ARCHITECTURE PORTFOLIO - BA & PROFESSIONAL EXPERIENCE l SHEFIELD NG

Page 1

SHEFIELD NG

ARCHITECTURE PORTFOLIO WORKS FROM PROFESSIONAL EXPERIENCE + BA ARCHITECTURE


PROFESSIONAL EXPERIENCE


PROFESSIONAL EXPERIENCE

P.5

CO-WORKING SPACE (INTERIOR FITOUT) LION ROCK 72, HKSTP ROLE

P.6

P.9-10

COLLATE SUBMISSION REPORTS, PLANNING AND AREA CALCULATION.

:

COLLATE SUBMISSION REPORTS, MLP + LANDSCAPE GRAPHICS, POST-PRODUCTION.

:

LDI AND CONSULTANT COORDINATION, DD DRAWINGS, CURTAIN WALL DRAWING REVIEW, DOCUMENTATION, 3D FACADE DESIGN STUDIES,VISUALIZATION

URBAN COMPLEX (COMMERCIAL, SERVICE APARTMENT, RETAIL, PUBLIC SPACE) FREE TRADE MIXC URBAN COMPLEX, PRC ROLE

P.12 15

:

URBAN COMPLEX (COMMERCIAL, DORMITRY, RETAIL, OFFICES) CHINA ISRAEL ACCELERATION OFFICE PARK PRC ROLE

P.11

REVIEW LOCAL CODES, SUBMISSIONS TO BD, MEETING MINUTES & COORDINATION

MLP + FACADE DESIGN SHENZHEN PEOPLE HOSPITAL(COMPETITION) ROLE

CONTENTS

:

MLP + TRANSIT ORIENTED DEVELOPMENT OCT GUISHAN STATION RETAIL DEVELOPMENT, FUJIAN, PRC ROLE

P.8

SUPPLIER LIAISON, TENDER PACKAGE, GFA CALCULATIONS, DOCUMENT PREPARATION

ALTERATION & ADDITION (ACCESSIBILITY) LINGNAN UNIVERSITY ROLE

P.7

:

:

3D DESIGN STUDIES, SETUP DRAWINGS AND SETTING OUT

MIXED USE (COMMERCIAL, SERVICE APARTMENT, RETAIL) PRC ROLE

:

CONSULTANT COORDINATION, DD DRAWINGS, DOCUMENTATION, 3D FACADE DESIGN STUDIES, VISUALIZATION

ACADEMIC WORK

P.13-22

MIXED-USE, ENTERPRISE CENTRE (PUBLIC FACILITY) A PASSAGEWAY TO THE PAST INDIVIDUAL PROJECT, 2018

LOW-RISE, RESIDENTIAL, COMMUNITY COLLECTIVE DWELLING P.23-31

A CO-DEPENDENT LIVING INDIVIDUAL PROJECT, 2017



CO-WORKING SPACE, START-UP INCUBATOR PROJECT: LION ROCK 72/ HKSTP STAGE : COMPLETED/INUSE END USER: RESIDENT STARTUP COMPANIES/UNIVERSITY R&D PROJECT TEAMS FEB 2016- MAY2016 / TEAM OF 5

SCHEMATIC & CONCEPT DESIGN Role : Sourced case studies, site analysis, assisted in

01

TENDER/CONSTRUCTION DRAWINGS Role: Reviewed local Hong Kong codes and regulations

further developing reception and conference area 3D

for the feasibilty of spaces, assisted in preparing CAD

design studies on sketchup, in terms of egronomics,

tender package (GFA Calculations, layout revision, GA/

colour and form.

elevation/detail drawings).

02

CONTRACT ADMINISTRATION Role:

On site inspection and defect inspection with

senior involvement.

@hkstpgaa

SKETCHUP, CAD, HAND DRAWING, EXCEL

03


ALTERATION & ADDITION (ACCESSIBILITY) PROJECT: LINGNAN UNIVERSITY, LIFT EXTENSION PROJECT TYPE : ACCESSIBILITY STAGE: CONCEPT DESIGN TO CONSTRUCTION JUNE 2015 - FEB 2016 TEAM OF 3

SUBMISSIONS TO BUILDING DEPARTMENT Role: Approval and consent forms, tender drawing submissions, drawing amendments by hand.

REVIEWING LOCAL CODES Role: Reviewing local codes and regulations for fire safety, dimensions, railing safety and land usage.

MEETING MINUTES AND COORDINATION

SKETCHUP, CAD, HAND DRAWING


7

MLP + TRANSIT ORIENTED DEVELOPMENT PROJECT: OCT GUISHAN STATION RETAIL DEVELOPMENT, FUJIAN, PRC STAGE : CONCEPT TO SCHEMATIC DESIGN USES: OFFICES, RESIDENTIAL, RETAIL, LEISURE JUNE 2020- JULY 2020 / A PART OF DESIGN TEAM

COLLATING SUBMISSION REPORTS Role: Complie submission report layouts and con-

01

PLANNING AND AREA CALCULATION Role: Assisted with the developing blocking plans, in terms of

tent (concept images/diagram, design, planning)

presentation graphics and report findings of shops that do not

according to the company's image of creating

have sufficient areas after the incorperation of M&E facilities.

riverside entertainment and retail desintination.

02


8

MLP + FACADE DESIGN PROJECT: SHENZHEN PEOPLE HOSPITAL, PRC STAGE : CONCEPT DESIGN (COMPETITION) USES: INPATIENT, OUTPATIENT, RESEARCH, LEISURE AUGUST 2020 / PART OF DESIGN TEAM

01

GRAPHICAL LAYOUTS Role: Complie submission report layout and con-

合楼项目 tent according ergency Building of Shenzhen People’s Hospital

03

04

任务书解读 BRIEF

Role: Visulization of interior

to the proposed design.

05

设计驱动力和概念 DESIGN DRIVERS

06

规划及平面设计 PLANNING DESIGN

02

VISUALIZATION

ward spaces.

07

建筑设计 ARCHITECTURE

08

室内设计 INTERIOR

09

景观设计 LANDSCAPE

设计说明 DESIGN StatEmENt

设计驱动力和概念 DESIGN DRIVERS

05

06

规划及平面设计 PLANNING DESIGN

07

建筑设计 ARCHITECTURE

08

室内设计 INTERIOR

09

景观设计 LANDSCAPE

设计驱动力和概念

设计说明 DESIGN STATEMENT

DESIGN DRIVERS

55

规划设计 规划设计

PLANNING PLANNING

17

深圳市人民医院改扩建工程(一期)急诊综合楼项目 Phase I Reconstruction and Extension of the Emergency Building of Shenzhen People’s Hospital

05

规划及平面设计 PLANNING DESIGN

06

07

建筑设计 ARCHITECTURE

08

室内设计 INTERIOR

09

景观设计 LANDSCAPE

RELATIONSHIP WITH THE CITY & ENVIRONMENT

06

07

建筑设计 ARCHITECTURE

08

室内设计 INTERIOR T VA NO

IN

A central green axis is woven into the urban grain as a renewed part of the city acting as a AND H sanctuary and promoting a green and healthy environment allowing patients to recoverARCthrough SE the use of nature. RE IS

AX

S OF

01 SUMMARY 01 SUMMARY

E AR

03 享

he same time,

OF

G,

IN

AR

SH

ALT HE

≤100米

总建筑面积 Total Building Area

764240m²

总计容建筑面积 (M²) Total Accountable GFA

616710m² 保留建筑面积合计 Retained Building Area

其中 In That

14

13

12

01

04

03

基地分析 SITE ANALYSIS

04

任务书解读 BRIEF

设计驱动力和概念 DESIGN DRIVERS

05

规划及平面设计 PLANNING DESIGN

06

建筑设计 ARCHITECTURE

05

设计驱动力和概念 DESIGN DRIVERS

07

室内设计 INTERIOR

09

景观设计 LANDSCAPE

07

建筑设计 ARCHITECTURE

07

08

室内设计

项目概览 SUMMARY

14

02

基地分析 SITE ANALYSIS

03

任务书解读 BRIEF

04

05

建筑设计 ARCHITECTURE dESIGN

门诊综合楼 Outpatient Building

60000m²

口腔中心 Stomatology Center

30000m²

科研楼 Research Building

53000m²

二氧化钛氧化涂层 净化空气 TiO2 coating Purify the Air4.0m

教学楼 Teaching Building

45000m²

行政教学楼 Administrative Building

20000m²

连廊 Connecting Corridor

6000m²

景观设计

20000m²

09

设计说明 DESIGN StatEmENt

城市关系 | Connection to City

07 12.5m

最大化视野

08

室内设计 INTERIOR

05

09

设计说明 DESIGN StatEmENt

二氧化钛亲水材料 TiO2 Hydrophilic

Maximizing Sunlight

15

17

4.5m

03

往地下停车场 TO CARPARK

遮光铝格栅

TiO2光催化剂具有吸收自然阳光并分解有机物的特性,因此雨水很 Sun-shading Fins 容易自然地洗去立面上的污垢。

10

30

Minimizing Heatgain

The layer functions as a filter to minimize heat the building gained from the sun. This can minimize energy usage of the building in terms of air conditioning.

