TABLE NO:1 GENERAL DESCRIPTION CATCHMENT
WATERSHED NO
MICRO WATERSHED NO
Satluj
Sp6
Sp6b
LATITUDE 31'33' to 31'39'
LONGITUDE 77'52' to 77'57'
ALTITUDE 1350m to 4272m
AREA(HA) 1760 SLOPE IN DEGREE
DISTRICT NAME
TEHSIL/BLOCK
VILLAGE
Kinnaur
Nichar
Rokcharang, Slaring
PHOTO F:\MLG Kinnaur Sq 4 & 5\P5190037.JPG
RAINFALL(mm)
SNOWFALL(mm)
TEMPERATURE(Cen)
NO OF HOUSE HOLD
NA
NA PROPOSED NO/NAME NA
NA PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA
19
40' to 85'
CATTLE POPULATION 110
MALE 52
FEMALE 58
MILTCH 22
OTHER 213
TABLE 1 PHOTO Sp6b
Volume: XI Chapter: 4 Page No:
213
DESCRIPTION NA
TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND
WASTE LAND OTHERS LAND TOTAL
GOVT AREA
PRIVATE AREA
COMMU AREA
B.AREA UNDER FOREST CATEGORY WISE :
Total
CATEGORY
DPF/RESERVE
UPF UF-18,19,20 & Slaring 1090 Deodar, Kail, Cheel, Rai, Tosh, Baan, Kharshu, Oak, Reunsh, Mapple .2 to .8
0 1090
16 0
0 0
16 1090
NAME AREA (HA)
0 NA
633 21 1744
0 0 16
0 0 0
633 21 1760
SPECIES DENSITY
NA NA
PASTURE Mahabal Kanda, Panagarh, Kaldingo 633
OTHERS
NA NA
NA NA
NA NA
TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS NAME
LATITUDE AND LONGITUD E
Rokchar ang
31'34'42" 77'56'27"
Slaring TOTAL :
31'35'37" 77'56'05"
TOTA L AREA (HA)
SAMPL E AREA (HA)
SPECI ES PLANT ED
SAMPLE GAP FILLING AREA(HA)
SUR VIVA L%
5
Cheel
2
60
5
Baan, Kail, Deoda r
1
80
40
40
10
TOTAL GAP FILLING AREA(HA)
14
3
14
AREA NEEDED NEW PLANTATION (HA)
20
20
FENCI NG REQUI RED (RM)
64200
REASONS FOR FAILURE
FINAL PRESCRIPTIO N(Enrichment (HA))
RATE/ HAC
COST (Rs)
Due to drought and fire.
Enrichment = 180
35000
6300000
Due to drought and fire.
Energy Plantation = 5
138000
690000
64200
6990000
TABLE 3 PHOTOS Rokcharang
Slaring
Volume: XI Chapter: 4 Page No:
214
TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA
Rokcharan g
Salaring
LATITUDE/LON GITUDE
31'34'42" 77'56'27"
31'35'37" 77'56'05"
PRESCRIPTI ON Trenching CheckDams Brushwood Live Hedge Trenching Live Hedge CheckDams Brushwood CheckDams
QUANTITY 1x.50x.30m 2x1.5x1.5m 3x1.5x1.5m 100 Rms 800 Rms 1x.50x.30m 250 Rms 3x1.5x1.5m 80 Rms 2x1.5x1.5m
= 1500 No =28 Nos =18 Nos
AVAILABIL TY OF LOCAL MATERIAL
OLD WORK NEED REPAIRING(QUA NTITY)
FINAL PRESCRIPTION NEW PRESCRIPTIO N NEW QUANTITY
Stone & local species
NA
Trenching
Stone & local species
NA
Trenching
RATE/CUM
COST(Rs)
1x.30x.30m= 2800 Nos
9.9
27720
1x.30x.30m= 3200 Nos
9.9
31680
= 1200 No = 12 Nos = 32 Nos
TABLE 4 PHOTOS Rokcharang
Slaring
Volume: XI Chapter: 4 Page No:
215
TABLE NO:5 AGROFORESTRY TYPE OF TREE TREES
WILD FRUIT
MEDICINAL
PRESENT STATUS PRESENT NOs PRESENT SPECIES Cheel, Khanor, Kakkar, Kunish, Kher, 150 Rubinia Chulli, Bemi, Shegul, Khanor, Basar, Paja, Walnut, Jamun, Mapple, Wild 260 almond Karu, Dhoop, Patish, Hathpanja, Zeera, Discoria, Jangli Gainda, Kashmal, 2000 Bhekal, Cuchhi, Timber, Rakhal
FUTURE REQUIREMENT FUTURE NOs FUTURE SPECIES Khanor, Kakkar, Kunish, Kher, Robinia, 1500 Walnut, Kunish, Willow, Poplar Chulli, Bemi, Shegul, Khanor, Basar, Paja, Walnut, Jamun, Mapple, Wild 3000 almond, Peach Karu, Dhoop, Patish, Hathpanja, Zeera, Discoria, Jangli Gainda, Kashmal, 6000 Bhekal, Cuchhi, Timber, Rakhal
NEED FOR EXTENSION
SOURCE OF PLANTING STOCK(Nearest Nursery)
Y
Slaring Nursery.
