TABLE NO:1 GENERAL DESCRIPTION CATCHMEN T
WATERSHED NO
MICRO WATERSHED NO
Satluj
Sn2
Sn2a
LATITUDE 31'15' to 31'21'
LONGITUDE
ALTITUDE
77'30' to 77'35'
810m to 2670m
MALE 3032
FEMALE 2997
POPULATIO N 6029
AREA(HA )
DISTRICT NAME
1715 SLOPE IN DEGREE 35' to 80'
Shimla RAINFALL (mm) NA
TEHSIL/BLOCK Rampur Bushahr/Kumarsai n
VILLAGE Bhutti, Bhargaon, Kainthla, Karangla, Kalmog, Delath, Darol, Chiltu, Bahli, Saroga
PHOTO C:\MWS_21\Photo\S N2A\Table 1\Table1.jpg
SNOWFALL (mm) NA
TEMPERATURE(Cen) NA
NO OF HOUSE HOLD 1218
PROPOSED NO/NAME NA
PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA
DESCRIPTION NA
CATTLE MILTCH 381
OTHER 120
TABLE 1 PHOTO Sn2a
Volume: X Chapter: 4 Page No:
79
TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND WASTE LAND OTHERS LAND TOTAL
B.AREA UNDER FOREST CATEGORY WISE :
GOVT AREA
PRIVATE AREA
COMMU AREA
Total
CATEGORY
DPF/RESERVE
UPF
PASTURE
OTHERS
0 914
583 0
0 0
583 914
NAME AREA (HA)
Saroga, Naula, Kunda, Bhargaon 669.06
NA NA
NA NA
49 169 1132
0 0 583
0 0 0
49 169 1715
SPECIES DENSITY
Tikker, Chiltu, Saroga 414.03 Deodar, Kail, Cheel, Baan, Rai Tosh 0.1 to 0.6
Deodar, Kail, Cheel, Baan, Rai Tosh 0 to 0.4
NA NA
NA NA
TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS NAME
LATITUD E AND LONGITU DE
Dhanapa ni
31'18'52" 77'31'39"
Lambi Dhar
31'20'08" 77'31'53"
Saroga
31'18'46" 77'30'38"
Tamberd har
31'23'38" 77'35'34"
TOTAL :
TOTAL AREA (HA)
AREA NEEDED NEW PLANTATI ON(HA)
FENCIN G REQUIR ED (RM)
SPECIES PLANTED
SAMPLE GAP FILLING AREA(HA)
SUR VIVA L%
10
Cheel
5
50
Due to fire burn and drought.
10
Cheel, Euqaplitus, Dedonia,
2
80
Due to fire burn and drought.
10
Cheel, Kail
5
50
Due to fire burn and drought.
5
Cheel, Daru, Drake
80
Due to fire burn and drought.
147
147
TOTAL GAP FILLING AREA (HA)
SAMPL E AREA (HA)
35
40
1 13
40
50
50
39000
REASONS FOR FAILURE
FINAL PRESCRIPT ION(Enrich ment(HA))
RATE/ HAC
COST (Rs)
Energy Plantation =4
112300
449200
Enrichment = 40
27900
1116000
39000
1565200
Volume: X Chapter: 4 Page No:
80
TABLE 3 PHOTOS Tamberdhar
Lambi Dhar
Dhanapani
Saroga
TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA
LATITUDE/L ONGITUDE
Dhanapani
31'18'52" 77'31'39"
Lambi Dhar
31'20'08" 77'31'53"
Saroga
31'18'46" 77'30'38"
CheckDams
Tamberdha r
31'23'38" 77'35'34"
CheckDams Live Hedge Trenching
PRESCRIPTION CheckDams Live Hedge Trenching CheckDams Trenching CheckDams Live Hedge CheckDams Live Hedge Trenching
QUANTITY 3x1.5x1.5m=22 Nos 70 Rms 1x.50x.30m=700 Nos 2x1.5x1.5m=30 Nos 1x.50x.30m=800 Nos 2x1.5x1.5m=28 Nos 60 Rms 3x1.5x1.5m=20 Nos 80 Rms 1x.50x.30m=800 Nos 3x1.5x1.5m=32 Nos 2x1.5x1.5m=38 Nos 3x1.5x1.5m=28 Nos 2x1.5x1.5m=36 Nos 80 Rms 1x.50x.30m=800 Nos
AVAILABILT Y OF LOCAL MATERIAL
OLD WORK NEED REPAIRING( QUANTITY)
FINAL PRESCRIPTION NEW PRESCRIPTIO N NEW QUANTITY
RATE /CUM
COS(Rs)
Stone & local species
NA
Trenching
1x.30x.30m= 5000 Nos
9.9
49500
