Costa final boards

Page 1

HEART FULL

AC

PROFESSOR HAWK INTEGRATED DESIGN STUDIO SPRING 2014

AYOTTE &COSTA

DESIGN INTENT THE IDEAS OF THE WAREHOUSE DISTRICT ARE CONCEPTS IN WHICH THIS PROJECT WISHES TO INSTILL IN THE COMMUNITY AS WELL AS THE BUILDING. THE IDEAS OF DINING, GROCERS AS WELL AS STORES FOR RETAIL ARE THE IDEAL IMAGES THE DISTRICT OFFERS AND THE IMAGES THAT WILL REFLECT IN THE BUILDINGS PROGRAM. THE CONCEPT OF PROGRAM IN, WHICH THE BUILDING WILL PERFORM, IS SOLELY BASED ON THE IDEA OF JOURNEY. FROM ENTRY TO ARRIVAL TO EXIT THERE IS A JOURNEY. THE PROGRAM WITHIN THE BUILDING IS TO BE A JOURNEY; FROM CHECK-IN (WAITING), TO SURGERY, TO RECOVERY AND THE NEW AFTER LIFE. SOME OF THE PIECES THAT WILL ENFORCE THIS JOURNEY ARE THE ACTIVE STAIRS THAT CONNECTS EACH FLOOR AND PROGRAM TO ONE ANOTHER. THE IDEA OF THE PROGRAMS AS WELL AS THE ACTIVITY WITHIN THE STAIR IS TO IMPOSE DEPENDABILITY FROM ONE PROGRAM TO ANOTHER. EACH FLOOR AND FLOOR PROGRAM IN SECTION RELY AND DEPEND ON ONE ANOTHER FOR JOURNEY PURPOSES AND THE NEW LIFE IN WHICH THEY WANT TO IN PART ON. THE USERS OF THE BUILDING ARE HERE TO LEARN HOW TO LIVE A BETTER, SAFER AND HEALTHIER LIFESTYLE. USERS WILL LEARN HOW TO GROW AND HARVEST THEIR OWN HERBS, VEGETABLES AND FRUITS AS WELL AS LEARN HOW TO PREPARE FINE MEALS WITH THE ALL-NATURAL SMART FOODS GROWN ON SITE.

WEST 9TH ST

WEST 6TH ST

WEST 9TH ST

JOHNSON CT

655’-0”

0' - 0"

WEST ST CLAIR AVE

SITE

0'

40'

100'

200'

