TABLE NO:1 GENERAL DESCRIPTION CATCHMENT
WATERSHED NO
MICRO WATERSHED NO
Satluj
Sp6
Sp6g
LATITUDE 31'32' to 31'38'
LONGITUDE 77'57' to 78'02'
ALTITUDE 1400m to 4645m
AREA(HA) 2368 SLOPE IN DEGREE
DISTRICT NAME
TEHSIL/BLOCK
VILLAGE
Kinnaur
Nichar
Nathpa, Kandar
PHOTO C:\MWS_21\Photo\SP6G\Table 1\Table1.jpg
RAINFALL(mm)
SNOWFALL(mm)
TEMPERATURE(Cen)
NO OF HOUSE HOLD
NA
NA PROPOSED NO/NAME NA
NA PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA
157
40' to 85'
CATTLE POPULATION 739
MALE 378
FEMALE 361
MILTCH 192
OTHER 1926
TABLE 1 PHOTO Sp6g
Volume: XI Chapter: 4 Page No:
237
DESCRIPTION NA
TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND WASTE LAND OTHERS LAND TOTAL
GOVT AREA
PRIVATE AREA
0 1611 689 0 2300
B.AREA UNDER FOREST CATEGORY WISE :
COMMU AREA 68 0 0 0 68
0 0 0 0 0
TOTAL
CATEGORY
DPF/RESERVE
68 1611 689 0 2368
NAME AREA (HA) SPECIES DENSITY
0 NA NA NA
UPF UF-26, C-92, C-93, Nathpa, Kandar 1611.47 Deodar, Kail, Cheel, Tosh 0 to 0.4
PASTURE
OTHERS
Humtang 688.53 NA NA
NA NA NA NA
TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS NAME
LATITUDE AND LONGITUD E
Kandar
31'34'29" 77'59'21"
Shilpi
31'34'24" 77'57'07"
TOTA L AREA (HA)
SAMP LE AREA (HA)
SPECIES PLANTED
SAMPLE GAP FILLING AREA(HA)
SU RVI VAL %
5
Chulli, Bemi, Lucinia
3
40
5
Cheel
3
40
40
TOTAL :
40
10
TOTAL GAP FILLING AREA (HA)
24
6
24
AREA NEEDED NEW PLANTATIO N(HA)
35
35
FENCIN G REQUIR ED(RM)
REASONS FOR FAILURE
38700
Due to drought and grazing. Due to drought and grazing.
FINAL PRESCRIPTIO N(Enrichment (HA))
RATE/ HAC
COST (Rs)
Enrichment = 70
35000
2450000
Energy Plantation = 5
138000
690000
38700
3140000
TABLE 3 PHOTOS Shilpi
Kandar
Volume: XI Chapter: 4 Page No:
238
TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA
LATITUDE/ LONGITUDE
Kanda r
31'34'29" 77'59'21"
Shilpi
31'34'24" 77'57'07"
PRESCRIPTIO N Trenching Live Hedge CheckDams Live Hedge CheckDams Trenching
QUANTITY 1x.50x.30m=1200 Nos 800 Rms 3x1.5x1.5m=18 Nos 2x1.5x1.5m=52 Nos 1000 Rms 2x1.5x1.5m=68 Nos 3x1.5x1.5m=24 Nos 1x.50x.30m=2500 Nos
AVAILABILT Y OF LOCAL MATERIAL
OLD WORK NEED REPAIRING (QUANTITY)
FINAL PRESCRIPTION NEW NEW PRESCRIPTION QUANTITY
Stone & local species
NA
Trenching
Stone & local species
NA
Trenching
RATE/CUM
COST(Rs)
1x.30x.30m= 10200 Nos
9.9
100980
1x.30x.30m= 10800 Nos
9.9
106920
TABLE 4 PHOTOS Shilpi
Kandar
TABLE NO:5 AGROFORESTRY TYPE OF TREE TREES WILD FRUIT
MEDICINAL
PRESENT STATUS PRESENT NOs PRESENT SPECIES 360 Kimu, Khanor, Willow, Kakkar 500 Chulli, Shegul, Fegra, Bemi, Khanor Karu, Patish, Dhoop, Hathpanja, Banafsha, Discoria, kashmal, Timber, 2000 Guchhi
FUTURE REQUIREMENT FUTURE NOs FUTURE SPECIES 800 Kimu, Khanor, Willow, Kakkar 1000 Chulli, Shegul, Fegra, Bemi, Khanor Karu, Patish, Dhoop, Hathpanja, Banafsha, Discoria, kashmal, Timber, 4000 Guchhi
NEED FOR EXTENSION Y Y
SOURCE OF PLANTING STOCK(Nearest Nursery) Slaring Nursery. Slaring Nursery.
Y
Slaring Nursery.
Volume: XI Chapter: 4 Page No:
239
TABLE NO:6 GRAZING LANDS Name Nathp a Shilpi
LATITUDE/LONGIT UDE
AREA (HA)
31'34'12"77'57'26"
292
31'34'24"77'57'02"
292
SPECIES Grass Grass & Bushes
WEED REMOVAL
SEEDING
CLOSURES
Yes
Yes
No
Yes
Yes
No
Other Requirement of 58400 fodder plants Requirement of 58400 fodder plants
PEOPLES SUGGESTION Improved seeds of grass be seeded. Improved seeds of grass be seeded.