减少直射光,确保漫反射光进入 Reduce direct sunlight, increase difuse reflection

二氧化钛亲水材料 TiO2 Hydrophilic

二氧化钛氧化涂层 TiO2 coating

东门北路 DONGMEN NORTH ROAD

最大化视野

净化空气

竖向格栅构件的通透性可使建筑内部的使用者视线几乎不受外界干 扰,充分展现外部景观,为建筑物内部的活动营造出更加生气勃勃的 氛围。

涂有TiO2涂层具能够通过氧化反应分解NOx并净化周围空气。

TiO2 coating has a feature that decomposes NOx through oxidation reaction, and purifies the surrounding air.

The vertical nature of the fins allows occupant to have an unobstructed view towards the outside creating a more rejuvenating atmosphere inside the building.

06

绿色通廊 院内电瓶车落客位置 遮光铝格栅 Sun-shading Fins AUTOMATED VEHICULAR DROP OFF

07

门诊到达入口 绿色缓冲 OUTPAITIENT ARRIVAL 最大化视野

15F(+ 63.00)

N

23F(+ 93.00)

23F(+ 93.00)

13

地块

09

PLANNING PLANNING

景观设计 LANDSCAPE

09

建筑设计

设计说明 DESIGN StatEmENt

设计说明 08 景观设计 09 设计说明 08 景观设计 LANDSCAPE 09 DESIGNDESIGN StatEmENt LANDSCAPE StatEmENt

12

11

02

03

基地分析 SITE ANALYSIS

任务书解读 BRIEF

1304 14

标牌设计 SIGNAGE dESIGN

15

清晰简洁是标识设计的主要理念。标识放于能让人舒 适地看到的高度及位置,为使用者提供一个清晰的指 引,而又不会干扰和阻碍到建筑物的功能空间设计。

09

住院入口 立面材料 FACAdE ARRIVAL mATERIAL INPATIENT

10

发热门诊 “简洁,干净,功能强大和高性能是构建建筑立面材料调色板时的关键词。 6. 裙楼立面材料选用平静和具保护性的色调与明亮的塔樓立面形成鲜明对比, GREEN PLAZA 3. 从而为建筑物营造出简洁典雅的轮廓。”

除了在墙上摆放标识,亦设计在地面提供以不同颜色 表达的导引,清晰有效地引领访客到医院内不同部门 和目的地。 Simple and clean are the main concept to the signage and wayfinding design. Located on a height designed to be comfortably observed by average human heights, the signage and wayfinding icons will provide a clear direction for buildings occupant without interrupting and obstructing too much of the spatial design of the building.

急救大厅 2. performance are the keyword when the Simple, clean, functional and high Architectural Façade material palette was compiled. Heavy and protective EMERGENCY ZONE tone of the podium façade material contrasting with a light and bright

Apart from Signage on the walls, clear and colourful signs on the floor is also suggested for effective guidance for direction to different destinations in the hopsital.

16 17 18

首先,根据场地条件及限制创建建筑体量; 首先,根据场地条件及限制创建建筑体量;

急救入口

16

Self Cleaning

17

TiO2 photo catalyst property to absorb natural sunlight and decompose organic matter makes it easy for rainwater to naturally wash away dirt from the façade.

18

16

住院入口 The vertical nature of the fins allows occupant to have an unobstructed view INPATIENTtowards ARRIVAL the outside creating a more rejuvenating atmosphere inside the

Purifying the air

23F(+ 98.10)

AD H RO

Meters 0

10

30

TiO2 photo catalyst property to absorb natural sunlight and decompose organic matter makes it easy for rainwater to naturally wash away dirt from the façade.

N

55

PLANNING PLANNING

再将两部分错动布置,形成建筑两端的入口; 再将两部分错动布置,形成建筑两端的入口;

诊室/治疗室/检查室 Emergency Building CLINIC/TREATMENT/EXAMINATION ROOM 花园 GREEN PLAZA 医技综合楼 MEDICAL TECHNOLOGY BUILDING 门诊综合楼 OUTPATIENT BUILDING

景观设计 LANDSCAPE

09

利用每层的到达位置把较长的体量消减,并与建筑 利用每层的到达位置把较长的体量消减,并与建筑 中庭产生联系; 中庭产生联系; Using the Using arrival the of arrival eachof floor each tofloor reduce to reduce the longthe massing long massing and connect and connect them with them thewith atrium the atrium

arcHitecture

室内设计 INTERIOR dESIGN

6

室内材料 INTERIOR mATERIAL 室内材质和颜色配搭采用平和及温暖的色调,创造精神和人性化的气氛。 Interior colour palette consists of calm and warm colours to provide a cheerful and humane atmposhere.

1. 7. 2.

6.

5.

009 透视图 009 : Emergency Building Facade

10

30

60

N 1. Brushed Aluminium 2. Vinyl floor sheet 3. Stone tiles 4. Red tinted glass 5. White concrete 6. Ash wood 7. Beech wood

1.拉丝铝 2.乙烯基地板 3.石材瓷砖 4.红色玻璃 5.白色混凝土 6.白蜡木 7.胡桃木

利用每层的到达位置把较长的体量消减,并与建筑 利用每层的到达位置把较长的体量消减,并与建筑 中庭产生联系; 中庭产生联系; Using the Using arrival the arrival of eachoffloor eachtofloor reduce to reduce the long themassing long massing and connect and connect them with themthe with atrium the atrium

SKYGARDENSKYGARDEN 空中花园 空中花园

5.

BALCONEY FOR BALCONEY MEDICAL FOR STAFF MEDICAL STAFF 医护人员专用阳台 医护人员专用阳台

1.灰色铝板 2.白色铝板 再引入空中花园为医务人员创造阳台; 再引入空中花园为医务人员创造阳台;

3.白蜡木 4.灰色石材 Then sky gardens are introduced to balconies create balconies for Then sky gardens are introduced to create for 5.深灰色石材 medicalmedical staff staff 009 透视图 6.混凝土 009 : Emergency Building Facade 7.清玻璃

013 室内透视图 013 : Emergency Buidling Lobby

形成最终设计。 形成最终设计。 The final is design is formed The final design formed

再引入空中花园为医务人员创造阳台; 再引入空中花园为医务人员创造阳台;

形成最终设计。 形成最终设计。

Then sky Then gardens sky gardens are introduced are introduced to create to balconies create balconies for for medicalmedical staff staff

The final The design final is design formed is formed

INTERIOR

建筑设计

Using the arrival eachtofloor to reduce themassing long massing and connect Using the arrival of eachoffloor reduce the long and connect themthe with the atrium them with atrium

BALCONEY FOR MEDICAL STAFF BALCONEY FOR MEDICAL STAFF 医护人员专用阳台 医护人员专用阳台

室内设计

设计说明 DESIGN StatEmENt

3.

Meters 0

7.

4. connect Grey Using the of arrival each to reduce long massing andStone connect Using the arrival eachof floor tofloor reduce the longthe massing and 5. Dark Grey Stone them the atrium them with thewith atrium 6. Concrete 7. Clear Glass

Then twoare parts are staggered form the entrance both Then the twothe parts staggered to formto the entrance at bothat ends ofends of the building; the building;

Then the Then twothe parts twoare parts staggered are staggered to formto the form entrance the entrance at bothat ends both ofends of the building; the building;

08

2.