Stone & local species
NA
Trenching
1x.30x.30m= 4000 Nos
9.9
39600
Stone & local species
NA
Trenching
1x.30x.30m= 3000 Nos
9.9
29700
Stone & local species
NA
Trenching
1x.30x.30m= 4000 Nos
9.9
39600
Volume: X Chapter: 4 Page No:
81
TABLE 4 PHOTOS Tamberdhar
Lambi Dhar
Dhanapani
Saroga
TABLE NO:5 AGROFORESTRY
TYPE OF TREE TREES WILD FRUIT MEDICINAL
PRESENT STATUS
FUTURE REQUIREMENT
PRESENT NOs 2500 1800 2000
FUTURE NOs 6500 5100 4000
PRESENT SPECIES Cheel, Kail, Baan, deodar Daru, Chulli, Bemi, Walnut, Paja, Timber, Kashmal, Kakkarsingi, Guchhi
FUTURE SPECIES Cheel, Kail, Baan, deodar Daru, Chulli, Bemi, Walnut, Paja, Timber, Kashmal, Kakkarsingi, Guchhi
NEED FOR EXTENSIO N Y Y Y
SOURCE OF PLANTING STOCK(Nearest Nursery) Naula Forest Nursery. Naula Forest Nursery. Naula Forest Nursery.
TABLE NO:6 GRAZING LANDS Name
LATITUDE/LONGITU DE
AREA(HA)
NA
006-01-NoPSn2a
25
SPECIES Grass & Bushes
WEED REMOVAL
SEEDING
CLOSURES
Yes
Yes
Yes
Other Requirement of 7500 fodder plants
PEOPLES SUGGESTIO N
Rate/ Hac (Rs)
NA
21700
Cost (Rs) 542500
TABLE NO:7
TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA
AREA(HA) NA
LATITUDE/LONGITUDE NA
SPECIES NA
GAP FILLING NA
MAINTENANCE NA
NEW PLANTATION NA
SOIL CONSERVATION MEASURES(QUANTITY) NA
Volume: X Chapter: 4 Page No:
82
TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads) NAME OF AREA
LATITUDE/L ONGITUDE
Kathi GadUpper (3 Kms)
PRESCRIPTI ON Live Hedge
31'17'06" 77'35'33"
CheckDams Brushwood
Tikker Nala (3.5 Kms)
Retaining Wall Gabion Live Hedge 31'18'48" 77'31'32"
CheckDams
QUANTITY 200 Rms 8x1.5x1.5m=7 Nos 5x1.5x1.5m=16 Nos 3x1.5x1.5m=12 Nos 30 Rms
15x3x4m=4 Nos 300 Rms 7x1.5x1.5m=18 Nos 10x1.5x1.5m=12 Nos
AVAILABILI TY OF LOCAL MATERIAL
OLD WORKS NEEDING REPAIR (QUANTITY)
LIFT IRRIGATIO N(HT/ACER AGE)
Stone & local species
NA
NA
Stone & local species
NA
NA
FINAL PRESCRIPTION NEW PRESCRIPTI ON NEW QUANTITY Live Hedge 900 Rms 8x1.5x1.5m=2 Nos 5x1.5x1.5m=5 Nos CheckDams 3x1.5x1.5m=4 Nos Brushwood 150 Rms Retaining Wall Gabion 15x3x4m=2 Nos Live Hedge 1050 Rms 7x1.5x1.5m=6 Nos CheckDams 10x1.5x1.5m=4 Nos Brushwood
175 Rms
TABLE 8 PHOTOS Kathi Gad-Upper
Tikker Nala
Volume: X Chapter: 4 Page No:
83
RATE/ UNIT 9.6 10033 10033 10033 62
COST (Rs) 8640 160528 250825 120396 9300
29131 9.6 10033 10033
873930 10080 421386 401320
62
10850
TABLE NO:9 PERFORMA FOR LANDSLIDE DAMAGE/R ISK TO LIFE & PROPERTY
MEA SUR ES TAKE N
OTHE R CONS TRUCT IONS
FINAL PRESCRIPTION
TYPE OF SOIL AND ROCK
DEGREE OF SLOPES/ SEVERITY
Rainy
No
No
No
Yes
Rainy
Yes
No
No
Yes
OCCU RREN CE(Se ason)
ROAD CONS TRUCT ION
NAME OF AREA/LOCATIO N
LATITUD E/LONGIT UDE
Barawag (400mx300m)
31'19'25" 77'32'07"
Property
NA
CLAY
MODERA TE
Bhargaon Road (500 m)
NA
Property
NA
CLAY
MODERA TE
Chaber (1000mx500m )
31'20'05" 77'31'56"
Property
NA
Clay
Moderate
Rainy
Yes
No
No
Yes
Delath Road (400 m)
NA
Property
NA
CLAY
MODERA TE
Rainy
