SHEFIELD NG
ARCHITECTURE PORTFOLIO WORKS FROM PROFESSIONAL EXPERIENCE + BA ARCHITECTURE
PROFESSIONAL EXPERIENCE
P.5-6
CO-WORKING SPACE, FITOUT LION ROCK 72, HK ROLE
P.5-6
CONTENTS
:
SUPPLIER LIAISON, PRESENTATIONS & REPORTS GRAPHICS AND LAYOUT, 3D DESKTOP STUDIES.
URBAN COMPLEX (COMMERCIAL, SERVICE APARTMENT, RETAIL) INTERNATIONAL COAST GARDEN, ZHUHAI PRC ROLE
P.8
TENDER DRAWINGS, DOCUMENT PREPARATION, GBP DRAWINGS , 3D DESIGN STUDIES, BUILDING SUBMISSIONS, CASE STUDIES
MIXED-USE MLP URBAN COMPLEX (COMMERCIAL, RESIDENTIAL, RETAIL) CHINA ISRAEL OFFICE ACCELERATION PARK, PRC ROLE
P.7
:
:
CONSULTANT COORDINATION, DD DRAWINGS, DOCUMENTATION, 3D FACADE DESIGN STUDIES, VISUALIZATION, COLLATED SUBMISSION REPORTS
URBAN COMPLEX (COMMERCIAL, SERVICE APARTMENT, RETAIL, PUBLIC SPACE) COFCO CENTRE RETAIL, BEIJING, PRC ROLE : GRAPHICS AND DIAGRAMS FOR INTERNAL LAYOUT, MODEL MAKING (PHYSICAL MODEL),
P.9-10
HOTEL (CHANGING ROOM AND SWIMMING POOL FITOUT) HK ROLE
:
DESIGN STUDIES, DOCUMENTATION, SPATIAL LAYOUT, REVIEW LOCAL CODES AND REGULATIONS
ACADEMIC WORK
P.13-22
P.23-31
MIXED-USE, ENTERPRISE CENTRE (PUBLIC FACILITY) A PASSAGEWAY TO THE PAST INDIVIDUAL PROJECT, 2018
LOW-RISE, RESIDENTIAL, COMMUNITY COLLECTIVE DWELLING A CO-DEPENDENT LIVING INDIVIDUAL PROJECT, 2017
HOUSING DESIGN FOR DEMENTIA PATIENTS- PUBLIC HOUSING, EXCEPT FROM WGO INVENTOR COMPEITION P.23-31
PLIGRISM - H20, IDEAS FORWARD 24 HOURS COMPETITION ENTRY COMPETITION (TEAM OF 3), 2017
PROFESSIONAL EXPERIENCE
CO-WORKING SPACE, START-UP INCUBATOR
INTERIOR FITOUT / RENOVATION
PROJECT: LION ROCK 72/ HKSTP
PROJECT: THE SALISBURY - YMCA OF HK
STAGE : COMPLETED/INUSE
PROJECT TYPE : LEISURE FACILITIES
END USER: RESIDENT STARTUP COMPANIES/UNIVERSITY R&D PROJECT TEAMS
STAGE: CONCEPT DESIGN TO CONSTRUCTION
FEB 2016- MAY2016 / TEAM OF 5
DEC 15 - FEB16 TEAM OF 4
01
SCHEMATIC & CONCEPT DESIGN
02
TENDER/CONSTRUCTION DRAWINGS
01
SPATIAL LAYOUT
Role : Sourced case studies, site analysis, assisted in further
Role: Reviewed local Hong Kong codes and regulations for the
Role: Proposed initial layout plans changing room areas. The
developing reception and conference area 3D design studies on
feasibilty of spaces, assisted in preparing CAD tender package
main challenge was to enlarge the corridor areas and provide a
sketchup, in terms of egronomics, colour and form.
(GFA Calculations, layout revision, GA/elevation/detail drawings).
more spacious feeling with the limited ceiling height. Reviewed regulations for spaces to ensure they were in accordance to accessibility/fire safety requirements/.
02
MATERIAL & GRAPHICS Role: Proposed and tested materiality and graphics on SketchUp to provide a calm and comforting environment for users.
03
DESIGN STUDIES Role : Design studies for facilities such as the sink area and jaccuzi. Ensured the ammenties were of ergronomic dimensions for all ages and fit in with the overall design intent.