利用每层的到达位置把较长的体量消减,并与建筑 利用每层的到达位置把较长的体量消减,并与建筑 中庭产生联系; 中庭产生联系;

PATIENT INTERACTION PATIENT INTERACTION 患者交流空间 患者交流空间

1. Grey Aluminium

The building The building massingmassing is divided is divided into theinto ward theand ward medical and medical assistant assistant space space 室内设计 INTERIOR

4.

2. White Aluminium 利用每层的到达位置把较长的体量消减,并与建筑 利用每层的到达位置把较长的体量消减,并与建筑 3. Ash Wood 中庭产生联系; 中庭产生联系;

再将两部分错动布置,形成建筑两端的入口; 再将两部分错动布置,形成建筑两端的入口;

4.

1.灰色铝板 2.白色铝板 3.白蜡木 4.灰色石材 5.深灰色石材 6.混凝土 7.清玻璃

60

SKYGARDEN SKYGARDEN 空中花园 空中花园 FORSTAFF MEDICAL STAFF BALCONEYBALCONEY FOR MEDICAL 医护人员专用阳台 医护人员专用阳台

规划设计 规划设计

PATIENT INTERACTION PATIENT INTERACTION 患者交流空间 患者交流空间

1.

将建筑体量分成病房和医务助理空间两部份; 将建筑体量分成病房和医务助理空间两部份;

建筑设计 ARCHITECTURE

3.

PATIENT INTERACTION PATIENT INTERACTION 患者交流空间 患者交流空间

TiO2光催化剂具有吸收自然阳光并分解有机物的特性,因此雨水很 容易自然地洗去立面上的污垢。

INPATIENT/OUTPATIENT INPATIENT/OUTPATIENT ARRIVAL ARRIVAL 住院/门诊到达入口 住院/门诊到达入口

RT

NO

6

手术室/抢救室 05 06 07 OPERATING/EMERGENCY ROOM 行政办公/员工 STAFF ZONE 规划及平面设计 PLANNING DESIGN

MEN

The building is divided theand ward and medical The building massingmassing is divided into theinto ward medical 建筑设计 assistant assistant space space arcHitecture

取药房 PHarmacy

设计驱动力和概念 DESIGN DRIVERS

NG

DO

北 将建筑体量分成病房和医务助理空间两部份; 将建筑体量分成病房和医务助理空间两部份; 东门

急救大厅 EMERGENCY ZONE

再将两部分错动布置,形成建筑两端的入口; 再将两部分错动布置,形成建筑两端的入口; 6. Then the Then two the parts twoare parts staggered are staggered to formtothe form entrance the entrance at bothatends bothofends of the building; the building;

The building The building massing massing is divided is divided into the into ward theand ward medical and medical assistant assistant space space

Self Cleaning

TiO2 coating has a feature that decomposes NOx through oxidation reaction, and purifies the surrounding air.

01

03

009 透视图 009 : Emergency Building Facade

诊室/治疗室/检查室 6. CLINIC/TREATMENT/EXAMINATION ROOM 3. 花园 4. 2. GREEN PLAZA 医技综合楼 1. MEDICAL TECHNOLOGY BUILDING 门诊综合楼 7. 5. OUTPATIENT BUILDING

06

5

SKYGARDENSKYGARDEN 空中花园 空中花园

将建筑体量分成病房和医务助理空间两部份; 将建筑体量分成病房和医务助理空间两部份; SHIFT MASSING SHIFT TOMASSING BECOMETO BECOME MORE PROMINENT MORE PROMINENT 把主要体量做的更明显 把主要体量做的更明显

EMERGENCYEMERGENCY ARRIVAL ARRIVAL 急救入口 急救入口

INPATIENT/OUTPATIENT INPATIENT/OUTPATIENT ARRIVAL ARRIVAL 涂有TiO2涂层具能够通过氧化反应分解NOx并净化周围空气。 住院/门诊到达入口 住院/门诊到达入口

23F(+ 93.00)

04

02

再将两部分错动布置,形成建筑两端的入口; 再将两部分错动布置,形成建筑两端的入口; Then the twoare parts are staggered form the entrance bothofends of Then the two parts staggered to formtothe entrance at bothatends the building; the building;

5.

1. Grey Aluminium 2. White Aluminium 3. Ash Wood 4. Grey Stone 5. Dark Grey Stone 6. Concrete 7. Clear Glass

PLANNING

The building massing is divided into theand ward and medical The building massing is divided into the ward medical assistant assistant space space

自我清洁

08

tower façade creates a simple and elegant outline to the building 取药房 04 PHarmacy

04

规划设计

将建筑体量分成病房和医务助理空间两部份; 将建筑体量分成病房和医务助理空间两部份;

SHIFT SHIFT MASSING TOMASSING BECOMETO BECOME MORE PROMINENT MORE PROMINENT 把主要体量做的更明显 把主要体量做的更明显

First, we First, created we created the building the building massing massing according according to the to sitethe site conditions conditions and restrictions. and restrictions.

1. Grey Aluminium 13

14

PATIENT INTERACTION PATIENT INTERACTION 患者交流空间 患者交流空间

EMERGENCY EMERGENCY ARRIVAL ARRIVAL 急救入口 急救入口

急救入口

首先,根据场地条件及限制创建建筑体量; 首先,根据场地条件及限制创建建筑体量;

净化空气

05

7F(+ 31.00)

First, weFirst, created we created the building the building massingmassing according according to the site to the site conditions conditions and restrictions. and restrictions.

6

室内设计 INTERIOR dESIGN

手术室/抢救室 减少过多热量 1.灰色铝板 Minimize Heatgain 2.白色铝板 OPERATING/EMERGENCY ROOM 3.白蜡木 行政办公/员工4.灰色石材 5.深灰色石材 6.混凝土 STAFF ZONE 7.清玻璃

55

规划设计 规划设计

PLANNING PLANNING

Simple, clean, functional and high performance are the keyword when the Architectural Façade material palette was compiled. Heavy and protective tone of the podium façade material contrasting with a light and bright INPATIENT/OUTPATIENT ARRIVAL ARRIVAL INPATIENT/OUTPATIENT tower façade creates a simple and elegant outline 住院/门诊到达入口 to the住院/门诊到达入口 building

20F(+ 82.50)

Maximizing 主到达广场View

Emergency Building 首先,根据场地条件及限制创建建筑体量; 首先,根据场地条件及限制创建建筑体量;

2. White Aluminium 3. Ash Wood 4. Grey Stone 5. Dark Grey Stone 6. Concrete 7. Clear Glass

6 SKYGARDEN SKYGARDEN 空中花园 空中花园

SHIFT MASSING SHIFTTO MASSING BECOME TO BECOME MORE PROMINENT MORE PROMINENT 把主要体量做的更明显 把主要体量做的更明显

“简洁,干净,功能强大和高性能是构建建筑立面材料调色板时的关键词。 INPATIENT/OUTPATIENT 裙楼立面材料选用平静和具保护性的色调与明亮的塔樓立面形成鲜明对比, INPATIENT/OUTPATIENT ARRIVAL ARRIVAL 住院/门诊到达入口 住院/门诊到达入口 从而为建筑物营造出简洁典雅的轮廓。”

08 景观设计 08 景观设计 09 设计说明 09 设计说明 LANDSCAPE LANDSCAPE DESIGNDESIGN StatEmENt StatEmENt

Emergency Building

EMERGENCY EMERGENCY ARRIVAL ARRIVAL 急救入口 急救入口

立面材料 FACAdE mATERIAL

First, we created the building massing according First, we created the building massing according to the to sitethe site 二氧化钛亲水材料 conditions and restrictions. conditions and restrictions. Hydrophilic TiO2EMERGENCY EMERGENCY ARRIVAL ARRIVAL

16

深圳市人民医院改扩建工程(一期)急诊综合楼项目 arcHitecture Phase I Reconstruction and Extension of the Emergency Building of Shenzhen People’s Hospital

4.

