vol12-Sq4b

Page 1

TABLE NO:1 GENERAL DESCRIPTION CATCHMENT

WATERSHED NO

MICRO WATERSHED NO

Satluj

Sq4

Sq4b

LATITUDE 31' 29' to 31'33'

LONGITUDE 77'49' to 77'51'

ALTITUDE 1170m to 3880m

AREA(HA)

DISTRICT NAME

TEHSIL/BLOCK

1688 SLOPE IN DEGREE

Shimla

30' to 85'

Rampur Bushahr

VILLAGE Dharali, Naini, Badhal, Dogri

PHOTO C:\MWS_21\Photo\SQ4B\Table 1\Table1.jpg

RAINFALL(mm)

SNOWFALL(mm)

TEMPERATURE(Cen)

NO OF HOUSE HOLD

NA

NA

NA PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA

CATTLE POPULATION 1600

MALE 939

FEMALE 661

MILTCH 152

PROPOSED NO/NAME NA

OTHER 210

321

DESCRIPTION NA

TABLE 1 PHOTO Sq4b

Volume: XII Chapter: 4 Page No:

190


TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND

GOVT AREA

WASTE LAND OTHERS LAND TOTAL

PRIVATE AREA

B.AREA UNDER FOREST CATEGORY WISE :

COMMU AREA

TOTAL

CATEGORY

DPF/RESERVE Shalabag 815.26 Deodar, Kail, Rai, Tosh, Baan, Robinia, Khanor .1 to .9

40 1024

223 0

0 0

263 1024

NAME AREA (HA)

201 200 1465

0 0 223

0 0 0

201 200 1688

SPECIES DENSITY

UPF Kundlu 6(a), 6(b) 408.74 Deodar, Kail, Rai, Tosh, Baan, Robinia, Khanor .0 to .5

PASTURE

OTHERS

NA NA

NA NA

NA NA

NA NA

TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS NAME

Badhal Girmi Humtu Matla TOTAL :

LATITUDE AND LONGITUD E 31'32'32" 77'48'48" 31'32'33" 77'48'24" 31'31'57" 77'48'50" 31'31'53" 77'48'31"

TOTAL AREA (HA)

SAMPLE AREA (HA)

SPECIES PLANTED

SAMPLE GAP FILLING AREA (HA)

SURV IVAL %

5

Cheel, Rubinia

1

80

5

Cheel

2

60

7

Deodar

2

71.43

10

Deodar

2

80

113

113

TOTAL GAP FILLING AREA (HA)

26

27

7

26

AREA NEEDED NEW PLANTATION (HA)

30

30

FENCING REQUIRED (RM)

REASON S FOR FAILURE

25800

Due to drought. Due to drought. Due to drought. Due to drought.

FINAL PRESCRIPTI ON(Enrichm ent(HA))

RATE/ HAC

COST (Rs)

Enrichment = 30

27900

837000

Energy Plantation = 10

112300

1123000

25800

Volume: XII Chapter: 4 Page No:

1960000

191


TABLE 3 PHOTOS Matla

Humtu

Badhal

Girmi

Volume: XII Chapter: 4 Page No:

192


TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA

LATITUDE/L ONGITUDE

Badha l

31'32'32"77' 48'48"

Girmi

31'32'33"77' 48'24"

Humt u

31'31'57"77' 48'50"

CheckDams Trenching CheckDams Live Hedge CheckDams CheckDams Trenching CheckDams Live Hedge

Matla

31'31'53"77' 48'31"

CheckDams Live Hedge Trenching

PRESCRIPTIO N Live Hedge Trenching

QUANTITY 60 Rms 1x.50x.30m=600Nos 2x1.5x1.5m = 24 Nos 3x1.5x1.5m = 16 Nos 1x.50x.30m=1000Nos 3x1.5x1.5m = 23 Nos 100 Rms 2x1.5x1.5m = 15 Nos 2x1.5x1.5m = 23 Nos 1x.50x.30m=800Nos 3x1.5x1.5m = 18 Nos 70 Rms 2x1.5x1.5m = 34 Nos 3x1.5x1.5m = 28 Nos 60 Rms 1x.50x.30m=600Nos

AVAILABIL TY OF LOCAL MATERIAL

OLD WORK NEED REPAIRING( QUANTITY)

FINAL PRESCRIPTION NEW PRESCRIPTION

NEW QUANTITY

RATE/CUM

COST(Rs)

