4Sk1a

Page 1

TABLE NO:1 GENERAL DESCRIPTION CATCHMENT

WATERSHED NO

MICRO WATERSHED NO

Satluj

Sk1

Sk1a

LATITUDE 31'21' to 31'24'

LONGITUDE 77'22' to 77'26'

ALTITUDE 783m to 2520m

AREA(HA)

DISTRICT NAME

TEHSIL/BLOCK

1504 SLOPE IN DEGREE

Kullu

Anni

VILLAGE Tihni, Deher Kharog, Taddasha, Tolini, Miog, Maindhar, Dadhol, Togi, Uluwa, Notnu, Chehu, Tipri, Dalash

RAINFALL(mm)

SNOWFALL(mm)

TEMPERATURE(Cen)

30' to 80'

NA

NA

NA

CATTLE POPULATION 1725

MALE 854

FEMALE 871

MILTCH 287

OTHER 1182

PROPOSED NO/NAME NA

PHOTO

C:\MWS_21\Photo\SK1A\Table 1\Table1.jpg NO OF HOUSE HOLD 384

PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA

DESCRIPTION NA

TABLE 1 PHOTO Sk1a

Volume: VIII Chapter: 4 Page No:

14


TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND WASTE LAND OTHERS LAND TOTAL

GOVT AREA

PRIVATE AREA

COMMU AREA

B.AREA UNDER FOREST CATEGORY WISE : TOTAL

CATEGORY

DPF/RESERVE

UPF

PASTURE

OTHERS

NAME AREA (HA)

0 NA

NA NA

NA NA

SPECIES DENSITY

NA NA

Tihni, Dalash, Dadhol, 630 Cheel, Kail, Eucaliptus, Robionia, Alinthus, Drek .1 to .3

NA NA

NA NA

0 630

592 0

0 0

592 630

220 62 912

0 0

0 0

220 62 1504

592

0

TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS NAM E Talun a Tihni -I Tihni -II TOTA L :

LATITUDE AND LONGITUD E 31'38'73" 77'39'25" 31'38'09" 77'39'08" 31'37'92" 77'40'41"

TOTA L AREA (HA)

97

97

SAM PLE ARE A (HA)

SPECIES PLANTED

SAMPLE GAP FILLING AREA(HA)

SURV IVAL %

5

Cheel

1

80

8

Lucinia, Cheel, Amla, Daru, Baan

4

50

10

Cheel

3

70

23

8

TOTAL GAP FILLING AREA (HA)

32

32

AREA NEEDED NEW PLANTAT ION(HA)

10

10

FENCIN G REQUIR ED(RM)

REASONS FOR FAILURE

42600

Due to drought and fire. Due to drought and fire. Due to drought and fire.

FINAL PRESCRIPT ION(Enrich ment(HA))

RATE/ HAC

COST (Rs)

Enrichment = 60

27900

1674000

Energy Plantation =8

112300

898400

42600

2572400

TABLE 3 PHOTOS Tihni-I

Tihni-II

Taluna

Volume: VIII Chapter: 4 Page No:

15


TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA

LATITUDE/LO NGITUDE

Talan a

31'38'73"77'4 9'25"

Tehni -I

31'38'09"77'3 9'08"

Tehni -II

31'37'92"77'4 0'41"

PRESCRIPTIO N Trenching Live Hedge CheckDams Trenching Live Hedge CheckDams Trenching Live Hedge CheckDams

QUANTITY 1x.50x.30m=1000Nos 100 Rms 2x1.5x1.5m = 30 Nos 3x1.5x1.5m = 24 Nos 1x.50x.30m=2000Nos 200 Rms 3x1.5x1.5m = 17 Nos 2x1.5x1.5m = 28 Nos 1x.50x.30m=1000Nos 100 Rms 3x1.5x1.5m = 21 Nos 2x1.5x1.5m = 29 Nos

AVAILABILT Y OF LOCAL MATERIAL

OLD WORK NEED REPAIRING (QUANTITY)

FINAL PRESCRIPTION NEW PRESCRIPTIO NEW N QUANTITY

Stone & local species

NA

Trenching

Stone & local species

NA

Stone & local species

NA

RATE/ CUM

COST(Rs)

1x.30x.30m = 8000 Nos

9.9

79200

Trenching

1x.30x.30m = 8000 Nos

9.9

79200

Trenching

1x.30x.30m = 8000 Nos

9.9

79200

TABLE 4 PHOTOS Tihni-I

Tihni-II

Taluna

Volume: VIII Chapter: 4 Page No:

16


TABLE NO:5 AGROFORESTRY PRESENT STATUS PRESENT NOs

TYPE OF TREE TREES

FUTURE REQUIREMENT

800

WILD FRUIT MEDICINAL

1100 700

PRESENT SPECIES Cheel, Fegra, Eucaliptus, Drake, Bheod, Reetha Walnut, Daru, Chulli, Bemi, Amla, Kimu, Anjeer Aloevera, Banafsha, Timber, Kashmal, Bhekal, Basuti

FUTURE NOs 2000 4500 2500

FUTURE SPECIES Cheel, Fegra, Eucaliptus, Drake, Bheod, Reetha Walnut, Daru, Chulli, Bemi, Amla, Kimu, Anjeer Aloevera, Banafsha, Timber, Kashmal, Bhekal, Basuti

NEED FOR EXTENSION

SOURCE OF PLANTING STOCK(Nearest Nursery)

Y

Shush & Taluna Nursery.

Y

Shush & Taluna Nursery.

Y

Shush & Taluna Nursery.

TABLE NO:6 GRAZING LANDS Name

LATITUDE/LO NGITUDE

AREA(HA)

Tihni

NA

30

SPECIES Grass & bushes

WEED REMOVAL

SEEDING

CLOSURES

Yes

Yes

Yes

Other 9000 BL plants are requiref to be planted for fodder.

PEOPLES SUGGESTION No suggestion.

Rate/ Hac (Rs) 21700

Cost (Rs) 651000

TABLE NO:7

TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA

AREA(HA) NA

LATITUDE/LONGITUDE NA

SPECIES NA

GAP FILLING NA

MAINTENANCE NA

NEW PLANTATION NA

SOIL CONSERVATION MEASURES(QUANTITY) NA

Volume: VIII Chapter: 4 Page No:

17


TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads) NAME OF AREA

LATITUD E/LONGI TUDE

Taluna Nala (1 Km)

31'38'63 " 77'42'05 " 31'38'48 " 77'39'17 "

Tihni Nala (3 Kms)

31'37'86 " 77'40'48 "

Devanu Nala (7 Kms)

PRESCRIPTI ON Water Harvesting Structure Live Hedge

CheckDams Brushwood Live Hedge CheckDams Brushwood Live Hedge

CheckDams Brushwood

QUANTITY

20x3x4m = 11 Nos 500 Rms 7x1.5x1.5m = 20 Nos 15x1.5x1.5m = 17 Nos 10x1.5x1.5m = 32 Nos 100 Rms 280 Rms 7x1.5x1.5m = 11 Nos 5x1.5x1.5m = 12 Nos 150 Rms 220 Rms 7x1.5x1.5m = 09 Nos 15x1.5x1.5m = 17 Nos 10x1.5x1.5m = 11 Nos 30 Rms

AVAILABILI TY OF LOCAL MATERIAL

OLD WORKS NEEDING REPAIR(QU ANTITY)

LIFT IRRIGATI ON(HT/AC ERAGE)

Stone & local species

NA

NA

Stone & local species

NA

NA

Stone & local species

NA

NA

FINAL PRESCRIPTION NEW PRESCRIPTI ON NEW QUANTITY Water Harvesting Structure 20x3x4m = 4 Nos Live Hedge 2100 Rms 7x1.5x1.5m = 7 Nos 15x1.5x1.5m = 6 Nos CheckDams 10x1.5x1.5m = 10 Nos Brushwood 350 Rms Live Hedge 300 Rms 7x1.5x1.5m = 3 Nos CheckDams 5x1.5x1.5m = 4 Nos Brushwood 50 Rms Live Hedge 900 Rms 7x1.5x1.5m = 3 Nos 15x1.5x1.5m = 6 Nos CheckDams 10x1.5x1.5m = 4 Nos Brushwood 150 Rms

RATE/ UNIT

COST(Rs)

63840 9.6 10033 10033 10033 62 9.6 10033 10033 62 9.6 10033 10033 10033 62

5107200 20160 491617 902970 1003300 21700 2880 210693 200660 3100 8640 210693 902970 401320 9300

TABLE 8 PHOTOS Tihni Nala

Davanu Nala

Taluna Nala

Volume: VIII Chapter: 4 Page No:

18


TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/LO CATION Road from Behna to Dalash ( 800 Mtr) Road from Telehani to Mungri ( 500 Mtr) Tadasha Nala (100mx6 0m) Tadasha, (30mx50 m)

LATITUDE/ LONGITUD E

NA

NA

DAMAGE/R ISK TO LIFE & PROPERTY

Property

Property

MEAS URES TAKEN

NA

NA

TYPE OF SOIL AND ROCK

NA

DEGRE E OF SLOPE S/SEV ERITY

NA

FINAL PRESCRIPTION OCCURR ENCE(S eason)

NA

ROAD CONSTR UCTION

Yes

RATE/UNIT

COST(Rs)

Yes

Retaining Wall Gabion

10x2x2.5 m = 20 Nos

17277

3455400

Yes

Retaining Wall Gabion

10x2x2.5 m = 50 Nos

17277

8638500

15x2.5x3 m=08Nos

20177

2421240

10x2x2.5 m=03Nos

17277

518310

No

No

No

Yes

Rainy

Yes

No

No

Yes

NA

Clay

31'38'74" 77'41'56"

Property

NA

Clay

Severe

No

NEW QUANTITY

Rainy

Property

No

No

NEW PRESCRI PTION

NA

Very Severe

Yes

No

NATU RAL

NA

31'38'77" 77'41'57"

NA

QU AR RY

OTHER CONST RUCTI ONS

Retaining Wall Gabion Retaining Wall Gabion

TABLE 9 PHOTOS Tadasha

Tadasha Nala

Volume: VIII Chapter: 4 Page No:

19


TABLE NO:9A

INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Walnut Annar Japani Fruit Apricot Orange Pears Apple

VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Royal, Golden, Red Royal, Red June, Spur

USE OF FERTILISERS No No No No No No Yes

USE OF INSECTICIDES No No No No No No Yes

PROBLEMS FACED

Technical guidence is requred. Monkey destroying the crops.

2.CROPS : CROPS NAME Kolth Soyabeen Urd Rajmash Barley Wheat Maize

VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local

USE OF FERTILISERS No No No No No No No

USE OF INSECTICIDES No No No No No No No

PROBLEMS FACED

Technical guidence is requred. Monkey destroying the crops.

3.VEGETABLE : VEGETABLE NAME Radish Cabbage Cauliflower Chilli Brinjal Tomato

VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local

USE OF FERTILISERS Yes Yes Yes Yes Yes Yes

USE OF INSECTICIDES Yes Yes Yes Yes Yes Yes

PROBLEMS FACED Technical guidence is requred. Monkey destroying the crops.

4. LIVE STOCK : LIVE STOCK(NO) Goat/Sheep-1127 Ox-55 Cow - 287

BREED Local Local Local & Jersey

WHETHER SELLING THE PRODUCT No No Yes

PROBLEM FACED Lack of technical guidence.

5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER

REQUIREMENT Yes Yes

AVAILABILITY

GAP PERCENTAGE 40% 50%

60% 50%

Volume: VIII Chapter: 4 Page No:

SOURCE LPG & Forest Forests

20


MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Tirmur Kari Patta Basuti Kashmal Daru Aloevera Banafsha Gloe Kakkarsingi

EXISTING NAME Tirmur Kari Patta Basuti Kashmal Daru Aloevera Banafsha Gloe Kakkarsingi

SUGGESTIONS

Extention of MFPs is required.

PEOPLES PARTICIPATION: MAIN PROBLEMS There is no provision of street lights and rain shelter for the village. There is no hand pump in the watershed. There is no provision of drainage of water from village. There is no water storage tank for drinking water. There is no good accomodation for the village temple. There is shortage of drinking and irrigated water.

SUGGESTION FOR IMPROVEMENT Rain shelter and street lights be managed for the villages. Hand Pump be provided for water in the village. Water drainage be made arround the village. Large Water storage tank be made for storage and distribution of drinking water. A good accomodation be made for the village temple. Drinking and irigated water be supplied from Sewan Khad through lift at a height of 3 Kms to cover two Panchayats.

PEOPLES PARTICIPATION

COSTING: TABLES COST

TABLE 3 2572400

TABLE 4 237600

TABLE 6 651000

TABLE 8 9497203

TABLE 9 26442818

Volume: VIII Chapter: 4 Page No:

21

TOTAL 39401021

PEOPLES PRIORITIES

Priority.

Top Priority.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.