@hkstpgaa
SKETCHUP, CAD, HAND DRAWING, EXCEL
SKETCHUP, CAD, HAND DRAWING
MIXED USE MLP - START UP CAMPUS PROJECT: CHINA ISRAEL ACCELERATION OFFICE PARK STAGE : DETAILED DESIGN TO CONSTRUCTION USES: OFFICES, RESIDENTIAL, RETAIL, LEISURE FEB 2018- AUG2018 / TEAM OF 5
01
SETTING OUT & FACADE PANELIZATION
02
DESIGN STUDIES (IN A TEAM OF 2)
03
GRAPHICS LAYOUTS
01
FACADE MATERIALS
Role : In a team of 3, designed and graphically represented 2D
Role: Completed design studies for canopies, ceilings, and
Role : Complied and organised the graphical layouts for submission reports , reviews and
Role : Responsible for sourcing and maintaining consistency and cost efficiency of materials
setting out drawings for a double curved soffit within a 2-3 week
facade softs on Rhino 3D. Responsible for adjusting 3D models
discussions consisting of design changes for all towers. Emphasized issues, especially
throughout entire complex. Proposed facade materials in terms of design intent and weathering
time period by 'unfolding' curved areas and setting out curves
post-discussion. Maintained circulation connectivity on site while
with green building regulations or change of designs , whilst noting possible solutions
properties throughout a number of design changes. Liaison with suppliers and curtain wall
logically.
reducing the area of covered canopy. Interpretation design ideas
for the client.
consultants, for example regarding a soft installation from 27 stories above ground level.
that proportionally and aesthetically suit the existing design intent of - 'local geography' and 'fusion'.
WOOD PATTERNED ALUMINUM CEILING FOR MAIN ENTRYWAY
COMPARING DIFFERENT PERFORATED METAL MATERIALS
SOFFIT SETTING OUT
SOFFIT DESIGN OPTIONS
THERMAL AND REFLECTIVITY COMPARISION
RHINO, CAD, GRASSHOPPER, ADOBE CREATIVE SUITE, ENSCAPE
SKETCHUP, CAD, HAND DRAWING
MLP + MIXED-USE DEVELOPMENT
MLP + MIXED-USE DEVELOPMENT
PROJECT: INTERNATIONAL COAST GARDEN, ZHUHAI , PRC
PROJECT: INTERNATIONAL COAST GARDEN PHASE 2, ZHUHAI , PRC
STAGE : DETAILED DESIGN TO CONSTRUCTION
STAGE : EPD, DETAILED DESIGN TO CONSTRUCTION
USES: OFFICES, RESIDENTIAL, RETAIL, LEISURE
USES: OFFICES, RESIDENTIAL, RETAIL, LEISURE
SEPT 2019
DEC 2019- MAR 2020 / TEAM OF 3
01
DETAILED DRAWINGS - CONNECTING BRIDGE JOINERY
DISCREPANCIES BETWEEN STRUCTURE AND DESIGN
02
01
REVIT/RHINO MODELING AND DESIGN STUDIES
02
COORDINATION WITH LOCAL DESIGN INSTITUTE
02
CHECKING CURTAIN WALL DRAWINGS
Role : Assisted in setting up detailed design drawings for a footbridge crossing between two podium plots. Noted discrepancies of
Role: (Team of 2) My role was to assist in incorporating the structure into the design,
Role: Revit 3D modeling, drawings and renderings. Proposed
Role: Coordinated with LDI, curtain wall consultants regarding
Role: Coordinate and review podium plan, elevations and sections
structural drawings, regulations with current bridge design, preserve design intent whilst connecting the two elements - the bridge
coordinating with structural consultants and formulated logical setting outs - for curves
design options for louver studies, roof layout studies, transfer
issues with facade, structural consultants, regulatory issues and
of our design with the cutain wall construction drawings.
and podium.
and design.
level facade & overall facade design.
green building requirements.
Notes: 1. 2.
