Nala (6 Kms)

31'30'91" 77'09'28"

CheckDams Brushwood Live Hedge

Jamnu Nala (3 Kms)

31'29'06" 77'06'56"

CheckDams Brushwood Live Hedge

Kotli Nala (1 Kms)

31'29'38" 77'05'69"

CheckDams Brushwood

QUANTITY 600 Rms 15x3x3m=4 Nos 8x1.5x1.5m=28 Nos 15x1.5x1.5m=12 Nos 10x1.5x1.5m=14 Nos 30 Rms 500 Rms 15x1.5x1.5m=12 Nos 10x1.5x1.5m=15 Nos 28 Rms 200 Rms 15x1.5x1.5m=12 Nos 10x1.5x1.5m=10 Nos 15 Rms

AVAILABIL ITY OF LOCAL MATERIAL

OLD WORKS NEEDING REPAIR (QUANTITY)

LIFT IRRIGATIO N(HT/ACER AGE)

FINAL NEW PRESCRIPTIO N Live Hedge DropStructur eGabion

Stone & local species

Check Dams=4 Nos

NA

CheckDams Brushwood Live Hedge

Stone & local species

NA

NA

CheckDams Brushwood Live Hedge

Stone & local species

NA

NA

CheckDams Brushwood

PRESCRIPTION

NEW QUANTITY 1800 Rms

RATE/ UNIT 9.6

COST(Rs) 17280

15x3x3m=2 Nos 8x1.5x1.5m=9 Nos 15x1.5x1.5m=4 Nos 10x1.5x1.5m=4 Nos 300 Rms 900 Rms 15x1.5x1.5m=4 Nos 10x1.5x1.5m=5 Nos 150 Rms 300 Rms 15x1.5x1.5m=4 Nos 10x1.5x1.5m=3 Nos 50 Rms

41593 10033 10033 10033 62 9.6 10033 10033 62 9.6 10033 10033 62

1247790 722376 601980 401320 18600 8640 601980 501650 9300 2880 601980 300990 3100

TABLE 8 PHOTOS Dhaun Nala

Jamnu Nala

Katli Nala

Volume: IV Chapter: 4 Page No:

95


TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/LOCATIO N

Bigan (50mx500m) Road from Balandi to Dharmu Kupli (500 m)

LATITUDE/ LONGITUD E 31'28'72" 77'06'44" 009-01454Sh2c

NA

DAMAGE /RISK TO LIFE & PROPERT Y

Life & Property

Property

MEASURE S TAKEN Check dams dry stone qty 12 exists.

NA

TYPE OF SOIL AND ROCK

DEGRE E OF SLOPE S/SEV ERITY

OCCUR RENCE (Seaso n)

FINAL PRESCRIPTION ROAD CONSTR UCTION

Loose stone

Severe

Rainy

Yes

CLAY

MODE RATE

Rainy

Yes

QUA RRY

OTHER CONST RUCTI ONS

NAT URA L

NEW PRESCRIPT ION

NEW QUANTITY

RATE/ UNIT

COST(Rs)

No

No

Yes

Live Hedge

300 Rms

9.6

2880

Yes

Retaining Wall Gabion

20x2x2.5 m=25 Nos

17277

8638500

No

No

TABLE 9 PHOTO Bigan

Volume: IV Chapter: 4 Page No:

96


TABLE NO:9A

INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Apple Pears Plum Almond Walnut Chulli Bemi

VARIETY(LOCAL/IMPROVED) Royal, Golden Local Sentaroza Local Local Local Local

USE OF FERTILISERS Yes Yes Yes Yes Yes No No

USE OF INSECTICIDES Yes Yes Yes Yes Yes No No

PROBLEMS FACED Technical guidence is required. Irrigated water shortage exist. Monkey and bear destroys the crops.

2.CROPS : CROPS NAME Wheat Maize Barley Rajmash Urd Soyabeen

VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local

USE OF FERTILISERS No No No No No No

USE OF INSECTICIDES No No No No No No

PROBLEMS FACED Technical guidence is required. Irrigated water shortage exist. Monkey and bear destroys the crops.

3.VEGETABLE : VEGETABLE NAME Frenchbeans Peas Cabbage Cauliflower Capsicum Ladyfinger Sehangi Barclay Lalek Lal Salad Yellow Salad

VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Improved Improved Improved Improved Improved

USE OF FERTILISERS No No No No No No No No No No No

USE OF INSECTICIDES No No No No No No No No No No No

Volume: IV Chapter: 4 Page No:

97

PROBLEMS FACED

Technical guidence is required. Irrigated water shortage exist. Monkey and bear destroys the crops.


4. LIVE STOCK : LIVE STOCK(NO) Cow - 502 Ox - 89 Sheep/Goat - 2200 Mule/Horse - 21 Buffalo - 35

BREED Local & Jersey Local Local Local Local

WHETHER SELLING THE PRODUCT Yes No No No Yes

PROBLEM FACED Medicines in the vaterinary are not satisfactory.

5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER

REQUIREMENT Yes Yes

AVAILABILITY

GAP PERCENTAGE 10% 25%

90% 75%

SOURCE LPG & Forest Forests

MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Amla Kashmal Timber Banfsha

EXISTING NAME Amla Kashmal Timber Banfsha

SUGGESTIONS No suggestion.

PEOPLES PARTICIPATION: MAIN PROBLEMS There is shortage of wood for construction of house. Condition of the village paths is poor. There is shortage of drinking water. There is lack of link roads in villages. Anganbari is away from villages. There is no school at Dhamu Kufri. Problem is being faced for heigher education. There is no living accommodation at Kamsu Nag Temple. There is no central playground in the villages. There is no medical staff in dispensary since four years.

PEOPLES PRIORITIES

SUGGESTION FOR IMPROVEMENT TD be opened and wood be provide to the needed people. Maintenance of village paths is required. Drinking water scheme be supplied from Pangna Khad to Mahasudhar by lift at height 5 Kms to cover 2 Panchayats. Handpumps approx 10 be installed in the area for drinking water. Link roads are required (Khamu to Pangna Khad - 12 Kms), (Dhirmu Kufri to Mahasu dhar - 3 Kms) Each Village be opened with Anganbaris. Primary school is required at Dhamu Kufri.

Priority.

High School be provided Kanu a Central place. Sarai type accommodation for living of visitors be made at Kamsu Nag Temple. Playground be made at Kamu Nala for playing and Central Functions. Top Priority.

Medical staff be posted to the dispensary.

Volume: IV Chapter: 4 Page No:

98


PEOPLES PARTICIPATION

COSTING: TABLES COST

TABLE 3 2177600

TABLE 4 198000

TABLE 6 1085000

TABLE 8 5039866

TOTAL 18756626

TABLE 9 10256160

Volume: IV Chapter: 4 Page No:

99


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.