2040 LONG RANGE TRANSPORTATION PLAN FINAL REPORT
PATHFORWARD2040.COM
Path Forward 2040 Long Range Transportation Plan
EXECUTIVE SUMMARY: INVESTING IN OUR FUTURE T HE P ATH F ORWARD 2040 L ONG R ANGE T RANSPORTATION P LAN PROPOSES NEW STRATEGIES AND PROJECTS TO ACT BOLDLY TO DEFINE THE TRANSPORTATION INVESTMENTS THAT WILL SHAPE OUR
COMMUNITY ’ S FUTURE FOR DECADES TO COME . North Florida, like many great regions, began as a hub for commerce and transportation. Our six county region consisting of Baker, Clay, Duval, Nassau, Putnam and St. Johns Counties consists of an area of over 3,900 square miles and 1.4 million citizens. It includes some of our nation’s first ports, cities and roads. Our history as a transportation center shaped our region’s past and will drive our future.
foundation for that process through the year 2040 that will meet the challenges of today’s congestion and tomorrow’s growth. Every five years, the North Florida Transportation Planning Organization (TPO) updates the region’s Long Range Transportation Plan (LRTP) to guide decision making and investment in our transportation system. Transportation projects must be included in the plan to receive state and federal funding, and all projects in the plan must have the projected cost and funding source identified. The plan is required to have at least a 20-year horizon and address major road, transit, freight, bike and pedestrian needs. Since the 2035 update was completed in 2009, we’ve experienced changes in our economy that affect how we live, travel and pay for transportation improvements. The LRTP proposes new strategies and projects to act boldly to define the transportation investments that will shape our community’s future for decades to come. However, our needs greatly exceed the anticipated revenues. In today’s dollars we have more than $27 billion of needs versus $7 billion in funding. Considering inflation over the 22-year plan horizon, those needs increase to $46 billion with only $14.8 billion in revenues available.
Roads, bridges, airports, railroads and seaports deliver the goods we consume each day. About 160 million tons of freight are transported throughout the region by truck, rail, air and water each year. These activities are a major engine driving our economy. But, our future as America’s Logistics Center is in danger because of traffic congestion. Traffic congestion slows the movement of people and goods that makes this region vital and prosperous. Every day we travel to work, to school, for shopping and recreation. By the year 2040, we’ll have nearly 1.9 million residents. Our region will grow by approximately 600,000 people, 265,000 households and 300,000 jobs. This growth in population will significantly increase the demand for safe, reliable and accessible transportation. Not only will we have more demand for transportation, but the mobility needs of our residents are changing too. For many, access to transit and the ability to walk to work or shop may be more important than driving. Transit use is on the rise and our residents have told us they want more access to reliable and efficient public transportation. Our older generation needs more choices for personal mobility that do not rely on automobiles and younger generations are choosing more active lifestyles that include bicycles and walking. Concerns about the environment are also changing the way we travel with more travelers choosing alternative fuels and ridesharing options to reduce their carbon footprint.
To maximize our return on investment, our plan proposes strategies such as express lanes and transportation systems management and operations projects. Other strategic investments such as transit, context sensitive solutions and dedicated revenues for bicycle and pedestrian improvements will provide mode choices to enhance mobility and livability within the region. Investments in our multimodal systems to move freight will be the catalyst for continued economic prosperity to enhance our region’s competitiveness. After an extensive planning and community outreach process, the North Florida TPO adopted the LRTP November 13, 2014.
Building roads, transit and other transportation infrastructure doesn’t happen overnight. It takes years of planning and coordination and this plan forms the
This report summarizes the planning process and the adopted plan.
i
Path Forward 2040 Long Range Transportation Plan
ORGANIZATION OF THIS REPORT This report is organized as follows.
PART ONE: INTRODUCTION
Travel Demand Forecasting
This section sets the stage for the plan by describing our region and providing a review of trends and conditions. A summary of the organization of this report is also provided to assist the reader in identifying the key elements of the plan and major components.
A summary of the anticipated growth and future demand for transportation services is provided that is based on the developing a regional travel demand forecasting model used in the planning process.
Freight and Intermodal Systems
PART TWO: PLANNING PROCESS
As part of the development of the LRTP, existing commodity flows and future demand for freight transportation systems were developed. This section provides a summary of that analysis.
Part Two outlines the planning process and is organized as follows:
Goals and Objectives This section summarizes the goals, objectives, performance measures and implementing polices that were adopted as part of the planning process.
Financial Resources A forecast of the financial resources anticipated to be available for use in the plan is summarized in this section. The plan considered federal, state and local resources that are anticipated to be available through the planning horizon of 2040.
Consistency with Federal and State Requirements This section outlines the federal and state metropolitan planning requirements and demonstrates the consistency of the plan with these requirements.
Environmental Considerations This section summarizes the process used to consider the potential environmental consequences of the plan through the Efficient Transportation Decision Making Process established by the FDOT. A summary of the systemwide approach to mitigation of projects is also identified.
Safety and Security This plan builds on the North Florida TPO’s Strategic Safety Plan which was adopted in 2012 and provided a foundation for identifying the needs and priorities for safety investments.
Public Involvement
Congestion Management Process
The public involvement process used as part of the plan and the involvement results are summarized as part of this report. The section also summarizes the actions that were used to engage the underserved and address the federal requirements for Environmental Justice and Title VI of the Civil Rights Act.
The North Florida TPO maintains a Congestion Management Process which identifies trends and conditions for congestion within the area, congested facilities and strategies and tactics for addressing that congestion. This section summarizes the use of the Congestion Management Plan in the planning process.
Plan Alternatives
Completed and Committed Construction
A summary of the plan alternatives considered as part of the planning process is summarized.
As a foundation of the planning process, this plan documents the major projects that were completed since adopting the 2035 LRTP and the projects with commitments to construction within the next five years as part of the Transportation Improvement Program, the Florida Department of Transportation’s (FDOT’s) Adopted Work Program and local agency capital improvement plans. ii
Path Forward 2040 Long Range Transportation Plan
Referenced Documents
PART THREE: ROAD CAPACITY
To supplement this report more detailed information is provided in the following technical memoranda and appendices provided on a DVD included with this report.
Within Part Three, a summary of the needs and projects adopted as part of the Cost Feasible Plan are summarized. The following plan elements were identified:
Needs Plan Cost Feasible Plan - Strategic Intermodal System Funded Projects - Other Federal and State Funded Projects - Toll Funded Projects - Locally and Privately Funded Projects
PART FOUR: MULTIMODAL PROJECTS This section describes the multimodal projects identified in the plan that support providing mobility choices within the region. They include
Transit Capacity Programs Active Transportation 1 Freight and Intermodal Planning Projects
A. Strategic Safety Plan B. Congestion Management Process and Annual Mobility Report C. Federal and State Revenue Forecast D. Efficient Transportation Decision MakingProject Summary E. FDOT Mitigation Plan and St. Johns River Water Management District Permitting Process F. Jacksonville to Atlanta High Speed Rail Corridor G. Jacksonville to Tampa Corridor of the Future H. Project Prioritization Scores I. Regional ITS and TSM&O Master Plan J. AASHTO Report on National Connected Vehicle Field Infrastructure Footprint Analysis K. Needs Plan Project Costs and Purpose and Need Statements L. Cost Feasible Plan Master Project List
PART FIVE: TRANSPORTATION SYSTEMS MANAGEMENT, OPERATIONS AND MAINTENANCE The management and operations of the transportation system is essential for ensuring we get the most from our investments and can adequately maintain the system consistent with our preservation goals. The following elements are discussed
Technical Memorandum #1 – Public Involvement Plan Technical Memorandum #2 – Goals and Objectives Technical Memorandum #3 – 2030 and 2040 Socioeconomic Data and Land Use Forecasts Technical Memorandum #4 – Model Validation Report Technical Memorandum #5 – Freight Modeling Technical Memorandum #6 – Financial Resources Technical Memorandum #7 – Existing Plus Committed Projects Technical Memorandum #8 – Needs Plan Technical Memorandum #9 – Context Sensitive Solutions Guidelines Technical Memorandum #10 – Cost Feasible Plan
Safety and Security Transportation Systems Management and Operations Autonomous and Connected Vehicles Operations and Maintenance
Part Six: Plan Summary Part Six provides a summary of the plan addressing measures of effectiveness and demonstrates the balance achieved in the plan from a modal and geographic equity distribution by county.
1
Active Transportation Projects include bicycle and pedestrian projects and mobility enhancements to support transit. iii
Path Forward 2040 Long Range Transportation Plan
CONTENTS Executive Summary: Investing in Our Future --------------------------------------------------------------------------------------------- i Organization of this Report ------------------------------------------------------------------------------------------------------------------- ii Contents ------------------------------------------------------------------------------------------------------------------------------------------ iv List of Figures------------------------------------------------------------------------------------------------------------------------------------- v List of Tables ----------------------------------------------------------------------------------------------------------------------------------- viii List of Acronyms --------------------------------------------------------------------------------------------------------------------------------- x Study Participants ------------------------------------------------------------------------------------------------------------------------------ xi Part One: Introduction Planning Process Overview ---------------------------------------------------------------------------------------------------------- 1-1 Regional Overview --------------------------------------------------------------------------------------------------------------------- 1-3 Part Two: Planning Process Goals, Objectives, Performance Measures and Implementing Policies --------------------------------------------------- 2-1 Consistency with Federal and State Plans ---------------------------------------------------------------------------------------- 2-9 Safety and Security------------------------------------------------------------------------------------------------------------------- 2-21 Congestion Management Process ------------------------------------------------------------------------------------------------ 2-25 Completed and Committed Construction -------------------------------------------------------------------------------------- 2-31 Travel Demand Forecasting -------------------------------------------------------------------------------------------------------- 2-39 Freight and Intermodal Systems -------------------------------------------------------------------------------------------------- 2-47 Financial Resources ------------------------------------------------------------------------------------------------------------------ 2-65 Environmental Considerations ---------------------------------------------------------------------------------------------------- 2-69 Public Involvement------------------------------------------------------------------------------------------------------------------- 2-75 Plan Alternatives-------------------------------------------------------------------------------------------------------------------- 2-107 Part Three: Road Projects Needs Plan ------------------------------------------------------------------------------------------------------------------------------- 3-1 Cost Feasible Plan -------------------------------------------------------------------------------------------------------------------- 3-15 Strategic Intermodal Systems Funded Projects ------------------------------------------------------------------------------- 3-33 Other Federally and State Funded Projects ------------------------------------------------------------------------------------ 3-37 Toll Funded Projects ----------------------------------------------------------------------------------------------------------------- 3-45 Locally and Privately Funded Projects ------------------------------------------------------------------------------------------- 3-47 Part Four: Multimodal Projects Transit Capacity Programs ----------------------------------------------------------------------------------------------------------- 4-1 Active Transportation and Context Sensitive Solutions --------------------------------------------------------------------- 4-27 Freight and Intermodal Systems ------------------------------------------------------------------------------------------------- 4-53 Part Five: Systems Management, Operations and Maintenance Transportation Systems Management and Operations ----------------------------------------------------------------------- 5-1 Autonomous and Connected Vehicles ------------------------------------------------------------------------------------------ 5-11 Safety and Security------------------------------------------------------------------------------------------------------------------- 5-13 Operations and Maintence -------------------------------------------------------------------------------------------------------- 5-17 Part Six: Plan Summary Measures of Effectiveness ----------------------------------------------------------------------------------------------------------- 6-1 Balancing the Plan---------------------------------------------------------------------------------------------------------------------- 6-5
iv
Path Forward 2040 Long Range Transportation Plan Attachements and Appendices (on DVD) Technical Memorandum #1 – Public Involvement Plan Technical Memorandum #2 – Goals and Objectives Technical Memorandum #3 – 2030 and 2040 Socioeconomic Data and Land Use Forecasts Technical Memorandum #4 – Model Validation Report Technical Memorandum #5 – Freight Modeling Technical Memorandum #6 – Financial Resources Technical Memorandum #7 – Existing Plus Committed Projects Technical Memorandum #8 – Needs Plan Technical Memorandum #9 – Context Sensitive Solutions Guidelines Technical Memorandum #10 – Cost Feasible Plan A. B. C. D. E. F. G. H. I. J. K. L.
Strategic Safety Plan Congestion Management Process and Annual Mobility Report Federal and State Revenue Forecast Efficient Transportation Decision Making Project Summary FDOT Mitigation Plan and St. Johns River Water Management District Permitting Process Jacksonville to Atlanta High Speed Rail Corridor Jacksonville to Tampa Corridor of the Future Project Prioritization Scores Regional ITS and TSM&O Master Plan AASHTO Report on National Connected Vehicle Field Infrastructure Footprint Analysis Needs Plan Project Costs and Purpose and Need Statements Cost Feasible Plan Master Project List
v
Path Forward 2040 Long Range Transportation Plan
LIST OF FIGURES Figure 1-1. Summary of Major Plan Components and Milestones --------------------------------------------------------------- 1-2 Figure 1-2. North Florida TPO Region Map -------------------------------------------------------------------------------------------- 1-4 Figure 1-3. Strategic Intermodal System Regional ----------------------------------------------------------------------------------- 1-5 Figure 1-4. Strategic Intermodal Sysem Inset Map ---------------------------------------------------------------------------------- 1-6 Figure 2-1. Priroty Safety and Congestion Management Corridors ------------------------------------------------------------ 2-23 Figure 2-2. Completed and Committed Projects ----------------------------------------------------------------------------------- 2-32 Figure 2-3. Changes in Screenline Volumes from 2010 to 2040 ---------------------------------------------------------------- 2-45 Figure 2-4. Summary of GDP Forecasts ----------------------------------------------------------------------------------------------- 2-52 Figure 2-5. 2040 Moderate TEU Port Forecast -------------------------------------------------------------------------------------- 2-54 Figure 2-6. 2040 Aggressive TEU Port Forecast – Loaded and Empties ------------------------------------------------------- 2-55 Figure 2-7. 2040 Moderate TEU Port Forecast – Loaded and Empties -------------------------------------------------------- 2-56 Figure 2-8. 2040 Moderate Forecast of Rail Intermodal -------------------------------------------------------------------------- 2-58 Figure 2-9. 2040 Aggressive Forecast of Rail Intermoal--------------------------------------------------------------------------- 2-59 Figure 2-10. 2010 Truck Volumes ------------------------------------------------------------------------------------------------------ 2-63 Figure 2-11. 2040 Truck Volumes ------------------------------------------------------------------------------------------------------ 2-64 Figure 2-12. Efficient Transportation Decision Making Planning Process ---------------------------------------------------- 2-71 Figure 2-13. St. Johns River Water Management District Wetland Mitigation Banks ------------------------------------- 2-73 Figure 2-14. Interactive Priority Map -------------------------------------------------------------------------------------------------- 2-80 Figure 2-15. Visits and Use of Allocation Game ------------------------------------------------------------------------------------- 2-81 Figure 2-16. Reported Priorities in Asset Allocation Game ---------------------------------------------------------------------- 2-82 Figure 2-17. Summary of Budget Allocation ----------------------------------------------------------------------------------------- 2-83 Figure 2-18. Summary Brochure -------------------------------------------------------------------------------------------------------- 2-86 Figure 2-19. Example of Future City Physical Model------------------------------------------------------------------------------- 2-87 Figure 2-20. Crash Severity Hot Spots ------------------------------------------------------------------------------------------------- 2-92 Figure 2-21. Congestion Hot Spots ----------------------------------------------------------------------------------------------------- 2-93 Figure 2-22. Comparison of Priorities from Multiple Sources ------------------------------------------------------------------- 2-97 Figure 2-23. Summary of Funding Allocation Compared to Public Priority ------------------------------------------------ 2-101 Figure 2-24. Percent of Need Met by Mode --------------------------------------------------------------------------------------- 2-102 Figure 2-25. 2010 Base Year Deficiencies ------------------------------------------------------------------------------------------ 2-111 Figure 2-26. 2040 No Build Deficiencies -------------------------------------------------------------------------------------------- 2-112 Figure 2-27. 2040 Needs Plan Trend Scenario Deficiencies -------------------------------------------------------------------- 2-113 Figure 2-28. 2040 Needs Plan Alternate Land Use Scenario Deficiencies -------------------------------------------------- 2-114 Figure 3-1. Regional Road Capacity Needs --------------------------------------------------------------------------------------------- 3-2 Figure 3-2. Baker County Road Capacity Needs--------------------------------------------------------------------------------------- 3-3 Figure 3-3. Clay County Road Capacity Needs----------------------------------------------------------------------------------------- 3-4 Figure 3-4. Duval County Road Capacity Needs--------------------------------------------------------------------------------------- 3-5 Figure 3-5. Nassau County Road Capacity Needs------------------------------------------------------------------------------------- 3-6 Figure 3-6. Putnam County Road Capacity Needs ------------------------------------------------------------------------------------ 3-7 Figure 3-7. St. Johns County Road Capacity Needs ---------------------------------------------------------------------------------- 3-8 Figure 3-8. Roadway Funded Projects ------------------------------------------------------------------------------------------------- 3-28 Figure 3-9. Clay County Funded Roadway Projects -------------------------------------------------------------------------------- 3-29 Figure 3-10. Duval County Funded Roadway Projects----------------------------------------------------------------------------- 3-31 Figure 3-12. St. Johns County Funded Roadway Projects ------------------------------------------------------------------------ 3-32 Figure 4-1. Transit Needs BRT, Commuter Rail, Skyway and Streetcar --------------------------------------------------------- 4-2 Figure 4-2. Transit Needs Local and Express Bus ------------------------------------------------------------------------------------- 4-3 Figure 4-3. Baker County Transit Needs Commuter Rail --------------------------------------------------------------------------- 4-4 Figure 4-4. Baker County Transit Needs Local Bus Service ------------------------------------------------------------------------- 4-5 vi
Path Forward 2040 Long Range Transportation Plan Figure 4-5. Clay County Transit Project Needs BRT and Commuter Rail ------------------------------------------------------- 4-6 Figure 4-6. Clay County Transit Projects Needs Local and Express Bus --------------------------------------------------------- 4-7 Figure 4-7. Duval County Transit Project Needs BRT, Commuter Rail, Skyway and Streetcar ----------------------------- 4-8 Figure 4-8. Duval County Transit Project Needs Local and Express Bus Service ---------------------------------------------- 4-9 Figure 4-9. Nassau County Transit Project Needs BRT, Commuter Rail, Skyway and Streetcar ------------------------- 4-10 Figure 4-10. Nassau County Transit Project Needs Local and Express Bus --------------------------------------------------- 4-11 Figure 4-11. Putnam County Transit Project Needs Commuter Rail ----------------------------------------------------------- 4-12 Figure 4-12. Putnam County Transit Project Needs Local Bus Service -------------------------------------------------------- 4-13 Figure 4-13. St. Johns County Transit Project Needs BRT and Commuter Rail ---------------------------------------------- 4-14 Figure 4-14. St. Johns County Transit Project Needs Local Bus Service ------------------------------------------------------- 4-15 Figure 4-15. Cost Feasible Plan Transit BRT, Commuter Rail, Skyway and Streetcar -------------------------------------- 4-19 Figure 4-16. Cost Feasible Plan Clay County Transit Projects BRT and Commuter Rail ----------------------------------- 4-20 Figure 4-17. Cost Feasible Plan Duval County Transit Projects BRT, Commuter Rail, Skyway and Streetcar -------- 4-21 Figure 4-18. Cost Feasible Plan Nassau County Transit Projects BRT, Commuter Rail, Skyway and Streetcar ------ 4-22 Figure 4-19. Cost Feasible Plan St. Johns County Transit Projects BRT and Commuter Rail ----------------------------- 4-23 Figure 4-20. Bicycle and Pedestrian Needs ------------------------------------------------------------------------------------------ 4-28 Figure 4-21. Baker County Bicycle and Pedestrian Corridors -------------------------------------------------------------------- 4-29 Figure 4-22. Clay County Florida Greenways and Trails and Priorities -------------------------------------------------------- 4-30 Figure 4-23. Duval County Greenways and Trails and Priorities ---------------------------------------------------------------- 4-31 Figure 4-24. Nassau County Greenways and Trails and Priorities -------------------------------------------------------------- 4-32 Figure 4-25. Putnam Greenways and Trails and Priorities ----------------------------------------------------------------------- 4-33 Figure 4-26. St. Johns Greenways and Trails and Priorities ---------------------------------------------------------------------- 4-34 Figure 4-27. Candidate Context Sensitive Solutions Corridors ------------------------------------------------------------------ 4-40 Figure 4-28. Freght Needs Projects ---------------------------------------------------------------------------------------------------- 4-55 Figure 4-29. Baker County Freight Needs Projects --------------------------------------------------------------------------------- 4-56 Figure 4-30. Clay County Freight Needs Projects ----------------------------------------------------------------------------------- 4-57 Figure 4-31. Duval County Freight Needs Projects --------------------------------------------------------------------------------- 4-58 Figure 4-32. Nassau County Freight Needs Projects ------------------------------------------------------------------------------- 4-59 Figure 4-33. Putnam County Freight Needs Projects ------------------------------------------------------------------------------ 4-60 Figure 4-34. St. Johns Freight Needs Projects --------------------------------------------------------------------------------------- 4-61 Figure 4-35. Cost Feasible Plan Freight Projects ------------------------------------------------------------------------------------ 4-66 Figure 4-36. Clay County CFP Freight Projects -------------------------------------------------------------------------------------- 4-67 Figure 4-37. Duval County CFP Freight Projects ------------------------------------------------------------------------------------ 4-68 Figure 4-38. Nassau County CFP Freight Projects ---------------------------------------------------------------------------------- 4-69 Figure 4-39. St. Johns County CFP Freight Projects -------------------------------------------------------------------------------- 4-70 Figure 5-1. Safety and TSM&O Projects------------------------------------------------------------------------------------------------- 5-2 Figure 5-2. Clay County Safety and TSM&O Projects -------------------------------------------------------------------------------- 5-3 Figure 5-3. Duval County Safety and TSM&O Projects ------------------------------------------------------------------------------ 5-4 Figure 5-4. Nassau Safety and TSM&O Projects -------------------------------------------------------------------------------------- 5-5 Figure 5-5. St. Johns Safety and TSM&O Projects ------------------------------------------------------------------------------------ 5-6 Figure 6-1. 2040 Cost Feasible Plan Deficiencies ------------------------------------------------------------------------------------- 6-4
vii
Path Forward 2040 Long Range Transportation Plan
LIST OF TABLES Table 1-1. Population Growth ----------------------------------------------------------------------------------------------------------- 1-11 Table 1-2. Employment Growth -------------------------------------------------------------------------------------------------------- 1-11 Table 1-3. Summary of Recent Mobility Trends (average daily values) ------------------------------------------------------- 1-13 Table 1-4. Anticipated Changes to TripTravel Times (2010 to 2040) ---------------------------------------------------------- 1-13 Table 1-5. Total Tons of Commodities (millions of tons per year)-------------------------------------------------------------- 1-14 Table 2-1. Enhance Economic Development Objectives and Performance Measures -------------------------------------- 2-2 Table 2-2. Livability and Sustainability Objectives and Performance Measures ---------------------------------------------- 2-3 Table 2-3. Safety Objectives and Performance Measures -------------------------------------------------------------------------- 2-3 Table 2-4. Mobility and Accessibility Objectives and Performance Measures ------------------------------------------------ 2-4 Table 2-5. System Preservation Objectives and Performance Measures ------------------------------------------------------- 2-6 Table 2-6. Traceability Matrix ----------------------------------------------------------------------------------------------------------- 2-11 Table 2-7. Federal Planning Requirements ------------------------------------------------------------------------------------------ 2-12 Table 2-8. State Planning Requirements---------------------------------------------------------------------------------------------- 2-18 Table 2-9. Congested Facilities ---------------------------------------------------------------------------------------------------------- 2-27 Table 2-10. Major Projects Under Construction or Completed Since the 2035 Plan was Adopted -------------------- 2-33 Table 2-11. Major Road Projects with Construction Funding Committed ---------------------------------------------------- 2-36 Table 2-12. Major Bicycle, Pedestrian and Transit Projects with Construction Funding Committed ------------------ 2-37 Table 2-13. NERPM-AB Year 2010 and 2040 Population and Employment Control Totals ------------------------------- 2-42 Table 2-14. Employment in Trend and Alternate Land Use Scenarios -------------------------------------------------------- 2-43 Table 2-15. Year 2040 School Enrollment Projects versus Age Group Projections ----------------------------------------- 2-43 Table 2-16. Total Tonns of Commodities (millions per year) -------------------------------------------------------------------- 2-48 Table 2-17. Top Origins and Destinations of Truck Freight Passinng Through North Florida ---------------------------- 2-48 Table 2-18. Top Origins and Destinations of Rail Freight Passing Through North Florida -------------------------------- 2-49 Table 2-19. Summary of TEUs for North Florida Port Facilities (JAXPORT and Port of Fernandina) ------------------- 2-59 Table 2-20. Summary of Rail Intermodal Forecasts -------------------------------------------------------------------------------- 2-57 Table 2-21. Growth Factors for Trucks ------------------------------------------------------------------------------------------------ 2-60 Table 2-22. Summary of Truck Model Inputs ---------------------------------------------------------------------------------------- 2-62 Table 2-23. Federal and State Revenues --------------------------------------------------------------------------------------------- 2-66 Table 2-24. Local Revenue --------------------------------------------------------------------------------------------------------------- 2-67 Table 2-25. Summary of Funding Programs by Primary Decision-Making Authority -------------------------------------- 2-68 Table 2-26. On-line Asset Allocation Game ............................................................................................................. 2-78 Table 2-27. Interactive Priority Map Legend .......................................................................................................... 2-79 Table 2-28. Summary of Priority Strategies On-line Allocation Game ..................................................................... 2-82 Table 2-29. Budget Allocation from On-line Allocation Game................................................................................. 2-83 Table 2-30. Summary of Strategies from On-line Allocation Game ......................................................................... 2-84 Table 2-31. Summary of Demographic Information from On-line Allocation Game ............................................... 2-85 Table 2-32. Meeting Summary ................................................................................................................................ 2-88 Table 2-33. Summary of Public Meeting Advertisements ....................................................................................... 2-94 Table 2-34. Needs Plan Workshops Attendance...................................................................................................... 2-95 Table 2-35. Summary of Needs Plan Public Workshop Allocation Game ................................................................ 2-95 Table 2-36. Summary of Needs Plan Public Workshop Comments ......................................................................... 2-96 Table 2-37. Summary of Input by Percent Respondents ......................................................................................... 2-97 Table 2-38. Summary of Attendance at the Cost Feasible Plan Workshops ............................................................ 2-98 Table 2-39. Summary of Comments During Cost Feasible Plan Workshops ............................................................ 2-99 Table 2-40. Modal Distribution .............................................................................................................................. 2-100 Table 2-41. Organizations Serving Minority and Underserved Populations .......................................................... 2-103 Table 2-42. Major Improvements in Minority and Underserved Communities .................................................... 2-105 Table 2-43. Summary of Deficiency Analysis ......................................................................................................... 2-110 Table 2-44. Summary of Needs Versus Revenue in Present Day Dollars ............................................................... 2-115 viii
Path Forward 2040 Long Range Transportation Plan Table 3-1. Road Capacity Needs by County -------------------------------------------------------------------------------------------- 3-9 Table 3-2. Road Capacity Needs in Ranked Order ---------------------------------------------------------------------------------- 3-17 Table 3-3. Strategic Intermodal System Projects ----------------------------------------------------------------------------------- 3-34 Table 3-4. Other State and Federally Projects--------------------------------------------------------------------------------------- 3-38 Table 3-5. Transportation Management Area Fund Projects -------------------------------------------------------------------- 3-42 Table 3-6. Transportation Regional Incentive Program -------------------------------------------------------------------------- 3-43 Table 3-7. Projects Funded with Turnpike/Toll Revenue ------------------------------------------------------------------------- 3-46 Table 3-8. Clay County Locally Funded Projects ------------------------------------------------------------------------------------ 3-48 Table 3-9. Duval County Locally Funded Projects (Non LOGT) ------------------------------------------------------------------ 3-48 Table 3-10. Duval County Locally Funded Projects from LOGT------------------------------------------------------------------ 3-49 Table 3-11. Nassau County Locally Funded Projects ------------------------------------------------------------------------------- 3-50 Table 3-12. St. Johns County Locally Funded Projects----------------------------------------------------------------------------- 3-50 Table 4-1. Transit Needs ------------------------------------------------------------------------------------------------------------------ 4-16 Table 4-2. Federal and State Transit Capacity Projects Cost Feasible Plan --------------------------------------------------- 4-24 Table 4-3. Summary of Funding Source for Transit -------------------------------------------------------------------------------- 4-25 Table 4-4. Dedicated Bicycle and Pedestrian Project Needs by County------------------------------------------------------- 4-35 Table 4-5. Candidate Context Sensitive Corridors ---------------------------------------------------------------------------------- 4-41 Table 4-6. Transit Accessibility and Mobility Enhancement Projects ---------------------------------------------------------- 4-42 Table 4-7. Bicycle and Pedestrian Prioritization ------------------------------------------------------------------------------------ 4-45 Table 4-8. Summary of Anticipated Expenditures for Bicycle and Pedestrian Projects ----------------------------------- 4-49 Table 4-9. Candidate Context Sensitive Solution Funded Projects ------------------------------------------------------------ 4-50 Table 4-10. Duval County LOGT Transit Accessibility and Mobility and Transit Hub Projects --------------------------- 4-51 Table 4-11. Freight and Intermodal Needs ------------------------------------------------------------------------------------------- 4-62 Table 4-12. Freight and Intermodal Funded Projects------------------------------------------------------------------------------ 4-71 Table 5-1. TSM&O Needs------------------------------------------------------------------------------------------------------------------- 5-7 Table 5-2. Priority Safety Corridors ---------------------------------------------------------------------------------------------------- 5-14 Table 5-3. Summary of Operations and Maintenance Costs--------------------------------------------------------------------- 5-18 Table 6-1. Summary of Measures of Effectiveness----------------------------------------------------------------------------------- 6-2 Table 6-2. Total Expenditures by Fund for Capacity Programs -------------------------------------------------------------------- 6-6 Table 6-3. Total Revenue and Expenditures for Balancing ------------------------------------------------------------------------ 6-7 Table 6-4. Summary of Funds in Proportion to Needs ------------------------------------------------------------------------------ 6-8 Table 6-5. Geographic Distribition ------------------------------------------------------------------------------------------------------- 6-8 Table 6-6. Modal Distribution ------------------------------------------------------------------------------------------------------------- 6-9
ix
Path Forward 2040 Long Range Transportation Plan
LIST OF ACRONYMS CBO CST DSB EST ETAT ENV FDOT FEC FHWA FTA GDP ITS JAXPORT LRTP MAP-21 MPO NERPM-AB OECD PD&E PE QOS ROW TDB TEU TPO TSM&O
Congressional Budget Office Construction Design Build Environmental Screening Tool Environmental Technical Advisory Team Environmental Florida Department of Transportation Florida East Coast Federal Highway Administration Federal Transit Administration Gross Domestic Product Intelligent Transportation Systems Jacksonville Port Authority Long Range Transportation Plan Moving Ahead Progress in the 21st Century Metropolitan Planning Organizations Northeast [Florida] Regional Planning Model - Activity Based Organization for Economic Cooperation and Development Project Development and Environment Preliminary Engineering Quality of Service Right of Way Toronto Dominion Bank Twenty-foot Equivalency Units Transportation Planning Organization Transportation Systems Management and Operations
x
Path Forward 2040 Long Range Transportation Plan
STUDY PARTICIPANTS NORTH FLORIDA TPO BOARD CHAIRMAN Nancy Sikes-Kline, City of St. Augustine Commission VICE CHAIRMAN Doyle Carter, Jacksonville City Council TREASURER Diane Hutchings, Clay County Commission Brian Reaves, Nassau County Ocean, Highway and Port Authority Charlie Latham, Mayor, City of Jacksonville Beach Alvin Brown, Mayor, City of Jacksonville Reginald Brown, Jacksonville City Council Danny Leeper, Nassau County Commission Rachael Bennett, St. Johns County Commission Ed Fleming, JAXPORT Donna Harper, Jacksonville Transportation Authority Teresa Davlantes, Jacksonville Aviation Authority William Bishop, Jacksonville City Council Doug Conkey, Clay County Commission Carl Youman, St. Augustine/St. Johns Airport Authority EX OFFICIO MEMBERS James Croft, Baker County Chip Laibl, Putnam County Capt. Roy Undersander, U.S. Navy NON-VOTING ADVISER: Gregory Evans, P.E., FDOT District 2 Secretary
xi
Path Forward 2040 Long Range Transportation Plan
NORTH FLORIDA TPO TECHNICAL COORDINATING COMMITTEE CHAIRMAN Jeff Beck, Clay County Engineering Department VICE CHAIRMAN Calvin Burney, Jacksonville Planning Neil Shinkre, St. Johns County Public Works Scott Herring, Nassau County Engineering Starling Kramer, Clay County Public Works Alaina Ray, Town of Orange Park Tom Morris, Clay County Utility Authority Phong Nguyen, St. Johns County Planning Steve Lindorff, Jacksonville Beach Planning Rick Carper, Atlantic Beach Public Works David Kaufman, JAXPORT Jim Robinson, City of Jacksonville Public Works Asst. Chief Dale Allen, Jacksonville Sheriff’s Office Mike Null, Green Cove Springs Planning Department David Buchanan, Town of Hilliard Martha Graham, St. Augustine Public Works Department Gary Larson, City of St. Augustine Beach Mayor Stan Totman, Town of Baldwin Bryan Spell, JEA Systems Planning Joseph Napoli, City of Jacksonville Environmental Quality Division Kevin Harvey, St. Augustine Airport Authority Karen Taulbee, Florida Department of Transportation Vincent Clark, Florida Department of Environmental Protection Todd Lindner, Jacksonville Aviation Authority Ed Lehman, Northeast Florida Regional Council Donald Jacobovitz, Putnam County Barbara Goodman, National Park Service Neil Nance, Jacksonville Transportation Authority Engineering Division Suraya Teeple, Jacksonville Transportation Authority Transit Division Shelby Jack, Town of Hastings Lisa Parlapiano, WorkSource Ron Braddock, Nassau County Ocean Highway and Port Authority Matt Schellhorn, U.S. Navy Peter King, Nassau County Planning Terry Suggs, City of Keystone Heights
xii
Path Forward 2040 Long Range Transportation Plan
NORTH FLORIDA TPO CITIZENS ADVISORY COMMITTEE CHAIRMAN Bernie O’Connor, Duval County (at large) VICE CHAIRMAN Frank Riner, Town of Orange Park Richard Darby, Clay County (at large) James M. Lucas, Duval County (Beaches) Richard Berry, Duval County (North Citizens Planning Advisory Committee) Celia Miller, Duval County (Urban Core Citizens Planning Advisory Committee) Lin White, Duval County (at large) Larry Solomon, Duval County (Northwest Citizens Planning Advisory Committee) Lesley Davidson, Duval County (at large) Warren Butler, St. Johns County (at large) Barney Roberts, Duval County (at large) Terry Tillman, City of Baldwin Anita Warming, Duval County (at large) Heather Neville, City of St. Augustine Gene Brisach, Nassau County (at large) Vickie Breedlove, Duval County (at large) Jim Hill, Duval County (Southeast Citizens Planning Advisory Committee) Roger Sharp, Duval County (Arlington/Beaches Citizens Planning Advisory Committee) Martha Moore, Duval County (at large) Ken Amaro, Duval County (at large) Brian Alley, St. Johns County (at large) Bradley Gordon, St. Johns County Melinda Luedtke, Amelia Island Branch Davis, Duval County (at large) Ron Hick, Nassau County (at large) Mike Kloehn, Clay County (at large)
xiii
Path Forward 2040 Long Range Transportation Plan
LRTP STEERING COMMITTEE Dale Allen, Jacksonville Sherriff’s Office Jeff Beck, Clay County Public Works Bill Ball, City of Jacksonville Public Works Bill Bishop, Council Member, City of Jacksonville Dan Buckman, Nassau County Public Schools Calvin Burney, City of Jacksonville Planning Vincent Clark, Florida Department of Environmental Protection Enis Davis, MetroJacksonville Dawn Emerick, Health Planning Council of North East Florida Janis Fleet, City of Green Cove Springs Barbara Goodman, National Park Service James Green, Florida Department of Transportation Kimberly Hair, Jacksonville Aviation Authority Scott Herring, Nassau County Planning Don Jacobovitz, Putnam County Public Works Dorren Joyner Howard, Florida Department of Transportation David Kauffman, JAXPORT Peter King, Nassau County Mark Knight, City of St. Augustine Planning Starling Kramer, Clay County Planning Gary Larson , City of Atlantic Beach Ed Lehman, Northeast Florida Regional Planning Council Michelle Leak, Mayo Clinic Todd Linder, Jacksonville Aviation Authority Steve Lindorff, City of Jacksonville Beach Planning Dan Locklear, St. Johns County Public Works Carolyn Morgan, Clay County Planning Joe Napoli, City of Jacksonville Environmental Quality Phong Nguyen, St. Johns County Planning Mike Null, City of Green Cove Springs Bernie O’Conner, Citizen Lisa Parlapiano, Career Source Northeast Florida Ed Preston, Baker County Public Works Alaina Ray, Town of Orange Park Matt Schellhorm, U.S. Navy Brian Spell, JEA Joe Stephenson, Regional Planning Commission David Stubbs, JAXPORT Karen Taulbee, Florida Department of Transportation Suraya Teeple, Jacksonville Transportation Authority Brad Thoburn, Jacksonville Transportation Authority Steve Tocknell, Citizen Kim Weisnburger, U.S. Marine Corps
xiv
PART
ONE
INTRODUCTION
Path Forward 2040 Long Range Transportation Plan
INTRODUCTION THE PATH FORWARD 2040 LONG RANGE TRANSPORTATION PLAN IS COMPREHENSIVE IN ITS NATURE AND WAS DEVELOPED THROUGH A COOPERATIVE PROCESS TO ACHIEVE CONSENSUS ON A VISION FOR OUR REGION’S FUTURE.
PLANNING PROCESS OVERVIEW
Federal and state metropolitan planning regulations require the North Florida Transportation Planning Organization (North Florida TPO) to develop a regional transportation plan every five years. This section outlines the process that was followed and is organized to address the following.
The Path Forward 2040 Long Rage Transportation Plan (LRTP) defines the transportation vision for the future of the region, establishes goals and policies that will lead to achieving the visions, and allocates projected revenue to transportation programs and projects that implement those goals and policies. Fundamentally, the LRTP is about making choices for the future of the metropolitan area—choices about local and regional land use, choices about where to allocate limited transportation resources, and
1-1
choices about the type of future we wish to see for our region and the State of Florida. The LRTP’s 22year scope (2019 to 2040) allows the TPO to consider the transportation network’s future from a regional perspective. Existing and proposed transportation facilities (including major roadways, transit, multimodal and intermodal facilities, pedestrian walkways and bicycle facilities, and intermodal connectors) that function as an integrated transportation system are addressed in the plan. The plan emphasizes those facilities that serve important national and regional transportation functions over the life of the transportation plan. The planning process was designed to meet federal planning rules that require the North Florida TPO to maintain a continuing, cooperative, and
Path Forward 2040 Long Range Transportation Plan comprehensive transportation planning process. Our planning process provides opportunities for public engagement and participation.
The major components of the plan include three milestones to adopt:   
Goals and Objectives of the Plan Needs Plan Cost Feasible Plan
A summary of the planning process and major milestones associated with the plan are shown in Figure 1-1.
Figure 1-1. Summary of Major Plan Components and Milestones
1-2
Path Forward 2040 Long Range Transportation Plan Virtually every freight shipment in the state, as well as nearly every visitor and business traveler, will use the Strategic Intermodal System at some point in its journey.”
REGIONAL OVERVIEW
North Florida, like many great regions, began as a hub for commerce and transportation. Our six county region consisting of Baker, Clay, Duval, Nassau, Putnam and St. Johns Counties consists of an area of over 3,900 square miles and 1.4 million citizens. It includes some of our nation’s first ports, cities and roads. Our history as a transportation center shaped our region’s past and will drive our future.
The major Strategic Intermodal System highway facilities within our region are shown on Figure 1-2 and Figure 1-3 and are summarized below.
PLANNING BOUNDARIES The metropolitan planning boundaries established by the Federal Highway Administration for the North Florida TPO metropolitan statistical area include Clay, Duval, Nassau and St. Johns Counties. To provide a regional approach, the LRTP addresses these counties and two additional counties: Baker and Putnam. Figure 1-2 on the next page shows the study area.
I-10 I-95 I-295 and SR 9B US 301/SR 200 US 1 from I-295 to the Georgia State Line SR 23 First Coast Expressway (future)
Strategic Intermodal System Connectors include
As part of the Cost Feasible Plan, only the federal planning boundaries associated with Clay, Duval, Nassau and St. Johns Counties were considered.
The following summarizes the major components of the freight network within North Florida including the Florida Department of Transportation’s (FDOT’s) Strategic Intermodal System. Figure 1-3 and 1-4 show the location of the major elements of the multimodal freight network in North Florida.
ROADS Strategic Intermodal System FDOT’s Strategic Intermodal System is:
“a statewide system of high-priority transportation facilities. It includes the state’s largest and most significant commercial service airports, spaceport, deep-water seaports, freight rail terminals, passenger rail and intercity bus terminals, rail corridors, waterways and highways. These facilities are the workhorses of Florida’s transportation system. They carry more than 99 percent of all enplaned commercial air passengers in the state, virtually 100 percent of all waterborne freight tonnage, almost 100 percent of all freight moving on the rail system, and more than 68 percent of all truck traffic and 54 percent of total traffic on the State Highway System. With the exception of some localized commuting, recreational and shopping trips, few trips in Florida are not impacted by the Strategic Intermodal System.
1-3
Cecil Spaceport (Planned); SR 23 First Coast th Expressway to New World Avenue to 6 Street to entrance. Jacksonville Amtrak Station (Currently this facility is planned to be dropped from the Strategic Intermodal System.); I-95 to New Kings Road and Martin Luther Jr. King Parkway to Clifford Lane. Jacksonville CSX Intermodal Terminal; I-295 to Pritchard Road to Sportsman Club Road to entrance. Jacksonville Florida East Coast (FEC) Railroad Intermodal Terminal (Bowden Yard); I-95 to SR 202 J.T. Butler Boulevard to US 1 Philips Highway to entrance. Jacksonville Greyhound (Currently this facility is planned to be dropped from the Strategic Intermodal System.); I-95 to Forsyth Street to Pearl Street to Bay Street entrance, exit to Forsyth Street to Broad Street to Adams Street to I-95. Jacksonville International Airport; I-295 to Duval Road to South International Airport Boulevard to Air Cargo Access Road to cargo entrance. Jacksonville International Airport; I-95 to SR 202 Airport Road to passenger terminal. Jacksonville Multimodal Terminal Center (Currently, this center is planned to be added to the Strategic Intermodal System); I-95 to Forsyth Street to Lee Street to entrance; exit to Lee Street to Adams Street to I-95.
" ) 108
" ) 115
" )
§ ¨ ¦ 95
1
£ ¤ 2
17
£ ¤
" ) " )
" ) 127
A1A
A1A
¬ «
108
¬ «
105
¬ « ¬ «
107
2
A1A
¬ «
301
£ ¤
" ) 122
295
119
" ) 250
¬ «
§ ¨ ¦
§ ¨ ¦
" )
A1A
295
105
¬ « ¬ « 116
" ) 125
221
¬ «
" ) 124
10
90
£ ¤
" )
¬ « 90
§ ¨ ¦
228
" ) 250A
" ) 130
£ ¤ ¬ «
10
228
¬ «
301
£ ¤
134
202
¬ « ¬ « 23
§ ¨ ¦ 295
1
£ ¤ 220
" )
¬ «
¬ «
" )
218
A1A
13
§ ¨ ¦ 95
21
¬ « 16
¬ «
16
¬ «
" ) 315
1
208
" )
13
17
£ ¤
315
16
¬ « " ) " " ) ) " )
209
" )
13A
207
" )
§ ¨ ¦ 95
305
17
£ ¤
26
¬ «
5
¬ «
A1A
¬ «
206
¬ «
100
¬ «
" ) 315
BAKER
¬ «
¬ «
" ) County
A1A
214
214
Legend
£ ¤
" ) 204
20
¬ «
CLAY DUVAL
" ) 21
" ) 310
NASSAU 320 PUTNAM
" )
" )
200A
§ ¨ ¦ 75
" ) STJOHNS" " ) £ ) ¤ « ) " ) Water Bodies" £ ¤¬ £ ¤Roadway" System ¬ «" ) ) " ) ¬ « " ¬ « ) 335
318
329
316
335
27
500
225
Date: 9/22/2014
225A
¬ «
" ) 309
" ) 308
301
441
25A
19
502
200
25
200
200A
Figure 1-2 North Florida TPO Region Map 1-4
¯
0
0
10,560 Feet
4.5
9 Miles
!
!
!
! !
!
!
! !
!
!
!
! ! ! ! !
!
!
!
!
! ! !! !
!
! !
108
Port of Fernandina
105
¬ « ¬ «
!
95
) ¯ í
!
§ ¦ ¨
A1A
A1A
¬ « !
1
!
£ ¤
!
" ) 107
!
115
!
!
!
" )
" )
!
!
! !
!
!
! ! !
!
!
!
! !
!
!
!
!
!
!
! !
!
!
!
!
!
!
! !
!
!
!
! !
!
!
!
!
!
!
!
2
A1A
!
!
! !
!
!
!
!
!
! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! ! !
! !
! !
! ! !
!
!
¬ «
!
!
!
A1A
!
220
!
" )
!
! !
!
!
!
! !
§ ¦ ¨
!
!
!
! !
95
!
!
!
!
!
!
!
16
! !
!
!
!
1
! ! ! ! ! ! !
!
!
!
!
!
214
! !
! ! ! ! ! ! !
!
!
!
!
!
!
!
!
! !
!
! !
!
!
!
!
!
!
!
!
Emerging SIS Waterway
!
!
!
!
SIS Waterway Connector 320
! ! !
!
!
!
!
!
!
" ) 310
!
!
!
" ) 21
SIS Waterway
!
!
19
¬ «
" )
!
! !
!
! !
!
309
!
!
!
200A
!
!
25
! !
¯
!
!
!
326
Figure 1-3 Strategic Intermodal System !
! !
!
1-5
!
!
!
326 326
!
200
!
25A
!
200
!
441
! !
316
! !
301
« £ ¤¬ Conservation Lands £ ¤Six Counties ¬ «" " Boundaries ) " ) ) ¬ « " ¬ ) « " ) ¬ «" ) ¬ «
" )
308
!
318
" )
" )
!
" )
200A
" ) £ ¤
Roadway 3System 29
225A
!
!
!
!
75
225
!
!
§ ¦ ¨
Railroad System
!
Waterways !
! !
! ! !
!
SIS Railway Connector
!
¬ « ! !
" )
!
!
A1A
!
!
20
¬ «
Emerging SIS Railway Corridors
206
¬ « 204
!
SIS Railway Corridors
!
!
315
! ! !
95
!
!
!
!
" ) 305
§ ¦ ¨
5
¬ «
!
" )
!
!
!
!
207
¬ «
!
100
¬ «
!
!
!
£ ¤
26
¬ «
!
! !
214
17
! !
!
!
" )
SIS Highway Corridor
¬ «
! !
13
13A
A1A ! !
! ! !! !
315
208
!
17
£ ¤
16
¬ « " ) " " ) ) " )
!
!
£ ¤
!
" ) 209
" )
Y SIS Higway b Connectors Æ
!
!
¬ «
" )
Emerging SIS Highway Corridor
!
202
13
315
Highway
!
!
!
1
Camp Blanding
Emerging SIS Passenger Terminal
Water Bodies
!
!
£ ¤
¬ «
SIS Passenger Terminal
Date: 6/25/2014
!
!
295
16
(¢ ( ( ( Intermodal Logistics Center ¢ ¥ ¥ ¢ ¥ ¥ ¢ ( ( ( ( ¥ ¢ ¥ ¢ ¥ ¢ ¥ ¢ Passenger Terminals
!
! ! !
§ ¦ ¨
¬ «
® X à SIS Freight Rail Terminal (¢ (Xâ (¢ (Emerging SIS Freight Rail Terminal ¥ ¢ ¥ ¥ ¥
326
!
Jacksonville Naval Complex
¯ ®
21
Freight Rail Terminals
500
! !
!
23
¬ «
Emerging SIS Seaport
27
90
£ ¤ ¬ «
Jacksonville FEC Intermodal Terminal
" )
SIS Seaport
335
10
¬ «
( ( ( ¢ ¥ ¥ ¥ X ® â (¢ ( ( ¥ ¢ ¥ ¢ ¥ ¢ ( ( ( ¥ ¢ ¥ ¢ ¥ ¢ (¢ (¢ ( ¥ ¢ ¥ ¥
!
!
134
¬ « ¬ «
218
SIS Spaceport
335
116
!
! ! !Naval Station Mayport Station
!
¬ «
301
Seaports
" ) " )
295
!
! !
228
£ ¤
Emerging SIS Airport
" )
!
! !
!
10
SIS Airport
Rail
§ ¦ ¨
!
§ ¦ ¨
Airports and Spaceports
b Æ b Æ
bÆ Æ b
¬ «
!
90
£ ¤
Legend
) ¯ í ¯ ) í
!
130
!
Port of Jacksonville Talleyrand ! !
" )
" )
!
!
Port of Jacksonville Talleyrand
228
® Y Y ¯ ®
!
124
!
¬ «
¬ « ¬ «
!
221
" ) " )
!
Jacksonville NS Intermodal Terminal
" )
) ¯ í
1!05 Port of Jacksonville Blount Island ! ! ! !
Jacksonville CSX Intermodal Terminal
125
250A
Port of Jacksonville Dames Point ! ! !
119
A1A
! !
295
" )
!
( ( ¢ ¥ ¥ (¢ (§ ¥ ¢ ¥ ¢ ¦ ¨ ( ¥ ¢ ¥ ¢ X ® Ã( (¢ (¢ ( ( ¥ ¢ ¥ ¥ ¥ (®XÃÆb¢ ( ¥ ¢ ¥ ¢
! !
122
! ! ! !
" ) 250
!
Y ®
301
£ ¤
" )
¬ «
!!
!
127
! ! !
" )
! !
2
! !
108
¬ «
!
17
£ ¤
" ) " )
0
0
10,560 Feet
3
6 Miles
!
!
!
!
!
! !
!
!
!
!
!
!
! !
!
!! ! ! ! ! !
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
Legend
! !
Port of Fernandina
Airports and Spaceports
!
¯ ) í
Port of Fernandina
! ! !
! ! !
! ! ! !
!
! !
! !
!
!
A1A
« ¬
! !
!
!
Jacksonville International Airport
« ¬
Intermodal Logistics Center
!
!!
!
! ! !
!
!
!!
!
!
!
! !
!
! ! ! !
!
! !
! !
!
!
!
!
!
!
! !
!
! !
!
Emerging SIS Waterway
!
!
SIS Waterway Connector
!
! !
!
!
!
!
!
!
!
3.5
7 Miles
!
!
0
!
!
10,560 Feet
!
0
!
! ! !
Six Counties Boundaries
!
!
! !
!
! !
!
!
!
!
!
!
!
¯
Conservation Lands
!
!
95
Water Bodies
!
!
295
Roadway System
!
!
152
« ¬
Railroad System
!
!
!
!
!
!
!
!
!
!
!
!
!
SIS Waterway
!
!
!
!
!
!
!
!
!
!
202
« ¬
¦ ¨ §
13
!
!
!
!
!
!
!
« ¬
!
!
! !
A1A
!
!
!
SIS Railway Connector
Waterways
!
!
Emerging SIS Railway Corridors
!
Private Marine Terminals !
! !
!
SIS Railway Corridors
!
!
!
!
! !
!
!
St. Johns River Channel
!
!
! !
!
Rail
!
!
!
!
SIS Higway Connectors
!
!
!
( ( ( ( ¢ ¥ ¥ ¥ ¢ ¢ ¥ X ®¢ à ( ( ( ( ¥ ¢ ¥ ¢ ¥ ¢ ¢ ¥ ( ( ( ( ¥ ¢ ¥ ¢ ¥ ¢ ¢ ¥ ( ( ( ( ¥ ¢ ¥ ¢ ¥ ¢ ¢ ¥ ( ( ( ( ¥ ¢ ¥ ¢ ¥ ¢ ¢ ¥ (¢ (¥ (¢ ( ¥ ¢ ¥ ¢ ¥
Emerging SIS Highway Corridor !
! !
! !
!
!
!
!
!
!
!
!
!
!
!
!
1-6
!
!
!
Date: 9/25/2014
!
!
10
« ¬
!
£Figure 1-4 Strategic Intermodal System Inset Map « ¬ ¦ ¨ § 21
« ¬
!
!
!
224
!
!
116
« ¬
FEC Intermodal Terminal
Jacksonville Naval Complex
« ¬
!
« ¬
90
134
23
!
!
¤ £
« ¬ « ¬
!
A1A
!
!
!
Naval Station Mayport Station ! !
¯ ®
!
!
17
¤ £
Cecil Spaceport
!
128
¤ £
!
17
¤ £ « ¬
301
!
!
!
Jacksonville Multimodal Terminal Center
! !
228
!
Port of Jacksonville Talleyrand
b Æb Æ
« ¬
!
!
¦ ¨ §
!
!
Jacksonville Greyhound
10
! !
!
!
!
! ! ! ! 295
SIS Highway Corridor
International Shipping Channel
!
!
!
!
!
NS Intermodal Terminal
90
! !
¯ ) í
Blount Island Command ! ! Port of Jacksonville Blount ! ! ! !Island
!
¦ ¨ §
!
!
!
Jacksonville Amtrak
¤§ £ ¦ ¨
« ¬
!
!
Port of Jacksonville Dames Point !
95
!
CSX Intermodal Terminal
Port of Jacksonville
Emerging SIS Passenger Terminal
Highway
A1A
!
!
( ( ¢ ¥ ¥ ¢ ( ( ¥ ¢ ¥ ¢ ( ( ¥ ¢ ¥ ¢ X ® à ( ( ¥ ¢ ¥ ¢ ¤ £ (¢ ( ¥ ( ( ( ¥ ¢ ¥ ¢ ¥ ¥ X ®¢ à b Æ¢ ( ( ( ¥ ¢ ¥ ¢ ¥ ¢ (¢ (¢ ( ¥ ¢ ¥ ¥ 1
! !
17
¤ £
104
SIS Passenger Terminal
b Æ b Æ
!
115
Emerging SIS Seaport
( ( ( ( ¢ ¥ ¥ ¢ ¢ ¥ (Passenger (¥ (¢ ( Terminals ¥ ¢ ¥ ¢ ¥ ¢ ¥ ¢
A1A
!
« ¬ « ¬
SIS Seaport
SIS Spaceport
X ® SIS Freight Rail Terminal à Emerging SIS Freight Rail Terminal (¢ (XÃ¥ (¢ ( ¥ ¢ ¥ ¢ ¥
! ! !
301
) ¯ í ¯ ) í
Emerging SIS Airport
Freight Rail Terminals
!
23
¤ £
¤ £
SIS Airport
Seaports
!
Y ®
® Y Y ¯ ®
Path Forward 2040 Long Range Transportation Plan
Naval Air Station Jacksonville; I-295 to US 17 Roosevelt Boulevard to entrance. Naval Station Mayport; I-295 to US 90 Atlantic Boulevard to SR A1A to entrance. Port of Jacksonville Blount Island; I-295 to SR 105 Heckscher Drive to Dave Rawls Boulevard to entrance. Part of Jacksonville Dames Point; I-295 to SR 105 Heckscher Drive to New Berlin Road. Port of Jacksonville Dames Point Cruise Ship Terminal; I-295 to SR 105 Heckscher Drive to August Drive to entrance. Port of Jacksonville Dames Point Cruise Ship Terminal; I-95 to SR 105 Heckscher Drive to August Drive to entrance. Port of Jacksonville; Talleyrand; I-95 to US 1 Martin st Luther King Jr. Parkway to Phoenix Avenue to 21 Street to North Talleyrand Avenue to 11th Street entrance. Port of Fernandina; I-95 to SR A1A to 8th Street to Dade Street to Front Street to entrance.
the Strategic Intermodal System. This terminal serves distribution facilities and shippers in Florida accessing the facility using I-95 and I-10. Preliminary estimates show this facility generates approximately 300,000 lifts (a lift is the move of one container on or off a rail car) per year which would equate to about 600,000 truck trips per year. The Norfolk Southern intermodal terminal (Simpson Yard), located east of the I-295 interchange with Pritchard Road, is included as a hub in the Strategic Intermodal System. This terminal serves distribution facilities and shippers in Florida accessing the facility using I-95 and I-10. Preliminary estimates show this facility generates approximately 225,000 lifts per year which would equate to about 450,000 truck trips. Norfolk Southern also operates an auto distribution facility with access from Old Kings Road north of Pritchard Road in the project study area. This facility serves the Jacksonville Port Authority (JAXPORT) auto terminal and other commercial shippers of automobile traffic destined for in the southeastern US. This facility is currently not part of the Strategic Intermodal System.
Other State Highways and Local Roads
The CSX intermodal terminal (Jacksonville Yard), located just west of I-295 at the Pritchard Road interchange, is a major intermodal facility within CSX’s operations and is included as a hub in the Strategic Intermodal System. This terminal serves distribution facilities and shippers in Florida accessing the facility using I-95 and I-10. Preliminary estimates show this facility generates approximately 300,000 lifts per year which would equate to about 600,000 truck trips. CSX also operates an auto distribution facility in the study area with access from Commonwealth Boulevard to the south. This facility is similar in size and services to the Norfolk Southern facility. This facility is currently not part of the Strategic Intermodal System.
In addition to the Strategic Intermodal System, other state highway system routes and locally-maintained roads of regional significance were addressed in the plan.
RAIL North Florida is located at a key junction for three railroads, CSX, Norfolk Southern and FEC. CSX, headquartered in Jacksonville, maintains the largest rail network in Florida and will soon provide enhanced connectivity to the Dames Point and Blount Island marine terminals with the Intermodal Container Transfer Facility at Dames Point. Norfolk Southern maintains its Florida terminus in northwest Jacksonville and provides direct service to the Talleyrand Marine terminals, other key sites along the St. Johns River, and inland facilities. FEC has its corporate operations center and its northern terminus in Jacksonville including a river bridge crossing in Downtown that facilitates connections to the CSX and Norfolk Southern railroads. Genesee & Wyoming Inc., which operates major short line railroads across the U.S. and in Australia, maintains its operations headquarters in Jacksonville. The following summarizes the Strategic Intermodal System and other major rail intermodal facilities in the study area.
AN INTERMODAL FREIGHT SHIPMENT IS ONE THAT IS MOVED VIA STANDARDIZED REUSABLE SHIPPING BOXES CALLED CONTAINERS.
TYPICAL MARINE CONTAINERS ARE 40-FT LONG AND TYPICAL TRUCK CONTAINERS ARE 53FT LONG. EACH CONTAINER CAN CARRY BETWEEN 20 AND 25 TONS OF FREIGHT.