2000
2000
2000
2000
2000
2000
2000
2000
2000
650
0 4
0 6
0 7
0 8
0 9
1 0
1 1
1 2
2000
1315
连桥局部平面图 FOOTBRIDGE L2 PART PLAN
一期建筑
-
1 8
1 9
2 0
2 1
2 2
2 3
2 4
2 5
2 6
2 7
2 8
2 9
3 0
3 1
3 2
3 3
3 4
3 5
3 6
3 7
3 8
3 9
4 0
4 1
4 2
4 3
4 4
4 5
2000
2000
2000
2000
207
+11.50
50
1 . 有關制圖問題已通過 1 0 D E S I G N G質量管理 R O U P 體系的檢查和認証 2 . 有關一般註釋,縮寫,標示等說明,請參閱 TEN_16035_PH2_0003. 3 . 除特別註釋外,所有尺寸均以毫米為單位 4 . 所有圖紙需要結合所有相關建築、內部結構及工程技術 圖紙及說明 V 型混凝土结构柱( 已施工) 5 . 切勿直接從圖紙中量度尺寸,應以標註尺寸為準
4 6
4 7
4 8
4 9
5 0
5 1
5 2
5 3
5 4
5 5
5 6
5 7
5 8
5 9
6 0
L T D .
+11.35
1050
600
18750
+6.10
+6.00
5800
600
7000
±0.00
17000
200 4000
淨寛4200
+6.00
650
( 详见中交院图纸) 13550
1000
6500 200 1050
750
二期建筑
6000
GL-10
伸缩缝 ( 详设计院图纸)
" 3 1 6 发面" 不锈钢立柱安全 玻璃栏杆 AL-01
2
银灰色铝合金外挂板
-
连桥剖面图 FOOTBRIDGE SECTION
+10.70
AL-01 半徑 R 银灰色铝合金外挂板屋顶 高度 B ( 幕墙顾问提供稳固图)
5000
AL-01
300
银灰色铝合金外挂板 ( 幕墙顾问提供稳固图)
750
+11.35
200
A
2019-11-18 BRIDGE FACADE DETAIL DESIGN INTENT
-
2019-11-15 BRIDGE FACADE DETAIL DESIGN INTENT
Description
Rev. Date 修订 日期
高度 C
描述
DC
JP
MAY
DC
JP
MAY
DR. CH.
AP.
画图 校对 批准
Consultant 顾问
高度 D
00
250
0
CHINA RESOURCE LAND LIMITED 华润置地
钢结构梁 ( 详结构专业图纸)
0 R1
75
100
650
Client 业主
R3
300
40
+11.35
1 7
2000
L T D .
+11.35
排水槽于顶棚两侧 高度 A ( 详设计院及幕墙顾问图纸)
银灰色铝合金外挂板 ( 幕墙顾问提供稳固图)
1000
1 6
连桥立面图 FOOTBRIDGE ELEVATION
1
( 详结构专业及幕墙顾问图纸)
2000
1 5
虚线所示为混凝土结构箱梁 ( 详见中交院图纸)
AL-01
2000
5260
钢结构柱 中灰色氟碳喷涂完成面
3 -
1 4
伸缩缝 ( 详设计院图纸)
" 3 1 6 发面" 不锈钢立柱及扶手 安全夹胶玻璃栏杆 ( 幕墙顾问提供稳固图及设计院审核)
185
1 3
6121
GL-10
1315
0 5
4500
80
250
0 3
1251
175 200
100
500
500 100
20
0 2
2000
1 . 有關制圖問題已通過 1 0 D E S I G N G質量管理 R O U P 體系的檢查和認証 2 . 有關一般註釋,縮寫,標示等說明,請參閱 TEN_16035_PH2_0003. 3 . 除特別註釋外,所有尺寸均以毫米為單位 4 . 所有圖紙需要結合所有相關建築、內部結構及工程技術 圖紙及說明 5 . 切勿直接從圖紙中量度尺寸,應以標註尺寸為準
8400 900
2000
註釋:
银灰色铝板竖向装饰条 ( 幕墙顾问提供稳固图)
175
250
0 1
-
2000
FACADE STUDIES / REVIT - ENSCAPE
註釋:
伸缩缝 ( 详设计院图纸)
2
1000
175 200
2000
1250
100
2000
5.
AL-01
350
2 -
-
1760
银灰色铝合金外挂板
4600
150
花池
185
1
4. 50
4.
5.
150
3.
