TABLE NO:1 GENERAL DESCRIPTION CATCHMENT
WATERSHED NO
MICRO WATERSHED NO
Satluj
Si2
Si2f
LATITUDE 31'22' to 31'24'
LONGITUDE 77'12' to 77'15'
ALTITUDE 1225m to 1865m
AREA(HA)
1060 SLOPE IN DEGREE 40' to 80'
DISTRICT NAME
TEHSIL/BLOCK
Mandi
Karsog
VILLAGE Girlan, Chalate, Damela, Sanna, Manol, Mandla, Keludhar
C:\MWS_21\Photo\SI2F\Table 1\Table1.jpg
RAINFALL(mm)
SNOWFALL(mm)
TEMPERATURE(Cen)
NO OF HOUSE HOLD
NA
NA PROPOSED NO/NAME NA
NA PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA
589
CATTLE POPULATION 2943
MALE 1465
FEMALE 1478
MILTCH 229
OTHER 481
PHOTO
DESCRIPTION NA
TABLE 1 PHOTO Si2f
Volume: VI Chapter: 4 Page No:
107
TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND WASTE LAND OTHERS LAND TOTAL
GOVT AREA
PRIVATE AREA
0 422 42 230 694
COMMU AREA
366 0 0 0
0 0 0 0
366
0
B.AREA UNDER FOREST CATEGORY WISE : TOTAL
CATEGORY
366 422 42 230 1060
NAME AREA (HA) SPECIES DENSITY
DPF/RESERVE Nehra, Bhadarnoo, Manaildhar, Tikker Dhar, Sanahudhar, Shill, Mahadevi ki Banon 421.67 Cheel, Deodar, kail, Robinia .3 to .8
UPF
PASTURE
OTHERS
NA NA NA NA
NA NA NA NA
NA NA NA NA
TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS NAME Shanaha dhar Shil Tikkerdha r - II TikridharI TOTAL :
LATITUDE AND LONGITU DE 31'39'55" 77'23'53" 31'38'49" 77'24'16" 31'39'82" 77'22'91" 31'39'81" 77'22'92"
TOTA L AREA (HA)
SAMPL E AREA (HA)
SPECI ES PLANT ED
SAMPLE GAP FILLING AREA(HA)
SURVIV AL %
5
Cheel
1
80
5
Cheel
0
100
10
Cheel
1
90
5
Cheel
0
100
112
112
TOTAL GAP FILLING AREA(HA)
AREA NEEDED NEW PLANTATION (HA)
10
25
2
10
40
40
FENCING REQUIRE D(RM)
REASONS FOR FAILURE
33000
Due to drought. Due to drought. Due to drought. Due to drought.
FINAL PRESCRIPTI ON(Enrichm ent(HA))
RATE/ HAC
COST (Rs)
Enrichment = 60
27900
1674000
Energy Plantation = 0
0
0
33000
1674000
TABLE 3 PHOTOS Tikridhar-I
Tikkerdhar - II
Shanahadhar
Shil
Volume: VI Chapter: 4 Page No:
108
TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA
LATITUDE /LONGITU DE
Shamel Dhar
31'39'55" 77'23'53"
Sheel
31'38'49" 77'24'16"
Tikri Dhar-I
31'39'81" 77'22'92"
Tikri Dhar-II
31'39'82" 77'22'91"
PRESCRIPTION CheckDams Live Hedge Trenching CheckDams Trenching CheckDams Live Hedge CheckDams Live Hedge Trenching CheckDams Trenching CheckDams Live Hedge
QUANTITY 2x1.5x1.5m=25 Nos 100 Rms 1x.50x.30m=1000 Nos 3x1.5x1.5m=20 Nos 1x.50x.30m=1000 Nos 2x1.5x1.5m=40 Nos 3x1.5x1.5m=30 Nos 100 Rms 3x1.5x1.5m=20 Nos 200 Rms 1x.50x.30m=2000 Nos 2x1.5x1.5m=25 Nos 1x.50x.30m=1000 Nos 3x1.5x1.5m=20 Nos 2x1.5x1.5m=30 Nos 100 Rms
AVAILABILT Y OF LOCAL MATERIAL
OLD WORK NEED REPAIRING (QUANTITY)
FINAL PRESCRIPTION NEW PRESCRIPTIO N NEW QUANTITY
Stone & local species
NA
Trenching
Stone & local species
NA
Stone & local species
Stone & local species
RATE/CUM
COST(Rs)
1x.30x.30m= 3200 Nos
9.9
31680
Trenching
1x.30x.30m= 2800 Nos
9.9
27720
NA
Trenching
1x.30x.30m= 3200 Nos
9.9
31680
NA
Trenching
1x.30x.30m= 2800 Nos
9.9
27720
TABLE 4 PHOTOS Tikridhar-I
Tikkerdhar - II
Shanahadhar
Volume: VI Chapter: 4 Page No:
Shil
109
TABLE NO:5 AGROFORESTRY TYPE OF TREE TREES WILD FRUIT