Y
Slaring Nursery.
Y
Slaring Nursery.
TABLE NO:6 GRAZING LANDS Name
LATITUDE/L ONGITUDE
AREA (HA)
SPECIES
WEED REMOVAL
SEEDING
CLOSURES
Kandas
NA
100
Grass
Yes
Yes
No
Other Local grass & NTFP plants are required to be planted in the Kanda.
PEOPLES SUGGESTION Improved seeds be seeded in the grazing lands.
Rate/ Hac (Rs)
Cost (Rs)
27000
2700000
TABLE NO:7
TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA
AREA(HA) NA
LATITUDE/LONGITUDE NA
SPECIES NA
GAP FILLING NA
MAINTENANCE NA
NEW PLANTATION NA
SOIL CONSERVATION MEASURES(QUANTITY) NA
TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads) NAME OF AREA NA
LATITUDE/LONGITUDE/ NA
KIND OF WORK NA
QUANTIT Y NA
AVAILABILITY OF LOCAL MATERIAL NA
OLD WORKS NEEDING REPAIR(QUANTITY) NA
LIFT IRRIGATION (HT/ACERAGE) NA
Volume: XI Chapter: 4 Page No:
FINAL PRESCRIPTIONS NA
216
TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/LOCATION NA
TYPE OF SOIL AND ROCK NA
DEGREE OF SLOPES/ SEVERITY NA
OCCURRENCE (Season) NA
DAMAGE/RISK TO LIFE & PROPERTY NA
ROAD CONSTR UCTION NA
QUARRY NA
OTHER CONSTRU CTIONS NA
NATURAL NA
MEASURES TAKEN NA
SUGGESTED MEASURES NA
TABLE NO:9A
INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Pears Bemi Chulli Apricot Apple
VARIETY(LOCAL/IMPROVED) Local Local Local Local Royal, Golden, Delicious, Red Royal
USE OF FERTILISERS No No No No Yes
USE OF INSECTICIDES No No No No Yes
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local
USE OF FERTILISERS No No No No No No
USE OF INSECTICIDES No No No No No No
PROBLEMS FACED Technical guidance is required. Wild animals destroy the crops frequently.
2.CROPS : CROPS NAME Wheat Barley Tulsi Ogla Fafra Koda
PROBLEMS FACED Technical guidance is required. Wild animals destroys the crops frequently.
3.VEGETABLE : VEGETABLE NAME Brinjal Radish Cabbage Cauliflower Tomato
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local
USE OF FERTILISERS No No No No No
USE OF INSECTICIDES No No No No No
PROBLEMS FACED Technical guidence is required. Wild animals destroys the crops frequently.
4. LIVE STOCK : LIVE STOCK(NO) Cow-12 Goat/Sheep-195 Mule/Donkey- 06 Ox - 12
BREED Local & Jersey Local Local Local
WHETHER SELLING THE PRODUCT Yes No No No
Volume: XI Chapter: 4 Page No:
PROBLEM FACED Vaterinary is far from the villages.
217
5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER
REQUIREMENT Yes Yes
AVAILABILITY
GAP PERCENTAGE 60% 65%
40% 35%
SOURCE Forests Forests
MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Timber Rakhal Guchhi Bhekal Kashmal Jungli Gainda Zeera Discoria Hathpanja Patish Karu Dhoop
EXISTING NAME Timber Rakhal Guchhi Bhekal Kashmal Jungli Gainda Zeera Discoria Hathpanja Patish Karu Dhoop
SUGGESTIONS
No Suggestion.
PEOPLES PARTICIPATION: MAIN PROBLEMS There is no approach road from Bridge at Satluj to Rokcharang. The area is very tough to walk in the paths in dark. The condition of village paths is very poor. Facility of common toilets is not available in the villages. Approach path to cremation point is very tough and there is no shelter also. Drainage of rain water goes through the villages and private land which cause huge damages.
SUGGESTION FOR IMPROVEMENT Approach road be made from Bridge to Rokcharang. Solar Lights be installed in the route at approx 5 Kms area. Maintenance of the village paths is required. Common toilets be made in the villages. A Rain shelter is required and path to the cremation point is required to be widened.
PEOPLES PRIORITIES Top Priority.
Priority.
Proper and good drainage be made in the village and private land.
Volume: XI Chapter: 4 Page No:
218
PEOPLES PARTICIPATION
COSTING: TABLES COST
TABLE 3 6990000
TABLE 4 59400
TABLE 6 2700000
TABLE 8 0
TOTAL 9749400
TABLE 9 0
Volume: XI Chapter: 4 Page No:
219