虚线所示为建筑轮廓在上
5
THIS DRAWING ISSUE HAS BEEN CHECKED AND APPROVED IN ACCORDANCE WITH 10 DESIGN GROUP LTD. QUALITY MANAGEMENT. FOR GENERAL NOTES, SYMBOLS AND ABBREVIATIONS, REFER TO DRAWING TEN_16035_PH2_0003. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE STATED. ALL DRAWINGS HAVE TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL AND SERVICES ENGINEER'S DRAWINGS AND SPECIFICATIONS. DO NOT SCALE OFF THIS DRAWING.
650
2.
伸缩缝 ( 详设计院图纸)
6
AL-01
4600
银灰色铝合金外挂板 ( 幕墙顾问提供稳固图)
1000
U
THIS DRAWING ISSUE HAS BEEN CHECKED AND AL-01 APPROVED IN ACCORDANCE WITH 10 DESIGN GROUP 银灰色铝板竖向装饰条 LTD. QUALITY MANAGEMENT. FOR GENERAL NOTES, SYMBOLS AND ( 造型高度定位详见下方装饰条定位表) ABBREVIATIONS, REFER TO DRAWING TEN_16035_PH2_0003. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE STATED. ALL DRAWINGS62067 HAVE TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL AND SERVICES ENGINEER'S DRAWINGS AND 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 SPECIFICATIONS. DO NOT SCALE OFF THIS DRAWING.
100
2000
1.
最少
AL-01 2000
3.
Notes:
1250 100
SETTING UP SECTIONAL DRAWING OF OVERHEAD WALKWAY
Project Stage 項目階段
400
350 200
Façade Detailed Design 外立面深化设计
连桥地砖完成面 100
150
1100
滴水线
Project Title 项目名稱
天花灯光预留位置 ( 详灯光顾问图纸)
1000
Hengqin MIXC World Project (Phase 2)
横琴万象世界项目(二期) Drawing Title 圖紙名稱
FOOTBRIDGE ELEVATION & SECTION 连桥立剖面图
AL-01
银灰色铝板竖向装饰条 ( 幕墙顾问提供稳固图) 350
350
1:150
香港湾仔駱克道4 号 1 东城大厦3樓 3F, East Town Building 41 Lockhart Road Wanchai, Hong Kong T +852 3975 2010 W www.10design.co
钢结构柱 PODIUM 中灰色氟碳喷涂完成面
Project No. Drawing No. 项目編號
16035 Scale @ 1:1
© Copyright 2010-2013 10 Design Ltd. All Rights Reserved
图号
TEN_16035_PH2_BR_1002
Rev. 修订 A
\\192.168.0.47\p\project\16035_china resources_zhuhai hengqin mixed-use\02_cad\01_ar\01_sheets\ten_16035_ph2_br_1002.dwg
( 详结构专业及幕墙顾问图纸)
700 350
Scale at A1 比例
建议排水管稳藏于钢结构内 铝板竖向装饰条造型定位表 3 ( 详设计院图纸) BRIDGE CONNECTION TO FINS SETTING-OUT CHART FOOTBRIDGE VERTICAL
350
250
250
GL-10
" 3 1 6 发面" 不锈钢立柱及扶手 安全夹胶玻璃栏杆 ( 幕墙顾问提供稳固图及设计院审核)
虚线所示为竖向装饰条钢结构支撑 ( 幕墙顾问提供稳固图)
-
2019-11-15 BRIDGE FACADE DETAIL DESIGN INTENT
Description
Rev. Date 修订 日期
描述
DC
JP
MAY
DR. CH.
AP.
画图 校对 批准
EQ EQ
2000
建议地砖完成面于连桥防水层上 ( 详设计院及景观设计图纸)
1315 750
花池
150
200 100
500
450 100
100 Client 业主
L2 F.F.L. 15
100 60
00
Project Stage 項目階段
1000
435
00
R5
AL-01
1000
50
50 90
1250
CHINA RESOURCE LAND LIMITED 华润置地
混凝土结构箱梁 ( 详见中交院图纸)
R1
00
R1
500
100
AL-01
银灰色铝合金外挂板 ( 幕墙顾问提供稳固图)
50
300
425
300
1000
L2 F.F.L.