Rate/ Hac (Rs)
Cost (Rs)
27000
7884000
27000
7884000
TABLE 6 PHOTOS Shilpi
Nathpa
TABLE NO:7
TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA
AREA(HA) NA
LATITUDE/LONGITUDE NA
SPECIES NA
GAP FILLING NA
MAINTENANCE NA
NEW PLANTATION NA
SOIL CONSERVATION MEASURES(QUANTITY) NA
Volume: XI Chapter: 4 Page No:
240
TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads) NAME OF AREA
LATITUDE /LONGITU DE
Nathpa Nala (8 Kms)
31'34'26" 77'58'04"
PRESCRIPT ION Live Hedge
CheckDam s Brushwood
QUANTITY 2000 Rms 8x3x4m=12 Nos 15x3x4m=48 Nos 12x3x4m=18 Nos 10x3x4m=16 Nos 800 Rms
AVAILABILI TY OF LOCAL MATERIAL
OLD WORKS NEEDING REPAIR (QUANTITY)
LIFT IRRIGATION( HT/ACERAGE)
Stone & local species
NA
NA
FINAL PRESCRIPTION NEW PRESCRIPTI ON NEW QUANTITY Live Hedge 2400 Rms 8x3x4m=4 Nos 15x3x4m=12 Nos 12x3x4m=6 Nos CheckDams 10x3x4m=5 Nos Brushwood 400 Rms
RATE/ UNIT 9.6 29131 29131 29131 29131 62
COST(Rs) 23040 932192 5243580 2097432 1456550 24800
TABLE 8 PHOTOS Nathpa Nala
TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/ LOCATION NA
TYPE OF SOIL AND ROCK NA
DEGREE OF SLOPES/ SEVERITY NA
OCCURRENCE (Season) NA
DAMAGE/RISK TO LIFE & PROPERTY NA
ROAD CONSTRU CTION NA
QUARRY NA
OTHER CONSTRU CTIONS NA
NATURAL NA
Volume: XI Chapter: 4 Page No:
MEASURES TAKEN NA
241
SUGGESTED MEASURES NA
TABLE NO:9A
INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Apple Bemi Chulli Pears Walnut Walnut
VARIETY(LOCAL/IMPROVED) Royal, Red Royal, Golden, Red Golden, Spur, Delicious Local Local Local Local Local
USE OF FERTILISERS Yes No No No No No
USE OF INSECTICIDES Yes No No No No No
PROBLEMS FACED
Technical guidance is required. Wild animals destroy the crops.
2.CROPS : CROPS NAME Barley Fafra Koda Potato Rajmash Tulsi Wheat
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local
USE OF FERTILISERS No No No No No No No
USE OF INSECTICIDES No No No No No No No
PROBLEMS FACED
Technical guidance is required. Wild animals destroy the crops.
3.VEGETABLE : VEGETABLE NAME Brinjal Cabbage Cabbage Capsicum Cauliflower Radish Saag Tomato
VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local Local
USE OF FERTILISERS No No No No No No No No
USE OF INSECTICIDES No No No No No No No No
PROBLEMS FACED
Technical guidance is required. Wild animals destroy the crops.
4. LIVE STOCK : LIVE STOCK(NO) Cow - 192 Mule/Horse - 26 Ox - 64 Sheep/Goat - 1836
BREED Local Local Local Local
WHETHER SELLING THE PRODUCT Yes No No No
PROBLEM FACED Veterinary is much away from the villages.
Volume: XI Chapter: 4 Page No:
242
5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER
REQUIREMENT Yes Yes
AVAILABILITY
GAP PERCENTAGE 20% 10%
80% 90%
SOURCE K Oil & Forests Forests
MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Dhoop Guchhi Kashmal Timber Bhekal Karu Patish Chora Banafsha Discoria
EXISTING NAME Dhoop Guchhi Kashmal Timber Bhekal Karu Patish Chora Banafsha Discoria
SUGGESTIONS
No suggestion.
PEOPLES PARTICIPATION: MAIN PROBLEMS There is no link road to Runi. Shortage of drinking water exists in Kandar villages. Shortage of timber for construction of houses exists. There is no LPG facility in the villages. There is problem of lights in the villages. Govt accommodation for Mahila Mandal, Community Hall, Veterinary, PHC and Primary School is held. Condition of village paths is very poor. Carriage of daily needs from Market is very tough. No facility of common toilets and bathrooms is held in the villages. Forests are minimizing day by day. Play ground at Middle School is held. Most of the areas are disturbed due to roads and constructions of projects.
SUGGESTION FOR IMPROVEMENT Link road be made from kandar to Runi approx 5 Kms. Drinking water scheme be provided from Safa Kanda to Runi. Storage tank for water be made at Runi. TD be provided or tin sheets be provided to the people for construction of houses. LPG connections be provided to the villagers. Solar lights be provided to the villagers. Govt accommodation be made for all these communities/institutes. Maintenance of village paths is required. Span be installed from Sujat to Runi. Common toilets and bathrooms be made in the villages. Blank areas of forest land be planted with suitable species. Playground be made at Middle School. Retaining walls at such areas be made with crate wire.
Volume: XI Chapter: 4 Page No:
243
PEOPLES PRIORITIES
Priority.
PEOPLES PARTICIPATION
COSTING: TABLES COST
TABLE 3 3140000
TABLE 4 207900
TABLE 6 15768000
TABLE 8 9777594
TABLE 9 0
TOTAL 28893494
Volume: XI Chapter: 4 Page No:
244