TABLE NO:1 GENERAL DESCRIPTION CATCHMEN T
WATERSHE D NO
MICRO WATERSHED NO
Satluj
Sn2 LONGITUD E 77'31' to 77'36'
Sn2d
LATITUDE 31'14' to 31'17'
AREA(HA)
DISTRICT NAME
TEHSIL/BLOC K
ALTITUDE
1880 SLOPE IN DEGREE
Shimla RAINFALL (mm)
Nankhari SNOWFALL (mm)
2600m to 2995m
30' to 80'
NA
NA
1660
MALE
866
FEMALE
794
MILTCH
204
PHOTO
TEMPERATURE(Cen)
NO OF HOUSE HOLD 329
OTHER
PROPOSED NO/NAME
NA PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM
120
Rest House renovation for stay of tourists.
Gahan Rest House site
CATTLE POPULATIO N
VILLAGE Addu, Shilla, Gahan, Jamhol, Jatral, Ghartola, Brat
C:\MWS_21\Photo\SN2D\Table 1\Table1.jpg
DESCRIPTION During the past English persons visited here frequently during 1903-04 to see the sites of whole area and stayed in the Gahan Forest Rest House. The Rest House is required to be developed and make the same able to stay the visitors/tourists.
TABLE 1 PHOTO Sn2d
Volume: X Chapter: 4 Page No:
101
TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND WASTE LAND OTHERS LAND TOTAL
GOVT AREA
B.AREA UNDER FOREST CATEGORY WISE :
PRIVATE AREA
COMMU AREA
0 1463
294 0
0 0
294 1463
NAME AREA (HA)
27 96 1586
0 0 294
0 0 0
27 96 1880
SPECIES DENSITY
Total
CATEGORY
DPF/RESERVE Perojan, Sheel, Addu, Bhagat, Gahan, Challali 637 Deodar, Kail, Cheel, Baan, Rai, Tosh, Robinia, Alunthus 0.1 to 0.8
UPF
PASTURE
OTHERS
Bhorja, Gahn, Jatral, Baroli 826 Deodar, Kail, Cheel, Baan, Rai, Tosh, Robinia, Alunthus 0.1 to 0.5
NA NA
NA NA
NA NA
NA NA
TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS NAME
LATITUDE AND LONGITU DE
Addu
31'16'17" 77'34'04"
Barkha
31'15'52" 77'33'04"
TOTAL AREA (HA)
SAMPLE AREA (HA)
SPECIE S PLANTE D
SAMPLE GAP FILLING AREA(HA)
SURV IVAL %
5
Deodar
3
40
28
TOTAL :
AREA NEEDED NEW PLANTATION (HA)
12 5
28
TOTAL GAP FILLING AREA(HA)
Deodar
10
2 5
12
FENCING REQUIRED (RM)
REASO NS FOR FAILUR E
31200
Due to drought . Due to drought .
60 12
12
FINAL PRESCRIPTI ON (Enrichment (HA))
RATE/ HAC
COST (Rs)
Enrichment = 80
27900
2232000
Energy Plantation = 3
112300
336900
31200
2568900
TABLE 3 PHOTOS Barkha
Addu
Volume: X Chapter: 4 Page No:
102
TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA
LATITUDE/ LONGITUDE
Addu
31'16'47" 77'34'04"
Barkha
31'15'52" 77'33'04"
PRESCRIPTION Live Hedge CheckDams Trenching Trenching Live Hedge CheckDams
QUANTITY 25 Rms 2x1.5x1.5m=26 Nos 3x1.5x1.5m=14 Nos 1x.50x.30m=250 Nos 1x.50x.30m=400 Nos 50 Rms 3x1.5x1.5m=17 Nos 2x1.5x1.5m=34 Nos
AVAILABILT Y OF LOCAL MATERIAL
OLD WORK NEED REPAIRING (QUANTITY)
FINAL PRESCRIPTION NEW PRESCRIPTION
NEW QUANTITY
RATE/ CUM
COST (Rs)
Stone & local species
NA
Trenching
1x.30x.30m= 2000 Nos
9.9
19800
Stone & local species
NA
Trenching
1x.30x.30m= 2000 Nos
9.9
19800
TABLE 4 PHOTOS Barkha
Addu
TABLE NO:5 AGROFORESTRY
TYPE OF TREE TREES WILD FRUIT MEDICINAL
PRESENT STATUS PRESENT NOs PRESENT SPECIES 1700 Kail, Deodar, Paja, Kimu 1350 Walnut, Chulli, Bemi, Khanor 1200 Chora, Patish, Guchhi, Wild mushroom
FUTURE REQUIREMENT FUTURE NOs FUTURE SPECIES 3500 Kail, Deodar, Paja, Kimu 2500 Walnut, Chulli, Bemi, Khanor 4500 Chora, Patish, Guchhi, Wild mushroom
Volume: X Chapter: 4 Page No:
NEED FOR EXTENSION Y Y Y
103
SOURCE OF PLANTING STOCK(Nearest Nursery) Gahan Forest Nursery. Gahan Forest Nursery. Gahan Forest Nursery.
