The Avalon Hotel

Page 1

HOLLY MUELLER NICOLE GUENTHER HOTEL DESIGN COMMERCIAL DESIGN I FALL 2020 MOORMAN


2

INDEX 01. Preliminary Design 02. Level One

15...Construction Documentation 18...Rendered Perspectivies

03. Double Bedroom

26.....Construction Documentation 30.....Rendered Perspectives

04. Suite

35.....Construction Documentation 38.....Rendered Perspectives

05. VIP Suite

44.....Construction Documentation 47.....Rendered Perspectives


3

PRELIMINARY PROCRESS


4

PROJECT OVERVIEW This existing hotel was built in Boston, Massachusetts in the 1950s and is in need of a top to bottom renovation. The area has been overdeveloped and lost commercial viability. We are in an attempt to bring a sense of life back into the area while also incorporating sustainable features to create a green enviornment. The Avalon will be a wonderful new addition to the area,


5

RESEARCH AND DEMOGRAPHICS The Avalon will be located in Boston, the capital of Massachuesetts.

Home to almost 700,000 residents

Sees almost 23 million visitors annually

Median household income is about $52,000

Third most densly populated city in the US


6

CONCEPT STATEMENT The concept for The Avalon was created by combining influences from Raphael and King Arthur. Raphael is an Italian painter and architect, best known for his Madonnas. King Arthur was a Britsh ruler in the fifth century, commonly known from his Knights at the Round Table and the legend of The Sword in the Stone. Taking elements from each of their time periods, we wanted to include feautures such as columns, crystal chandeliers, marble floors, solid woods, and rich colors. With a complimentary color scheme, including shades of green and red with gold accents.


7

CONCEPTUAL IMAGERY


8

SUSTAINABILITY FEATURES Materials & finishes have been warehoused for two weeks. Dual flush toilets and low flow shower heads have been included to help lower water consumption. Incorporation of biophilia to increase human health and well-being. Breakfast / restaurant will use locally farmed organic produce, poultry, fish, and meats. LED lighting takes energy efficiency into consideration. Bike Rental station for quality transportation to limit gas emissions. Ample amount of natural lighting. Within walking distance of local entertainment and attractions.


9

EXPLODED AXONOMETRIC


10

LEVEL ONE SPACE PLANNING BIKE RENTAL / CONCIERGE FAMILY RESTROMS CONFERENCE ROOMS GYM SINGLE ROOM BREAKFAST / DINING BAR LOUNGE / SEATING RECEPETION ENTRY


11

LEVEL THREE - SIXTEEN SPACE PLANNING VIP SUITE SUITE DOUBLE ROOM SINGLE ROOM ELEVATOR / STAIRS STORAGE CLOSET EMPLOYEE OFFICE VENDING / ICE


12

FIRE PROTECTION CHECKLIST Required Fire Protection

Existing

(yes or no)

Location in Building

(check those that apply)

Detection Systems: Smoke Detector/Alarms Fire Alarms Audio Systems Accessible Warning Systems

Quantities Required (Additional or new)

N/A Yes Yes Yes No

Ceiling Ceiling Ceiling Ceiling

Suppression Systems: Fire Extinguisher Standpipe Hose Sprinkler Systems Types of Sprinkler Heads Other:

Type of System Required

Additional Additional Additional New Standard Code

Yes Yes No Yes Yes

Lobby, Bar, Suites Kitchen Kitchen Ceiling Ceiling

Additional Additional New Additional Additonal


13

TILE SPECIFICATION SHEET General

1. Type of traffic expected: Heavy 2. Will tile be used on the stairs: No 3. Will there be concentrated traffic patterns: No 4. One-Way Traffic: No 5. Is plushness desired: No 6. Are employees walking on floor as part of daily work (i.e., retail, manufacturing, showroom, hospital): Yes 7. Will tile be exposed to direct sunlight: No 8. What kind of light will be used in the area: Natural; Incandescent 9. Has a budget been established: No

Healthy, Safety, and Comfort Factors Flammability

1. Will tile be used on the walls: Yes 2. Will tile be used on stairwell: No 3. Will tile be used on exit ramp: No 4. Will tile be used in a medical facility: N/A 5. Will fireplace or other open flame source be nearby: No 6. Is Hill-Burton federal funding to be used: No 7. Will sprinklers or other fire-prevention equipment be used in the area: Yes

Static

1. Is static control a necessity: No 2. Is static control for human comfort: No 3. Is static control for computer tape: No 4. Is static control for memory transmission machines: No 5. Is static control from heart monitoring equipment: No 6. Will there be some method of controlling humidity above 20 percent at 70 Degrees F: Yes 7. Will electric typewriters and metallic office equipment be used: No

Acoustics

1. Are airborne noises important to consider: Yes 2. Will impact noise reduction be important: No 3. Will area be used for public event or speeches: No 4. Will music listening be involved: No 5. Will a concentration of seating be prevalent: Yes

Installation

1. Type of floor: Tile 2. Grade Level: Ground Level 3. Does the floor contain utilities: No 4. Type of building: Existing 5. Is carpet presently on floor: No 6. Will old tile be removed: Yes 7. Will this disrupt operations: No 8. Could a direct cement (no pad) installation be used: N/A 9. Is pattern an important feature in the design criteria: Yes 10. Will mechanical access to trench header ducts be required: No 11. Will portions be fastened to the floor: Yes 12. Will there be wheeled traffic: No 13. Will wheeled traffic move directly from street to tile: No 14. In office areas, will chairs have casters: No