5

arcHitecture

SHIFT TO MASSING TO BECOME SHIFT MASSING BECOME MORE PROMINENT MORE PROMINENT 把主要体量做的更明显 把主要体量做的更明显

建筑设计 ARCHITECTURE dESIGN

07

15F(+ 61.10)

胸痛入口竖向格栅构件的通透性可使建筑内部的使用者视线几乎不受外界干 扰,充分展现外部景观,为建筑物内部的活动营造出更加生气勃勃的 CHEST PAIN 氛围。 CENTER ENTRANCE

发热门诊 10 首先,根据场地条件及限制创建建筑体量; 首先,根据场地条件及限制创建建筑体量; GREEN PLAZA

建筑设计

15

二氧化钛氧化涂层 TiO2 coating

23F(+ 93.00)

人民和城市的休憩空间

18

建筑设计 Sun-shading Fins 胸痛入口 dESIGN CHESTARCHITECTURE PAIN CENTER ENTRANCE

12

08

14

11

项目概览 SUMMARY

23F(+ 93.00)

24F(+ 93.20)

10

we created the building according to the site First, weFirst, created the building massingmassing according to the site

08

7.

停车场入口 ARRIVAL FROM CARPARK

conditions and restrictions. conditions and restrictions. 宁静的休憩空间 | Spaces for Sanctuary

门诊到达入口 OUTPAITIENT ARRIVAL

12

5F(+ 21.00)

05

景观边界定义了

绿轴 | Green Axis

07

自我清洁 TiO2光催化剂具有吸收自然阳光并分解有机物的特性,因此雨水很 容易自然地洗去立面上的污垢。

立面剖透视示意 Sectional Diagram

Purifying the air

60

01 院内电瓶车落客位置 AUTOMATED VEHICULAR DROP OFF

11

08

building.

Simple, clean, functional and high performance are the keyword when the Architectural Façade material palette was compiled. Heavy and protective tone of the podium façade material contrasting with a light and bright tower façade creates a simple and elegant outline to the building

15

东门北路 DONGMEN NORTH ROAD

主到达广场

1.

TiO2 photo catalyst property to absorb natural sunlight and decompose organic matter makes it easy for rainwater to naturally wash away dirt from the façade.

06

地铁D出口 METRO EXIT D

20F(+ 81.00)

Meters 0

地铁D出口 04 建筑设计 METRO EXIT D

18

白色铝型材 White Aluminum Fins

08

08

室内设计 INTERIOR

自我清洁 Self Cleaning

25F(+ 98.89)

3F(+ 13.60)

08

科研创新交流轴 AXIS OF SCIENTIFIC RESEARCH & INNOVATION EXCHANGE

地块

外层立面层用作过滤器,以最大程度地减少从太阳获 Self Cleaning 得的建筑物的热量。 就空调而言,这可以使建筑物

4.5m

05

07

建筑设计 ARCHITECTURE

净化空气 Purify the Air

8F(+ 30.00)

22F(+ 86.69)

19F(+ 80.00)

11F(+ 47.00)

巴士站 BUS STOP 地铁 METRO EXIT

公共上落客区 PUBLIC PICKUP/DROPOFF

7F(+ 34.50)

公共上落客区 视野最大化 Maximizing View PUBLIC PICKUP/DROPOFF 往地下停车场

憩空间

三期新建科研楼 PHASE 3 TEACHING & ADMINISTRATIVE BUILDING 三期新建教学楼及新政教学楼 RESEARCH BUILDING

02

自我清洁

Selfit Cleaning Although the layer block heat to enter the building, but will still allow the interior to have maximum exposure to sunlight. This way, the building can also minimize energy usage for interior artificial lighting.

06

Maximizing View

二期新建口腔中心 PHASE 2 STOMATOLOGY CENTER

遮光铝格栅

TiO2 coating has a feature that decomposes NOx through oxidation reaction, 的能耗減少。 and purifies the surrounding air.

The vertical nature of the fins allows occupant to have an unobstructed view towards the outside creating a more rejuvenating atmosphere inside the building.

遮光铝格栅 Sun-shading Fins

12

停车场入口 ARRIVAL FROM CARPARK

景观设计 LANDSCAPE

医院作为城

11

急诊落客区/ 急救入口 景观边界定义了 DROPOFF/ENTRANCE EMERGENCY

01

自我清洁

Purifying the air

06

PLANNING

室内设计 05 规划及平面设计 06 建筑设计 07 室内设计 04 DESIGN 05 规划及平面设计 06 建筑设计 04 DESIGN PLANNING ARCHITECTURE07 INTERIOR INTERIOR DRIVERS PLANNING DESIGNDESIGN ARCHITECTURE DRIVERS

BRIEF

09

绿色缓冲

06

減低熱量吸收 4.5m 涂有TiO2涂层具能够通过氧化反应分解NOx并净化周围空气。

Maximizing View

规划设计 规划设计

BALCONEYBALCONEY FOR MEDICAL FORSTAFF MEDICAL STAFF 医护人员专用阳台 医护人员专用阳台

17

设施

“简洁,干净,功能强大和高性能是构建建筑立面材料调色板时的关键词。 裙楼立面材料选用平静和具保护性的色调与明亮的塔樓立面形成鲜明对比, 从而为建筑物营造出简洁典雅的轮廓。”

净化空气

竖向格栅构件的通透性可使建筑内部的使用者视线几乎不受外界干 扰,充分展现外部景观,为建筑物内部的活动营造出更加生气勃勃的 氛围。

ure of the material also made to minimize maintenance effort upant.

规划及平面设计 PLANNING DESIGN

规划设计

DESIGN DESIGN GENERATION GENERATION DIAGRAM DIAGRAM

绿色通廊 一期新建医技综合楼裙楼 PHASE 1 MEDICAL TECHNOLOGY BUILDING PODIUM

05 立面材料 FACAdE mATERIAL

08

13

05

设计驱动力和概念 DESIGN DRIVERS

基地分析 基地分析 05 规划及平面设计 05 规划及平面设计 06 建筑设计 06 建筑设计 07 室内设计 07 室内设计 0203 02 SITE 03 任务书解读 03 任务书解读 04 设计驱动力和概念 04 设计驱动力和概念 PLANNING PLANNING DESIGNDESIGN ARCHITECTURE ARCHITECTURE INTERIOR INTERIOR SITE ANALYSIS BRIEF BRIEF DESIGNDESIGN DRIVERS DRIVERS TOANALYSIS CARPARK

设计生成图解 设计生成图解04

绿色基础

16

外层立面阻止热量进入建筑物,但仍能使光線有效地 穿透到内部。这样,建筑物还可以減少室内照明的能 源使用。

遮光铝格栅 Sun-shading Fins

视野最大化 Maximizing View

12

FACAdE dESIGN

07

一期新建医技综合楼 PHASE 1 MEDICAL TECHNOLOGY BUILDING

14

提升光線

高性能铝装饰条,并结合了TiO2光催化剂涂层,可起到过 當地調整建筑物溫度同時清洁周围空气。

特性, 还可以最大程度地减少建筑工人的维护工作量。

建筑设计 06立面设计 ARCHITECTURE

绿化广场 GREEN PLAZA

09

13

自我清洁 Self Cleaning

规划及平面设计 PLANNING DESIGN

院内电瓶车路线 AUTOMATED VEHICULAR PATH

08

111000m²

建筑设计 ARCHITECTURE dESIGN

设计驱动力和概念 DESIGN DRIVERS

07

103259m²

INTERIOR LANDSCAPE 医疗部门 | The Departments

净化空气 Purify the Air

空中绿廊 Green Corridor

01

充当标准墙和窗户立面顶部的气候控制层。该立面层起到 作用,从而优化能源的使用,并过滤建筑物内部和周围的

forming aluminium fins which incorporates TiO2 photo catalyst ontrol layer functions to filter and distribute sunlight, moderate nd also clean the surrounding air.

06

设计说明 DESIGN StatEmENt

深圳市人民医院改扩建工程(一期)急诊综合楼项目 Phase I Reconstruction and Extension of the Emergency Building of Shenzhen People’s Hospital

01

ns act as a Climate Control Layer on top of the standard wall and façade layer that will function as a protective layer and buffer energy usage, and filter the air inside and around the building.