500 50
银灰色铝合金外挂板 ( 幕墙顾问提供稳固图)
V 型混凝土结构柱( 已施工) ( 详见中交院图纸)
滴水线
排水管沿结构柱则面凹槽安装 ( 详设计院图纸)
2 -
连桥内部局部立面图 Rhino, CAD
3 -
PARTIAL ELEVATION
Façade Detailed Design 外立面深化设计 Project Title 项目名稱
Hengqin MIXC World Project (Phase 2)
连桥放大剖面图 FOOTBRIDGE ENLARGED SECTION
Drawing Title 圖紙名稱
FOOTBRIDGE DETAIL 连桥局部平立剖面图 Scale at A1 比例
1:25
香港湾仔駱克道4 号 1 东城大厦3樓 3F, East Town Building 41 Lockhart Road Wanchai, Hong Kong T +852 3975 2010 W www.10design.co Project No. Drawing No. 项目編號
16035 Scale @ 1:1
CONNECTING WALKWAY
横琴万象世界项目(二期)
550
FOOTBRIDGE INTERNAL SKETCHUP, CAD, HAND DRAWING, EXCEL
Consultant 顾问
1000
1315
© Copyright 2010-2013 10 Design Ltd. All Rights Reserved
图号
TEN_16035_PH2_BR_1003
Rev. 修订 -
\\192.168.0.47\p\project\16035_china resources_zhuhai hengqin mixed-use\02_cad\01_ar\01_sheets\ten_16035_ph2_br_1003.dwg
REVIT, ENSCAPE, CAD, INDESIGN
GBP DRAWINGS / REVIT
AMENITIES STUDIES / REVIT - ENSCAPE
CURTAIN WALL STUDIES /SKETCH
MLP + SHOPPING CENTRE
MLP + TRANSIT ORIENTED DEVELOPMENT
PROJECT : COFCO X2 SHOPPING CENTRE, HAIDIAN, BEIJING
PROJECT: OCT GUISHAN STATION RETAIL DEVELOPMENT, FUJIAN, PRC
STAGE : CONCEPT DESIGN (COMPETITION)
STAGE : CONCEPT TO SCHEMATIC DESIGN
USES: LEISURE, RETAIL
USES: OFFICES, RESIDENTIAL, RETAIL, LEISURE
SEPT 2019
JUNE 2020- JULY 2020 / A PART OF DESIGN TEAM
01
DIAGRAM AND GRAPHICS LAYOUT
02
PHYSICAL MODEL
01
COLLATING SUBMISSION REPORTS
02
PLANNING AND AREA CALCULATION
Assisted in graphical representation of retail plans, blocking plans and di-
Physical model building with 3D printed counterparts accompa-
Role: Complie submission report layouts and content (concept im-
Role: Assisted with the developing blocking plans, in terms of
agrams to clearly represent planning layouts of open areas /retail street,
nied with hand cut site base.
ages/diagram, design, planning) according to the company's image
presentation graphics and report findings of shops that do not
of creating riverside entertainment and retail desintination.
have sufficient areas after the incorperation of M&E facilities.
intended circulatory flow and MEP Counterparts.
PHOTOSHOP, ARCHITECTURAL MODEL MAKING
00
MASTERPLAN REVITALIZATION OF CHATHAM HISTORIC DOCKYARD 2018
ACADEMIC WORKS
PROJECT NO.
01
MIXED-USE, ENTERPRISE CENTRE (PUBLIC FACILITY) A PASSAGEWAY TO THE PAST
" P L A N T I N G S E E D S O F V I TA L I T Y. "
" S H A P I N G N E W S T O R I E S AT S T I L L WAT E R S . "
INDIVIDUAL PROJECT, 2018
02
LOW-RISE, RESIDENTIAL, COMMUNITY COLLECTIVE DWELLING A CO-DEPENDENT LIVING
" S TAC K E D D W E L L I N G S B Y T H E C R E E K . "
INDIVIDUAL PROJECT, 2017
HOUSING DESIGN FOR DEMENTIA PATIENTS- PUBLIC HOUSING, EXCEPT FROM WGO INVENTOR COMPEITION 03
PLIGRISM - H20, IDEAS FORWARD 24 HOURS COMPETITION ENTRY COMPETITION (TEAM OF 3), 2017
STATEMENT
00 PROJECT NATURE: REVITALIZATION - MIXED USE ENTERPRISE CENTRE LOCATION: CHATHAM HISTORIC DOCKYARD
The importance of weaving a building with its contextual language and responding to the rhythm of patterned human activity is a trait I value. To me, design changes and evolves with us. I have aims to explore designs in sync with technological progression and schemes that are adaptable to our future needs, striving to further discover the potentiality of impactful positive spaces.
