TABLE NO:1 GENERAL DESCRIPTION CATCHMENT
WATERSHED NO
MICRO WATERSHED NO
Satluj
Sj1
Sj1e
LATITUDE 31' 08' to 31'12'
LONGITUDE 77'12' to 77'14'
ALTITUDE 1342m to 2387m
AREA(HA)
DISTRICT NAME
TEHSIL/BLOCK
1744 SLOPE IN DEGREE
Shimla
Shimla/Mashobra
VILLAGE Jagyalru, Gharog, Gumma, Holikanda, Kargnano
RAINFALL(mm)
SNOWFALL(mm)
TEMPERATURE(Cen)
40' to 80'
NA
NA
NA PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM
CATTLE POPULATION
MALE
FEMALE
MILTCH
OTHER
1293
680
613
421
189
PROPOSED NO/NAME Gumma, Chaba, Naldehra recommended for picnic spot.
NA
TABLE 1 PHOTO Sj1e
Volume: VII Chapter: 5 Page No:
55
PHOTO C:\MWS_21\Photo\SJ1E\Table 1\Table1.jpg NO OF HOUSE HOLD 266
DESCRIPTION The whole area is road connected and many [laes are worth seing and can be used for Pic purposes.
TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND
WASTE LAND OTHERS LAND TOTAL
GOVT AREA
PRIVATE AREA
B.AREA UNDER FOREST CATEGORY WISE : COMMU AREA
TOTAL
CATEGORY NAME AREA (HA)
0 760
321 0
0 0
321 760
109 553 1422
0 0 321
0 0 0
109 553 1743
DPF/RESERVE Khamali, Panyali, Dhagog, Barog shil, Parihaltu 362.12 Deodar, Kail, cheel, Baan, Mohru, Fegra, Toot, Brass, Paja, Beul .1 to .6
SPECIES DENSITY
UPF Baldeyan, Chakal, Bag, Devidhar, Kalyanpur 398.13 Deodar, Kail, cheel, Baan, Mohru, Fegra, Toot, Brass, Paja, Beul 0 to .5
PASTURE
OTHERS
NA NA
NA NA
NA NA
NA NA
TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS NAME
LATITUDE AND LONGITU DE
Jigyarlu
31'11'23" 77'12'52"
Panaili I Panaili II Panaili III TOTAL
:
31'09'32" 77'12'38" 31'09'36" 77'12'46" 31'09'40" 77'13'08"
TOTA L AREA (HA)
138
138
SAMP LE AREA (HA)
SPECIES PLANTED
SAMPLE GAP FILLING AREA(HA)
SUR VIVA L%
10
Daru, Cheel, Amla & Lucinia
4
60
10
Deodar
2
80
5
Deodar
2
60
5
Deodar & BL
1
80
30
9
TOTAL GAP FILLING AREA(HA)
AREA NEEDED NEW PLANTATION( HA)
FENCIN G REQUIR ED(RM)
REASONS FOR FAILURE Due to fire and drought.
46
46
45
45
69000
Due to drought. Due to drought. Due to drought.
FINAL PRESCRIPT ION(Enrich ment(HA))
RATE/ HAC
COST (Rs)
Enrichment = 140
27900
3906000
Energy Plantation = 14
112300
1572200
69000
Volume: VII Chapter: 5 Page No:
5478200
56
TABLE 3 PHOTOS Panaili - I
Panaili - II
Panaili - III
Jigyarlu
TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA
LATITUDE/LO NGITUDE
Jigyarlu
31'11'23"77'1 2'52"
Panaili -I
31'09'32"77'1 2'38"
CheckDams Live Hedge
Panaili - II
31'09'36"77'1 2'46"
Trenching Live Hedge Trenching
Panaili - III
31'09'40"77'1 3'08"
CheckDams Live Hedge
PRESCRIPTIO N CheckDams Live Hedge Trenching CheckDams Trenching
QUANTITY 3x1.5x1.5m = 28 Nos 180 Rms 2x1x1m = 700 Nos 2x1.5x1.5m = 18 Nos 2x1x1m = 500 Nos 3x1.5x1.5m = 12 Nos 2x1.5x1.5m = 10 Nos 120 Rms 2x1.5x1.2m = 24 Nos 3x1.5x1.2m = 18 Nos 2x1x1m = 600 Nos 150 Rms 2x1x1m = 450 Nos 2x1.5x1.5m = 14 Nos 3x1.5x1.5m = 22 Nos 200 Rms
AVAILABILTY OF LOCAL MATERIAL
OLD WORK NEED REPAIRING(QUAN TITY)
FINAL PRESCRIPTION NEW PRESCRIPTION NEW QUANTITY
Stone & local species
NA
Trenching
Stone & local species
NA
Stone & local species
Stone & local species
RATE/CUM
COST(Rs)
1x.30x.30m= 2700 Nos
9.9
26730
Trenching
1x.30x.30m= 2700 Nos