规划及平面设计 PLANNING DESIGN

06

一,二及三期连桥 PHASE 1,2 &3 SKYWALKWAY LINK

二期新建门诊综合楼及保健办 PHASE 2 OUTPATIENT BUILDING AND HEALTHCARE CENTRE市宁静的休

ARCHITECTURE dESIGN

08

视野最大化 Maximizing View

12

11

URE dESIGN

14

428259m²

建筑设计 ARCHITECTURE dESIGN

16

扩建工程(一期)急诊综合楼项目 on and Extension of the Emergency Building of Shenzhen People’s Hospital 任务书解读 BRIEF

02

项目概览 SUMMARY

共享绿色健康轴 AXIS OF GREEN, SHARING & HEALTHCARE

急诊综合楼 Emergency Building

保健办 Health Care Center

深圳市人民医院改扩建工程(一期)急诊综合楼项目 Phase I Reconstruction and Extension of the Emergency Building of Shenzhen People’s Hospital

一期住院/门诊到达入口 PHASE 1 EMERGENCY BUILDING INPATIENT ARRIVAL

05

10

医院作为

24700m²

01 项目概览 01 项目概览 SUMMARY SUMMARY

一期上落客区 PHASE 1 PRIVATE CAR DROPOFF

04

医技综合楼 Medical Technology Building

其中 In That

e hospital and its staff, fic research before

03

81877m²

Outpatient Medical Building

09

基地分析 SITE ANALYSIS

81874m²

内科住院大楼 医院成为城市一 Medical Inpatient Building

规划新建建筑面积 Planned Building Area

其中 In That

14

04

任务书解读 BRIEF

DESIGN GENERATION DIAGRAM DESIGN GENERATION DIAGRAM 深圳市人民医院改扩建工程(一期)急诊综合楼项目 深圳市人民医院改扩建工程(一期)急诊综合楼项目 Phase IPhase Reconstruction I Reconstruction and Extension and Extension of the Emergency of the Emergency BuildingBuilding of Shenzhen of Shenzhen People’sPeople’s HospitalHospital

一期新建急诊综合楼 PHASE 1 EMERGENCY BUILDING 一期急诊上落客区 PHASE 1 EMERGENCY DROPOFF

03

188451m²

外科住院大楼 Surgical Inpatient Building

部分门诊内科楼

17

15

02

30%

绿地率 Green Ratio

建筑高度 Height Limit

科技创新交流轴旨在 现科研交流的平台。

stablish a sustainable

01

37%

建筑密度 Building Density

医疗部门群

绿

AX

设计说明 DESIGN StatEmENt

16

HC

IS

09

景观设计 LANDSCAPE

RY. NE

02ANALYSIS 03 02 SITE SITE ANALYSIS 03 BRIEF

02 设计生成图解 设计生成图解

经济技术指标 Development Schedule

用地性质 Most urban hospitals are self contained islands, with no relationship to their context 医疗卫生用地 Land use or surroundings. A simple move connecting 可建设总用地面积 (m²) the north and south boundaries offered a 119000m² connection to the city. This will Site be Area further exemplified via a green axis connecting the 5.182 容积率 FAR campus via green plazas and areas sanctuary within the city fabric.

E

RE

,G

to the basement with

NT

CE

andard of y for the patients in mergency department,

IFIC

03

基地分析 SITE ANALYSIS

ROAD 翠竹路 CUI ZHU

规划及平面设计 PLANNING DESIGN

,一层及以上为人行

02

项目概览 SUMMARY

建筑设计

急诊落客区/ 急救入口 ARCHITECTURE dESIGN 深圳市人民医院改扩建工程(一期)急诊综合楼项目 深圳市人民医院改扩建工程(一期)急诊综合楼项目 01Extension I Reconstruction and of the Emergency of Shenzhen Phase IPhase Reconstruction and Extension of the Emergency BuildingBuilding of Shenzhen People’sPeople’s HospitalHospital EMERGENCY DROPOFF/ENTRANCE 项目概览 基地分析 任务书解读 设计驱动力和概念 项目概览 基地分析 任务书解读 设计驱动力和概念

设计说明 DESIGN StatEmENt

mLp ANALYSIS

场地中新增的绿轴作为更新、复生的象征融入旧城区既有的文脉,也像不断自然扩展 延伸的健康保护所,为病人带来更多治愈的同时以绿色的自然之力修复着城市环境。ION

55

08 景观设计 08 景观设计 09 设计说明 09 设计说明 LANDSCAPE LANDSCAPE DESIGN DESIGN StatEmENt StatEmENt

设计生成图解 设计生成图解

深圳市人民医院改扩建工程(一期)急诊综合楼项目 003 鸟瞰图

PhaseView I Reconstruction and Extension of the Emergency Building of Shenzhen People’s Hospital 003 : Aerial 与城市和自然的关系 基地分析 01 项目概览 02 SITE 03 任务书解读 04 设计驱动力和概念 ANALYSIS BRIEF DESIGN DRIVERS SUMMARY 许多城市的医院与城市文脉联系不足。设计中连接南北边界的动线为园区提供了 与城市联系的机会。这种联系通过动线上的绿化以及广场设计得到进一步加强。 总平面分析

准的环境,提升医院 用,加强在院区门急

05 规划及平面设计 05 规划及平面设计 06 建筑设计 06 建筑设计 07 室内设计 07 室内设计 02 SITE 02ANALYSIS 03 任务书解读 03 任务书解读 04 设计驱动力和概念 04 设计驱动力和概念 PLANNING PLANNING DESIGNDESIGN ARCHITECTURE ARCHITECTURE INTERIOR INTERIOR SITE ANALYSIS BRIEF BRIEF DESIGNDESIGN DRIVERS DRIVERS

01 SUMMARY 01 SUMMARY

4

深圳市人民医院改扩建工程(一期)急诊综合楼项目 Phase I Reconstruction and Extension of the Emergency Building of Shenzhen People’s Hospital

01

02

5

DESIGN DESIGN GENERATION GENERATION DIAGRAM DIAGRAM

dESIGN VISION

10

PLANNING

设计说明 08 景观设计 09 设计说明 08 景观设计 LANDSCAPE 09 DESIGN DESIGN StatEmENt LANDSCAPE StatEmENt

DESIGN GENERATION DIAGRAM DESIGN GENERATION DIAGRAM 项目概览 项目概览 基地分析 基地分析

设计愿景

05

基地分析 室内设计 基地分析 任务书解读 05 规划及平面设计 06 建筑设计 07 室内设计 02 SITE 03 任务书解读 04 设计驱动力和概念 04 设计驱动力和概念 05 规划及平面设计 06 建筑设计 02 SITE PLANNING DESIGN ARCHITECTURE 07 INTERIOR INTERIOR ANALYSIS 03 BRIEF BRIEF DESIGN DRIVERS PLANNING DESIGN ARCHITECTURE ANALYSIS DESIGN DRIVERS

深圳市人民医院改扩建工程(一期)急诊综合楼项目 深圳市人民医院改扩建工程(一期)急诊综合楼项目 设计生成图解 设计生成图解 Phase Phase I Reconstruction I Reconstruction and Extension and Extension of the of Emergency the Emergency Building Building of Shenzhen of Shenzhen People’s People’s Hospital Hospital

n People’s Hospital

04

规划设计

深圳市人民医院改扩建工程(一期)急诊综合楼项目 深圳市人民医院改扩建工程(一期)急诊综合楼项目 I Reconstruction and Extension the Emergency Building of Shenzhen People’s Hospital Phase Phase I Reconstruction and Extension of the of Emergency Building of Shenzhen People’s Hospital

01 项目概览 01 项目概览 SUMMARY SUMMARY

7

再引入空中花园为医务人员创造阳台; 再引入空中花园为医务人员创造阳台;

形成最终设计。 形成最终设计。

Then sky gardens are introduced to create balconies Then sky gardens are introduced to create balconies for for medical medical staff staff

Thedesign final design is formed The final is formed

再引入空中花园为医务人员创造阳台; 再引入空中花园为医务人员创造阳台;

形成最终设计。 形成最终设计。

Then sky Then gardens sky gardens are introduced are introduced to create to create balconies balconies for for medical medical staff staff

The final Thedesign final design is formed is formed


9

MIXED USE DEVELOPEMENT (STARTUP CAMPUS) PROJECT: CHINA ISRAEL ACCELERATION OFFICE PARK, PRC STAGE : DD STAGE TO CONSTRUCTION USES: OFFICES, RESIDENTIAL, RETAIL, LEISURE FEB 2018- AUG 2018 / TEAM OF 5

SETTING OUT & FACADE PANALIZATION

01

DESIGN STUDIES (IN A TEAM OF 2)

02

GRAPHICS LAYOUTS

03

Role : In a team of 3, designed and graphically represented 2D

Role: Completed design studies for canopies, ceilings, and facade

Role : Complied and organised the graphical layouts for reports

setting out drawings for a double curved soffit within a 2-3 week-

soffits on Rhino 3D. Responsible for adjusting 3D models post-

, reviews and discussions consisting of design changes for all

time period by 'unfolding' curved areas and set out curves logi-

disicussion. Maintained Circulation connectivity on site while

towers. Emphasized issues, especially with green building regu-

cally.

reducing the area of covered canopy. Interpretating design ideas

lations or chang of designs , whilst noting possible solutions for

that proportionally and aesthetically suit the existing design

the client.

intent of -'local geography' and 'fusion'.