The Florida East Coast Industries intermodal terminal (Bowden Yard), located west of US 1 Philips Highway near SR 202 J. T. Butler Boulevard, is included as a hub in
THE UNITS OF MEASURE ARE EXPRESSED IN TWENTYFOOT EQUIVALENCY UNITS OR TEUS. 1-7
Path Forward 2040 Long Range Transportation Plan AMTRAK, the National Railroad Passenger Corporation, operates a passenger intermodal facility on the northwest side of Jacksonville off US 23 SR 15 New Kings Road. This facility serves approximately 30,000 passengers per year. This facility is part of the Strategic Intermodal System.
two 50-LT capacity rubber tired gantry cranes, both of which straddle four rail spurs totaling 4,800 linear feet Talleyrand's on-dock rail facilities are run by Talleyrand Terminal Railroad, Inc., which provides direct switching service for Norfolk Southern and CSX rail lines. The terminal is only 25 minutes from FEC railroad's intermodal ramp, and is conveniently located within minutes of interstates I-95 and I-10. Talleyrand is equipped with four container cranes, on-dock rail and 160,000 square feet of transit shed space capable of handling cargo in refrigerated, freezer or ambient conditions. Additionally, a 553,000-square foot warehouse stores a variety of cargoes, including rolls of fine and specialty papers.
The FDOT Strategic Intermodal System rail connectors include the following:
CSX Eastport Railroad connector to Blount Island and Dames Point Terminals CSX Connector to CSX Intermodal Facility Talleyrand Terminal Railroad CSX Downtown Jacksonville to Port of Fernandina along US 17 Main Street and SR 200 Buccaneer Trail
The U.S. Marine Corps Terminal is located on Blount Island and supports deployments by the US Transportation Command. Shipments include roll-on/rolloff cargo, intermodal and break-bulk cargo.
PORTS JAXPORT 2 and its maritime partners handle containerized cargo, automobiles, recreational boats and construction equipment, dry and liquid bulks, break-bulk commodities, and oversized and specialty cargoes.
A network of privately-owned maritime facilities also operates in Jacksonville’s harbor, and in Northeast Florida.
Blount Island is a 754-acre terminal and is JAXPORT's largest marine facility. It is one of the largest vehicle import/export centers in the United States. The terminal also handles bulk cargo via roll-on/roll-off, heavy lift, and liquid bulk cargo operations. Blount Island has one 112ton whirly crane and eight container cranes (five 50-ton cranes, one 45-ton crane and two 40-ton cranes). The terminal also offers 240,000-square feet of transit shed space and a 90,000-square-foot Container Freight Station for cross-dock efficiency.
The Nassau County Ocean Highway and Port Authority operates the Port of Fernandina, a deep-water access with 47-ft channel depth and two berths. The port consistently handles over 225 vessels per year. The 3 port’s principal cargoes include break-bulk cargo consisting of forest products including Kraft liner board, wood pulp, steel and treated lumber. The principal imports are lumber, wood pulp, hardboard and steel. The containerized commodities moving through the Port include wood pulp, automobile parts, steel products, beer, frozen foods, machinery, consumer goods just to mention a few.
The Dames Point Marine Terminal (TraPac) is located ten nautical miles from the Atlantic Ocean, the Dames Point Marine Terminal is home to the 158-acre TraPac Container Terminal, where vessels from Tokyo-based MOL and other carriers offer direct containership service between Jacksonville and ports throughout Asia. The TraPac terminal features new port infrastructure, including roadways, terminal buildings, two 1,200-foot berths and six new Panamax container cranes. This 173acre terminal has 4,780 linear feet of berthing space on 40 feet of deep-water. A second terminal is planned at Dames Point but a tenant is currently not identified.
AVIATION
Jacksonville’s Airport System 4 Jacksonville's Airport System encompasses four airports, each of which serves a distinct aviation need. Jacksonville International is the major regional passenger air service provider, featuring non-stop flights to dozens of major U.S. cities. Jacksonville Executive at Craig Airport (CRG), centrally located near Jacksonville's suburban business centers, is a general aviation field perfect for busy corporate travelers and operators of small aircraft. Herlong Recreational Airport, on the city's
The Talleyrand Terminal, located north of Downtown on the west bank of the St. Johns River, is a 173-acre terminal that has 4,780 linear feet of berthing space on 40 feet of deep-water. The Talleyrand terminal offers 2
3
http://www.portoffernandinamaritimeexchange.org/res ources_port.html 4 http://www.flyjacksonville.com/default.aspx?sMP=JAA
Adapted from http://www.jaxport.com/ 1-8
Path Forward 2040 Long Range Transportation Plan west side, is ideally suited as a general aviation field and prime recreational site for small private planes, hot air balloons, gliders and similar craft. Cecil Field Airport is located approximately 15 miles west of downtown Jacksonville. The newest addition to the Jacksonville airport system, Cecil Airport is an ideal site for aviation maintenance, manufacturing and repair and overhaul 5 operations.
provide minimal or non-stop service and serve popular areas like the Beaches, Arlington, Blanding, Orange Park, Mandarin, various shopping malls, employment centers and Downtown. Jacksonville Transportation Authority's Interliner service combines two routes into one, providing one-seat transportation between two quadrants of town. Residents traveling between two areas no longer change buses (i.e. from Commonwealth Boulevard to SR 152 Baymeadows Road), eliminating the need to transfer or pay two fares. Nine Interliner routes currently serve Jacksonville residents.
Although a smaller market relative to tonnage handled by other modes of transportation, aviation services are also part of the region’s freight movement. Several passenger airlines and dedicated all-cargo airlines provide air cargo service at the Jacksonville International Airport. The airport’s air cargo area has more than 200,000 square feet of warehouse space dedicated to air cargo operations and hundreds of acres of on-airport property suitable for air cargo development. FedEx, UPS, and Airborne all utilize Jacksonville International Airport. It is anticipated that Cecil Airport will help support economic development within the region, serving both aviation and aerospace dependent industries. The airport is adjacent to the Cecil Commerce Center and recently was designated a spaceport and “space territory” by the state of Florida (HB59). As a result, the newly named “Cecil Field Spaceport” is included in Space Florida’s Spaceport Master Plan and the Strategic Intermodal System.
All Jacksonville Transportation Authority buses are equipped with front-mounted bike racks. There is no extra charge to transport the bicycle. JTA Connection is a shared-ride service that provides door-to-door transportation for the disabled, elderly and transportation disadvantaged in Duval County. It is complementary to the fixed route bus service. A private vendor is contracted to provide drivers and operate specially equipped transit vehicles. Jacksonville Transportation Authority Paratransit staff manage the day-to-day system operations, take reservations and schedule trips. The Jacksonville Transportation Authority is the Community Transportation Coordinator (CTC) for Duval County.
Northeast Florida Regional Airport 6
The Automated Skyway Express is a fully automated state-of-the-art transit system operating on an elevated dual guideway, with peripheral parking at several stations. Ten two-car trains whisk patrons to eight stations on both sides of the St. Johns River in the central business district.
The Northeast Florida Regional Airport is located just a few miles from historic downtown St. Augustine and serves as a focal point for the Northeast Florida region. The airport is centered in a gateway market of 4.4 million passengers within a 2-hour drive to the facility.
TRANSIT Jacksonville Transportation Authority
Approximately 3,500 spaces are available to commuters for monthly parking. Nearly 1,000 spaces are located in and around the Skyway Convention Center Station. Another major parking facility is the King's Avenue Transit garage with 1,684, low cost, covered parking spaces, with walkways leading to the Kings Avenue Skyway Station. Another 200 surface spots are available, some for short-term. Limited daily and hourly (meter) parking is available at the Convention Center and King's Avenue Skyway Stations.
7
Another vital component to an integrated transportation network is the bus system. Jacksonville Transportation Authority has 56 routes with vehicles traveling 8.5 million revenue miles each year with approximately 320 bus operators and 110 maintenance employees supporting an active fleet of 180 vehicles. Flyer and express bus routes offer additional opportunities for Jacksonville Transportation Authority to meet the community's needs. Flyers and express buses
The Skyway hours are Monday through Friday from 6 AM to 9 PM. The Skyway is closed Saturday and Sunday, except for special events. The Skyway is free.
5
http://www.flyjacksonville.com/content.aspx?id=83 http://www.flynf.com/ 7 http://www.jtafla.com/AboutJTA
Jacksonville Transportation Authority offers the very popular Stadium Shuttle Service that connects thousands
6
1-9
Path Forward 2040 Long Range Transportation Plan of football fans to EverBank Field for Jaguars home games, the Florida-Georgia game and the Gator Bowl. Fans may park free in several suburban and downtown locations, then shuttle to the stadium starting two hours before kick-off and ending one hour following the game. Customers may purchase a discounted season pass or a game-day ticket. Prices are reasonable, but vary depending on pick-up points. The Riverside Trolley offers weekday, lunchtime trips between the Five Points historic district in Riverside and The Landing in Downtown. The Beaches Trolley runs seven days a week along A1A through the heart of Jacksonville Beach, Neptune Beach and Atlantic Beach. The Jacksonville Transportation Authority served more 8 than 12 million passenger trips in 2012.
Baker County Council on Aging The Baker County Council on Aging is the Community Transportation Coordinator providing transportation to residents of Clay County.
Clay Transit Clay Transit is the Community Transportation Coordinator providing transportation to residents of Clay County. The paratransit services connect to Jacksonville Transportation Authority Service at the Orange Park Mall enabling riders to commute from Middleburg, Fleming Island, Green Cove Springs and Orange Park all the way into Jacksonville or vice versa.
Council on Aging of Nassau County The Council on Aging of Nassau County is the Community Transportation Coordinator providing paratransit services to residents of Nassau County.
Ride Solution Ride Solution is the Community Transportation Coordinator providing paratransit services to residents of Nassau County.
The Sunshine Bus Company St. Johns County Council on Aging, Inc. operates the Sunshine Bus Company in St. Johns County which provides paratransit services to St. Johns County along six routes. More than 237,000 passenger trips were served by The Sunshine Bus Service in 2012. 9
8 9
Florida Transit Handbook, 2013. Florida Transit Handbook, 2013. 1-10
Path Forward 2040 Long Range Transportation Plan
POPULATION AND EMPLOYMENT
A summary of the anticipated growth in population and employment by county is summarized in the tables below.
North Florida is anticipated to grow by approximately 600,000 persons, 265,000 households and nearly 300,000 jobs by the year 2040 representing an increase in population of 41 percent and an increase of workers of 43 percent.
Table 1-1. Population Growth County 2010 2040
Percent Change Nassau 73,314 116,700 43,386 59.2 Duval 864,278 1,071,600 207,322 24.0 St. Johns 189,396 377,000 187,604 99.1 Clay 190,865 315,700 124,835 65.4 Baker 27,115 39,000 11,885 43.8 Putnam 74,364 79,400 5,036 6.8 Totals 1,419,332 1,999,400 580,068 40.9 Source: Bureau of Economic Business and Research, University of Florida Table 1-2. Employment Growth County 2010 2040
Growth
Growth
Percent Change
Nassau 24,126 40,661 16,535 68.5 Duval 519,142 627,144 108,002 20.8 St. Johns 61,714 186,691 124,977 202.5 Clay 54,454 87,737 33,283 61.1 Baker 7,396 16,775 9,379 126.8 Putnam 25,148 29,218 4,070 16.2 Total 691,980 988,226 296,246 42.8 Note: Growth rate for Putnam County is adjusted to 0.05%. Source: Bureau of Economic Business and Research, University of Florida
1-11
Compounding Annual Growth Rate (percent)
2.0 0.8 3.3 2.2 1.5 0.2 1.4
Compounding Annual Growth Rate 1.74 0.63 3.69 1.59 2.73 -0.06 0.95
Path Forward 2040 Long Range Transportation Plan To address this growth and maintain the quality of life for the residents of North Florida, investments in transportation infrastructure and services are needed.
Reduced automobile use and increased transit use combined with the opening of 62 additional lane miles of highways between 2008 and 2012 resulted in significant benefits in the quality of travel within the region. Average speeds during the peak periods improved by 2.73 percent from 2008 to 2012 and 0.65 percent from 2011 to 2012. These average speeds resulted in a positive economic impact to the local economy of $280 million per year.
LAND USE Land use is what drives our need to travel and is an important input into the transportation planning process. Land use development decisions are made at the local level but the effects of these decisions can be seen in regional travel patterns. Coordination between local communities is important so that the growth pattern is beneficial for the area as a whole. Extensive coordination with the local agencies within the region occurred to cooperatively develop a land use forecast for the year 2040.
However, vehicle use and travel is anticipated to increase in the region for the next five years as a result of the economic recovery and new growth within the region. The demand for travel is anticipated to return to pre- recession levels by the year 2018. Investments to meet these demands are needed to remain competitive.
New developments of regional impact are anticipated to be built-out and by the year 2040. Land use within the region is anticipated to intensify as are result. Vacant parcels within the urban service boundary are anticipated to fill and densities intensify within existing parcels through redevelopment to meet the demand for new households, schools, recreation and employment.
A summary of the recent trends in mobility within the region is provided in Table 1-3 on the next page. By the year 2040, the traffic volumes are anticipated to increase by one-third within the region as a result of the growth in population and economic activity. Although driving (alone or with other passengers) is still anticipated to account for about 85 percent of all trips within the region, because of the aging population and changes in preferences from the millennial generation who wish to drive less, the percent of trips made by persons walking is anticipated to increase from 8.4 percent to 9.4 percent, a 14 percent change. According to the American Planning Association’s 2014 National Poll, 81 percent of millennials and 77 percent of active boomers say “affordable and convenient alternatives to the car are at least somewhat important in deciding where to live and work.” These changes in travel preferences will require a multimodal approach to addressing our transportation needs in 2040.
PERSONAL MOBILITY From 2008 to 2012, automobile use has declined within the region by 5.7 percent. This decline in vehicle use is believed to be the result of the economic downturn, changing travel patterns associated with an aging population and younger driver’s reduced automobile dependence. The exception to this reduction is the recent increase in the truck miles traveled within the region. Over the last five years, truck traffic declined by 16.4 percent. From 2011 to 2012 truck traffic increased 1.6 reflecting the beginning of the economic recovery. Although transit use in North Florida continues to be less than one percent of all person travel miles, ridership continues to rise with a 1.8 percent annual increase from 2011 to 2012. Since 2008, transit use in the area has increased by 30.8 percent.
Without investments in transportation, travel conditions are anticipated to worsen. By the year 2040, trip times are anticipated to increase by nearly 20 percent as summarized in Table 1-4.
1-12
Path Forward 2040 Long Range Transportation Plan Table 1-3. Summary of Recent Mobility Trends (average daily values) Item 2008 Quantity of Travel Vehicle-miles traveled (daily) in thousands 26,997 Vehicle-miles traveled (peak hour) in thousands 2,161 Person-miles traveled (daily) in thousands 44,081 Person-miles traveled (peak Hour) in thousands 3,520 Truck-miles traveled (daily) in thousands 2,249 Transit ridership (thousands) 55,640 Quality of Travel Average travel speed (peak hour) 51.38 Delay (daily) 18,316 Travel time reliability (daily) 68.95 Percent miles meeting level of service criteria (daily) 99.42 on rural facilities System Utilization Percent miles severely congested (peak hour) 5.26 Percent travel severely congested (daily) 2.83 Percent travel severely congested (peak hour) 0.23 Hours severely congested (daily) 0.81 Hours severely congested (yearly) 153.94 Vehicle per lane miles (peak hour) in hundreds 642.1 Passengers per transit revenue mile 5.47 Table 1-4. Anticipated Changes in Trip Travel Times (2010 to 2040) Trip Purpose Work Shopping Social/recreation School trips Personal business
FREIGHT MOBILITY
2009
2010
2011
26,629 2,132 43,507 3,472 2,139 55,884
26,310 2,105 43,000 3,432 1,866 63,755
26,081 2,087 42,646 3,403 1,851 72,785
25,474 2,036 41,640 3,323 1,880 72,785
50.92 14,782 69.77 99.72
52.13 11,740 69.41 99.72
52.03 13,211 69.59 99.45
52.38 12,244 69.26 99.68
6.49 4.08 0.34 1.10 226.70 633.9 5.91
4.41 2.52 0.21 0.81 105.04 622.8 6.48
5.52 3.75 0.31 0.80 184.41 620.2 7.42
3.64 2.43 0.20 0.80 120.45 604.3 7.67
Increase in Trip Time
2012
16.4% 21.7% 25.1% 16.5% 21.7%
which operates major short line railroads across the US and in Australia, maintains its operations headquarters in Jacksonville.
The level of connectivity to the North Florida region is a significant economic advantage for our region. I-95 serves as the major highway gateway to Florida’s 19.5 million persons. I-10 connects our region along an eastwest route to the southwest, western states and Pacific Ocean. A third interstate, I-295 serves as a beltway around Jacksonville that connects both of these interstates and provides direct access to major JAXPORT marine terminals at Blount Island and Dames Point and rail intermodal facilities for CSX and Norfolk Southern railroads. I-75, the nation’s central spine connecting Florida, southeastern and mid-western states is located 60 miles to the west of our region. North Florida provides the rail gateway into Florida. Norfolk Southern and FEC railroads have their Florida termini in North Florida. In addition CSX’s and FEC both maintain their corporate headquarters in North Florida. Genesee & Wyoming Inc.,
These significant assets result in 160 million tons of freight moving through North Florida each year. As our regional, the state and global economy grow, the movement of goods will increase. Growth is anticipated to occur for deliveries to our region, goods exported from our region and shipments that travel through our region each year. Trends that will affect our region include the continued shift of freight to containerized or intermodal movements, growth in the port imports and exports and shipments through North Florida as the gateway to Florida.
1-13
Path Forward 2040 Long Range Transportation Plan Table 1-5 summarizes the freight flows in the year 2012 in North Florida. By the year 2040, shipments traveling through North Florida are anticipated to increase 280 percent as a result of economic growth. Investments in our multimodal freight network are needed to meet this demand and maintain our region’s competitiveness in the global economy.
Table 1-5. Total Tons of Commodities (millions of tons per year) Origin and Destination Internal to area Originates in area And is destined to locations within Florida And is destined to locations outside Florida Is destined for the area And originated from within Florida And originated from outside Florida Port related Through traffic Total Mix Percent
1-14
Truck
34.9
Rail
0.0
Total
34.9
Percentage
18%
18.5 8.0
0.2 0.6
18.7 8.6
10% 5%
7.5 8.9 11.7 70.0 159.5 84%
0.4 11.6 0.6 18.0 31.4 16%
7.9 20.5 12.3 88.0 190.9 100%
4% 11% 6% 46% 100%
PART
TWO
PLANNING PROCESS
Path Forward 2040 Long Range Transportation Plan
GOALS, OBJECTIVES, PERFORMANCE MEASURES AND IMPLEMENTING POLICIES F ACED WITH ESCALATING DEMANDS FOR TRANSPORTATION INVESTMENT AND LIMITED RESOURCES , ESTABLISHING THE GOALS AND OBJECTIVES WITHIN THE P ATH F ORWARD 2040 LRTP IS AN ESSENTIAL FIRST STEP IN DEFINING THE SUCCESS OF OUR PLAN AND GUIDING DECISION MAKING .
LRTP GOALS AND OBJECTIVES
The goals, objective and performance measures proposed are based on the transportation user’s point of view. The order of the goals and objectives do not indicate the priority.
Through the LRTP, it is North Florida TPO’s vision to promote the regional optimization of mobility consistent with the values of local communities. Specifically, the goals and objectives are to enhance the following:
Economic Competitiveness Livability Safety Mobility and Accessibility Equity in Decision Making System Preservation
2-1
Path Forward 2040 Long Range Transportation Plan
GOAL 1: INVEST IN PROJECTS THAT ENHANCE ECONOMIC COMPETITIVENESS
Table 2-2 on the next page summarizes the objectives, performance measures and benchmarks associated with this goal. The targets are to achieve the benchmarks by the year 2040.
Investing in projects that enhance economic competitiveness are primarily those that improve travel time reliability, which is the most important factor for freight operators, enhance access to job and maximize the return on investment. Table 2-1 summarizes the objectives, performance measures and benchmarks associated with this goal.
GOAL 2: INVEST IN LIVABLE AND SUSTAINABLE COMMUNITIES There no single definition of what constitutes a “livable” or “sustainable” transportation system. According to the definition endorsed by the Transportation Research Board Sustainable Transportation Indicators Subcommittee, a sustainable transportation system follows: Allows the basic access and development needs of individuals, companies, and society to be met safely and in a manner consistent with human and ecosystem health, and promotes equity within and between successive generations. Is affordable, operates fairly and efficiently, offers a choice of transportation modes, and supports a competitive economy, as well as balanced regional development. Limits air, water, noise emissions, waste and resource use. Limits emissions and waste within the planet’s ability to absorb them, uses renewable resources at or below their rates of generation, and uses non-renewable resources at or below the rates of development of renewable substitutes, while minimizing the impact on the use of land and the generation of noise.
Table 2-1. Enhance Economic Competitiveness Objectives and Performance Measures Objective Performance Measure Benchmark Improve travel reliability on major Travel time reliability Maintain or improve the freight routes reliability Enhance access to jobs Jobs within ½ mile of a congestion Maintain or improve access to management system facility jobs Maximize the return on investment Benefit: cost ratio Rank benefit-to-cost ratio Return on investment Rank return on investment
2-2
Path Forward 2040 Long Range Transportation Plan Table 2-2. Livability and Sustainability Objectives and Performance Measures Objective Performance Measure Enhance transit Âź mile walk accessibility to transit stops accessibility Households within 5 miles of major transit centers or park and ride lots Enhance transit Annual boardings per vehicle revenue mile ridership Annual boardings per vehicle revenue hour Enhance bicycle and Lane mile with bicycle and pedestrian facilities at the quality pedestrian quality of of service standard service Reduce the cost of Transportation costs per capita congestion per capita Costs of congestion Reduce the impacts of Environmental screening and mitigation investments on the natural environment Reduce emissions from Hydrocarbon, nitrous oxides and volatile organic compound automobiles emissions Consistency with land Includes active transportation design principles in context use planning sensitive solutions Supports regional Reduce clearance times for evacuations evacuation needs Table notes
Benchmark 95% of all stops (1) (2) (2) 85% of lane miles (3) Apply Efficient Decision Making Process to all projects in LRTP. Maintain our attainment status. (4) Include walkability standards in context sensitive solutions Improve clearance times by 15 minutes. (5)
(1) This performance measure will not change significantly from year to year unless major route changes or new transit operations are deployed. (2) Coordination with Jacksonville Transportation Authority is needed to develop the baseline and benchmark data needed. (3) Many exogenous factors influence this performance measure including the price of fuels that are beyond the scope of a LRTP. However, this performance measure will be considered within the LRTP based on policy decisions made during the scenario development. (4) Emissions will be determined using Florida emission factors from the FHWA Moves model. (5) Based on modeling provide by the Northeast Florida Regional Council.
GOAL 3: ENHANCE SAFETY Investing in projects that enhance the safety will lead to reduced crashes and lower crash severity. Table 2-3 summarizes the objectives, performance measures and benchmarks associated with this goal.
Table 2-3. Safety Objectives and Performance Measures Objective Performance Measure Reduce Crashes Number of crashes Crash rate per million vehicle miles Reduce Fatal crashes Number of fatalities Crash rate per million vehicle miles
2-3
Benchmark Reduce by 0.25% each year Reduce or maintain Reduce by 0.25% each year Reduce or maintain
Path Forward 2040 Long Range Transportation Plan
GOAL 4: ENHANCE MOBILITY AND ACCESSIBILITY
context of each corridor being considered is an essential element to identifying the right mobility solution for any project.
Enhancing mobility includes addressing the four dimensions of mobility – quantity of travel, quality of travel, system accessibility and system utilization. Several of these measures also support other goals and objectives (such as livability and sustainability).
Table 2-4 summarizes the objectives, performance measures and benchmarks associated with this goal. The measures associated with the quantity of travel are oriented to how many people use the network. These measures are important, as some operational improvements may increase the throughput of travel at a location, but the quality of travel flow (speeds, delays, etc.) may not change during the peak hour.
Mobility is about more than increasing the volume of persons served and managing congestion. Users want a less stressful commute, but they also want improved reliability of their travel, more choices including transit, walking and bicycling and to ensure we optimize system operations before we invest in new infrastructure. Understanding the trade-offs of these goals in the
Table 2-4. Mobility and Accessibility Objectives and Performance Measures Goal Mobility Performance Measures Benchmark Person-miles traveled Truck-miles traveled Vehicle-miles traveled Person trips Transit ridership Average speed Delay Average trip time
(2) (2) Optimize the (2) quantity of travel (2) Increase transit ridership Maintain or improve the average travel speed Maintain or reduce the average vehicle delay Maintain or reduce the average trip time Optimize the Maintain or improve the reliability quality if Reliability Achieve 95% reliability (on time arrival) on Strategic travel (1) Intermodal System facilities. Maintain the level of service standard (FDOT standard for Level of service on rural facilities Strategic Intermodal System facilities and local government standards for other facilities) Proximity to major transportation hubs (3) Improve the % miles bicycle accommodations (3) accessibility to mode % miles pedestrian accommodations (3) choices Transit coverage Increase the % of population served with Âź mile % system heavily congested Maintain or reduce the % of system heavily congested % travel heavily congested Maintain or reduce the % of travel heavily congested Optimize the Vehicles per lane mile Optimize the vehicles per lane mile for a desired LOS utilization of Duration of congestion Maintain or reduce the duration of congestion the system Optimize the transit load factor for a desired quality of Transit load factor service (1) These measures may not apply on corridors not selected for context-based solutions that may intentionally lower the running speed or capacity. (2) Generally, increases in the quantity traveled (throughout) are preferred. However, consistent with livability and sustainability goals, one objective is to reduce the amount of travel needed. Therefore, no benchmarks are proposed, but monitoring is recommended. (3) These performance measures will not change significantly from year to year but will be evaluated in each major update to the LRTP to establish benchmark and monitor performance. 2-4
Path Forward 2040 Long Range Transportation Plan
1. To avoid, minimize, or mitigate disproportionately high and adverse human health and environmental effects, including social and economic effects, on minority populations and low-income populations.
Optimizing the quantity of travel is proposed so that context sensitive solutions and alternatives that result in fewer trips and less use of the transportation network can be considered equitably with projects that add capacity. The quality of travel includes not only speeds and delays but also travel reliability.
2. To ensure the full and fair participation by all potentially affected communities in the transportation decision-making process.
Accessibility refers to the ease of reaching goods, services and other activities. Accessibility analysis is one component of mobility in that it considers the connections to adjacent land uses and the modalities of transportation between desired origins and destinations. By improving accessibility, we can meet the same needs of users by being smarter and enhancing the efficiencies of our investments.
3. To prevent the denial of, reduction in, or significant delay in the receipt of benefits by minority 11 and low-income populations. To address these goals, these three principles are adopted as objectives for this LRTP. The performance measures associated with each objective are less quantifiable than the objectives associated with other goals and are more process oriented. These three factors will be considered as part of the Needs Plan and Cost Feasible Plan and will be implemented using Geographic Information Systems techniques to identify the minority and low-income populations and by designing outreach programs to involve minority and low-income populations.
As transportation providers, understanding the utilization of the system is important in optimizing the transportation network. Measures such as the duration of congestion are used to ensure the services and facilities are allocated appropriately. Together these four dimensions will allow us to evaluate the tradeoffs of alternative transportation investments.
GOAL 5: ENHANCE EQUITY IN DECISION MAKING
GOAL 6: PRESERVE AND MAINTAIN OUR EXISTING SYSTEM
The United States Environmental Protection Agency defines Environmental Justice as follows.
The Federal Highway Administration (FHWA) and FDOT established formal goals and objectives for systems preservation that are proposed for adoption as part of this LRTP. They include:
Environmental Justice is the fair treatment and meaningful involvement of all people regardless of race, color, national origin, or income with respect to the development, implementation, and enforcement of environmental laws, regulations, and policies. EPA has this goal for all communities and persons across this Nation [sic]. It will be achieved when everyone enjoys the same degree of protection from environmental and health hazards and equal access to the decision-making process to have a healthy 10 environment in which to live, learn, and work.
1. 2. 3. 4.
The United States Department of Transportation defines three fundamental Environmental Justice principles for the Federal Highway Administration and the Federal Transit Administration as follows:
1.
5.
Have 95 percent of the Strategic Intermodal System in good or better condition. Have 85 percent of other arterials in good or better condition. Strengthen bridges that are either (1) structurally deficient or (2) posted for weight restriction within six years on FDOT facilities. Replace bridges that require structural repair and are more cost effective to replace within nine years on FDOT facilities. Satisfy FDOT’s off system bridge replacement goals.
2.
"Environmental Justice". US EPA. Retrieved 2012-03-29.
2-5
"Overview of Transportation and Environmental Justice". U.S. Department of Transportation. Retrieved 2010-01-22.
Path Forward 2040 Long Range Transportation Plan In addition, the objective of the systems preservation and maintenance goal is to provide a transit fleet that meets Federal Transit Administration’s (FTA’s) requirements for system preservation, vehicle age and maintenance.
Federal and state requirements and policies associated with the LRTP’s goals for “Equity in Decision Making” and “System Preservation” were in place before this plan began and are recommended for direct adoption in the plan. The following are new policies to consider.
Table 2-5 summarizes the performance measures established for preservation, operations and maintenance.
ECONOMIC COMPETITIVENESS This policy requires each new project included in the 2040 Cost Feasible Plan provide a benefit-to-cost ratio. This policy will ensure that all projects are evaluated using consistent criteria in relationship to the economic goals of the plan and are focused on the greatest economic return and efficient allocation of resources.
LRTP IMPLEMENTING POLICIES INTENT
Not all projects that are included in the Cost Feasible Plan may demonstrate benefit-to-cost ratio of greater than 1.0. The intent of the policy is for this to be one of the factors used to support decision-making.
Adopting more formal policies as part of the LRTP is a first step toward a stronger regional approach to transportation decision making. Establishing these policies is within the context of the role of the North Florida TPO as a policy board in regional planning. The intent is not for the Board to be involved with or direct design decisions. Engineers are the licensed professionals charged with safe and efficient operation of the transportation system. It is inappropriate, for the Board or elected officials to direct elements of roadway design. However, it is appropriate at the policy level to establish the general framework and policy guidelines for the objectives of the project to be constructed.
LIVABILITY TRANSIT INVESTMENT Incorporating a regional livability policy in the LRTP will guide investment decisions to promote transit and mode choices. The Jacksonville Transportation Authority has defined a vision for future transit investments with the 2040 horizon that may include bus rapid transit, trolleys, commuter rail and other modes. The policy intent is to support these investments. In addition to considering transit alternatives, successful transit investments are dependent on walkable access, pedestrian-oriented design and transit-oriented design.
As changes to the LRTP or Transportation Improvement Program are considered for adoption by the North Florida TPO, a policy review of the projects should be performed to ensure the proposed investments reflect the values and intent of the goals and objectives within the LRTP. Policies for economic competitiveness, livability, safety, mobility and accessibility were adopted.
CONTEXT SENSITIVE SOLUTIONS A policy in the LRTP that identifies corridors where investments would be made consistent with complete
Table 2-5. System Preservation Objectives and Performance Measures Objective Performance Measure Benchmark Maintain roadways FDOT condition rating system 95% of SIS roadways in good or better condition 85% of non-SIS roadways in good or better condition Maintain bridges FDOT condition rating system Strengthen bridges that are either (1) structurally deficient or (2) posted for weight restriction within six years on FDOT facilities. Replace bridges that require structural repair that more cost effective to replace within nine years on FDOT facilities. Satisfy FDOT’s off system bridge replacement goals. Maintain transit system FTA system preservation Age of vehicles
2-6
Path Forward 2040 Long Range Transportation Plan street and context sensitive solutions principles is recommended. With the complete streets and context sensitive solutions concept, we are working to change the paradigm from “moving cars quickly” to “providing safe mobility for all modes”.
SAFETY
Implementing these concepts should reflect the context and character of the surrounding built and natural environments. These transportation investments need to be linked to land use and zoning requirements to ensure a consistent urban character and link transportation investment to achieve the goals of livability include.
As part of the Strategic Safety Plan completed in 2012, several strategic safety corridors and intersections on the state-maintained highway system and local roadways were identified. Many safety projects are smaller in scope and costs and can be implemented in a shorter time than major capacity improvements. Safety projects often result in high benefit-to-cost ratios. This policy leverages the plan to identify safety strategies for implanting and advancing projects.
Maximizing the number of lanes to six general use lanes. Any additional lanes would be bus rapid transit or other managed lanes. Investing in each corridor consistent with an urban character defined through the project or adopted from a prior study such as the Neighborhood Vision projects performed by the City of Jacksonville. For example, on some corridors an urban village could be used which would require wider sidewalks and on-street parking or grand boulevards, or “Grand Boulevard” concepts. Grand Boulevards would require bicycle, pedestrians and transit to be considered with equal consideration to automobile mobility. Requiring land use and zoning regulations to be in place by local governments to encourage redevelopment consistent with the urban design characteristics established for the corridor. Establishing prototype corridor concepts for use within designated corridors or areas.
TRANSPORTATION SYSTEMS MANAGEMENT AND OPERATIONS The policies associated with transit oriented development context sensitive solutions are key elements of the overall mobility and accessibility approach for this plan. In addition, to ensure we are optimizing the efficiency of the network, a Transportation Systems Management and Operations (TSM&O) policy is proposed. TSM&O alternatives should be considered prior to investing in new capacity is recommended. These strategies are highly competitive with capacity projects funding in many settings. Examples of TSM&O approaches include:
The following actions were performed as part of the developing the LRTP.
candidates for more detailed evaluation during project development phases were identified. Context sensitive solutions improvements were included in the 2040 Needs Plan and 2040 Cost Feasible Plan.
The policy built on work being prepared by local agencies within the region that are developing context sensitive solutions, livable communities and low impact development guidelines. A network of context sensitive solutions corridors was identified where context sensitive solutions are considered a priority. A list of context sensitive solutions guidelines was prepared where specific types of investments are encouraged. The guidelines are provided in Technical Memorandum #9 – Context Sensitive Solutions Guidelines. A conceptual evaluation context sensitive solutions were screened and identified projects that are
Integrated corridor management Arterial traffic management systems Bus rapid transit Ramp metering Hard shoulder running Commercial vehicle information systems
The following actions were performed within the LRTP process.
2-7
A TSM&O network that includes the constrained corridors identified in the plan and the congested corridors identified in the Congestion Management Plan are designated. A list of candidate TSM&O strategies and tactics screened and identified for more detailed evaluation during project development phases. TSM&O improvements were included in the 2040 Needs Plan and the Cost Feasible Plan.
Path Forward 2040 Long Range Transportation Plan This page is intentionally blank.
2-8
Path Forward 2040 Long Range Transportation Plan
CONSISTENCY WITH FEDERAL AND STATE PLANS T HE P ATH F ORWARD 2040 LRTP CONSIDERS THE REQUIREMENTS OF KEY LEGISLATIVE , STATEWIDE AND POLICIES , GOALS AND OBJECTIVES AND IS CONSISTENT WITH THE REQUIREMENTS OF F EDERAL AND S TATE LEGISLATION . MOVING AHEAD FOR PROGRESS IN THE 21ST CENTURY 12
Congress passed the act entitled Moving Ahead for Progress in the 21st Century (MAP-21) in 2012 which establishes national performance goals for Federal highway programs and include:
Support the economic vitality of the metropolitan areas, especially by enabling global competitiveness, productivity and efficiency. Increase the safety and security of the transportation system for motorized and nonmotorized users to achieve a significant reduction in
12
Adapted from http://www.fhwa.dot.gov/planning/tpr_and_nepa/tpran dnepa.cfm 2-9
traffic fatalities and serious injuries on all public roads. Increase the accessibility and mobility of people and freight to achieve a significant reduction in congestion on the National Highway System. Improve the efficiency of the surface transportation system. Improve the national freight network, strengthen the ability of rural communities to access national and international trade markets, and support regional economic development. Enhance the performance of the transportation system while protecting and enhancing the natural environment.
Path Forward 2040 Long Range Transportation Plan As part of MAP-21, the following new policies related to metropolitan planning were identified: 

LRTPs and Transportation Improvement Programs (Transportation Improvement Programs) are required to be developed through a performancebased approach. As part of the performance-based planning approach: o Performance measures that support national goals are required. o Targets are required with monitoring toward attaining the performance measures. o The targets should be established in coordination with other state or public transportation agencies. o Targets are required to be integrated into the continuing planning process. o The performance measures should be included in the LRTP and show the progress that is anticipated to be achieved by planned investments and decision making. System Performance Reports are required that describe the progress made toward achieving the performance targets. o The U.S. Department of Transportation will establish the minimum condition levels for all highways on the Interstate System and bridges on the National Highway System. Within two years of enacting MAP-21, each MPO shall include representation by transportation providers, including public transit systems.
Table 2-6 demonstrates how these goals and objectives are consistent with the federal requirements in MAP-21. Table 2-7 outlines the Federal planning requirements as enumerated in CFR 450.322 and provides references to how each of the planning requirements is addressed. The public involvement requirements from Federal and state legislation and policies are discussed in greater detail in the Public Involvement section.
2-10
Path Forward 2040 Long Range Transportation Plan Table 2-6. Traceability Matrix Support economic vitality
Increase safety and security
Increase accessibility and mobility
Improve efficiency
Improve the national freight network
Goal
Objective
Invest in projects that enhance economic competitiveness
Improve travel time reliability on major freight routes.
Enhance access to jobs.
Enhance transit ridership.
Enhance bicycle and pedestrian quality of service.
Reduce the cost of congestion per capita.
Maximize the return on investment. Enhance transit accessibility.
Invest in livable communities and sustainable communities
Reduce the impacts of improvements on the natural environment Reduce emissions from automobiles.
Enhance safety
Reduce crashes. Reduce facilities. Optimize the quantity of travel.
Enhance mobility and accessibility
Optimize the quality of travel. Improve the accessibility to mode choices. Optimize the utilization of the system.
Enhance equity in decision making
Avoid disproportionately adverse impacts on minority or low-income populations.
Ensure fair participation by all affected populations.
Prevent the denial of benefits to minority and lowincome populations.
Satisfy FDOT’s off system bridge replacement goals.
Meet FTA transit system maintenance requirements.
Meet the FDOT pavement condition goals
Preserve and maintain our existing system
Protect and enhance the environment
Meet the FDOT bridge condition goals
2-11
Path Forward 2040 Long Range Transportation Plan Table 2-7. Federal Planning Requirements Planning Requirement (a) The metropolitan transportation planning process shall include the development of a transportation plan addressing no less than a 20-year planning horizon as of the effective date.
Action Taken The plan addresses a horizon of 2040.
In nonattainment and maintenance areas, the effective date of the transportation plan shall be the date of a conformity determination issued by the FHWA and the FTA. In attainment areas, the effective date of the transportation plan shall be its date of adoption by the MPO. (b) The transportation plan shall include both long-range and short-range strategies/actions that lead to the development of an integrated multimodal transportation system to facilitate the safe and efficient movement of people and goods in addressing current and future transportation demand. (c) The MPO shall review and update the transportation plan at least every four years in air quality nonattainment and maintenance areas and at least every five years in attainment areas to confirm the transportation plan's validity and consistency with current and forecasted transportation and land use conditions and trends and to extend the forecast period to at least a 20-year planning horizon.
A maintenance plan is not required in this airshed based on Section 185A of the Clean Air Act Amendments and the adopted State Implementation Plan.
In addition, the MPO may revise the transportation plan at any time using the procedures in this section without a requirement to extend the horizon year. The transportation plan (and any revisions) shall be approved by the MPO and submitted for information purposes to the Governor. Copies of any updated or revised transportation plans must be provided to the FHWA and the FTA. (d) In metropolitan areas that are in nonattainment for ozone or carbon monoxide, the MPO shall coordinate the development of the metropolitan transportation plan with the process for developing transportation control measures in a State Implementation Plan. (e) The MPO, the State(s), and the public transportation operator(s) shall validate data utilized in preparing other existing modal plans for providing input to the transportation plan.
Not applicable.
In updating the transportation plan, the MPO shall base the update on the latest available estimates and assumptions for population, land use, travel, employment, congestion, and economic activity. The MPO shall approve transportation plan contents and supporting analyses produced by a transportation plan update.
Short- and long-range strategies were evaluated that included safety and TSM&O strategies.
This is an update to the 2035 Long-Range Transportation Plan.
Not applicable.
Extensive coordination with all state and local transportation agencies including the Jacksonville Transportation Authority was performed in the development of the plan as outlined in the public involvement section. A travel demand model was prepared as part of the planning process that included information on the population, land use, travel, employment, congestion and economic activity. These data were reviewed and approved by the local agencies and the North Florida TPO.
2-12
Path Forward 2040 Long Range Transportation Plan Table 2-7. Federal Planning Requirements Planning Requirement Action Taken (f) The metropolitan transportation plan shall, at a minimum, include: (1) The projected transportation demand of persons and A regional travel demand model was developed that goods in the metropolitan planning area over the period of included a freight analysis and forecasts through the year the transportation plan. 2040. (2) Existing and proposed transportation facilities (including A comprehensive evaluation of all regional multimodal major roadways, transit, multimodal and intermodal needs was conducted as part of the planning process. As facilities, pedestrian walkways and bicycle facilities, and documented in this report, an inventory of major roadways, intermodal connectors) that should function as an transit, multimodal and intermodal facilities, pedestrian integrated metropolitan transportation system, giving walkways and bicycle facilities, and intermodal connectors emphasis to those facilities that serve important national was completed and the needs were identified. and regional transportation functions over the period of the transportation plan. In addition, the locally preferred alternative selected from an Alternatives Analysis under the FTA's Capital Investment Grant program (49 U.S.C. 5309 and 49 CFR part 611) needs to be adopted as part of the metropolitan transportation plan as a condition for funding under 49 U.S.C. 5309. (3) Operational and management strategies to improve the performance of existing transportation facilities to relieve vehicular congestion and maximize the safety and mobility of people and goods. (4) Consideration of the results of the congestion management process in Transportation Management Areas that meet the requirements of this subpart, including the identification of single-occupancy vehicle projects that result from a congestion management process in Transportation Management Areas that are nonattainment for ozone or carbon monoxide. (5) Assessment of capital investment and other strategies to preserve the existing and projected future metropolitan transportation infrastructure and provide for multimodal capacity increases based on regional priorities and needs.
Transit projects are identified in the plan. Projects where project development has begun and projects with plans to conduct alternatives analysis phases are also identified.
The metropolitan transportation plan may consider projects and strategies that address areas or corridors where current or projected congestion threatens the efficient functioning of key elements of the metropolitan area's transportation system. (6) Design concept and design scope descriptions of all existing and proposed transportation facilities in sufficient detail, regardless of funding source, in nonattainment and maintenance areas for conformity determinations under the EPA's transportation conformity rule (40 CFR part 93). In all areas (regardless of air quality designation), all proposed improvements shall be described in sufficient detail to develop cost estimates.
An analysis of the regional congestion management plan and process was used to identify system bottlenecks and needs.
A regional ITS and TSM&O Master Plan was adopted as part of the Needs Plan and funding will be allocated on an annual basis to address needs within the plan. The congestion management process was used to identify needs and alternative strategies to address congestion.
Operations and maintenance of the region’s infrastructure was addressed and funding was allocated within this plan.
The purpose and need for each project is summarized for projects. Cost estimates were included based on prior studies for most of the projects included in the plan. Where project costs estimates were not available, generic cost estimates were used based on FDOT historical data. These are provided in Appendix K.
2-13
Path Forward 2040 Long Range Transportation Plan Table 2-7. Federal Planning Requirements Planning Requirement (7) A discussion of types of potential environmental mitigation activities and potential areas to carry out these activities, including activities that may have the greatest potential to restore and maintain the environmental functions affected by the metropolitan transportation plan. The discussion may focus on policies, programs, or strategies, rather than at the project level. The discussion shall be developed in consultation with Federal, State, and Tribal land management, wildlife, and regulatory agencies. The MPO may establish reasonable timeframes for performing this consultation. (8) Pedestrian walkway and bicycle transportation facilities in accordance with 23 U.S.C. 217(g);
Action Taken A systemwide approach to environmental mitigation activities are identified in the plan. Estimates for mitigation costs were provided for projects as part of the plan. The Efficient Transportation Decision Making Process established by FDOT was used to identify an inventory of issues that may be associated with each corridor. The FDOT has established procedures for addressing all mitigation issues in consultation with agencies as part of the Project Development and Environment (PD&E) process.
(9) Transportation and transit enhancement activities, as appropriate; and (10) A financial plan that demonstrates how the adopted transportation plan can be implemented. (i) For purposes of transportation system operations and maintenance, the financial plan shall contain system-level estimates of costs and revenue sources that are reasonably expected to be available to adequately operate and maintain Federal-aid highways (as defined by 23 U.S.C. 101(a)(5)) and public transportation (as defined by title 49 U.S.C. Chapter 53). (ii) For the purpose of developing the metropolitan transportation plan, the MPO, public transportation operator(s), and State shall cooperatively develop estimates of funds that will be available to support metropolitan transportation plan implementation, as required under ยง450.314(a). All necessary financial resources from public and private sources that are reasonably expected to be made available to carry out the transportation plan shall be identified. (iii) The financial plan shall include recommendations on any additional financing strategies to fund projects and programs included in the metropolitan transportation plan. In the case of new funding sources, strategies for ensuring their availability shall be identified.
Pedestrian and bicycle improvements are addressed in the plan as part of the Active Transportation discussion. Dedicated funding was set aside for bicycle and pedestrian projects. Projects that are candidates for context sensitive solutions and transit accessibility and mobility enhancements are also identified. Transit and transit mobility enhancement improvements are addressed in the plan. A financial plan was prepared and is documented in this plan. System-level estimates of operations and maintenance costs were identified for state roads, local roads and transit and are documented in this report.
Federal and state funding program estimates were provided in consultation with FDOT. These revenues are summarized in this report. Through consultation with the Jacksonville Transportation Authority, estimates of local match and operations and maintenance costs for each project were developed for transit.
A financial plan was prepared that included alternative revenue sources. While developing the plan, alternatives for additional financing beyond those that are currently in place were not advanced to the Cost Feasible Plan stage. Toll revenues anticipated to fund the future First Coast Expressway were also estimated. Locally-funded and privately-funded projects of regional significance were also identified.
2-14
Path Forward 2040 Long Range Transportation Plan Table 2-7. Federal Planning Requirements Planning Requirement (iv) In developing the financial plan, the MPO shall take into account all projects and strategies proposed for funding under title 23 U.S.C., title 49 U.S.C. Chapter 53 or with other Federal funds; State assistance; local sources; and private participation. Starting December 11, 2007, revenue and cost estimates that support the metropolitan transportation plan must use an inflation rate(s) to reflect “year of expenditure dollars,� based on reasonable financial principles and information, developed cooperatively by the MPO, State(s), and public transportation operator(s). (v) For the outer years of the metropolitan transportation plan (i.e., beyond the first 10 years), the financial plan may reflect aggregate cost ranges/cost bands, as long as the future funding source(s) is reasonably expected to be available to support the projected cost ranges/cost bands. (vi) For nonattainment and maintenance areas, the financial plan shall address the specific financial strategies required to ensure the implementation of traffic control measures in the applicable State Implementation Plan. (vii) For illustrative purposes, the financial plan may (but is not required to) include additional projects that would be included in the adopted transportation plan if additional resources beyond those identified in the financial plan were to become available. (viii) In cases that the FHWA and the FTA find a metropolitan transportation plan to be fiscally constrained and a revenue source is subsequently removed or substantially reduced (i.e., by legislative or administrative actions), the FHWA and the FTA will not withdraw the original determination of fiscal constraint; however, in such cases, the FHWA and the FTA will not act on an updated or amended metropolitan transportation plan that does not reflect the changed revenue situation. (g) The MPO shall consult, as appropriate, with State and local agencies responsible for land use management, natural resources, environmental protection, conservation, and historic preservation concerning the development of the transportation plan. The consultation shall involve (1) Comparison of transportation plans with State conservation plans or maps, if available; or (2) Comparison of transportation plans to inventories of natural or historic resources, if available.
Action Taken The Cost Feasible Plan was developed using year of expenditure dollars and inflation rates provided by FDOT. All values in this report are expressed in the year-ofexpenditure, unless otherwise noted.
Funding bands of 2019-2020, 2021-2025, 2026-2030 and 2031-2040 were used.
A maintenance plan is not required in this airshed based on Section 185A of the Clean Air Act Amendments and the adopted State Implementation Plan. A needs plan was developed that identifies the illustrative projects that would be included if additional resources were available. Illustrative projects that were not funded for construction but funded for preliminary engineering phases only are also summarized in the plan. Not applicable. This process is address in the plan maintenance phase.
Extensive coordination with agencies was performed as part of the planning process and is summarized in this report.
Conservation areas were identified as part of the planning process and are shown on the plan maps. A comparison was performed through the Efficient Transportation Decision Making Process.
2-15
Path Forward 2040 Long Range Transportation Plan Table 2-7. Federal Planning Requirements Planning Requirement (h) The metropolitan transportation plan should include a safety element that incorporates or summarizes the priorities, goals, countermeasures, or projects for the MPA contained in the Strategic Highway Safety Plan required under 23 U.S.C. 148, as well as (as appropriate) emergency relief and disaster preparedness plans and strategies and policies that support homeland security (as appropriate) and safeguard the personal security of all motorized and nonmotorized users. (i) The MPO shall provide citizens, affected public agencies, representatives of public transportation employees, freight shippers, providers of freight transportation services, private providers of transportation, representatives of users of public transportation, representatives of users of pedestrian walkways and bicycle transportation facilities, representatives of the disabled, and other interested parties with a reasonable opportunity to comment on the transportation plan using the participation plan developed under §450.316(a). (j) The metropolitan transportation plan shall be published or otherwise made readily available by the MPO for public review, including (to the maximum extent practicable) in electronically accessible formats and means, such as the World Wide Web. (k) A State or MPO shall not be required to select any project from the illustrative list of additional projects included in the financial plan under paragraph (f)(10) of this section. (l) In nonattainment and maintenance areas for transportation-related pollutants, the MPO, as well as the FHWA and the FTA, must make a conformity determination on any updated or amended transportation plan in accordance with the Clean Air Act and the EPA transportation conformity regulations (40 CFR part 93). During a conformity lapse, MPOs can prepare an interim metropolitan transportation plan as a basis for advancing projects that are eligible to proceed under a conformity lapse. An interim metropolitan transportation plan consisting of eligible projects from, or consistent with, the most recent conforming transportation plan and Transportation Improvement Program may proceed immediately without revisiting the requirements of this section, subject to interagency consultation defined in 40 CFR part 93. An interim metropolitan transportation plan containing eligible projects that are not from, or consistent with, the most recent conforming transportation plan and Transportation Improvement Program must meet all the requirements of this section.
Action Taken The region recently adopted a Strategic Safety Plan and the needs identified in the plan are summarized in this plan. Funding will be allocated on an annual basis for selected projects in consultation with FDOT. Emergency relief and disaster preparedness plans were prepared by the Regional Planning Council and considered as part of the plan. Evaluation routes received a priority designation as part of the prioritization process. The North Florida TPO Board, Technical Advisory Board and Citizens Advisory Board were consulted through the plan development. These boards include representatives of all users. A project steering committee was also established which included additional members. The participation of these interest groups is documented in greater detail in Technical Memorandum #1 – Public Involvement and summarized in this report. A project web site was established for the project and all materials were made available to the public for review. The project web site is http://pathforward2040.com/. All projects were adopted by the North Florida TPO. Two projects were excluded from consideration in the Cost Feasible Plan based on the potential environmental impacts. These projects are documented in the Environmental Considerations section. A maintenance plan is not required in this airshed based on Section 185A of the Clean Air Act Amendments and the State Implementation Plan.
2-16
Path Forward 2040 Long Range Transportation Plan
FLORIDA TRANSPORTATION PLAN The 2060 Florida Transportation Plan was adopted in 2010 and creates a shared vision for the future of transportation in Florida and the goals, objectives and strategies to achieve this vision over the next 50 years.
Goal: Make transportation decisions to promote responsible environmental stewardship
Goal: Invest in transportation systems to support a prosperous, globally competitive economy
Maximize Florida’s position as a strategic hub for international and domestic trade, visitors and investment by developing, enhancing, and funding Florida’s Strategic Intermodal System. Improve transportation connectivity for people and freight to establish emerging regional employment centers in rural and urban areas. Plan and develop transportation systems to provide adequate connectivity to economically productive rural lands. Invest in transportation capacity improvements to meet future demand for moving people and freight. Be a worldwide leader in developing and implementing innovative transportation technologies and systems.
Goal: Provide a safe and secure transportation system for all users
Eliminate fatalities and minimize injuries on the transportation system. Improve the security of Florida’s transportation system. Improve Florida’s ability to use the transportation system to respond to emergencies and security risks.
Goal: Improve mobility and connectivity for people and freight
Goal: Make transportation decisions to support and enhance livable communities
Plan and develop transportation systems and facilities in a manner which protects and, where feasible, restores the function and character of the natural environment and avoids or minimizes adverse environmental impacts. Plan and develop transportation systems to reduce energy consumption, improve air quality, and reduce greenhouse gas emissions.
Develop transportation plans and make investments to support the goals of the Florida Transportation Plan and other statewide plans, as well as regional and community visions and plans. Coordinate transportation investments with other public and private decisions to foster livable communities. Coordinate transportation and land use decisions to support livable rural and urban communities.
2-17
Expand transportation options for residents, visitors and businesses. Reinforce and transform Florida’s Strategic Intermodal System to provide multimodal options for moving people and freight. Develop and operate a statewide high speed and intercity passenger rail system connecting all regions of the state and linking to public transportation systems in rural and urban areas. Expand and integrate regional public transit systems in Florida’s urban areas. Increase the efficiency and reliability of travel for people and freight. Integrate modal infrastructure, technologies, and payment systems to provide seamless connectivity for passenger and freight trips from origin to destination.
Path Forward 2040 Long Range Transportation Plan
STATE PLANNING REQUIREMENTS The state planning principles to be considered in the LRTP: preserving the existing transportation infrastructure; enhancing Florida’s economic competitiveness; and improving travel choices to ensure mobility. Table 2-8. State Planning Requirements Planning Requirement Each MPO must develop a long-range transportation plan that addresses at least a 20-year planning horizon. The plan must include both long-range and short-range strategies and must comply with all other state and federal requirements. The prevailing principles to be considered in the longrange transportation plan are: preserving the existing transportation infrastructure; enhancing Florida’s economic competitiveness; and improving travel choices to ensure mobility.
Table 2-8 summarizes the state planning requirements and how they addressed in this plan.
Action Taken The plan addresses a 22-year horizon. Long-range and short-range strategies such as TSM&O were considered. The prevailing principles were adopted as part of our goals and objectives.
The long-range transportation plan must be consistent, to the maximum extent feasible, with future land use elements and the goals, objectives, and policies of the approved local government comprehensive plans of the units of local government located within the jurisdiction of the MPO
Future land use forecasts were made in consultation with local governments and adopted by the North Florida TPO. Two land use scenarios were developed during the planning process.
Each MPO is encouraged to consider strategies that integrate transportation and land use planning to provide for sustainable development and reduce greenhouse gas emissions.
The North Florida TPO adopted a livability policy as part of the plan and Active Transportation strategies including Context Sensitive Solutions were identified.
The approved long-range transportation plan must be considered by local governments while developing the transportation elements in local government comprehensive plans and any amendments thereto. (a) Identify transportation facilities, including, but not limited to major roadways, airports, seaports, spaceports, commuter rail systems, transit systems, and intermodal or multimodal terminals that will function as an integrated metropolitan transportation system. The long-range transportation plan must give emphasis to those transportation facilities that serve national, statewide or regional functions. The plan must consider the goals and objectives identified in the Florida Transportation Plan as provided in s. 339.155. If a project is located within the boundaries of more than one MPO, the MPOs must coordinate plans regarding the project in the long-range transportation plan.
The approved long-range transportation plan was developed through coordination with local governments and is consistent with the local government land use plans and capital improvement programs. A comprehensive evaluation of all regional multimodal needs was conducted as part of the planning process. As documented in this report, an inventory of major roadways, transit, multimodal and intermodal facilities, pedestrian walkways and bicycle facilities, and intermodal connectors. No projects identified in the plan are located in another metropolitan area.
2-18
Path Forward 2040 Long Range Transportation Plan Table 2-8. State Planning Requirements Planning Requirement Action Taken (b) Include a financial plan that demonstrates how the A financial plan was prepared that included alternative plan can be implemented, indicating resources from revenue sources. While developing the plan, alternatives public and private sources which are reasonably expected for additional financing beyond those that are currently to be available to carry out the plan, and recommends in place were not advanced to the Cost Feasible Plan. Toll any additional financing strategies for needed projects revenues anticipated to be available to fund the future and programs. The financial plan may include, for First Coast Expressway were also estimated. illustrative purposes, additional projects that would be included in the adopted long-range transportation plan if reasonable additional resources beyond those identified in the financial plan were available. For the purpose of developing the long-range transportation plan, the MPO and the department shall cooperatively develop estimates of funds that will be available to support the plan implementation. Innovative financing techniques may be used to fund needed projects and programs. Such techniques may include the assessment of tolls, the use of value capture financing, or the use of value pricing. (c) Assess capital investment and other measures necessary to: 1. Ensure the preservation of the existing metropolitan Goals and objectives associated with the preservation of transportation system including requirements for the the existing transportation system were included. The operation, resurfacing, restoration, and rehabilitation of anticipated costs for operations and maintenance of the major roadways and requirements for the operation, state and local transportation systems are documented maintenance, modernization and rehabilitation of public in the plan. transportation facilities; and 2. Make the most efficient use of existing TSM&O strategies and a dedicated funding source for transportation facilities to relieve vehicular congestion these projects were identified. and maximize the mobility of people and goods. (d) Indicate, as appropriate, proposed transportation Pedestrian and bicycle improvements are addressed in enhancement activities, including, but not limited to, the plan as part of the Active Transportation discussion. pedestrian and bicycle facilities, scenic easements, Dedicated funding was set aside for bicycle and landscaping, historic preservation, mitigation of water pedestrian projects. Projects that are candidates for pollution due to highway runoff, and control of outdoor context sensitive solutions and transit accessibility and advertising. mobility enhancements are also identified. (e) In addition to the requirements of paragraphs (a)Not applicable. (d), in metropolitan areas that are classified as nonattainment areas for ozone or carbon monoxide, the MPO must coordinate the development of the long-range transportation plan with the State Implementation Plan developed pursuant to the requirements of the federal Clean Air Act. In the development of its long-range transportation plan, The North Florida TPO, Technical Coordinating each MPO must provide the public, affected public Committee and Citizens Advisory Committee were agencies, representatives of transportation agency consulted through the plan development. These boards employees, freight shippers, providers of freight include representations of all users. A project steering transportation services, private providers of committee was also established which included transportation, representatives of users of public transit, additional members. The participation of these interest and other interested parties with a reasonable groups is documented in greater in the section on public opportunity to comment on the long-range involvement. transportation plan. The long-range transportation plan must be approved by the MPO 2-19
Path Forward 2040 Long Range Transportation Plan This page is intentionally blank.
2-20
Path Forward 2040 Long Range Transportation Plan
SAFETY AND SECURITY T HE SAFETY OF OUR TRAVELING PUBLIC IS THE NUMBER ONE PRIORITY OF THE PLANNING PROCESS . M ORE PEOPLE DIE OF TRAFFIC CRASHES EACH YEAR IN OUR REGION THAN FROM HOMICIDES . negative impact to lives and economic productivity contribute to the region’s economic competitiveness and quality of life.
TRAFFIC CRASHES
Traffic crashes unnecessarily claim the lives of residents of North Florida each year. More people die from traffic crashes each year than homicides. From 2005-2010, 1,288 fatal crashes occurred versus 715 homicides in the four-county metropolitan area. But it is homicides that make the news headlines. During that same period an additional 81,404 persons were injured in vehicle crashes.