9.9
26730
NA
Trenching
1x.30x.30m= 3500 Nos
9.9
34650
NA
Trenching
1x.30x.30m= 3100 Nos
9.9
30690
Volume: VII Chapter: 5 Page No:
57
TABLE 4 PHOTOS Panaili - I
Panaili - II
Panaili - III
Jigyarlu
TABLE NO:5 AGROFORESTRY TYPE OF TREE TREES WILD FRUIT
MEDICINAL
PRESENT STATUS PRESENT NOs PRESENT SPECIES 400 Deodar, Cheel, Baan, Mohru, Bheod Chulli, Paja, Bami, Khanor, Shegul, 550 Fegra, Shahtut Brass, Kainth, Timber, Bhekal, Kashmal, Guchhi, Pathartod, Khanor, 300 Banafsha, Mushkbala
FUTURE REQUIREMENT FUTURE NOs FUTURE SPECIES 3500 Deodar, Cheel, Baan, Mohru, Bheod Chulli, Paja, Bami, Khanor, Shegul, 2800 Fegra, Shahtut Brass, Kainth, Timber, Bhekal, Kashmal, Guchhi, Pathartod, Khanor, 2000 Banafsha, Mushkbala
NEED FOR EXTENSION Y
SOURCE OF PLANTING STOCK(Nearest Nursery) Dhrog & Gumma Nursery.
Y
Dhrog & Gumma Nursery.
Y
Dhrog & Gumma Nursery.
TABLE NO:6 GRAZING LANDS Name Nehagaon
LATITUDE/LONGIT UDE 31'09'35"77'12'57 "006-01-232Sj1e
AREA (HA) 42
SPECIES Grass, Kail, Cheel,
WEED REMOVAL
SEEDING
CLOSURES
Yes
Yes
No
Other 8400 fodder plants are required to be planted.
PEOPLES SUGGESTION
Rate/ Hac (Rs)
No suggestion.
Volume: VII Chapter: 5 Page No:
21700
58
Cost (Rs) 911400
TABLE 6 PHOTOS Nehagaon
TABLE NO:7
TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA
AREA(HA) NA
LATITUDE/LONGITUDE NA
SPECIES NA
GAP FILLING NA
MAINTENANCE NA
NEW PLANTATION NA
SOIL CONSERVATION MEASURES(QUANTITY) NA
TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads) NAME OF AREA
LATITUD E/LONGI TUDE
Gumru Nala (5 Kms)
31'09'35" 77'12'48"
CheckDams Brushwood Live Hedge
Shivan al (4 Kms)
31'09'28" 77'13'08"
CheckDams Brushwood
PRESCRIPT ION Live Hedge
QUANTITY 200 Rms 7x1.5x1.5m = 19 Nos 5x1.5x1.5m = 27 Nos 3x1.5x1.5m = 34 Nos 28 Rms 150 Rms 7x1.5x1.5m = 10 Nos 5x1.5x1.5m = 13 Nos 3x1.5x1.5m = 12 Nos 10x1.5x1.5m = 08 Nos 50 Rms
AVAILABILI TY OF LOCAL MATERIAL
OLD WORKS NEEDING REPAIR(QUA NTITY)
LIFT IRRIGATI ON(HT/AC ERAGE)
Stone & local species
NA
NA
Stone & local species
NA
NA
FINAL PRESCRIPTION NEW PRESCRIPTI ON NEW QUANTITY Live Hedge 1500 Rms 7x1.5x1.5m = 6 Nos 5x1.5x1.5m = 9 Nos CheckDams 3x1.5x1.5m = 11 Nos Brushwood 250 Rms Live Hedge 1200 Rms 7x1.5x1.5m = 3 Nos 5x1.5x1.5m = 4 Nos 3x1.5x1.5m = 4 Nos CheckDams 10x1.5x1.5m = 2 Nos Brushwood 200 Rms
Volume: VII Chapter: 5 Page No:
59
RATE/U NIT 9.6 10033 10033 10033 62 9.6 10033 10033 10033 10033 62
COST (Rs) 14400 421386 451485 331089 15500 11520 210693 200660 120396 200660 12400
TABLE 8 PHOTOS Shivaval Nala
Gumru Nala
TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/LOC ATION Jigyarlu Querry Site (200mx20 0m) Road from Mashobra to Nauty via Gumma (1 Km)
LATITUDE/L ONGITUDE 31'11'36" 77'12'44" 009-01012Sj1e
NA
DAMAGE/ RISK TO LIFE & PROPERTY
Property
Property
MEAS URES TAKEN
NA
NA
TYPE OF SOIL AND ROCK
DEGR EE OF SLOPE S/SEV ERITY
Loose stone
Very sever e
NA
NA
FINAL PRESCRIPTION OCCUR RENCE( Season )
Rainy
NA
ROAD CONSTR UCTION
No
Yes
QU AR RY
Yes
No
OTHER CONST RUCTI ONS
No
No
NAT URA L
NEW PRESCRIP TION
NEW QUANTITY
RATE/ UNIT
COSTRs)
No
Retaining Wall Gabion
200x2x2.5m = 01 Nos, Stopage of quarry.