MEDICINAL
PRESENT STATUS PRESENT NOs PRESENT SPECIES 900 Cheel, Baan, Eucaliptus, Kail, Deodar, Chulli, Bemi, Walnut, Shegul, Anjeet, 700 Fedu, Paja, Kashmal, Kakkarsingi, Timber, Banafsha, Bhekal, Ashwagandha, 1100 Aloevera
FUTURE REQUIREMENT FUTURE NOs FUTURE SPECIES 3200 Cheel, Baan, Eucaliptus, Kail, Deodar, Chulli, Bemi, Walnut, Shegul, Anjeet, 4000 Fedu, Paja, Kashmal, Kakkarsingi, Timber, Banafsha, Bhekal, Ashwagandha, 5000 Aloevera
NEED FOR EXTENSION Y
SOURCE OF PLANTING STOCK(Nearest Nursery) Galech & Mamel Nursery
Y
Galech & Mamel Nursery
Y
Galech & Mamel Nursery
TABLE NO:6 GRAZING LANDS Name Nadol Tikri Dhar
LATITUDE/LONGITUDE 31'39'89"77'25'55"006 -01-513Si2f 31'39'18"77'21'61"006 -02-514Si2f
AREA(HA ) 20 20
SPECIE S Grass & Cheel Grass & Bushes
WEED REMOVAL
SEEDIN G
CLOSURE S
Yes
Yes
Yes
Yes
Yes
Yes
Other Requirement of 6000 fodder plants Requirement of 6000 fodder plants
PEOPLES SUGGESTION No suggestion. No suggestion.
Rate/ Hac (Rs) 21700
434000
21700
434000
TABLE 6 PHOTOS Nadol
Tikri Dhar
Volume: VI Chapter: 4 Page No:
Cost (Rs)
110
TABLE NO:7
TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA
AREA(HA) NA
LATITUDE/LONGITUDE NA
SPECIES NA
GAP FILLING NA
MAINTENANCE NA
NEW PLANTATION NA
SOIL CONSERVATION MEASURES(QUANTITY) NA
TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads) NAM E OF ARE A
LATITUDE /LONGITU DE
PRESCRIPTIO N Live Hedge
QUANTITY 400 Rms
AVAILABILI TY OF LOCAL MATERIAL
OLD WORKS NEEDING REPAIR QUANTITY)
LIFT IRRIGATI ON(HT/AC ERAGE)
6x1.5x1.5m=22 Nos Duga Nala (4 Kms)
Durli Nala (1 Kms)
12x1.5x1.5m=9 Nos 31'39'33" 77'24'50"
CheckDams Brushwood Live Hedge
10x1.5x1.5m=12 Nos 46 Rms 200 Rms
Stone & local species
Check Dams=5 Nos
NA
7x1.5x1.5m=11 Nos 31'39'81" 77'22'92"
CheckDams Brushwood Live Hedge
10x1.5x1.5m=9 Nos 15 Rms 300 Rms
Stone & local species
Check Dams=4 Nos
NA
7x1.5x1.5m=12 Nos Gago n Nala (3 Kms)
12x1.5x1.5m=18 Nos 31'39'86" 77'23'61"
CheckDams Brushwood
10x1.5x1.5m=19 Nos 42 Rms
Stone & local species
NA
NA
FINAL PRESCRIPTION NEW PRESCRIPTIO N NEW QUANTITY Live Hedge 1200 Rms 6x1.5x1.5m=7 Nos 12x1.5x1.5m=3 Nos 10x1.5x1.5m=4 CheckDams Nos Brushwood 200 Rms Live Hedge 300 Rms 7x1.5x1.5m=4 Nos 10x1.5x1.5m=3 CheckDams Nos Brushwood 50 Rms Live Hedge 900 Rms 7x1.5x1.5m=4 Nos 12x1.5x1.5m=6 Nos 10x1.5x1.5m=6 CheckDams Nos Brushwood 150 Rms
Volume: VI Chapter: 4 Page No:
111
RATE/ UNIT 9.6
COST (Rs) 11520
10033
421386
10033
361188
10033 62 9.6
401320 12400 2880
10033
280924
10033 62 9.6
300990 3100 8640
10033
280924
10033
722376
10033 62
601980 9300
TABLE 8 PHOTOS Durli Nala
Gagon Nala
Duga Nala
TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/LO CATION Duga Nala (150m x 50m) Road from Memel to Mendi (200 m)
LATITUDE/ LONGITUD E 31'39'33" 77'24'50" 009-01096Si2f
NA
DAMAGE/ RISK TO LIFE & PROPERTY
Property
Property
MEA SURE S TAKE N
NA
NA
TYPE OF SOIL AND ROCK
DEGREE OF SLOPES/ SEVERITY
Clay
Severe
CLAY
MODERAT E
OCCUR RENCE (Seaso n)
Rainy
Rainy
ROAD CONST RUCTI ON
No
Yes
QUA RRY
No
No
OTHER CONSTRUC TIONS
No
No
NATURA L