A Strategic Safety Plan was adopted by the North Florida TPO in 2012 and is included in Appendix A. The Strategic Safety Plan identified priority locations (corridors and intersections) that were determined to be of the most significant concern for the safety of the drivers and vulnerable road users (bicyclists and pedestrians). These locations were identified based on the severity of the crashes using the economic cost of the crashes and the total frequency of crashes.
Based on data provided by the Texas Transportation Institute, crashes cause 53 percent of all delays or 7 hours per resident each year in our region in lost economic productivity. The economic costs of traffic crashes in our region exceeded $5 billion annually in medical costs, lost productivity, travel delays, workplace costs, insurance costs, and legal costs. These economic losses are approximately 8 percent of the $60.3 billion gross product of the metropolitan statistical area. The
The 20-highest ranked locations based on the severity of crashes included segments of, and intersections with, SR 21 Blanding Boulevard, SR 134 103rd Street/Timuquana Road, I-295, Ricker Road, Harlow Boulevard, Firestone Road, Old Middleburg Road, Morse Avenue, Rampart Road, SR 228 Normandy Boulevard, Collins Road, CR 220 Doctors Inlet and CR 209 Russell Road. 2-21
Path Forward 2040 Long Range Transportation Plan When the total frequency of crashes was considered (without weighting the severity of crashes), the following additional priority corridors and intersections were identified: SR 212 Beach Boulevard, SR 10 Atlantic Boulevard, SR 115 Southside Boulevard, SR 202 J. T. Butler Boulevard and SR 109 University Boulevard.
infrastructure interdependencies, as well as information sharing and public-private partnering. Together these factors aid in the focus and direction of the Regional Domestic Security Task Forces. The Jacksonville Transportation Authority maintains a Transit Safety and Security Plan as part of their operations.
Because of the close relationship of congestion and safety, congestion management priority corridors which will be discussed in the following section are also shown on Figure 2-1.
These plans were evaluated and coordinated as part of the planning process.
Construction projects are currently planned on many of the highest ranked priority corridors and intersections. Many of these projects include reconstruction, widening, resurfacing, signalization and access management improvements to address the safety needs.
EMERGENCY PREPAREDNESS
The Northeast Florida Regional Council coordinates the preparation of a Local Mitigation Strategy with each county to reduce and/or eliminate the risks associated with natural and man-made hazards. These plans are prepared in accordance with the Disaster Mitigation Act of 2000. This Act is a mechanism for collaboration between state and local entities that encourages predisaster planning, recognizes need for mitigation, and designates funding for projects through Federal grant opportunities. The Florida Division of Emergency Management Mitigation Planning Unit assists counties in the update and review process of the local mitigation strategy. They serve as a resource for technical advice, knowledge of funding sources, and general information regarding hazard mitigation. Without an approved local mitigation strategy a county will not be able to apply for many Federal grants. The Local Mitigation Strategy must be updated every five years to remain compliant.
SECURITY
Security planning is addressed through seven Regional Domestic Security Task Forces within the State of Florida. Each Regional Domestic Security Task Forces consists of local representatives from disciplines involved in prevention and response. They are each composed of separate Sub-Committees (with Chairs & Co-Chairs) that include law enforcement, fire/rescue, emergency medical services, emergency management, hospitals, public health, schools and businesses. The Regional Domestic Security Task Forces work together with the Chief of Domestic Security, to prepare for, prevent and respond to terrorist events. The Northeast Florida Regional Council currently has a Florida Division of Law Enforcement and Florida Division of Emergency Management Planner assigned to the region to help push the State strategy.
As part of this plan evacuation routes were reviewed to assess needs. Designated evacuation routes received a priority consideration in developing the Cost Feasible Plan.
The U.S. Department of Homeland Security and its lead agency for disaster readiness and response, the Federal Emergency Management Agency, has implemented new program initiatives that involve a holistic approach to both disaster readiness and response, and combating terrorism, and are therefore supportive of the national concept of “All Hazards Resilience� and the three closely related factors that necessitate development of a holistic, regional approach to all-hazards resilience that involves engaging the broad stakeholder community-
In the event of a disaster, the Jacksonville Transportation Authority has a management plan to providing emergency evacuation, paratransit transport, moving emergency service personnel and/or civilian relocation via mass transit.
2-22
Âą
0 1.5 3
6
Miles
LEGEND
! ?
Safety Plan - Intersections Congestion Management Plan - Facilities Safety Plan - Facilities Other Roads Conservation Areas North Florida TPO Governing Counties Additional Counties Considered for the LRTP Water Bodies
! ?
! ? ! ? ! ? ! ?
! ? ! ? ! ?
! ? ! ? ?! ?! ?! ? ! ? !
! ? ! ? ! ? ! ? ! ? ! ?
! ? ! ?
! ? ?? ! !! ? ! ? ?!
! !? ?
! ?
! ? ! ?
! ? ! ? ! ? ! ? ! ? ! ?
! ?
! ?
! ?
! ?
! ?
Figure 2-1 Priority Safety and Congestion Management System Corridors 2-23
Path Forward 2040 Long Range Transportation Plan This page is intentionally left blank.
2-24
Path Forward 2040 Long Range Transportation Plan
CONGESTION MANAGEMENT PROCESS A DDRESSING CONGESTION ON OUR ROADWAY SYSTEM IS THE MOST VISIBLE ELEMENT OF THE LRTP. C ONGESTION IN N ORTH F LORIDA COSTS OUR REGION $526 MILLION IN LOST PRODUCTIVITY EACH YEAR . Recurring congestion has staggering social and economic costs. More than $316 million are lost each year by travelers due to the lost time and excess fuel consumption associated with delays. When congestion resulting from crashes is considered, the total costs of congestion are $526 million. This amounts to 13 hours or $400 per year for each of our region’s 1.3 million residents.
Although transit use in North Florida continues to be less than one percent of all person travel miles, transit use continues to rise with a 1.8 percent annual increase from 2011 to 2012. Since 2008, transit use in the area has increased by 30.8 percent. The reduction in automobile use and increase in transit use combined with the opening of 62 additional lane miles of highways between 2008 and 2012 resulted in significant benefits in the quality of travel within the region. Average speeds during the peak periods improved by 2.73 percent from 2008 to 2012 and 0.65 percent from 2011 to 2012. These average speeds resulted in a positive economic impact to the local economy of $280 million per year.
From 2008 to 2012, automobile use declined within the region by 5.7 percent. This decline in vehicle use is the result of the economic downturn, changing travel patterns associated with an aging population and younger drivers’ reduced automobile dependence. The exception to this reduction is the recent increase in the truck miles traveled within the region. Over the last five years, truck traffic declined by 16.4 percent. From 2011 to 2012 truck traffic increased 1.6 reflecting the beginning of the economic recovery. 2-25
Path Forward 2040 Long Range Transportation Plan However, vehicle use and travel is anticipated to increase in the region for the next five years as a result of the economic recovery and regional growth. The demand for travel is anticipated to return to pre- recession levels by the year 2018 and improvements to enhance our mobility are needed to meet these needs. By the year 2040, the traffic volumes will increase by one-third within the region as a result of the growth in population and economic activity. Although driving (alone or with other passengers) is still anticipated to account for about 85 percent of all trips within the region, because of the aging population and changes in preferences from the millennial generation who wish to drive less, the percent of trips made by persons walking is anticipated to increase from 8.4 percent within the region to 9.4 percent, a 14 percent change. According to the American Planning Association’s 2014 National Poll, 81 percent of millennials and 77 percent of active boomers say “affordable and convenient alternatives to the car are at least somewhat important in deciding where to live and work.� These changes in travel preferences will require a multimodal approach to addressing our transportation needs in 2040. Without investments in transportation, travel conditions are anticipated to worsen. By the year 2040, travel times are anticipated to increase by nearly 20 percent. In 2013, the North Florida TPO completed a Congestion Management Plan. The plan developed performance measures and analyzed mobility trends and conditions. The Congestion Management Plan identified congested corridors and recommended strategies and tactics to address these corridors. As part of developing the Congestion Management, corridors that are currently severely congested (operating at level of service E or F) and constrained were identified. These corridors are shown on Figure 2-1 (in the prior section). Because of the close relationship of congestion and safety, priority safety corridors are also shown on this map. The corridors are summarized in Table 2-9. An annual mobility report is prepared each year as part of the congestion management process established in the Congestion Management Plan. The Congestion Management Plan and the 2014 Annual Mobility Report is attached as Appendix B.
2-26
Path Forward 2040 Long Range Transportation Plan Table 2-9. Congested Facilities County Name of Name Area Clay Clay County St. Johns St. Johns County Clay Clay County Clay Clay County St. Johns St. Johns County Duval Jacksonville St. Johns St. Johns County Duval Jacksonville Clay Orange Park Duval Jacksonville Duval Jacksonville St. Johns St. Johns County Nassau Nassau County Duval Jacksonville Duval Jacksonville Beach Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Beach Duval Jacksonville Duval Jacksonville Duval Jacksonville St. Johns St Augustine Duval Jacksonville Clay Middleburg St. Johns St. Johns County Duval Jacksonville Clay Orange Park Duval Jacksonville Duval Neptune Beach Duval Jacksonville Beach Duval Jacksonville Duval Jacksonville
Facility
From Location
To Location
SR 21 Blanding Boulevard SR A1A SR 21 Blanding Boulevard SR 21 Blanding Boulevard SR A1A SR 212 Atlantic Boulevard SR A1A SR 115 Southside Boulevard US 17 SR 109 University Boulevard I-95 SR 13 SR AIA SR 202 J.T. Butler Boulevard SR A1A Third Street SR 10 Atlantic Boulevard I-95 SR 13 San Jose Boulevard US 90 Beach Boulevard SR A1A Third Street SR 10 Atlantic Boulevard US 1 SR 5 Philips Highway SR 21 Blanding Boulevard US 1 I-95 SR21 Blanding Boulevard US 1 SR 10 US 17 Rail Connector/Pritchard Road SR 10 Atlantic Boulevard SR A1A Third Street I-295 SR 152 Baymeadows Road
College Drive CR 210 Corona Road Suzanne Avenue SR 224 Kingsley Avenue Solana Road St. Johns Bluff Road CR 210 Palm Valley Road SR 202 J. T. Butler Boulevard SR 224 Kingsley Avenue I-95 SR 202 J. T. Butler Boulevard Racetrack Road US 17 SR 5 US 1 Philips Highway US 90 Beach Boulevard SR 116 Monument Road SR 109 University Boulevard Loretto Road SR 228 Hart Bridge Expressway 19th Street I-295 SR 152 Baymeadows Road Clay County Line SR 207 SR 228 Emerson Expressway CR 218 SR 312 SR 10 Atlantic Boulevard Wells Road I-295 Ramp to A1A St. Johns County Line St. Johns Bluff Road US 1 Philips Highway
Suzanne Avenue Solana Road SR 224 Kingsley Ave Duval County Line Duval County Line Girvin Road CR 210 Corona Road Beach Boulevard Wells Road US 90 Beach Boulevard Bowden Road Duval County Line CR 107 Blackrock Road I-95 19th Street I-295 Emerson Expressway I-295 Southside Boulevard 34th Street St. Johns Bluff Road SR 202 J. T. Butler Boulevard I-295 King Street Atlantic Boulevard Ramps North City Limit - Palmetto Street SR 207 SR 5 Exit Downtown Duval County Line Old Kings Road West A1A Junction 34th Avenue US 90 Beach Boulevard I-95
2-27
Path Forward 2040 Long Range Transportation Plan Table 2-9. Congested Facilities County Name of Name Area St. Johns St Augustine St. Johns St Augustine Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Clay Orange Park Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville St. Johns St Augustine Duval Jacksonville Duval Jacksonville Clay Orange Park Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville St. Johns St. Johns County Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Neptune Beach
Facility
From Location
To Location
San Marco Avenue SR A1A Bridge of Lions Ocean Street SR 10 Atlantic Boulevard SR 115 Mathews Bridge Expressway US 90 Beach Boulevard US 17 SR 21 Blanding Boulevard US 90 Beach Boulevard SR 152 Baymeadows Road I-295 I-10 I-10 I-10 I-295 King Street I-295 SR 115 Arlington Expressway SR 224 Kingsley Avenue SR 115 Arlington Expressway US 1 Philips Highway SR 13 San Jose Boulevard SR 155 Arlington Expressway Mayport Road SR 126 Emerson Street US 1 I-95 I-95 I-95 SR 115 Southside Boulevard SR 115 Southside Boulevard SR 202 J.T. Butler Boulevard US 90 Beach Boulevard SR A1A Third Street
Orange Street SR A1A Bridge of Lions Ocean Street Girvin Road SR 109 University Boulevard I-295 Elbow Road I-295 SR 115 Southside Boulevard I-95 SR 152 Baymeadows Road SR 129 McDuff Avenue Stockton Street Ramps SR 228/US 17 Old St Augustine Road US 1 I-10 Arlington Road North Doctors Lake Drive SR 115 Southside Boulevard I-295 St. Johns County SR 109 Cesery Boulevard Church Road I-95 Lewis Point Road Bowden Road SR 5 Downtown Exit SR 152 Baymeadows Road Belle Rive Boulevard US 90 Beach Boulevard I-95 Hodges Boulevard SR 10 Atlantic Boulevard
May Street SR A1A US 17 Main Street San Pablo Road Haines Street Expressway Kernan Boulevard SR 224 Kingsley Avenue SR 134 103rd Street I-295 Old Baymeadows Road US 1 Philips Highway US 17 Roosevelt Boulevard I-95 Stockton Street Ramps SR 13 San Jose Boulevard Cordova Street Commonwealth Avenue SR 109 Cesery Boulevard US 17 Arlington Road SR 115 Southside Boulevard Loretto Road SR 109 University Boulevard SR A1A SR 228 Emerson Expressway SR 312 SR 109 University Boulevard I-10 Fuller Warren Bridge SR 202 J. T. Butler Boulevard SR 152 Baymeadows Road SR 10 Atlantic Boulevard SR 115 Southside Boulevard San Pablo Parkway Seagate Avenue
2-28
Path Forward 2040 Long Range Transportation Plan Table 2-9. Congested Facilities County Name of Name Area Duval Jacksonville Beach Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville St. Johns St Augustine Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Clay Clay County Duval Jacksonville Duval Jacksonville Duval Atlantic Beach Duval Jacksonville
Facility
From Location
To Location
SR A1A Third Street I-295 SR 10 Atlantic Boulevard SR 109 University Boulevard I-95 SR 109 University Boulevard SR 115 Arlington Expressway SR 10 Atlantic Boulevard SR 228 Normandy Boulevard I-295 I-295 I-295 SR 115 Southside Boulevard SR 228 Normandy Boulevard US 17 Roosevelt Boulevard US 1 Ponce de Leon Boulevard SR 152 Baymeadows Road US 17 Roosevelt Boulevard I-95 SR 152 Baymeadows Road I-95 8th St. I-295 I-295 I-10 I-295 I-10 I-10 Branan Field Road I-95 SR 134 103rd Street SR 10 Atlantic Boulevard SR 109 University Boulevard
Seagate Avenue SR 208 Wilson Boulevard SR 115 Southside Boulevard St Augustine Road SR 15/US 17 Powers Avenue SR 155 Southside Boulevard SR 109 University Boulevard Herlong Road SR 10 Atlantic Boulevard Merrill Road Monument Road US 1 Philips Highway I-295 Park Avenue King Street Craven Road SR 111 Edgewood Avenue SR 122 Golfair Avenue SR 115 Southside Boulevard SR 139/US 23 Francis Street I-95 SR 202 J. T. Butler Boulevard Luna Ramps SR 134 103rd Street Cassat Avenue Lane Avenue Kindlewood Drive I-10 Ricker Road West A1A Junction SR 10A Arlington Expressway
US 90 Beach Boulevard SR 228 Normandy Boulevard Monument Road Powers Avenue SR 122 Golfair Avenue US 1 Philips Avenue Regency Mall Entrance SR 115 Southside Boulevard I-295 St. Johns Bluff Road Monument Road SR 10 Atlantic Boulevard Belle Rive Boulevard Lane Avenue SR 111 Edgewood Avenue Castillo Drive US 1Philips Highway McDuff Avenue SR 115 Lem Turner Road I-295 SR 114 8th Street Perry Street Old St Augustine Road Gate Parkway SR 129 McDuff Avenue SR 208 Wilson Boulevard Luna Ramps Cassat Avenue Duval County Line US 23 Kings Road I-295 SR A1A Third Street Arlington Road
2-29
Path Forward 2040 Long Range Transportation Plan Table 2-9. Congested Facilities County Name of Name Area Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville Duval Jacksonville
Facility
From Location
To Location
SR 104 Dunn Avenue I-95 I-95 US 90 Union Street US 90 State Street US 90 State Street I-295
Biscayne Boulevard SR 114 8th Street Exit to SR 115 Southside Boulevard I-95 US 1 Main Street Liberty Street Commonwealth Avenue
I-95 SR 15 20th Street SR 152 Baymeadows Road US 17 Main Street US 23 Union Street US 1 Pritchard Road
2-30
Path Forward 2040 Long Range Transportation Plan
COMPLETED AND COMMITTED CONSTRUCTION T O ESTABLISH A BASELINE FOR DETERMINING FUTURE NEEDS , PROJECTS THAT WERE COMPLETED SINCE THE LAST LRTP AND PROJECTS WITH COMMITMENTS FOR CONSTRUCTION WITHIN THE NEXT FIVE YEARS WERE IDENTIFIED . An analysis of the progress made in completing the Envision 2035 LRTP was performed to establish the baseline for this Cost Feasible Plan. Major projects completed since the adoption of the 2035 LRTP are shown on Figure 2-2 and summarized in Table 2-10.
The projects identified with commitments for construction or capital improvements are part of the Cost Feasible Plan to provide the flexibility to implement projects commensurate with future funding availability. Projects in Baker and Putnam Counties are shown in the list of committed projects based on the regional development of this plan and their inclusion in the travel demand forecasting model for North Florida.
The major projects with commitments for construction are summarized in Figure 2-2 in Table 2-11 and Table 212. The commitments were obtained from the following planning documents and through coordination with our partner agencies.
All values in this plan for revenues and costs are reported in year of expenditure millions of dollars unless otherwise noted.
North Florida TPO’s Transportation Improvement Program for the Fiscal Years 2015-2019 as Amended 10/27/14 FDOT’s 2015-2019- Adopted with Amended dated October 30, 2014 Local government Capital Improvement Programs Jacksonville Transportation Authority’s Transit Development Plan
Technical Memorandum #7 – Existing Plus Committed Projects is included in the attachments to this report.
2-31
¿ ¾ ¿ ¾ ¿ ¾
¾¿ ¾¿ ¾¿ ¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
2
¿ ¾ ¾
¾¿
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
301
¿ ¾ ¿ ¾ ¾
300 1
67 3011
í ì ë é Wè " Ò )
§ ¦ ¨ 10
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
50
51
¿ ¾ ¾
¿ ¾
¿ ¾
¿ ¾ ¿ ¾ ¾
¿ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
13A
¬ «
214
51
" )
3003
305
£ ¤ 17
§ ¦ ¨ 95
¬ «
206
¬ «
504
" ) 204
20
54
422
21
A1A
100
¬ « ¬ «
" )
5
¬ «
" ) 310
19
¬ «
" ) 309
" ) 308
502
200
25
200A
200
326 326
13
A1A
207
301
441
3002 4
34
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
3006
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¿ ¾
5
¾¿
17
¿ ¾
53
Date: 3/13/2015
126
¿ ¾
" )
200A
" ) £ " ) ¤ Conservation Lands « " £ ¤¬ Six ) Counties Boundaries £ ¤ ¬ «" " ) " ) ) ¬ « ¬ ) « " ) " ¬ «" ) ¬ « 326
" ) 209
¬ «
" )
55
320 FEC Project X Ã" ) 75
16
208
214
New 3 Lane Road
£ ¤
¬ « " ) " " ) ) " )
17
315
Roadway System
61
1
£ ¤
" )
Express Lanes
" Ò ) Ê
21
95
315
New 6 Lane Road
¬ «
§ ¦ ¨
" )
422
A1A
16
New 2 Lane Road
225A
" Ò ) Ê
" )
New 4 Lane Road
46 30
¬ «
Context Sensitive Solutions¬ 26 «
25A
220
315
Reconstruct 6 Lanes
316
" )
16
Widen to 5 Lanes
318
¬ «
¬ «
Widen to 4 Lanes
329
13
¬ «
Widen to 3 Lanes
500
¿ ¾ ¾
¿ ¾ ¾
1027
Reconstruct 2 Lanes
§ ¦ ¨ Water Bodies
3
21
Bus Rapid Transit
225
¿ ¾ ¾
¿ ¾ ¾
36
" )
33
Types of Projects
27
¿ ¾ ¾
¿ ¾
3047
218
è Intersection Projects í ì ë é " Ò ) Ê Interchange Projects
5
32
¿ ¾
301
£ ¤
Legend
¿ ¾ ¿ ¾ ¿ ¾ ¿ ¾ ¿ ¾ ¿ ¾
36
973
711
¿ ¾
¿ ¾ ¾
130
45
¾¿
5 50
" )
¬ «
18
" )
105
« ¬ «
¿ ¾
228
A
A1A 21
¿ ¾
£ ¤
95
¿ ¾
90
¯§ ¨ ¦
¿ ¾ ¾
124
¿ ¾ ¿ ¾ ¿ ¾ ¿ ¾ ¿¾ ¿¾ ¿ ¾ ¿ ¿¾ ¾ ¿ ¾
" )
23
3004
3009
¯ " Ò ) Ê
¬ « ¬ « ¬
116 " Ò ) Ê 11 27 3012 30 3052 3045 33043 10 051 3012 4 « 3005 44 1 " Ò í ) ì ë é è " Ò ) Ê ¬ Ê 16 " Ò ) Ê 3010 W " Ò 3008 105 ) í ì ë é è " Ò ) Ê 62 90 " Ò ) £ Ê65 ¤ " Ò 3007 3016 966 ) 3015 Ê W3021 71 " Ò ) 1 34 ¬ " Ò í ì ë é " Ò « è " Ò ) ) " Ò Ê Ê ) Ê Ê ) 3017 228 X Ã ¬ « 23 ¬ « í 3014 ì ë é è 970 295 í ì ë é è § ¦ ¨ 961 3020 66 " Ò ) Ê 1 53 £ ¤ " Ò ) Ê 0 05
" ) 221
¬ «
59
7
¿ ¾
" Ò ) Ê " Ò ) Ê
125
¬ «
§ ¦ ¨
§ ¦)"ÒÊ ¨ 295
1020
¿ ¾
¿ ¾ ¾
250
60
295
¿ ¿ ¾ ¿ ¾ ¾
" ) 119
" )
A1A
961
50 30
33
34
" Ò ) Ê " Ò ) Ê
¿ ¾ ¿ ¿¾ ¾
" )
3020
" )
0 304 64 13
£ ¤ 122
A1A
A1A
218
43
2
¬ « ¬ «
6
127
¿ ¾ ¾
" )
¿ ¾ ¾
42
¿ ¾ ¾
" ) 13 39
¿ ¾
17
£ ¤
" ) " )
¿ ¾
95
108
" Ò Ê ¬ «)
¿ ¾ ¾
38 37
§ ¦ ¨
1
£ ¤
105
¬ « ¬ «
107
40
2
¿ ¾ ¾
108
" )
64
" Ò ) Ê
" )
115
" Ò ) Ê 1
£ ¤ ¿ ¾ ¾
3040
" Ò ) Ê
5
¿ ¾
¾¿
¿ ¾
¿ ¾ ¾
6
¿ ¾ ¾
295
¿ ¾
3018
23 3014 í ì ë é è 66
" )
" ) " )
£ ¤§ ¨ ¦ 301
¿ ¾
¯
3019
228
¬ «
¬ « ¬ «
í ì ë é è
¾¿
326
Figure 2-2 Committed Plus Completed Projects 2-32
¯
0
10,560 Feet
0
4
8 Miles
Path Forward 2040 Long Range Transportation Plan Table 2-10. Major Projects Under Construction or Completed Since the 2035 Plan Was Adopted Facility ID From To Improvement Alt. US 1 Martin Luther King Jr. Parkway Chaffee Road Clark Road Extension Collins Road Concourse Loop Road CR 210
7 3047 1020 3048 711 21
at 21st Street/ Talleyrand Avenue SR 134 103rd Street Clark Road Old Middleburg Road Gene Lassere Boulevard US 1
New Interchange
Complete
Chaffee Road Broward Road Shinder Drive Nassau Center Court FEC Railroad
New 2 Lane New 2 Lane New 2 Lane New 2 Lane
New 2 Lane New Interchange and New 2 Lane Road Add 2 Lane Add Auxiliary Lanes
Complete Complete Complete Under Construction Under construction Complete Under construction Complete Under construction Under construction Under construction Under construction Complete
CR 210 Extension Davis Parkway
3046 961
Valley Ridge Boulevard at 9B Extension
Nocatee Parkway
I-10 I-10
3051 3052
Halsema Road I-295
I-10
3043 3042 3052
at Hammond Boulevard (Marietta) I-295
Lane Avenue SR 111 Cassat Avenue
I-10 I-295
62
I-295
3010
I-295
11
I-295
3009
I-295
60
at Commonwealth Avenue at Pritchard Road
I-295
67
at SR 104 Dunn Avenue
13
at SR 208 Wilson Boulevard at SR 228 Normandy Boulevard I-10
Phase
SR 111 Cassat Avenue
Overpass
New Interchange and Remove Existing Add Auxiliary Lanes Interchange Modification Interchange Modification
Commonwealth Avenue
Add Auxiliary Lanes Interchange Modification Interchange Modification Interchange Modification
Under construction Under construction Under construction Complete
2035 Cost Feasible Plan Status 13 Committed Project Committed Project Committed Project Locally Funded Locally Funded 2035 Cost Feasible Plan #19 Private Privately Funded Committed Project Operations Improvement Committed Project Operations Improvement Operations Improvement Operations Improvement 2035 Cost Feasible Plan #6 Operations Improvement 2035 Cost Feasible Plan #7 Operations Improvement
Projects identified in the list of committed projects in the Envision 2035 Cost Feasible Plan are show as “Committed Project�. Projects identified as Operations Improvement were not part of the 2035 Cost Feasible Plan. 2-33
Path Forward 2040 Long Range Transportation Plan Table 2-10. Major Projects Under Construction or Completed Since the 2035 Plan Was Adopted Facility ID From To Improvement I-295
1022
I-295
505
I-295
59
I-95
65
I-95
71
I-95
3041
I-95
13
SR 13 (Buckman Bridge)
I-95
Add 4 Express Lanes
SR 21 Blanding Boulevard at SR 105 Heckscher Drive at Bowden Road
Collins Road
Interchange Modification Interchange Modification Interchange Modification
at SR 202 J.T. Butler Boulevard Emerson Street (Overland Bridge) at I-295 North
Interchange Modification Fuller Warren Bridge Phase 1
Bridge Replacement Interchange Modifications
Max Leggett Parkway Max Leggett Parkway
35 3040
I-95 Owens Road
Owens Road SR 5 US 1
Widen to 4 Lanes New 4 Lane
SR 104 Dunn Avenue
3011
Garden Boulevard
Walgreens
Intersection Improvement
I-95
CR 107
Widen to 6 Lanes
SR 200 SR 202 J. T. Butler Boulevard SR 21 Blanding Boulevard
37 3007
Hodges Boulevard
33
SR 23 Branan Field Road Old Jennings Road Old Jennings Road
SR 21 Blanding Boulevard SR 23 First Coast Expressway
3050 3006
SR 23 First Coast Expressway
36
SR 9B
4
SR 9B
126
US 17 Park Avenue
3020
SR 21 Blanding Boulevard I-95 US 1 SR 5 Philips Highway Wells Road
Phase Under construction Complete Under construction Complete Under construction Under construction Complete Complete Under Construction Complete
2035 Cost Feasible Plan Status 13 2035 Cost Feasible Plan #5 Committed Project Committed Project Operations Improvement 2035 Cost Feasible Plan #22 Operations Improvement 2035 Cost Feasible Plan #21 Privately Funded Privately Funded
Intersection Improvement
Under Construction Complete
Old Jennings Road
Widen to 4 Lanes
Complete
Operations Improvement 2035 Cost Feasible Plan #9 Operations Improvement Locally Funded
Knight Boxx Road Oakleaf Plantation Parkway I-10
Widen to 6 Lanes Build Frontage Roads
Complete Complete
Locally Funded Committed Project
New Limited Access Toll Road New Limited Access Roadway New Limited Access Roadway Add Lanes and Reconstruct
Under construction Under construction Complete
Committed Project
Complete
Operations Improvement
US 1 SR 5 Philips Highway I-295 I-295 2-34
2035 Cost Feasible Plan #11 Committed Project
Path Forward 2040 Long Range Transportation Plan Table 2-10. Major Projects Under Construction or Completed Since the 2035 Plan Was Adopted Facility ID From To Improvement US 301 SR 200
23
US 301 SR 200
301
Baldwin Bypass South of Baldwin North of Baldwin
Baldwin Bypass North of Baldwin Callahan
New 4 Lane Road Widen to 4 Lanes
Note: All Cost Feasible Plan project number references are as shown in the plan summary brochure.
2-35
Phase Under construction Under construction
2035 Cost Feasible Plan Status 13 2035 Cost Feasible Plan #12 2035 Cost Feasible Plan #13
Path Forward 2040 Long Range Transportation Plan Table 2-11. Major Projects with Construction Funds Committed Facility Chester Road CR 216 CR 220 Doctors Inlet Road CR 739 Henley Road/ Russell Road Crawford Road Crawford Road Florida East Coast Railway Fort Gates Ferry Road Girvin Road Girvin Road Holloway Road I-10 at I-95 I-10 I-295 I-295 I-95 I-95 I-95 Kolas Ferry Road Lake Susan Road Old St Augustine Road Parramore Road Extension Pecan Park Road Radio Avenue SR 10 Atlantic Boulevard SR 10 US 90 Beaver Street SR 10 US 90 Beaver Street SR 109 University Boulevard SR 115 Southside Boulevard SR 134 103rd Street SR 152 Baymeadows Road SR 20 SR 200 SR A1A SR 200 SR A1A SR 202 J. T . Butler Boulevard SR 21 Blanding Boulevard SR 21 Blanding Boulevard SR 21 Blanding Boulevard SR 212 Beach Boulevard SR 23 First Coast Expressway SR 23 First Coast Expressway SR 243 JIA North Access Road SR 9B SR 9B
ID 973 504 50 51 42 43 3021 502 44 45 3003 27 3045 5 3016 13 64 66 3018 55 53 970 3019 40 105 3004 3005 3012 3014 3015 3017 422 38 39 966 32 33 34 3008 18 17 6 126 3002
From
To
Improvement
County
Fund Source
Phase
SR 200 SR A1A SR 100 CR 209 Russell Road CR 218 CR 121 Old Alabama Trail RAILEX SR 19 SR 10 Atlantic Boulevard Ashley Melisse SR 100 US 17 Roosevelt Boulevard SR 23 First Coast Expressway SR 9B SR 134 103rd Street at I-295/SR 9A North at SR 102 Airport Road at Old St. Augustine Road Murrhee Road Alachua County Line Greenland Road / Loretto Road Youngerman Circle SR 243 JIA North Access Road US 17 SR 115 Arlington Expressway CR 121 Brandy Branch Road CR 119 Otis Road Bartram Drive Deercreek Club Road at Firestone Road Freedom Commerce Parkway Alachua County Line Still Quarters Road Rubin Lane SR 115 Southside Boulevard CR 218 Branan Field Road CR 220 Long Bay Road F.O.P. Way Argyle Forest Boulevard Clay County Line SR 102 Airport Road US 1 Philips Highway CR 2209
Green Pine Road US 17 Knight Boxx Road CR 220 Doctors Inlet Road Old Alabama Trail US 301 SR 200
Add Lanes and Reconstruct Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Road Reconstruction Road Reconstruction Rail Capacity Project Road Reconstruction Widen to 5 Lanes Widen to 3 Lanes New Road Construction Interchange Improvement Interchange Improvement Add 4 Express Lanes Interchange Improvement Interchange Ramp (New) Interchange Improvement Interchange Improvement Road Reconstruction Widen to 4 Lanes Widen to 6 Lanes New 2 Lane Road Widen to 4 Lanes New Road Construction Intersection Improvement Add Right Turn Lane(s) Add Right Turn Lane(s) Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Add Lanes and Reconstruct Add Lanes and Reconstruct Add Lanes and Reconstruct Interchange Improvement Add Lanes and Reconstruct Add Lanes and Reconstruct Add Lanes and Reconstruct Intersection Improvement New 4-Lane Road Construction Widen to 6 Lane Limited Access Toll Road New Road Construction New Road Construction New Road Construction
Nassau Putnam Clay Clay Nassau Nassau Duval Putnam Duval Duval Putnam Duval Duval Duval Duval Duval Duval Duval Nassau Putnam Duval Duval Duval Nassau Duval Duval Duval Duval Duval Duval Duval Putnam Nassau Nassau Duval Clay Clay Clay Duval Clay/Duval Clay/Duval Duval Duval St. Johns
FDOT FDOT FDOT Clay FDOT FDOT FDOT FDOT Duval LOGT Duval LOGT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT Duval LOGT Duval LOGT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT
CST CST CST CST CST CST CAP CST CST CST CST DSB CST CST CST DSB CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST DSB DSB CST DSB CST
Mount Royal Ave Ashley Melisse Wonderwood Drive Tinsley Road San Marco Avenue US 90 SR 202 J.T. Butler Boulevard Firestone Road Phase 2
Kings Ferry Road CR 21 I-295 Collins Road I-95 Minor Road Monument Road
Cesery Boulevard
Country Day School Drive SW 56th Avenue Rubin Lane CR 107 Scott Road Black Creek Old Jennings Road Allie Murray Road Ryar Road I-10 Argyle Forest Boulevar Pecan Park Road I-95 Duval County Line 2-36
Fiscal Year 2018 2016 2015 2018 2015 2015 2015 2015 2018 2018 2015 2016 2018 2015 2017 2017 2018 2018 2017 2017 2018 2018 2016 2016 2017 2018 2018 2019 2017 2017 2018 2019 2016 2018 2018 2019 2017 2019 2018 2015 2015 2018 2015 2015
Amount $10.30 $0.78 $0.81 $0.00 $0.29 $3.38 $1.14 $2.25 $5.74 $7.36 $1.26 $118.77 $48.10 $103.35 $6.90 $165.02 $6.60 $0.90 $3.64 $1.91 $0.60 $5.00 $11.83 $0.24 $6.84 $0.40 $0.19 $3.77 $0.52 $2.20 $6.72 $54.35 $0.65 $32.54 $1.83 $9.23 $15.28 $19.77 $5.41 $12.61 $7.21 $17.20 $95.43 $111.37
Path Forward 2040 Long Range Transportation Plan Table 2-11. Major Projects with Construction Funds Committed Facility
ID
SR 9B US 17 SR 15 US 301 SR 200
126 54 23
From
To
Improvement
County
Fund Source
Phase
South of SR 9A Horse Landing Road South of Baldwin
I-95 Boundary Road in San Mateo North of Baldwin
New Road Construction Widen to 4 Lanes New 4 Lane Roadway - Baldwin Bypass
Duval Putnam Duval
FDOT FDOT FDOT
DSB CST CST
Table 2-12. Major Bicycle, Pedestrian and Transit Projects with Construction Funding Committed
County
Facility
From
To
Improvement
Phase Fund Source
Clay
CR 218 Pine Avenue FEC Railway North First Coast Flyer 15 Sherry Drive Southeast First Coast Flyer 16 SR 10 Atlantic Boulevard SR 115 Arlington Expressway Timuquan Trail Bailey and Simmons Road Main Street St. Johns Avenue River Sea Loop Trail SR 13 SR 207
Mimosa Avenue Old Fleming Grove Road RAILEX Downtown Jacksonville (Duval County) Atlantic Beach Elementary Downtown Jacksonville (Duval County) Intracoastal Waterway Bridge Service Roads Kingsley Connector Sports Complex Junction Road Sports Complex
SR 21 Blanding Boulevard Raggedy Point Road
Holley Berry Lane Armstrong Trail Heads Hastings Trail Heads
Roberts Road
Bike Path Trail Sidewalk Rail Capacity Bus Rapid Transit Sidewalk Bus Rapid Transit Sidewalk Sidewalk Bike Path Trail Sidewalk Bike Path Trail Bike Path Trail Bike Path Trail Sidewalk Bike Path Trail Bike Path Trail
CST CST CAP 14 CAP CST CAP CST CST CST CST CST CST CST CST CST CST
Duval
Nassau Putnam St. Johns
I-295 Avenues Mall
Fletcher Avenue End of Existing Trail SR 19
Total Note: All Cost Feasible Plan project number references are as shown in the plan summary brochure.
14
CAP represents capital improvements. 2035 Cost Feasible Plan Project #B 16 2035 Cost Feasible Plan Project #D 15
2-37
Fiscal Year
FDOT FDOT FDOT Jacksonville Transportation Authority FDOT Jacksonville Transportation Authority FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT
2015 2015 2017
First Year 2015 2017 2015 2016 2019 2016 2017 2017 2016 2018 2016 2019 2019 2014 2015 2015
Amount $0.05 $17.65 $37.18
Amount $0.74 $1.30 $1.14 $33.50 $0.45 $23.80 $1.20 $0.30 $2.00 $1.30 $0.77 $0.75 $0.95 $0.15 $0.32 $0.37 $69.04
Path Forward 2040 Long Range Transportation Plan This page is intentionally blank.
2-38
Path Forward 2040 Long Range Transportation Plan
TRAVEL DEMAND FORECASTING P LANNING TO ADDRESS NOT ONLY OUR CURRENT NEEDS BUT THE NEEDS OF THE FUTURE IS INTEGRAL TO THE SUCCESS OF THE PLANNING PROCESS . modeled at higher levels of demographic, spatial and temporal resolution than has been possible with tripbased modeling systems. DaySim links activities and trips through tours (trip chains), and links tours through day patterns. This equips the North Florida TPO with the ability to respond to complex questions involving impacts of plans on specific demographic sub-groups and geographic units, consideration of different values of time for tolling analysis, and shifts in demand by time of day, all the while accounting for the linkages within a tour and across a day. NERPM-AB also uses parcel-level land use data as an input to create accessibility-related variables, providing the potential to make better predictions of the impacts of large-scale land use changes, such as developments of regional impact.
MODEL FRAMEWORK
The Northeast Regional Planning Model: Activity-Based v1.0 (NERPM-AB) is the region travel demand forecasting model was used in developing this plan. The model was used for forecasting future transportation demand and transportation systems analysis. The modeling process and socio-economic data forecasting process are discussed in greater detail in the following
Technical Memorandum #3 – Socio Economic Data Forecasts Technical Memorandum #4 – Model Validation and Calibration Technical Memorandum #5 – Freight Modeling
DaySim is a person-day activity and travel simulator, which is the only activity-based component of the NERPM-AB model. DaySim accounts for all travel by residents of the region. The simulation occurs at the person level, so the primary outputs of DaySim relate to
NERPM-AB represents a paradigm shift towards a more disaggregate modeling approach in which the activitytravel patterns of individual households and persons are 2-39
Path Forward 2040 Long Range Transportation Plan personal travel for work, school, social/recreational, and other non-work purposes. The truck and freight model includes all trips made for transportation of goods and services and includes a Jacksonville area Port Model. The external trips model includes both internal-external (trips made by region residents to points outside the region), external-internal (trips made by residents from outside the region to points within the region), and through trips. All of the mode components use the traffic analysis zone system and are adapted from previous NERPM trip-based models. Trips from all the sub-models are aggregated and factored to create trip tables, which are then assigned to the highway and transit networks.
The model components listed above were integrated into a single package within the Citilabs® Cube travel demand modeling system, using the Cube Catalog graphic user interface.
MARKET SEGMENTATION
The NERPM-AB modeling system covers regional landbased travel, segmented by four primary markets:
MODEL COMPONENTS
NERPM-AB is composed of many different model components. The following activities were performed:
Develop a synthetic population of residents living in households and group quarters. Develop employment by industry group. Develop a parcel-based land use database. Specify parameters for activity-based residential demand models, covering travel within the region. Develop calibration target values for activity-based model components, using National Household Transportation Survey data, US Census American Community Survey, and the Census Transportation Planning Package. Incorporate updated trip tables representing nonresident travel and resident travel with external trip ends (external-external, external-internal, internalexternal). Incorporate updated truck-trip generation and distribution models from the Florida statewide model and from port facilities. Incorporate special generators for Jacksonville International Airport and for the tourism district of St. Augustine. Incorporate and development of updated highway network files, requiring recoding of some link attributes and intersection turning penalties. Incorporate updated transit route files. Develop new highway assignment procedures and skimming methods for four time periods (AM peak, midday, PM peak, and evening off-peak), as well as summaries for full-day analysis. Incorporate updated traffic count data. and Develop new speed-feedback procedures and closure criteria.
Resident travel internal to the modeling region. Non-resident/visitor travel internal to the modeling region. Resident and non-resident/visitor travel involving trips passing through the region, but with at least one end outside the region. Commercial vehicle travel internal to the modeling region.
The DaySim model covers all household resident travel within the region for the following market segments.
Permanent residents living in households. Permanent residents living in group quarters. Seasonal residents living part of the year in the region, who are permanent residents of a different region.
DaySim does not model visitors to the region, such as tourists, business travelers and non-residents visiting family and friends. Nor does DaySim model travel by persons who live external to the modeling area, but who may commute in and out of the region for work or school, or who come to the region for shopping, recreation or other personal business. However, adjustments were made to the model to account for these travel patterns. Common special generators, such as hospitals, shopping malls and military installations are covered by the resident travel models listed above. Two special generators were retained in NERPM-AB: (1) Jacksonville International Airport (15,000 daily trip ends, derived from airline enplanements); and (2) St. Augustine’s historic center (2,288 daily trip ends, derived from hotel and motel rooms). Both of these special generators represent concentrations of intense visitor traffic, which are not covered by DaySim. DaySim assumes that a portion of the jobs within the region will be filled by workers who live outside the region. To accommodate this market, external-internal 2-40
Path Forward 2040 Long Range Transportation Plan work trips are fixed for workplace destinations, thereby reducing the availability of those jobs for workers living within the region. The usual workplace location choice is affected by DaySim’s shadow-pricing mechanism, which compares the total employment within each zone to the number of workplace locations predicted for each zone and adjusts the attractiveness of that zone through a series of iterations to balance job supply with worker demand. Trial-and-error revealed that a ten-iteration approach to shadow-pricing for employment yielded the best results.
The DaySim model calibration components consisted of
MODEL YEARS
The following model scenarios were developed as part of the planning process.
The calibration process met or exceeds all of the calibration standards established under the Florida Standard Urban Transportation Modeling guidelines and showed a significant improvement over the prior tripbased models.
2010 Base Year 2030 Interim Year Cost Feasible Plan 2040 Existing Plus Committed 2040 Needs Plan 2040 Cost Feasible Plan
The model calibration process results are documented in greater detail in Technical Memorandum #4 – Model Validation and Calibration.
TIME OF DAY
Consistency with the model design of DaySim necessitated the development of separate highway network assignment and skimming processes for four time-periods of the day:
Usual location choice models Usual school location sub-model Auto ownership Day pattern models Main-pattern model Exact number of tours model Number and purpose of work-based sub-tours model Number and purpose of intermediate stops Non-mandatory tour destination choice Tour mode choice Time-of-day choice model
AM peak (6:00-8:59) Midday off peak (9:00-3:59) PM peak (4:00-6:59) Evening off peak (7:00 -5:59)
These four time-period-based assignments are run individually, producing a loaded network for each period. At the end of the process, a new script is then run to combine all four time periods into a single daily assignment output, representing a 24-hour travel period.
MODEL CALIBRATION
Model calibration is the process of applying the estimated models, comparing the results to observed values, and adjusting either the model specification or the alternative specific constants. The process is complicated by the fact that the various model components in DaySim are not isolated.
2-41
Path Forward 2040 Long Range Transportation Plan
FUTURE LAND USE ALTERNATIVES
As part of preparing the NERPM-AB, the development of land use scenarios and forecasting of land use within the region at a parcel level was required.
Population forecast were based on the Bureau of Economic and Business Research medium scenario and were used as control totals at the county-level.
During the development of the base year model households, population in group quarters, school enrollment and employment by market sector were assigned to individual parcels for the six county region. As part of this process vacant and underdeveloped parcels were identified. According to the 2010 Census, 13 percent or 82,272 of the housing units within the six county region are vacant.
Table 2-13 summarizes the population forecasts that were provided by the University of Florida Bureau of Economic and Business Research and used as the control totals within the modeling process. An alternate land use scenario was also prepared in cooperation with the local governments that changed employment but not household, school or group quarter land uses. Table 2-14 summarizes the change in employment by market sector. Table 2-15 summarizes school enrollment.
Table 2-13. NERPM-AB Year 2010 and 2040 Population and Employment Control Totals County Year 2010 Year 2040 Population Year 2010 Year 2040 Workers Population living Population living Growth Rate NERPM-AB Estimated Growth Rate in Households in Households 2010 -2040 Total Workers Workers* 2010 -2040 Nassau 72,771 116,159 60% 24,126 39,586 64% Duval 844,293 1,050,684 24% 519,142 636,596 23% St. Johns 186,598 374,207 101% 61,714 155,227 152% Clay 189,614 314,010 66% 54,454 88,958 64% Baker 24,771 36,657 48% 7,396 13,860 87% Putnam 72,957 77,991 7% 25,148 28,051 21% Total 1,391,004 1,969,708 42% 691,980 962,278 39% * Average between BEA 10 year growth rate (2000-2010) and NERPM-AB growth rate of population year 2040.
2-42
Path Forward 2040 Long Range Transportation Plan Table 2-14. Employment in Trend and Alternate Land Use Scenarios Employment Sectors
Year 2010
Year 2040 Trend
Alternate
Agriculture, Forestry, Fishing and Hunting
551
633
541
Mining, Quarrying, and Oil and Gas Extraction
276
315
271
Construction
39,403
45,140
38,677
Manufacturing
39,670
45,455
38,939
Transportation and Warehousing
24,412
27,982
23,962
104,312
119,525
102,390
376
433
369
Wholesale Trade
20,322
23,285
19,947
Retail Trade
61,371
70,362
60,240
Accommodation and Food Services
38,919
44,615
38,202
Industrial - Subtotal Utilities
Commercial - Subtotal
120,988
138,695
118,758
Information
13,882
17,836
17,848
Finance and Insurance
41,546
53,425
53,416
Real Estate and Rental and Leasing
11,509
14,766
14,797
Professional, Scientific, and Technical Services
28,713
37,481
36,916
5,425
6,914
6,975
Administrative and Support and Waste Management and Remediation Services
35,270
45,319
45,347
Educational Services
27,718
35,652
35,637
Health Care and Social Assistance
57,340
73,825
73,722
5,009
6,418
6,440
Other Services (except Public Administration)
21,486
27,617
27,625
Public Administration
45,944
59,123
59,070
Service -Subtotal
293,842
378,376
377,792
Total
519,142
636,596
584,940
Management of Companies and Enterprises
Arts, Entertainment, and Recreation
Table 2-15. Year 2040 School Enrollment Projections versus Age Group Projections County Total Kindergarten thru 8th 9th Grade thru 12th University and Grade Grade College Nassau 13,389 5,584 1,805 20,779 Duval 141,606 52,601 114,890 309,092 St. Johns 49,317 24,151 10,875 84,343 Clay 40,947 21,095 8,057 70,100 Baker 5,576 2,037 0 7,614 Putnam 9,757 3,339 9,014 22,108 Total 260,592 108,807 144,641 514,036
2-43
NERPM-AB Age Groups 5 thru 14 15 thru 17 Years Years 14,998 4,579 142,620 47,325 55,763 19,913 45,562 15,982 5,876 1,692 9,931 2,885 274,750 92,376
Path Forward 2040 Long Range Transportation Plan
REASONABLENESS CHECKS FOR FUTURE YEAR MODEL ASSIGNMENTS
The future land use maps and approved developments received from the local governments were used to allocate households and employment to the parcel level. The growth was allocated to the vacant and underutilized parcels before new development was considered consistent with the data provided by the local agencies.
As part of the development of the model, reasonableness tests were performed for the model calibration criteria previously discussed. Changes to screenline, cutline and cordon volumes are shown Figure 2-3. Across the region, these volumes exhibit remarkably proportional growth. That is, locations that carried larger volumes in 2010 seem to grow proportionally in 2040.
Reasonableness checks on the projections on parcel data included evaluation of the number of housing units associated with the residential developments and reviews of aerial photography to ensure that the projections can actually geographically fit within the parcels and traffic analysis zones. Several of the local government requested a reduction in the vacancy rate, assuming it was higher than usual due to the economic downturn. The characteristics of land uses needed for applying DaySim was performed at the parcel level by the Population Generator (PopGen) program. This program synthesizes the population to the characteristics identified in the Census and PUMS data sources and allocates it to a household/parcel and individual level.
Traffic volumes on the Strategic Intermodal System, and particularly the I-95 corridor, are forecast to grow faster than in many other corridors without investments in new services or capacity. St. Johns County is expected to grow faster than the other counties in the 2040 scenario and significant growth in traffic volumes along the I-95 corridor south of Jacksonville is anticipated. Growth resulting from the East Nassau Community Planning Area also resulted in proportionally higher growth along the I-95 corridor than other major screenline and corridor locations.
Extensive coordination occurred with the local governments as part of this process and concurrence of the land use projections and allocations was achieved.
DEFICIENCY ANALYSIS
A deficiency analysis using the NERPM-AB is discussed in the section titled Plan Alternatives
2-44
Path Forward 2040 Long Range Transportation Plan
Figure 2-3 - Changes in Screenline Volumes from 2010 to 2040 Source: RSG 2-45
Path Forward 2040 Long Range Transportation Plan This page is intentionally blank.
2-46
Path Forward 2040 Long Range Transportation Plan
FREIGHT AND INTERMODAL SYSTEMS F REIGHT AND I NTERMODAL S YSTEMS ARE MAJOR DRIVERS OF OUR ECONOMIC GROWTH AND INVESTMENTS ARE NEEDED FOR US TO BE COMPETITIVE IN THE FUTURE . marine terminals at Blount Island and Dames Point and rail intermodal facilities for CSX and Norfolk Southern railroads. I-75, the nation’s central spine connecting Florida, southeastern and mid-western states is located 60 miles to the west of our region. North Florida also provides the rail gateway into Florida. Norfolk Southern and FEC railroads have their Florida termini in North Florida. CSX’s and FEC both maintain their corporate headquarters in North Florida. Genesee & Wyoming Inc., which operates major short –line railroads across the US and in Australia, maintains its operations headquarters in Jacksonville.
OVERVIEW
This section summarizes the analysis of the demand for freight and intermodal systems within the region. The intermodal system was previously discussed in Part One of this report. The needs that resulted from this forecast of future demand are discussed in Part Three. Additional detail is provided in Technical Memorandum #5 – Freight Modeling.
CURRENT SITUATION
The level of connectivity to the North Florida region is a significant economic advantage for our region. I-95 serves as the major highway gateway to Florida’s 19.5 million persons. I-10 connects our region along an eastwest route to the southwest, western states, and Pacific Ocean. A third interstate, I-295 serves as a beltway around Jacksonville that connects both of these interstates and provides direct access to major JAXPORT 2-47
Path Forward 2040 Long Range Transportation Plan
CURRENT FREIGHT MOVEMENTS North Florida is the origin or destination of freight moving over roadways and railways in Florida and the Southeast U.S. The total shipments that originate in, are destined for, or travel through North Florida are summarized in Table 216. This data is based on the U.S. Department of Transportation’s Freight Analysis Framework data. The top origins and destinations for truck or rail shipments are summarized in Table 2-17 and Table 2-18. Table 2-16. Total Tons of Commodities (millions of tons per year) Origin and Destination Truck
Rail
Total
Percentage
34.9
0.0
34.9
18%
and is destined for locations within Florida and is destined for locations outside Florida Is destined for the area And originated from within Florida And originated from outside Florida Port related
18.5 8.0
0.2 0.6
18.7 8.6
10% 5%
7.5 8.9 11.7
0.4 11.6 0.6
7.9 20.5 12.3
4% 11% 6%
Through traffic
70.0
18.0
88.0
46%
159.5
31.4
190.9
100%
84%
16%
100%
Internal to area Originates in area
Total Mix Percentage Source: Freight Analysis 2012 data.
Table 2-17. Top and Origins and Destinations of Truck Freight Passing through North Florida Through Origins Through Destinations Locations Tonnage Mix Locations Florida Locations Polk County 10% Miami-Dade County
Out of State
Other Origins Total
Tonnage Mix 14%
Miami-Dade County
8%
Polk County
5%
Hillsborough County Palm Beach County
7% 4%
Hillsborough County Orange County
4% 3%
Broward County Orange County
4% 2%
Savannah, GA New York, NY Baltimore, MD Charleston, WV
13% 5% 4% 2% 39% 100%
2-48
New York, NY Baltimore, MD Boston, MA Philadelphia, PA Savannah, GA Total
12% 5% 4% 4% 3% 47% 100%
Path Forward 2040 Long Range Transportation Plan Table 2-18. Top Origins and Destinations of Rail Freight Passing through North Florida Through Origins Through Destinations Locations Tonnage Mix Locations Florida Locations Polk County 7% Polk County Hillsborough County 5% Orange County Manatee County 3% Hillsborough County Miami-Dade County 3% Miami-Dade County Martin County
Out of State
Charleston, WV Lexington, KY Chicago, IL Atlanta, GA Birmingham, AL Macon, GA
8% 8% 7% 6% 5% 3%
Other Origins Total
Tonnage Mix 13% 11% 11% 10% 5%
Alachua County Sumter County Brevard County
3% 3% 3%
Broward County
3%
New York, NY
3%
45%
35%
100%
100%
2-49
Path Forward 2040 Long Range Transportation Plan About 4.7 million tons of cargo exported from the US passes-through the region each year. Of these, 59 percent of the freight originated in one of the top ten markets summarized in Table 2-14 or Table 2-15.
TRUCKING About 84 percent of all freight moved within the region is moved on trucks. North Florida has a large internal truck market (both the origins and the destinations are within North Florida). North Florida roadways handle 159.5 million tons of freight each year.
The container market is 47 percent of the shipments. The balance is split between bulk and break-bulk cargo. About 9.3 million tons of international cargo imported to the US pass through North Florida. Domestic waterborne cargo is handled at public and private terminals in North Florida and 62 percent of the tonnage is petroleum and petroleum products.
Freight originating in North Florida that is moved by truck is split between break-bulk, bulk and containerized commodities. About 43 percent of the freight destined for North Florida is bulk cargo with the balance split between break-bulk and bulk cargo.
RAIL
A significant amount of cargo shipped by truck in our region is not from or destined for North Florida travels but is shipped to destinations in central Florida and southeast Florida. About 61 percent of the through freight traveling through North Florida is break-bulk cargo 29 percent is bulk and 10 percent is in a container.
Most of the rail cargo shipped in North Florida originated outside of Florida and is consumed within North Florida.
AIR CARGO In 2012, air cargo operators moved more than 0.75 million tons of air cargo through Jacksonville International Airport. The typical commodities shipped by air are high value and time sensitive. An emerging market for air cargo is Asia. The largest growth in air cargo is anticipated to be exports of Florida citrus, Vidalia onions, peaches and fish from the Caribbean. Flowers from Columbia are the largest import good. Air cargo delivered on underutilized aircraft flying to Asia represents the greatest recent growth in air cargo.
PORTS About 12.3 million tons of freight are handled each year by the ports in North Florida. The cargo includes freight that is originating in or destined for the six-county region and cargo that uses the port but originates or is destined for another location in the US. International shipments account for 71 percent of cargo handled by North Florida ports. Over 74 percent of the imports are from the Caribbean or South America. Of these international shipments, 55 percent is destined for distribution and consumption in North Florida. Cargo exported through North Florida ports totals 4.9 million tons. About 75 percent of the market is to the Caribbean. North Florida is the largest origin for international shipments that travel through our ports with an 11 percent market share. Of the exports that move through North Florida ports, 80 percent are containerized. More than 70 percent of the freight originating in North Florida is exported using ports in North Florida. This means 30 percent of the freight is exported through a port outside of North Florida. For example, some of the goods produced in North Florida are driven to the Port of Savannah and exported for consumption in other markets.
2-50
Path Forward 2040 Long Range Transportation Plan
FUTURE FREIGHT DEMAND INTRODUCTION Freight forecasts were used in the development of the truck model in the NERPM-AB and to identify potential needs for freight and intermodal infrastructure to support economic development. The modeling update and future needs are discussed later in this report.
FORECASTING METHODOLOGY Historically, the demand for freight shipments and the Gross Domestic Product (GDP) and Gross State Product (GSP) the equivalent considering only the economic productivity in Florida) are highly correlated. Therefore, the first step in developing a forecast for the regional freight movements was to forecast the anticipated growth in GDP and GSP for Florida. The based forecasts are appropriate for estimating the total movement of commodities that include trips that are shipped by rail and port intermodal. Figure 2-4 shows the basis of the forecast used in continuous annual growth rates. In the figure, the acronyms used are for the Congressional Budget Office (CBO), Organization for Economic Cooperation and Development (OECD) and Toronto Dominion Bank (TDB). The historical growth is shown as HIS growth. The average of the forecasted growth rates shown on the dashed line show the basis of the forecasts provided in this report.
2-51
Path Forward 2040 Long Range Transportation Plan
GDP forecasts were used as basis for freight forecasts.
Figure 2-4. Summary of GDP Forecasts
2-52
Path Forward 2040 Long Range Transportation Plan
PORT INTERMODAL
The forecast of intermodal rail originating and destined for JAXPORT and Port of Fernandina Facilities is based on published historical 20-ft Equivalency Units (TEU) and rail intermodal market analysis.
Two levels of forecasts were prepared: a moderate and a more aggressive forecast. The moderate split uses a growth factor of 1.25 times the GDP growth in freight movements. The aggressive forecast uses a factor of 1.75 times GDP. The more aggressive forecast anticipates a greater shift of freight movements moving by intermodal rail than by truck movements today.
Conservative estimate: Assumes that today 10 percent of the total TEU imports and exports are shipped via rail. This rate is increased by 0.4 percent annually High estimate: Assumes that today 20 percent of total TEU imports and exports are shipped via rail. This rate is also increased by 0.4 percent annually. The percent of TEUs shipped via rail ranges from 8 percent to 18 percent for the conservative estimate, or 16 percent to 26 percent for the high estimate. Two TEU forecasts for “loaded containers” were developed for the Jacksonville and Fernandina ports.
In addition to the loaded TEUs that are imported and exported – empty TEUs are also moved - primarily to the Jacksonville Ports. Many of the TEU’s are from the Jacksonville area, but many also travel from locations beyond North Florida to our ports.
Table 2-19 shows a summary of historical data as reported by the American Association of Port Authorities (AAPA) and the moderate and aggressive forecasts for loaded commodities in TEUs.
These historical data were used to estimate the number of imported, exported and empty containers traveling through the ports in North Florida. Figures 2-5 thru 2-9 on the following pages summarize the forecasts.
For the areas outside the Jacksonville area, two forecast splits were developed for both the moderate forecast and the aggressive forecast.