Yes
No
No
Yes
QUA RRY
NATU RAL
NEW PRESCRIPT ION Retaining Wall Gabion Retaining Wall Gabion Retaining Wall Gabion Retaining Wall Gabion
NEW QUANTITY
RATE/ UNIT
10x2x2.5 m=13 Nos
17277
2246010
20x2x2.5 m=25 Nos
17277
8638500
10x2x2.5 m=10 No
17277
1727700
20x2x2.5 m=20 Nos
17277
6910800
TABLE 9 PHOTOS Barawag
Chaber
Volume: X Chapter: 4 Page No:
84
COST (Rs)
TABLE NO:9A
INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Apple Cherry Almond Peach Walnut Chulli Bemi
VARIETY(LOCAL/IMPROVED) Royal, Golden, Delicious Local Drake, Semi Drake, IXL, Kagzi Local Local Local Local
USE OF FERTILISERS Yes No No No No No No
USE OF INSECTICIDES Yes No No No No No No
PROBLEMS FACED
Technical guidance is required. Monkey and birds destroying the crops.
2.CROPS : CROPS NAME Wheat Barley Rajmash Urd Kolth Maize Paddy
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local
USE OF FERTILISERS No No No No No No No
USE OF INSECTICIDES No No No No No No No
PROBLEMS FACED
Technical guidence is required. Monkey and birds destroying the crops.
3.VEGETABLE : VEGETABLE NAME Cabbage Cauliflower Brinjal Tomato Capsicum
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local
USE OF FERTILISERS Yes Yes Yes Yes Yes
USE OF INSECTICIDES Yes Yes Yes Yes Yes
PROBLEMS FACED Technical guidence is required. Monkey destroying the crops.
4. LIVE STOCK : LIVE STOCK(NO) Cow - 361 Ox-38 Sheep/Goat-82
BREED Jersey & Local Local Local
WHETHER SELLING THE PRODUCT Yes No No
PROBLEM FACED Healthcare system for cattle is at approx 2 Kms far from the village.
5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER
REQUIREMENT Yes Yes
AVAILABILITY 50% 80%
GAP PERCENTAGE 50% 20%
Volume: X Chapter: 4 Page No:
SOURCE LPG & Forest Forests
85
MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Kashmal Timber Kakkarsingi Guchhi
EXISTING NAME Kashmal Timber Kakkarsingi Guchhi
SUGGESTIONS No suggestion.
PEOPLES PARTICIPATION: MAIN PROBLEMS There is shortage of drinking and irrigation water. The road approach is very far from villages. The condition of village temple is poor. Condition of Middle School building is poor and there is no playground for children. There is no vetnary facility nearby the village. The system of water supply to the houses is not satisfactory.
SUGGESTION FOR IMPROVEMENT Drinking and irrigation water be supplied from Tikker Khad at approx 4 Kms span to cover 3 villages. Link road be made to the villages. Repair of the village temple building is required.
PEOPLES PRIORITIES
Priority. Building of the school be repaired and a plaground be made. Healthcare system for both human and cattle be managed. Large storage tanks be made for equal distribution of water to the houses.
PEOPLES PARTICIPATION
COSTING: TABLES COST
TABLE 3 1565200
TABLE 4 158400
TABLE 6 542500
TABLE 8 2267255
TABLE 9 23675544
Volume: X Chapter: 4 Page No:
TOTAL 28208899
86