SOFFIT SETTING OUT

SOFFIT DESIGN OPTIONS


10

MIXED USE DEVELOPEMENT (STARTUP CAMPUS) PROJECT: CHINA ISRAEL ACCELERATION OFFICE PARK, PRC STAGE : DD STAGE TO CONSTRUCTION USES: OFFICES, RESIDENTIAL, RETAIL, LEISURE FEB 2018- AUG 2018 / TEAM OF 5

RESPONSIBILITY: FACADE MATERIALS

01

Role : Responsible for sourcing and maintaning consistency and cost efficientcy of materials throughout entire complex. Proposed facade materials in terms design intent and whethering properties throughout a number of design changes. Liaison with suppliers and curtain wall consultants, for example regarding a soffit installation 27 stories above ground level.

WOOD PATTERNED ALUMINUM CEILING FOR MAIN ENTRYWAY

COMPARING DIFFERENT PERFORATED METAL MATERIALS


11

URBAN COMPLEX/ PODIUM BRIDGE PROJECT: FREE TRADE MIXC URBAN COMPLEX MIXC, PRC STAGE : DETAILEDD DESIGN USES: OFFICES, RESIDENTIAL, RETAIL, LEISURE SEPT 2019/ TEAM OF 2

01

DETAILED CONNECTION DRAWINGS

02

COMPARED DISCREPANCIES BETWEEN DRAWINGS AND DESIGN

Role : Assisted in setting up Detailed Design drawings for a footbridge crossing between podiums. Noted discrepancies of structural draw-

Role: (Team of 2) My role was to assist in incorporating the structure into the design. Formulat-

ings, regulations with current bridge design preserve design intent and connect the two elements - the bridge and podium.

ed logical setting outs - for curves and design.

Notes: 1. 2. 3.

SETTING UP SECTIONAL DRAWING OF OVERHEAD WALKWAY

U AL-01

100 175 200 80

250

2000

1315

2 -

-

连桥局部平面图 FOOTBRIDGE L2 PART PLAN

0 4

0 5

0 6

0 7

0 8

0 9

1 0

1 1

1 2

1 3

1 4

1 5

1 6

1 7

1 8

6121

0 3

1 9

2000

2000

2000

2000

2000

2000

2000

207

+11.50

50

6500 200 1050

150

2000

200 4000

+11.35

1050

650

650

2000

4 6

4 7

4 8

4 9

5 0

5 1

5 2

5 3

5 4

5 5

5 6

5 7

5 8

5 9

6 0

淨寛4200

+6.10

+6.00

+6.00

600

V 型混凝土结构柱( 已施工) 1 . 有關制圖問題已通過 1 0 D E S I G N G質量管理 R O U P 體系的檢查和認証 ( 详见中交院图纸) 2 . 有關一般註釋,縮寫,標示等說明,請參閱 TEN_16035_PH2_0003 . 17000 3 . 除特別註釋外,所有尺寸均以毫米為單位 4 . 所有圖紙需要結合所有相關建築、內部結構及工程技術 虚线所示为混凝土结构箱梁 圖紙及說明 ( 详见中交院图纸) 5 . 切勿直接從圖紙中量度尺寸,應以標註尺寸為準

5800

600

7000

±0.00

L T D .

650

750

二期建筑

LOREM IPSUM DOLOR SITER AMET CONSECTETUR ADIPISCING ELIT 13550

18750

6000

GL-10

伸缩缝 ( 详设计院图纸)

" 3 1 6 发面" 不锈钢立柱安全 玻璃栏杆

-

银灰色铝合金外挂板

FOOTBRIDGE ELEVATION

-

FOOTBRIDGE SECTION

VENENATIS. CUM SOCIIS NATOQUE PENATIBUS ET MAGNIS DIS +11.35

高度 B

排水槽于顶棚两侧 ( 详设计院及幕墙顾问图纸)

银灰色铝合金外挂板 ( 幕墙顾问提供稳固图)

+10.70

半徑 R

A

2019-11-18 BRIDGE FACADE DETAIL DESIGN INTENT

-

2019-11-15 BRIDGE FACADE DETAIL DESIGN INTENT

Description

Rev. Date 修订 日期

高度 C

描述

DC

JP

MAY

DC

JP

MAY

DR. CH.

AP.

画图 校对 批准

Consultant 顾问

AL-01

银灰色铝合金外挂板屋顶 高度 D ( 幕墙顾问提供稳固图)

5000

AL-01

300

750

+11.35

200

Project Stage 項目階段

300

Façade Detailed Design 外立面深化设计

连桥地砖完成面

Project Title 项目名稱

Hengqin MIXC World Project (Phase 2)

横琴万象世界项目(二期)

R3

Drawing Title 圖紙名稱

00

250

75

3

400

350

-

200

150

1100

滴水线

FOOTBRIDGE ELEVATION & SECTION 连桥立剖面图

钢结构梁 ( 详结构专业图纸)

0

0 R1

100

650

Client 业主

CHINA RESOURCE LAND LIMITED 华润置地

100

银灰色铝合金外挂板 ( 幕墙顾问提供稳固图)

40

+11.35

0 2

5260

高度 A

1000

2000

AL-01

( 详结构专业及幕墙顾问图纸)

2000

2000

L T D .

DONEC A PLACERAT ANTE ETIAM EGET NULLA MOLLIS ELIT INTERDUM 连桥立面图 连桥剖面图 1 2

AL-01

2000

2000

1251

一期建筑

钢结构柱 中灰色氟碳喷涂完成面

3 -

2000

伸缩缝 ( 详设计院图纸)

" 3 1 6 发面" 不锈钢立柱及扶手 安全夹胶玻璃栏杆 ( 幕墙顾问提供稳固图及设计院审核)

185

2000

註釋:

银灰色铝板竖向装饰条 ( 幕墙顾问提供稳固图)

175

100

175 200

100

500

500

AL-01

GL-10

1315

2000

1000

1250

250

20

2000

1000

花池 350

2000

4600

150

0 1

185

1

1760

8400 900

最少

50

虚线所示为建筑轮廓在上

-

1 . 有關制圖問題已通過 1 0 D E S I G N G質量管理 R O U P 體系的檢查和認証 2 . 有關一般註釋,縮寫,標示等說明,請參閱 TEN_16035_PH2_0003. 3 . 除特別註釋外,所有尺寸均以毫米為單位 4 . 所有圖紙需要結合所有相關建築、內部結構及工程技術 圖紙及說明 5 . 切勿直接從圖紙中量度尺寸,應以標註尺寸為準

1250 100

1000

5.

2

THIS DRAWING ISSUE HAS BEEN CHECKED AND APPROVED IN ACCORDANCE WITH 10 DESIGN GROUP LTD. QUALITY MANAGEMENT. FOR GENERAL NOTES, SYMBOLS AND ABBREVIATIONS, REFER TO DRAWING TEN_16035_PH2_0003. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE STATED. ALL DRAWINGS HAVE TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL AND SERVICES ENGINEER'S DRAWINGS AND SPECIFICATIONS. DO NOT SCALE OFF THIS DRAWING.

註釋:

伸缩缝 ( 详设计院图纸)

4600

2000

4500

2000

银灰色铝合金外挂板 ( 幕墙顾问提供稳固图)

5

银灰色铝合金外挂板

100

AL-01

6

AL-01

银灰色铝板竖向装饰条 ( 造型高度定位详见下方装饰条定位表) 1. THIS DRAWING ISSUE HAS BEEN CHECKED AND APPROVED IN ACCORDANCE WITH 10 DESIGN GROUP LTD. QUALITY MANAGEMENT. 62067 2. FOR GENERAL NOTES, SYMBOLS AND ABBREVIATIONS, REFER TO DRAWING 2000 TEN_16035_PH2_0003. 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 3. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE STATED. 4. ALL DRAWINGS HAVE TO BE READ IN CONJUNCTION 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 3 2 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL AND SERVICES ENGINEER'S DRAWINGS AND SPECIFICATIONS. 5. DO NOT SCALE OFF THIS DRAWING. Notes:

伸缩缝 ( 详设计院图纸)

4.