Table 2-19. Summary of TEUs for North Florida Port Facilities (JAXPORT and Port of Fernandina) TEUs 2009 2010 2011 Import TEUs 139,653 162,645 174,174 Export TEUs 376,044 436,172 444,526 Total loaded TEU's 515,697 598,817 618,700 Empty TEUs* 262,532 291,176 303,151 Empties as percent of Total Loaded 51% 49% 49% Average % past 4 years * Empties are not defined as imported or exported
2-53
2012 192,830 425,393 618,223 319,455 52% 50%
Path Forward 2040 Long Range Transportation Plan 3,000,000
2,847,947 Actual (AAPA Loaded TEUs) Vickerman Moderate Forecast (Loaded TEUs Moderate Forecast (Loaded TEUs only) only) Vickerman Aggressive Forecast (Loaded TEUs Aggressive Forecast (Loaded TEUs only) only)
2,500,000
2,000,000
1,903,555
TEUs per year
2030, 1,628,602 1,500,000
2020, 927,670
2030, 1,272,981
1,000,000
2020, 848,872 500,000
2013, 618,500
-
2003
2006
2009
2012
2015
2018
2021
2024
Figure 2-5. Moderate TEU Port Forecast
2-54
2027
2030
2033
2036
2039
Path Forward 2040 Long Range Transportation Plan
4,500,000
Aggressive Forecast
2040, 4,271,920
4,000,000 Imports 3,500,000 Exports
3,000,000
Empties
2,500,000
2030, 2,442,902
Total TEUs (Loaded + Empties)
2,000,000 1,500,000
2020, 1,391,506
1,000,000 500,000 2003
2006
2009
2012
2015
2018
2021
2024
2027
Figure 2-6. Aggressive TEU Port Forecast – Loaded and Empties
2-55
2030
2033
2036
2039
Path Forward 2040 Long Range Transportation Plan
4,500,000
Moderate Forecast Imports
4,000,000
Exports
3,500,000
3,000,000
2040, 2,855,333
Empties
2,500,000 Total TEUs (Loaded + Empties)
2030, 1,909,471
2,000,000 2020, 1,273,308
1,500,000 2013, 927,750 1,000,000
500,000
2003
2006
2009
2012
2015
2018
2021
2024
2027
2030
Figure 2-7. Summary of 2040 Moderate TEU Port Forecast – Loaded and Empties 2-56
2033
2036
2039
Path Forward 2040 Long Range Transportation Plan
RAIL
RAIL INTERMODAL The mix of the forecasted TEUs that travel via rail, both to and from North Florida, as well as to and from areas outside North Florida, is based on U.S. Department of Transportation’s Freight Analysis Framework published data. The assumptions with the moderate and aggressive forecasts vary.
Aggressive forecast: Assumes that today 20 percent of total TEU imports and exports are shipped via rail. This rate is also increased by 0.4 percent annually.
The percent of TEUs shipped via rail ranges from 8 percent to 18 percent for the conservative estimate, or 16 percent to 26 percent for the high estimate. Table 2-20 summarizes the rail intermodal forecasts. Figures 2-10 and 2-11 show this information graphically.
Moderate forecast: Assumes that today 10 percent of the total TEU imports and exports are shipped via rail. This rate is increased by 0.4 percent annually
Table 2-20. Summary of Rail Intermodal Forecasts 2013
Rail Intermodal TEUs Incremental TEUs shipped via rail TEUs shipped outside the metro area TEUs shipped within the metro area Total TEUs
68,245 70,975 7,653
2-57
2040 Moderate or Conservative 212,484 450,497 65,716 728,697
Aggressive 317,902 673,952 98,318 1,090,172
Path Forward 2040 Long Range Transportation Plan
800,000
700,000
2040, 212,484 2040, 450,467
Incremental TEU's shipped via Rail (Conservative Rate vs. High Rate)
2040, 65,716 600,000
TEUs shipped outside the Metro area Conservative Range
500,000
400,000
TEUs shipped within the Jacksonville Metro area
2025, 171,226
300,000 2013, 68,245
200,000
2025, 112,649
2025, 21,344
2013, 70,975 2013, 7,653
100,000
-
2003 2005 2007 2009 2011 2013 2015 2017 2019 2021 2023 2025 2027 2029 2031 2033 2035 2037 2039
Figure 2-8. 2040 Moderate Forecast of Rail Intermodal 2-58
Path Forward 2040 Long Range Transportation Plan
1,200,000
2040, 317,902
Incremental TEU's shipped via Rail (Conservative Rate vs. High Rate)
2040, 673,952
1,000,000 2040, 98,318
TEUs shipped outside the Metro area Conservative Range 800,000 TEUs shipped within the Jacksonville Metro area 600,000 2025, 133,020 400,000
2013, 68,245
2025, 202,191 2025, 25,204
2013, 70,975 200,000
-
2013, 7,653
2003 2005 2007 2009 2011 2013 2015 2017 2019 2021 2023 2025 2027 2029 2031 2033 2035 2037 2039
Figure 2-9. 2040 Aggressive Forecast of Rail Intermodal
2-59
Path Forward 2040 Long Range Transportation Plan
RAIL CARLOAD
Similar to the rail intermodal growth forecast, rail carload movements are also anticipated to grow. This growth will be less than the increase of rail intermodal because of the anticipated shift between carload and intermodal and the consumption orientation of the carload shipments within these areas. This growth is anticipated to be 2.0 percent to 2.2 percent per year or a growth factor of 2.7.
Using the market and information developed through the cargo and logistics demand forecast, the ratio of truck movements between intermodal facilities was estimated. External truck volumes were identified at the major external nodes within the NERPM-AB.
TRUCK INTERMODAL FORECASTS
After establishing the base year truck flows, growth rates were forecast using growth rates based on the following assumptions.
TRUCK TRIPS AND VOLUMES
GROWTH RATES Where gross domestic product is highly correlated to the overall growth in commodity movements, population growth also serves as a reasonable basis for estimating the growth of the internal-internal truck trips. For external truck trips that remain in Florida the forested population growth in Florida was used. Both growth factors were based on the University of Florida’s Bureau of Economic and Business Research medium growth forecasts. These growth factors are summarized in Table 2-21.
Using the port and rail intermodal forecasts and existing truck counts at the entrances to the major intermodal facilities, a worksheet model was prepared to estimate the truck movements between each of the major intermodal facilities within the region. To build a truck trip table between each of the regional intermodal facilities, the following steps were performed.
The existing truck volumes at the entrances to the intermodal facilities were estimated based on the FDOT Traffic Online database.
Table 2-21. Growth Factors for Trucks
2011 BEBR (millions 1.4 18.905
Internal GF based on population growth External GF based on population growth in Florida
2-60
2040 BEBR (millions) 1.9 25.847
Growth Factor (GF) 1.36 1.37
Path Forward 2040 Long Range Transportation Plan An anticipated shift in truck to rail intermodal traffic based on industry trends is anticipated to occur. With this shift, a growth factor of 3.08 was used to reflect the change in rail intermodal demand versus truck trip growth. This shift explaining the basis for the growth rate is discussed in greater detail in the rail intermodal forecasting section.
The statewide freight data is obtained from the statewide freight model, while the freight data associated with the ports within the NERPM-AB area was obtained by conducting a study of the commodity flows at the Jacksonville and Fernandina ports. In the NERPMAB, the data associated with the ports is located in the JAXPORT input file.
In addition, two major shifts in truck movements associated with intermodal shipments were assumed:
The JAXPORT file distributes trips to the ports and the intermodal facilities. Trips associated with the intermodal facilities are generated by the port but also by the statewide freight model. The model distributes the trips from these two sources based on percentages. These percentages are placed in the JAXPORT file. One input percentage is associated with each of the intermodal facilities, while the other percentage results in the model calculating how many of the port trips go to the intermodal facilities. This percentage represents the distribution of truck freight volumes (port and statewide) among the different intermodal facilities. The total number of freight trips associated with the different intermodal facilities in 2010 and 2040 were shown in Table 2-22 on the next page.
The opening of an intermodal container transfer facility near Blount Island requires trucks to leave the port gate by truck. These containers are then shifted to the rail network for short-haul movement to the CSX Intermodal Facility or long-haul movement by rail. The delivery of containers to the intermodal container transfer facility by truck is anticipated to be small with most of the regional port-related container shipments being delivered to the CSX Intermodal Facility. Neither the FEC nor Norfolk Southern railroads are anticipated to use the Intermodal Container Transfer Facility. The second Dames Point intermodal terminal is anticipated to be open by the year 2040 and operating near capacity similar to the existing intermodal terminal.
These data were converted to percentages to distribute the freight truck trips tables which are then added to all the other trip tables by the model and assigned to the highway network. The resulting truck volumes are shown on Figure 2-10 and 2-11.
Table 2-19 summarizes the anticipated intermodalrelated truck movements in the year 2040.
AIR CARGO Florida Trade and Logistic Study (2011) and 2013-2043 Florida and Metro Forecast published by the University of Central Florida anticipate that air cargo within the region will increase by 45 percent between now and the year 2040. This forecast will largely be driven by population growth within the region. Air cargo accounts for less than 1 percent by volume shipped in the region, but may be as high as 4 percent of the total value of goods.
TRUCK MODEL IN THE NERPM-AB
In addition to forecasting the overall goods movement and intermodal shipments which were of particular concern within the region, the truck component of the NERPM-AB was updated. These updates were based on data from the freight and intermodal demand forecasts, statewide freight model and the truck model in the NERPM-AB. In the NERPM-AB there are three types of freight data sources, (1) the statewide freight data on the interstate system, (2) the freight destined to the Jacksonville and Fernandina ports within our study area and (3) the truck trips that are related to distribution of goods and services within our study area. The third group is calculated by the model based on residential and employment input data.
2-61
Path Forward 2040 Long Range Transportation Plan Table 2-22. Summary of Truck Model Inputs Port Terminal Blount Island Dames Point Dames Point 2 Total Trucks bound to an intermodal facility at CSX, Norfolk Southern or FEC.
2-62
2040 761 305 305 1,371
" ) 108
" ) 115
" )
§ ¦ ¨ 95
1
£ ¤ 2
" ) 127
A1A
A1A
¬ «
17
£ ¤
" ) " ) 108
¬ «
105
¬ « ¬ «
107
2
A1A
¬ «
® q
301
£ ¤
A1A
¬ «
" ) 122
§ ¦ ¨ 295
" ) 119
" ) 250
105
§ ¦ ¨ 295
" ) 125
221
¬ «
" ) 124
" )
10
90
£ ¤
" )
" ) 130
116
¬ « 90
§ ¦ ¨
£ ¤ ¬ «
10
228
250A
¬ « ¬ «
228
¬ «
301
£ ¤
202
134
¬ « ¬ « 23
§ ¦ ¨ 295
1
£ ¤ 220
218
§ ¦ ¨ 95
21
¬ « 16
¬ «
16
® nq ¤
¬ «
" ) 315
Legend
1
16
208
" )
13
17
£ ¤
315
13A
207
¬ «
" )
" ) 305
17
£ ¤
26
¬ «
206
¬ «
" ) 204
® q 20
¬ «
501 - 1,000
1,001 - 2,000
" ) 21
2,001 - 3,000 > 3,001 320
" ) § " ) ¦ ¨ Railroad System " )Roadway ) £ " )System " ¤ « " ) " )Water Bodies £ ¤¬ £ ¤ «" Conservation Lands¬ " ) " ) ) ¬ « " ¬ « Six Counties " ) )Boundaries ¬ «" ) ¬ « 335
75
318
329
316
335
27
500
225
326
Date: 7/11/2014
225A
" ) 310
200A
441
25A
19
¬ «
" ) 309
" ) 308
301
200
25
200A
200
326 326
326
Figure 2-10 2010 Truck Volumes 2-63
¯
A1A
¬ «
0
0
10,560 Feet
3
5
¬ «
100
315
< 500
§ ¦ ¨ 95
¬ «
" )
Total Average Daily Truck Volume
¤ n
214
214
Year 2010 Base Year
£ ¤
¬ « " ) ) " ) " " )
209
" )
® Airport q ¤ Amtrak Station n ¤ Passenger Rail Station n
¬ «
¬ «
" )
" )
A1A
13
6 Miles
A1A
¬ «
" ) 108
" ) 115
" )
§ ¦ ¨ 95
1
£ ¤ 2
" ) 127
A1A
A1A
¬ «
17
£ ¤
" ) " ) 108
¬ «
105
¬ « ¬ «
107
2
A1A
¬ «
® q
301
£ ¤
A1A
¬ «
" ) 122
§ ¦ ¨ 295
" ) 119
" ) 250
105
§ ¦ ¨ 295
" ) 125
221
¬ «
" ) 124
" )
10
90
£ ¤
" )
" ) 130
116
¬ « 90
§ ¦ ¨
£ ¤ ¬ «
10
228
250A
¬ « ¬ «
228
¬ «
301
£ ¤
202
134
¬ « ¬ « 23
§ ¦ ¨ 295
1
£ ¤ 220
218
§ ¦ ¨ 95
21
¬ « 16
¬ «
16
® nq ¤
¬ «
" ) 315
Legend
1
16
208
" )
13
17
£ ¤
315
13A
207
¬ «
" )
" ) 305
17
£ ¤
26
¬ «
206
¬ «
" ) 204
® q 20
¬ «
501 - 1,000
1,001 - 2,000
" ) 21
2,001 - 3,000 > 3,001 320
" ) § " ) ¦ ¨ Railroad System " )Roadway ) £ " )System " ¤ « " ) " )Water Bodies £ ¤¬ £ ¤ «" Conservation Lands¬ " ) " ) ) ¬ « " ¬ « Six Counties " ) )Boundaries ¬ «" ) ¬ « 335
75
318
329
316
335
27
500
225
326
Date: 7/11/2014
225A
" ) 310
200A
441
25A
19
¬ «
" ) 309
" ) 308
301
200
25
200A
200
326 326
326
Figure 2-11 2040 Truck Volumes 2-64
¯
A1A
¬ «
0
0
10,560 Feet
3
5
¬ «
100
315
< 500
§ ¦ ¨ 95
¬ «
" )
Total Average Daily Truck Volume
¤ n
214
214
Year 2040 No Build
£ ¤
¬ « " ) ) " ) " " )
209
" )
® Airport q ¤ Amtrak Station n ¤ Passenger Rail Station n
¬ «
¬ «
" )
" )
A1A
13
6 Miles
A1A
¬ «
Path Forward 2040 Long Range Transportation Plan
FINANCIAL RESOURCES P UTTING OUR INFRASTRUCTURE TO WORK REQUIRES FINANCIAL RESOURCES TO BUILD , OPERATE AND MAINTAIN BOTH EXISTING AND FUTURE FACILITIES . Revenues were forecast through the year 2040. These revenues will come from federal, state and local revenue sources that are currently authorized. No new sources of revenue were considered. Within the Path Forward LRTP, only the revenues consistent with the federal planning boundaries for Clay, Duval, Nassau and St. Johns Counties were considered. All revenues shown in this report are in year of expenditure values. Alternative sources of revenue were considered and include
Table 2-23 and Table 2-24 summarize the estimated revenues. Operations and maintenance revenues are discussed in a later section of this report. Not all revenues estimated for the plan were used to fund projects within the Cost Feasible Plan. In Table 2-24 the total revenues estimated during the planning process for local governments are shown. However, during the Cost Feasible Plan development, local agencies used more conservative estimates of revenue in identifying their locally-funded projects. The forecasts prepared as part of the planning process are shown to provide consistency. Table 2-25 summarizes the funding programs identified in the plan based on the agency with the primary decision-making authority using the adjusted local revenues and summarizes the allocation by mode in the Cost Feasible Plan. Additional detail on the forecasting methodology is provided in Technical Memorandum #6 – Financial Resources and the federal and state revenue forecasts are provided in Appendix C.
Extension of existing taxes that are scheduled to retire within the horizon of the plan. Authorizing new taxes to maximize the potential for revenue within the legislative authority of each county. Alternative taxes such as vehicle miles traveled taxes. Additional toll revenues beyond facilities currently planned as toll roads. 2-65
Path Forward 2040 Long Range Transportation Plan Table 2-23. Federal and State Revenue Fund Program Strategic Intermodal System 17 Other State Highways 18 Turnpike/Tolls 19 Transportation Management Area Transportation Regional Incentive Program 20 Transportation Alternatives (TALU) 21 Transportation Alternatives (TALT) 22 State and Federal Transit 23 Federal Transit Administration Passenger Ferry Grant 24 Strategic Intermodal System Multimodal 25 Federal Seaport Grant 26 Total
2019-2020 $39.82 $122.33 $0.00 $28.80 $0.70 $2.80 $3.78 $63.07 $338.65 $311.00 $1,376.45
17
2021-2025 $508.26 $273.13 $1,951.22 $77.44 $5.40 $7.10 $9.38 $174.11 $6.62 $220.42
2026-2030 $874.16 $284.40 $0.00 $83.98 $5.39 $7.10 $9.38 $171.98
2031-2040 $2,635.50 $709.21 $0.00 $126.18 $10.80 $14.20 $18.76 $350.84
$313.60
$2,923.24
$3,719.80
$2,026.49
$7,420.68
Total $4,057.74 $1,389.08 $1,951.22 $316.40 $22.29 $31.20 $41.30 $760.00 $6.62 $3,795.90 $311.00 $14,543.42
The revenue estimate provided by FDOT of $3,880.96 million does not include Preliminary Engineering (PE) phases. This total includes Preliminary Engineering (PE) phases as programmed in the Cost Feasible Plan. 18 The revenue estimate provided by FDOT of $1,162.50 million does not include Preliminary Engineering (PE) phases. This total includes PE phases as programmed in the Cost Feasible Plan. 19 The revenue estimate was provided by FDOT. 20 These funds are distributed by FDOT on a districtwide basis. The total shown is a districtwide total. 21 These funds may only be used in the North Florida Transportation Management Area. 22 These funds are distributed by FDOT on a districtwide basis. The total shown is a districtwide total. 23 The funds include $680.10 million of federal and state capacity funding for the North Florida TPO estimated by FDOT plus $79.90 of New Starts funding. The federal and state capacity funds are distributed on a statewide priority basis. The New Starts funding is allocated by the Federal Transit Administration on a competitive basis. A total of $760.30 million of New Start funds was estimated on a statewide basis by FDOT. These programs are not shown in the FDOT Adopted Work Program. 24 A Passenger Ferry Program Grant was authorized for capacity improvements but is not obligated. 25 These funds are distributed by FDOT on a statewide basis. The funds were estimated by extrapolating the current statewide funding through the horizon of the plan and developing a reasonable estimate of the statewide funding that would be allocated to North Florida. This estimate includes $186.50 million of state funds to match the federal authorization for St. Johns River Dredging. 26 Authorization was approved in the 2014 Water Resources and Reform Development Act but is not obligated. In additional to $311.00 million shown, $186.50 million is anticipated to come from local sources and $186.50 million from the Strategic Intermodal System Multimodal programs. 2-66
Path Forward 2040 Long Range Transportation Plan Table 2-24. Local Revenue 27
Type
Source
Clay County
Constitutional Gas Tax County Fuel Tax Ninth-Cent Gas Tax 1st Local Option Gas Tax Local Infrastructure Surtax 28
Clay County Total Duval Constitutional Gas Tax County Fuel Tax 1st Local Option Gas Tax Extension 29 Ninth-Cent Fuel Tax (Diesel Only) Local Infrastructure Surtax 30 Subtotal for Non-Transit 31 Charter Transit Surtax Total Duval County Nassau Constitutional Gas Tax County Fuel Tax 1st Local Option Gas Tax Ninth-Cent Gas Tax Total Nassau County St. Johns Constitutional Gas Tax County Fuel Tax 1st Local Option Gas Tax 32 Ninth-Cent Fuel Tax (Diesel Only) Total St. Johns County Total Local Funds 33
Years 2019-2020
$4.94 $2.18 $2.20 $13.16
Years 2021-2025
$10.47 $4.61 $4.67 $28.04
Years 2026-2030
$11.06 $4.87 $4.96 $29.73
Years 2031-2040
$24.02 $10.59 $10.83 $64.98
22-Year Total
$50.49 $22.25 $22.66 $135.91
$44.58 $67.04 $22.09 $9.74 $255.23
$47.79 $46.88 $20.66 $362.31
$50.62 $49.51 $21.82
$110.42 $107.54 $47.40 $0.00
$44.58 $275.87 $226.02 $99.62 $617.55
$2.80
$6.20
$6.82
$15.72
$31.54
$235.10
$551.73
$647.40
$524.96 $235.10 $760.05 $2.96 $1.31 $6.38 $1.07 $11.71 $6.16 $2.72 $19.41
$987.78 $551.73 $1,539.51 $6.28 $2.77 $13.67 $2.28 $25.00 $13.06 $5.76 $41.51
$725.55 $647.40 $1,372.95 $6.63 $2.92 $14.56 $2.43 $26.54 $13.79 $6.08 $44.17
$170.66 $1,651.08 $1,834.18 $14.41 $6.35 $32.05 $5.35 $58.16 $29.96 $13.20 $61.73
$2,408.95 $3,085.31 $5,506.70 $30.28 $13.35 $66.66 $11.13 $121.41 $62.97 $27.76 $166.82
$0.59
$1.30
$1.43
$3.29
$6.61
$28.86 $867.66
$61.62 $1,673.92
$65.47 $1,515.58
$108.18 $2,110.94
$264.13 $6,155.67
27
$1,434.23
Not all revenues estimated for the plan were used to fund projects within the Cost Feasible Plan. The local agencies used more conservative estimates of revenue when providing their list of locally-funded projects. These forecasts are shown to provide consistency with the forecasts prepared as part of this planning process. 28 The Local Infrastructure Surtax is set to expire in 2019 in Clay County. 29 The existing 1st Local Option Gas Tax expires in Duval County in 2036 and no funds are anticipated to be available for new capacity projects. The extension of the 1st Local Option Gas Tax was adopted by Local Ordinance 2013-820 and bonds will be issued making these revenues available in early years for capacity projects. 30 The Local Infrastructure Surtax is set to expire in Duval County in 2030. 31 Significant portions of these funds are anticipated to be allocated to debt service and maintenance and operations activities. 32 The 1st Local Option Gas expires in St. Johnâ&#x20AC;&#x2122;s County in 2036. 33 All local revenue available for capacity projects were estimated at 25 percent of the revenue forecasts with 75 percent being dedicated to operations and maintenance with the exception of Duval County where a greater portion of these revenues are dedicated to debt service and operations and maintenance. 2-67
Path Forward 2040 Long Range Transportation Plan Table 2-25. Summary of Funding Programs by Primary Decision-Making Authority Primary DecisionProgram Roads Making Authority FDOT Strategic Intermodal System $4,057.74 FDOT Turnpike/Tolls $1,951.22 FDOT SIS Multimodal FDOT Subtotal $7,306.37 North Florida TPO Other State Highways $1,297.42 North Florida TPO Transportation Management Area $268.75 North Florida TPO Transportation Alternatives (TALU) North Florida TPO Transportation Alternatives (TALT) North Florida TPO Transportation Regional Incentive Program (TRIP) $21.23 North Florida TPO State and Federal Transit North Florida TPO Subtotal $1,587.40 Local Clay County $236.88 Local Duval County Road Capacity $860.64 Local JAXPORT Local Transit Local Match Local Duval County Subtotal $860.64 Local Nassau County $39.64 Local St. Johns County $159.41 Subtotal Local $1,296.58 Federal Grants FTA Passenger Ferry Grant Federal Grants Federal Seaport Grant Federal Grants $0.00 Grand Total $8,892.93
34
Transit
$1,377.21 $1,377.21
$760.00 $760.00 $0.00 $253.33 $253.33
$253.33 $6.62 $6.62 $2,397.16
Bicycle and Pedestrian 34
$91.66 $91.66 $13.44 $31.20 $41.30 $1.06
TSM&O
$0.00
Freight
$2,006.10 $2,006.10
$34.21
$178.66 $11.84 $43.03
$34.21
$0.00
$59.44
$0.00 $186.50
$102.47 $1.98 $7.97 $124.27
$0.00
$186.50
$0.00
$186.50
$0.00 $34.21
$311.00 $311.00 $2,503.60
$302.93
These expenditures are based on 5% of road capacity projects and dedicated revenues for bicycle and pedestrian projects. 2-68
Total $4,057.74 $1,951.22 $3,383.31 $10,781.34 $1,389.08 $316.40 $31.20 $41.30 $22.29 $760.00 $2.560.27 $248.73 $963.11 $186.50 $253.33 $1,402.95 $41.63 $167.38 $1,860.68 $6.62 $311.00 $317.62 $14,130.82
Path Forward 2040 Long Range Transportation Plan
ENVIRONMENTAL CONSIDERATIONS L EVERAGING RESOURCES TO ENGAGE ENVIRONMENTAL STAKEHOLDERS EARLY IN THE PLANNING PROCESS RESULTED IN THE EFFECTIVE SCREENING OF PROJECTS AND AN UNDERSTANDING OF THE POTENTIAL ENVIRONMENTAL CONSEQUENCES OF MAJOR PROJECTS .
INTRODUCTION
was developed by using a methodology of rapid software prototyping, frequent user feedback and flexible architecture designed to adapt to the Efficient Transportation Decision Making Process. This resulted in an internet-accessible interactive database and mapping application which integrates: a geo-relational database of Efficient Transportation Decision Making Process, over 550 environmental resource geographic information systems data layers, an automated and standardized geographic information systems-based environmental screening analysis application, and numerous tools for data entry, review, and reporting.
FDOT Adopted the Efficient Transportation Decision Making Process to assist agencies in streamlining the environmental review of projects. The following is FDOT’s summary of the process. Florida’s Efficient Transportation Decision Making Process was developed in response to the Congress' "Environmental Streamlining" initiative, accomplishes major transportation project planning with early and continuous agency participation, efficient online electronically managed environmental review and meaningful dispute resolution mechanisms. Efficient Transportation Decision Making Process is carried out through the use of the Environmental Screening Tool (EST). EST 2-69
Path Forward 2040 Long Range Transportation Plan It is used throughout the Efficient Transportation Decision Makin Process to:
protecting and enhancing the natural environment," as established for federal transportation programs in Moving Ahead for Progress in the 21st Century Act (MAP-21).
Integrate data from multiple sources into an easy to use, standard format. Analyze the effects of proposed projects on the human and natural environment. Communicate information effectively among Environmental Technical Advisory Team (ETAT) representatives and to the public. Store and report results of the ETAT review effectively and efficiently. Maintain project records, including commitments and responses, throughout the project life cycle. Stakeholders involved in the Efficient Transportation Decision Making Process generally include Metropolitan Planning Organizations (MPOs)/Transportation Planning Organizations (TPOs), county and municipal governments, federal and state agencies, Native American tribes, and the public. To facilitate intergovernmental interaction, each FDOT District has an Environmental Technical Advisory Team (ETAT). The ETAT includes representatives from MPOs/TPOs, state and federal agencies, and participating Native American Tribes. ETAT members and the public have the opportunity to provide input to the Florida Department of Transportation (FDOT) regarding a project's potential effects on the natural, physical, cultural, and community environment throughout the Planning phase of project delivery. These comments help to determine the feasibility of a proposed project; focus the issues to be addressed during the PD&E phase; allow for early identification of potential avoidance, minimization, and mitigation opportunities; and create products that may be used in the PD&E phase to promote efficiency and consistency during project development.
The Efficient Transportation Decision Making Process is composed of two project screening events: Planning and Programming. During the Planning Screen, comments received from the ETAT members and the public help FDOT and MPOs/TPOs to prioritize proposed transportation projects for their inclusion in their Cost Feasible Long Range Transportation Plans (LRTPs). During the Programming Screen, qualifying projects are reviewed when being considered for funding in the FDOT Five-Year Work Program or MPO Transportation Improvement Program, or if already funded, before advancing to the PD&E Phase. Coordination with the ETAT members is facilitated through the Environmental Screening Tool (EST), an Internet-accessible interactive database and mapping application. The EST brings together resource and project data from multiple sources into one consistent format. It provides quick, standardized Geographic Information System analyses, identifying potential natural, physical, cultural, and community resources present in the project area. The EST also allows the ETAT members to comment on the potential effects of the proposed project. Project information is made available to the public through the Efficient Transportation Decision Making Public Access Site (https://etdmpub.flaetat.org/est/).
SUMMARY OF EFFICIENT TRANSPORTATION DECISION MAKING PLANNING SCREEN RESULTS
The Efficient Transportation Decision Making Process links land use, transportation, and environmental resource planning initiatives through early interactive agency involvement. It also connects the Planning and PD&E phases by carrying forward planning products, previous analyses and decisions supporting future transportation decisions in subsequent phases of project development. Furthermore, the Efficient Transportation Decision Making Process provides a planning framework to support the national goal of Environmental Sustainability, which seeks "to enhance the performance of the transportation system while
As part of the Efficient Transportation Decision Making Process, each of the projects identified in the Needs Plan were submitted through the planning screen. This process is shown in Figure 2-12. A report of the data provided through the Planning Screen is provided in Appendix D.
2-70
Path Forward 2040 Long Range Transportation Plan
Figure 2-12. Efficient Transportation Decision Making Planning Process
2-71
Path Forward 2040 Long Range Transportation Plan the use of mitigation banks established pursuant to this part…
Based on the potential environmental impacts of projects, two projects identified as priority projects were not included in the Cost Feasible Plan as a result of the identification of potential fatal flaws during the environmental screening process and potential controversy.
As part of the program, on an annual basis, projects that are anticipated to be constructed in the first three years of the Tentative Work Program are submitted with a description of the habitats and wetland impacts and a mitigation plan describing which mitigation bank shall be used. A funding plan for the mitigation and the commitments for the funding of mitigation in partnership with the water management district are required. The water management district is then responsible for ensuring that the mitigation requirements are met in accordance with the plan.
SR 313 from US 1 to International Golf Parkway, Wells Road Extension from SR 21 Blanding Boulevard to Argyle Forest Boulevard.
Public comments are summarized in Technical Memorandum #1 – Public Involvement.
The applicable mitigation banks for this region are shown on Figure 2-13. Credits for impacts based on the Uniform Mitigation Assessment Method may be purchased from local agencies as well.
SYSTEM APPROACH TO MITIGATION
The mitigation of environmental impacts are addressed in the FDOT Project Development and Environment Manual which implements the National Environmental Policy Act of 1969 and related legislation for projects that may use federal funds or require a federal action. These procedures also apply to major projects where state revenues are used.
The mitigation of other environmental impacts, such as archeological and historic resources and noise are addressed in the FDOT Project Development and Environment Manual. Specific project level mitigation requirements are determined through the Environmental Resource Permit process administered by the St. Johns River Water Management District.
FDOT maintains a wetland mitigation plan with the St. Johns River Water Management District that is conducted on an annual basis for projects in the FDOT’s Adopted Work Program. The requirements to be address in the Mitigation Plan are outlined in F.S. 373.41337 Mitigation Requirements for Specified Transportation Projects.
The FDOT Mitigation Plan and St. Johns River Water Management District permitting process are provided in Appendix E.
The Legislature recognized in the establishment of this program that “environmental mitigation for the impact of transportation projects proposed by the Department of Transportation or a transportation authority can be more effectively achieved by regional, long-range mitigation planning rather than on a project-by-project basis. It is the intent of the Legislature that mitigation to offset the adverse effects of these transportation projects be funded by the Department of Transportation and be carried out by the water management districts, including
AIR QUALITY
The Jacksonville urban area airshed is designated as a maintenance area in accordance with Section 185A of the Clean Air Act Amendments. As such the LRTP may proceed revisiting the conformity determination requirements in accordance with the State Implementation Plan.
2-72
Path Forward 2040 Long Range Transportation Plan
Figure 2-13. St. Johns River Water Management District Wetland Mitigation Banks
2-73
Path Forward 2040 Long Range Transportation Plan This page is intentionally blank.
2-74
Path Forward 2040 Long Range Transportation Plan
PUBLIC INVOLVEMENT T HE INFORMATION GATHERED EARLY IN THE PLANNING PROCESS THROUGH PUBLIC INVOLVEMENT IS ESSENTIAL TO THE SUCCESS OF THE LRTP. W HEN COMBINED WITH PLANNING AND ENGINEERING DATA , IT SETS THE DIRECTION FOR THE PLAN ' S DEVELOPMENT . I T WILL TELL THE N ORTH F LORIDA TPO WHAT THE RESIDENTS OF N ORTH F LORIDA CONSIDER IMPORTANT AND PLAYS A SIGNIFICANT ROLE IN ESTABLISHING THE TRANSPORTATION GOALS . The public involvement activities carried out as part of this plan were conducted to inform and solicit ideas from the public about transportation needs, alternatives and priorities. The program elements are described further in the following sections.
The Path Forward 2040 Public Involvement Plan contained a structured process to inform the public and interested parties and solicited input in identifying transportation needs and prioritizing projects. Multiple methods were used to engage and solicit input from the public as part of the planning process.
2-75
Path Forward 2040 Long Range Transportation Plan
PUBLIC PERCEPTIONS SURVEY
A survey was conducted online, by landline telephone and by mobile phone among residents of Baker, Clay, Duval, Nassau, Putnam, and St. Johns counties to identify opinions on transportation issues and needs. A total of 759 respondents participated in the survey. The key findings are listed below:
Of the respondents who work outside the home, 92 percent traveled to their jobs by private car, while three percent rode the bus, two percent participated in a car pool, and the remainder went by bicycle (one percent), airplane (one percent), walking (0.5 percent), or were always on the road, such professional truckers (one percent). About seven percent of the commuters said that the traffic on their primary road to work was “always backed up far below the speed limit,” and 21 percent said their road was “usually below the speed limit unless there’s bad weather or an accident.” Interstate 10 was most often cited as “always backed up,” by 25 percent of the people who used it. The mean commuting time to work was 24 minutes, and the median commute was 20 minutes. These findings were unchanged from the 2008 transportation survey. About 86 percent of the commuters reported that their current commuting time was acceptable to them, while 14 percent found it “unacceptable.” 97 percent said they would be willing to accept a commute up to 30 minutes to work. About 17 percent of the respondents reported that they had used public transit in North Florida during the past year. Public transit use was highest among respondents age 18 to 24, at 36 percent, and also among those with household incomes under $25,000, at 28 percent. Among those who used public transportation, 61 percent used the bus, 27 percent used a trolley, 26 percent used the Skyway, and 23 percent used a van or shuttle service. Most residents of North Florida have used public transit in another city: 67 percent said they had used public transit while traveling in another city. In this case, the rate of usage increased with household income, rising from a low of 43 percent among those with household incomes below $25,000 to 81 percent among those with household incomes of $150,000 and over. Those who had used public transit in another city had most often used a bus (68 percent), subway (62
percent), commuter rail (35 percent) or light rail (28 percent). The “need for better mass transit” was identified by 22 percent of the respondents as the most important transportation issue in North Florida. Fifteen percent specifically mentioned the need for an expanded bus system, while 13 percent called for an expanded road system and 12 percent mentioned the need to alleviate traffic congestion in general. Only one of eight ideas for transportation was deemed a “high priority” by a majority of the respondents. “Providing smooth-flowing traffic on local highways” is a high priority for 72 percent of the respondents, 47 percent placed a high priority of “Providing convenient public transit alternatives,” and 37 percent placed a high priority on “Promoting the use of alternative fuels and vehicles.” Of the respondents, 28 percent felt that public transit services in North Florida are adequate, while 52 percent said they are not adequate and 20 percent were “not sure.” Those who said public transit is not adequate were invited to suggest what the region should do to improve it. 36 percent called for “more buses” or “more bus routes.” 18 percent suggested using light rail, and 13 percent proposed expanding all of the public transit options for greater accessibility. Public opinion was divided on the best long-term solution to reducing traffic in their area. “Improving public transit,” was supported by 37 percent. About 26 percent favored “developing communities where people don’t have to drive so much” and 24 percent advocated “building new roads.”
ELECTRONIC MEDIA
The public information campaign used multiple forms of electronic media to inform and solicit public input.
2-76
Interactive project web site Asset allocation game Social media Community forum engagement
Path Forward 2040 Long Range Transportation Plan
PROJECT WEB SITE The pathforward2040.com website included:
The following summarizes the geographic clusters of comments:
Home page with news, events and social media feed, overview video and link to asset allocation game Plan development overview with news and frequently asked questions Project lists, maps and documents Public involvement opportunities including the asset allocation game, online survey and social media Project team contact information
From September 2013 to December 2014 the site had 4,527 users, 5,586 sessions and 9,652 page-views. The most popular page was “Get Involved” which detailed public involvement opportunities including a survey, asset allocation game, meetings and events. The second most popular page was “Resources” which included project lists, maps and study documents.
In the urban core, transit was identified as the highest priority in the comments (29 comments). This is the consistent with comments received through other sources (public perception survey, public meetings, etc.) The next highest comment was related to freight and port-related investments (8 comments).
Table 2-28 summarizes the priority strategies and rankings of the participants. Figure 2-16 summarize the reported priorities. Similar to other sources of input, transit and bicycle and pedestrian improvements were the highest ranked priorities followed by maintaining our roadways and improving traffic flow.
ASSET ALLOCATION GAME
In Table 2-29 and Figure 2-17, when the budget was allocated, enhancing safety and widening roadways were budgeted higher than transit or bicycles and pedestrians.
The Path Forward 2040 website included a link to an “asset allocation game” where visitors could provide input. There were five screens that are summarized in Table 2-26 which summarizes the game. The project resulted in 1,400 visitors and 257 persons provided data. 35
A total of 1,714 data points were input on the strategies recommended within each priority area. More males than females responded. The household income was distributed to higher income brackets than exist within the region with a weighted average of $82,500 versus a median wage for the region of $42,400. Ten responders were in the low income bracket with a household income of less than $10,000 per year.
Figure 2-14 is a map of the locations where users identified priority locations. Table 2-27 is a legend for the map indicating the priority of the map input by color. The input received from users was peaked around placements in MetroJacksonville.com an online community forum on transportation. Figure 2-15 summarizes the number of visitors who use of the allocation game by period.
Table 2-30 summarizes the strategies recommended in the on-line allocation game. Table 2-31 is a summary of the demographics of the participants.
35
Map Data on Google Drive https://www.google.com/fusiontables/DataSource?docid=1m6 MDLQVmM8JACZ1J9n4hYH32Irs_v2Ie-TSFvo2O Map on Google Maps https://www.google.com/fusiontables/embedviz?q=select+col2 +from+1m6MDLQVmM8JACZ1J9n4hYH32Irs_v2IeTSFvo2O&viz=MAP&h=false&lat=30.256694798509937&lng=81.79939270020623&t=1&z=9&l=col2&y=2&tmplt=2&hml=TW O_COL_LAT_LNG
2-77
Path Forward 2040 Long Range Transportation Plan Table 2-26. On-line Asset Allocation Game Screen Screen 1 – Welcome
Screen Image
The first screen provides a brief introduction to the project.
Screen 2 – Priority Ranking The second screen asked visitors to prioritize a list of priorities by moving their top three priorities. Ten preset priorities were provided with an option to suggest another priority.
Invest in ports Enhance safety Expand transit Serve elderly or disabled Serve trucking Alternative fuel infrastructure Maintain roads and bridges Enhance traffic flow Serve bicycles and pedestrians Widen roads
The opportunity to comment about the priorities was also provided and a link to an interactive map provided for users to identify specific locations where projects are needed. Figure 2-17 and Table 2-24 shows the locations where project priorities were located and the level of priority. Screen 3 – Budget Allocation The third screen asked visitors to allocate budget amounts in ten categories. Each category contained existing budget amounts that reflect federal and state limitations of the flexibility of funding programs within the plan. For example, the Strategic Intermodal Systems road capacity funding category investments are selected by the state and provided to the North Florida TPO for concurrency. The visitors’ task was to allocate the portion of the budget that was not already allocated.
2-78
Path Forward 2040 Long Range Transportation Plan Table 2-26. On-line Asset Allocation Game Screen 4 â&#x20AC;&#x201C; Additional Questions The fourth screen asked visitors to provide more detailed input on the type of alternative strategies the respondent would recommend in each of the ten priority areas. This was accomplished by having visitors rank a set of alternatives for each category. Users could also add comments within each priority area describing each alternative.
Screen 5 â&#x20AC;&#x201C; Stay Involved The last screen was used to gather demographic data about visitors and provide additional project information for those who wished to provide information.
Table 2-27. Interactive Priority Map Legend Priority Alternative Fuel Infrastructure Enhance Safety Expand Transit Invest in Ports Maintain Roads/Bridges Serve Bikes and Pedestrians Serve Elderly/Disabled Widen Roads
Icon Color Green Purple White Turquoise Grey Blue Red Yellow
2-79
Path Forward 2040 Long Range Transportation Plan
Figure 2-14. Interactive Priority Map
2-80
Path Forward 2040 Long Range Transportation Plan
Figure 2-15. Visits and Use of Asset Allocation Game
2-81
Path Forward 2040 Long Range Transportation Plan Table 2-28. Summary of Priority Strategies On-line Allocation Game Ranking Priority Alternative Fuel Infrastructure Enhance Safety Expand Transit Invest in Ports Maintain Roads/Bridges Serve Bikes and Pedestrians Serve Elderly/Disabled Serve Trucking Traffic Flow Widen Roads
Times Ranked
Average Rank 27 47 108 38 64 99 19 5 55 20
Figure 2-16. Reported Priorities in Asset Allocation Game
2-82
2.15 2.04 1.74 2.13 2.17 1.99 2.37 2.20 1.96 1.60
Path Forward 2040 Long Range Transportation Plan
Table 2-29. Budget Allocation from On-line Allocation Game Budget Item Enhance Safety Widen Roads Expand Transit Serve Bikes & Pedestrians Serve Elderly/Disabled Maintain Roads & Bridges Invest in Ports Serve Trucking Traffic Flow Alternative Fuel Infrastructure
Dollars Allocated
Figure 2-17. Summary of Budget Allocation
2-83
Average Dollars 399 166 1024 847 217 548 287 44 412 187
2.79 1.15 7.11 5.88 1.52 3.81 1.99 0.31 2.86 1.30
Path Forward 2040 Long Range Transportation Plan Table 2-30. Summary of Strategies from On-line Allocation Game Strategy Alternative Fuels I would not invest in alternative fuels Incentives for alternative fuel purchases Incentives for compressed natural gas stations Incentives for electronic vehicle stations Enhance Safety Access management (reducing driveways and closing medians) Improving traffic signals (removing "permitted left turn phases, etc.) Intersection improvements (adding turn lanes, etc.) Expand Transit Commuter rail Enhancing bus service Expanding bus services Trolley services Invest in Ports I would not invest in ports Improve rail access to ports Improve water access to ports (dredging) Serve Bicyclists and Pedestrians Construct bicycle lanes Construct paths separate from the roadway Construct sidewalks Traffic Flow Road rangers Roadway message signs Traffic signal coordination Widen Roads Build new roads Construct or improve intersections and interchanges Widen existing roadways Widen roadways with express lanes Total
2-84
Inputs 224 26 72 53 73 233 68 64 101 306 97 68 70 71 214 23 81 44 66 263 78 103 82 209 51 55 103 263 49 96 58 1,712
Relative Rank 1.81 2.19 1.71 1.92 1.68 1.69 1.93 2.13 1.26 2.09 1.62 2.10 2.54 2.28 1.76 2.26 1.63 2.30 1.39 1.77 1.90 1.55 1.91 2.18 1.93 1.84 2.03 2.82 1.52 2.13 2.07 1.84
Path Forward 2040 Long Range Transportation Plan
Table 2-31. Summary of Demographic Information from On-line Allocation Game Survey item Gender Female Male Household Income Less than $25,000 $25,000 but less than $50,000 $50,000 but less than $100,000 $100,000 but less than $150,000 $150,000 and over Residents in Household 1 2 3 4 5 More than 5 Number of Drivers in Household 1 2 3 4 5 Number of Vehicles in Household 1 2 3 4 5 Work Trip Travel Modes Bike Bus Drive Mix of modes Commute Durations Less than 10 minutes Between 10 and 30 minutes Between 30 and 60 minutes More than 1 hour
2-85
Number of Responses 117 43 74 105 10 16 44 25 10 106 21 47 15 18 4 1 109 22 70 11 5 1 107 25 60 14 7 1 106 3 2 86 15 101 24 54 20 3
Path Forward 2040 Long Range Transportation Plan
NEWSLETTERS
SOCIAL MEDIA The North Florida TPO’s Facebook page and Twitter account were used to post study updates, meetings, events and information. The public involvement team posted 72 tweets and 100 Facebook statuses updates generating 7,110 impressions. Facebook advertising was used to generate traffic to the asset allocation game December 2013 to February 2014 resulting in 136,967 impressions and 651 clicks to the site.
Newsletters announcing meetings and study updates were distributed to the contact list at the beginning of the study, prior to each round of public meetings.
OVERVIEW BROCHURE
An overview brochure was created to introduce the LRTP update process and participation opportunities. The complete brochure was distributed at meetings and events throughout the course of the project.
Two Pinterest boards were developed to encourage input – “What’s Your Vision?” and “Transportation Flashback.” Sixty pins were placed generating over 8,000 impressions per month. The most popular pin, “More bike paths, please!” showed the Cherry Creek bike path in Denver and was re-pinned over 50 times.
COMMUNITY FORUM
The Metrojacksonville.com online news publication and community forum was used to share articles about the update, promote discussion and obtain comments. Each round of public meetings was promoted on the site through editorial articles and banner advertising that linked to the pathforward2040.com site.
OVERVIEW VIDEO
An overview video was created to explain the LRTP process. The video was posted on the website and used for presentations, meetings and workshops. The video can be viewed at www.pathforward2040.com.
CALENDAR
A public involvement calendar was developed to schedule and document presentations, group meetings, public workshops and outreach events throughout the study.
CONTACT LIST
A contact list of stakeholders was developed to include elected officials, agency partners, transportation-related organizations, business and civic groups, neighborhood associations, environmental groups, organizations serving the elderly, disabled, minority and low-income populations, meeting attendees and interested parties who sign up via the website.
Figure 2-18. Summary Brochure
2-86
Path Forward 2040 Long Range Transportation Plan
TRANSPORTATION TOMORROW YOUTH OUTREACH
VISUALIZATION TECHNIQUES
Visualization techniques are required to communicate the planning process to the public. The visualization techniques employed included:
As part of the 2014 National Engineer’s Week Future City Competition, 120 students in elementary, middle and high school throughout North Florida imagined their “city of the future”. The competition engages teams of students, educators and mentors to prepare vision statements, write research essays, use the SimCity™ software, build scale models with recycled materials, and present their ideas for cities of the future in the year 2050.
Participating schools included
Clay County - Argyle Elementary. Duval County - Lee High School. Duval County - Westview K-8. Nassau County - Yulee Middle School. St. Johns County - Florida School for the Deaf and Blind.
Individuals from transportation agencies and consulting firms volunteered as mentors.
Allocation games – on-line and interactive meeting games were used to engage the public in the virtual or physical allocation of resources. Interactive map for needs – as part of the on-line allocation game, participants could locate specific project needs and add comments explaining their needs. Temperature charts – as part of the Needs Plan public workshops temperature charts were used to explain intensity and extent of congestion and safety challenges. Maps, charts and graphs – presentations were used as part of the public workshops to explain the purpose, intent and process used in the development of the plan. Video – a project video was prepared explaining the context and planning process used.
AGENCY MEETINGS
The result of the program was education on the role of transportation in regional development. The participants identified a wide range of future technologies for transit that included trains, hyperloops, gondola and bus rapid transit. Livability was also emphasized as part of several models. Figure 2-19 is an example of the one of the physical models developed by Yulee Middle School.
A total of 109 community small group, steering committee, North Florida TPO Board or committees, or community organization briefings were conducted during the planning process. Table 2-32 summarizes these meetings by organization and if the meeting was a technical meeting, citizens meeting, and if the meeting engaged or invited minorities, underserved populations or businesses.
STEERING COMMITTEE The Steering Committee was formed with representatives from the TPO Technical Coordinating Committee, Citizens Advisory Committee, Board, agencies, environmental, business and community groups. The members of the Steering Committee are shown in the forward to this report and included representatives from:
Figure 2-19. Example Future City Physical Model
2-87
Career Source. Citizens. Community forum (Metro Jacksonville). Elected officials. Florida Department of Environmental Protection. FDOT. Health Planning Council of Northeast Florida. Jacksonville Aviation Authority.
Path Forward 2040 Long Range Transportation Plan Table 2-32. Meeting Summary Date 22-Feb-13 26-Jun-13 9-Jul-13 10-Jul-13 11-Jul-13 13-Jul-13 15-Jul-13 16-Jul-13 16-Jul-13 18-Jul-13 22-Jul-13 22-Jul-13 23-Jul-13 30-Jul-13 31-Jul-13 31-Jul-13 2-Aug-13 5-Aug-13 6-Aug-13 9-Aug-13 9-Aug-13 9-Aug-13 12-Aug-13 12-Aug-13 13-Aug-13 16-Aug-13 16-Aug-13 16-Aug-13 25-Aug-13 28-Aug-13 5-Sep-13 5-Sep-13 9-Sep-13 24-Sep-13 1-Oct-13 6-Dec-13 17-Dec-13 10-Jan-14 14-Jan-14 14-Jan-14
Event
County
Agency Kickoff Meeting Steering Committee Meeting #1 Travel Demand Model Government Staff Discussion - Baker County Travel Demand Model Government Staff Discussion – Town of Orange Park Travel Demand Model Government Staff Discussion - Clay County Travel Demand Model Government Staff Discussion - Nassau County Travel Demand Model Government Staff Discussion – City of St. Augustine Travel Demand Model Government Staff Discussion - Fernandina Beach Travel Demand Model Government Staff Discussion - St. Johns County Travel Demand Model Government Staff Discussion - Putnam County Travel Demand Model Government Staff Discussion – City of Hastings Travel Demand Model Government Staff Discussion - Town of Marineland Travel Demand Model Government Staff Discussion - Green Cove Springs Jax2035 Bicycle and Pedestrian Committee of the Florida Bicycle Association Travel Demand Model Government Staff Discussion - Callahan City Hall Travel Demand Model Government Staff Discussion – City of Jacksonville Travel Demand Model Government Staff Discussion - Town of MacClenny Travel Demand Model Government Staff Discussion - Town of Penney Farms Travel Demand Model Government Staff Discussion - St. Augustine Beach Travel Demand Model Government Staff Discussion - Atlantic Beach Travel Demand Model Government Staff Discussion - Jacksonville Beach Travel Demand Model Government Staff Discussion - Neptune Beach Travel Demand Model Government Staff Discussion - Town of Pomona Park Travel Demand Model Government Staff Discussion - Town of Welaka Jax2035 Bicycle and Pedestrian Committee of the Florida Bicycle Association Travel Demand Model Government Staff Discussion - Crescent City Travel Demand Model Government Staff Discussion - Interlachen Travel Demand Model Government Staff Discussion – City of Palatka Travel Demand Model Government Staff Discussion - Town of Penney Farms Travel Demand Model Government Staff Discussion – City of Yulee Travel Demand Model Government Staff Discussion - Baldwin Travel Demand Model Government Staff Discussion - Keystone Heights Travel Demand Model Government Staff Discussion - Town of Glen St. Mary Jax2035 Bicycle and Pedestrian Committee of the Florida Bicycle Association Jax2035 Bicycle and Pedestrian Committee of the Florida Bicycle Association Regional Transportation Commission Jax2035 Bicycle and Pedestrian Committee of the Florida Bicycle Association Data Forecasts and Needs Teleconference - Putnam County Data Forecasts and Needs Teleconference - Clay County Data Forecasts and Needs Teleconference - Nassau County
2-88
Region Region Baker Clay Clay Nassau St. Johns Nassau St. Johns Putnam St. Johns St. Johns Clay Regional Nassau Duval Baker Clay St. Johns Duval Duval Duval Putnam Putnam Regional Putnam Putnam Putnam Clay Nassau Duval Clay Baker Regional Regional Region Regional Putnam Clay Nassau
Technical
Citizen
Minority or Underserved
Business
Path Forward 2040 Long Range Transportation Plan Table 2-32. Meeting Summary Date 14-Jan-14 16-Jan-14 26-Feb-14 26-Feb-14 1-Mar-14 12-Mar-14 13-Mar-14 24-Mar-14 27-Mar-14 2-Apr-14 2-Apr-14 3-Apr-14 10-Apr-14 14-Apr-14 14-Apr-14 14-Apr-14 15-Apr-14 17-Apr-14 22-Apr-14 22-Apr-14 22-Apr-14 23-Apr-14 23-Apr-14 24-Apr-14 28-Apr-14 4-May-14 6-May-14 7-May-14 7-May-14 7-May-14 10-May-14 12-May-14 15-May-14 28-May-14 4-Jun-14 4-Jun-14 5-Jun-14 12-Jun-14 12-Jun-14
Event
County
Data Forecasts and Needs Teleconference - St. Johns County Regional Transportation Commission Amelia Island-Fernandina Beach-Yulee Chamber Government Affairs Committee Regional Transportation Commission Northwest Jacksonville Sherriff ShAdCo Safety Fair City of Jacksonville North Citizens Planning Advisory Committee North Florida TPO Board Briefing Emmanuel United Methodist Church -Palatka Steering Committee Meeting #2 North Florida TPO Citizens Advisory Committee Briefing North Florida TPO Technical Coordinating Committee Briefing Regional Transportation Commission North Florida TPO Board Briefing City of Jacksonville TEU Committee Briefing St. Augustine City Commission West Augustine Community Redevelopment Association Needs Plan Public Workshop – St. Augustine City Commission Chambers Needs Plan Public Workshop – Clay County Thrasher-Horne Center Baker County Commission Briefing Clay County Commission Briefing Needs Plan Public Workshop – Baker County Commission Chambers Nassau County Commission Briefing Needs Plan Public Workshop – Nassau County Commission Chambers Needs Plan Public Workshop – Duval County Florida State College Deerwood Needs Plan Public Workshop – Putnam County Commission Chambers Trinity United Methodist Church - Fernandina Shrimp Festival St. Johns County Commission Briefing Steering Committee Meeting #3 North Florida TPO Citizens Advisory Committee Briefing North Florida TPO Technical Coordinating Committee Briefing National Train Day Healthy Baker - Baker County Health Department Springfield Community Meeting with Congresswoman Brown Regional Transportation Commission North Florida TPO Citizens Advisory Committee Briefing North Florida TPO Technical Coordinating Committee Briefing Rotary Club of Arlington Lincolnville Neighborhood Association City of Jacksonville Northwest Citizens Planning Advisory Committee
2-89
St. Johns Region Nassau Region Duval Duval Region Putnam Region Region Region Region Region Duval St. Johns St. Johns St. Johns Clay Baker Clay Baker Nassau Nassau Duval Putnam Nassau St. Johns Region Region Region Duval Baker Duval Region Region Region Duval St. Johns Duval
Technical
Citizen
Business
Minority or Underserved
Path Forward 2040 Long Range Transportation Plan Table 2-32. Meeting Summary Date 18-Jun-14 18-Jun-14 26-Jun-14 6-Aug-14 6-Aug-14 6-Aug-14 14-Aug-14 27-Aug-14 11-Sep-14 16-Sep-14 16-Sep-14 17-Sep-14 18-Sep-14 22-Sep-14 23-Sep-14 24-Sep-14 1-Oct-14 1-Oct-14 1-Oct-14 4-Oct-14 9-Oct-14 14-Oct-14 22-Oct-14 28-Oct-14 5-Nov-14 5-Nov-14 13-Nov-14 13-Nov-14 17-Nov-14 3-Dec-14
Event
County
River Region Human Services Community Review Panel Southpoint Rotary Steering Committee Meeting #4 Steering Committee Meeting #5 North Florida TPO Citizens Advisory Committee Briefing North Florida TPO Technical Coordinating Committee Briefing North Florida TPO Board Briefing Southside Businessmen's Club North Florida TPO Board Briefing Associated Builders and Contractors Women's Council Cost Feasible Plan Public Workshop - Jacksonville Main Library Cost Feasible Plan Public Workshop - Fleming Island High School Cost Feasible Plan Public Workshop - American Beach Community Center Cost Feasible Plan Public Workshop - Bartram Trail Library Cost Feasible Plan Public Workshop - Jacksonville Beach City Hall Regional Transportation Commission Steering Committee Meeting #6 North Florida TPO Citizens Advisory Committee Briefing North Florida TPO Technical Coordinating Committee Briefing Clay Soul Food Festival North Florida TPO Board Briefing Logistics Advisory Group Regional Transportation Commission Cost Feasible Plan Public Workshop – North Florida TPO Board Room North Florida TPO Citizens Advisory Committee Briefing North Florida TPO Technical Coordinating Committee Briefing Public Hearing – North Florida TPO Board Room North Florida TPO Board Briefing Lakeshore Area Preservation Society Regional Transportation Commission
2-90
Duval Duval Region Region Region Region Region Duval Region Duval Duval Clay Nassau St. Johns Duval Region Region Region Region Clay Region Region Region Duval Region Region Region Region Duval Region
Technical
Citizen
Minority or Underserved
Business
Path Forward 2040 Long Range Transportation Plan
REGIONAL TRANSPORTATION COMMISSION
Jacksonville Sherriff’s Office Jacksonville Transportation Authority JAXPORT Local governments Mayo Clinic (healthcare) National Park Service Regional Planning Commission Regional Transportation Commission U.S. Marine Corps U.S. Navy WorkSource
In 2013, the Florida Legislature established a Regional Transportation Commission for the six county region of Baker, Clay, Duval, Nassau, Putnam and St. Johns Counties. The commission is charged with developing a regional multimodal corridors plan and identifying funding to support deployments of regional nature. As part of the planning process, briefings were provided throughout the planning process in December of 2013, January, February, March, April, May, September and October of 2014. At the December 3, 2014 meeting, the commission endorsed of the plan.
The steering committee met six times - in June of 2013, and March, May, June, August and October of 2014.
NEEDS PLAN PUBLIC WORKSHOPS
TECHNICAL COORDINATING COMMITTEE The members of the Technical Coordinating Committee are summarized in the Forward of this report and include representatives from:
MEETING FORMAT Six Needs Plan public workshops were conducted in April 2014. One workshop was conducted in each of the six counties participating in the Needs Plan. A presentation was provided during the workshops that provided:
FDOT Jacksonville Aviation Authority Jacksonville Sherriff Office JAXPORT Local governments National Park Service Ocean Highway and Port Authority Regional Planning Commission Regional Transportation Commission St. Augustine Airport Authority U.S. Navy Utilities (JEA and Clay County) WorkSource
Briefings and workshops were provided to the Technical Coordinating Committee in April, May, June, August, October and November of 2014. These meetings are publically noticed in accordance with the North Florida TPO policies.
Overview of the planning process Goals and objectives Summary of trends and conditions related to population growth Increases in congestion Growth in transit ridership Crashes Maps were used to provide visualizations of the hot spots for congestion and safety Opportunities for public input through the web page and allocation game, comment cards during the workshop and contact information for the North Florida TPO
Examples of the visualization techniques used are shown in Figure 2-20 for safety hot spots and Figure 2-21 for congestion hot spots.
CITIZENS ADVISORY COMMITTEE
Table 2-33 summarizes the public notifications for the Needs Plan and Cost Feasible Plan public workshops and the Cost Feasible Plan Public Hearing.
The members of the Citizens Advisory Committee are summarized in the Forward of this report. Briefings and workshops were provided to the Citizens Advisory Committee in April, May, June, August, October and November of 2014. These meetings are publically noticed in accordance with the North Florida TPO policies.
PARTICIPATION A summary of the attendees at each of the Needs Plan public workshops are summarized in Table 2-34.
