TABLE NO:1 GENERAL DESCRIPTION CATCHMENT
WATERSHED NO
MICRO WATERSHED NO
Satluj
Sm1
Sm1d
LATITUDE 31'23' to 31' 26'
LONGITUDE 77'29' to 77'35'
ALTITUDE 830m to 3154m
AREA(HA)
DISTRICT NAME
TEHSIL/BLOCK
2100 SLOPE IN DEGREE
Kullu
Nirmand
VILLAGE Koel, Shanah, Anas, Dhama, Doraha, Maltha, Panwi, Gatmoh, Lagoni, Gaura
RAINFALL(mm)
SNOWFALL(mm)
TEMPERATURE(Cen)
NO OF HOUSE HOLD
30' to 80'
NA
NA PROPOSED NO/NAME NA
NA PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA
314
CATTLE POPULATION 1257
MALE 622
FEMALE 635
MILTCH 290
OTHER 371
PHOTO
C:\MWS_21\Photo\SM1D\Table 1\Table1.jpg
DESCRIPTION NA
TABLE 1 PHOTO Sm1d
Volume: IX Chapter: 4 Page No:
43
TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND WASTE LAND OTHERS LAND TOTAL
GOVT AREA 0 1856 124 0 1980
PRIVATE AREA 120 0 0 0 120
COMMU AREA 0 0 0 0 0
Total 120 1856 124 0 2100
B.AREA UNDER FOREST CATEGORY WISE : CATEGORY NAME AREA (HA) SPECIES DENSITY
DPF/ RESERVE 0 NA NA NA
UPF Katal, Shara, Doraha, Neethar 1855.72 Cheel, Kail, Deodar, Eucaliptus, Robinia 0 to .4
PASTURE NA NA NA NA
OTHERS NA NA NA NA
TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS NAM E
Anas Char ni Dura h Khan i Kapri Shan gu TOTA L :
SAMP LE AREA (HA)
SPECI ES PLANT ED
SAMPL E GAP FILLIN G AREA (HA)
SURVI VAL %
10
Cheel
2
80
10
Deoda r
3
70
10
Cheel
3
70
31'40'55" 77'52'50"
5
Deoda r
2
60
Due to fire and drought.
31'40'61" 77'51'19"
5
Deoda r
1
80
Due to fire and drought.
LATITUDE AND LONGITU DE 31'37'48" 77'53'39" 31'40'50" 77'51'04" 31'40'05" 77'53'74"
TOTA L AREA (HA)
168
168
40
11
TOTAL GAP FILLIN G AREA (HA)
44
44
AREA NEEDED NEW PLANTATIO N(HA)
50
50
FENCING REQUIRED (RM)
46200
REASONS FOR FAILURE
FINAL PRESCRIPT ION(Enrich ment(HA))
RATE/ HAC
COST (Rs)
Due to fire and drought. Due to fire and drought. Due to fire and drought.