Scale at A1 比例

1:150

铝板竖向装饰条造型定位表 FOOTBRIDGE VERTICAL FINS SETTING-OUT CHART

香港湾仔駱克道4 号 1 东城大厦3樓 3F, East Town Building 41 Lockhart Road Wanchai, Hong Kong T +852 3975 2010 W www.10design.co

天花灯光预留位置 ( 详灯光顾问图纸)

1000

Project No. Drawing No. 项目編號

16035 Scale @ 1:1

© Copyright 2010-2013 10 Design Ltd. All Rights Reserved

图号

TEN_16035_PH2_BR_1002

Rev. 修订 A

\\192.168.0.47\p\project\16035_china resources_zhuhai hengqin mixed-use\02_cad\01_ar\01_sheets\ten_16035_ph2_br_1002.dwg

BRIDGE CONNECTION TO PODIUM

建议排水管稳藏于钢结构内 ( 详设计院图纸)

AL-01

银灰色铝板竖向装饰条 ( 幕墙顾问提供稳固图)

钢结构柱 中灰色氟碳喷涂完成面 ( 详结构专业及幕墙顾问图纸)

700 350

350

350

350

250

250

GL-10

" 3 1 6 发面" 不锈钢立柱及扶手 安全夹胶玻璃栏杆 ( 幕墙顾问提供稳固图及设计院审核)

虚线所示为竖向装饰条钢结构支撑 ( 幕墙顾问提供稳固图)

-

2019-11-15 BRIDGE FACADE DETAIL DESIGN INTENT

Description

Rev. Date 修订 日期

描述

DC

JP

MAY

DR. CH.

AP.

画图 校对 批准

EQ EQ

2000

建议地砖完成面于连桥防水层上 ( 详设计院及景观设计图纸)

1315 750

花池

150

200 100

500

450 100

100 Client 业主

L2 F.F.L. 15

100 60

00

Project Stage 項目階段

1000

435

00

R5

AL-01

1000

50

50 90

1250

CHINA RESOURCE LAND LIMITED 华润置地

混凝土结构箱梁 ( 详见中交院图纸)

R1

00

R1

500

100

AL-01

银灰色铝合金外挂板 ( 幕墙顾问提供稳固图)

50

300

425

300

1000

L2 F.F.L.

500 50

银灰色铝合金外挂板 ( 幕墙顾问提供稳固图)

V 型混凝土结构柱( 已施工) ( 详见中交院图纸)

滴水线

排水管沿结构柱则面凹槽安装 ( 详设计院图纸)

-

连桥内部局部立面图 FOOTBRIDGE INTERNAL PARTIAL ELEVATION

3 -

Façade Detailed Design 外立面深化设计 Project Title 项目名稱

Hengqin MIXC World Project (Phase 2)

横琴万象世界项目(二期)

550

2

Consultant 顾问

1000

1315

连桥放大剖面图 FOOTBRIDGE ENLARGED SECTION

Drawing Title 圖紙名稱

FOOTBRIDGE DETAIL 连桥局部平立剖面图 1:25

香港湾仔駱克道4 号 1 东城大厦3樓 3F, East Town Building 41 Lockhart Road Wanchai, Hong Kong T +852 3975 2010 W www.10design.co Project No. Drawing No. 项目編號

16035 Scale @ 1:1

CONNECTING WALKWAY

Scale at A1 比例

© Copyright 2010-2013 10 Design Ltd. All Rights Reserved

图号

TEN_16035_PH2_BR_1003

Rev. 修订 -

\\192.168.0.47\p\project\16035_china resources_zhuhai hengqin mixed-use\02_cad\01_ar\01_sheets\ten_16035_ph2_br_1003.dwg


URBAN PLANNING + MLP PROJECT : RECREATIONAL URBAN PLANNING STAGE : CONCEPT DESIGN (COMPETITION) USES: LEISURE, RECREATIONAL, MIXED USE SEPT 2020

ANAYLSIS AND GRAPHICS LAYOUT Role: Diagrams to represent our data, case studies

01

Role: Research into the historical background of the area (The

of similar sites and presentation layout to set up

Rea Sea, Saudi Arabia) and how to ground the architecture/

some basic guildlines for the project.

planning.

al w ajh

urb An desi gn p ri n ci p les

A n A l y s is

6%

32%

16%

21%

a l w a jh

a l wa j h

AnAlysis

u rb An d e s i g n p ri nc i p l e s

A n A l ys i s

2.4

vIEW IS OPEN

Ar r ivAl visib il it y

A L W A J H ,B EK N S AC H M A R K S T U D I E S | 0 4 STREET NETWORK

AL WAJH, KSA STREET NETWORK

a l wa j h An Aly s is

AL WAJH, KSA STREET NETWORK

BENCHMARK STUDIES | 04

ur b A n de s ig n p r in cip l e s

Landmarks, points of attraction with walkable distances and time

Landmarks, points of attraction with walkable distances and time Landmarks, points of attraction with walkable distances and time

WALKABILITY FACTORS

WALKABILITY FACTORS

BENCHMARK STUDIES | 04

2. 4

WALKABILITY FACTORS

50 % vIEW IS OPEN

vIEW IS OPEN

Ac c es s ibility

p l Az A vi s i b i l i t y

ArrIvAL POINTS

s tr eet h ier A r c h y

HIGH DENSITy MEDIUM DENSITy

PrIMAry rOAD

MArINA

29% 1254 m 53

54

Amaala Masterplan 4

TOTAL GFA

7 3 ,8 3 3 m 2

FUNCTIONAL ZONING

TOTAL SITE ArEA

8 8 ,2 8 0 m 2

FOrT & CITy GATE HISTOrIC MOSQUE

2 STOrEy

TErITIAry rOAD

SECONDAry rOAD

27% 1197 m

33% 1455 m

CU-DE-SAC

11%

470 m

3 STOrEy

10%

73%

LOW DENSITy

1 STOrEy

17%

ADMINISTrATIvE BUILDINGS

MIN & MAx GFA PEr BUILDING

1 6 .7 m 2 T O 1 ,6 6 7 .6 5 m 2

MArKET

rESIDENTIAL

Amaala Masterplan 4

55

56

MOSQUES

3

rESIDENTIAL

POrT BUILDINGS

AvErAGE GFA PEr BUILDING

3 2 3 .8 3 m 2

64.5%

Amaala Masterplan 4

<30m

30- 100m >100m

BUILDINGS IN 30M Plaza COASTAL PrOxIMITy

25%

AvErAGE COASTAL PrOxIMITy

84.1m

2 STORIES

2 STORIES

2 STORIES 2 STORIES

2 STORIES

2 OR S 2 S ST TO R II E ES

2 STORIES

3 STORIES

2 STORIES

2 STORIES 2 STORIES

2 STORIES

25m

b u i l di n g s b y co A s t Al p r o Xi m i t y

p r o g r Am m e

den s i t y

3540 m

PUBLIC BUS STOP

Amaala Masterplan 4

b ui l d i ng s by flo o r n u mber

TOTAL rOAD LENGTH

PUBLIC CAr PArKING

2 STORIES

vIEW IS OPEN

2 STORIES

vIEW IS OPEN

2.4

02

RESEARCH

3 STORIES

12

8m mm 4.5 53.5 m mm 3m m 3 m 10m 4.5 8.5 3.5

BUILDINGS IN 100M COASTAL PrOxIMITy

33%

MIN TO MAx DISTANCEM a i n COASTAL PrOxIMITy

5.40-230m

street

ry SecoM nSdaeai cnr o y snst da rt reeeet t

street

29.6%

ndar y str eet SeconS de a rcSyo e sc tornedeat r y s t r e e t

1 4 .8 %

T er i ti ar y str eet

SecS o en cdoa nr yd asrt yr eset tr e e t

Secondary street

2 4 .7 %

Amaala Masterplan 4

59


13

MLP + TRANSIT ORIENTED DEVELOPMENT PROJECT: OCT GUISHAN STATION RETAIL DEVELOPMENT, FUJIAN, PRC STAGE : CONCEPT TO SCHEMATIC DESIGN USES: OFFICES, RESIDENTIAL, RETAIL, LEISURE JUNE 2020- JULY 2020 / A PART OF DESIGN TEAM

COLLATING SUBMISSION REPORTS Role: Complie submission report layouts and con-

01

PLANNING AND AREA CALCULATION Role: Assisted with the developing blocking plans, in terms of

tent (concept images/diagram, design, planning)

presentation graphics and report findings of shops that do not

according to the company's image of creating

have sufficient areas after the incorperation of M&E facilities.

riverside entertainment and retail desintination.