17277
3455400
Yes
Retaining Wall Gabion
10x2x2.5m = 30 Nos
17277
5183100
Volume: VII Chapter: 5 Page No:
60
TABLE 9 PHOTOS Jigyarlu Querry Site
TABLE NO:9A
INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Cherry Plum Apricot Apple Citrus Daru
VARIETY(LOCAL/IMPROVED) Local Sentaroza Local Royal, Golden, Delicious, Spur, Red June Local Local
USE OF FERTILISERS No Yes No
USE OF INSECTICIDES No Yes No
Yes No No
Yes No No
PROBLEMS FACED
Technical guidence from Horti & Agri Deptt side is required. Monkey and rabbits destroys the crops.
Volume: VII Chapter: 5 Page No:
61
2.CROPS : CROPS NAME Rajmash Barley Potato Wheat Maize Urd
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local
USE OF FERTILISERS No No No No No No
USE OF INSECTICIDES No No No No No No
PROBLEMS FACED
Technical guidence from Horti & Agri Deptt side is required. Monkey and rabbits destroys the crops.
3.VEGETABLE : VEGETABLE NAME Peas French Beans Cabbage Cauliflower Capsicum Tomato
USE OF FERTILISERS Yes Yes Yes Yes Yes Yes
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local
USE OF INSECTICIDES Yes Yes Yes Yes Yes Yes
PROBLEMS FACED
Technical guidance from Horti & Agri Deptt side is required. Monkey and rabbits destroys the crops.
4. LIVE STOCK : LIVE STOCK(NO) Others - 02 Ox - 126 Sheep/Goat - 61 Cow - 421
BREED Local Local Local Local & Jersey
WHETHER SELLING THE PRODUCT No No Yes Yes
PROBLEM FACED There is no sufficient staff and medicines in the veterinary.
5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER
REQUIREMENT Yes Yes
AVAILABILITY
GAP PERCENTAGE 60% 70%
40% 30%
SOURCE LPG & Forest Forest & Purchase.
MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Kainth Mushkbala Kashmal Brass Khanor Bhekal
EXISTING NAME Kainth Mushkbala Kashmal Brass Khanor Bhekal
SUGGESTIONS
People have no knowledge of MFPs. They require training camps for education regarding identification and use of MFPs.
Volume: VII Chapter: 5 Page No:
62
PEOPLES PARTICIPATION: MAIN PROBLEMS There is shortage of irrigated water. The condition of village path Naldehra to Jablandha is very poor. There is blank area at Durgapur for plantation. There is shortage of medical staff and medicines at vaterinary. All the villages are not connected with the link roads. There is no water storage facilities in the area.
SUGGESTION FOR IMPROVEMENT Irrigated water be supplied by lift from Ghishan Khad to Naldehra at height of approx 6 Kms to cover two Panchayats.
PEOPLES PRIORITIES
The path is required to be maintained with cement concrete. Suitable plants be planted in the blank area.
Priority.
Staff be posted and sufficient medicines be provided for the vaterinary. Link road from Durgapur to Oddu be made. Water storage tanks be made at Naldehra, Oddu, Charain, Mandhar, Patnaila, Kiartu and Kogi.
Top Priority.
PEOPLES PARTICIPATION
COSTING: TABLES COST
TABLE 3 5478200
TABLE 4 118800
TABLE 6 911400
TABLE 8 1990189
Volume: VII Chapter: 5 Page No:
TABLE 9 20732400
63
TOTAL 29230989