LEVEL ONE


15

LOBBY DIMENSION FLOOR PLAN

SCALE NOT SPECIFIED FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS


16

LOBBY TITLE REFLECTED CEILING PLAN TARAXACUM DIMMABLE PENDANT BY FLOS

PARALLEL CYLINDER PENDANT LIGHT BY HENNEPIN MADE

ACOUTSIC CEILING TILE

BEETHOVEN CHROME CRYSTAL CHANDELIER BY MEYDA

PENDANT A

COFFERED CEILING TILE

CUSTOM LIGHT

PENDANT B

RECESSED CAN LIGHT BY DALS LIGHTING

SCALE NOT SPECIFIED FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS

CRYSTAL CHANDELIER


17

TITLE LOBBY ELEVATIONS RECEPTION - NORTH WALL

18' - 0"

22' - 0"

www.autodesk.com/revit

Consultant Address Address Address Phone

-

Consultant Address Address Address Phone

Consultant Address Address Address Phone

4' - 0"

Consultant Address Address Address Phone

Consultant Address Address Address Phone

20' - 0" 1' - 5 1/2"

LOBBY - SOUTH WALL

17' - 7 1/2"

Description

Date

-

2' - 11"

22' - 0"

No.

-

Owner 9' - 6 1/2"

2' - 5 3/4"

9' - 6 1/2"

2' - 7"

9' - 6 1/2"

2' - 8"

9' - 6 1/2"

2' - 5 1/2"

9' - 6 1/2"

2' - 7"

9' - 6 1/2"

SCALE NOT SPECIFIED FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS

Project Name


18


19


20


21


22


23


24


LEVEL THREE - SIXTEEN DOUBLE BEDROOM


26

DIMENSIONED TITLE FLOOR PLAN 22' - 2 11/16" 16' - 2 11/16"

6' - 0"

3' - 0" 2' - 6"

1

8' - 6"

13' - 8 11/16"

23' - 6"

E5

3' - 0"

-

21' - 0"

4' - 0"

E6 E7

E8

4' - 8"

BATH

3' - 4"

8' - 0"

2

3

5' - 9"

2' - 9"

6' - 7 11/16"

8' - 6" SCALE NOT SPECIFIED FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS

5' - 2"

13' - 8 11/16" 22' - 2 11/16"

1' - 11"

23' - 6"

BDRM

4' - 0"

15' - 6"

ENTRY


27

TITLE FURNISHINGS PLAN

SCALE NOT SPECIFIED FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS


28

REFLECTED TITLE CEILING PLAN

FLOS PENDANT

PEDANT

COFFERED CEILING TILE

RECESSED LIGHTING

M

SCALE NOT SPECIFIED FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS


29

TITLE ELEVATIONS BEDROOM - WEST WALL

SCALE NOT SPECIFIED FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS

VANITY - WEST WALL


30


31


32


33


LEVEL THREE - SIXTEEN SUITE


35

TITLE DIMENSION FLOOR PLAN 27' - 3"

3' - 6"

9' - 9"

8' - 9"

7' - 6"

13' - 8"

3' - 0"

KITCHEN

1 18' - 6"

ENTRY

18' - 9 7/8"

2

8' - 6 11/16"

BDRM BATH

3

5' - 9"

SCALE NOT SPECIFIED FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS

3' - 0"

27' - 6 7/8"

8' - 9"

4' - 0"

20' - 0 7/8"

27' - 6 7/8"

11' - 6 5/32"

8' - 9"

3' - 11"

5' - 2" 27' - 3"

9' - 5"


36

FURNISHINGS TITLE PLAN

SCALE NOT SPECIFIED FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS


37

TITLE REFLECTED CEILING PLAN

PENDANT

COFFERED CEILING TILE

FLOS PENDANT

RECESSED LIGHTING

M

SCALE NOT SPECIFIED FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS


38


39


40


41


42


LEVEL THREE - SIXTEEN VIP SUITE


44

TITLE DIMENESIONED FLOOR PLAN 56' - 6 7/16" 22' - 5 29/32" 9' - 3 19/32"

13' - 2 5/16"

34' - 0 9/16" 3' - 0"

17' - 8 1/4"

13' - 4 5/16"

12' - 10"

BDRM1 3' - 0"

16' - 11 3/8"

KITCHEN

BATH1

LIVING 3' - 0" 11' - 6" 3' - 0"

21' - 10 5/16"

BDRM2

BATH2 4' - 0"

3' - 3 13/16"

18' - 11 23/32" 22' - 3 9/16"

13' - 6" 35' - 9 9/16"

SCALE NOT SPECIFIED FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS

57' - 7 27/32"

13' - 6"

13' - 3"

3' - 0" 3' - 8" 2' - 6"

40' - 11 3/8"

5' - 2"

14' - 10 3/8"

3' - 0"

DINING

8' - 0"

24' - 11 3/8"

4' - 0"


45

FURNISHINGS PLAN

SCALE NOT SPECIFIED FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS


46

REFLECTED CEILING PLAN

FLOS PENDANT

CHANDELIER

SCALE NOT SPECIFIED FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS NOTE: CEILING IS COFFERED

RECESSED LIGHTING


47


48


49


50


51