FINAL PRESCRIPTION NEW NEW PRESCR QUANTI IPTION TY
RATE/ UNIT
COST (Rs)
Yes
Retainin g Wall Gabion
15x3x4 m =8 Nos
29131
3495720
Yes
Retainin g Wall Gabion
20x2x2. 5m=10 Nos
17277
3455400
Volume: VI Chapter: 4 Page No:
112
TABLE 9 PHOTOS Duga Nala
TABLE NO:9A
INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Apple Plum Almond Pears Apricot Walnut Bemi
VARIETY(LOCAL/IMPROVED) Royal, Golden, Delicious Sentaroza Drake, Semi Drake, Kagzi, IXL Local Local Local Local
USE OF FERTILISERS Yes Yes
USE OF INSECTICIDES Yes Yes
Yes Yes No No No
Yes Yes No No No
PROBLEMS FACED
Technical guidence is required. Plants/seeds be provided in time. Stray cattle & Monkey destrooys the crops.
Volume: VI Chapter: 4 Page No:
113
2.CROPS : CROPS NAME Wheat Barley Maize Rajmash Paddy Potato
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local
USE OF FERTILISERS No No No No No No
USE OF INSECTICIDES No No No No No No
PROBLEMS FACED
Technical guidence is required. seeds be provided in time. Stray cattle & Monkey destrooys the crops.
3.VEGETABLE : VEGETABLE NAME Cabbage Cauliflower Brinjal Radish Mustard Capsicum Tomato Ladyfinger
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local Local
USE OF FERTILISERS Yes Yes No No No No No No
USE OF INSECTICIDES Yes Yes No No No No No No
PROBLEMS FACED
Technical guidence is required. Stray cattle & Monkey destrooys the crops.
4. LIVE STOCK : LIVE STOCK(NO) Cow - 229 Ox- 139 Sheep/goat - 320 Mule/Horse-22
BREED Local & Jersey Local Local Local
WHETHER SELLING THE PRODUCT Yes No Yes No
PROBLEM FACED Veterinary is much away from the village.
5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER
REQUIREMENT Yes Yes
AVAILABILITY
GAP PERCENTAGE 40% 35%
60% 65%
SOURCE LPG & Forest Forests
MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Kashmal Kakkarsingi Timber Banafsha Bhekal Ashwagandha Aloevera
EXISTING NAME Kashmal Kakkarsingi Timber Banafsha Bhekal Ashwagandha Aloevera
SUGGESTIONS
No suggestion.
Volume: VI Chapter: 4 Page No:
114
PEOPLES PARTICIPATION: MAIN PROBLEMS There is a very small playground at Primary school Keludhar. There is no accomodation for Community Hall and Mahila Mandal. There is difficulty of healthcare system of cattle. There is lack of link roads to the villages. There is no storage facility for water at natural resources. There is no way to cross over the Dhayal Nala. There is shortage of drinking water in the areas.
SUGGESTION FOR IMPROVEMENT Existing playground be enlarged. Govt accomodation be made for Community Hall and Mahila Mandal Healthcare system for cattle be brought at the nearest place. Link road from Namel to Mandala (3Kms) be made. Large storage tank for natural water resources be made at Dhalla. A foot bridge be made at Dhayal Nala. Drinking water be provided through lift from Doffa at 9Kms distance.
PEOPLES PRIORITIES
Priority.
Top Priority.
PEOPLES PARTICIPATION
COSTING: TABLES COST
TABLE 3 4760500
TABLE 4 99000
TABLE 6 282100
TABLE 8 5709625
TOTAL 19489725
TABLE 9 8638500
Volume: VI Chapter: 4 Page No:
115