2-91
±
J I 115A
15
T S
J I 121A
1
2
4 Miles
23
LEGEND
17
108
£ ¤
J I
£ ¤
J I
0
115
I J J I
J I
J I
105
J I I J J I J I J I
200A
-
108
J I
-
105B
A1A
0019
105
105A
200A
115
Cold Spot
0016
J I J I
Hot Spot Analysis Scale
T T S S T S
107
North Florida TPO Boundary
105A
0012
Neutral
105A
107
30
1
£ ¤
Hot Spot
105
015A
105
T S
J I 121
30
1
£ ¤
1
£ ¤
J I
20
-
A1A
J I T S
108
-
105
107A
J I
-
T SS T T S
200
I J J I
T S A
T S
1A
T S
T S
2
5
A
1A
T S
5 11
J T I S 110
102
J I 110
T IS J 24
3
T S A1A
110
T S 104
J I 106
J I 163
J I
J I
T S 10
115A
119
J I
5
117
T S
J I
22
8
101
A1A
99
113
109A
T S S T
J I
T S
T S 109
115
£ ¤
T S
90A
10A
T S
£ ¤
10
J I
90A
£ ¤
1A
A
T S
I J J I
T S
101A
228
J I 212
126
211
J I
211
213
200
T S
217
90
1 21
128
295
£ ¤
T S
T S
§ ¦ ¨
J I
J I
228
213
115C
228
15
228
T S
129
J I
J I
T S
T S
115 A
T S
103
§ ¦ ¨ 10
T S
200
8
T S
£ ¤
T S
10
21B
111
T S S T
90
J I
T T S S
J I
114
T S 116
113
J I
1
139
103
T S
£ ¤ S T
15
119
7 11
21D
T S
J I S T T S
T S
T S
202
301
£ ¤
134
T S T S
115
116
23
T S
152
J I
J I 210A
J I I J T I J JS I
J I 203
1179
J I
1162
224 1187
217
J I
1177
J I 1181
209
JI I J
220A
J I
J I
220A
13B
J I
220
A1A
220B
T S
J I
1189
J I
J I 15A
220
J I
J I
J I I J 209
J I
209B
739
21A
210
J I 739B
T S 16
315
T S
1
J I
J I
J I
13
218
£ ¤
16
16A
9
T S
16A
J I
209
T S
J I
J I
5
315
215
T S
J I
J I
13A
T S
J I
16
15A
J I I J
§ ¦ ¨
226
209
208
I J J I J S I JTJ JI I I J I J I J I I J S T J I I J J I I J J I 1333
95
J I
1332
1335
A1A
1351
1365
J I
31
1340
20
7
T S 17
£ ¤
J I
315C
J S I T 219
100
J I
13
309D
J I
J I 305
Figure 2-20 Crash Severity Hot Spots
315
2-92
1363
A1A
J I
214
312
T S
J I
352
J I
2
A1A
13A
J I
1353
5A
15
T S
T S
J I 214
315
1339
1354
13A
21
5A
1359
J I
T S
1337
30
¤ £
J I
1
115A
±
J I 121A
15
T S
T S
J I
23
¤ £
J I
5
108
115
J I I J J I J I J JI I J I 105A
17
£ ¤
0012
J I
J I
J I
105
Peak Hour Delay
Cold Spot
105B
-
105
T S
0019
-
105A
I J J I
T S
107
Neutral
A1A
T S
A
T S
A1
200
4 Miles
108
200A
115
2
North Florida TPO Boundary
0016
200A
1
LEGEND
T S
107
J I
0
-
107A
J I
30
105
20
-
T S
1
¤ £
J I S T
108
015A
Hot Spot
105
T S
1
¤ £
J JI I 121
2
T S
10
5
T S
5 11
J T I S 110
102
J I 110
T IS J 24
3
200
A1A
T S
T S
110
T S 104
J I
301
£ ¤
106
J I
J I 163
J I
T S 10
115A
119
J I
5
A1
A
T S
117
§ ¦ ¨
T S 22
200
T S
217
8
101
A1A
113
109
228
A
T S
T S
10
10A
1A
1 21
128
T S
T S
£ ¤
5
T S
T I S J
295
T S
J I
90A
129
T S
103
213
115C
J I
109A
116
99
T S
90A
J I
J I J I
T S
T S
10
228
T S
J I
£ ¤
§ ¦ ¨
111
8
228
115A
10
90
139
T S
T S
T S S T
£ ¤
200
J I
1
T S
21B
T S
T S
£ ¤
103
T S
115
139
£ ¤
J I I J
T S
113
J I 119
T S
15
T S S T
7 11
21D
T S
J I
S T T S
101A
228
J I 212
126
211
J I
J I
211
213
T S
T S
202
301
£ ¤
134
T S
115
J I
T S
J S I T
T S
152
116
23
228
228
J I 210A
J I I J T S J J I I
J I 203
17
£ ¤
1179
J I
1162 224
217
1177
1187
J I 1181
JI I J
220A
J I 13B
T S
J I
13
J I
220
1189
J I
J I 15A
220
J I I J 209
209B
739
21A
J I
J I 210
15
J I
J I
T S
J I 218
A1A
220B 220A
T S
J I
739B
16A
9
T S 1
£ ¤
T S
315
16
16A
J I
209
J I
T S
J I
5
J I
315
215
225
T S
J I
J I
J I
J I
16
13A
T S
J I
16
15A
J I
J I
I J T S J J I I T S J I JI I J JI I J J I I JS T
13
226
1333
J I 208
1365
214
315
1353
312
J I
J I
J JI I J I 5A
20
7
T S
21
5A
1351
209
T S
J I
A1A
1339
1338
95
13A
1337
T S
§ ¦ ¨
J I
J I
1332 A A1
1335
1359
1342
I J J I 312
A1A
1363
13A
J I 352
J I 315C
J I
J I
J I
214
305
209
J I 309D
I J J I 214
A1A
T S
T S
219
100
J I
T S
209
26
J I
J I
207A
315
J I 309C
J I
J I
13
216
J I 1447
21
T S
Figure 2-21 Congestion Hot-Spots J I 21
J I 20A
2-93
Path Forward 2040 Long Range Transportation Plan Table 2-33. Summary of Public Meeting Advertisements Needs Plan Workshops
Dates
Targeted Minority or Underserved
Needs Plan Workshops: 22-Apr-14, 23-Apr-14, 23-Apr-14, 24-Apr-14, 28-Apr-14 Florida Times-Union
8-Apr-14
St. Augustine Record
8-Apr-14
Baker County Press
10-Apr-14
Clay Today
10-Apr-14
Florida Star
12-Apr-14
Eco Latino
14-Apr-14
Fernandina News Leader
16-Apr-14
Palatka Daily News
22-Apr-14
Radio WJBT 93.3 The Beat (Urban Contemporary) WQIK FM 99.9 (Country) WSOL V1015 FM (Urban Adult Contemporary) WJGH Jack FM (Classic Hits) WNWW Kiss FM (Pop Contemporary) WFXJ Sports Radio AM 930 (Sports) Metrojacksonville.com banner
7-Apr-14 through 23-Apr-14
13-Apr-14 through 28-Apr-14
Cost Feasible Plan Workshops 18-Sep-14, 2-Sep-14, 17-Sep-14, 23-Sep-14, 16-Sep-14 Florida Times-Union
9-Sep-14 and 16-Sep-14
St. Augustine Record
9-Sep-14
Creekline (Northwest St. Johns County) Southside Newsline (zip code 32256) Beaches Leader
Delivered 8-Sep-14 through 11-Sep-14 Delivered 1-Sep-14 through 4-Sep-14 11-Sep-14
Ponte Vedra Beach Leader
11-Sep-14
Fernandina News-Leader
12-Sep-14
Clay Today
11-Sep-14
Florida Star
13-Sep-14
Eco Latino web banner
1-Sep-14 through 30-Sep-14
Metrojacksonville.com banner
4-Sep-14 through 23-Sep-14
Radio - WJCT First Coast Connect
10-Sep-14
Television – First Cost Connect
8-Sep-14 through 22-Sep-14
Cost Feasible Plan Workshop 28-Oct-14 Florida Times-Union
23-Oct-14
Public Hearing 13-Nov-14 Florida Times-Union
24-Cot-14 and 25-Oct-14
2-94
Path Forward 2040 Long Range Transportation Plan Table 2-34. Needs Plan Workshops Attendance Location Baker County – Commission Chambers Clay County - Thrasher-Horne Center Duval County - FSCJ Deerwood Nassau County – Commission Chambers Putnam County – Commission Chambers St. Johns County - St. Augustine City Commission Chambers Total Average Per Meeting
Attendance
During the workshops an allocation game was conducted using tokens for participants to determine how they would invest their resources similar to the interactive project web site. Stations focusing on five categories – bicycle and pedestrian, road capacity, safety and TSM&O, transit and freight were provided. Each station included a map and list of potential projects needed, reference brochures pertaining to previous studies and a tube for that category. As attendees arrived, they were given a handout explaining the workshop and a pouch of ten tokens to place in tubes at each of the five stations based on their preferences.
15 20 8 9 9 43 104 17.3
Table 2-35 provides a summary of the results of the allocation game that was conducted during the meetings. This table is colored so that the areas that received the greatest interest are coded green and the least are coded brown. During the public meetings and based on follow-up correspondence (such as emails and phone calls), 155 comments were provided. Table 2-36 summarizes the comments by topic.
Table 2-35. Summary of Needs Plan Public Workshop Allocation Game Transit Baker Clay Duval Nassau Putnam St. Johns Overall
21% 25% 27% 26% 16% 40% 30%
Bicycles and Pedestrians
Road Capacity
10% 24% 36% 23% 14% 31% 25%
41% 26% 17% 9% 38% 15% 23%
36
Freight 20% 11% 8% 15% 30% 6% 12%
Safety and TSM&O
Participants 36
7% 14% 13% 26% 3% 8% 10%
The exact number of participants is not known since not all participants fully allocated ten tokens. The values are estimated by rounding to the next highest factor of ten. For example, if 183 tokens were used, 19 participants were assumed. 2-95
15 19 8 6 8 43 99
Path Forward 2040 Long Range Transportation Plan Table 2-36. Summary of Needs Plan Public Workshop Comments Topic Transit Bicycle and Pedestrian Road Freight Safety Miscellaneous TSM&O Context sensitive solutions Need for additional funding Land use and transportation coordination Grand Total Attendees from Baker, Clay and Putnam counties favored road capacity projects as their top priority.
Number
Percent 69 29 22 12 12 3 3 2 2 1 155
45% 19% 14% 8% 8% 2% 2% 1% 1% 1% 100%
Overall, there was a significant increase in support for transit and bicycle and pedestrian projects from previous LRTP updates with the meeting participants.
Clay County participants were closely divided among road, transit and bicycle and pedestrian projects.
Following the Needs Plan workshops, the North Florida TPO received correspondence objecting to the construction of the SR 313 in the vicinity of Twelve Mile Swamp. Because of the environmental fatal flaws and potential for public controversy associated with this project it was removed from the Needs Plan. CR 2209 from SR 16 to SR 9B was also removed from the Needs Plan based over environmental concerns.
Duval County attendees selected bicycle and pedestrian projects as their top priority, followed by transit. St. Johns and Nassau participants prioritized transit first, followed by bicycle and pedestrian projects. Nassau participants also felt equally strong about safety and TSM&O projects.
2-96
Path Forward 2040 Long Range Transportation Plan
COMPARISON OF PRIORITIES When these results of the telephone survey, on-line allocation game and the public meeting allocation game were considered, the results are shown in Figure 2-22 and Table 2-37.
Similar to the public meeting participants, the telephone survey respondents had transit as the highest priority. Road capacity was the second priority with a much higher priority than the public meeting attendees. The telephone survey responders rated bicycle and pedestrian improvements as much lower priorities.
450 400 350 300 250 200 150 100 50 0 Transit
Bicycles and Pedestrians
Road Capacity
Freight
Safety and TSM&O
Telephone Survey
290
7
195
0
67
On-line Allocation Game
108
99
139
43
47
Public Workshops
30
25
22
12
10
Figure 22. Comparison of Priorities from Multiple Sources
Table 2-37. Summary of Input by Percent of Respondents Transit
Bicycles and Pedestrians
Road Capacity
Freight
Public Workshop On-line Allocation Game
30% 25%
25% 23%
23% 32%
12% 10%
Safety and TSM&O 10% 11%
Telephone Survey All Respondents
67% 39%
2% 12%
45% 33%
0% 5%
15% 11%
Note: The telephone survey does not total 100 percent because respondents could comment on multiple categories.
2-97
Path Forward 2040 Long Range Transportation Plan
The on-line allocation game had a much high allocation to road capacity than the workshop participants. Transit was the second highest priority.
The meeting locations within each county were shifted to reach new geographic and demographic areas. Television advertising was used instead of radio for the second round of meetings, but public relations effort included participation with agency partners on public radio public affairs programming.
As shown in the summary in input provided in Table 2-34, 39 percent of respondents prioritized transit improvements and 33 percent of respondents prioritized road improvements. Bicycle and pedestrian improvements compared similarly with safety and TSM&O improvements at 12 percent and 11 percent respectively. Freight investments received the lowest priority.
PARTICIPATION A summary of the attendees at each of the Cost Feasible Plan workshops is summarized in Table 2-38 and the comments by priority area are summarized in Table 2-39. Duval County attendees commented that a majority of funding was committed to Strategic Intermodal System projects versus other desired projects focusing on transit, bicycle and pedestrian improvements.
COST FEASIBLE PLAN WORKSHOPS MEETING FORMAT
Clay County attendees wanted more investment in roadway infrastructure as part of the Strategic Intermodal System. Additional outreach targeting Clay County minority communities showed a desire for more transit.
Five Cost Feasible Plan Public Workshops were held September 16-22 in Clay, Duval, Nassau and St. Johns counties and October 28, 2014 in Duval County. The meetings were advertised via newsletters, website posting, social media and radio public affairs programming. Notifications also included general circulation, local and minority publications, web and television advertising. The notifications are summarized in Table 2-33. Attendees viewed maps and lists of proposed projects. The consultant gave a PowerPoint presentation explaining the funding and project selection process.
St. Johns County attendees had concerns about the SR 23 First Coast Expressway and Shands Bridge. Nassau County residents focused on the need for bicycle, pedestrian and safety improvements.
Table 2-38. Summary of Attendance at the Cost Feasible Plan Workshops Location St. Johns County - Bartram Trail Library Duval County - Jacksonville Main Library Duval County - Jacksonville Beach Clay County - Fleming Island H.S. Teach Center Nassau County American Beach Community Center Duval County - North Florida TPO Board Room Total Average Per Meeting
2-98
Attendance
16 28 6 11 32 1 94 15.6
Path Forward 2040 Long Range Transportation Plan Table 2-39. Summary of Comments During Cost Feasible Plan Workshops Topic Bicycle and Pedestrian Transit Road Funding Environment Grand Total
Comments
Percent 39 23 18 12 1 90
USE OF PUBLIC INPUT IN THE PLANNING PROCESS
During the planning process extensive agency and community outreach was conducted. During both the Needs Plan and Cost Feasible Plan meetings, significant interest in improving transit and enhanced services for bicycles and pedestrian improvements were provided. During the prioritization funds, significant consideration to advance funding for transit and bicycle and pedestrian improvements were made. Table 2-40 on the next page shows the allocation of the total funding in the plan to various components based on the primary decision-making authority. With the various funding categories, limitations exist as to how the funding can be used. The FDOT has the primary decision-making authority for other programs with concurrency of the North Florida TPO for 70 percent of the revenue estimated in the plan. The North Florida TPO has primary decision-making authority with the concurrency of FHWA for 11 percent of the revenue and local government funded projects represent 18 percent of the plan.
2-99
43% 26% 20% 13% 1% 100%
Path Forward 2040 Long Range Transportation Plan Table 4-20. Modal Distribution Fund Program Strategic Intermodal System Other State Highways Turnpike/Tolls Strategic Intermodal System Multimodal Subtotal State Transportation Management Area Transportation Alternatives (TALU) Transportation Alternatives (TALT) Transportation Regional Incentive Program (TRIP) State and Federal Transit Subtotal North Florida TPO Clay Duval CIP Duval Mobility Plan Duval Southside Vision Plan Duval LOGT JAXPORT Transit Local Match Duval County Subtotal Nassau St. Johns Subtotal Local FTA Passenger Ferry Grant Federal Seaport Grant Subtotal Federal Grants Total
Total $4,057.74 $1,389.08 $1,951.22 $3,795.90 $11,193.94 $316.40 $31.20 $41.30 $22.29 $760.00 $1,171.19 $248.73 $36.27 $224.62 $44.67 $657.55 $186.50 $253.33 $1,402.95 $41.63 $167.38 $1,860.68 $6.62 $311.00 $317.62 $14,543.42
Roads
Transit
$4,057.74 $1,297.42 $1,951.22 $7,306.37 $268.75
TSM&O
Freight
$91.66 $1,377.21 $1,377.21
$21.23 $289.98 $236.88 $34.54 $213.93 $42.55 $569.62
Bicycle and Pedestrian
$760.00 $760.00
$91.66 $13.44 $31.20 $41.30 $1.06
$0.00 $34.21
$87.00 $11.84 $1.73 $10.70 $2.13 $87.92
$34.21
$2,418.69 $2,418.69
$0.00
$186.50 $860.64 $39.64 $159.41 $1,296.58
$0.00 $8,892.93
2-100
$253.33 $253.33
$253.33 $6.62 $6.62 $2,397.16
$102.47 $1.98 $7.97 $124.27
$302.93
$0.00
$186.50
$0.00
$186.50
$0.00 $34.21
$311.00 $311.00 $2,916.19
Total $4,057.74 $1,389.08 $1,951.22 $3,795.90 $11,193.94 $316.40 $31.20 $41.30 $22.29 $760.00 $1,171.19 $248.73 $36.27 $224.62 $44.67 $657.55 $186.50 $253.33 $1,402.95 $41.63 $167.38 $1,860.68 $6.62 $311.00 $317.62 $14,543.42
Path Forward 2040 Long Range Transportation Plan Within the context of these funding program limitations, Figure 2-23 summarizes the proportion of funding allocated by mode in relation to the priorities provided through public input.
After coordination with local agencies and deliberations of the plan alternatives, the North Florida TPO believes the plan makes an appropriate allocation of resources considering the public input and the proportion of the needs identified through the planning process.
This chart shows that a greater proportion of the total funding is dedicated to road projects than other modes of investment. However, a much smaller percentage of the total needs for roadways (27 percent) are met than with any other mode as shown in Figure 2-24. 70%
Additional detail on the needs and prioritization of projects is identified in Part Three of this report.
63%
60% 50% 40%
39%
33%
30% 17%
20%
18%
12%
10%
11%
0% Road
Transit
TSM&O Allocation
5%
2%
0%
Bicycles and Pedestrians
Freight
Public Perception
Figure 2-23. Summary of Funding Allocation Compared to Public Priority
70%
65% 58%
60% 50%
38%
40% 30%
26%
20% 10%
5%
0% Road
Transit
TSM&O
Bicycle and Pedestrian
Percent Figure 2-24. Percent of Need Met by Mode 2-101
Freight
Path Forward 2040 Long Range Transportation Plan
Strategies and Efforts
PUBLIC HEARING
As part of the planning process, extensive efforts were made to engage minority and underserved populations through a demographic analysis, targeted outreach, using web sites with interactive opportunities to provide information on needs and priorities, social media, telephone surveys and outreach to organizations and elected officials. The process and performance measures deployed are summarized in the following sections.
The plan was adopted by the North Florida TPO Board as part of the November 13, 2014 regularly scheduled board meeting. A unanimous vote was recorded to approve the plan.
ENVIRONMENTAL JUSTICE AND TITLE VI
Identification of Minority and Underserved Populations
Executive Order 12898, signed by President Clinton in February 1994, directed all Federal agencies to make environmental justice a key part of its mission by identifying and addressing the impacts of programs, policies, and activities on both minority and low-income populations.
The locations of minority and underserved population communities were identified using 2010 Census data by census tract. Areas with minority or underserved populations of 50 percent or more were identified as communities for special consideration. The following communities were identified.
In 1999, the U.S. Department of Transportation issued a memorandum to all federally-funded transportation agencies, including state DOTs and MPO, and required such agencies to comply with Title VI and environmental justice. Noting that issues of Title VI and environmental justice were raised by concerned citizens primarily during project development phases of projects, the U.S. Department of Transportation urged that compliance be evaluated as early as possible, specifically, in the planning stages of the transportation process.
1. 2. 3. 4. 5.
Throughout the LRTP study process, the provisions of environmental justice, as defined by the Federal Highway Administration, were followed to ensure consistency with environmental justice and Title VI of the Civil Rights Act. North Florida TPO staff and consultants made every effort to include all affected parties from varying socioeconomic groups to ensure that their input was considered in the planning process. The planning process was also conducted in compliance with the following related legislation ď&#x201A;§
ď&#x201A;§
6.
7.
Low income households making less than $25,000 per year. Populations greater than 65 years old. Black: a person having origins in any of the black racial groups of Africa. Hispanic or Latino: a person of Mexican, Puerto Rican, Cuban, Central or South American, or other Spanish culture or origin, regardless of race. Asian American: a person having origins in any of the original peoples of the Far East, Southeast Asia or the Indian subcontinent. American Indian and Alaskan Native: a person having origins in any of the original people of North America, South America (including Central America), and who maintains cultural identification through tribal affiliation or community recognition. Native Hawaiian and Other Pacific Islander: a person having origins in any of the original peoples of Hawaii, Guam, Samoa or other Pacific Islands.
Regional maps showing the results of this analysis are provided in Technical Memorandum #1 â&#x20AC;&#x201C; Public Involvement. No significant populations of American Indian or Native Hawaiian were identified through the mapping.
23 CFR 450.316, providing interested parties with reasonable opportunities to be involved in the metropolitan transportation planning process. Chapter 286, Florida Statutes (Florida Sunshine Law) requiring public access to governmental meetings at the state and local level and requires meetings of boards and commissions to be open to the public, adequately noticed, and recorded via minutes.
Outreach Efforts and Analysis of Needs Multiple strategies were implemented as part of the public involvement process to engage the underserved and minority populations as summarized in the prior section. The organizations solicited for participation in the planning process related to minority and underserved populations are summarized in Table 2-38. 2-102
Path Forward 2040 Long Range Transportation Plan Table 2-41. Organizations Serving Minority and Underserved Populations Organization Low Income 100 Black Men Ability Housing Adult Services Division Asian American Chamber of Commerce Baker County Health Department Better Living Community Association Career Source of Northeast Florida City of Jacksonville Citizen’s Planning Advisory Committees Clara White Mission Clay County Council on Aging Clay Soul Food Festival Destined for a Change Duval County Council on Aging Edwards Waters College (Historically Black University) Emmanuel United Methodist Church Habitat for Humanity Health Planning Council of North Florida Jacksonville Housing Authority Knots for Kids Mayo Clinic Nassau Council on Aging National Council for Negro Women Northeast Florida Community Action Agency Northeast Florida Healthy Start Coalition Northeast Florida Veterans Council Palatka Housing Authority Springfield Community Meeting St. Augustine Council on Aging Summer Haven United Way of Northeast Florida West St. Augustine Community Redevelopment Authority Work Source
2-103
Elderly
Black
Hispanic
Asian
Path Forward 2040 Long Range Transportation Plan
Analysis of Investments Related to Minority and Underserved Populations The public input received from minority and underserved populations related primarily to the need for more mass transit and active transportation improvements. Significant investments are identified in the Cost Feasible Plan to address these needs and a predominant amount of that investment is occurring in areas where minority and the underserved populations exist. Nearly $2.4 billion of transit investments and $303 million in active transportation investments were adopted. The investments in the Cost Feasible Plan are discussed in greater detail in Part Three.
Equity Considerations Analysis of the investments in transit and highway investments was performed relative to the predominant locations of minority and underserved populations. Table 2-39 on the next page summarizes these areas, the targeted group and the major projects within that area that are funded.
Language Translation According to the U. S. Census 2013 American Community Survey one-year estimate, only two percent of the households in Clay, Duval and St. Johns counties are deemed â&#x20AC;&#x153;Limited English Speaking Householdsâ&#x20AC;? with the largest concentration being Spanish speaking households at .8 percent. The public involvement materials were produced in English but translation capability into Spanish or Braille for the visually impaired was available as requested. There were no requests. The public involvement team will continue to monitor demographic trends and anecdotal experience within the TPO service area for language translation as needed.
2-104
Path Forward 2040 Long Range Transportation Plan
Table 2-42. Major Improvements in Minority and Underserved Communities Low Organization Elderly Black Income
Urban Core (downtown and areas along US 90 Beaver Street east of I-295)
Westside Jacksonville and Argyle (area along the I-295 corridor between US 17 Roosevelt Boulevard and I-10)
Arlington and San Souci (north of SR 10 Atlantic Boulevard and east of I295)
East Arlington (east of I-295 and north of SR 10 Atlantic Boulevard)
Hispanic
West St. Augustine (west of US 1 Ponce de Leon Boulevard)
Middleburg and Penny Farms
2-105
Major Projects
Enhanced bus service Bus rapid transit Commuter rail Streetcar Skyway enhancements Transit mobility and accessibility improvements US 90 Beaver Street widening
Enhanced bus service Bus rapid transit Transit mobility and accessibility improvements I-295 express lanes Ricker Road widening SR 21 Blanding Boulevard widening Enhanced bus service Bus rapid transit Transit mobility and accessibility improvements I-295 express lanes SR 115 Southside intersection improvements and context sensitive solutions Enhanced bus service Bus rapid transit Transit mobility and accessibility improvements I-295 express lanes Kernan Boulevard widening SR 10 Atlantic Boulevard intersection improvements Commuter rail SR 207 widening from I-95 to South Holmes Boulevard Bus rapid transit SR 21 Blanding Boulevard from SR 16 to CR 215
Path Forward 2040 Long Range Transportation Plan
SUMMARY
The public involvement process used in developing the plan provided significant input into the needs to be addressed, concerns with specific projects that would result in community impacts and the strategies used in the LRTP.
Multiple outreach and data gather activities were used to engage the public as part of the process:
Public perceptions telephone survey. Interactive project web site. On-line asset allocation game. Social media. Community forum engagement. Overview video. Contact list. Newsletters. Overview brochure. Youth outreach. Visualization techniques. Agency meetings. Public workshops. Public hearing.
A significant effort was made to engage minority and underserved populations in accordance with the requirements of Executive Order 12898 and Title VI of the Civil Rights. Strategies and tactics used to engage minorities and underserved included identifying the population locations, target outreach to organizations serving these populations, scheduling public workshops in areas with clusters of these populations. Analysis of the investments related to these populations was performed to ensure the investments resulted in equity and the projects implemented would not result in disproportionate impacts.
The stakeholders involved represented a wide range of community organizations and populations.
Future decision-makers (middle and high school students) were engaged through the Transportation Tomorrow program which resulted in 120 student participants. Users of public transportation were engaged through the telephone survey and public workshops. Representatives of public transportation employees were engaged as part of our steering committee and the North Florida TPO’s committees and boards.
Freight shippers and freight transportation providers were solicited for participation as part of the outreach process. A presentation was made to the Jacksonville Chamber of Commerce’s Logistics and Advisory Group which involved approximately 40 representatives of beneficial cargo operators, overthe-road truckers, shipping companies and railroads, third party logistics providers, etc. In addition to attending the Jacksonville Chamber of Commerce’s Logistics and Advisory Group meetings, Norfolk Southern and CSX participated in one steering committee. JAXPORT, the Nassau County Ocean Highway Port Authority, Jacksonville Aviation Authority and St. Augustine Airport also participated through the North Florida TPO Board and committees. The Jacksonville Transportation Authority participated in the agency meetings and the Sunshine Bus Company participated through their involvement in the Regional Transportation Commission. Military freight transportation providers were represented by the U.S Navy Air Station Jacksonville on the steering committee and the North Florida TPO Board. Representatives of pedestrian and bicyclist organizations participated such as the North Florida Bicycle Club and the Bicycle and Pedestrian Coordinator for the City of Jacksonville participated in steering committee and public workshops. Significant discussion and focus on investments in active transportation solutions were adopted as part of the plan. Representatives of the disabled participated through the North Florida TPO Board and committees. Several members of the disabled community attended the Needs Plan and Cost Feasible Plan meetings in the urban core. Neighborhood associations and community groups were solicited through our contact list mailings. Business and professional groups were engaged through presentations to local community organizations such as rotary clubs, the Jacksonville Chamber and public workshops. Elected officials and agency representatives were engaged through the North Florida TPO Board and committees, community planning groups and briefings to commissions on the planning process.
A total of 109 community meetings, public workshops and the public hearing were conducted as part of the project. 2-106
Path Forward 2040 Long Range Transportation Plan The size of the contact database increased by 53 percent from 653 to 1,000 contacts compared to the 2035 LRTP. The contact database included geographically and demographically diverse organizations. Meeting advertising increased from seven to eight print publications. Radio spots increased and television advertising was used for the first time. Facebook advertising was again used to drive traffic resulting in 651 clicks and 136,967 impressions. Facebook and Twitter posts were used in LRTP outreach for the first time with 72 tweets and 100 Facebook updates generating 7,110 impressions. Finally, 60 pins on Pinterest generated over 83,864 impressions in ten months. In comparison to the 2035 LRTP, meeting attendance improved with an average of 15 per meeting to 16 per meeting. The number of comments submitted increased over 500 percent from 83 for the 2035 LRTP to 500 for this update. The major themes of the public involvement process were that transit should be a major priority for future investments within the region. Depending on the type of participation (through the allocation game on-line, the allocation game in workshops or comments received during the meetings or in correspondence), road investment and investment in bicycles and pedestrians also remain a high priority. These priorities were reflected in developing of the Cost Feasible Plan by allocating funding through which the North Florida TPO has the primary decision-making authority. When the allocation funds to the types of improvements were analyzed, bicycles and pedestrians are funded with a significantly higher percent of the needs identified than for road capacity projects. The results of the planning process resulted in fair and equitable distribution by mode. An analysis of the investments for major projects in minority or underserved populations was also performed and the major investments in these areas consisted of transit improvements for enhanced bus service, bus rapid transit, commuter rail and streetcars. In addition, the Jacksonville Transportation Authority plans to implement transit mobility and enhancement projects that will serve many of these areas to provide greater mobility and access to transit. The result of the public involvement process reflected the needs of the community balanced with the regional needs identified in the planning process. 2-107
Path Forward 2040 Long Range Transportation Plan This page is intentionally blank.
2-108
Path Forward 2040 Long Range Transportation Plan
PLAN ALTERNATIVES C ONSIDERING A RANGE OF ALTERNATIVES IS NEEDED TO MEET THE DIVERSE MOBILITY NEEDS OF STAKEHOLDERS WITHIN OUR REGION IS AN IMPORTANT PART OF THE PLANNING PROCESS .
INTRODUCTION
This section summarizes the process used to develop the Needs Plan and Cost Feasible Plan. The illustrative projects and inter-regional projects considered in the planning process are also discussed.
Because of the level of visioning and planning that occurred within these studies, the known needs greatly exceeded the resources anticipated to be available. Building on the community consensus that was achieved, the development of the Needs Plan began with a review and confirmation of these studies. The following sources were used to define the needs.
NEEDS PLAN
The Needs Plan included a six county area consisting of Baker, Clay, Duval, Nassau, Putnam and St. Johns counties. The Needs Plan is not a prioritized list of projects, nor is it constrained by financial resources.
The Needs Plan leveraged prior studies developed by local governments. Maintaining the public consensus continuity of these efforts was essential to the credibility of the planning process. 2-109
FDOT’s Strategic Intermodal Systems Needs Plan and Cost Feasible Plan (includes 1st Five Years and 2nd Five Years) FDOT’s Adopted Work Program North Florida TPO Transportation Improvement Program 2035 Envision Long Range Transportation Plan North Florida TPO Strategic Safety Plan North Florida TPO ITS Master Plan North Florida TPO Congestion Management Plan
Path Forward 2040 Long Range Transportation Plan
North Florida TPO Regional Bicycle and Pedestrian Plan First Coast Regional Greenways and Trails Plan North Florida TPO Freight, Logistics and Intermodal Planning Framework Plan City of Jacksonville Mobility Plan Local Government Comprehensive Plans Committed Development Projects Provided by Local Governments Coordination with local governments and stakeholders on additional needs
When alternate land use scenarios in the Needs Plan were evaluated, the amount of travel within the network increases. This growth in trips occurs primarily on portions of the network that are less congested (demand to capacity ratio of less than 0.8). There was a reduction in the vehicle-miles traveled in the severely congested segments of the network with the alternate land use scenario in the Needs Plan.
DEFICIENCY ANALYSIS
Future mobility deficiencies were identified through an evaluation of anticipated levels of congestion using the NERPM-AB as the primary analysis tool. The congestion assessment was performed using the existing plus committed model scenario in the year 2040 which represents a No Build Scenario. This approach considers only the projects that are committed for construction within the Transportation Improvement Program and FDOT Adopted Work Program.
Appendix I includes a matrix that summarizes the purpose and need for the project.
LAND USE ALTERNATIVES
As discussed in greater detail in the section on travel demand forecasting, two alternative land use scenarios were developed. Although the consensus of the participating agencies was to use the trend-based scenario, performance measures for both alternatives were developed.
Congestion was assessed through the ratio of roadway volume to roadway capacity, known as the demand-tocapacity ratio. Table 2-43 summarizes the systemwide deficiencies in the Base Year model scenario and the 2040 No Build model scenario (existing plus committed). The congested links (greater than 0.8) are shown for the Base Year on Figure 2-25, the No Build on Figure 2-26, the Needs Plan Trend Land Use Scenario on Figure 2-27 and the Needs Plan Alternate Land Use Scenario on Figure 2-28.
Because of the NERPM-AB’s model framework, the model is much more sensitive to changes in the network and the impacts on trip-making. As more capacity is added to the network, persons are more willing to make longer trips when the travel times do not significantly change. As shown in Table 2-43, the number of vehiclemiles traveled is greater when the Needs Plan is modeled than in the No Build or Build model scenarios as a result of the increased capacity of the network.
Table 2-43. Summary of Deficiency Analysis Millions of Vehicle Miles Traveled by Demand to Capacity Ratio Model Scenario Base Year (2010) Future Year No Build (2040) Trend Land Use Scenario Needs Plan Trend Land Use Scenario Needs Plan Alternate Land Use Scenario Cost Feasible Plan Trend Land Use Scenario
Less than 0.8 (uncongested)
Between 0.8 and 0.9 (Moderately congested)
Greater than 0.9 (Severely congested)
20.4
4.3
12.7
37.4
31.3
6.2
19.4
56.9
22.6
4.9
30.7
58.2
24.8
4.9
30.5
60.2
19.4
4.7
34.0
58.1
2-110
Total
" ) 108
" ) 115
" )
§ ¦ ¨ 95
£ ¤ 1
2
127
A1A
A1A
¬ «
17
" ) " )
" )
105
£ ¤
108
¬ «
¬ « ¬ «
107
2
A1A
¬ «
£ ¤ 301
" ) 122
295
119
" ) 250
¬ «
§ ¦ ¨
§ ¦ ¨
" )
A1A
295
105
¬ « ¬ « 116
" ) 125
221
¬ «
" ) 124
¬ « 10
£ ¤ 90
" )
§ ¦ ¨
90
228
" ) 130
£ ¤ ¬ «
10
228
¬ «
£ ¤ 301
202
134
¬ « ¬ « 23
§ ¦ ¨ 295
Legend
£ ¤ 1
V/C Ratio
< 0.80
0.81 - 0.89
¬ «
220
218
> 0.90
§ ¦ ¨ 95
21
¬ «
Roadway System Water Bodies
16
¬ «
Conservation Lands
¬ «
13
" )
" )
A1A
16
¬ «
Six Counties Boundaries
" ) 315
1
208
" )
13
£ ¤ 17
315
16
¬ « " ) ) " ) " " )
209
" )
13A
207
" )
£ ¤ 17
¬ «
206
" ) 204
20
" ) 329
Date: 1/28/2015
" ) 310
" )
200A
" ) 318
¬ «
¬ «
¬ «
75
A1A
100
315
§ ¦ ¨
5
¬ «
¬ «
" )
320
§ ¦ ¨ 95
305
26
" )
¬ «
¬ «
" )
21
A1A
214
214
" )
£ ¤
19
¬ «
" ) 309
" ) 308
Figure 2-25 2010 Base Year Deficiencies 2-111
¯
0
10,560 Feet
0
3.5
7 Miles
" ) 108
" ) 115
" )
§ ¦ ¨ 95
£ ¤ 1
2
127
A1A
A1A
¬ «
17
" ) " )
" )
105
£ ¤
108
¬ «
¬ « ¬ «
107
2
A1A
¬ «
£ ¤ 301
" ) 122
295
119
" ) 250
¬ «
§ ¦ ¨
§ ¦ ¨
" )
A1A
295
105
¬ « ¬ « 116
" ) 125
221
¬ «
" ) 124
¬ « 10
£ ¤ 90
" )
§ ¦ ¨
90
228
" ) 130
£ ¤ ¬ «
10
228
¬ «
£ ¤ 301
202
134
¬ « ¬ « 23
§ ¦ ¨ 295
Legend
£ ¤ 1
V/C Ratio
< 0.80
0.81 - 0.89
¬ «
220
218
> 0.90
§ ¦ ¨ 95
21
¬ «
Roadway System Water Bodies
16
¬ «
Conservation Lands
¬ «
13
" )
" )
A1A
16
¬ «
Six Counties Boundaries
" ) 315
1
208
" )
13
£ ¤ 17
315
16
¬ « " ) ) " ) " " )
209
" )
13A
207
" )
£ ¤ 17
¬ «
206
" ) 204
20
" ) 329
Date: 1/28/2015
" ) 310
" )
200A
" ) 318
¬ «
¬ «
¬ «
75
A1A
100
315
§ ¦ ¨
5
¬ «
¬ «
" )
320
§ ¦ ¨ 95
305
26
" )
¬ «
¬ «
" )
21
A1A
214
214
" )
£ ¤
19
¬ «
" ) 309
" ) 308
Figure 2-26 2040 No Build Deficiencies 2-112
¯
0
10,560 Feet
0
3.5
7 Miles
" ) 108
" ) 115
" )
§ ¦ ¨ 95
£ ¤ 1
2
127
A1A
A1A
¬ «
17
" ) " )
" )
105
£ ¤
108
¬ «
¬ « ¬ «
107
2
A1A
¬ «
£ ¤ 301
" ) 122
295
119
" ) 250
¬ «
§ ¦ ¨
§ ¦ ¨
" )
A1A
295
105
¬ « ¬ « 116
" ) 125
221
¬ «
" ) 124
¬ « 10
£ ¤ 90
" )
§ ¦ ¨
90
228
" ) 130
£ ¤ ¬ «
10
228
¬ «
£ ¤ 301
202
134
¬ « ¬ « 23
§ ¦ ¨ 295
Legend
£ ¤ 1
V/C RATIO
< 0.8
0.81 - 0.89
¬ «
220
218
>0.9
§ ¦ ¨ 95
21
¬ «
Roadway System 16
¬ «
Water Bodies Conservation Lands
¬ «
13
" )
" )
A1A
16
¬ «
Six Counties Boundaries
" ) 315
1
208
" )
13
£ ¤ 17
315
16
¬ « " ) ) " ) " " )
209
" )
13A
207
" )
£ ¤ 17
¬ «
206
" ) 204
20
" ) 329
Date: 2/9/2015
" ) 310
" )
200A
" ) 318
¬ «
¬ «
¬ «
75
A1A
100
315
§ ¦ ¨
5
¬ «
¬ «
" )
320
§ ¦ ¨ 95
305
26
" )
¬ «
¬ «
" )
21
A1A
214
214
" )
£ ¤
19
¬ «
" ) 309
" ) 308
Figure 2-27 2040 Needs Plan Trend Scenario Deficiencies 2-113
¯
0
0
10,560 Feet
3.5
7 Miles
" ) 108
" ) 115
" )
§ ¦ ¨ 95
£ ¤ 1
2
127
A1A
A1A
¬ «
17
" ) " )
" )
105
£ ¤
108
¬ «
¬ « ¬ «
107
2
A1A
¬ «
£ ¤ 301
" ) 122
295
119
" ) 250
¬ «
§ ¦ ¨
§ ¦ ¨
" )
A1A
295
105
¬ « ¬ « 116
" ) 125
221
¬ «
" ) 124
¬ « 10
£ ¤ 90
" )
§ ¦ ¨
90
228
" ) 130
£ ¤ ¬ «
10
228
¬ «
£ ¤ 301
202
134
¬ « ¬ « 23
§ ¦ ¨ 295
Legend
£ ¤ 1
V/C Ratio
< 0.80
0.81 - 0.89
¬ «
220
218
> 0.90
§ ¦ ¨ 95
21
¬ «
Roadway System Water Bodies
16
¬ «
Conservation Lands
¬ «
13
" )
" )
A1A
16
¬ «
Six Counties Boundaries
" ) 315
1
208
" )
13
£ ¤ 17
315
16
¬ « " ) ) " ) " " )
209
" )
13A
207
" )
£ ¤ 17
¬ «
206
" ) 204
20
" ) 329
Date: 2/6/2015
" ) 310
" )
200A
" ) 318
¬ «
¬ «
¬ «
75
A1A
100
315
§ ¦ ¨
5
¬ «
¬ «
" )
320
§ ¦ ¨ 95
305
26
" )
¬ «
¬ «
" )
21
A1A
214
214
" )
£ ¤
19
¬ «
" ) 309
" ) 308
Figure 2-28 2040 Needs Plan Alternate Land Use Scenario Deficiencies 2-114
¯
0
0
10,560 Feet
3.5
7 Miles
Path Forward 2040 Long Range Transportation Plan Within the Needs Plan project cost estimates were prepared based on today’s buying power for projects. In the future inflation is anticipated to occur that will increase the nominal costs of the projects. Since as part of the Needs Plan, the year of expenditure for each project is not known and to compare projects on consistent basis, the following summary of the Needs Plan is reported in “present-day costs”.
community were conducted. These workshops are documented in the public involvement section. Several iterations of the Needs Plan were also presented to the steering committee, North Florida TPO Board and committees during March, April and May of 2014 for refinement of alternatives and consensus building. The Needs Plan includes road capacity projects, multimodal projects (transit, active transportation and freight) and operations strategies.
In today’s dollars we have more than $7 billion of needs versus $27 billion in funding. Forecasting that over the 22-year plan horizon, those needs increase to $46 billion with only $14.8 billion in revenues available. Table 2-44 summarizes the Needs Plan in present day dollars.
The Needs Plan was adopted by the North Florida TPO Board on June 12, 2014. Technical Memorandum #8 – Needs Plan is attached to this report. The projects in the Needs Plan are presented in Part Three of this report.
Four iterations of the Needs Plan were prepared with the stakeholder agencies during the planning process. Public comments were considered as part of the process and a series of public workshops throughout the
Table 2-44. Summary of Needs Versus Revenue in Present Day Costs Type Roadway Capacity Bicycle and Pedestrian TSM&O Context Sensitive Solutions Subtotal Highways Transit Freight Subtotal Multimodal TOTAL
2-115
Need (Millions) $19,503 $306 $417 $273 $20,499 $2,448 $3,824 $6,272 $26,771
Estimated Revenue (millions) $5,537 $135 $38 $59 $5,769 $624 $1,839 $2,463 $8,232
Path Forward 2040 Long Range Transportation Plan
COST FEASIBLE PLAN
For the purposes of this plan reasonable estimates for all potential funding programs were developed. However, the revenue estimated for the Strategic Intermodal System Multimodal funding program and the state New Start transit capacity programs are allocated on a statewide basis and there is no “guarantee” these projects will be funded. The Strategic Intermodal System Multimodal program revenue estimates used were based on a proportion of the program-level revenue based on population share. The New Starts funding program is allocated on a competitive basis and projects that are eligible for New Start funding and feasible were included in the Cost Feasible Plan.
Following the identification of needs, the Cost Feasible Plan was prepared for the federal planning boundaries only – Clay, Duval, Nassau and St. Johns Counties. The projects selected from the Needs Plan were identified using the prioritization system developed using the performance measures established with the goals and objectives. The prioritization systems and decision-making process used for the selection of projects is documented in Part Three of this report. Quantitative performance measures and prioritization systems were developed for road capacity and bicycle and pedestrian projects. More qualitative methods were used for other components of the plan.
In addition, the following projects received high rankings during the prioritization of the Needs Plan, but are so costly that if included they would have consumed all of the funding available in the programs they are eligible. These projects included.
Priority projects were identified and revenues allocated from various funding sources until the plan was balanced (project costs equaled revenues). The process of prioritization and selection of the projects for inclusion in the Cost Feasible Plan is discussed in greater detail in Part Three.
Extensive coordination with the steering committee and TPO Board and committees occurred. Multiple versions of the plan were presented in the August, September and October TPO Board and committee meetings for review and comment.
Public workshops were conducted in September of 2014 and a public hearing occurred on October 28, 2014. The Cost Feasible Plan was adopted by the North Florida TPO Board in November 13, 2014 with a unanimous vote of approval. Technical Memorandum #10 – Cost Feasible Plan is attached to this report.
Project # 79, SR 115 Mathews Bridge over the St. Johns River. The construction cost was estimated to be $1.1 billion. Project #413, I-95 from I-10 to SR 104 Dunn Avenue Express Lanes. The project was not included in the Strategic Intermodal System program and if funded in the Other Road Capacity program, it would have consumed more than one-half of the available funding. The project was estimated cost $374 million in construction. Project #74, SR 115 Lem Turner Road from I-295 to US 1 Kings Road, Widen to 4 Lanes. The estimated construction cost is $88 million.
Two projects ranked favorably but insufficient information on the scope of the work was available to include construction, right of way or environmental phases.
ILLUSTRATIVE PROJECTS
Illustrative projects are included as defined by FHWA
The financial plan may include, for illustrative purposes, additional projects what would be included in the adopted/approved transportation plan/program if reasonable additional resources beyond those identified in the financial plan were available" [see 23 U.S.C. 135(e)(4), 23 U.S.C. 135(f)(2)(E), 23 U.S.C. 134(g)(2)(B), and 23 U.S.C. 134(h)(2)(B)(iv), respectively].
Project #100, SR 115 Arlington Expressway from SR 109 University Boulevard to SR 10 Atlantic Boulevard. Project #967, SR 115 Southside Boulevard at SR 152 Baymeadows Road Underpass.
These projects were included in the Cost Feasible Plan for preliminary engineering phases only so that if additional funding were available, subsequent phases could be advanced.
2-116
Path Forward 2040 Long Range Transportation Plan determines that high-speed rail is feasible in the AtlantaMacon-Jacksonville Corridor. It is further recommended that a Tier 1 NEPA Document and Service Development Plan be pursued for high-speed rail service within the corridor. This analysis should continue to address a range of technology alternatives including the Hybrid High Performance implementation approach.
INTER-REGIONAL PROJECTS
As part of the development of the plan, the following key inter-regional projects that will connect North Florida to other metropolitan regions were identified.
Jacksonville to Atlanta high speed rail Miami to Jacksonville intercity passenger rail Tampa Bay to Northeast Florida: Florida’s Future Corridors
A copy of the executive summary of the Georgia Department of Transportation study is provided in Appendix F.
No funding was allocated to these projects as part of the plan but they are long-term needs that will be addressed through intra-state or inter-state cooperation. The following provides a brief overview of these projects.
MIAMI TO JACKSONVILLE HIGH SPEED RAIL All Aboard Florida, an intercity passenger rail program being developed by the owner of the FEC railroad, Fortress Investment Group, will be a privately owned, operated and maintained passenger rail service to connect South Florida and Orlando that is anticipated to open service in 2016. As part of their long-term plan, Jacksonville to Miami service is proposed in the future. However, no timetable has been set.
JACKSONVILLE TO ATLANTA HIGH SPEED RAIL In 1998, the U.S. Department of Transportation 37 designated the Jacksonville to Atlanta as a component of the Southeast High Speed Rail network. According to the report Ground Transportation for America prepared by U.S. Department of Transportation the Southeast High Speed Rail network was given a "specialized analysis" and "afforded exceptional treatment" because of its extraordinary potential for commercial success.
TAMPA BAY TO NORTHEAST FLORIDA: FLORIDA’S FUTURE CORRIDOR New connections between Tampa Bay and Jacksonville, two large regions that are not well connected today are needed to enhance intrastate commerce and personal mobility. In 2013, FDOT completed high-level evaluations of Future Corridors. A possible new connection between the Suncoast Parkway in Tampa and I-75 in the Gainesville or Ocala area and enhanced connectivity between Gainesville and Ocala and the Jacksonville area were evaluated. However, no commitments for advancing study or implementation of these projects has been made. Additional information is provided in Appendix G.
In 2012, the Georgia Department of Transportation and U.S. Department of Transportation completed a feasibility study for the potential of high speed rail consistent with the Southeast High Speed Rail Network program. The total costs of implementing service ranged from $5 billion to $15 billion if shared rail use or exclusive rail was constructed. The following summarizes the recommendations of the study. High-speed rail service in the Atlanta-Macon-Jacksonville Corridor presents an opportunity to provide needed transportation solutions and promote economic development. While high-speed rail is not the only transportation solution, this study gives evidence that passenger high-speed rail will provide added mobility and transportation choices to consumers. High-speed rail can provide more efficient and cost-effective means to consumers, providing added connectivity to major cities such as Atlanta and Birmingham through commercial centers and national / international destinations. This study illustrates that although the initial investment in high-speed rail is significant, the mobility and economic opportunities offered by this new more are significant. Based on the analysis findings, this study 37
http://www.sehsr.org/reports/time2act/actchapter4.htm
2-117
Path Forward 2040 Long Range Transportation Plan This page is intentionally blank
2-118
PART
THREE
ROAD PROJECTS
Path Forward 2040 Long Range Transportation Plan
NEEDS PLAN R OADS ARE THE MOST VISIBLE AND PRODUCTIVE COMPONENT OF OUR TRANSPORTATION INFRASTRUCTURE . N EW ROADS AND ADDITIONAL CAPACITY ARE NEEDED TO MEET OUR REGION â&#x20AC;&#x2122; S NEEDS .
OVERVIEW
The need to provide safe, convenient and effective mobility for all persons was identified throughout our region. Major projects identified for funding within this program include new roads, the widening and reconstruction of corridors, intersection improvements and interchange modifications.
Our plan addresses context sensitive solutions by identifying corridors that are candidates for more walkable, ride-able and livable communities. Roads donâ&#x20AC;&#x2122;t just serve automobiles. All road projects on arterials will include new sidewalks and bicycle lanes. Roads provide buses with access to more persons and allow them to offer better quality of service through more reliable travel times and reduced congestion.
Revenues are also dedicated to constructing standalone bicycle and pedestrian projects and deployment of TSM&O projects within these road capacity funding categories.
Figures 3-1 through 3-7 summarize the project needs that were identified. Table 3-1 summarizes the road capacity needs identified in the six county region.
These projects are discussed in later sections.