Stone & local species

NA

Trenching

1x.30x.30m= 2000 Nos

9.9

19800

Stone & local species

NA

Trenching

1x.30x.30m= 1600 Nos

9.9

15840

Stone & local species

NA

Trenching

1x.30x.30m= 2400 Nos

9.9

23760

Stone & local species

NA

Trenching

1x.30x.30m= 2000 Nos

9.9

19800

TABLE 4 PHOTOS Matla

Humtu

Badhal

Volume: XII Chapter: 4 Page No:

Girmi

193


TABLE NO:5 AGROFORESTRY PRESENT STATUS PRESENT NOs PRESENT SPECIES Kail, Deodar, Cheel, Mohru, Kunish, 1100 Willow, Beul, Murth, Khirak Walnut, Chulli, Beemi, Khanor, Paja, 1000 Shegul, Wild Cherry Karvi, Dhoop, Discoria, Patish, Tirmur, Chora, Mohra, Kashmal, Pathartod, 1200 Banafsha, Guchhi

TYPE OF TREE TREES WILD FRUIT

MEDICINAL

FUTURE REQUIREMENT FUTURE NOs FUTURE SPECIES Kail, Deodar, Cheel, Mohru, Kunish, 3200 Willow, Beul, Murth, Khirak Walnut, Chulli, Beemi, Khanor, Paja, 2000 Shegul, Wild Cherry Karvi, Dhoop, Discoria, Patish, Tirmur, Chora, Mohra, Kashmal, Pathartod, 2500 Banafsha, Guchhi

NEED FOR EXTENSION

SOURCE OF PLANTING STOCK(Nearest Nursery)

Y

Badhal Forest Nursery

Y

Badhal Forest Nursery

Y

Badhal Forest Nursery

TABLE NO:6 GRAZING LANDS Name

LATITUDE/LO NGITUDE

AREA(HA)

SPECIES

WEED REMOVAL

SEEDING

CLOSURE S

Overall MWS

NA

20

Grass & Bushes

Yes

Yes

Yes

Other 6000 BL plants plants for requirement of fodder be planted.

PEOPLES SUGGESTION

Rate/ Hac (Rs)

No suggestion.

Cost (Rs)

21700

TABLE NO:7

TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA

AREA(HA) NA

LATITUDE/LONGITUDE NA

SPECIES NA

GAP FILLING NA

MAINTENANCE NA

NEW PLANTATION NA

SOIL CONSERVATION MEASURES(QUANTITY) NA

Volume: XII Chapter: 4 Page No:

194

434000


TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads) NAME OF AREA

LATITUD E/ LONGITU DE

Dhara li (1.5K ms)

31'31'52" 77'48'55"

CheckDams Brushwood Live Hedge

31'31'52" 77'48'35"

CheckDams Brushwood Live Hedge

Matla (1Km ) Shak ari Nala (800 Mtr)

31'32'09" 77'49'09"

PRESCRIPT ION Live Hedge

CheckDams

QUANTITY 250 Rms 5x1.5x1.5m = 07 Nos 12x1.5x1.5m = 08 Nos 10x1.5x1.5m = 12 Nos 75 Rms 150 Rms 7x1.5x1.5m = 08 Nos 10x1.5x1.5m = 11 Nos 60 Rms 150 Rms 5x1.5x1.5m = 06 Nos 3x1.5x1.5m = 05 Nos

Brushwood

85 Rms

AVAILABIL ITY OF LOCAL MATERIAL

OLD WORKS NEEDING REPAIR (QUANTITY)

LIFT IRRIGATION (HT/ ACERAGE)

Stone & local species

NA

NA

Stone & local species

NA

NA

Stone & local species

NA

NA

FINAL PRESCRIPTION NEW PRESCRIPTI ON NEW QUANTITY Live Hedge 450 Rms 5x1.5x1.5m = 2 Nos 12x1.5x1.5m = 3 Nos CheckDams 10x1.5x1.5m = 4 Nos Brushwood 75 Rms Live Hedge 300 Rms 7x1.5x1.5m = 2 Nos CheckDams 10x1.5x1.5m = 3 Nos Brushwood 50 Rms Live Hedge 275 Rms 5x1.5x1.5m = 2 Nos CheckDams 3x1.5x1.5m =2 Nos

RATE/ UNIT 10 10033 10033 10033 62 9.6 10033 10033 62 9.6 10033 10033

COST (Rs) 4320 100330 361188 401320 4650 2880 140462 300990 3100 2640 100330 60198

Brushwood

62

2480

40 Rms

TABLE 8 PHOTOS Matla

Dharali

Shakari Nala

Volume: XII Chapter: 4 Page No:

195


TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/ LOCATION

LATITUDE/ LONGITUDE

Badhal (300mx400 m)

31'33'37" 77'48'12"

Matla (50mx30m)

31'32'07" 77'48'14"

Shakari (40mx10m)

31'32'09" 77'48'57"

DAMAGE/ RISK TO LIFE & PROPERT Y

Property

Property

Property

MEASU RES TAKEN

NA

NA

NA

TYPE OF SOIL AND ROCK

Clay

Clay

Clay

DEGREE OF SLOPES/ SEVERITY

Moderate

Moderate

Moderate

OCCUR RENCE( Season)

Rainy

Rainy

Rainy

ROAD CONST RUCTI ON

Yes

Yes

Yes

QU AR RY

No

No

No

OTHER CONST RUCTI ONS

No

No

No

NAT URA L

FINAL PRESCRIPTION NEW NEW PRESCR QUANTIT IPTION Y

RATE/ UNIT

COST (Rs)

Yes

Retainin g Wall Gabion

10x1.5x1. 5m=06No s

10033

601980

Yes

Retainin g Wall Gabion

30x1.5x1. 5m=2 Nos

10033

601980

Yes

Retainin g Wall Gabion

7x1.5x1.5 m=3 Nos

10033

210693

TABLE 9 PHOTOS Matla

Shakari

Badhal

Volume: XII Chapter: 4 Page No:

196


TABLE NO:9A

INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Grapes Japani Fruit Walnut Almond Apple Khumani Chulli Pears

VARIETY(LOCAL/IMPROVED) Local Local Local Kagzi, IXL, Semi Drek Royal, Golden, Red Royal, Red June, Spur Local Local Local

USE OF FERTILISERS No No No No Yes No No No

USE OF INSECTICIDES No No No No Yes No No No

PROBLEMS FACED

Technical Guidence required.

2.CROPS : CROPS NAME Barley Potato Kawni Tulsi Koda Paddy Wheat

VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local

USE OF FERTILISERS No No No No No No No

USE OF INSECTICIDES No No No No No No No

PROBLEMS FACED

Technical Guidence required.

3.VEGETABLE : VEGETABLE NAME Brinjal Ladyfinger Cauliflower Capsicum Cabbage

VARIETY(LOCAL/IMPROVED) Local Local Local Local Local

USE OF FERTILISERS No No No No No

USE OF INSECTICIDES No No No No No

4. LIVE STOCK : LIVE STOCK(NO) Goat - 70 Ox - 35 Cow - 152 Sheep - 105

BREED Local Local Jersey & Local Local

WHETHER SELLING THE PRODUCT Yes Yes Yes Yes

Volume: XII Chapter: 4 Page No:

PROBLEM FACED NA

197

PROBLEMS FACED Technical Guidence required.


5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER

REQUIREMENT Yes Yes

AVAILABILITY

GAP PERCENTAGE 60% 40%

40% 60%

SOURCE Nearest Forest Nearest Forests.

MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Guchhi Banafsha Chora Karvi Pathartod Kashmal Mohra Patish Discoria Dhoop Tirmur

EXISTING NAME Guchhi Banafsha Chora Karvi Pathartod Kashmal Mohra Patish Discoria Dhoop Tirmur

SUGGESTIONS

More MFPs be planted in suitable areas for generating the income of locals.

PEOPLES PARTICIPATION: MAIN PROBLEMS Condition of village temple accomodation is very poor. There is no accomodation for Anganbari, Community Hall and Mahila Mandal. There is no school in the village. Small children have to go to school at approx 2Kms from village daily. There is no source of irrigation water. The village is not connected with motorable road. There is shortage of timber for making houses by the villagers. Condition of village paths is very poor.

SUGGESTION FOR IMPROVEMENT Maintenance of temple accomodation be done. Govt accomodation be made for Anganbari, Community Hall and Mahila Mandal. Primary School be opened in the village. Large tanks be made for for storage of water for irrigation. The village be connected with the road to meet the daily needs by villagers. Ban on TD be lifted and timber be given to people as per their requirement. Maintenance of village paths be done.

PEOPLES PRIORITIES

Priority.

Volume: XII Chapter: 4 Page No:

198


PEOPLES PARTICIPATION

COSTING: TABLES COST

TABLE 3 1960000

TABLE 4 79200

TABLE 6 434000

TABLE 8 1484888

TOTAL 13098029

TABLE 9 9139941

Volume: XII Chapter: 4 Page No:

199


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.