TABLE NO:1 GENERAL DESCRIPTION CATCHMENT
WATERSHED NO
MICRO WATERSHED NO
Satluj
Sp6
Sp6d
LATITUDE 31'36' to 31'42'
LONGITUDE 77'55' to 77'58'
ALTITUDE 3590m to 5465m
AREA(HA) 3448 SLOPE IN DEGREE
DISTRICT NAME
TEHSIL/BLOCK
VILLAGE
Kinnaur
Nichar
NA
PHOTO C:\MWS_21\Photo\SP6D\Table 1\P5200120.JPG
RAINFALL(mm)
SNOWFALL(mm)
TEMPERATURE(Cen)
NO OF HOUSE HOLD
NA
NA PROPOSED NO/NAME NA
NA PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA
NA
40' to 85'
CATTLE POPULATION 0
MALE NA
FEMALE NA
MILTCH NA
OTHER NA
DESCRIPTION NA
TABLE 1 PHOTO Sp6d
Volume: XI Chapter: 4 Page No:
228
TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND
GOVT AREA
WASTE LAND OTHERS LAND TOTAL
PRIVATE AREA
B.AREA UNDER FOREST CATEGORY WISE :
COMMU AREA
Total
CATEGORY
DPF/RESERVE
UPF UF -21,22,23, Slaring 1755 Kail, Deodar, Cheel, Rai, Tosh, BL .2 to .6
0 1755
0 0
0 0
0 1755
NAME AREA (HA)
0 NA
1693 0 3448
0 0 0
0 0 0
1693 0 3448
SPECIES DENSITY
NA NA
PASTURE Fafal, Rutu, nagar 1693
OTHERS
NA NA
NA NA
NA NA
TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS NAME
LATITUD E AND LONGITU DE
TOTA L AREA (HA)
SAM PLE ARE A(HA )
SPECI ES PLANT ED
SAMPLE GAP FILLING AREA(HA)
SURVIV AL %
TOTAL GAP FILLING AREA(HA)
AREA NEEDED NEW PLANTATION( HA)
FENCING REQUIRE D(RM)
REASO NS FOR FAILUR E
FINAL PRESCRIPTIO N(Enrichment (HA))
RATE/ HAC
COST (Rs)
UF Slaring
31'35'55" 77'56'02"
20
5
Chulli, Bemi, Khanor
2
60
8
8
64800
Due to fire.
Enrichment = 200
35000
7000000
20
5
8
8
64800
TOTAL :
2
7000000
TABLE 3 PHOTOS UF Slaring
Volume: XI Chapter: 4 Page No:
229
TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA
LATITUDE/LONGITUDE
PRESCRIPTION
Slaring
31'35'55" 77'56'02"
Trenching
QUANTITY 1x.50x.30m =500 Nos
AVAILABILTY OF LOCAL MATERIAL Stone & local species
OLD WORK NEED REPAIRING(QUANTITY) NA
FINAL PRESCRIPTION NEW NEW PRESCRIPTION QUANTITY 1x.30x.30m= Trenching 4000 Nos
RATE/CUM
COST(Rs)
9.9
39600
TABLE 4 PHOTOS UF Slaring
TABLE NO:5 AGROFORESTRY TYPE OF TREE TREES WILD FRUIT MEDICINAL
PRESENT STATUS PRESENT NOs PRESENT SPECIES NA NA NA NA NA NA
FUTURE REQUIREMENT FUTURE NOs FUTURE SPECIES NA NA NA NA NA NA
NEED FOR EXTENSION Y Y Y
SOURCE OF PLANTING STOCK(Nearest Nursery) NA NA NA
TABLE NO:6 GRAZING LANDS NAME NA
AREA(HA) NA
LATITUDE/LONGITUDE NA
SPECIES NA
WEED REMOVAL NA
SEEDING NA
CLOSURES NA
OTHERS NA
PEOPLES SUGGESTION NA
Volume: XI Chapter: 4 Page No:
PHOTO NA
230
TABLE NO:7
TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA
AREA(HA) NA
LATITUDE/LONGITUDE NA
SPECIES NA
GAP FILLING NA
MAINTENANCE NA
NEW PLANTATION NA
SOIL CONSERVATION MEASURES(QUANTITY) NA
TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads) NAME OF AREA NA
LATITUDE/LONGITUDE/WAYPOINT NA
KIND OF WORK NA
QUANTITY NA
AVAILABILITY OF LOCAL MATERIAL NA
OLD WORKS NEEDING REPAIR(QUANTITY) NA
LIFT IRRIGATION(HT/ACERAGE) NA
FINAL PRESCRIPTIONS NA
TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/ LOCATION NA
TYPE OF SOIL AND ROCK NA
DEGREE OF SLOPES/ SEVERITY NA
OCCURRENCE( Season) NA
DAMAGE/RISK TO LIFE & PROPERTY NA
ROAD CONSTRU CTION NA
QUARRY NA
OTHER CONSTRU CTIONS NA
NATURAL NA
MEASURES TAKEN NA
SUGGESTED MEASURES NA
TABLE NO:9A
INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME NA
VARIETY(LOCAL/IMPROVED) NA
USE OF FERTILISERS NA
USE OF INSECTICIDES NA
PROBLEMS FACED NA
2.CROPS : CROPS NAME NA
VARIETY(LOCAL/IMPROVED) NA
USE OF FERTILISERS NA
USE OF INSECTICIDES NA
PROBLEMS FACED NA
3.VEGETABLE : VEGETABLE NAME NA
VARIETY(LOCAL/IMPROVED) NA
USE OF FERTILISERS NA
USE OF INSECTICIDES NA
4. LIVE STOCK : LIVE STOCK(NO) NA
BREED NA
WHETHER SELLING THE PRODUCT NA
Volume: XI Chapter: 4 Page No:
PROBLEM FACED NA
231
PROBLEMS FACED NA
5.FUEL/FODDER : FUEL/FODDER MANAGEMENT
REQUIREMENT
AVAILABILITY
GAP PERCENTAGE
SOURCE
FUEL
NA
NA
NA
NA
FODDER
NA
NA
NA
NA
MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Patish Karu Dhoop Bhekal Kashmal Timber Discoria Zeera Banafsha Guchhi Hathpanja
EXISTING NAME Patish Karu Dhoop Bhekal Kashmal Timber Discoria Zeera Banafsha Guchhi Hathpanja
SUGGESTIONS
No suggestion.
PEOPLES PARTICIPATION: MAIN PROBLEMS NA
SUGGESTION FOR IMPROVEMENT NA
PEOPLES PRIORITIES NA
COSTING: TABLES COST
TABLE 3 7000000
TABLE 4 0
TABLE 6 0
TABLE 8 0
TABLE 9 0
TOTAL 7000000
Volume: XI Chapter: 4 Page No:
232