3-1
" )
Ò " ) Ê
78
27
500
225
326
Date: 11/4/2014
721
225A
25A
25
200A
200
326 326
326
956 2
82 9
31
826 11 3
413 414
133
84 9
902
909
1023 1023
11 9
410
934 431 98
101
104
411 411
944
971 91 2
114
441
850
818
¬ «
Ò " ) Ê
¬ «
Ò " Ê " ) )
9 42
138
204
8 42
19
¬ «
" ) 309
430
" ) 308
502 425
200
« " ) £ ¤¬ £ ¤ ¬ «" " ) ) " ) ¬ « ¬ « ) " ) " ¬ «" ) ¬ « 316
335
95 4
1017
701
88 123
425
91
424
05 4301
404
206
A1A
425
453
318
453
310
403
" ) £ ¤
138
20
91
329
§ ¨ ¦
¬ «
" )
5
¬ «
95
965
® q
88
424
" )
¬ «
400
315
720
115
130
" )
1008
400
100
¬ «
200A
500
809
420
50 5
1007
420
£ ¤
n A¬ ¤ 1A í« ì ë é è í ì ë é è
2 45
335
75
110
214
" )
17
3 50
" ) " )
§ ¨ ¦
1
£ ¤
832
26
21
1 13
451
" )
83 6
305
¬ «
" )
13
" )
423
320
13A
839
Ò " ) Ê q ¤® n
207
Six Counties Boundaries
" )
907
823
16
214
422
128
17
£ ¤
2 13
Conservation Lands
1 15
Water Bodies
81 2
814
Roadway System
840
208
209
315
846
95
¬ « " ) " " ) ) " )
" )
" ) 45 0
16
¬ «
820
906
Future Corridor TBD
841
¬ «
845
844
816
315
Northern Outer Beltway Corridor
Ò " ) Ê 46
" )
First Coast Expressway
847
5 80
802
803
106
819
Ò" " ) Ò Ò " ) Ê Ê Ê) Ò " Ê Ò " ) Ê ) § ¨ ¦ Ò " ) Ê ) Ò " Ê
842
418
Operational Improvements
827
811
16
Ò " ) Ê Ò " ) Ê
32
A1A
93
25 41 26
1013
¬ «
220
904
¬ «
Express Lanes
" )
Ò " ) Ê
24
80 0
1
34
1012 905
202
£ ¤ 13
1
1036
New 6 Lane Road
119
716
10 2
90
73
New 4 Lane Road
Ò " ) Ê
810
21
¬ «
1022
848
1027
33
Ò " ) Ê
715
18
New 3 Lane Road
962
49
834
" ) 218
57
903
New 2 Lane Road
1011
§ ¨ ¦ 295
152
£ ¤ ¬ «
121
721
4 43
Context Sensitive Solutions
57
964 16
911
1026
960
960
14
Widen to 6 Lanes
960
103
913 23
16
957
715
10
714
Ò " ) Ê è í ì ë Ò " ) Ê é í ì ë é è Ò " ) Ê 416
í) ì ë é è Ò " Ê
116
968
153
95
23
957
0 97
Widen to 5 Lanes
¬ «
86
957
¬ « ¬ « è í ì ë é
Ò " ) Ê è ¬é í ì ë é íè ì ë é èè í ì ë í « ì ë é 3 43
301
£ ¤
415
è í ì ë é í ì ë é è
431
" )
228
134
¬ « ¬ «
105
100
79
432
Ò " ) Ê
87
Ò " ) Ê
9
" )
7
432
935
¬ «
§ ¨ ¦
419
96
10
228
Widen to 4 Lanes 130
" )
§ ¨ ¦
6
A1A
295
3 43
404
90
£ ¤
406
85
410
405
406
710
¬ «
959
407
951
221
Ò " ) Ê Ò " ) Ê
295
119
¬ «
705
A1A
§ ¨ ¦
" ) 401
A1A
704
1005 92
408
145 940
" )
250A
74
301
£ ¤
124
453 Widen to 3 Lanes 453
® q
83
Reconstruct 2 Lanes
939
2
500
¬ «
706
127
Ò " ) Ê
17
£ ¤
¬ « ¬ «
3 70
A1A
1006
" ) ® Airport q ¤ Amtrak Station n Rail Station ¤ Passenger" n 122 ) í Intersection Projects ì ë é è Projects Ò " 250 ) Ê Interchanges " ) 125 " ) Lanes
í ì ë é è
707
105
107
501
994
" ) " )
708
" )
981
981
í ì ë é è
108
2
427
984
95
88
«
36
í ì ë é Ò Ò " " § ¨ ¦èéëìí ) ÊÊè
1
£ ¤
Legend ¬
969
97
115
9 70
108
" )
23
Figure 3-1 Regional Road Capacity Needs 3-2
¯
0
10,560 Feet
0
4
8 Miles
Legend Intersection Projects
è í ì ë é Ò " ) Ê
Interchanges Projects
Lanes
Reconstruct 2 Lanes Widen to 3 Lanes Widen to 4 Lanes Widen to 5 Lanes Widen to 6 Lanes Context Sensitive Solutions New 2 Lane Road New 3 Lane Road New 4 Lane Road New 6 Lane Road Express Lanes Operational Improvements
" ) 108
Northern Outer Beltway Corridor
¬ « 2
Future Corridor TBD Roadway2 System
" ) 127
" )
Water Bodies Conservation Lands
88
Six Counties Boundaries
" ) 121
" ) 122
£ ¤ 301
88
" ) 125
" ) 119
" ) 127
" ) 119
" ) " ) 23D
" ) 250
23C
" ) £ ¤ ¤ £ 121
" )
" ) 124
£ ¤
250A
121
139B
90
" )
¬ «
§ ¦ ¨
" ) 123
453
10
453
404
" ) 23A
" ) 125
" )
§ ¦ ¨ 10
720
¬ « 228
405
405
" ) 228
90
217
301
86
425
" ) " ¬ « ) ) " £ ¤ " ) " ) 228
" ) 229
228
228
217
301
" ) 231
217
218
424
23
Figure 3-2 Baker County Road Capacity Needs Date: 11/4/2014
3-3
406 406
" )
£ ¤
130
721
301
403 403
402
91
" ) 229
123
500
¯
1026 0
0
10,560 Feet
1.5
3 Miles
98
101
970
í ì ë é è
9
425
936
932
1015
86
957
16
431
Ò " ) ÊÊ Ò " )
431
910
301
217
23
" )
57
§ ¦ ¨ 295
57
49 1022
224
13
¬ «
14
91 2
¬ «
964
1179
913
£ ¤ " )
16
1022
" )
220A
Ò " ) Ê
1011
6
900
2 10
" ) " ) 1189 220
33
" ) 13B
34
23
" )
915
739
24
904
" ) 739B
25
" ) ¬ «
909
21
" ) 209
41
26
13
¬ « 32
15
¬ «
803
Ò " ) Ê
" ) 315
114
215
Ò " ) Ê
133
" )
15A
1013
16
¬ «
" ) 16A
106
Ò " ) Ê
16
¬ «
841
0 82
31
721
1027
" )
914
218
Ò " ) Ê
903
" )
1012
220
905
84 9
" )
901
911
902
424
209
908
17
£ ¤ 230
¬ «
" ) 226
46
" ) 315
906
" ) 209
907
" ) 315
Legend
" ) 21
Interchanges Projects
Lanes
45 0
¬ «
Intersection Projects
è í ì ë é Ò " ) Ê
352
Reconstruct 2 Lanes
" ) 214
" )
209 to 3 Lanes Widen Widen to 4 Lanes Widen to 5 Lanes
" ) 214
Widen to 6 Lanes
" ) 315
Context Sensitive Solutions New 2 Lane Road
451
21
¬ « ¬ «
" ) 309D
26
" ) 209
New 3 Lane Road New 4 Lane Road New 6 Lane Road Express Lanes
505
Operational Improvements First Coast Expressway 965
Future Corridor TBD Roadway System Water Bodies
Conservation Lands 422
Six Counties Boundaries
423
Figure 3-3 Clay County Road Capacity Needs Date: 11/4/2014
3-4
¯
0
0
10,560 Feet
1.5
3 Miles
Ò Ò " ) ) Ê" Ê
í ì ë é è
í ì ë é è
501
í ì ë é è
705
70 7
706
Ò " ) Ê
706
710
78
708
A1A
¬ «
952
939
1005
413
407
104
9 40
948
40 7
Ò " ) Ê £ ¤ 17
949
951
¬ «
82
95
§ ¦ ¨
£ ¤
1036
Operational Improvements
414
104
102
1022
119
119
£ ¤ 1
§ ¦ ¨
5 82
Northern Outer Beltway Corridor
80 0
Future Corridor TBD Roadway System Water Bodies
95
828
833
Ò " ) Ê
41 4
90 3
902
901
911
New 6 Lane Road
First Coast Expressway
827
Figure 3-4 Ò " Duval County Road Capacity Needs ) Ê 3-5
¬ «
826
91 3 91 2
Ò " ) Ê
New 4 Lane Road
202
819
Ò " ) Ê
Conservation Lands
844
Ò " ) Ê Ò " ) Ê 2 13
900
34
New 3 Lane Road
93
33
152
¬ «
962
90
¬ «
¬ «
1023
410
431
934
101 5 101
98
123 123 425
424
1022
17
New 2 Lane Road
A1A
Express Lanes
8 41
1011
966
967
Ò " ) Ê
49
£ ¤
Context Sensitive Solutions
128
295
Widen to 6 Lanes
1
18
23
Date: 11/4/2014
§ ¦ ¨
Widen to 5 Lanes
94
21
57
Widen to 4 Lanes
1024
14
¬ «
57
152
960
418
224
964
13
Ò " ) Ê
è í ì ë é í ì ë é è í ì ë é è Ò " ) Ê
4 43
Ò " ) Ê
910
16
10 2
90
960
95
16
¬ «
200
¬ «
416
129
716 714 715
10
¬ « è í ì ë é íè ì ë é íè ì ë é
í ì ë é è
£ ¤
99
í ì ë é è
957
820
102 6
Ò " ) Ê
4 43
970
13
960
9
721
930
932
936
431
23
¬ «
17
968
73
134
820
415
957
¬ «
í ì ë é è
Interchanges Projects
1023
411 411
944 971
957
228
86
Ò " ) Ê
¬ « ¤ í £ ì ë é è í ì ë é è
87
100
3 43
91
17
128
¬ «
301
£ ¤
947
946
103
5 103
Ò " ) Ê
3 43
4 103
79
43
96
820
405
£ ¤
Ò " ) Ê
935
432
¬ «
121
972
7
153
Intersection Projects
Widen to 3 Lanes
152
A1A
116
¬ «
945
121
406
419
47
10
1006
950
405
90
401
Ò " ) Ê
85
Airport
Reconstruct 2 Lanes
295
432
0 41
404
403
402
720
406
£ ¤§ ¦ ¨
6
Lanes
§ ¦ ¨
1019
454
® q í ì ë é è Ò " ) Ê
A1A 1
20 10
1
500
Legend
37
¬ «
963
940
40 8
88
83
¬ «
954
2
115
1 94
68
Ò " ) Ê
1038
301
¬ «
97
421
A1A
956
701
74
® q
88
£ ¤
92
953
1033
1017
£ ¤ 23
845
¯
Six Counties Boundaries
0
10,560 Feet
0
3
6 Miles
0
10 0
7 97
996
987
983
í ì ë é è
995
78
" )
994
115
í ì ë é è
" )
£ ¤ 301
SR 200 Projects Inset
707
Legend
108
9 70
975
969
Ò " ) Ê £ ¤ 17
" ) 115
981
£ ¤ 1
í ì ë é è
994
501
501
1001
981
997
See Inset
710
" )
705
" ) 107
78
708
í ì ë é è
108
703
706
Widen to 4 Lanes Widen to 5 Lanes
115
£ ¤ 301
104
40 8
Ò " ) Ê
40 7
959
134
134
1016
410
228
¬ « £ ¤¬ « 17
208
414
15
410
957
2 11
« é è í ì ë " )¬ " ) ¬ « Figure í 3-5 ì ë é è 213
9
87
79
21
211
£ ¤ Ò " ) Ê ¬ « Ò " ¬ «) Ê ¬ «
100
153
1
415
13
416
109
Nassau County Road Capacity Needs 3-6
947
í ì ë é è
968
104
411 411
944
123 425
301
23
¬ « ¬ « ¬ «
Ò " ) Ê ¬ «
43
5
1 15
23A 121
200
¬ « £ ¤
10
109
¬ « Ò " ) Ê
116
¬ «
í ì ë é è
960
714 715 716
10
¬ «
í ì ë é íè ì ë é íè ì ë é è
115
Future Corridor TBD
¯
¬ « 10 2
Roadway System
1
Water Bodies Conservation Lands
A1A
« ¤¬ ¬ « £ 212
960
è í ì ë é í ì ë é è ¬ « í ì ë é è Ò " ) Ê
Northern Outer Beltway Corridor
152
A1A
121
) " )¬ « " 228
¬ «
972
§ ¦ ¨
945
121
405
406
432
432
419
1006
¬ «
721
406
7
Ò " ) Ê
96
Date: 11/4/2014
453
85
3 43
" ) 123
8
90
820
228
403
£ ¤
6
401
454
First Coast Expressway
47
91
402
Express Lanes
950
295
23C
720
¬ «
82
§ ¦ ¨
" ) " )
500
New 6 Lane Road
A1A
Operational Improvements
41 4
119
23D
125
New 4 Lane Road
951
) " )"
" )
949
1
9 40
121
New 3 Lane Road
956
948
37
¬ «
954
407
963
940
1 94
Ò " ) Ê
413
88
127
¬ «
83
" )
New 2 Lane Road
2
74
421
68
Context Sensitive Solutions
A1A
1005
® q
Widen to 6 Lanes
105
92
97
¬ «
952
939
953
¬ «
1033
15
Interchanges Projects
Widen to 3 Lanes
¬ « ¬ « ¬ «
1017
2
701
" )
Intersection Projects
Reconstruct 2 Lanes
A1A
A1A
2
Airport
Lanes
105
¬ « ¬ «
706
Ò " ) Ê
108
í ì ë é è
987
105
« ¬ « ¬
A1A
200A
1003
ÊÊ
982
95
23
" )
) è" í ì ë Ò " Òé " ) ) 427
707
§ ¦ ¨
£ ¤
88
998
107
979
984
" )
" )
36
® q í ì ë é è Ò " ) Ê
105A
704
501
982
981
986
971
6 97
Ò " Ò " ) Ê) Ê
97 6
9 99
1003
í ì ë é è
427
979
70 7
984
985
70 9
202
¬ «
0
90
10,560 Feet
" ) 203
Six Counties Boundaries
0
3.5
7 Miles
" ) 226
" ) 315
906
" ) 13
" ) 13A
" ) 209
907
" ) 315
21
45 0
¬ «
" )
13A
" ) 352
" )
315C
" ) 214
" ) 214
" )
309D
" ) 219
100
¬ «
26
¬ « 45 1
21
¬ «
505
" )
207A
" ) 216
965
" )
309C
" ) 315
422
100
¬ «
" ) 310
20
423
¬ «
" ) 20A
è í ì ë é Ò " ) Ê
£ ¤
" )
309B
19
¬ «
" ) 21
" ) 310
8 42
429
15
¬ «
2 45
Legend
20
¬ « 17
3 50
" )
5
46
Intersection Projects
Interchanges Projects
Lanes
" )
308B
Reconstruct 2 Lanes
430
" ) 309
Widen to 3 Lanes Widen to 4 Lanes Widen to 5 Lanes
" ) 308
Widen to 6 Lanes
Context Sensitive Solutions New 2 Lane Road
" ) 309
New 3 Lane Road New 4 Lane Road New 6 Lane Road Express Lanes
Operational Improvements Roadway System Water Bodies
Conservation Lands
" ) 314
Six Counties Boundaries
Figure 3-6 Putnam County Road Capacity Needs Date: 11/4/2014
3-7
¯
0
0
10,560 Feet
1.5
3 Miles
) Ê
1029
103 1
49
1025
295
1022
« " ) ¬ 210A
119
1022
A1A
1024
§ ¦ ¨
962
1036
Ò " ) Ê
295
102
57
825
18
1008
80 0
94
í ì ë é è
721
St. Augustine
90
826
809
967
4 43
95
57
1023
0
964
§ ¦ ¨
1023
99
103
Ò " ) ÊÊ Ò
16
128
4 43
115
937
938
966
¬ «
202
¬ «
73
96
3 43
í ì ë é è
103
960
121
è í ì ë é í ì ë é è í ì ë é è Ò " ) Ê
Ò " ) Ê
11 9
¤ n
8 41
93
" ) 13B
828
827
842
851
5 80
834
848
833
Ò " ) Ê
843
Ò " ) Ê
Ò " Ê " ))
844
Ò " ) Ê
845
846
210
810
807
2 13
13
84 9
¬ «
Ò " ) Ê
7
847
Ò " ) Ê
840
418
802
841 803
Ò " ) Ê
811
10 3
Ò " ) Ê
9 81
1 13
0 82
16
¬ «
16
¬ «
823
812
908
82 9
106
Ò " ) Ê
" ) 13A
839
¤ n
815
5 81
816
" ) 13
16
¬ «
" )
¬ « A1A
1007
103
821
813
0
906
§ ¦ ¨
See Inset
115
83 0
13A
1025
" )
103 1
1029
809
95
" ) 214
è í ì ë é
1008
1008
312
¬ «
11 3
907
814
Lanes
n ¤ í ì ë é è
110
208
Legend ® Airport q ¤ Amtrak Station n ¤ Passenger Rail Station n í Intersection Projects ì ë é è Ò " ) Ê Interchanges Projects
1
£ ¤
83 6
832
46
835
® q
801
Reconstruct 2 Lanes Widen to 3 Lanes
" ) 13A
Widen to 5 Lanes
207
¬ «
09 Widen to 6 2Lanes
1
£ ¤
Context Sensitive Solutions 17
£ ¤ ¬ «Road New 3 Lane
" ) 305
New 2 Lane Road
850
15
New 4 Lane Road
" )
138
818
Express Lanes
¬ «
Ò " ) Ê
A1A
400
New 6209 Lane Road
206
¬ «
130
420
" )
420
Widen to 4 Lanes
207A Operational Improvements 505
First Coast Expressway 451
" ) " ) 13
Roadway System 19
¬ « ® q " ) ¬ «Bodies Water
965
Future Corridor TBD
" )
Ò " ) Ê
Figure 3-7 St. John's County Road Capacity Needs
¯
100 1447
" ) 2016
Conservation Lands
204
100
¬ «
" )
310 Six Counties Boundaries
Date: 11/4/2014
3-8
138
0
0
10,560 Feet
1.5
3 Miles
Path Forward 2040 Long Range Transportation Plan Table 3-1. Road Capacity Needs by County County Map ID Facility Baker 453 I-10 Baker 404* I-10 Baker 405* I-10 Baker 720 I-10/US 90 Parallel Reliever Baker/Clay/Duval 721 Future Corridor Initiative Baker/Duval 91 Outer Loop Facility Clay 900 Baxley Road Clay 13 Cheswick Oak Avenue Extension Clay 902 College Drive Clay 14 College Drive Extension Clay 905 CR 209 Russell Road Clay 906 CR 209 South Clay 24 CR 218 Clay 909 CR 218 Clay 1026 CR 218 Clay 1027 CR 218 Clay 25 CR 218 Extension Clay 26 CR 218 Extension Clay 33 CR 220 Doctors Inlet Road Clay 34 CR 220 Doctors Inlet Road Clay 31 CR 315 Clay 32 CR 315 Clay 904 CR 739B Sandridge Road Clay 907 Decoy Road Clay 46 Governors Park Road Clay 901 Knight Boxx Road Clay 915 Lake Asbury East West 1 Clay 914 Lake Asbury North South Road 3 Clay 911 Long Bay Road Extension North Clay 913 Oakleaf Village Parkway Extension Clay 450 SR 100 Clay 106 SR 16 Clay 908 SR 16 Clay 114 SR 21 Blanding Boulevard Clay 903 Town Center Boulevard Clay 912 Tynes Road Clay 133 US 17 Clay 1037 US 17 Clay 424 US 301 SR 200 Clay 910 Wells Road Duval 2 Alta Drive / Yellow Bluff Road Duval 1 Alta Drive Realignment Duval 936 Argyle Forest Boulevard Duval 1006 Blount Island Boulevard Extension Duval 939 Braddock Parkway Duval 1016 Cahoon Road Duval 972 Cecil Field Connector Duval 971 Chaffee Road Duval 1020 Clark Road Extension Duval 932 Collins Road Duval 16 Collins Road
From Baker/Columbia County Line W of CR 125 W of SR 121 South MacClenny Tampa Bay SR 228 Normandy Boulevard CR 220 Doctors Inlet Road Oakleaf Plantation Parkway CR 220 Doctors Inlet Road SR 21 Blanding Boulevard CR 739 Henley Road Decoy Road SR 21 Blanding Boulevard SR 16 US 301 Cosmos Avenue CR 739 Henley Road SR 23 First Coast Expressway SR 21 Blanding Boulevard College Drive SR 16 CR 315B CR 739 Henley Road US 17 US 17 CR 220 Doctors Inlet Road NS3 CR 739B Sandridge Road Old Jennings Road Oakleaf Plantation Parkway Clay/Bradford County Line CR 218 US 17 SR 16 US 17 Pipit Place CR 315 Governor Street Clay/Bradford County Line Aquarius Concourse I-295 SR 105 Zoo Parkway SR 23 First Coast Expressway Spoil Island SR 115 Lem Turner Road Lenox Avenue Commerce Center SR 228 Normandy Boulevard Broward Road Old Middleburg Road S at US 17 Roosevelt Boulevard
To CR 125 W of SR 121 Baker/Nassau County Line East Baldwin Northeast Florida SR 228 Normandy Boulevard SR 21 Blanding Boulevard Savannah Glen Boulevard SR 21 Blanding Boulevard Challenger Drive (Branan Field Road ) US 17 US 17 CR 739 Henley Road CR 739 Henley Road Cosmos Avenue Pine Tree Lane SR 23 First Coast Expressway CR 315 Knight Boxx Road US 17 CR 315B US 17 CR 209 Russell Road CR 209 South SR 16 SR 21 Blanding Boulevard CR 209 Russell Road CR 209 Russell Road Long Bay Road Oakleaf Village Parkway Clay/Putnam County Line SR 15A Oakridge Avenue Shands Bridge CR 215 Blanding Boulevard CR 220 Doctors Inlet Road Oakleaf Plantation Parkway Town Center Boulevard Haven Avenue Duval/Clay County Line SR 21 Blanding Boulevard New Berlin Road (north ) North of New Berlin Road (south) Old Middleburg Road JAXPORT Pecan Park Road US 90 Beaver Street SR 23 First Coast Expressway Crystal Springs Road Clark Road Shindler Drive 3-9
Improvement Type Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Future Corridor Future Corridor Future Corridor Widen to 4 Lanes New 4 Lane Road Widen to 6 Lanes New 4 Lane Road Widen to 4 Lanes Reconstruct 2 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes New 4 Lane Road New 4 Lane Road Widen to 4 Lanes Widen to 6 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Reconstruct 2 Lanes New 4 Lane Road Widen to 6 Lanes New 2 Lane Road New 2 Lane Road New 2 Lane Road New 2 Lane Road Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes New 2 Lane Road Widen to 6 Lanes Widen to 4 Lanes Widen to 6 Lanes Reconstruct and New 2 Lane Road Widen to 4 Lanes New 4 Lane Road Widen to 6 Lanes New 2 Lane Bridge New 2 Lane Road Reconstruct 2 Lanes New 2 Lane Road Widen to 5 Lanes New 3 Lane Road Widen to 4 Lanes New Interchange
Path Forward 2040 Long Range Transportation Plan Table 3-1. Road Capacity Needs by County County Map ID Facility Duval 16B Collins Road Realignment Duval 1036 Davis / 9B Parcel Duval 942 Duval Station Road Duval 37*** Eastport Road Duval 1021 Florida Boulevard Duval 43 Gator Bowl Boulevard Duval 943 Harlow Boulevard Duval 43B SR 228 Hart Expressway Ramps Duval 49 Hartley Road Duval 963 Harts Road Duval 401 I-10 Duval 406 I-10 Duval 432 I-10 Duval 454 I-10 Duval 403* I-10 Duval 119 I-295 Duval 407 I-295 Duval 408 I-295 Duval 409 I-295 Duval 410 I-295 Duval 411 I-295 Duval 431 I-295 Duval 964 I-295 Duval 1022 I-295 Duval 1023 I-295 Duval 121 I-295 Duval 68 I-95 Duval 413 I-95 Duval 414 I-95 Duval 419 I-95 Duval 433 I-95 Duval 434 I-95 Duval 962 I-95 Duval 418A I-95 Duval 944 Jones Road Duval 73 Kernan Boulevard Duval 945 Merrill Road Duval 946 Monument Road Duval 947 Monument Road Duval 1033 National Cemetery Road Duval 948 New Berlin Road Duval 949 New Berlin Road Duval 1034 New World Avenue Duval 1035 New World Avenue Duval 85 Norfolk Southern Railroad Overpass Duval 951 Old Kings Road Duval 1015 Old Middleburg Road Duval 90 Old St. Augustine Road Duval 1010 Old St. Augustine Road Duval 952 Pecan Park Road Duval 92 Pecan Park Road
From Pine Verde SR 9B US 17/SR 5 Main Street SR 105 Heckscher Drive Penman Road Liberty Street SR 134 103rd Street Liberty Street SR 13 San Jose Boulevard SR 104 Dunn Avenue SR 23 First Coast Expressway US 301 I-295 at I-295 Nassau/Duval County Line SR 9B I-95 North North of Trout River US 1 New Kings Road SR 134 103rd Street I-10 US 17 Roosevelt Boulevard US 17 at Roosevelt Boulevard I-95 South SR 202 J. T. Butler Boulevard SR 113 Southside Connector at SR 102 Airport Road SR 104 Dunn Avenue North of Fuller Warren Bridge at US 1/SR 15 Martin Luther King Jr. SR 202 J. T. Butler Boulevard I-295 SR 115 at Southside Boulevard Duval/St. Johns County Line US 90 Beaver Street SR 202 J. T. Butler Boulevard Hartsfield Road Tredinick Parkway I-295 Lannie Road Pulaski Road Yellow Bluff Road SR 23 First Coast Expressway SR 23 First Coast Expressway West 12th Street SR 111 Edgewood Avenue Argyle Forest Boulevard Bartram Park Boulevard at Greenland Road Braddock Boulevard I-95
To US 17 Roosevelt Boulevard SR 152 Baymeadows Road Starratt Road Pulaski Road SR 10 Atlantic Boulevard Hart / SR 115 Mathews Bridge Lane Avenue Hart / SR 115 Mathews Bridge Old St. Augustine Road I-295 I-295 SR 23 First Coast Expressway I-95 US 301 I-295 SR 105 Dames Point Bridge/Heckscher Drive I-95 North of Trout River I-10 US 1 South of New Kings Road SR 134 103rd Street SR 13 San Jose Boulevard SR 9B SR 202 J. T. Butler Boulevard SR 102 Airport Road SR 104 Dunn Avenue SR 10 Atlantic Boulevard SR 202 J. T. Butler Boulevard I-295 Pritchard Road Glen Kernan Parkway SR 113 Southside Connector I-295 Lee Road Arnold Road Yellow Bluff Road Cedar Point Road Chaffee Road Chaffee Road US 23 New Kings Road Plummer Road SR 134 103rd Street US 1/SR 5 Phillips Highway JIA North Access Road US 17 Main Street 3-10
Improvement Type New 4 Lane Road, Two Overpass and New Interchange Widen to 4 Lanes Widen to 4 Lanes Widen to 3 Lanes Widen to 3 Lanes Widen to 6 Lanes and Remove Ramps Widen to 3 Lanes Remove Ramps Widen to 3 Lanes Widen to 4 Lanes Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Modify Interchange Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Add 4 Express Lanes Modify Interchange Add 2 Express Lanes Add 2 Express Lanes Add 4 Express Lanes Modify Interchange Add 4 Express Lanes Add 4 Express Lanes Modify Interchange Add 4 Express Lanes Add 4 Express Lanes Modify Interchange Add 4 Express Lanes Intersection Improvements Widen to 6 Lanes Widen to 6 Lanes Widen to 6 Lanes Widen to 6 Lanes New 2 Lane Road Widen to 4 Lanes Widen to 4 Lanes New 2 Lane Road Widen to 4 Lanes New 3 Lane Road / Bridge Intersection Improvements Widen to 4 Lanes Widen to 6 Lanes and Overpass Intersection Improvements / Add 1 Lane Widen to 4 Lanes Widen to 4 Lanes
Path Forward 2040 Long Range Transportation Plan Table 3-1. Road Capacity Needs by County County Map ID Facility Duval 953*** Pulaski Road Duval 97 Pulaski Road / Starratt Road Duval 935 Ramona Boulevard Duval 98 Rampart / Firestone Road Duval 1038 Ranch Road Duval 934 Ricker Road Duval 99 Salisbury Road Extension Duval 101 Shindler Drive Duval 714 SR 10 Atlantic Boulevard Duval 715 SR 10 Atlantic Boulevard Duval 716 SR 10 Atlantic Boulevard Duval 152 SR 101 Mayport Road Duval 152B SR 101 Mayport Road Duval 421 SR 102 Airport Road Duval 940 SR 104 Dunn Avenue Duval 941 SR 104 Dunn Avenue Duval 100 SR 115 Arlington Expressway Duval 153 SR 115 Arlington Expressway * Duval 102 SR 115 Southside Boulevard Duval 103 SR 115 Southside Boulevard Duval 104 SR 115 Southside Boulevard Duval 960 SR 115 Southside Boulevard Duval 966 SR 115 Southside Boulevard Duval 967 SR 115 Southside Boulevard Duval 968 SR 115 Southside Boulevard Duval 937 SR 152 Baymeadows Road Duval 938 SR 152 Baymeadows Road Duval 9 SR 21 Blanding Boulevard Duval 957A SR 21 Blanding Boulevard Duval 957B SR 21 Blanding Boulevard Duval 957C SR 21 Blanding Boulevard Duval 47 SR 228 Hart Bridge Duval 86 SR 228 Normandy Boulevard Duval 87 SR 228 Normandy Boulevard Duval 701 SR 243 JIA North Access Road Duval 18 SR 9B Duval 1024 SR 9B Duval 151 SR A1A Duval 954 Starratt Road Duval 129 Touchton Road Duval 955 Trout River Boulevard Duval 6 US 90 Beaver Street Duval 82 US 1/SR 15 New Kings Road Duval 83 US 1/SR 15 New Kings Road Duval 950 US 1/SR 15 New Kings Road Duval 93 US 1 SR 5 Philips Highway Duval 94 US 1 SR 5 Philips Highway Duval 95 US 1 SR 5 Philips Highway Duval 96 US 1 SR 5 Philips Highway Duval 1017 US 17 Main Street Duval 959 US 17 Main Street
From Eastport Road I-295 Hammond Boulevard Collins Road Tradeport Road Morse Avenue SR 152 Baymeadows Boulevard Collins Road at Girvin Road at Hodges Boulevard at San Pablo Boulevard at SR 116 Wonderwood Drive SR 116 Wonderwood Drive Airport Entrance US 1/SR 15 New Kings Road Old Kings Road SR 109 University Boulevard at SR 109 University Boulevard US 1 SR 5 Philips Highway SR 202 J. T. Butler Boulevard US 90 Beach Boulevard Hogan Road at SR 202 J. T. Butler Boulevard at SR 152 Baymeadows Road at SR 10 Atlantic Boulevard I-95 US 1 /SR 5 Philips Highway I-295 at Collins Road at SR 134 103rd Street at Cedar Hills Boulevard SR 228 Hart Expressway - Downtown US 301 SR 23 First Coast Expressway SR 102 Airport Road US 1 SR 5 Philips Highway US 1 SR 5 Philips Highway SR 116 Wonderwood Drive Duval Station Road Belfort Road Old Kings Road SR 23 First Coast Expressway Soutel Drive I-295 SR 111 Edgewood Avenue Nocatee Parkway / Race Track Road SR 9B I-95 at the Avenues SR 202 J. T. Butler Boulevard New Berlin Road at Eastport Road
To I-295 Duval Station Road Cahoon Road South SR 134 103rd Street SR 102 North of Airport Road Old Middleburg Road Belfort Road SR 134 103rd Street
Mayport Main Gate I-95 I-295 US 23 New Kings Road SR 10 Atlantic Boulevard I-95 Ramps US 90 Beach Boulevard SR 10 Atlantic Boulevard Gate Parkway
SR 115 Southside Boulevard I-95 Wilson Boulevard
SR 10 Atlantic Boulevard Bell Road (Equestrian Park ) SR 111 Cassat Avenue Pecan Park Road I-295 I-295 Naval Station Mayport North Gate Yellow Bluff Road SR 115 Southside Boulevard US 23 New Kings Road Cahoon Road I-295 Old Kings Road Soutel Drive SR 9B I-295 SR 202 J. T. Butler Boulevard SR 126 Emerson Street Pecan Park Road 3-11
Improvement Type Widen to 4 Lanes Widen to 4 Lanes Widen to 5 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 3 Lanes New 3 Lane Road Widen to 3 Lanes Intersection Improvements Intersection Improvements Intersection Improvements Intersection Improvements Add 2 Northbound Lanes Widen to 6 Lanes Widen to 4 Lanes Intersection Improvements Widen to 6 Lanes* Modify Interchange Widen to 6 Lanes* Widen to 6 Lanes* Widen to 6 Lanes* Intersection Improvements Modify Interchange Underpass Intersection Improvements Widen to 6 Lanes Widen to 6 Lanes* Widen to 6 Lanes Intersection Improvements Intersection Improvements Intersection Improvements New 6 Lane Bridge Widen to 4 Lanes Widen to 6 Lanes Widen to 4 Lanes Widen to 6 Lanes Add 2 Auxiliary Lanes Widen to 4 Lanes* Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 6 Lanes Widen to 6 Lanes Intersection Improvements Widen to 6 Lanes Widen to 6 Lanes* Widen to 6 Lanes* Widen to 6 Lanes Widen to 4 Lanes New Interchange
Path Forward 2040 Long Range Transportation Plan Table 3-1. Road Capacity Needs by County County Map ID Facility Duval 123 US 301 SR 200 Duval 425 US 301 SR 201 Duval 7 US 90 Beaver Street Duval 79 US 90 SR 115 Mathews Bridge Duval 956 Yellow Bluff Road Duval/Clay 57 I-295 Duval/Nassau 88 Northern Outer Beltway Duval/Nassau 74 SR 115 Lem Turner Road Duval/Nassau 78 US 17 Main Street Nassau 988 Abaco Island Drive Extension Nassau 704 Amelia Island Parkway Nassau 980 Arrigo-Parliament Reconnection Nassau 1001 Barnwell-0' Neil Scott Connector Nassau 1002 Brady Point-Clements Connector Nassau 976 Cardinal Street North Extension Nassau 975 Cardinal Street South Extension Nassau 995 Christian Way Extension Nassau 996 Commodore Point Drive Extension Nassau 501 Concourse Loop Road Nassau 705 CR 105A Buccaneer Trail Nassau 993 Crosby Avenue Extension Nassau 991 Dove Road Extension {west} Nassau 974 east Dove Road Extension Nassau 36 East Nassau Connector Nassau 969 East Nassau Connector Nassau 986 Flora Parke-Wal-Mart Connector Nassau 985 Gene Lassere Boulevard Extension Nassau 977 Goodbread Road Reconstruction Nassau 1000 Hamilton Street Extension Nassau 989 Harper Chapel Extension Nassau 402* I-10 Nassau 710 Lofton Creek Crossing Nassau 982 Macaw Avenue Extension Nassau 990 Mentoria-William Burgess Connector Nassau 987 Pages Dairy Road East Extension Nassau 983 Pages Dairy Road South Extension Nassau 1003 SR 200 Overpass Nassau 998 SR 200 William Burgess Connector Nassau 992 SR 200 Yulee Backage Roads Nassau 427 SR 200 SR A1A Nassau 703 SR 200 SR A1A Nassau 979 SR 200A Pages Dairy Road Nassau 706 SR A1A Nassau 707 US 17 Nassau 709 US 17 Nassau 984 US 17 Pages Dairy Connector w/roundabout Nassau 994 US 17 Powerline Corridor Nassau 999 US 17 Yulee Backage Roads Nassau 708 US 301 SR 200 Nassau 981 Various SR 200 Intersections Modifications Nassau 997 Woodbridge Parkway Extension
From US 90 Duval/Clay County Line Cahoon Road US 1 Martin Luther King Jr. Jr. Parkway Starratt Road SR 13 San Jose Boulevard I-10 I-295 Pecan Park Road Abaco Island Drive South 14th Street Arrigo Boulevard Barnwell Road Brady Point Road Cardinal Avenue Spring Meadow Avenue Christian Way Commodore Point Drive License Road South Fletcher Avenue US 17 SR 5 Harper Chapel Road Extension Harper Chapel Road I-95 at I-95 Flora Parke Boulevard Gene Lassere Boulevard US 17 SR 5 Goodbread Circle Harper Chapel Road Baker/Nassau County Line Hendricks Road Cardinal Street William Burgess Boulevard Chester Road SR 200 SR A1A at US 17 SR 5 and Railroad Tracks William Burgess Boulevard Cardinal Street North Extension at US 17 Amelia Island Parkway at Felmor Road South Fletcher Avenue Nassau/Duval County Line SR 200 SR A1A US 17 SR 5 Vegas Boulevard US 17 SR 5 US 1 at S Kings Road
To Duval/Nassau County Line I-10 McDuff Avenue SR 109 University Boulevard New Berlin Road (north) W of US 17 Roosevelt Boulevard I-95 US 1 / Callahan S Kings Road SR 200 / SR A1A Zion Court CR 105A Buccaneer Trail Parliament Drive O'Neil Scott Road Clements Road SR 200 SR AIA Yulee Backage Roads William Burgess Boulevard Hampton Club Way Blackrock Road Amelia Concourse Canopy Drive Pinewood Drive Mentoria Road William Burgess Boulevard Chester Road
Woodbrigde Parkway
Clements Road
Wal-Mart Supercenter SR 200A Pages Dairy Road Hamilton Street Dove Road Extension Nassau/Duval County Line Avant Road US 17 SR 5 Harper Chapel Road Blackrock Road Sowell Road SR 200 SR A1A Old Yulee Road Sadler Road Amelia Island Parkway Harts Road Georgia State Line SR 200A Pages Dairy Road Radio Avenue North of Koen Lane
3-12
Improvement Type Widen to 4 Lanes Widen to 6 Lanes Widen to 4 Lanes New 6 Lane Bridge and Transit Widen to 4 Lanes Add 4 Express Lanes on Bridge Future Corridor Widen to 4 Lanes Widen to 4 Lanes New 2 Lane Road Widen to 4 Lanes* New 2 Lane Road New 2 Lane Road New 2 Lane Road New 2 Lane Road New 2 Lane Road New 2 Lane Road New 2 Lane Road New 2 Lane Road Turn Lane Improvements* New 2 Lane Road New 2 Lane Road New 2 Lane Road New 4 Lane Road New Interchange New 2 Lane Road New 2 Lane Road and Roundabout New 2 Lane Road New 2 Lane Road New 2 Lane Road Add 4 Express Lanes New 2 Lane Bridge New 2 Lane Road New 2 Lane Road New 2 Lane Road New 2 Lane Road Overpass New 2 Lane Road New 2 Lane Road Intersection Improvements Widen to 6 Lanes Roundabout Projects Turn Lane Improvements* Intersection Improvements Widen to 4 Lanes New 2 Lane Road and Roundabout New 2 Lane Road New 2 Lane Road Intersection Improvements Intersection Improvements New 2 Lane Road
Path Forward 2040 Long Range Transportation Plan Table 3-1. Road Capacity Needs by County County Map ID Facility Putnam 503 Buffalo Road Putnam 505 Comfort Road Putnam 451 SR 100 Putnam 965 SR 19 Connector Putnam 422 SR 20 Putnam 423 SR 20 Putnam 428 US 17 SR 15 Putnam 429 US 17 SR 15 Putnam 430 US 17 SR 15 Putnam 452 US 17 SR 15 St John's 801 Brinkhoff Road St John's 803 CR 16A St John's 802 CR 16A Extension St John's 805 CR 210 St John's 807 CR 210 St John's 849 CR 210 W St John's 809 CR 214 St John's 810 CR 2209 St John's 811 CR 2209 St John's 812 CR 2209 St John's 813 CR 2209 St John's 814 CR 2209 St John's 815 CR 2209 St John's 816 CR 2209 St John's 843 CR 2209 St John's 818 CR 305 St John's 850 CR 305 St John's 1025 Dixie Highway / Pellicer Lane St John's 819 Durbin Parkway St John's 844 Durbin Parkway St John's 821 Holmes Boulevard St John's 138 I-95 St John's 400 I-95 St John's 420 I-95 St John's 846 I-95 St John's 418B I-95 St John's 823 International Golf Parkway St John's 825 Mickler Road St John's 826 Palm Valley Road St John's 827 Race Track Road St John's 828 Race Track Road St John's 851 Race Track Road Connector St John's 110 SR 16 St John's 835 SR 16 St John's 836 SR 16 St John's 829 SR 16 Connector St John's 113 SR 207 St John's 830 SR 207 St John's 115 SR 312 St John's 832 SR 313 St John's 839 SR 313
From Buffalo Road west Port Road Clay/Putnam County Line SR 19 Putnam/Alachua County Line SW 56th Avenue West of Dunn Creek Bridge CR 309 Satsuma Putnam/Volusia County Line Pomona Park/Feagle Avenue SR 207 SR 16 Connector CR 16A I-95 Greenbriar Road Longleaf Pine Parkway Holmes Boulevard SR 23 First Coast Expressway SR 16 Connector International Golf Parkway CR 214 SR 207/CR 305 SR 16 CR 208 at CR 210 CR 204 SR 206 SR 207 9B Extension at US 1/SR 5 Dixie Highway CR 214 at US 1/SR 5 Ponce De Leon Boulevard and at SR 206 St. Johns /Flagler County Line SR 206 at CR 210 International Golf Parkway I-95 Palm Valley Road Intracoastal Waterway St. Johns Parkway Bartram Park Boulevard Durbin Parkway / 9B Extension I-95 South Francis Road CR 208 Outlet Mall SR 16/CR 16A I-95 Holmes Boulevard US 1/SR 5 Dixie Highway SR 16 at US 1/SR 5 Dixie Highway 3-13
To Buffalo east US 17 US 17 SR 5 Putnam County Boulevard SW 56th Avenue CR 315 Interlachen Horse Landing Road West of Dunn Creek Bridge Pomona Park/Feagle Avenue CR 309 Satsuma Wildwood Drive SR 13 Leo Maguire Parkway near US 1 Cimarrone Road Greenbriar Road US 1 CR 210 SR 23 First Coast Expressway SR 16 Connector CR 208 CR 214 International Golf Parkway SR 16 SR 206 SR 207 CR 214 West of King Street Nocatee Parkway Four Mile Road SR 206 International Golf Parkway St. Johns /Duval County Line Turn/Bend SR A1A Mickler Road Bartram Park Boulevard Bartram Springs Race Track Road SR 313 International Golf Parkway South Francis Road CR 2209 South Holmes Boulevard SR 312 SR A1A US 1 Dixie Highway
Improvement Type New 2 Lane Bridge Widen to 4 Lanes Widen to 4 Lanes New 4 lane road / bridge Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes New 2 Lane Road Widen to 4 Lanes New 2 Lane Road Widen to 6 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 3 Lanes* New 6 Lane Road New 6 Lane Road New 6 Lane Road New 4 Lane Road New 4 Lane Road New 4 Lane Road New 4 Lane Road New Interchange New 2 Lane Road Widen to 4 Lanes Reconstruct 2 Lanes and Widen to add Sidewalks and Bike Lanes New 4 Lane Road Modify Interchange Widen to 6 Lanes Modify Interchange Add 4 Express Lanes Add 4 Express Lanes Modify Interchange Add 4 Express Lanes Widen to 4 Lanes* Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes New 2 Lane Road Widen to 6 Lanes Widen to 4 Lanes Widen to 4 Lanes New 4 Lane Road Widen to 6 Lanes Widen to 6 Lanes Widen to 6 Lanes New 4 Lane Road New Interchange
Path Forward 2040 Long Range Transportation Plan Table 3-1. Road Capacity Needs by County County Map ID Facility St John's 833 SR 9B Extension St John's 842 SR 9B Extension St John's 128 SR A1A St John's 1008 SR A1A St John's 800 SR A1A St John's 1031 SR A1A Anastasia Boulevard St John's 848 St. Johns Parkway St John's 845 US 1 SR 5 St John's 130 US 1/SR 5 Dixie Highway St John's 131 US 1/SR 5 Dixie Highway St John's 132 US 1/SR 5 Dixie Highway St John's 1029 US 1B King Street St John's 1030 US 1B San Marco Avenue St John's 834 Veterans Parkway Private Projects Baker 500 Northern Cross Town Corridor Putnam 502 Connector Road
From St. Johns Parkway at Durbin Parkway Solana Road at Red Cox/Coquina Road Mickler Road Casanova Road CR 2209 at CR 210 SR 206 SR 313 International Golf Parkway US 1 Ponce de Leon Boulevard Bridge of Lions Greenbriar Road
To Race Track Road
Lewis Point Road International Golf Parkway Race Track Road Avenida Menendez SR 16 Longleaf Pine Parkway
Improvement Type Widen to 6 Lanes New Interchange Widen to 6 Lanes* Intersection Improvements Widen to 4 Lanes context sensitive solutions Widen to 6 Lanes Modify Interchange Widen to 6 Lanes Widen to 6 Lanes Widen to 6 Lanes Context sensitive solutions Context sensitive solutions New 4 Lane Road
CR 125 US 17
SR 121 Distribution Center
New 2 Lane Road New 2 Lane Road
SR 202 J. T. Butler Boulevard Palm Valley Road Bridge of Lions 9B Extension
A, B Projects must be done together to provide logical termini. *Project identified as potential context sensitive solutions improvements. **Projects must be done together to provide logical termini.
3-14
Path Forward 2040 Long Range Transportation Plan
COST FEASIBLE PLAN OVERVIEW P ROVIDING A PLAN THAT HAS A REASONABLE EXPECTATION OF THE FUNDING AVAILABLE THROUGH THE PLAN HORIZON WILL ALLOW AGENCIES TO PROGRAM AND ADVANCE PROJECTS CONSISTENT WITH THE REGION ’ S NEEDS AND PRIORITIES .
OVERVIEW
Economic competitiveness
The Cost Feasible Plan was prepared for the federal planning boundaries only – Clay, Duval, Nassau and St. Johns Counties and the projects are summarized in sections that follow by the funding programs previously identified in Part Two. A prioritization system using the performance measures established with the goals and objectives was used to rank projects priorities for inclusion in the Cost Feasible Plan. The projects in the plan are summarized by funding source.
Access to jobs within ¼ mile Benefit to cost ratio Safety crash cost reduction benefits Travel time saving benefits Emissions reduction benefits
Livable and sustainable communities
PRIORITIZATION PROCESS
The candidate projects for funding in the Cost Feasible Plan were identified using a prioritization system to rank projects according to the following criteria.
3-15
Population within ¼ mile that would benefit from a bus transit route or ½ mile for commuter rail Transit ridership per day Inclusion of bicycle and pedestrian amenities Number of environmental features identified that during the Efficient Transportation Decision Making Process planning screen Project identified on an evacuation route established by the Northeast Florida Regional Council
Path Forward 2040 Long Range Transportation Plan The prioritization scores for each project are summarized in Table 3-2. A summary of the performance measures and ranked scores for each project is provided in Appendix H.
Safety
Project identified as a priority safety corridor in the Strategic Safety Plan
After the initial ranking of the projects, strategic priority decisions were used to determine if the project should be funded. For example, two projects that received a high rank were identified as having potential environmental fatal flaws and were removed.
Mobility
Person-miles traveled Person-delay Demand-to-capacity ratio
These criteria were drawn from the performance measures adopted in the goals and objectives. Not all measures were used in the prioritization system since methodologies to forecast the measure are not available within the context of the travel demand forecasting model (such as reliability). Other measures are more qualitative and were considered in a strategic way (such as compatibility with adjacent land uses).
SR 313 from US 1 to International Golf Parkway Wells Road Extension from SR 21 Blanding Boulevard to Argyle Forest Boulevard
Following the prioritization of the projects, the projects were reviewed strategically to evaluate:
Because there are many different units involved in measuring these prioritization criteria, each of the performance measure data was normalized using the statistical measure of a Z-score. The Z-score calculates the difference a value is from the mean of a normal distribution relative to the standard deviation of the data. This provides a ranking of the project in scale that can be more easily compared to other measures. For example, a project may provide access to 10,000 jobs becomes a score of 1.1 (or 10 percent of one standard deviation greater than the mean). Converting all the measures to the Z-score allows each measure of effectiveness to be compared on a relative basis. Measures such as the benefit to cost ratio or demand to capacity ratio which are based on a ratio were not normalized.
System connectivity and linkages Logical termini Size and scale of the project Geographic equity
COST FEASIBLE PLAN
Following the maps, sections are provided that summarize the road capacity projects by funding source:
Strategic Intermodal System Funded Projects Other State and Federally Funded Projects Toll Funded Projects Local and Privately Funded Project
In the following tables, the phases of each project are identified as
Since there are a different number of measures within each goal category, once the measures were normalized, the total score within each of the goals was summarized and ranked. For example, the score for access to jobs and the benefit to cost ratio for economic competitiveness were added and then the score within that goal category was ranked. The ranks were then summed for each goal category and then ranked based on the low score being the best.
3-16
Preliminary Engineering (PE) Right of Way (ROW) Environmental (ENV) Capital Improvements (CAP) Construction (CST) Operations (OPS)
Path Forward 2040 Long Range Transportation Plan Table 3-2. Road Capacity Needs in Ranked Order Map State or County Id Local Road
Name
From
To
Improvement Type
Economic Score 18.90
Livability Score 0.18
Mobility Score 0.44
Safety Score 0.00
Total Score 19.52
Rank Total Score 1
6.68
1.01
2.27
0.00
9.96
2
3.79
0.17
5.03
0.00
8.99
3
6.96
0.48
1.31
0.00
8.76
4
6.24
0.35
1.89
0.00
8.48
5
6.31
0.40
1.16
0.00
7.87
6
3.37
0.41
3.95
0.00
7.73
7
2.36
0.43
4.77
0.00
7.57
8
5.55
0.38
0.31
1.00
7.24
9
2.15
0.44
4.09
0.00
6.68
10
4.22
1.25
1.14
0.00
6.61
11
4.52
0.85
0.98
0.00
6.35
12
5.07
0.46
0.71
0.00
6.24
13
910
LR
Clay
Wells Road
Aquarius Concourse
SR 21 Blanding Boulevard
Reconstruct and New 2 Lane Road
807
LR
St John's
CR 210
Cimarrone Road
Greenbriar Road
Widen to 4 Lanes
964
SR
Duval
I-295
at US 17 Roosevelt Boulevard
835
SR
St John's
SR 16
International Golf Parkway
967
SR
Duval
SR 115 Southside Boulevard
at SR 152 Baymeadows Road
Underpass
427
SR
Nassau
SR A1A SR 200
at US 17
Intersection Improvements
415
SR
Duval
I-95
at SR 126 Emerson Street
Modify Interchange
966
SR
Duval
SR 115 Southside Boulevard
at SR 202 J. T. Butler Boulevard
Modify Interchange
706
SR
Nassau
SR A1A
South Fletcher Avenue
419
SR
Duval
I-95
at US 1 SR 5 Martin Luther King Jr. Parkway
103
SR
Duval
SR 115 Southside Boulevard
SR 202 J. T. Butler Boulevard
US 90 Beach Boulevard
Widen to 6 Lanes
1029
SR
St John's
US 1 B King Street
Palmer Street
Granada Street
Context Sensitive Solutions
809
LR
St John's
CR 214
US 1
Holmes Boulevard
Widen to 3 Lanes
823
LR
St John's
International Golf Parkway
I-95
Turn/Bend
Widen to 4 Lanes
5.58
0.34
0.31
0.00
6.23
14
106
SR
Clay
SR 16
CR 218
SR 15A Oakridge Avenue
Widen to 4 Lanes
3.18
1.02
1.88
0.00
6.07
15
715
SR
Duval
SR 10 Atlantic Boulevard
at Hodges Boulevard
Intersection Improvements
3.85
0.33
1.68
0.00
5.86
16
705
LR
Nassau
CR 105A Buccaneer Trail
South Fletcher Avenue
Turn Lane Improvements
4.73
0.49
0.25
0.00
5.47
17
16
LR
Duval
Collins Road
at US 17 Roosevelt Boulevard
New Interchange
3.65
0.41
0.35
1.00
5.40
18
714
SR
Duval
SR 10 Atlantic Boulevard
at Girvin Road
Intersection Improvements
3.34
0.36
1.70
0.00
5.40
19
101
LR
Duval
Shindler Drive
Collins Road
SR 134 103rd Street
Widen to 3 Lanes
3.60
0.75
1.04
0.00
5.40
20
9
SR
Duval
SR 21 Blanding Boulevard
I-295
SR 208 Wilson Boulevard
Widen to 6 Lanes
2.09
1.13
1.93
0.00
5.15
21
454
SR
Duval
I-10
at I-295
0.40
0.49
2.97
1.00
4.87
22
95
SR
Duval
SR 5 US 1 Philips Highway
I-95 at the Avenues
SR 202 J. T. Butler Boulevard
Widen to 6 Lanes
2.94
0.99
0.90
0.00
4.83
23
418B
SR
Duval
I-95
International Golf Parkway
St. Johns /Duval County Line
Add 4 Express Lanes
1.10
0.02
3.70
0.00
4.83
24
416
SR
Duval
I-95
at SR 109 University Boulevard and Bowden Road
Modify Interchange
0.79
0.54
3.45
0.00
4.78
25
414
SR
Duval
I-95
North of I-95 Fuller Warren Bridge
Add 4 Express Lanes
1.86
-0.06
1.77
1.00
4.56
26
957A
SR
Duval
SR 21 Blanding Boulevard
at Collins Road
3.25
0.60
0.67
0.00
4.52
27
Modify Interchange South Francis Road
Amelia Island Parkway
Widen to 4 Lanes
Turn Lane Improvements Modify Interchange
Canopy Drive
Modify Interchange
SR 104 Dunn Avenue
Intersection Improvements
3-17
Path Forward 2040 Long Range Transportation Plan Table 3-2. Road Capacity Needs in Ranked Order Map State or County Id Local Road
Name
From
To
Improvement Type
Economic Score 3.18
Livability Score 0.64
Mobility Score 0.59
Safety Score 0.00
Total Score 4.41
Rank Total Score 28
3.65
0.41
0.35
0.00
4.41
29
1030
SR
St John's
US 1 B San Marco Avenue
West Castillo Drive
US 1 Ponce de Leon Boulevard
Context Sensitive Solutions
16B
LR
Duval
Collins Road Realignment
Pine Verde
US 17 Roosevelt Boulevard
New 4 Lane Road, Two Overpass and New Interchange
930
LR
Duval
Collins Road
Shindler Drive
Rampart Road
Widen to 4 Lanes
2.68
0.66
1.06
0.00
4.40
30
803
LR
St John's
CR 16A
SR 16 Connector
SR 13
Widen to 4 Lanes
2.15
1.27
0.97
0.00
4.39
31
908
SR
Clay
SR 16
US 17
Shands Bridge
Widen to 4 Lanes
2.34
0.50
1.45
0.00
4.29
32
68
SR
Duval
I-95
at SR 102 Airport Road
Modify Interchange
0.67
0.37
2.16
1.00
4.20
33
94
SR
Duval
SR 5 US 1 Philips Highway
SR 9B
I-295
Widen to 6 Lanes
2.65
0.65
0.72
0.00
4.03
34
433
SR
Duval
I-95
SR 202 J. T. Butler Boulevard
SR 10 Atlantic Boulevard
Add 4 Express Lanes
1.70
0.16
2.06
0.00
3.92
35
113
SR
St John's
SR 207
I-95
South Holmes Boulevard
Widen to 6 Lanes
1.99
0.51
1.41
0.00
3.91
36
1027
LR
Clay
CR 218
Cosmos Avenue
Pine Tree Lane
Widen to 4 Lanes
2.85
0.31
0.74
0.00
3.91
37
418A
SR
Duval
I-95
Duval/St. Johns County Line
I-295
Add 4 Express Lanes
1.11
0.02
2.77
0.00
3.90
38
90
LR
Duval
Old St. Augustine Road
Bartram Park Boulevard
US 1 SR 5 Philips Highway
Widen to 6 Lanes and Overpass
2.85
0.48
0.54
0.00
3.86
39
828
LR
St John's
Racetrack Road
Bartram Park Boulevard
Bartram Springs
Widen to 4 Lanes
2.49
0.31
1.05
0.00
3.85
40
936
LR
Duval
Argyle Forest Boulevard
Old Middleburg Road
SR 23 First Coast Expressway
Widen to 6 Lanes
2.30
0.40
1.11
0.00
3.81
41
941
SR
Duval
SR 104 Dunn Avenue
Old Kings Road
US 23 New Kings Road
Intersection Improvements
2.75
0.59
0.46
0.00
3.80
42
1008
SR
St John's
SR A1A
at Red Cox/Coquina Road
Intersection Improvements
2.67
0.61
0.43
0.00
3.71
43
957C
SR
Duval
SR 21 Blanding Boulevard
at Cedar Hills Boulevard
Intersection Improvements
2.63
0.56
0.51
0.00
3.70
44
1015
LR
Duval
Old Middleburg Road
SR 134 103rd Street
1.79
0.50
1.36
0.00
3.64
45
957B
SR
Duval
SR 21 Blanding Boulevard
at SR 134 103rd Street
2.56
0.57
0.50
0.00
3.63
46
1028
LR
Clay
CR 218
Pine Tree Lane
SR 21 Blanding Boulevard
Widen to 4 Lanes
2.93
0.25
0.43
0.00
3.61
47
951
LR
Duval
Old Kings Road
SR 11 Edgewood Avenue
Plummer Road
Intersection Improvements
0.94
2.54
0.07
0.00
3.54
48
34
LR
Clay
SR 220 SR 220 Doctors Inlet Road
College Drive
US 17
Widen to 6 Lanes
1.51
0.75
1.26
0.00
3.52
49
1026
LR
Clay
CR 218
US 301
Cosmos Avenue
Widen to 4 Lanes
1.31
0.50
1.66
0.00
3.47
50
432
SR
Duval
I-10
I-295
I-95
Add 4 Express Lanes
1.49
-0.06
1.85
0.00
3.29
51
115
SR
St John's
SR 312
US 1 SR 5 Dixie Highway
SR A1A
Widen to 6 Lanes
1.81
0.49
0.95
0.00
3.24
52
1007
SR
St John's
US 1 Ponce De Leon Boulevard
at San Carlos Avenue / US 1 B San Marco Avenue / May Street
2.24
0.64
0.32
0.00
3.20
53
805
LR
St John's
CR 210
I-95
1.66
0.78
0.74
0.00
3.19
54
Argyle Forest Boulevard
Widen to 4 Lanes Intersection Improvements
Intersection Improvements Turn/Bend
Widen to 6 Lanes
3-18
Path Forward 2040 Long Range Transportation Plan Table 3-2. Road Capacity Needs in Ranked Order Map State or County Id Local Road
Name
From
To
Improvement Type
Economic Score 0.89
Livability Score 0.14
Mobility Score 2.13
Safety Score 0.00
Total Score 3.16
Rank Total Score 55
2.04
0.30
0.81
0.00
3.15
56
2.62
0.21
0.32
0.00
3.15
57
2.12
0.73
0.29
0.00
3.14
58
0.92
0.51
1.65
0.00
3.08
59
1.04
0.37
1.60
0.00
3.00
60
1.16
0.86
0.99
0.00
3.00
61
1.43
0.69
0.87
0.00
2.99
62
0.72
0.35
0.91
1.00
2.97
63
1.64
0.64
0.60
0.00
2.87
64
1.02
0.54
1.29
0.00
2.85
65
0.75
0.62
0.41
1.00
2.78
66
1.32
0.42
1.03
0.00
2.77
67
434
SR
Duval
I-95
I-295
SR 202 J. T. Butler Boulevard
Add 4 Express Lanes
73
LR
Duval
Kernan Boulevard
SR 202 J. T. Butler Boulevard
Glen Kernan Parkway
Widen to 6 Lanes
943
LR
Duval
Harlow Boulevard
SR 134 103rd Street
Lane Avenue
Widen to 3 Lanes
151
SR
Duval
SR A1A
SR 116 Wonderwood Drive
Naval Station Mayport Gate
Widen to 4 Lanes
121
SR
Duval
I-295
SR 202 J. T. Butler Boulevard
SR 113 Southside Connector
Add 4 Express Lanes
968
SR
Duval
SR 115 Southside Boulevard
at SR 10 Atlantic Boulevard
114
SR
Clay
SR 21 Blanding Boulevard
SR 16
CR 215 Blanding Boulevard
Widen to 4 Lanes