0

SKY BLUE: RESIDENTIAL AND COMMERCIAL GREEN: PUBLIC OUTDOOR GREEN SPACES

20

SKY BLUE: RESIDENTIAL AND COMMERCIAL 3D BUILDINGS GREEN: PLANTED STREET SCAPE ORANGE: PROPOSED BUILDING LOCATION

40

60

80

ELEVATED STREET SHOT OF THE PROPOSED SITE

INTENT & SITE

WEST ST CLAIR AVE


FORM ONE- MASS MODEL

FORM TWO-MASS MODEL

FORM THREE- MASS MODEL

FORM FOUR- PLATE MODEL

SOUTH ELEVATION

NORTH ELEVATION

EAST ELEVATION

WEST ELEVATION

VERTICAL GREEN WALL

ROOF DRAIN-WATER COLLECTION WIND TURBINE TUNNEL SPA RECOVERY GROUND FLOOR

SIXTH

-EIGHTH

ACTIVE STAIR

MEDICAL SUITES

KINETIC FACADE

CORPORATE OFFICES

SECOND FLOOR

NINTH -ELEVENTH FLOOR

THIRD -FIFTH FLOOR

ROOF

11 STORY ATRIUM MARKET/CAFE RESTAURANT RETAIL SHOPS

ARCHITECTURE

MEDICAL INTEGRATED FLOOR


MIND

SUMMER SUN

BODY

WIND TUNNEL TURBINE NIGHT FLUSH AIR PREVAILING WINDS SW WATER CHASE- COLLECTION

INTEGRATED FLOOR

WINTER SUN KINETIC FACADE ACTIVE STAIR

CLEAN AIR

VENTILATED AIR VERTICAL GREEN WALL

HVAC

DESIGN SYSTEMS AND PERFORMANCES THIS DIAGRAM SHOWS HOW THE SYSTEMS ARE INTEGRATED. BY HAVING CHASES AND SHAFTS THAT WORK AS DISTRIBUTION AREAS THROUGHOUT THE BUILDING, WE ARE ABLE TO CREATE A UNIFORM INTEGRATION. EACH SYSTEM OVERLAPS AND WORKS WITH THE OTHER IN THE SAME AREAS OF THE BUILDING. BY HAVING AN INTEGRATED SYSTEM, WE ARE ABLE TO HAVE A MORE EFFICIENT BUILDING, WHILE KEEPING THE COMFORT OF THE TENANTS IN MIND.

STRUCTURE

BY HAVING THE HIGH PERFORMANCE MECHANICAL SYSTEMS AS WELL AS LIGHTING FIXTURES THE BUILDINGS EFFICIENCY WILL BE SET TO A HIGHER STANDARD. WITH MINIMUM DESIGN COST AND MINIMUM PIPING/DUCTING IT WILL ALLOW FOR THE BUILDING TO SAVE MONEY AND HAVE BETTER EFFICIENCY USE. THE BUILDING ENERGY USE INTENSITY IS A FACTOR DETERMINED BY THE AMOUNT OF ENERGY THAT THE BUILDING USES AS WELL AS CAN RETURN BACK. THE HEARTFULL FACILITY ALSO COLLECTS AND TRANSFORMS ENERGY THAT IT GETS FROM THE WIND TURBINE TUNNEL AS WELL AS FROM THE KINETIC FAÇADE. THE SOLAR PANELED SPANDREL GLASS AND THE PV PANELED FRAMING MATERIAL ALSO COLLECTS SUNS RAYS AND TRANSFORMER THE ENERGY INTO USABLE POWER FOR THE BUILDING.

PLUMBING

THE FACILITY ALSO HAS UNIQUE ATRIA THAT IS 11 STORIES TALL. WITHIN THE ATRIA THERE IS A VERTICAL GARDEN THAT HELPS KEEP THE AIR CLEAN AS WELL AS DEAL WITH THE HUMIDITY WITHIN THE BUILDING. TO HELP PREVENT POOR AIR QUALITY DURING THE EVENING THE ATRIUM HAS A NIGHT FLUSH WINDOW. ONE OF THE MAJOR ASPECTS TO THE BUILDING AND THE EFFICIENCY OF THE BUILDING IS THE KINETIC FAÇADE. THE KINETIC FAÇADE IS CONSIDERS A DOUBLE ENVELOPE STRUCTURE. THE FAÇADE IS MADE UP OF TRANSLUCENT METAL, VIBRO WIND PANELS, PIEZOELECTRIC FRAMING PLATES AND METAL CONNECTION BRACKETS. THE FAÇADE MOVES AND TRANSFORMS AS WINDS RUN THROUGH THE DIFFERENT PANELS. AS THE PANELS MOVE AND VIBRATE THE FRAMING PLATES COLLECT THE VIBRATIONS, WHICH ARE THEN STORED AND TRANSFORMED INTO USABLE ENERGY.

LIGHTING

MAKEUP OF KINETIC FACADE

DESIGN PLAN

10'

20'

40'

80'

DESIGN SYSTEMS

0'