Enrichment = 60
27900
1674000
Energy Plantation =6
112300
673800
46200
2347800
Volume: IX Chapter: 4 Page No:
44
TABLE 3 PHOTOS Anas
Charni
Khani Kapri
Shangu
Durah
Volume: IX Chapter: 4 Page No:
45
TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA
LATITUDE/ LONGITUDE
Anas
31'37'48" 77'53'39"
Charni
31'40'50" 77'51'04"
Durah
31'40'05" 77'53'74"
Khani Kopri
31'40'55" 77'51'50"
CheckDams Live Hedge Trenching Trenching
Shamnu
31'40'61" 77'51'19"
CheckDams Live Hedge
PRESCRIPTI ON CheckDams Live Hedge Trenching CheckDams CheckDams Live Hedge Trenching Live Hedge CheckDams Trenching CheckDams
QUANTITY 3x1.5x1.5m = 25 Nos 100 Rms 1x.50x.30m=1000Nos 2x1.5x1.5m = 30 Nos 3x1.5x1.5m = 20 Nos 2x1.5x1.5m = 30 Nos 200 Rms 1x.50x.30m=1800Nos 100 Rms 3x1.5x1.5m = 20 Nos 1x.50x.30m=1000Nos 2x1.5x1.5m = 35 Nos 2x1.5x1.5m = 40 Nos 3x1.5x1.5m =30 Nos 120 Rms 1x.50x.30m=1200Nos 1x.50x.30m=1000Nos 3x1.5x1.5m = 25 Nos 2x1.5x1.5m = 30 Nos 100 Rms
AVAILABILT Y OF LOCAL MATERIAL
Stone & local species
Stone & local species
Stone & local species
Stone & local species
Stone & local species
OLD WORK NEED REPAIRING (QUANTITY)
NA
NA
NA
NA
NA
FINAL PRESCRIPTION NEW PRESCRIPTI NEW ON QUANTITY
RATE/ CUM
COST(Rs)
Trenching
1x.30x.30 m= 4800 Nos
9.9
47520
Trenching
1x.30x.30 m= 4800 Nos
9.9
47520
Trenching
1x.30x.30 m= 4200 Nos
9.9
41580
Trenching
1x.30x.30 m= 5400 Nos
9.9
53460
Trenching
1x.30x.30 m= 4800 Nos
9.9
47520
TABLE 4 PHOTOS Anas
Charni
Shangu
Volume: IX Chapter: 4 Page No:
46
Khani Kapri
Durah
TABLE NO:5 AGROFORESTRY PRESENT STATUS
FUTURE REQUIREMENT
TYPE OF TREE
PRESENT NOs
FUTURE NOs
TREES
600
WILD FRUIT
800
MEDICINAL
600
PRESENT SPECIES Cheel, Drake, Bheod, Eucaliptus, Fedu, Anzeer Walnut, Daru, Chulli, Bemi, Ber, Kather, Amla, Kimu, Jamun Aloevera, Banafsha, Timber, Kashmal, Bhekal
1000 1400 6000
FUTURE SPECIES Drake, Bheod, Fedu, Anzeer, Khirak Walnut, Daru, Chulli, Bemi, Ber, Kather, Amla, Kimu, Jamun Aloevera, Banafsha, Timber, Kashmal, Bhekal
NEED FOR EXTENSION
SOURCE OF PLANTING STOCK(Nearest Nursery)
Y
Neether Nursery.
Y
Neether Nursery.
Y
Neether Nursery.
TABLE NO:6 GRAZING LANDS Name Overal l MWS
LATITUDE/ LONGITUDE 006-01NoPSm1d
AREA (HA) 30
SPECIE S Grass & Bushes
WEED REMOVAL
SEEDIN G
CLOSURE S
Yes
Yes
Yes
Other 9000 fodder plants are required to be planted.
PEOPLES SUGGESTION No suggestion.