TABLE NO:6 GRAZING LANDS NAME NA
AREA(HA) 0
LATITUDE/LONGITUDE NA
SPECIES NA
WEED REMOVAL NA
SEEDING NA
CLOSURES NA
OTHERS NA
PEOPLES SUGGESTION NA
PHOTO NA
TABLE NO:7
TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA
AREA(HA) NA
LATITUDE/LONGITUDE NA
SPECIES NA
GAP FILLING NA
MAINTENANCE NA
NEW PLANTATION NA
SOIL CONSERVATION MEASURES(QUANTITY) NA
TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads) NAME OF AREA
Bhagri Nala (3 Kms)
LATITUDE/ LONGITUD E
PRESCRIPTION
31'15'07" 77'32'48"
CheckDams Live Hedge Retaining Wall in Gabion Brushwood
CheckDams Live Hedge
Ghan Nala (2.5 Kms)
31'15'57" 77'32'03"
Nera Nala (3 Kms)
31'15'07" 77'32'56"
Retaining Wall Gabion CheckDams Brushwood CheckDams Live Hedge Silt Detention Dams CheckDams
QUANTITY 10x1.5x1.5m=18 Nos 5x1.5x1.5m=22 Nos 7x1.5x1.5m=17 Nos 300 Rms 12x2x2.5m=5 Nos 30 Rms 10x1.5x1.5m=8 Nos 5x1.5x1.5m=12 Nos 7x1.5x1.5m=12 Nos 240 Rms
10x1.5x1.5m=8 Nos 7x1.5x1.5m=16 Nos 26 Rms 5x1.5x1.5m=27 Nos 320 Rms 15x2x3m=2 Nos 10x1.5x1.5m=9 Nos
AVAILABIL ITY OF LOCAL MATERIAL
Stone & local species
OLD WORKS NEEDING REPAIR(QUA NTITY)
NA
LIFT IRRIGATI ON(HT/A CERAGE)
NA
Stone & local species
NA
NA
Stone & local species
NA
NA
FINAL PRESCRIPTION NEW PRESCRIPTION
CheckDams Live Hedge Retaining Wall Gabion Brushwood Brushwood
CheckDams Live Hedge Retaining Wall Gabion CheckDams Brushwood CheckDams Live Hedge Silt Detention Dams CheckDams
NEW QUANTITY 10x1.5x1.5m=6 Nos 5x1.5x1.5m=7 Nos 7x1.5x1.5m=6 Nos 900 Rms
RATE/ UNIT 10033 10033 10033 9.6
COST (Rs) 601980 351155 421386 8640
12x2x2.5m=2 Nos 150 Rms 125 Rms 10x1.5x1.5m=3 Nos 5x1.5x1.5m=4 Nos 7x1.5x1.5m=4 Nos 750 Rms
17277 62 62 10033 10033 10033 9.6
414648 9300 7750 300990 200660 280924 7200
10x1.5x1.5m=3 Nos 7x1.5x1.5m=5 Nos 150 Rms 5x1.5x1.5m=9 Nos 1500 Rms
10033 10033 62 10033 9.6
300990 351155 9300 451485 14400
15x2x3m=2 Nos 10x1.5x1.5m=3 Nos
20177 10033
605310 300990
Volume: X Chapter: 4 Page No:
104
Piyojn a Nala (2.5 Kms)
Shella Nala (4 Kms)
CheckDams Live Hedge 31'15'57" 77'32'03"
31'15'59" 77'33'44"
Retaining Wall Gabion
CheckDams Live Hedge Silt Detention dams
10x1.5x1.5m=4 Nos 5x1.5x1.5m=13 Nos 7x1.5x1.5m=12 Nos 300 Rms
Brushwood
Stone & local species
10x2x2.5m=8 Nos
10x1.5x1.5m=22 Nos 7x1.5x1.5m=17 Nos 420 Rms 15x2x3m=1 Nos
Stone & local species
NA
62 10033 10033 10033 9.6
7750 100330 200660 280924 7200
10x2x2.5m=4 Nos
17277
691080
CheckDams
15x2x3m=1 Nos 200 Rms 10x1.5x1.5m=7 Nos 7x1.5x1.5m=6 Nos
20177 62 10033 10033
302655 12400 702310 421386
Live Hedge
1200 Rms
9.6
11520
CheckDams Live Hedge Retaining Wall Gabion Silt Detention dams Brushwood
NA
NA
125 Rms 10x1.5x1.5m=1 Nos 5x1.5x1.5m=4 Nos 7x1.5x1.5m=4 Nos 750 Rms
NA
TABLE 8 PHOTOS Ghan Nala
Piyojna Nala
Bhagri Nala
Nera Nala
Shella Nala
TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/LOC ATION Barkha (200mx15 0m)
LATITUDE/ LONGITUDE
DAMAGE/ RISK TO LIFE & PROPERT Y
MEA SURE S TAKE N
TYPE OF SOIL AND ROCK
DEGRE E OF SLOPE S/SEV ERITY
FINAL PRESCRIPTION OCCURRE NCE (Season)
ROAD CONSTR UCTION
31'15'51" 77'33'03"
Property
NA
CLAY
Severe
Rainy
No
QUA RRY
OTHER CONSTR UCTION S
NAT URA L
NEW PRESCRIPTI ON
NEW QUANTIT Y
RATE/ UNIT
No
No
Yes
Retaining Wall Gabion
20x2x2.5 m=6 Nos
17277
Volume: X Chapter: 4 Page No:
105
COST(Rs)
2073240
TABLE 9 PHOTO Barkha
TABLE NO:9A
INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Apple Pears Cherry Apricot Chulli Walnut Almond
VARIETY(LOCAL/IMPROVED) Royal, Red Royal, Golden, Red Golden, Delicious Local Local Local Local Local Drake, Semi Drake, IXL, Kagzi