02


14 COMPETITION STAGE: CONCEPT DESIGN AND DEVELOPMENT, SCHEMATIC DEVELOPMENT

DISGRAM AND GRAPHICS LAYOUT

01

PHYSICAL MODEL

02

Assisted in graphical representation of retail plans, blocking plans and di-

Physical model building with 3D printed counterparts and ac-

agrams to clearly represent planning layouts of open areas /retail street,

companied with hand cut base and surrounding buildings.

intended circulatory flow and MEP Counterparts.

in tempus turpis, sagittis pulvinar erat. Maecenas volutpat


15 MIXED-USE. RESIDENTIAL AND COMMERCIAL STAGE: DETAIL DESIGN TO CONSTRUCTUION. DEC 2019- MAR 2020 / TEAM OF 3

REVIT/RHINO MODELING AND DESIGN STUDIES

01

COORDINATION WITH LOCAL DESIGN INSTUTE

02

REGULATIONS, DETAILING DRAWINGS

03

Role: Revit 3D modelling, drawings and renderings. Proposed multiple

Role: Main person to coordinate with LDI and curtain wall consultants

Role : Make sure that the drawing adhere to building require-

design options for louvre studies, roof layout studies, transfer level

regarding issues with structure, regulatory issues and green building

ments - assure that our design intent is shown through whilst

facade & overall facade design.

requirements.

compromising certain structural additions.

FACADE STUDIES / REVIT - ENSCAPE

GBP DRAWINGS / REVIT

CURTAIN WALL STUDIES /SKETCH

AMENITIES STUDIES / REVIT - ENSCAPE


16

ACADEMIC WORKS


17

00

MASTERPLAN REVITALIZATION OF CHATHAM HISTORIC DOCKYARD 2018

PROJECT NO.

01

MIXED-USE, ENTERPRISE CENTRE (PUBLIC FACILITY) A PASSAGEWAY TO THE PAST

" S H A P I N G N E W S T O R I E S AT S T I L L WAT E R S . "

INDIVIDUAL PROJECT, 2018

03

ADAPTION AND EXTENSION, REVITALIZATION A SHIFTING INTERVENTION

" S TAC K E D D W E L L I N G S B Y T H E C R E E K . "

INDIVIDUAL PROJECT, 2018

04

LOW-RISE, RESIDENTIAL, COMMUNITY COLLECTIVE DWELLING A CO-DEPENDENT LIVING INDIVIDUAL PROJECT, 2017

" S TAC K E D D W E L L I N G S B Y T H E C R E E K . "


18

STATEMENT

The importance of weaving a building with its contextual language and responding to the rhythm of patterned human activity is a trait I value. To me, design changes and evolves with us. I have aims to explore designs in sync with technological progression and schemes that are adaptable to our future needs, striving to further discover the potentiality of impactful positive spaces.


19

01 PROJECT NATURE: MIXED USE - ENTERPRISE CENTRE LOCATION: CHATHAM HISTORIC DOCKYARD

PASSAGEWAY TO THE PAST



Shaping new stories at still waters Chatham Dockyard has constantly been changing. Many parts of paths, buildings and usage of the Dockyard in particular has been demolished, extended and rebuilt to cope with the change of use. Perhaps a new proposal can seek to rediscover old paths and artefacts and reinterpret them. This project attempts to embrace the rich surroundings of Chatham Historical Dockyard, and to ignite a conversation between the building and the context. Located between Medway River and the mast pond, it connects both water bodies and acts as a threshold to site. Organisation and movement throughout the building is driven by the masses of water.


Existing Change of circulation

Frontages

Change of land-use Existing

Riverside Social Space

New

Expansion and addition to t diverse functions of existing buildings. Small one storey buildings separa the public square into two while retaining the view for both commissioner’s house and the admiral’s offic


the -

ate o

ce

MASTERPLAN Uniting different parts of the dockyard at one point

REINVENT - REDISCOVER - REINVIGORATE Re-imagining Chatham Dockyard to enhance & Invigorate the area.

Central Node Student Hub

Social hub area extruded building to invite people to enter, and separates the open square into two parts, the turn into the dockyard provides a interesting spacial shift

Central pond, is meant to reflect the previous mast pond

Central node, merging of functions, and gives a contrast in scale. Buildings in the centre relatively smaller. Leisure bridge will be beside a bell tower, it alerts visitors of time and directs people towards this area, like the chimneys of the sawmill


PLAN A long corridor connecting river Medway and the north mast pond. The corridor is intercepted by many activities and facilities, such as the event space, workspaces, cafe, lobby and road. The lobby is visually connected to the river, dry docks, mast pond and green area. This is all in hopes to introduce and lead users of the building to further explore the dockyard.

SPATIAL ORGANISATION Create strong spatial and visual interconnections between workspaces by creating shared spaces at intersecting points of workspace.

G/F


PROGRESSION

Development from several forms (elongated and centralized blocks) to a linear building with many integrated activities.

Plan development & model development

1/F

2/F

3/F


INTERIOR PERSPECTIVES Internal spaces vary greatly. From rentable cubic 4m x 4m studios, shared work spaces and event space all intersecting an open atrium space. The environment is meant to encourage creativity, connection, and collaboration for all.


Pv panels

AC/DC inverter fuse box

Photovoltaics system

Heat pump unit

Distribution system

Ground Loop (Heat Exchanger)

Supply for WC flushing Rainwater storage Sand filter Distribution system

Pump Main tank


Reinterpretation of existing building layouts & structure

Ropery Building 1786-91

Exposed trusses and vastness of industrial buildings

Covered Walkways


The exposed columns give a sense of variation and dynamism within shared spaces.

With reference to the structure of Madrid airport.

TREE COLUMNS


30


31

02 PROJECT NATURE: RESIDENTIAL - COLLECTIVE DWELLING LOCATION: FAVERSHAM, UK

A CO-DEPENDENT LIVING A project located in Faversham, downstream of the Faversham river. The aim is to create a residential hub which encompasses varying groups. Families, young professionals and elderly. This project utilizes the idea of assembling modular blocks in varying ways to achieve an interconnected neighbourhood where structures, homes and pathways meet at different points.


32


33

SITE ANALYSIS


34

HOUSING PROTOTYPES

TYPE 1 HOUSING

Studio + Home Target group: business start-ups

TYPE 2 HOUSING 3 Storey House Target : Families

TYPE 3 HOUSING

Single storey Target: Elderly families and those with mobility difficulties


35


36

GFA 64.5m2


37

GFA 115m2


38

TYPE 2 HOUSING SECTION : A LOOK INTO THE INTO THE STACKING OF LEVELS

RAISED PATHWAYS SCHEDULE OF ACCOMMODATION

JOURNEY THROUGH THE COMMUNITY

Public gathering space for workshops and events.


39


40

02 PROJECT NATURE: MIXED USE - NURSERY & CARE HOME LOCATION: CHATHAM HISTORIC DOCKYARD

A SHIFTING INTERVENTION


41

Adaption and extension : Timber Seasoning Huts 1880 The scheme is to integrate a new structure to existing timber seasoning sheds while also introducing a new combination of uses of the building, nursery children, care home residents and local residents, to be able to respect privacy and also have points of interaction. The final form relies on shifting forms to divide and join spaces.


42

Winter Garden for residents

Seminars

Story Telling Corner

Office area

Climbing Net

Shared Workstations

Shared Cooking

Walkway to nursery

Care home

Public spaces

CONCEPT STATEMENT The concept is to extend and challenge the rigid grid form of the boxed framed timber huts. The main idea is to create prefabricated shifting forms and utilise such rectangular forms to divide spaces and usages.


43

SWITCHING MATERIALITY


44


45


46


47


48


49


50


51


52

06

IDEAS FORWARD 24 HR COMPETITION


53


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.