33
LR
Clay
SR 220 Doctors Inlet Road
SR 21 Blanding Boulevard
Knight Boxx Road
Widen to 4 Lanes
830
SR
St John's
SR 207
Holmes Boulevard
SR 312
Widen to 6 Lanes
981
SR
Nassau
Various SR 200 Intersections Modifications
716
SR
Duval
SR 10 Atlantic Boulevard
at San Pablo Boulevard
945
LR
Duval
Merrill Road
Hartsfield Road
SR 113 Southside Connector
Widen to 6 Lanes
133
SR
Clay
US 17
Town Center Boulevard
CR 315
Widen to 6 Lanes
130
SR
St John's
US 1 SR 5 Dixie Highway
SR 206
Lewis Point Road
Widen to 6 Lanes
1.03
0.28
0.38
1.00
2.69
68
946
LR
Duval
Monument Road
I-295
Tredinick Parkway
Widen to 6 Lanes
0.73
0.43
0.45
1.00
2.60
69
431
SR
Duval
I-295
US 17 Roosevelt Boulevard
SR 134 103rd Street
Add 4 Express Lanes
0.61
0.37
1.62
0.00
2.60
70
153
SR
Duval
SR 115 Arlington Expressway
at SR 109 University Boulevard
Modify Interchange
0.24
0.49
1.87
0.00
2.60
71
845
LR
St John's
CR 210
at US 1 SR 5 Dixie Highway
Modify Interchange
0.46
0.39
1.74
0.00
2.59
72
93
SR
Duval
US 1 SR 5 Philips Highway
Nocatee Parkway / Racetrack Road
SR 9B
Widen to 6 Lanes
1.11
0.60
0.87
0.00
2.58
73
102
SR
Duval
SR 115 Southside Boulevard
US 1 SR 5 Philips Highway
I-95 Ramps
Widen to 6 Lanes
1.61
0.47
0.50
0.00
2.58
74
98
LR
Duval
Rampart / Firestone Road
Collins Road
SR 134 103rd Street
Widen to 4 Lanes
1.37
0.49
0.71
0.00
2.57
75
934
LR
Duval
Ricker Road
Morse Avenue
Old Middleburg Road
Widen to 3 Lanes
1.31
0.78
0.48
0.00
2.57
76
905
LR
Clay
CR 209 Russell Road
CR 739 Henley Road
US 17
Widen to 4 Lanes
0.38
0.61
0.56
1.00
2.56
77
15
LR
Duval
Collins Road
SR 21 Blanding Boulevard
Pine Verde
Widen to 4 Lanes
0.61
0.31
0.64
1.00
2.56
78
129
LR
Duval
Touchton Road
Belfort Road
SR 115 Southside Boulevard
Widen to 4 Lanes
0.74
0.39
0.43
1.00
2.55
79
18
SR
Duval
SR 9B
US 1 SR 5 Philips Highway
I-295
Widen to 6 Lanes
1.11
0.18
1.23
0.00
2.52
80
100
SR
Duval
SR 115 Arlington Expressway
SR 109 University Boulevard
SR 10 Atlantic Boulevard
Widen to 6 Lanes
1.42
0.49
0.59
0.00
2.51
81
846
LR
St John's
CR 210
at I-95
Modify Interchange
0.46
0.42
1.59
0.00
2.47
82
Intersection Improvements
Intersection Improvements Intersection Improvements
3-19
Path Forward 2040 Long Range Transportation Plan Table 3-2. Road Capacity Needs in Ranked Order Map State or County Id Local Road
Name
From
To
Improvement Type
Economic Score 1.05
Livability Score 0.72
Mobility Score 0.68
Safety Score 0.00
Total Score 2.46
Rank Total Score 83
1.89
0.36
0.17
0.00
2.42
84
87
SR
Duval
SR 228 Normandy Boulevard
SR 23 First Coast Expressway
SR 111 Cassat Avenue
Widen to 6 Lanes
43
LR
Duval
Gator Bowl Boulevard
Liberty Street
Hart / SR 115 Mathews Bridge
Widen to 6 Lanes and Remove Ramps
960
SR
Duval
SR 115 Southside Boulevard
Hogan Road
Gate Parkway
Intersection Improvements
0.85
0.64
0.92
0.00
2.41
85
1009
LR
Duval
San Pablo Road
US 90 Beach Boulevard
SR 10 Atlantic Boulevard
Widen to 3 Lanes
0.77
1.11
0.52
0.00
2.40
86
420
SR
St John's
I-95
SR 206
International Golf Parkway
Add 4 Express Lanes
0.66
-0.06
1.79
0.00
2.39
87
132
SR
St John's
US 1 SR 5 Dixie Highway
International Golf Parkway
Racetrack Road
Widen to 6 Lanes
1.31
0.03
1.04
0.00
2.38
88
57
SR
Duval/Clay
I-295
SR 13 San Jose Boulevard
West of US 17 Roosevelt Boulevard
Add 4 Express Lanes on Bridge
0.40
0.27
1.68
0.00
2.36
89
937
SR
Duval
SR 152 Baymeadows Road
I-95
SR 115 Southside Boulevard
Widen to 6 Lanes
0.81
0.74
0.79
0.00
2.34
90
104
SR
Duval
SR 115 Southside Boulevard
US 90 Beach Boulevard
SR 10 Atlantic Boulevard
Widen to 6 Lanes
0.74
0.74
0.85
0.00
2.34
91
43B
LR
Duval
SR 228 Hart Expressway Ramps
Liberty Street
Hart / SR 115 Mathews Bridge
Remove Ramps
1.80
0.36
0.17
0.00
2.33
92
99
LR
Duval
Salisbury Road Extension
Belfort Road
SR 115 Baymeadows Road
New 3 Lane Road
0.69
0.34
0.27
1.00
2.30
93
405
SR
Baker
I-10
West of SR 121
Baker/Nassau County Line
Add 4 Express Lanes
0.38
0.18
0.73
1.00
2.29
94
413
SR
Duval
I-95
SR 104 Dunn Avenue
SR 102 Airport Road
Add 4 Express Lanes
0.91
0.35
0.99
0.00
2.25
95
96
SR
Duval
US 1 SR 5 Philips Highway
SR 202 J. T. Butler Boulevard
SR 126 Emerson Street
Widen to 6 Lanes
1.34
0.52
0.36
0.00
2.22
96
26
LR
Clay
CR 218 Extension
SR 23 First Coast Expressway
CR 315
New 4 Lane Road
0.32
1.65
0.25
0.00
2.22
97
408
SR
Duval
I-295
North of Trout River
I-95
Add 4 Express Lanes
0.16
0.37
0.68
1.00
2.21
98
901
LR
Clay
Knight Boxx Road
SR 220 Doctors Inlet Road
SR 21 Blanding Boulevard
Widen to 6 Lanes
0.34
0.31
0.48
1.00
2.13
99
406
SR
Duval
I-10
US 301
SR 23 First Coast Expressway
Add 4 Express Lanes
0.05
0.29
0.78
1.00
2.11
100
410
SR
Duval
I-295
SR 134 103rd Street
I-10
Add 4 Express Lanes
0.36
0.13
1.62
0.00
2.11
101
848
LR
St John's
St. Johns Parkway
CR 2209
9B Extension
Widen to 6 Lanes
0.66
0.37
1.08
0.00
2.10
102
92
LR
Duval
Pecan Park Road
I-95
US 17 Main Street
Widen to 4 Lanes
0.46
0.24
0.37
1.00
2.07
103
800
SR
St John's
SR A1A
Mickler Road
Palm Valley Road
Widen to 4 Lanes
0.97
0.58
0.51
0.00
2.06
104
79
SR
Duval
SR 115 Mathews Bridge
US 1Martin Luther King Jr. Parkway
SR 109 University Boulevard
New 6 Lane Bridge (+Transit)
0.40
0.73
0.92
0.00
2.05
105
47
SR
Duval
SR 228 Hart Expressway Bridge
SR 228 Hart Expressway
SR 10 Atlantic Boulevard
New 6 Lane Bridge
0.14
0.38
0.52
1.00
2.04
106
900
LR
Clay
Baxley Road
SR 220 Doctors Inlet Road
SR 21 Blanding Boulevard
Widen to 4 Lanes
1.29
0.36
0.37
0.00
2.02
107
128
SR
St John's
SR A1A
Solana Road
SR 202 J. T. Butler Boulevard
Widen to 6 Lanes
0.18
1.34
0.49
0.00
2.02
108
411
SR
Duval
I-295
I-10
South of New Kings Road (US 1)
Add 4 Express Lanes
0.74
0.04
1.15
0.00
1.93
109
3-20
Path Forward 2040 Long Range Transportation Plan Table 3-2. Road Capacity Needs in Ranked Order Map State or County Name Id Local Road SR 200 William Burgess 998 SR Nassau Connector
From
To
Economic Score 0.64
Livability Score 0.29
Mobility Score 0.00
Safety Score 1.00
Total Score 1.92
Rank Total Score 110
0.87
0.35
0.63
0.00
1.85
111
Roundabout Projects
0.45
0.18
0.21
1.00
1.84
112
Improvement Type
William Burgess Boulevard
SR A1A SR 200
New 2 Lane Road
SR 9B
Add 2 Express Lanes
1023
SR
Duval
I-295
SR 202 J. T. Butler Boulevard
979
SR
Nassau
SR 200A Pages Dairy Road
at Felmor Road
947
LR
Duval
Monument Road
Lee Road
I-295
Widen to 6 Lanes
0.67
0.70
0.45
0.00
1.82
113
992
SR
Nassau
SR 200 Yulee Backage Roads
Cardinal Street North Extension
Old Yulee Road
New 2 Lane Road
0.63
0.18
0.00
1.00
1.81
114
938
SR
Duval
SR 152 Baymeadows Road
Philips Highway (US 1 /SR 5)
I-95
Widen to 6 Lanes
0.89
0.51
0.40
0.00
1.80
115
836
SR
St John's
SR 16
South Francis Road
CR 208 Outlet Mall
Widen to 4 Lanes
0.73
0.37
0.70
0.00
1.80
116
424
SR
Clay
US 301 SR 200
Clay/Bradford County Line
Duval/Clay County Line
Widen to 6 Lanes
0.08
0.38
0.33
1.00
1.79
117
25
LR
Clay
CR 218 Extension
Henley Road (CR 739)
SR 23 First Coast Expressway
New 4 Lane Road
0.00
0.51
0.26
1.00
1.78
118
7
SR
Duval
US 90 Beaver Street
Cahoon Road
McDuff Avenue
Widen to 4 Lanes
0.93
0.53
0.30
0.00
1.76
119
24
LR
Clay
CR 218
SR 21 Blanding Boulevard
Henley Road (CR 739)
Widen to 4 Lanes
0.40
0.74
0.61
0.00
1.75
120
849
LR
St John's
CR 210 West
Greenbriar Road
Longleaf Pine Parkway
Widen to 4 Lanes
0.78
0.49
0.45
0.00
1.73
121
138
SR
St John's
I-95
at Ponce De Leon Boulevard (US 1/SR 5) and at SR 206
Modify Interchange
0.49
0.55
0.69
0.00
1.73
122
1022
SR
Duval
I-295
I-95
Buckman Bridge
Add 2 Express Lanes
0.46
0.73
0.52
0.00
1.70
123
1024
SR
Duval
SR 9B
Phillips Highway (US 1)
I-295
Add 2 Auxiliary Lanes
0.53
0.18
0.99
0.00
1.70
124
831
SR
St John's
SR 313
SR 207
SR 16
New 6 Lane Road
0.03
0.88
0.77
0.00
1.67
125
1031
SR
St John's
SR A1A Anastasia Boulevard
Casanova Road
Bridge of Lions
Context Sensitive Solutions
0.76
0.46
0.43
0.00
1.65
126
950
SR
Duval
US 1 SR 15 New Kings Road
Soutel Drive
SR 11 Edgewood Avenue
Intersection Improvements
0.94
0.36
0.32
0.00
1.62
127
709
SR
Nassau
US 17
SR A1A SR 200
Georgia State Line
Widen to 4 Lanes
0.99
0.45
0.18
0.00
1.61
128
401
SR
Duval
I-10
SR 23 First Coast Expressway
I-295
Add 4 Express Lanes
0.30
0.02
1.30
0.00
1.61
129
953
LR
Duval
Pulaski Road
Eastport Road
I-295
Widen to 4 Lanes
1.33
0.18
0.09
0.00
1.60
130
451
SR
Putnam
SR 100
Clay/Putnam County Line
US 17 SR 5
Widen to 4 Lanes
0.91
0.12
0.54
0.00
1.56
131
911
LR
Clay
Long Bay Road Extension North
Old Jennings Road
Long Bay Road
New 2 Lane Road
0.04
0.17
0.35
1.00
1.56
132
74
SR
Duval/Nassau
SR 115 Lem Turner Road
I-295
US 1 Kings Road Callahan
Widen to 4 Lanes
0.26
0.79
0.48
0.00
1.53
133
453
SR
Baker
I-10
Baker/Columbia County Line
CR 125
Add 4 Express Lanes
0.01
0.12
0.39
1.00
1.52
134
703
SR
Nassau
SR A1A SR 200
Amelia Island Parkway
Sadler Road
Widen to 6 Lanes
0.75
0.47
0.30
0.00
1.52
135
909
LR
Clay
CR 218
SR 16
CR 739 Henley Road
Widen to 4 Lanes
0.39
0.58
0.54
0.00
1.51
136
3-21
Path Forward 2040 Long Range Transportation Plan Table 3-2. Road Capacity Needs in Ranked Order Map State or County Id Local Road
Name
From
To
Improvement Type
Economic Score 0.56
Livability Score 0.35
Mobility Score 0.59
Safety Score 0.00
Total Score 1.50
Rank Total Score 137
0.59
0.42
0.49
0.00
1.50
138
0.52
0.33
0.63
0.00
1.48
139
0.43
0.45
0.59
0.00
1.47
140
0.00
0.18
0.29
1.00
1.47
141
0.61
0.31
0.52
0.00
1.44
142
0.00
0.17
0.25
1.00
1.42
143
0.50
0.31
0.60
0.00
1.41
144
110
SR
St John's
SR 16
I-95
SR 313
Widen to 6 Lanes
826
LR
St John's
Palm Valley Road
Intracoastal Waterway
Mickler Road
Widen to 4 Lanes
82
SR
Duval
US 1 SR 15 New Kings Road
SR 11 Edgewood Avenue
I-295
Widen to 6 Lanes
78
SR
Duval/Nassau
US 17 Main Street
Pecan Park Road
SR 200 / SR A1A
Widen to 4 Lanes
811
LR
St John's
CR 2209
SR 23 First Coast Expressway
SR 16 Connector
New 6 Lane Road
32
LR
Clay
CR 315
CR 315B
US 17
Widen to 4 Lanes
819
LR
St John's
Durbin Parkway
9B Extension
Nocatee Parkway
New 4 Lane Road
902
LR
Clay
College Drive
SR 220 Doctors Inlet Road
SR 21 Blanding Boulevard
Widen to 6 Lanes
904
LR
Clay
CR 739B Sandridge Road
CR 739 Henley Road
CR 209 Russell Road
Widen to 4 Lanes
0.44
0.63
0.32
0.00
1.39
145
704
LR
Nassau
Amelia Island Parkway
South 14th Street
CR 105A Buccaneer Trail
Widen to 4 Lanes
0.56
0.45
0.36
0.00
1.37
146
49
LR
Duval
Hartley Road
SR 13 San Jose Boulevard
Old St. Augustine Road
Widen to 3 Lanes
0.75
0.34
0.25
0.00
1.35
147
969
LR
Nassau
East Nassau Connector
at I-95
New Interchange
0.15
0.38
0.81
0.00
1.34
148
912
LR
Clay
Tynes Road
Pipit Place
Oakleaf Plantation Parkway
New 2 Lane Road
0.00
0.17
0.17
1.00
1.34
149
407
SR
Duval
I-295
I-95 North
Dames Point Bridge
Add 4 Express Lanes
0.26
0.16
0.91
0.00
1.33
150
450
SR
Clay
SR 100
Clay/Bradford County Line
Clay/Putnam County Line
Widen to 4 Lanes
0.48
0.37
0.48
0.00
1.33
151
31
LR
Clay
CR 315
SR 16
CR 315B
Widen to 4 Lanes
0.54
0.23
0.53
0.00
1.30
152
914
LR
Clay
Lake Asbury North South Road 3
CR 209 Russell Road
CR 739B Sandbridge Road
New 2 Lane Road
0.00
0.17
0.13
1.00
1.30
153
1017
SR
Duval
US 17 Main Street
I-295
Pecan Park Road
Widen to 4 Lanes
0.32
0.54
0.43
0.00
1.29
154
152
SR
Duval
SR 101 Mayport Road
at SR 116 Wonderwood Drive
0.49
0.48
0.31
0.00
1.28
155
44
LR
Duval
Girvin Road
SR 10 Atlantic Boulevard
Ashley Melisse
Widen to 5 Lanes
0.58
0.37
0.30
0.00
1.25
156
152B
SR
Duval
SR 101 Mayport Road
SR 116 Wonderwood Drive
Mayport Main Gate
Add 2 Northbound Lanes
0.29
0.65
0.31
0.00
1.24
157
505
LR
Putnam
Comfort Road
Port Road
US 17
Widen to 4 Lanes
0.00
0.23
0.00
1.00
1.23
158
933
LR
Duval
Kernan Boulevard
SR 10 Atlantic Boulevard
SR 116 McCormick Road
Widen to 6 Lanes
0.45
0.31
0.44
0.00
1.20
159
907
LR
Clay
Decoy Road
US 17
CR 209 South
Reconstruct 2 Lanes
0.00
0.18
0.03
1.00
1.20
160
421
SR
Duval
SR 102 Airport Road
Airport Entrance
I-95
Widen to 6 Lanes
0.82
0.16
0.23
0.00
1.20
161
402
SR
Nassau
I-10
Baker County Line
Duval County Line
Add 4 Express Lanes
0.13
0.33
0.73
0.00
1.19
162
400
SR
St John's
I-95
St. Johns /Flagler County Line
SR 206
Add 4 Express Lanes
0.21
0.28
0.69
0.00
1.19
163
Intersection Improvements
3-22
Path Forward 2040 Long Range Transportation Plan Table 3-2. Road Capacity Needs in Ranked Order Map State or County Name Id Local Road Commodore Point Drive 996 LR Nassau Extension
From
To
Improvement Type
Commodore Point Drive
Blackrock Road
New 2 Lane Road
Economic Score 0.00
Livability Score 0.17
Mobility Score 0.00
Safety Score 1.00
Total Score 1.17
Rank Total Score 164
0.30
0.41
0.46
0.00
1.17
165
1021
LR
Duval
Florida Boulevard
Penman Road
SR 10 Atlantic Boulevard
Widen to 3 Lanes
833
SR
St John's
SR 9B Extension
Racetrack Road
St. Johns Parkway
Widen to 6 Lanes
0.29
0.33
0.54
0.00
1.16
166
935
LR
Duval
Ramona Boulevard
Hammond Boulevard
Cahoon Road South
Widen to 5 Lanes
0.60
0.34
0.22
0.00
1.15
167
802
LR
St John's
CR 16A Extension
CR 16A
Leo Maguire Parkway
New 2 Lane Road
0.28
0.75
0.12
0.00
1.14
168
962
SR
Duval
SR 115 Southside Boulevard
at I-95
Modify Interchange
0.30
0.46
0.39
0.00
1.14
169
989
LR
Nassau
Harper Chapel Extension
Harper Chapel Road
Dove Road Extension
New 2 Lane Road
0.72
0.41
0.00
0.00
1.13
170
429
SR
Putnam
US 17 SR 15
CR 309 (Satsuma)
West of Dunn Creek Bridge
Widen to 4 Lanes
0.33
0.48
0.32
0.00
1.13
171
977
LR
Nassau
Goodbread Road Reconstruction
US 17 SR 5
Hamilton Street
New 2 Lane Road
0.94
0.17
0.00
0.00
1.12
172
994
SR
Nassau
US 17 Powerline Corridor
Vegas Boulevard
Radio Avenue
New 2 Lane Road
0.06
0.05
0.00
1.00
1.11
173
1003
SR
Nassau
SR 200 Overpass
at US 17 SR 5 and Railroad Tracks
Overpass
0.05
0.35
0.71
0.00
1.11
174
827
LR
St John's
Racetrack Road
St. Johns Parkway
Bartram Park Boulevard
Widen to 4 Lanes
0.19
0.31
0.60
0.00
1.10
175
990
LR
Nassau
Mentoria-William Burgess Connector
William Burgess Boulevard
Harper Chapel Road
New 2 Lane Road
0.72
0.37
0.00
0.00
1.09
176
409
SR
Duval
I-295
US 1 New Kings Road
North of Trout River
Add 4 Express Lanes
0.09
0.35
0.65
0.00
1.09
177
976
LR
Nassau
Cardinal Street North Extension
Cardinal Avenue
SR 200 Yulee Backage Roads
New 2 Lane Road
0.64
0.44
0.00
0.00
1.08
178
131
SR
St John's
US 1 SR 5 Dixie Highway
SR 313
International Golf Parkway
Widen to 6 Lanes
0.31
0.45
0.30
0.00
1.06
179
944
LR
Duval
Jones Road
Pritchard Road
US 90 Beaver Street
Intersection Improvements
0.34
0.61
0.10
0.00
1.04
180
403
SR
Duval
I-10
Nassau/Duval County Line
US 301
Add 4 Express Lanes
0.10
0.33
0.61
0.00
1.04
181
959
SR
Duval
US 17 Main Street
at Eastport Road
0.11
0.36
0.55
0.00
1.02
182
404
SR
Baker
I-10
W of CR 125
W of SR 121
Add 4 Express Lanes
0.05
0.36
0.58
0.00
0.98
183
955
LR
Duval
Trout River Boulevard
Old Kings Road
US 23 New Kings Road
Widen to 4 Lanes
0.57
0.21
0.20
0.00
0.98
184
6
SR
Duval
Beaver Street (US 90)
SR 23 First Coast Expressway
Cahoon Road
Widen to 4 Lanes
0.28
0.45
0.24
0.00
0.97
185
948
LR
Duval
New Berlin Road
Pulaski Road
Yellow Bluff Road
Widen to 4 Lanes
0.16
0.53
0.27
0.00
0.96
186
844
LR
St John's
Durbin Parkway
at US 1 SR 5 Dixie Highway
Modify Interchange
0.07
0.55
0.34
0.00
0.95
187
821
LR
St John's
Holmes Boulevard
CR 214
Four Mile Road
Widen to 6 Lanes
0.68
0.20
0.07
0.00
0.94
188
119
SR
Duval
I-295
I-95
SR 9B
Add 4 Express Lanes
0.11
0.35
0.48
0.00
0.94
189
963
LR
Duval
Harts Road
SR 104 Dunn Avenue
I-295
Widen to 4 Lanes
0.16
0.55
0.22
0.00
0.93
190
New Interchange
3-23
Path Forward 2040 Long Range Transportation Plan Table 3-2. Road Capacity Needs in Ranked Order Map State or County Id Local Road
Name
From
To
Improvement Type
Economic Score 0.20
Livability Score 0.41
Mobility Score 0.29
Safety Score 0.00
Total Score 0.90
Rank Total Score 191
0.16
0.50
0.22
0.00
0.88
192
0.05
0.17
0.64
0.00
0.86
193
0.14
0.27
0.44
0.00
0.86
194
0.18
0.06
0.61
0.00
0.85
195
0.14
0.20
0.51
0.00
0.85
196
2
LR
Duval
Alta Drive / Yellow Bluff Road
I-295
New Berlin Road (north)
Widen to 4 Lanes
973
LR
Nassau
Chester Road
SR A1A SR 200
Green Pine Road
Widen to 4 Lanes
851
LR
St John's
Racetrack Road Connector
Durbin Parkway / 9B Extension
Racetrack Road
New 2 Lane Road
1016
LR
Duval
Cahoon Road
Lenox Avenue
US 90 Beaver Street
Reconstruct 2 Lanes
843
LR
St John's
CR 2209
at CR 210
14
LR
Clay
College Drive Extension
SR 21 Blanding Boulevard
Cheswick Oak Avenue
New 4 Lane Road
85
LR
Duval
Norfolk Southern Railroad Overpass
West 12th Street
US 23 New Kings Road
New 3 Lane Road / Bridge
0.07
0.38
0.39
0.00
0.83
197
940
SR
Duval
SR 104 Dunn Avenue
US 1 SR 15 New Kings Road
I-295
Widen to 4 Lanes
0.14
0.40
0.27
0.00
0.81
198
97
LR
Duval
Pulaski Road / Starratt Road
I-295
Duval Station Road
Widen to 4 Lanes
0.19
0.48
0.13
0.00
0.81
199
825
LR
St John's
Mickler Road
Palm Valley Road
SR A1A
Widen to 4 Lanes
0.25
0.26
0.25
0.00
0.76
200
701
SR
Duval
SR 243 JIA Access Road
SR 102 Airport Road
Pecan Park Road
Widen to 4 Lanes
0.22
0.40
0.13
0.00
0.75
201
942
LR
Duval
Duval Station Road
US 17 SR 5 Main Street
Starratt Road
Widen to 4 Lanes
0.35
0.31
0.06
0.00
0.72
202
503
LR
Putnam
Buffalo Road
Buffalo Road west
Buffalo east
New 2 Lane Bridge
0.00
0.18
0.53
0.00
0.72
203
971
LR
Duval
Chaffee Road
SR 228 Normandy Boulevard
Crystal Springs Road
Widen to 5 Lanes
0.15
0.25
0.32
0.00
0.72
204
965
SR
Putnam
SR 19 Connector
SR 19
Putnam County Boulevard
New 4 lane road / bridge
0.22
0.18
0.30
0.00
0.70
205
452
SR
Putnam
US 17 SR 15
Pomona Park/Feagle Avenue
CR 309 (Satsuma)
Widen to 4 Lanes
0.13
0.27
0.30
0.00
0.69
206
83
SR
Duval
US 1 SR 15 New Kings Road
I-295
Old Kings Road
Widen to 6 Lanes
0.14
0.27
0.27
0.00
0.68
207
810
LR
St John's
CR 2209
CR 210
SR 23 First Coast Expressway
New 6 Lane Road
0.14
0.19
0.35
0.00
0.67
208
428
SR
Putnam
US 17 SR 15
West of Dunn Creek Bridge
Horse Landing Road
Widen to 4 Lanes
0.09
0.43
0.15
0.00
0.67
209
1025
LR
St John's
Dixie Highway / Pellicer Lane
West of CR 214 King Street
SR 207
Resurface 2 Lanes
0.26
0.38
0.02
0.00
0.66
210
1019
LR
Duval
McDuff Avenue / 5th Street
Melson Avenue
Huron Street
Widen to 3 Lanes
0.18
0.23
0.23
0.00
0.65
211
37
LR
Duval
Eastport Road
SR 105 Heckscher Drive
Pulaski Road
Widen to 3 Lanes
0.25
0.35
0.05
0.00
0.64
212
707
SR
Nassau
US 17
Nassau/Duval County Line
Harts Road
Intersection Improvements
0.11
0.35
0.18
0.00
0.64
213
13
LR
Clay
Cheswick Oak Avenue Extension
Oakleaf Village Parkway Extension
Cheswick Oak Avenue
New 4 Lane Road
0.00
0.20
0.44
0.00
0.64
214
932
LR
Duval
Collins Road
Old Middleburg Road S
Shindler Drive
Widen to 4 Lanes
0.04
0.35
0.24
0.00
0.63
215
949
LR
Duval
New Berlin Road
Yellow Bluff Road
Cedar Point Road
Widen to 4 Lanes
0.06
0.34
0.22
0.00
0.62
216
913
LR
Clay
Oakleaf Village Parkway Extension
Oakleaf Plantation Parkway
Oakleaf Village Parkway
New 2 Lane Road
0.01
0.17
0.44
0.00
0.62
217
New Interchange
3-24
Path Forward 2040 Long Range Transportation Plan Table 3-2. Road Capacity Needs in Ranked Order Map State or County Id Local Road
Name
From
To
Improvement Type
Economic Score 0.24
Livability Score 0.27
Mobility Score 0.08
Safety Score 0.00
Total Score 0.58
Rank Total Score 218
0.06
0.32
0.20
0.00
0.58
219
0.00
0.33
0.24
0.00
0.58
220
0.14
0.26
0.17
0.00
0.57
221
0.09
0.37
0.09
0.00
0.55
222
0.08
0.26
0.18
0.00
0.53
223
0.03
0.28
0.22
0.00
0.52
224
0.34
-0.08
0.25
0.00
0.51
225
903
LR
Clay
Town Center Boulevard
US 17
SR 220 Doctors Inlet Road
Widen to 4 Lanes
832
SR
St John's
SR 313
SR 16
US 1 Dixie Highway
New 4 Lane Road
829
SR
St John's
SR 16 Connector
CR 2209
SR 16/CR 16A
New 4 Lane Road
45
LR
Duval
Girvin Road
Ashley Melisse
Wonderwood Drive
Widen to 3 Lanes
956
LR
Duval
Yellow Bluff Road
Starratt Road
New Berlin Road (north)
Widen to 4 Lanes
86
SR
Duval
SR 228 Normandy Boulevard
US 301
Bell Road (Equestrian Park)
Widen to 4 Lanes
423
SR
Putnam
SR 20
SW 56th Avenue
CR 315 (Interlachen)
Widen to 4 Lanes
430
SR
Putnam
US 17 SR 15
Putnam/Volusia County Line
Pomona Park/Feagle Avenue
Widen to 4 Lanes
970
LR
Duval
Parramore Road Extension
Youngerman Circle
Collins Road
New 2 Lane Road
0.09
0.24
0.18
0.00
0.51
226
708
SR
Nassau
US 301 SR 200
at S Kings Road (US 1)
Intersection Improvements
0.02
0.34
0.14
0.00
0.51
227
812
LR
St John's
CR 2209
SR 16 Connector
International Golf Parkway
New 6 Lane Road
0.22
0.18
0.09
0.00
0.50
228
954
LR
Duval
Starratt Road
Duval Station Road
Yellow Bluff Road
Widen to 4 Lanes
0.10
0.28
0.11
0.00
0.49
229
422
SR
Putnam
SR 20
Putnam/Alachua County Line
SW 56th Avenue
Widen to 4 Lanes
0.05
0.17
0.26
0.00
0.49
230
425
SR
Duval
US 301 SR 200
Duval/Clay County Line
I-10
Widen to 6 Lanes
0.08
0.12
0.28
0.00
0.48
231
999
SR
Nassau
SR 200 Yulee Backage Roads
US 17 SR 5
North of Koen Lane
New 2 Lane Road
0.00
0.46
0.00
0.00
0.46
232
974
LR
Nassau
Dove Road Extension (east)
Harper Chapel Road
William Burgess Boulevard
New 2 Lane Road
0.15
0.30
0.00
0.00
0.45
233
983
LR
Nassau
Pages Dairy Road South Extension
SR A1A SR 200
Sowell Road
New 2 Lane Road
0.19
0.26
0.00
0.00
0.45
234
801
LR
St John's
Brinkhoff Road
SR 207
Wildwood Drive
New 2 Lane Road
0.00
0.24
0.21
0.00
0.45
235
123
SR
Duval
US 301 SR 200
US 90
Duval/Nassau County Line
Widen to 4 Lanes
0.16
0.24
0.04
0.00
0.44
236
3
LR
Duval
Alta Drive
New Berlin Road (south)
I-295
Widen to 4 Lanes
0.21
0.18
0.02
0.00
0.41
237
993
LR
Nassau
Crosby Avenue Extension
US 17 SR 5
Pinewood Drive
New 2 Lane Road
0.21
0.20
0.00
0.00
0.41
238
991
LR
Nassau
Dove Road Extension {west}
Harper Chapel Road Extension
Mentoria Road
New 2 Lane Road
0.10
0.29
0.00
0.00
0.40
239
834
LR
St John's
Veterans Parkway
Greenbriar Road
Longleaf Pine Parkway
New 4 Lane Road
0.02
0.17
0.21
0.00
0.39
240
906
LR
Clay
CR 209 South
Decoy Road
US 17
Reconstruct 2 Lanes
0.04
0.27
0.07
0.00
0.37
241
982
LR
Nassau
Macaw Avenue Extension
Cardinal Street
US 17 SR 5
New 2 Lane Road
0.13
0.23
0.00
0.00
0.36
242
850
LR
St John's
CR 305
SR 206
SR 207
Widen to 4 Lanes
0.07
0.18
0.10
0.00
0.35
243
815
LR
St John's
CR 2209
International Golf Parkway
SR 16
New 4 Lane Road
0.00
0.00
0.34
0.00
0.34
244
1020
LR
Duval
Clark Road Extension
Broward Road
Clark Road
New 3 Lane Road
0.03
0.23
0.05
0.00
0.31
245
3-25
Path Forward 2040 Long Range Transportation Plan Table 3-2. Road Capacity Needs in Ranked Order Map State or County Id Local Road
Name
From
To
Livability Score 0.17
Mobility Score 0.12
Safety Score 0.00
Total Score 0.30
Rank Total Score 246
0.08
0.20
0.00
0.00
0.27
247
LR
Duval
Braddock Parkway
SR 115 Lem Turner Road
1010
LR
Duval
Old St. Augustine Road
at Greenland Road
952
LR
Duval
Pecan Park Road
Braddock Boulevard
JIA North Access Road
Widen to 4 Lanes
0.01
0.19
0.07
0.00
0.27
248
995
LR
Nassau
Christian Way Extension
Christian Way
Hampton Club Way
New 2 Lane Road
0.07
0.18
0.00
0.00
0.25
249
816
LR
St John's
CR 2209
SR 16
CR 208
New 4 Lane Road
0.00
0.17
0.08
0.00
0.24
250
818
LR
St John's
CR 305
SR 206
CR 204
New 4 Lane Road
0.00
0.17
0.07
0.00
0.24
251
1032
SR
Duval
US 301 SR 200
Baldwin Bypass South of Baldwin
Baldwin Bypass North of Baldwin
Widen to 4 Lanes
0.04
0.19
0.00
0.00
0.24
252
813
LR
St John's
CR 2209
CR 208
CR 214
New 4 Lane Road
0.01
0.17
0.06
0.00
0.23
253
988
LR
Nassau
Abaco Island Drive Extension
Abaco Island Drive
Zion Court
New 2 Lane Road
0.04
0.19
0.00
0.00
0.23
254
710
LR
Nassau
Lofton Creek Crossing
Hendricks Road
Avant Road
New 2 Lane Bridge
0.01
0.22
0.00
0.00
0.23
255
814
LR
St John's
CR 2209
CR 214
SR 207 CR 305
New 4 Lane Road
0.05
0.17
0.01
0.00
0.23
256
46
LR
Clay
Governors Park Road
US 17
SR 16
New 4 Lane Road
0.01
0.19
0.03
0.00
0.22
257
975
LR
Nassau
Cardinal Street South Extension
Spring Meadow Avenue
William Burgess Boulevard
New 2 Lane Road
0.02
0.20
0.00
0.00
0.22
258
1
LR
Duval
Alta Drive Realignment
SR 105 Zoo Parkway
North of New Berlin Road (south)
New 4 Lane Road
0.01
0.18
0.03
0.00
0.21
259
985
LR
Nassau
Gene Lassere Boulevard
SR 200A Pages Dairy Road
New 2 Lane Road and Roundabout
0.02
0.18
0.00
0.00
0.20
260
984
LR
Nassau
US 17 SR 5
SR 200A Pages Dairy Road
New 2 Lane Road and Roundabout
0.00
0.20
0.00
0.00
0.20
261
980
LR
Nassau
Arrigo Boulevard
Parliament Drive
New 2 Lane Road
0.01
0.19
0.00
0.00
0.20
262
1001
LR
Nassau
Barnwell Road
O'Neil Scott Road
New 2 Lane Road
0.02
0.18
0.00
0.00
0.20
263
720
LR
Baker
I-10/US 90 Parallel Reliever
South MacClenny
East Baldwin
Future Corridor
0.02
0.17
0.01
0.00
0.20
264
987
LR
Nassau
Pages Dairy Road East Extension
Chester Road
Blackrock Road
New 2 Lane Road
0.00
0.19
0.00
0.00
0.19
265
501
LR
Nassau
Concourse Loop Road
License Road
Amelia Concourse
New 2 Lane Road
0.00
0.18
0.00
0.00
0.18
266
915
LR
Clay
Lake Asbury East West 1
NS3
CR 209 Russell Road
New 2 Lane Road
0.00
0.17
0.01
0.00
0.18
267
986
LR
Nassau
Flora Parke Boulevard
Walmart Supercenter
New 2 Lane Road
0.00
0.18
0.00
0.00
0.18
268
997
LR
Nassau
Woodbrigde Parkway
Clements Road
New 2 Lane Road
0.00
0.17
0.00
0.00
0.17
269
839
SR
St John's
SR 313
at US 1 SR 5 Dixie Highway
New Interchange
0.01
0.17
0.00
0.00
0.17
270
1000
LR
Nassau
Hamilton Street Extension
Goodbread Circle
New 2 Lane Road
0.00
0.17
0.00
0.00
0.17
271
1002
LR
Nassau
Brady Point-Clements Connector
Brady Point Road
New 2 Lane Road
0.00
0.17
0.00
0.00
0.17
272
Flora Parke-Wal-Mart Connector Woodbridge Parkway Extension
New 2 Lane Road
Economic Score 0.00
939
Gene Lassere Boulevard Extension US 17 Pages Dairy Connector w/roundabout Arrigo-Parliament Reconnection Barnwell-0' Neil Scott Connector
Pecan Park Road
Improvement Type
Intersection Improvements / Add 1 Lane
Clements Road 3-26
Path Forward 2040 Long Range Transportation Plan Table 3-2. Road Capacity Needs in Ranked Order Map State or County Id Local Road
Name
From
To
Improvement Type New Interchange
Economic Score 0.00
Livability Score 0.17
Mobility Score 0.00
Safety Score 0.00
Total Score 0.17
Rank Total Score 273
0.00
0.17
0.00
0.00
0.17
273
842
SR
St John's
SR 9B Extension
at Durbin Parkway
972
LR
Duval
Cecil Field Connector
SR 23 First Coast Expressway
Commerce Center
New 2 Lane Road
721
LR
Baker/Clay/Duval
Future Corridor Initiative
Tampa Bay
Northeast Florida
Future Corridor
0.00
0.17
0.00
0.00
0.17
273
1006
LR
Duval
Blount Island Boulevard Extension
Spoil Island
JAXPORT
New 2 Lane Bridge
0.00
0.17
0.00
0.00
0.17
273
36
LR
Nassau
East Nassau Connector
I-95
Chester Road
New 4 Lane Road
0.00
0.02
0.01
0.00
0.03
277
91
LR
Baker/Duval
Outer Loop Facility
SR 228 Normandy Boulevard
SR 228 Normandy Boulevard
Future Corridor
0.04
-0.17
0.04
0.00
-0.09
278
88
LR
Duval/Nassau
Northern Outer Beltway
I-10
I-95
Future Corridor
0.03
-0.30
0.03
0.00
-0.25
279
3-27
Legend Airport
® q ¤ n ¤ n í ì ë é è Ò " ) Ê Ò " ) Ê
Amtrak Station
Passenger Rail Station
" ) 108
" ) 115
Intersection Projects
Interchange Projects
FCE Interchange Projects
« Lanes ¬ 2
§ ¨ ¦èéëìí 95
1
£ ¤
" ) " ) 108
" ) 127
í ì ë é è
A1A
A1A
¬ «
í ì ë é è
17
£ ¤
í ì ë é è
A1A
¬ «
® q
301
£ ¤
Widen to 3 1Lanes 22
Ò " ) Ê Ò " ) Ê
" )
Widen to 4 Lanes
§ ¨ ¦ 295
" ) 119
Widen 250 to 5 Lanes
" ) 125
A1A
¬ «
§ ¨ ¦ 295
105
¬ « ¬ « 116
Ò " ) Ê
Widen to 6 Lanes
124 Road New 2 Lane
221
¬ «
" )
New 3 Lane Road
90
£ ¤
§ ¨ ¦ 10
" )
130
í ì ë é è
Ò " ) Ê
228
" ) New 4 Lane Road " ) 250A
" )
Ò " ) Ê
2
Reconstruct 2 Lanes
" )
105
¬ « ¬ «
107
228
¬ «
301
£ ¤
New 6 Lane Road
è í ì ë é í ì ë é è Ò " ) Ê
í ì ë é è è í ì ë é
134
¬ « ¬ « 23
í) ì ë é è Ò " Ê
Context Sensitive Solution
10
¬ «é í ì ë é íè ì ë é èè í ì ë £ ¤ ¬ « 90
202
Ò " ) Ê
§ ¨ ¦ 295
1
£ ¤
Operational Improvements
218
Express Lanes
St John's River Ferry
¬ «
First Coast Expressway
220
¬ «
Water Bodies
Ò " ) Ê 16
" )
Six Counties Boundaries
) " 108
) " 115
® nq ¤
¬ «
315
Conservation Lands
Ò " ) Ê § ¨ ¦"ÒÊ Ò " ) Ê ) 95
Ò " ) Ê Ò " ) Ê
16
Roadway System
Ò " ) Ê
Ò " ) Ê
21
¬ «
¬ «
" )
Ò " ) Ê
" )
A1A
13
1
208
" )
13
17
£ ¤
315
16
¬ « " ) " " ) ) " )
209
" )
13A
1
207
" )
" )
108
) " 127
17
£ ¤
2
£ ¤ 301
250
) " 221
" ) " )
90
320
335
21
) "
§ ¨ ¦ 75
) " 130
" ) 310
10
228
" )
" )
¬ « ¤ Ã £ § ¦X ¨
) " ) "
204
125
124
250A
" )
® q 20
119
) "
£ " )¤
200A 301
¬ « ¬ « 134
228
¬ «
23
19
¬ «
" ) £ ¤ 318
" ) 329
" ) 309
" ) 308
301
200
« £ ¤¬ ) " £ ¤ Projects ID's shown on County Maps ¬ «" " ) ¬ « ) " ) ¬ « " ¬ « Figure 3-8 " ) ) ¬ « ¬ " «) ¬ Roadway Funded Projects «
" ) 316
335
27
500
206
¬ «
¬ «
) "
A1A
100
315
) "
5
95
¬ «
" )
122
¬ «
« § ¨ ¦¬ ¬ «
305
" ) 26 ¬ « ) " X Ã
A1A
í ì ë é è
¬ «
214
¬ «
¤ n
214
£ ¤ 2
£ ¤
225
326
Date: 11/3/2014
225A
441
25A
25
218
200A
21
200
326 326
326
502
16
3-28
¯
0
0
10,560 Feet
4.5
9 Miles
í ì ë é è
957
16
9
1015
932
16
Ò " ) ÊÒ " ) Ê
431
301
964
57
" ) 1179
£ ¤ " ) 217
23
¬ «
295
49
49
1022
224
¬ «
13
13
§ ¦ ¨
" ) 209
" )
" ) " ) 1189
220A
2 10
Ò " ) Ê
1011
220
33
" ) 13B
34
" )
6
15A
" ) 218
1027
" ) 220
Ò " ) Ê
1012
" ) 739
" ) ¬ « 21
209
13
¬ «
41
15
¬ « 315
1013
¬ «
" )
" ) " )
16
16A
739B
Ò " ) Ê
114
215
" )
10 3
Ò " ) Ê
7
106
Ò " ) Ê
16
¬ « 820
841
908
17
£ ¤
230
¬ «
" ) 226
" ) 315
" ) 209
" ) 315
Legend
" ) 352
21
¬ «
" ) 214
Intersection Projects
è í ì ë é Ò " ) Ê Ò " ) Ê
Interchange Projects FCE Interchange Projects
Lanes
" ) 214
" )
209 Reconstruct 2 Lanes Widen to 3 Lanes Widen to 4 Lanes Widen to 5 Lanes
" ) 315
Widen to 6 Lanes
New 2 Lane Road
21
¬ « ¬ «
" )
" ) 209
309D
26
New 3 Lane Road New 4 Lane Road New 6 Lane Road
Context Sensitive Solution
Operational Improvements Express Lanes
First Coast Expressway Roadway System Water Bodies
Conservation Lands
Six Counties Boundaries
Figure 3-9 Clay County Funded Roadway Projects Date: 11/3/2014
3-29
¯
0
0
10,560 Feet
1.5
3 Miles
Ò " ) Ê
í ì ë é è
í ì ë é è
í ì ë é è
501 707
705 706
70 7
706
í ì ë é è
708
A1A
¬ «
£ ¤ 23
1033
701
A1A
¬ «
701
Legend
68
Ò " ) Ê
1017
74
® q
959
17
¬ «
9 40
® q í ì ë é è Ò " ) Ê Ò " ) Ê
949
40 7
A1A
¬ «
37
1020
1
955
Ò " ) Ê £ ¤
104
40 8
940
1 94
948 2
115
¬ «
953
301
£ ¤
§ ¦ ¨
Lanes
95
§ ¦ ¨ 295
1
414
411
£ ¤§ ¦ ¨ 10
£ ¤ 17
101 5 101
934
224
¬ «
16 964
57
Ò " ) Ê
49
§ ¦ ¨ 295
¬ «
New 6 Lane Road
202
¬ «
Context Sensitive Solution 152
¬ «
962
Operational Improvements Express Lanes
1
17
St John's River Ferry
80 0
First Coast Expressway
94
Roadway System
8 41
2 10 6
Date: 11/3/2014
966
£ ¤
£ ¤
Water Bodies
§ ¦ ¨ 95
34
Ò " ) Ê
New 3 Lane Road
A1A
New 4 Lane Road
1022
13
200
Widen to 6 Lanes
1
960
¬ « ¬ «
Widen to 5 Lanes 10 2
1024
820
Ò " ) ÊÊ Ò " )
21
33
Widen to 4 Lanes
960
967
16
¬ « Ò " ) Ê
£ ¤ 90
4 43
í ì ë é è
957
827
Conservation Lands
828
Figure 3-10 Ò " ) Duval County Funded Roadway Projects Ê 3-30
FCE Interchange Projects
New 2 Lane Road
960
è í ì ë é í ì ë é è í ì ë é è Ò " ) Ê
95
930
13
1011
¬ « è í ì ë é íè ì ë é íè ì ë é
¬ «
9
932
431
23
716 714 715
10
73
134
¬ «
17
957
¬ « 820
957
968
103
¬ « ¤ í £ ì ë é è í ì ë é è
3 43
410
228
¬ «
301
í ì ë é è
128
4 103
£ ¤
432
Ò " ) Ê
103
820
100
79
Interchange Projects
Widen to 3 Lanes
A1A
102
972
7
1016
971
90
116
¬ «
121
402
403
406
419
Intersection Projects
Reconstruct 2 Lanes
1023
935
Ò " ) Ê
1 15
£ ¤
454
2331
Airport
Ò " ) Ê
Six Counties Boundaries
845
¯
0
10,560 Feet
0
3
6 Miles
Legend ® Airport q í Intersection Projects ì ë é è Ò " ) Ê Interchange Projects Ò " ) Ê FCE Interchange Projects
" ) 108
£ ¤ 301
17
" ) £ ¤ 1
í ì ë é è
í ì ë é è
708
" ) 108
703
981
705
" ) 107
105
¬ « ¬ «
Lanes
A1A
Reconstruct 2 Lanes
706
" )
200A
707
105
« ¬ « ¬
A1A
Widen to 3 Lanes
74
í ì ë é è
108
" ) 501
í ì ë é è
§ ¦ ¨
£ ¤
427
Ò " ) Ê
981
95
23
105A
" )
£ ¤
115
" )
107
704
115
70 7
" )
Widen to 4 Lanes
A1A
¬ «
1033
15
¬ «
® q
74
301
) " )"
411
228
200
¬ « £ ¤ 301
134
410
228
15
¬ « £ ¤¬ « 17
134
2 11
í ì ë é è " ) « ¬ í Figure 3-11 ì ë é è 213
100
79
432
971
23
¬ « ¬ « ¬ «
¬ «
7
Ò " ) Ê ¬ « 21
211
£ ¤ ¬ «
í ì ë é è
1
960
13
3-31
968
First Coast Expressway A1A 714 715 716
10
¬ «
í ì ë é íè ì ë é èè í ì ë é
115
109
¬ « 5
¬ « 10 2
Roadway System Water Bodies
1
Conservation Lands
A1A
« ¬ ¤¬ « £ 212
960
è í ì ë é í ì ë é è ¬ « í ì ë é è Ò " ) Ê
¬ « Nassau County Funded Roadway Projects í ì ë é è
Express Lanes
116
¬ «
109
3 43
) " )« ¬ " 23A 121
972
820
Date: 11/3/2014
8
¬ «
406
419
121
£ ¤
403
§ ¦ ¨ 10
1016
454
228
123
Ò " ) Ê
23C
¬ «
Context Sensitive Solution Operational Improvements
§ ¦ ¨
" ) " ) 402
¬ «
295
90
" )
1020
New 6 Lane Road
A1A
1 15
" )
New 4 Lane Road
40 7
119
23D
125
9 40
414
121
104
¬ «
959
1
955
Ò " ) Ê
New 3 Lane Road
949
37
1 94
40 8
940
8 94
953
115
¬ «
£ ¤
New 2 Lane Road
68
1017
127
Widen to 6 Lanes
A1A
Ò " ) Ê
" )
Widen to 5 Lanes
105
701
2
2
701
" )
2
¬ « ¬ « ¬ «
202
¬ «
¯
90
0
Six Counties Boundaries 10,560 Feet
" ) 203
0
3.5
7 Miles
è í ì ë é í ì ë é è í ì ë é è Ò " ) Ê
202
¬ «
966
115
¬ «
§ ¦ ¨
4 43 95
16
57
49
962
" )
210A
102
Ò " ) ÊÒ " ) Ê
964
Ò " ) Ê
1023
967
295
49
§ ¦ ¨ 295
A1A
80 0
1024
1022
¬ «
94
8 41
" ) 13B
34
828
827
8 41
Ò " ) Ê
845
846
Ò " Ê " )) 810
210
13
¬ « Ò " ) Ê
7
Ò " ) Ê
840
811
10 3
Ò " ) Ê
841
847
8 41
0 82
16
¬ «
16
¬ «
812
908
106
" ) 13A
835
13
16
¬ «
¬ « A1A
¤ n
" ) 208
103
Airport
813
0
Amtrak Station
1029
§ ¦ ¨
" ) 13A
Intersection Projects
Interchange Projects
1025
95
Passenger Rail Station
í ì ë é è
115
" ) 214
FCE Interchange Projects
1008
312
¬ «
11 3
Lanes
1
832
® q ¤ n ¤ n í ì ë é è Ò " ) Ê Ò " ) Ê
£ ¤
816
" ) Legend
¤ n
815
® q
Reconstruct 2 Lanes Widen to 3 Lanes
" ) 13A
Widen to 4 Lanes Widen to 5 Lanes
£ ¤ 1
207
¬ «
Widen to 6 Lanes
" ) 209
New 2 Lane Road
£ ¤ New 4 Lane ¬ «Road 17
New 3 Lane Road
¬ « A1A
" ) 305
15
206
¬ «
New 6 Lane Road
Context Sensitive Solution
" ) 209
Express Lanes
First Coast Expressway
818
Operational Improvements
" )
207A
Roadway System
" ) 13
Water19Bodies
¬ « ® q ) Lands ¬ «" Conservation 100 1447
" ) 2016
Six Counties Boundaries
" ) 310
Date: 11/3/2014
" ) 204
100
¬ « Figure 3-12 St. John's County Funded Roadway Projects 3-32
¯
0
0
10,560 Feet
1.5
3 Miles
Path Forward 2040 Long Range Transportation Plan
STRATEGIC INTERMODAL SYSTEM FUNDED PROJECTS S OPHISTICATED TOLLING SYSTEMS ARE COMING TO N ORTH F LORIDA TO OFFER MOTORISTS COMPETITIVE TRAVEL CHOICES . The success of express lanes in South Florida will be brought to North Florida to enhance travel times, improve system reliability and ensure we get the most from our transportation system. To address escalating congestion within our Interstate System highways and other expressways, lanes will be constructed that will allow travelers to pay a small fee to receive a higher operating speed and greater reliability. The tolls will be collected using SunPass速 transponders.
In other regions, once commuters experience the reliable and congestion-free ride, they want to use the express lanes as much as possible. In addition to the express lane projects on the Interstate System, two auxiliary lanes will be added on SR 9B from US 1 Phillips Highway to I-295. The following table summarizes the Cost Feasible Plan projects.
3-33
Path Forward 2040 Long Range Transportation Plan Table 3-3. Strategic Intermodal System Projects Facility
County
I-10
Duval
Nassau
I-10 Total I-295
Duval
ID 403 38
39
From
To
Improvement Type
Phase
Nassau/Duval County Line
US 301
Add 4 Express Lanes
Design ROW ENV CST Total ENV CST Total Design PDE ROW CST Total Design ROW ENV CST Total
406
US 301
SR 23 First Coast Expressway
Add 4 Express Lanes
432
I-295
I-95
Add 4 Express Lanes
402
40
1022 57
Baker/Nassau County Line
Nassau/Duval County Line
Add 4 Express Lanes
I-95 South
SR 13 San Jose Boulevard (Buckman Bridge)
Add 2 Express Lanes
SR 13 San Jose Boulevard
W of US 17 Roosevelt Boulevard (Buckman Bridge)
Add 4 Express Lanes on Bridge
431
US 17 Roosevelt Boulevard
SR 134 103rd Street
Add 4 Express Lanes
410
SR 134 103rd Street
I-10
Add 4 Express Lanes
38
CST Total Design PDE ROW ENV CST Total Design PDE ROW CST Total Design PDE ROW CST Total
Improvements on I-10 in Baker County shown in the FDOT District 2 Strategic Intermodal System Plan are not listed. The construction to SR 228 in Baker County is necessary to provide logical limits. Projects 402 and 403 will be constructed together. 40 Projects 402 and 403 will be constructed together. 39
3-34
Years 2019-2020 $3.10
Years 2021-2025
Years 2026-2030
Years 2031-2040
$4.65
$3.10
$1.00 $97.58 $98.58
$4.65 $3.80 $153.07 $156.87
$7.90 $3.09
$3.09
$12.52 $709.10 $729.52
$0.30 $1.10
$3.10 $1.00 $1.00
$0.30 $4.96
$1.10 $161.06
$1.00 $6.15 $7.15 $835.25
$6.40 $0.98
$7.38
$33.21 $3.00 $228.69 $264.90 $9.85 $1.48 $17.00 $75.00 $103.33
$15.11 $0.98
$16.09
$81.51 $117.65 $199.15
22-Year Total $3.10 $4.65 $1.00 $97.58 $106.34 $3.80 $153.07 $156.87 $7.90 $3.09 $12.52 $709.10 $732.60 $0.30 $1.10 $1.00 $6.15 $8.55 $1,004.37 $1.00 $1.00 $6.40 $0.98 $33.21 $3.00 $228.69 $272.27 $9.85 $1.48 $17.00 $75.00 $103.33 $15.11 $0.98 $81.51 $117.65 $215.24
Path Forward 2040 Long Range Transportation Plan Table 3-3. Strategic Intermodal System Projects Facility
County
I-295
Duval
ID 411
409
408
407
121
1023 964
I-295 Total I-95
Duval
418
41
434
41
From
To
Improvement Type
Phase
I-10
South of US 1 New Kings Road
Add 4 Express Lanes
Design PDE ROW CST Total Design PDE ROW CST Total Design PDE ROW CST Total ENV CST Total Design ROW ENV CST Total CST Total Design ROW CST Total
South of US 1 New Kings Road
North of Trout River
I-95 North Interchange
SR 113 Southside Connector
SR 202 J. T. Butler Boulevard
North of Trout River
Add 4 Express Lanes
I-95 North Interchange
Add 4 Express Lanes
Dames Point Bridge/ SR 105 Heckscher Drive
SR 202 J. T. Butler Boulevard
Add 4 Express Lanes
SR 9B
Add 2 Express Lanes
at US 17 Roosevelt Boulevard to Wells Road
Duval/St. Johns County Line
I-295
Add 4 Express Lanes
Modify Interchange
I-295
Add 4 Express Lanes
SR 202 J. T. Butler Boulevard
Add 4 Express Lanes
Project 48 is divided into the portion in Duval and St. Johns County. 3-35
ROW ENV CST Total Design ROW ENV CST Total
Years 2019-2020
Years 2021-2025
Years 2026-2030 $4.93 $0.54
$5.47 $2.70 $0.42
$3.12
Years 2031-2040
$22.56 $101.29 $123.86
$6.86 $44.65 $51.51 $7.42
$1.16
$1.16 $3.23
$31.92 $131.32 $170.66
$3.23
$238.78 $238.78
$477.01
$688.13
$11.86
$11.86 $1.00 $1.00
$13.86 $21.86
$21.86
$29.46 $3.00 $185.86 $218.32
$3.93 $6.18 $34.55 $44.66 $286.45 $4.28 $59.24 $63.52
$44.87 $28.17
$73.04
$3.00 $615.63 $618.63
22-Year Total $4.93 $0.54 $22.56 $101.29 $129.32 $2.70 $0.42 $6.86 $44.65 $54.63 $7.42 $1.16 $31.92 $131.32 $171.81 $3.23 $238.78 $242.00 $11.86 $29.46 $3.00 $185.86 $230.18 $1.00 $1.00 $3.93 $6.18 $34.55 $44.66 $1,465.46 $21.86 $4.28 $59.24 $85.37 $44.87 $28.17 $3.00 $615.63 $691.67
Path Forward 2040 Long Range Transportation Plan Table 3-3. Strategic Intermodal System Projects Facility
County
I-95
Duval
ID 433
419
68
St. Johns I-95 Total SR 9B
Duval
418 42
1024
From
To
Improvement Type
Phase
SR 202 J. T. Butler Boulevard
SR 10 Atlantic Boulevard
Add 4 Express Lanes
Design ROW ENV CST Total Design PDE ROW CST Total Design CST Total CST Total Total CST Total
at US 1/SR 15 Martin Luther King Jr.
Modify Interchange
at SR 102 Airport Road - Phase 2
International Golf Parkway
Phillips Highway (US 1)
Modify Interchange
St. Johns /Duval County Line
Add 4 Express Lanes
I-295
Add 2 Auxiliary Lanes
SR 9B Total Grand Total
42
Project 418 is divided into the portion in Duval and St. Johns County. 3-36
Years 2019-2020
Years 2021-2025
Years 2026-2030 $43.12 $35.22
$78.34
Years 2031-2040
$1.00 $492.50 $493.50
$5.24 $0.66
$21.86 $1.00 $1.00 $1.00 $39.82
$7.70 $77.00 $84.70
$5.90 $0.75 $7.50 $8.25 $139.18 $139.18 $216.85
$236.08
$1,112.13
$508.26
$874.16
$2,635.50
22-Year Total $43.12 $35.22 $1.00 $492.50 $571.84 $5.24 $0.66 $7.70 $77.00 $90.60 $0.75 $7.50 $8.25 $139.18 $139.18 $1,586.91 $1.00 $1.00 $1.00 $4,057.74
Path Forward 2040 Long Range Transportation Plan
OTHER FEDERALLY AND STATE FUNDED PROJECTS T HE OTHER FEDERAL AND STATE ROADWAYS PROVIDE IMPORTANT CONNECTIONS BETWEEN LAND USES , SERVE LOCAL TRIPS , CARRY BUSES , ACCOMMODATE BICYCLE AND PEDESTRIANS AND PROVIDE ACCESS TO S TRATEGIC I NTERMODAL S YSTEM ROADS . The need to provide safe, convenient and effective mobility for all persons was identified throughout our region. Major projects identified for funding within this program includes constructing new roads, widening and reconstructing corridors, improving intersections improvements and modifying interchanges. The following tables summarize the Cost Feasible Plan for road capacity projects that are not part of the Strategic Intermodal System.
Roads donâ&#x20AC;&#x2122;t just serve automobiles. All road projects on arterials will include new sidewalks and bicycle lanes where practical. Roads provide buses with access to more persons and allow them to offer better quality of service through more reliable travel times and reduced congestion. These multimodal elements are discussed in Part Four of this report. Operational issues are discussed in Part Five.
3-37
Path Forward 2040 Long Range Transportation Plan
Table 3-4. Other State and Federal Highway Capacity Projects
43
Facility I-10
County Duval
Map Id From 454 at I-295
I-95
Duval
SR 104 Dunn Avenue
Duval
SR 115 Arlington Expressway
Duval
100 44 SR 109 University Boulevard
SR 115 Southside Boulevard
Duval
103 SR 202 J. T. Butler Boulevard
41450 North of Fuller Warren Bridge 941 Old Kings Road
To
Improvement Type Modify Interchange
SR 104 Dunn Avenue
Add 4 Express Lanes
US 23 New Kings Road
Intersection Improvements
SR 10 Atlantic Boulevard
Widen to 6 Lanes
US 90 Beach Boulevard
Widen to 6 Lanes
966 at SR 202 J. T. Butler Boulevard
Modify Interchange
96750 SR 152 Baymeadows Road SR 16
43 44
Clay
Underpass
106 CR 218
SR 15A Oakridge Avenue
Widen to 4 Lanes
908 US 17
Shands Bridge
Widen to 4 Lanes
Where projects are identified as candidates for context sensitive solutions, the estimates are based on the improvement type shown. Project is included for PE phases only so that preliminary engineering can be prepared to determine the detailed scope and costs for this project. 3-38
Years Years Years Years Phase 2019-2020 2021-2025 2026-2030 2031-2040 PE $26.07 ROW $119.32 CST $122.25 Total $267.64 PE $100.00 Total $100.00 PE $0.80 ROW $0.80 ENV $0.16 CST $3.82 Total $5.57 PE $20.00 Total $20.00 PE $1.02 ROW $1.02 ENV $0.20 CST $17.05 Total $19.29 PE $1.02 ROW $1.02 ENV $0.20 CST $55.62 Total $57.86 PE $12.99 Total $12.99 PE $17.49 ROW $4.37 ENV $4.37 CST $60.36 $23.43 Total $86.59 $23.43 PE $12.08 ROW $3.02 ENV $3.02 CST $54.38 Total $72.50
22-Year Total $26.07 $119.32 $122.25 $267.64 $100.00 $100.00 $0.80 $0.80 $0.16 $3.82 $5.57 $20.00 $20.00 $1.02 $1.02 $0.20 $17.05 $19.29 $1.02 $1.02 $0.20 $55.62 $57.86 $12.99 $12.99 $17.49 $4.37 $4.37 $83.78 $110.02 $12.08 $3.02 $3.02 $54.38 $72.50
Path Forward 2040 Long Range Transportation Plan
Table 3-4. Other State and Federal Highway Capacity Projects Facility SR 16
County St. Johns
SR 200
Nassau
SR 207
43
To South Francis Road
Improvement Type Widen to 4 Lanes
981 I-95
Fernandina
Intersection Improvements
St. Johns
113 I-95
South Holmes Boulevard
Widen to 6 Lanes
SR 21 Blanding Boulevard
Clay
114 SR 16
CR 215 Blanding Boulevard
Widen to 4 Lanes
SR 243 JIA North Access Road
Duval
701 SR 102 Airport Road
Pecan Park Road
Widen to 4 Lanes
SR 312
St. Johns
115 US 1/SR 5 Dixie Highway
SR A1A
Widen to 6 Lanes
SR 313
St. Johns
831 SR 207
SR 16
New 6 Lane Road
832 SR 16
US 1 Dixie Highway
New 4 Lane Road
706 South Fletcher Avenue
Amelia Island Parkway
Turn Lane Improvements
SR A1A
Nassau
Map Id From 835 International Golf Parkway
3-39
Years Years Years Years Phase 2019-2020 2021-2025 2026-2030 2031-2040 PE $0.61 ROW $0.61 ENV $0.12 CST $5.32 Total $6.66 PE $1.02 ROW $1.02 ENV $0.20 CST $12.99 Total $15.23 PE $1.02 ROW $1.02 ENV $0.20 CST $51.56 Total $53.80 CST $47.25 Total $47.25 CST $12.04 $31.12 Total $12.04 $31.12 PE $1.02 ROW $1.02 ENV $0.20 CST $45.47 Total $47.71 ROW $18.85 ENV $2.23 CST $45.47 Total $66.55 PE $3.62 ROW $31.37 $20.29 ENV $2.86 CST $40.07 Total $34.99 $63.22 PE $1.02 ROW $1.02 ENV $0.20 CST $4.87 Total $7.11
22-Year Total $0.61 $0.61 $0.12 $5.32 $6.66 $1.02 $1.02 $0.20 $12.99 $15.23 $1.02 $1.02 $0.20 $51.56 $53.80 $47.25 $47.25 $43.16 $43.16 $1.02 $1.02 $0.20 $45.47 $47.71 $18.85 $2.23 $45.47 $66.55 $3.62 $51.66 $2.86 $40.07 $98.21 $1.02 $1.02 $0.20 $4.87 $7.11
Path Forward 2040 Long Range Transportation Plan
Table 3-4. Other State and Federal Highway Capacity Projects Facility SR A1A
County Duval
St. Johns
43
Map Id From 151 SR 116 Wonderwood Drive
1008 at Red Cox/Coquina Rd
(blank)
Intersection Improvements
Palm Valley Road
Widen to 4 Lanes
94 SR 9B
I-295
Widen to 6 Lanes
95 I-95 at the Avenues
SR 202 J. T. Butler Boulevard
Widen to 6 Lanes
800 Mickler Road
US 1 SR 5 Philips Highway
Duval
St. Johns
To Improvement Type Naval Station Mayport North Gate Widen to 4 Lanes*
845 at CR 210
Modify Interchange
US 17
Clay
1037 Governor Street
Haven Avenue
Context Sensitive Solutions
US 17 Main Street
Duval
1017 New Berlin Road
Pecan Park Road
Widen to 4 Lanes
US 1B San Marco Avenue
St. Johns
1030 Bridge of Lions
SR 16
Context Sensitive Solutions
3-40
Years Years Years Years Phase 2019-2020 2021-2025 2026-2030 2031-2040 PE $0.20 ROW $1.02 ENV $0.20 CST $4.87 Total $6.29 PE ROW ENV CST Total PE ROW ENV CST Total PE ROW ENV CST Total PE ROW ENV CST Total CST Total PE ENV CST Total PE ROW CST Total PE ROW ENV CST Total
$0.61 $0.61 $0.12 $2.90 $4.24 $7.63 $3.98 $0.80 $38.16 $50.56 $1.02 $1.02 $0.20 $12.99 $15.23 $1.02 $1.02 $0.20 $12.99 $15.23 $43.20 $43.20 $4.42 $1.29 $25.33 $31.04 $8.91 $58.05 $44.55 $111.51 $1.02 $1.02 $0.20 $15.02 $17.26
22-Year Total $0.20 $1.02 $0.20 $4.87 $6.29 $0.1 $0.61 $0.12 $2.90 $4.24 $7.63 $3.98 $0.80 $38.16 $50.56 $1.02 $1.02 $0.20 $12.99 $15.23 $1.02 $1.02 $0.20 $12.99 $15.23 $43.20 $43.20 $4.42 $1.29 $25.33 $31.04 $8.91 $58.05 $44.55 $111.51 $1.02 $1.02 $0.20 $15.02 $17.26
Path Forward 2040 Long Range Transportation Plan
Table 3-4. Other State and Federal Highway Capacity Projects Map Id
43
Facility
County
From
US 1B King Street
St. Johns
Bicycle and Pedestrian
Regional
SR 115 Mathews Bridge
Duval
79 45 US 1 Alt. MLK Jr. Parkway
SR A1A SR 200
Nassau
427 at US 17
1029 US 1 Ponce de Leon Boulevard
To
Improvement Type
Avenida Menendez
Context Sensitive Solutions
(Boxed Funds)
Bicycle and Pedestrian SR 109 University Boulevard
Total
* Projects identified as candidates for context sensitive solutions.