USE OF FERTILISERS Yes No No No No No No
USE OF INSECTICIDES Yes No No No No No No
PROBLEMS FACED Plants/roots are not being provided of good quality.
NA.
2.CROPS : CROPS NAME Maize Barley Potato Rajmash
VARIETY(LOCAL/IMPROVED) Local Local Local Local
USE OF FERTILISERS No No No No
USE OF INSECTICIDES No No No No
Volume: X Chapter: 4 Page No:
PROBLEMS FACED NA
106
3.VEGETABLE : VEGETABLE NAME Cabbage Peas Chilli
VARIETY(LOCAL/IMPROVED) Local Local Local
USE OF FERTILISERS No No No
USE OF INSECTICIDES No No No
PROBLEMS FACED NA
4. LIVE STOCK : LIVE STOCK(NO) Cow - 204 Ox-18 Goat/Sheep-102
BREED Jersey & Local Local Local
WHETHER SELLING THE PRODUCT No No No
PROBLEM FACED No problem.
5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER
REQUIREMENT Yes Yes
AVAILABILITY 15% 75%
GAP PERCENTAGE 85% 25%
SOURCE LPG & Forest Forests
MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Chora Patish Guchhi Wild mushroom Brass
EXISTING NAME Chora Patish Guchhi Wild mushroom Brass
SUGGESTIONS
No suggestion.
PEOPLES PARTICIPATION: MAIN PROBLEMS Huge losses have be created for property and plants by HT lines. There is shortage of wood for construction of houses. Condition of paths within the village and to each other village is very poor. Condition of natural water resources is very poor. Condition of the village temple is very poor and there is no one employed to look after the same. There is shortage of drinking water in Gahan village. The supply of LPG is not satisfactory. Huge losses have be created for property and plants by HT lines. There is shortage of wood for construction of houses.
SUGGESTION FOR IMPROVEMENT Proper management for HT lines be done. Ban on TD be lifted and wood be provided to the person who are in need for construction of houses. Bridle paths be made for each villages and maintenance of old paths be done. All the natural water resources be maintained properly. Maintenance of the village temple is requred and a person be employed there for its looking after and its maintenance. Drinking water be supplied from Peojna Khad at approx 4 Kms span. The LPG be supplied on the fixed date of delievery. Proper management for HT lines be done. Ban on TD be lifted and wood be provided to the person who are in need for construction of houses.
Volume: X Chapter: 4 Page No:
107
PEOPLES PRIORITIES
Priority.
Condition of paths within the village and to each other village is very poor. Condition of natural water resources is very poor. Condition of the village temple is very poor and there is no one employed to look after the same. There is shortage of drinking water in Gahan village. The supply of LPG is not satisfactory. There is shortage of teaching staff in schools. There is no Fire services in the area to control on the fire hazards. Fire services are away at approx 5 to 6 hours run.
Bridle paths be made for each villages and maintenance of old paths be done. All the natural water resources be maintained properly. Maintenance of the village temple is requred and a person be employed there for its looking after and its maintenance. Drinking water be supplied from Peojna Khad at approx 4 Kms span. The LPG be supplied on the fixed date of delievery. Adequate staff be posted to the school to provide good education to children. Fire services be deployed in the areas at approx 10Kms distance.
PEOPLES PARTICIPATION
COSTING: TABLES COST
TABLE 3 2568900
TABLE 4 39600
TABLE 6 0
TABLE 8 7376478
TABLE 9 2075712
TOTAL 12060690
Volume: X Chapter: 4 Page No:
108