Rate/ Hac (Rs) 21700
Cost (Rs) 651000
TABLE NO:7
TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA
AREA(HA) NA
LATITUDE/LONGITUDE NA
SPECIES NA
GAP FILLING NA
MAINTENANCE NA
NEW PLANTATION NA
SOIL CONSERVATION MEASURES(QUANTITY) NA
Volume: IX Chapter: 4 Page No:
47
TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads)
NAME OF AREA
LATITUDE /LONGITU DE
CheckDams Live Hedge Water Harvesting Structure Brushwood Brushwood
AnasI (2 Kms)
AnasII (4 Kms)
PRESCRIPTI ON
31'38'30" 77'54'35"
Koil Nala (1 Km)
31'39'40" 77'59'29"
Nagra Nala (1.5 Kms)
31'38'75" 77'54'57"
Shana h Nala (500 Mtr)
31'39'40" 77'59'29"
Shana h NalaI(1.5 Kms)
31'38'74" 77'54'57"
CheckDams Live Hedge Live Hedge Brushwood CheckDams Water Harvesting Structure CheckDams Brushwood
CheckDams Live Hedge Brushwood Live Hedge Water Harvesting Structure Live Hedge Brushwood
CheckDams
QUANTITY 10x1.5x1.5m = 07 Nos 5x1.5x1.5m = 10 Nos 7x1.5x1.5m = 05 Nos 200 Rms
15x2x4m = 02 Nos 22 Rms 25 Rms 10x1.5x1.5m = 09 Nos 5x1.5x1.5m = 10 Nos 7x1.5x1.5m = 15 Nos 400 Rms 100 Rms 15 Rms 10x1.5x1.5m = 15 Nos 20x1.5x1.5m = 05 Nos
20x3x5m = 01 Nos 15x1.5x1.5m = 07 Nos 18 Rms 10x1.5x1.5m = 06 5x1.5x1.5m = 10 7x1.5x1.5m = 08 Nos 200 Rms 15 Rms 100 Rms
20x3x5m = 02 Nos 200 Rms 15 Rms 10x1.5x1.5m = 07 Nos 5x1.5x1.5m = 09 Nos 7x1.5x1.5m = 10 Nos
AVAILA BILITY OF LOCAL MATERI AL
FINAL PRESCRIPTION OLD WORKS NEEDING REPAIR(Q UANTITY)
LIFT IRRIGAT ION(HT/ ACERAG E)
Stone & local species
NA
NA
Stone & local species
NA
NA
Stone & local species
NA
NA
Stone & local species
NA
NA
Stone & local species
NA
NA
Stone & local species
NA
NA
NEW PRESCRIPTI ON
CheckDams Live Hedge Water Harvesting Structure Brushwood Brushwood
CheckDams Live Hedge Live Hedge Brushwood CheckDams Water Harvesting Structure CheckDams Brushwood
CheckDams Live Hedge Brushwood Live Hedge Water Harvesting Structure Live Hedge Brushwood
CheckDams
NEW QUANTITY 10x1.5x1.5m = 2 Nos 5x1.5x1.5m = 3 Nos 7x1.5x1.5m = 2 Nos 600 Rms
RATE/ UNIT 10033 10033 10033 9.6
COST (Rs) 200660 150495 140462 5760
15x2x4m = 02 Nos 100 Rms 200 Rms 10x1.5x1.5m = 3 Nos 5x1.5x1.5m = 3 Nos 7x1.5x1.5m = 5 Nos 1200 Rms 300 Rms 50 Rms 10x1.5x1.5m = 5 Nos 20x1.5x1.5m = 2 Nos
62290 62 62 10033 10033 10033 9.6 9.6 62 10033 10033
1868700 6200 12400 300990 150495 351155 11520 2880 3100 501650 401320
20x3x5m = 01 Nos 15x1.5x1.5m = 2 Nos 75 Rms 10x1.5x1.5m = 2 Nos 5x1.5x1.5m = 3 Nos 7x1.5x1.5m = 3 Nos 450 Rms 25 Rms 150 Rms
84338 10033 62 10033 10033 10033 9.6 62 9.6
1686760 300990 4650 200660 150495 210693 4320 1550 1440
20x3x5m = 02 Nos 450 Rms 75 Rms 10x1.5x1.5m = 2 Nos 5x1.5x1.5m = 3 Nos 7x1.5x1.5m = 3 Nos
84338 9.6 62 10033 10033 10033
3373520 4320 4650 200660 150495 210693
Volume: IX Chapter: 4 Page No:
48
TABLE 8 PHOTOS Koil Nala
Nagra Nala
Shanah Nala
Shanah Nala-I
Anas-I
Anas-II
Volume: IX Chapter: 4 Page No:
49
TABLE NO:9 PERFORMA FOR LANDSLIDE
NAME OF AREA/LO CATION Road from Durah Link Road (1 Km) Road from Koil to Anas (500 Mtr) Road from Nither to Durah (500 Mtr)
LATITU DE/LO NGITU DE
NA
NA
NA
DAMAGE/ RISK TO LIFE & PROPERTY
Property
Property
Property
MEAS URES TAKE N
NA
NA
NA
TYPE OF SOIL AND ROCK
NA
NA