GENERATOR ROOM EQUIPMENT ROOM TECH STATION CATH LAB COUNSELING

CONTROL ROOM PREP ROOMS

BREAK TABLE

VERTICAL GARDEN WAITING ROOM RECOVERY ROOM HVAC ROOM TENANT METER HEALING GARDEN

WAITING ROOM RECHARGEABLE AREA NURSE STORAGE NURSE STATION ACTIVE STAIR RECOVERY ROOM

ABOUT THE INTEGRATED FLOOR INTEGRATION IS THE COMBINATION OF ALL THE DIFFERENT PARTS AND PIECES OF A PROJECT COMING TOGETHER AND FORMING A SYSTEM, A SYSTEM IN WHICH WILL RUN AND OPERATE THE FACILITY. IN THIS PROJECT THE INTEGRATED FLOOR IS THE NINTH FLOOR. THE REASON FOR CHOOSING THE NINTH FLOOR IS BECAUSE IT IS ONE OF THE PROGRAMED MEDICAL SUITES. THIS FLOOR CONSISTS OF DESIGNATED WAITING AREAS, PREP ROOMS, IN-OUT PATIENT ROOMS, RECOVERY, AND COUNSELING OFFICES. EVERY SYSTEM FROM PLUMBING, HVAC, AND LIGHTING IS DESIGNED TO KEEP THE PATIENTS, EMPLOYEES AND GUEST FEEL COMFORTABLE DURING THEIR JOURNEY AND EXPERIENCE WITHIN THE BUILDING. WITH THE MULTIPLE SYSTEMS ONE CAN SEE HOW EACH WORKS WITH ONE ANOTHER AS WELL AS HOW THEY FIT TOGETHER IN THE SMALL PLACES WHERE THEY ARE STORED. THE FLOOR ALLOWS VISITORS TO EXPERIENCE VIEWS OUT OF THE BUILDING WHICH IN RETURN GIVES THE PEOPLE A BEAUTIFUL SCENE OF DOWNTOWN CLEVELAND. THE NINTH FLOOR ALSO ALLOWS ITS OCCUPANTS TO FEEL THE NATURISTIC FEELING OF BEING OUTDOORS WHILE REALLY BEING INDOORS. EACH OF THE SPACES IS DESIGNED TO REFLECT AND RELY ON ONE ANOTHER AS THE TAKE THE JOURNEY OF A BETTER, HEALTHIER LIFESTYLE. THE JOURNEY TO THIS BETTER LIFE STARTS ON THIS FLOOR AND IS THE KEY TO SUCCESS.

COUNSELING OFFICE

0'

10'

20'

40'

80'

ABOUT THE INTEGRATION OF SYSTEMS6

7

INTERSTITIAL SPACE NARRATIVE 0'

10'

20'

40'

THESE SECTIONS SHOW HOW OUR INTEGRATED 80' FLOORS WORKS TOGETHER IN A SECTION CUT. THE SPACE BETWEEN THE CEILING AND THE FLOOR ABOVE MUST HOLD PLUMBING, HVAC, STRUCTURE, AND ANY ELECTRICAL FOR THAT SPECIFIC FLOOR. THE FOLLOWING IS THE ORDER IN WHICH EACH ITEM IS STACKED (BOTTOM-TOP): 1) ELECTRICAL (also sprinklers) 2) PLUMBING 3) HVAC 4) STRUCTURE

OUT PATIENT WAITING ROOM

BY LOOKING AT A SECTION OF THIS INTERSTITIAL SPACE, ONE CAN TELL HOW THE COMPONENTS OF THIS INTEGRATED BUILDING LIVE AND WORK TOGETHER. 0

1

2

3

4

5

2'

4'

6

8'

7

Level 10 141' - 0"

Level 9 126' - 0"

RECOVERY ROOM 0'

2 2

3

3

4 5 6 7

4

8

5 6

7 8 9 10 11 12

WEST/SOUTH WALL SECTION 1:GIRDER 2:RAISED CEILING CONNECTION 3: CEILING 4: STUCCO FINISH 5:DOUBLE GLAZE WITH 50% TINT 6: FINISHED FLOOR 7: AIR SPACE 8: 6” METAL DECKING 9: 12” SHINGLE ROOF 10: ALUMINUM CASEMENT FRAMING 11: TRANSLUCENT GLASS PANELS 12: EXTERIOR CONNECTION

EAST WALL SECTION 1:GIRDER 2:RAISED CEILING CONNECTION 3:CEILING 4:GYPSUM BOARD 5:BATT INSULATION 6:AIR SPACE 7:CAVITY 8:TRIPLE GLAZED PANEL 9: CARPET 10:FINISHED WOOD FLOOR 11:CONCRETE FLOOR SLAB 12:STUCCO 13:SPANDRELS PANEL

9 10 11 12

13

8'

16'

32'

INTEGRATION

1

1

4'


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.