A PASSAGEWAY TO THE PAST
MASTERPLAN
Uniting different parts of the dockyard at one point
REINVENT - REDISCOVER - REINVIGORATE
RE-IMAGINING
Existing Change of circulation
Chatham Dockyard to enhance & Invigorate the area.
Frontages
Change of land-use Existing
Riverside Social Space
New
Expansion and addition to the diverse functions of existing buildings. Small one storey buildings separate the public square into two while retaining the view for both commissioner’s house and the admiral’s office
Central Node Student Hub
Social hub area extruded building to invite people to enter, and separates the open square into two parts, the turn into the dockyard provides a interesting spacial shift
Central pond, is meant to reflect the previous mast pond
Central node, merging of functions, and gives a contrast in scale. Buildings in the centre relatively smaller. Leisure bridge will be beside a bell tower, it alerts visitors of time and directs people towards this area, like the chimneys of the sawmill
SHAPING NEW STORIES AT STILL WATERS Chatham Dockyard has constantly been changing. Many parts of paths, buildings and usage of the Dockyard in particular has been demolished, extended and rebuilt to cope with the change of use. Perhaps a new proposal can seek to rediscover old paths and artefacts and reinterpret them. This project attempts to embrace the rich surroundings of Chatham Historical Dockyard, and to ignite a conversation between the building and the context. Located between Medway River and the mast pond, it connects both water bodies and acts as a threshold to site. Organisation and movement throughout the building is driven by the masses of water.
PROGRESSION
PLAN
Development from several forms (elongated and centralized blocks) to a linear building with many integrated activities.
Plan development & model development
A long corridor connecting river Medway and the north mast pond. The corridor is intercepted by many activities and facilities, such as the event space, workspaces, cafe, lobby and road. The lobby is visually connected to the river, dry docks, mast pond and green area. This is all in hopes to introduce and lead users of the building to further explore the dockyard.
SPATIAL ORGANISATION Create strong spatial and visual interconnections between workspaces by creating shared spaces at intersecting points of workspace.
G/F
1/F
2/F
3/F
INTERIOR PERSPECTIVES
Internal spaces vary greatly. From rentable cubic 4m x 4m studios, shared work spaces and event space all intersecting an open atrium space. The environment is meant to encourage creativity, connection, and collaboration for all.
Pv panels
AC/DC inverter fuse box
Photovoltaics system
Heat pump unit
Distribution system
Ground Loop (Heat Exchanger)
Supply for WC flushing Rainwater storage Sand filter Distribution system
Pump Main tank
The exposed columns give a sense of variation and dynamism within shared spaces.
Reinterpretation of existing building layouts & structure
Ropery Building 1786-91
Exposed trusses and vastness of industrial buildings
Covered Walkways
With reference to the structure of Madrid airport.
TREE COLUMNS
02 PROJECT NATURE: RESIDENTIAL - COLLECTIVE DWELLING LOCATION: FAVERSHAM, UK
CO-DEPENDENT LIVING A project located in Faversham, downstream of the Faversham river. The aim is to create a residential hub which encompasses varying groups. Families, young professionals and elderly. This project utilizes the idea of assembling modular blocks in varying ways to achieve an interconnected neighbourhood where structures, homes and pathways meet at different points.
SITE ANALYSIS
HOUSING PROTOTYPES
TYPE 2 HOUSING
TYPE 2 HOUSING
Studio + Home Target group: business start-ups
3 Storey House Target : Families
Ruam-plan inspired spaces to create differnt scaled rooms and sectioned off spaces for separate use.
TYPE 3 HOUSING
Single storey Target: Elderly families and those with mobility difficulties
GFA 64.5m2
GFA 115m2
TYPE 2 HOUSING SECTION: A LOOK INTO THE STACKING OF LEVELS
ENVIRONMENTAL STRATEGIES
RAISED PATHWAYS
SCHEDULE OF ACCOMODATION
VIEWS THROUGHOUT THE COMMUNITY
Public gathering space for workshops and events.
03 WGO SOCIAL INNOVATOR: HOUSING FOR ELDERLY WITH DEMENTIA,HK
04 IDEAS FORWARD 24 HOUR COMPEITION