NA
DEGREE OF SLOPES/S EVERITY
NA
NA
NA
OCCU RREN CE(Se ason)
NA
NA
NA
ROAD CONS TRUC TION
Yes
Yes
Yes
QUA RRY
No
No
No
OTHER CONSTR UCTIONS
No
No
No
NAT URA L
FINAL PRESCRIPTION NEW PRESCR NEW IPTION QUANTITY
RATE/ UNIT
COST(Rs)
Yes
Retainin g Wall Gabion
15x2x2.5 m = 40 Nos
17277
10366200
Yes
Retainin g Wall Gabion
10x2x2.5 m = 20 Nos
17277
3455400
Yes
Retainin g Wall Gabion
10x2x2.5 m = 25
17277
4319250
TABLE NO:9A
INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Almond Peach Litchi Mango Plum Banana Orange
VARIETY(LOCAL/IMPROVED) Kagzi, Semi Drek, IXL Local Local Local Local Local Local
USE OF FERTILISERS No No No Yes No No No
USE OF INSECTICIDES No No No Yes No No No
PROBLEMS FACED
Market rates are not satisfactory. Technical guidence is required. Monkey destroying the crops.
Volume: IX Chapter: 4 Page No:
50
2.CROPS : CROPS NAME Kolth Urd Rongi Maize Potato Paddy Wheat Rajmash
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local Local
USE OF FERTILISERS No No No No No No No No
USE OF INSECTICIDES No No No No No No No No
PROBLEMS FACED
Technical guidance is required. Monkey destroying the crops.
3.VEGETABLE : VEGETABLE NAME Carrot Radish Brinjal Cauliflower Chilli Cabbage Capsicum
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local
USE OF FERTILISERS No No No Yes No Yes No
USE OF INSECTICIDES No No No Yes No Yes No
PROBLEMS FACED
Technical guidance is required. Monkey destroying the crops.
4. LIVE STOCK : LIVE STOCK(NO) Cow - 290 Ox - 88 Sheep/Goat - 283
BREED Local & Jersey Local Local
WHETHER SELLING THE PRODUCT Yes No No
PROBLEM FACED
GAP PERCENTAGE
SOURCE LPG & Forest Forests
No problem.
5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER
REQUIREMENT Yes Yes
AVAILABILITY 80% 40%
20% 60%
MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Kakkarsingi Tirmur Alloevera Banafsha Kashmal Ashwagandha Discoria
EXISTING NAME Kakkarsingi Tirmur Alloevera Banafsha Kashmal Ashwagandha Discoria
SUGGESTIONS
Medicinal plantation be increased to improve the income of locals.
Volume: IX Chapter: 4 Page No:
51
PEOPLES PARTICIPATION: MAIN PROBLEMS Environment of the area is polluted by 412MW Rampur Project. Crops production have been failed due to dust of the 412 MW Rampur Project. Natural resources of water have been also lapsed due to heavy blastings. Maximum houses of the villagers have been damaged due to heavy blastings by 412MW Ramput Project. There is shortage of drinking and irrigated water.
SUGGESTION FOR IMPROVEMEN Keeping in view the pollution and global warming these Projects be stopped immediately.
PEOPLES PRIORITIES
Compensation be given to all the land holders or stopage of work of the Project is demand of public. Compensation to all those house holders be given by the Project authorities otherwise there will be strikes/hesitations regularily. Drinking and irrigated water be supplied from Kurpan Khad to kalog by lift irrigation at height of 1200m in two stages to cover maximum of the villages.
Top Priority.
COSTING: TABLES COST
TABLE 3 2347800
TABLE 4 237600
TABLE 6 651000
TABLE 8 10613683
TABLE 9 34122075
TOTAL 47972158
Volume: IX Chapter: 4 Page No:
52