45
Project is included for PE phases only so that preliminary engineering can be prepared to determine the detailed scope and costs for this project. 3-41
New 6 Lane Bridge and Transit Intersection Improvements
Years Years Years Years Phase 2019-2020 2021-2025 2026-2030 2031-2040 PE ROW ENV CST Total CST Total PE Total PE ROW ENV CST Total
$1.82 $1.82
$5.06 $5.06
$5.96 $5.96
$122.33
$273.13
$284.40
22-Year Total
$1.02 $1.02 $1.02 $1.02 $0.20 $0.20 $6.90 $6.90 $9.14 $9.14 $13.95 $26.79 $13.95 $26.79 $0.00 $0.00 $0.00 $0.00 $1.02 $1.02 $1.02 $1.02 $0.20 $0.20 $4.87 $4.87 $7.11 $7.11 $709.21 $1,389.08
Path Forward 2040 Long Range Transportation Plan Table 3-5. Transportation Management Areas Fund Projects Facility Alta Drive Realignment
Cheswick Oak Avenue Extension
CR 2209
County Duval
Map Id 1
Clay
13
St. Johns
From SR 105 Zoo Parkway
Oakleaf Plantation Parkway
To North of New Berlin Road (south)
Savannah Glen Boulevard
Improvement Type New 4 Lane Road
New 4 Lane Road
810
SR 23 First Coast Expressway
CR 210
New 6 Lane Road
811
SR 16 Connector
SR 23 First Coast Expressway
New 6 Lane Road
812
International Golf Parkway
SR 16 Connector
New 6 Lane Road
815
SR 16
International Golf Parkway
New 4 Lane Road
Lannie Road
Arnold Road
New 2 Lane Road
Total Total Total
National Cemetery Road
Duval
1033
Race Track Road
St. Johns
828
Bartram Park Boulevard
Bartram Springs
Widen to 4 Lanes
SR 115 Lem Turner Road
Duval/Nassau
74 46
I-295
US 1 Kings Road / Callahan
Widen to 4 Lanes
TSM&O Projects
Regional
SR A1A St. Johns Ferry 47
Duval
(Boxed Funds) 2331 Total
Grand Total
46 47
Project is included for PE phases only so that preliminary engineering can be prepared to determine the detailed scope and costs for this project. This is the local match to the Federal Passenger Ferry Program Grant which was authorized for capacity improvements but is not obligated. 3-42
TSM&O Projects Ferry Slip Replacement
Phase PE ROW ENV CST Total PE ROW ENV CST Total CST Total CST Total CST Total PE CST Total CST Total CST Total PE Total CST Total CST
2019-2020
$19.36 $19.36 $7.26 $7.26
2021-2025 $4.32 $0.68 $0.14 $2.24 $7.37
2026-2030
2031-2040
$21.85 $21.85 $12.08 $0.80 $0.16 $15.71 $28.75
$55.87 $55.87
$10.80 $10.80 $19.08 $19.08 $4.87 $24.36 $29.23 $34.51 $34.51 $40.50 $40.50
$2.18 $2.18
$28.80
$6.61 $6.61 $6.62 $6.62 $71.90
$2.22 $2.22
$1.00 $1.00 $23.20 $23.20
$71.89
$143.81
22-Year Total $4.32 $0.68 $0.14 $24.09 $29.22 $12.08 $0.80 $0.16 $71.57 $84.61 $19.36 $19.36 $18.06 $18.06 $19.08 $19.08 $4.87 $24.36 $29.23 $34.51 $34.51 $40.50 $40.50 $1.00 $1.00 $34.21 $34.21 $6.62 $6.62 $316.40
Path Forward 2040 Long Range Transportation Plan Table 3-6. Transportation Regional Incentives Program (TRIP) Facility County ID From
To
Improvement Type
Phase Fund Source
CR 218
Pine Tree Lane
Widen to 4 Lanes
CST
Reconstruct 2 Lanes and Widen to add Sidewalks and Bike Lanes
Total CST
Widen to 4 Lanes
Total CST
Dixie Highway / Pellicer Lane
Race Track Road
Clay
St. Johns
St. Johns
1027
1025
827
Cosmos Avenue
SR 207
St. Johns Parkway
CR 214 King Street
Bartram Park Boulevard
TRIP TRIP Local Match 48 TRIP TRIP Local Match
Years Years Years Years 2019-2020 2021-2025 2026-2030 2031-2040
$0.70 $0.70 $1.40
$3.12 $3.12 $6.24 $2.28 $2.28 $4.56
$5.39 $8.25 $13.64
TRIP TRIP Local Match
Total Fund Totals
TRIP TRIP Local Match
Grand Total
48
Local match for TRIP funding is also shown in the locally funded projects summary.
3-43
$0.70 $0.70 $1.40
$5.40 $5.40 $10.80
$5.39 $8.25 $13.64
$3.65 $3.65
$7.15 $75.66 $82.80 $10.80 $75.26 $86.46
22-Year Total
$12.16 $11.37 $23.53 $2.98 $2.98 $5.97 $7.15 $75.66 $82.80 $22.29 $90.01 $112.30
Path Forward 2040 Long Range Transportation Plan This page is intentionally blank.
3-44
Path Forward 2040 Long Range Transportation Plan
TOLL FUNDED PROJECTS L EVERAGING TOLL REVENUES TO FINANCE NEW PROJECTS WILL ALLOW OUR REGION TO CONSTRUCT THE FIRST COAST EXPRESSWAY , A REGIONAL PRIORITY FOR SEVERAL DECADES . SR 23 the First Coast Expressway will be a new multi-lane limited access toll facility that will eventually connect I-95 in northern St. Johns County to I-10 in western Duval County. The northern section from SR 21 Blanding Boulevard in Clay County to I-10 in Duval County is currently under construction. The southern section from I-95 in St. Johns County to SR 21 Blanding Boulevard in Clay County is currently in the preliminary design phase. The project includes a new bridge over the St. Johns River. Leveraging future toll revenues to finance this project of regional significance involving three counties will advance the construction sooner than traditional funding sources.
3-45
Path Forward 2040 Long Range Transportation Plan Table 3-7. Projects Funded with Turnpike/Toll Revenue Facility SR 23 First Coast Expressway
County Clay
Clay/St. Johns St. Johns
Map Id 8202 1013 1012 41 8203 840 841 847
From US 17 at SR 16 at CR 739 at CR 218 I-95 at I-95 at CR 16 A at CR 2209
To SR 21 Blanding Boulevard
US 17
Grand Total
Improvement Type New 4 Lane Road New Interchange New Interchange New Interchange New 6 Lane Road New Interchange New Interchange New Interchange
Phase CST CST CST CST CST CST CST CST
Years 2019-2020
$0.00
3-46
Years 2021-2025 $698.08 $47.57 $47.57 $56.70 $949.48 $47.57 $47.57 $56.70 $1,951.22
Years 2026-2030
Years 2031-2040
$0.00
$0.00
22-Year Total $698.08 $47.57 $47.57 $56.70 $949.48 $47.57 $47.57 $56.70 $1,951.22
Path Forward 2040 Long Range Transportation Plan
LOCALLY AND PRIVATELY FUNDED PROJECTS I NCLUSION OF LOCALLY AND PRIVATELY FUNDED PROJECTS OF REGIONAL SIGNIFICANCE IN THE PLAN IS ESSENTIAL TO ENSURING THE ROAD NETWORK IS CONNECTED , EFFICIENT AND SERVES ALL PEOPLE AND JOBS . The following projects are funded using local revenues or private commitments for development mitigation. The projects include widening and reconstruction projects, interchange improvements and major intersection operational improvements. The list of projects was developed cooperatively with the local government partners in the planning process.
3-47
Path Forward 2040 Long Range Transportation Plan Table 3-8. Clay County Locally Funded Road Projects Facility CR 218 CR 218 50 CR 220 Doctors Inlet Road
49
ID 1026 1027 33 34
From
To
Improvement Type
Phase
Cosmos Avenue Cosmos Avenue SR 21 Blanding Boulevard College Drive
US 301 Pine Tree Lane Knight Boxx Road (end of four lane) US 17
Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 6 Lanes
CST CST CST CST
Years 2019-2020
$3.12 $49.76
Grand Total
$52.88
Table 3-9. Duval County Locally Funded Road Projects (Non LOGT) 51 Facility ID From Alta Drive / Yellow Bluff Road I-95 New World Avenue New Berlin Road
Years 2021-2025
2 962 1034 948 949 940 102 955
SR 104 Dunn Avenue SR 115 Southside Boulevard Trout River Boulevard Grand Total *Projects identified as candidates for context sensitive solutions.
I-295 SR 115 Southside Boulevard SR 23 First Coast Expressway Pulaski Road Yellow Bluff Road US 1 SR 15 New Kings Road US 1 SR 5 Philips Highway Old Kings Road
To
Improvement Type
Phase
New Berlin Road (north)
Widen to 4 Lanes Modify Interchange New 2 Lane Road Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 6 Lanes* Widen to 4 Lanes
CST CST CST CST CST CST CST CST
Chaffee Road Yellow Bluff Road Cedar Point Road I-295 I-95 Ramps US 23 New Kings Road
50
3-48
Years 2021-2025
Years 2031-2040 $122.82
$8.25 $64.77 $73.02
Years 2026-2030
$122.82
Years 2031-2040 $29.44
$43.14 $6.84 $86.62 $86.62
$0.00
49
Clay County 1st LOGT, Clay County 9th Cent Gas Tax, and Clay County Local Infrastructure Surtax. Local match for TRIP funding. Amount is also shown in the TRIP table. 51 Duval County 9th Cent (Diesel Only), Duval County Transit Surtax and Duval County Local Infrastructure Surtax.
Years 2019-2020
Years 2026-2030
$0.00
$40.89 $1.54 $10.49 $102.9
$202.68
22-Year Total $122.82 $11.37 $49.76 $64.77 $248.73
22-Year Total $29.44 $43.14 $6.84 $86.62 $86.62 $40.89 $1.54 $10.49 $305.58
Path Forward 2040 Long Range Transportation Plan Table 3-10. Duval County Locally Funded Road Projects from LOGT Facility 5th Street (McDuff Avenue Phase 3) Alta Drive Cahoon Road Cecil Field Connector Chaffee Road Clark Road Extension Collins Road
Eastport Road Florida Boulevard Hartley Road Kernan Boulevard Old Middleburg Road Pulaski Road Ramona Boulevard (Crystal Springs Road Phase 2) Ricker Road San Pablo Road Shindler Drive SR 10 Atlantic Boulevard
SR 115 Southside Boulevard SR 21 Blanding Boulevard
US 17 Main Street US 17 Roosevelt Boulevard US 90 Beaver Street SR 115 Mathews Bridge Various Grand Total
52
ID 1019 2 1016 972 971 1020 932 930 15 37 1021 49 73 933 1015 953 935 934 1009 101 714 715 716 960 968 9 957A 957B 957C 959 16 7 79 54
52 53
From Melson Avenue Faye Road Lenox Avenue Commerce Center SR 228 Normandy Boulevard Broward Road Old Middleburg Road S Shindler Drive SR 21 Blanding Boulevard SR 105 Heckscher Drive Penman Road SR 13 San Jose Boulevard SR 202 J. T. Butler Boulevard SR 10 Atlantic Boulevard Argyle Forest Boulevard Eastport Road Hammond Boulevard Morse Avenue US 90 Beach Boulevard Collins Road at Girvin Road at Hodges Boulevard at San Pablo Boulevard Gate Parkway at SR 10 Atlantic Boulevard I-295 at Collins Road at SR 134 103rd Street at Cedar Hills Boulevard at Eastport Road at Collins Road Cahoon Road US 1 Alt. Martin Luther King Jr. Jr. Parkway
To Huron Street Burkit Lane US 90 Beaver Street SR 23 First Coast Expressway Crystal Springs Road Clark Road Shindler Drive Rampart Road Pine Verde Pulaski Road SR 10 Atlantic Boulevard Old St. Augustine Road Glen Kernan Parkway McCormick Road SR 134 103rd Street I-295 Cahoon Road Old Middleburg Road SR 10 Atlantic Boulevard SR 134 103rd Street
Hogan Road Wilson Boulevard
McDuff Avenue SR 109 University Boulevard
Improvement Type Widen to 3 Lanes Widen to 5 Lanes Reconstruct 2 Lanes New 2 Lane Road Widen to 5 Lanes New 3 Lane Road Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 3 Lanes Widen to 3 Lanes Widen to 3 Lanes Widen to 6 Lanes Widen to 6 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 5 Lanes Widen to 3 Lanes Widen to 3 Lanes Widen to 3 Lanes Intersection Improvements Intersection Improvements Intersection Improvements Intersection Improvements Intersection Improvements Widen to 6 Lanes Intersection Improvements Intersection Improvements Intersection Improvements New Interchange New Interchange Widen to 4 Lanes New 6 Lane Bridge and Transit Bicycle and Pedestrian Improvements
Adopted by local Ordinance 2013-820. Transit hubs and transit accessibility and mobility improvements are summarized in the transit component. 54 Project is included for PE phases only so that preliminary engineering can be prepared to determine the detailed scope and costs for this project. 3-49 53
Phase CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST PE CST
Years 2019-2020 $2.54 $10.71
Years 2021-2025
Years 2026-2030
Years 2031-2040
$0.00 $0.00
$40.00 $0.00 $40.00
$13.77 $16.97 $40.50 $1.22 $4.96 $6.41 $16.46 $14.28 $6.41 $10.16 $5.45 $20.21 $27.95 $3.73 $3.27 $11.37 $13.19 $13.79 $9.27 $9.27 $9.27 $27.35 $4.46 $101.50 $7.02 $7.02 $7.02 $28.89 $48.60 $55.11 $9.50 $228.80
$23.50 $362.31
22-Year Total $2.54 $10.71 $13.77 $16.97 $40.50 $1.22 $4.96 $6.41 $16.46 $14.28 $6.41 $10.16 $5.45 $20.21 $27.95 $3.73 $3.27 $11.37 $13.19 $13.79 $9.27 $9.27 $9.27 $27.35 $4.46 $101.50 $7.02 $7.02 $7.02 $28.89 $48.60 $55.11 $40.00 $33.00 $631.11
Path Forward 2040 Long Range Transportation Plan Table 3-11. Nassau County Locally Funded Road Projects
55
Facility ID From Amelia Island Parkway 704 South 14th Street Concourse Loop Road 501 License Road CR 105A Buccaneer Trail 705 South Fletcher Avenue US 17 707 Nassau/Duval County Line SR 200 SR A1A 703 Amelia Island Parkway US 301 SR 200 708 US 1 S Kings Road Grand Total *Projects identified as candidates for context sensitive solutions. Table 3-12. St. Johns County Locally Funded Road Projects Facility CR 2209 CR 305 Dixie Highway / Pellicer Lane Race Track Road Grand Total
55 56
Improvement Type Widen to 4 Lanes* New 2 Lane Road Turn Lane Improvements* Intersection Improvements Widen to 6 Lanes Intersection Improvements
Phase CST CST CST CST CST CST
Years 2019-2020
Years 2021-2025
Years 2026-2030
Years 2031-2040 $8.47 $5.01 $2.86
$4.72 $6.03 $0.00
$0.00
Years 2019-2020
Years 2021-2025
$10.75
$14.53 $30.88
22-Year Total $8.47 $5.01 $2.86 $4.72 $6.03 $14.53 $41.63
56
ID 813 816 818
From CR 214 CR 208 CR 204
1025
SR 207
827
To CR 105A Buccaneer Trail Amelia Concourse Canopy Drive Harts Road Sadler Road (blank)
St. Johns Parkway
To CR 208 SR 16 SR 206 CR 214 West of King Street Bartram Park Boulevard
Nassau County 1st LOGT, Nassau County 9th Cent Gas Tax and Nassau County Small County Tax. St. Johns County 1st LOGT and St. Johns County 9th Cent (Diesel Only).
Improvement Type New 4 Lane Road New 4 Lane Road New 2 Lane Road Reconstruct 2 Lanes and Widen to add Sidewalks and Bike Lanes Widen to 4 Lanes
Phase CST CST CST CST
Years 2031-2040 $42.96
$32.52 $13.50 $2.75
22-Year Total $42.96 $32.52 $13.50 $2.75
CST $2.75
3-50
Years 2026-2030
$13.50
$32.52
$75.66 $118.61
$75.66 $167.38
PART
FOUR
MULTIMODAL PROJECTS
Path Forward 2040 Long Range Transportation Plan
TRANSIT CAPACITY PROGRAMS N EW TRANSIT SYSTEMS WILL BRING CUTTING EDGE TECHNOLOGY , INNOVATION AND TRANSPORTATION OPTIONS TO N ORTH F LORIDA .
NEEDS PLAN
Effective and efficient mass transportation in our region is an essential element for us to be competitive, provide mobility options and offer the quality of life our residents desire. New transit systems including bus rapid transit (BRT), commuter rail and transit for downtown Jacksonville are being planned that will transform our region. Regional park and ride lots, transit hubs and improvements at the St. Johns River Ferry are also included.
A summary of the transit needs was developed. The Needs were identified based on prior studies including the Jacksonville Transportation Authority and City of Jacksonvilleâ&#x20AC;&#x2122;s Mobility Plan. A summary of the transit needs are shown on Figures 4-1 through 4-14 and Table 4-1.
In addition, as part of the Active Transportation Section, projects that enhance access to transit and mobility are discussed.
4-1
2369
" ) 108
115
2255
" )
§ ¨ ¦ 95
1
£ ¤
17
£ ¤
" ) " )
" ) 127
2
A1A
® q 7 235
2356
301
£ ¤
2356
" ) 122
" ) 125
130
¬ «
301
£ ¤
2350
134
¬ « ¬ « 23
202
§ ¨ ¦ 295
4
0 23
Bus Rapid Transit
1
£ ¤
8
Skyway Extension
21
95
8
7
Streetcar Downtown
16
¬ «
16
® nq ¤
¬ «
1
9 231
Streetcar La Villa
Streetcar Riverside
" ) 315
Streetcar Springfield
Intercity Passenger Rail Corridor Ferry Service
13A
17
¬ « 315
® q
204
® q
20
¬ «
¤ n
7
55 22
23 5
8
320
2355
" )
318
308
25
200
7
326 326
200A 6 238
0
Date: 10/14/2014
225A
" )
200
2 23
326
25A
309
2377
500
225
441
2348
235 0
0
27
2353
¤ n
" )
301
« £ ¤¬ £ ¤ ¬ «" " ) ) " ) ¬ « " ) ¬ « " ) ¬ «" ) ¬ «
2352
19
¬ «
" ) £ ¤
7
238 6
2
2349
316
310
385 200A
75
" )
St. Augustine
" )
2385
§ ¨ ¦
" ) 329
2385
2 23
335
2386
21
2354 2351
" )
8
" )
7
23 5
6
2 23
5 23
335
" )
2356
323
2254
206
¬ «
A1A
100
Downtown Jacksonville 2
" ) " )
95
¬ «
" )
Six Counties Boundaries
5
« § ¨ ¦¬ ¬ «
305
£ ¤
¬ «
6 225
" )
A1A
See Inset
214
207
" )
Conservation Lands
¤ n
¬ «
26
Water Bodies
13
17
£ ¤
214
Transportation Intermodal Center Roadway System
208
" )
315
16
¬ « " ) ) " ) " " )
209
" )
£ ¤ 2377
Streetcar San Marco
5 23
2 23
Streetcar Five Points
§ ¨ ¦
5 23
¬ «
¬ «
13
220
218
A1A
¬ «
" )
" )
Existing Skyway Express
2328
2385
2 23
Legend
2358
" )
228
90
£ ¤ ¬ «
7
2321
228
250A
2385
2 23
" )
§ ¨ ¦
2 232
10
2386
2254
90
£ ¤
6
2301
2386
124
10
¬ «
See Inset
8 23
" )
2328
2301 2301
2348
221
¬ «
2331
116
232 3
2325
250
105
¬ « ¬ «
2325
" )
¬ «
§ ¨ ¦
295
119
A1A
295
§ ¨ ¦
" )
" )
¬ «
2326
2353 2354
2
A1A
A1A
¬ «
108
¬ «
" )
105
¬ « ¬ «
107
2366
326
Figure 4-1 Transit Needs BRT, Commuter Rail, Skyway, Streetcar 4.2
¯
0
10,560 Feet
0
4
8 Miles
" ) 108
" ) 115
95
2
" ) 127
2
õ ô ó ö
122
§ ¨ ¦ 295
" ) 119
A1A
¬ «
® q
" ) 250
¬ «
17
301
" )
ó õ ô ö õ ô ó ö ó õ ô ö õ ô ó ö
A1A
¬ «
§ ¨ ¦ 295
105
¬ « ¬ «
" )
116
125
221
¬ «
" ) 124
õ ô ó ö
10
90
£ ¤
" )
¬ «
õ ô ó öó ó õ ô ö õ ô ö
§ ¨ ¦ 10
" )
" ) 130
õ ô ö ¬ «ó 228
301
£ ¤
134
¬ « ¬ « 23
õ ô ö óó õ ô ö õ ô ó ö õ ô ó ö õ ô ó ö õ ô ó ö õ ô ó ö 295 õ ô ó öó õ ô ¨ ö§ ¦ õ ô ó ö õ ô ó ö õ ô ó ö õ ô ó ö
ó õ ö õ ô ó öô 220 ) õ ô ó ö"
" ) 218
Legend
ó õ ô ö 90 ó õ ô ó ö£ õ ô ö ¤
See Inset
228
250A
A1A
A1A
£ ¤
" ) " ) £ ¤
ó õ ô ö ® q ¤ n ¤ n
õ ô ó ö
108
¬ «
105
¬ « ¬ «
107
§ ¨ ¦ õ ô ó ö
1
£ ¤
" )
¬ «
¬ «
õ ô ö ó õ ô ö ó
§ ¨ ¦ 95
16
¬ «
16
® ó õ ô ö ¤q n 1 £ ¤ õ ô ó ö õ ô ó ö 16 ¬ « ¤ n ó õ ô ö
¬ «
Airport
Amtrak Station
" ) 315
Passenger Rail Station Express Bus Service
" ) " " ) ) " ) 208
" ) 209
13
17
£ ¤
" ) 315
Ferry Service
A1A
13
21
Local Bus Service
õ ô ó ö
1
£ ¤
¬ «
Park and Ride Parking Lot
13A
207
" ) 305
17
£ ¤
« Transportation Intermodal Center ¬ 26
Roadway System
® q 20
õ ô ó ö Boundaries Six Counties
320
" ) " ) 335
318
329
500
225
326
Date: 10/9/2014
225A
441
25A
" ) 204
19
¬ «
" ) 309
St. Augustine
¤ n
õ ô ó ö
" ) 308
301
õ ô ó ö
200
« £ ¤¬ £ ¤ ¬ «" " ) ) " ) ó õ ô ö ¬ « " ¬ « ) ó õ ô ö õ ô ó ö " ) õ ô ó ¬ ö «" ) ¬ «
" ) 316
27
310
" ) £ ¤
" )
25
¬ «
206
ó õ ô ö õ ô ó ö
" )
" )
§ ¨ ¦
335
" ) 21
200A
75
A1A
¬ «
ó õ ô ö ¤ n
¬ «
Downtown Jacksonville
5
¬ «
100
315
Conservation Lands
§ ¨ ¦ 95
¬ «
" )
Water Bodies
¬ «
See Inset
ó õ ô ö
¬ «
" )
A1A
õ ô ó ö
214
214
Community Shuttle Area
" )
ó õ ô ö õ ô ó ö
202
¬ «
200A
200
326 326
326
õ ô ó ö Figure 4-2 Transit Needs Local and Express Bus Service 4.3
¯
0
10,560 Feet
0
4
8 Miles
Legend
Commuter Rail Corridors
Intercity Passenger Rail Corridor Railroad System
Roadway System Water Bodies
Conservation Lands
Six Counties Boundaries
" ) 108
¬ « 2
" ) 127
" ) 2
" ) 121
" ) 122
£ ¤ 301
" ) 125
" ) 119
" ) 127
" ) 119
" ) " ) 23D
" ) 250
23C
" )
¬ « 121
229
" )
" )
250A
§ ¦ ¨ 10
228
" )
" ) 23A
" )
90
301
10
¬ « 125
2301
§ ¦ ¨
2301
123
£ ¤ 2254
2301
" )
90
" )
121
139B
124
" ) £ ¤ ¤ £ " ) 217
£ ¤ 301
" ) 228
130
" ) " ¬ « ) ) " £ ¤ " ) " ) 228
" ) 229
228
228
217
301
" ) 231
217
218
Figure 4-3 Baker County Transit Needs Commuter Rail Date: 10/9/2014
4-4
¯
0
0
10,560 Feet
1.5
3 Miles
2328
Legend ö õ ô ó
Park and Ride Parking Lot Local Bus Service Railroad System
Roadway System Water Bodies
Conservation Lands
Six Counties Boundaries
" ) 108
¬ « 2
" ) 127
" ) 2
" ) 121
" ) 122
£ ¤ 301
" ) 125
" ) 119
" ) 127
" ) 119
" ) " ) 23D
" ) 250
23C
" )
¬ « 121
229
250A
121
" )
" )
139B
124
" ) 123
£ ¤ 90
" )
" ) £ ¤ ¤ £
§ ¦ ¨ 10
" )
¬ « 228
" ) 23A
" )
§ ¦ ¨ 10
ö õ ô ó 125
90
301
" ) 217
£ ¤ 301
" ) 228
130
" ¬ ) " « ) ) " £ ¤ " ) " ) 228
" ) 229
228
228
217
301
" ) 231
217
218
Figure 4-4 Baker County Transit Needs Local Bus Service Date: 10/9/2014
4-5
¯
0
0
10,560 Feet
1.5
3 Miles
2
2 23
2 23
7 5 22
2321
2386
6
§ ¦ ¨ 295
301
" ) 1179
£ ¤ " ) 217
224
¬ «
23
¬ «
" ) 209
0 23
" )
8
" ) " ) 1189
220A
" ) 13B
220
" ) 15A
" ) 220
" ) 739
215
8
" ) ¬ «
5 23
" ) 218
" ) 739B
" ) 209
13
¬ « 15
¬ «
21
" ) 315
16
¬ «
" ) 16A
16
¬ « 17
£ ¤ 230
¬ «
" ) 226
" ) 315
" ) 209
9 231
" ) 315
" ) 352
21
¬ «
" ) 214
Legend
" ) 214
" ) 209
Bus Rapid Transit
Commuter Rail Corridors
" ) 315
Intercity Passenger Rail Corridor Railroad System
21
¬ « ¬ «
" ) 309D
26
Roadway System 209 Water Bodies
" )
Conservation Lands Six Counties Boundaries
Figure 4-5 Clay County Transit Project Needs BRT and Commuter Rail Date: 10/14/2014
4-6
¯
0
0
10,560 Feet
1.5
3 Miles
õ ó ô ó ö õ ô ö õ ô ó ö
õ ô ó ö ó õ ô ö õ ô ó ö õ ô ó ö õ ô ó ö
õ ô ó ö
õ ô ó ö
301
õ ô ö õ ô ó ö óó õ ô ö õ ô ó ö õ ô ó ö õ ô ó ö 1179 224 õ ô ó ö ¬ « õ ô ó ö 209 õ ô ó ö
" )
£ ¤ " ) 217
23
¬ «
§ ¦ ¨ 295
" )
õ ô ó ö
" ) 220A
õ ô ó ö
" ) " )ó õ ô ö 1189
" ) 13B
220
" ) 15A
" ) 220
" ) 218
" ) 739
" ) ¬ « 215
" ) 739B
" ) 209
13
¬ « 15
¬ «
21
" ) 315
16
¬ «
" ) 16A
16
¬ « 17
£ ¤ 230
¬ «
" ) 226
" ) 315
" ) 209
" ) 315
" ) 352
21
¬ «
" ) 214
Legend 209 Park and Ride Parking Lot õ ô ó ö
" ) 214
" )
Express Bus Service Local Bus Routes
" ) 315
Railroad System Community Shuttle Area
21
¬ « ¬ «
Roadway System 209 Water Bodies
" )
" )
309D
26
Conservation Lands
Figure 4-6 Clay County Transit Projects Local and Express Bus Service Date: 10/9/2014
4-7
¯
Six Counties Boundaries 0
0
10,560 Feet
1.5
3 Miles
5 23
A1A
¬ «
£ ¤ 23
A1A
23 5
2301
2301
2301
90
£ ¤§ ¦ ¨ 10
2254
£ ¤ 17
2352
2354
2349
238 6
2348
® q
¬ «
Streetcar Five Points
2 23
2385
90
7
£ ¤
2385
Streetcar Downtown
A1A
¬ «
Streetcar La Villa
£ ¤ 17
8 23
134
¬ «
¬ «
Streetcar Springfield Streetcar San Marco
5 22
2358
Streetcar Riverside
202
6
301
2321
2386
£ ¤
228
¬ «
152
¬ «
Commuter Rail Corridors
2325
2386
2358
¬ «
2325
6
23
§ ¦ ¨
Intercity Passenger Rail Corridor
295
2 23
Ferry Service
7
224
¬ « 21
¬ «
Roadway System
§ ¦ ¨ 95
13
¬ «
200
¬ «
Date: 10/14/2014
Water Bodies
4
8
1
17
2 23
0 23
Railroad System
£ ¤
£ ¤
Airport
Skyway Extension
10
See Inset
128
6
Existing Skyway Express
¬ «
2353
23 8
Bus Rapid Transit
A1A
116
¬ «
¬ «
2 232
2353
235 0
2356
2255
2356
295
2349
Legend
2331
§ ¦ ¨
1
2385
Downtown Jacksonville
¬ «
£ ¤
2385
7
A1A
95
2328
2385
2352
§ ¦ ¨
2350
7
2386
17
232 3
2355
4 23
8
2254
£ ¤
104
¬ «
2351
55
32 7 2
5 23
115
22
6
2 23
2326
¬ «
7 235
301
7
8
¬ «
® q
£ ¤
23 5
2328
2354
2356
232 3
Figure 4-7 Duval County Transit Project Needs BRT, Commuter Rail, Skyway, Streetcar 4-8
Conservation Lands
¯
Six Counties Boundaries 0
10,560 Feet
0
3
6 Miles
õ ô ó ö
õ ô ó ö
A1A
¬ «
£ ¤ 23
A1A
¬ «
® q
õ ô ó ö 301
£ ¤
115
¬ « õ ô ó ö ¬ «ó õ ô ö
£ ¤ õ ô ó ö 17
104
õ ô ó ö
A1A
¬ «
§ ¦ ¨ 95
§ ¦ ¨ 295
1
£ ¤
A1A
¬ «
116
¬ «
õ ô ó öó ó õ ô ö õ ô ö
17
£ ¤
£ ¤§ ¦ ¨ 90
10
10
¬ «
See Inset
Downtown Jacksonville
ó õ ô ö õ ô ó ö£ ¤ ó õ ô ö 90
128
¬ «ó õ ô ö õ ô ó ö õ ô ó ö £ ¤ õ ô ó ö õ ô ó ö õ ô ó ö
Legend
A1A
¬ «
ó õ ô ö ® q
17
£ ¤ 301
õ ô ó ö
228
¬ «
134
¬ «
õ ô ó ö
23
¬ «
Railroad System
295
£ ¤
17
Community Shuttle Area Roadway System
§ ¦ ¨ 95
13
¬ «
Water Bodies
õ ô ó ö
Conservation Lands
õ ô ó ö
Six Counties Boundaries
200
Date: 10/9/2014
Transportation Intermodal Center
õ ô ó ö
1
õ ô ó ö
¬ «
Ferry Service
§ ¦ ¨
21
õ ô ó ö
Local Bus Service
152
224
Airport Express Bus Service
¬ «
ó õ ô ö õ ô ó õ ô ó ö ö õ ô ó ö ó õ ô ö õ ô ó ö õ ô ó ö ¬ « £ ¤ õ ô ö õ ô ó ö ¬ «ó õ ô ó ö
ó õ ô ö õ ô ó ö
202
¬ «
Park and Ride Parking Lot
Figure 4-8 Duval County Transit Project Needs Local and Express Bus Service 4-9
¯
0
10,560 Feet
0
3
6 Miles
" ) 108
" ) 115
£ ¤ 301
" )
105A
107
£ ¤ 17
2255
115
" )
" ) " ) 200A
£ ¤ 1
105
« ¬ « ¬
A1A
" ) 108
236 6
105
§ ¦ ¨ 95
£ ¤ 23
¬ « ¬ «
Legend
A1A
" ) 107
® q
" ) 108
Bus Rapid Transit
A1A
" ) 2
¬ « ¬ « ¬ «
15
¬ «
105
7 235
127
Streetcar La Villa
Commuter Rail Corridors
§ ¦ ¨ 295
Intercity Passenger Rail Corridor
23C
Date: 10/14/2014
) " )« ¬ " 23A 121
228
200
¬ « £ ¤ 301
2 232
23
6 23 8
228
¬ «
15
6
90
23 8
£ ¤
¬ « £ ¤¬ « 17
211
109
¬ «
134
134
21
4-10
211
Roadway System
¬ «
1
¬ « Figure 4-9 « ) Projects ¬ ¬ « Nassau County Transit ¬ « ¬ « «BRT, Commuter Rail, Skyway, Streetcar¬ 213
A1A
10
£ ¤ ¬ « 13
Railroad System
¬ «
2350 2 349
Water Bodies
2385
109
5
115
¬ «
¯
202
¬ «
Conservation Lands
A1A
« ¤¬ ¬ « £
2385
212
7
123
8
¬ «
§ ¦ ¨ 10
2352
¬ «
2 23
" )
228
2301
2328
2254
58 23
116
2354
2325
232 3
2353
" ) " ) ¬ «
¬ «
119
23D
2301
Streetcar Springfield
A1A
Streetcar San Marco
) " )"
2301
Streetcar Riverside
2356
104
¬ «
" )
Streetcar Downtown
115
£ ¤
125
Streetcar Five Points
2326
¬ «
301
121
Skyway Extension
A1A
® q
" )
Existing Skyway Express
2356
2
¬ «
Airport
0
90
10,560 Feet
" ) 203
Six Counties Boundaries
0
3.5
7 Miles
" ) 108
" ) 115
£ ¤ 301
17
" ) £ ¤ 1
200A
" ) 108
õ ô ó ö
105
§ ¦ ¨ 95
£ ¤
105
« ¬ « ¬
A1A
" )
õ ô ó ö 23
105A
107
£ ¤
115
" )
" )
¬ « ¬ «
A1A
" ) 107
" ) 108
A1A
" ) 2
2
¬ «
¬ « ¬ « ¬ «
15
¬ «
105
õ ô ó ö
" ) 127
A1A
® q
ó õ ô ö ® q
115
¬ «
£ ¤ 301
ó õ ô ö « õ ô ó ö¬ 104
119
¬ «
Ferry Service
§ ¦ ¨ 295
Community Shuttle Area 116
¬ «
23D
109
¬ «
23C
" )
£ ¤ õ ô ó öó ó õ ô ö õ ô ö 90
" ) 123
Date: 10/9/2014
õ ô ó ö
Railroad System
A1A
¬ «
Roadway System
10
228
8
¬ «
¬ «
) " )« ¬ " 23A 121
228
200
¬ « £ ¤ 301
¬ «
§ ¦ ¨ 10
228
¬ «
£ ¤ ¬ « £ ¤ õ ô ó ö¬ « ¬ « õ ô ó ö ¬ ¬ « « õ ô ó ö Figure 4-10 ¬ « õ ô ó ö ) ¬ « Nassau County Transit Project Needs õ ô ó ö ¬ « ¬ « « Local and Express õ ô ó ö õ ô ó ö¬ Bus Service 134
213
134
208
21
õ4-11 ô ó ö
Water Bodies
1
15 17
23
Airport
Local Bus Service
" ) " )
125
Park and Ride Parking Lot
Express Bus Service
A1A
õ ô ó ö
õ ô ó ö
) " )" 121
Legend
211
211
13
109
5
ó õ ô ö õ ô ó ö 115
¬ «
¯
202
¬ «
Conservation Lands
A1A
« ¤¬ ¬ « £ ó õ ô ö 212
0
90
10,560 Feet
ó õ ô ö õ ô ó ö " ) 203
Six Counties Boundaries
0
3.5
7 Miles
" ) 225
" ) 209
" ) 215
" ) 315
" ) 16A
15A
6
" )
5 22
16A
8 235
" )
" )
13A
9 231
" ) 226
" )
A
" )
2
" ) 315
" ) 13
" ) 13A
" ) 209
" )
2
" ) 315
21
¬ «
" )
" ) 13A
352
" ) 315C
" ) 214
" ) 214
" ) 309D
" ) 219
207
¬ «
100
¬ «
26
¬ « 21
¬ «
" ) 207A
" ) 216
" ) 309C
® q
" )
20
" ) 315
100
¬ «
310
¬ «
20
¬ « £ ¤ 17
" ) 20A
15
¬ «
" ) 309B
19
¬ «
" ) 21
" ) 310
" ) 308B
" ) 309
" ) 308
Legend ® q
" ) 309
Airport Bus Rapid Transit
Commuter Rail Corridors Intercity Passenger Rail Corridor Roadway System
" ) 35
Water Bodies
Conservation Lands
" ) 314
Six Counties Boundaries
Figure 4-11 Putnam County Transit Project Needs Commuter Rail Date: 10/14/2014
4-12
¯
0
0
10,560 Feet
2
" )
2825 4 Miles
" ) 225
" ) 209
" ) 215
" ) 315
" ) 16A
" ) 16A
" )
13A
" ) 15A
" ) 226
" )
A
" )
2
" ) 315
" ) 13
" ) 13A
" ) 209
" )
2
" ) 315
21
¬ «
" )
" ) 13A
352
" ) 315C
" ) 214
" ) 214
" ) 309D
" ) 219
207
¬ «
100
¬ «
26
¬ « 21
¬ «
" ) 207A
" ) 216
" ) 309C
® q
" )
20
" ) 315
100
¬ «
310
¬ «
20
¬ « £ ¤ 17
" ) 20A
15
¬ «
" ) 309B
19
¬ «
" ) 21
" ) 310
" ) 308B
" ) 309
" ) 308
" ) 309
Legend ® q
Airport Local Bus Service Roadway System
" ) 35
Water Bodies
Conservation Lands
" ) 314
Six Counties Boundaries
Figure 4-12 Putnam County Transit Project Needs Local Bus Service Date: 10/9/2014
4-13
¯
0
0
10,560 Feet
2
" )
2825 4 Miles
238 6
2 23 7
202
¬ «
2321
¤ n
115
2358
¬ «
§ ¦ ¨ 295
« " ) ¬ A1A
2325
210A
§ ¦ ¨ 295
8
2377
0 23
St. Augustine
" ) 13B
2 23 4
" ) 210
5 23 8
13
¬ « 2 23 7
16
¬ «
16
¬ «
" ) 13A
¤ n
® q
£ ¤
" ) 13
1
16
¬ «
¬ « A1A
¤ n
" )
9 231
208
§ ¦ ¨ 95
" ) 13A
See Inset
312
¬ «
" ) 214
2377
" ) 13A
£ ¤ 1
207
¬ «
" ) 209
£ ¤ ¬ « 17
® q ¤ n ¤ n
Amtrak Station
" ) 305
15
Airport
206
¬ «
" ) 209
Passenger Rail Station Bus Rapid Transit
" )
207A
Commuter Rail Corridors
" ) 13
Intercity Passenger19Rail Corridor
¬ « ® q ) ¬ «" Roadway System 100 1447
Water Bodies
A1A
6 225
Legend
¬ «
" ) 2016
" ) 204
100
¬ «
310 Conservation Lands
" )
Six Counties Boundaries
Figure 4-13 St. John's County Transit Project Needs BRT and Commuter Rail Date: 10/14/2014
4-14
¯
0
0
10,560 Feet
1.5
3 Miles
õ ô ó ö ó õ ô ö õ ô ó ö õ ô ó ö õ ô ó ö
ó õ ô ö õ ô ó ö
¤ õn ô ó ö
ó õ ô ö õ ô ó ö
202
¬ « 115
¬ «
õ ô ó ö ó õ ô ö õ ô ó õ ô ó ö ö õ ô ó ö õ ô ó ö õ ô ó ö õ ô ó ö õ ô ó ö
õ ô ó ö
§ ¦ ¨ 295
« " ) ¬
210A
õ ô ó ö
§ ¦ ¨
A1A
295
õ ô ó ö
õ ô ó ö
St. Augustine
" ) 13B
õ ô ó ö
õ ô ó ö
õ ô ó ö
" ) 210
13
¬ «
16
¬ «
16
¬ «
® ó õ ô öq ¤ n
" ) 13A
£ ¤ 1
" ) 13
ó õ ô ö õ ô ó ö ¤ n
16
¬ « õ ô ó ö
" ) 208
§ ¦ ¨ 95
" ) 13A
¬ « A1A
õ ô ó ö
See Inset
312
¬ «
" ) 214
õ ô ó ö
" ) 13A
£ ¤ 1
207
¬ «
" ) 209
£ ¤ ¬ « 17
ó õ ô ö ® q ¤ n ¤ n
A1A
" ) 305
15
Legend
¬ «
206
¬ «
Park and Ride Parking 209 Lot Airport
" )
" )
207A
Amtrak Station
Passenger Rail Station Local Bus Service
13
19
¬ « ® q ) ¬ «" Roadway System Water Bodies
" )
100 1447
" ) 2016
" ) 204
100
¬ «
310 Conservation Lands
" )
Six Counties Boundaries
Figure 4-14 St. John's County Transit Project Needs Local Bus Service Date: 10/9/2014
4-15
¯
0
0
10,560 Feet
1.5
3 Miles
Path Forward 2040 Long Range Transportation Plan Table 4-1. Transit Needs County Map ID Baker 2301 Baker 2302 Baker 2303 Duval 2304 Duval 2305 Baker 2306 Duval 2307 Clay 2308 Clay 2310 Clay 2311 Clay 2312 Clay 2313 Clay 2314 Clay 2315 Clay 2316 Clay 2317 Clay 2318 Clay 2319 Clay 2320 Duval 2321 Duval 2322 Duval 2323 Duval 2324 Duval 2325 Duval 2326 Duval 2327 Duval 2328 Duval 2329 Duval 2330 Duval 2331 Duval 2332 Duval 2333 Duval 2334 Duval 2335 Duval 2336 Duval 2337 Duval 2338 Duval 2339 Duval 2340 Duval 2341 Duval 2342 Duval 2343 Duval 2344 Duval 2345 Duval 2346 Duval 2347 Duval 2348 Duval 2349 Duval 2350 Duval 2351 Duval 2352
Facility * West Extension (CSX) US 90 Area wide **** Center Street Drew Street South of Glen St. Mary Yellow Water Road SR 21 Blanding Boulevard Area wide **** SR 21 Blanding Boulevard SR 21 Blanding Boulevard SR 21 Blanding Boulevard SR 21 Blanding Boulevard SR 21 Blanding Boulevard CR 220 Doctors Inlet Road Youngerman Circle SR 21 Blanding Boulevard Southwest Extension (CSX) US 17 Roosevelt Boulevard SR 134 103rd Street SR 228 Normandy Boulevard US 1/SR 15 New Kings Road US 1 SR 115 Southside Boulevard I-95 Southeast (FEC) West (CSX) SR A1A St. Johns River Ferry I-95 SR A1A St. Johns River Ferry Area wide **** SR A1A St. Johns River Ferry SR 134 103rd Street SR 21 Blanding Boulevard Duval Road SR 115 Lem Turner Road Mayport Road US 90 Beach Boulevard SR 21 Blanding Boulevard SR 21 Blanding Boulevard US 17 Roosevelt Boulevard SR A1A SR A1A St. Johns River Ferry SR A1A St. Johns River Ferry SR A1A St. Johns River Ferry Five Points/Core/Brooklyn Southbank/San Marco Downtown - Sports Complex Five Points/Core/Brooklyn La Villa/Core Riverside/Avondale
From MacClenny (Baker County) MacClenny (Baker County)
To Baldwin (Duval County) Downtown Jacksonville (Duval County)
North of Drew Street (Baldwin) at Center Street (Baldwin) North of I-10 CR 218
Wells Road
at Tanglewood at Old Jennings Road at Edson Drive at Wells Road at SR 224 Kingsley Avenue at Hollow Road at Argyle Forest Boulevard North and South of Bolton Road Palatka (Putnam County) at Wells Road SR 228 Normandy Boulevard SR 134 103rd Street Downtown Jacksonville (Duval County) Lewis Speedway (St. Johns County) Avenues Mall Gateway Mall St. Augustine (St. Johns County) Baldwin (Duval County)
Green Cove Springs (Clay County) SR 21 Blanding Boulevard Downtown Jacksonville (Duval County) SR 111 Edgewood Avenue Avenues Mall (Duval County) Regency Square Mall Jacksonville International Airport Downtown Jacksonville (Duval County) Downtown Jacksonville (Duval County)
Downtown Jacksonville (Duval County)
Yulee (Nassau County)
Ft. George/Mayport at SR 228 Normandy Boulevard at Wesconnett Boulevard at I-95 at SR 104 Dunn Avenue at SR A1A West and East of Kernan Boulevard North and South of Wilson Boulevard North and South of SR 134 103rd Street at SR 128 San Juan Avenue North and South of SR 202 J. T. Butler Boulevard JPA Property Mayport Ft. George/Mayport Central Station Kings Avenue Station Downtown Jacksonville (Bay Street & Main Street) Five Points Transportation Center Riverside (King Street)
Mayport Terminal Ft. George Island Brooklyn Station Southwest of Railroad Tracks (Southbank) Jacksonville Municipal Stadium Downtown Jacksonville (Bay Street & Main Street) Duval Street & Monroe Street to Ocean Five Points 4-16
Improvement Type/ Mode Commuter Rail Local Bus Service Local Bus Service Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots BRT Local Bus Service Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Commuter Rail Park and Ride Lots BRT BRT BRT BRT BRT BRT Commuter Rail Commuter Rail Drydock / Ferry Repairs Express Bus Service Ferry Slip Replacement Local Bus Service Long Term Site Improvements Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Relocation of Ferry offices Service & Capital Improvements Site Improvements Skyway Extension ** Skyway Extension ** Streetcar ** Streetcar ** Streetcar ** Streetcar **
Path Forward 2040 Long Range Transportation Plan Table 4-1. Transit Needs County Map ID Duval 2353 Duval 2354 Duval 2355 Duval 2356 Duval 2357 Duval 2358 Duval 2359 Duval 2360 Duval 2361 Duval 2362 Duval 2363 Duval 2364 Nassau 2366 Nassau 2368 Nassau 2369 Nassau 2370 Nassau 2371 Nassau 2372 Putnam 2374 St. Johns 2377 St. Johns 2378 St. Johns 2379 St. Johns 2380 St. Johns 2381 St. Johns 2382 St. Johns 2383 St. Johns 2384 Duval 2385 St. Johns 2385 Duval 2386 St. Johns 2386
Facility * Southbank/San Marco Springfield Downtown Facility North (CSX) Northwest (CSX) Southwest (CSX) US 90 Beach Boulevard SR 21 Blanding Boulevard SR 115 Lem Turner Road SR 115 Lem Turner Road US 1/SR 15 New Kings Road SR 21 Blanding Boulevard North Extension (CSX) I-95 Cumberland Island Ferry Area wide **** SR 200 SR A1A SR 200 SR A1A Area wide **** Southeast Extension (FEC) Area wide **** SR A1A Anastasia Island (Amphitheatre) CR 210 Racetrack Road St. Augustine Airport US 1 East First Coast Flyer SR 16*** Southwest First Coast Flyer SR 207***
From Kings Avenue Station FSCJ Station
To Baptist Hospital / MOSH & Atlantic Boulevard 8th Street/ Medical Complex
Downtown Jacksonville (Duval County) Downtown Jacksonville (Duval County) Green Cove Springs (Clay County) at San Pablo Road at 105th Street at Soutel at I-295 Timucuan DRI North of I-295 Yulee Downtown Jacksonville (Duval County) Fernandina
Yulee (Nassau County) Callahan (Nassau County) Downtown Jacksonville (Duval County)
Fernandina Beach Yulee (Nassau County) Cumberland Island
at I-95 east of Yulee Palm Coast (Flagler County)
City of St. Augustine
at Palm Valley Road east of US 1 at US 1 at Lewis Speedway Road Downtown Jacksonville (Duval County)
3rd Street (Jacksonville Beach)
Wells Road
Downtown Jacksonville (Duval County)
Notes: *Facility is duplicated if it crosses county lines ** Transit technology or mode is to be determined during feasibility studies. *** Location to be determined. **** Services to be determined during Transit Development Plans.
4-17
Improvement Type/ Mode Streetcar ** Streetcar ** Transportation Center Commuter Rail Commuter Rail Commuter Rail Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Commuter Rail Express Bus Service Ferry Service Local Bus Service Park and Ride Lots Park and Ride Lots Local Bus Service Commuter Rail Local Bus Service Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots Park and Ride Lots BRT Park and Ride Lots BRT Park and Ride Lots
Path Forward 2040 Long Range Transportation Plan
PRIORITIZATION PROCESS PRIORITIZATION SYSTEM
The transit capacity needs identified as part of the planning process were prioritized based on the following criteria: ď&#x201A;§
ď&#x201A;§
Projects that have some level of project development completed (Alternatives Analysis, PD&E or PE phases) were given the highest priority. Other transit priorities were then considered and funded if revenues were available.
COST FEASIBLE PLAN
Based on the estimated revenues available from federal and state revenue sources and local match revenues, a Cost Feasible Plan was developed and is summarized in Figures 4-15 through 4-19 and Table 4-2. The Cost Feasible Plan projects shown represent only the transit capacity projects. The funding for operations of the local and express bus needs is address in Part Five of this report.
4-18
" ) 108
" ) 115
95
2
" ) 127
2
A1A
¬ «
® q
ó õ ô ö
ó ô õ ö ó õ ô ö
" ) 122
§ ¨ ¦ 295
" ) 119
250
ó õ ô ö
" ) 250A
221
¬ « ó õ ô ö
90
£ ¤
" )
" ) 130
§ ¨ ¦ 10
óô õ ô ö ó ô õ ö ó õ ö 228
¬ «
£ ¤
ó õ ô ö
134
¬ « ¬ « 23
£ ¤ ¬ «
ó õ ô ö
ó õ ô ö
" ) 218
¬ «
220
" ) 315
Streetcar Springfield
£ ¤
" ) £ ¤
Conservation Lands
" ) 310
" ) 204
St. Augustine
ó õ ô ö
19
¬ «
" ) £ ¤
" ) 309
¤ n
ó õ ô ö
" ) 308
301
200A
200
326 326
ó õ ô ö
200
25
¬ «
206
ó õ ô ö
" )
441
A1A
¤ n
200A
« £ ¤¬ £ ¤ ¬ «" " ) ) " ) ¬ « ) ¬ « Downtown Jacksonville " ) " ¬ «" ) ¬ «
Date: 11/10/2014
5
¬ «
¬ «
ó õ ô ö
20
75
326
® q
¬ « 21
§ ¨ ¦ 95
100
315
" )
See inset
¬ «
" )
Six Counties Boundaries
225A
" )
¬ «
ó õ ô ö
305
17
A1A
ó õ ô ö
207
26
318
214
¤ n
¬ «
¬ «
25A
13A
214
Water Bodies
" )
208
13
ó õ ô ö £ ¤ ó õ ô ö
16
¬ «ôõöó " ) " " ) ) " )
17
Roadway System
316
1
" )
315
Transportation Intermodal Center
329
óq ® õ ô ö n ¤
209
" )
Bus Rapid Transit Corridors
" )
ó õ ô ö
16
Streetcar Riverside
225
ó õ ô ö
¬ «
Streetcar Downtown
§ ¨ ¦
¬ «
95
16
St John's River Ferry
A1A
§ ¨ ¦
Streetcar Five Points
335
£ ¤ 13
¬ «
Commuter Rail Corridors
ó õ ô ö
1
21
JTA Mobility & Transit Access Improvements
320
295
¬ «
Passenger Rail Station
" )
§ ¨ ¦
" )
ó õ ô ö
ó ô õ ö ó õ ô ö
202
ó õ ô ö ó ó õ ô ô õ ö ö ó ô õ ô ö ó õ ö ó õ ô ö ó õ ô ö ó õ ô ö ó õ ô ö
Park and Ride Parking Lot Amtrak Station
ó ô õ ö ó90 ô õ ô ö ó õ ö
õ ö óô õ ô ö ó ô õ ö ó õ ô ö ó õ ô ö ó õ ô ö ó õ ô ö ó
301
Airport
10
¬ «
See inset
Legend
500
105
¬ « ¬ « 116
228
27
¬ «
§ ¨ ¦
125
" )
" ) " )
A1A
295
ó õ ô ö
" ) 124
335
¬ «
17
301
" )
A1A
A1A
£ ¤
" ) " ) £ ¤
® q ¤ n ¤ n
ó ô õ ö
108
¬ «
105
¬ « ¬ «
107
§ ¨ ¦ ó õ ô ö
1
£ ¤
ó õ ô ö
" )
326
Projects ID's shown on County Maps
ó õ ô ö
Figure 4-15 Cost Feasible Plan Transit BRT, Commuter Rail, Skyway, Streetcar 4-19
¯
0
10,560 Feet
0
4
8 Miles
ó õ ô ö
ó õ ô ö ó õ ô ö ó õ ô ö ó ô õ ö
22 23
S CS
18
ó õ ô ö
2 23
ó ô õ ö ó õ ô ö ó õ ô ö
2321
7
2386
CSS3
ó õ ô ö
301
ó õ ô ö ó õ ö óô ô õ ö ó õ ô ö ó 1179 õ ô ö
" )
£ ¤ " ) 217
§ ¦ ¨ 295
224
¬ «
ó õ ô ö
23
¬ «
ó õ ô ö
CS S1
7
10 CSS
" )
óô ô õ ö ó09 õ ö 2 0 23
8
ó õ ô ö
" ) 220A
ó õ ô ö
" ) " ) ôõö 1189
" ) 13B
220 ó
" ) 15A
" ) 220
" ) 739
5 23 8
" ) 218
" ) 739B
" ) ¬ « 215
" ) 209
13
¬ « 15
¬ «
21
" ) 315
16
¬ «
" ) 16A
16
¬ « 17
£ ¤ 230
¬ «
" ) 226
" ) 315
" ) 209
Legend
" ) 315
ó õ ô ö
" ) 352
21
¬ «
" ) 214
Park and Ride Parking Lot
JTA Mobility & Transit Access Improvements Commuter Rail Corridors
" ) 214
Bus Rapid Transit Corridors
" ) 209
Railroad System
" ) 315
Roadway System Water Bodies
21
¬ « ¬ «
" " ) ) Conservation Lands 209
309D
26
Six Counties Boundaries
Figure 4-16 Cost Feasible Plan Clay County Transit Projects BRT and Commuter Rail Date: 11/10/2014
4-20
¯
0
0
10,560 Feet
1.5
3 Miles
õ ô ó ö
CSS9
CSS7
23 5
6
CS S 13
2356
232 3
CSS12
õ ô ó ö
A1A
¬ «
£ ¤ 23
¬ «
2349
58 23
2326
2 23
õ ô ó ö
2355
A1A
® q
2385
2354
7 232
115
õ ô ó ö 104
2356
¬ «
235 0
238 6
7
301
£ ¤
CSS5
õ ô ö ¬ «ó
2352
£ ¤ 17
õ ô ó ö
¬ «
§ ¦ ¨ 295
2354
S CS
CS S3
134
õ ô ó ö
23
¬ «
õ ô ö õ ô ó óó õ ô ö ö õ ô ó ö õ ô ó ö 224 õ ¬ ô ó ö « ó õ ô öô õ ö 21 ó
¬ « 0 23
õ ô ó ö 200
Date: 11/10/2014
õ ô ó ö
Streetcar Riverside
A1A
¬ «
Streetcar Springfield
ó õ ô öó õ ô ö
202
¬ «
Commuter Rail Corridors
8
Bus Rapid Transit Corridors
õ ô ó ö
£ ¤ 17
§ ¦ ¨ 295
CS S1
Transportation Intermodal Center
7
10 CSS
Railroad System
õ ô ó ö
1
£ ¤
Roadway System Water Bodies
§ ¦ ¨
13
95
¬ «
ó õ ô ö
St John's River Ferry
152
¬ «
Conservation Lands õ ô ó ö
õ ô ó ö
¬ «
90
Streetcar Downtown
17
ó õ ô ö õ ô ó ö õ ô ó ö
¬ «
£ ¤
2385
2325
2321
23 5
128
ó õ ô öó õ ô ö
7
¬ «
CSS2
2386
õ ô ó ö
See inset
2 23
301
£ ¤
17
õ ô ö ¬ «ó õ ô ó ö õ ô ó ö £ ¤
2 232
228
£ ¤
Park and Ride Parking Lot Streetcar Five Points
10
¬ «
CSS 18
10
õ ô ó ö
Airport
JTA Mobility & Transit Access Improvements
2358
90
0
CSS6
£ ¤§ ¦ ¨
4
¬ «
116
CSS1
2349
® q
A1A
¬ «
CSS11
2
õ ô ó ö ó õ ô ö õ ô ó ö
1 SS 8C SS 4C
2331
§ ¦ ¨
CSS9
S1 CS
232 3
Legend
95
S7 CS
1
£ ¤
CSS 2
Downtown Jacksonville Inset
A1A
õ ô ó ö
2356
CSS5
15 CSS
Figure 4-17 Cost Feasible Plan Duval County Transit Projects BRT, Commuter Rail, Skyway, Streetcar 4-21
Six Counties Boundaries
õ ô ó ö
¯
0
10,560 Feet
0
3
6 Miles
" ) 108
" ) 115
£ ¤ 301
17
" ) £ ¤
105A
107
£ ¤
115
" )
" ) " ) 200A
1
105
« ¬ « ¬
A1A
" ) 108
õ ô ó ö
105
¬ « ¬ «
2356
õ ô ó ö
§ ¦ ¨ 95
£ ¤ 23
A1A
" ) 107
Legend
" ) 108
" ) 2
15
¬ «
" ) 127
115
£ ¤
ö õ ô ó ö 104
CSS5
105
õ ô ó ö
Park and Ride Parking Lot Streetcar Five Points Streetcar Downtown
¬ «
Streetcar Riverside
CSS5
¬ «
2356
119
295
2 23
¬ «
¬ «
) " )¬ « " 23A 121
228
200
¬ « £ ¤ 301
23
¬ « « ¬ « õ ô ó ö¬ 134
134
2 232
15
¬ « £ ¤ õ ô ó ö¬ « õ ô ó ö 17
208
« " )¬ 213
5
õ ô ó ö
2 11
" ) 211
8 23
6
¬ « CSS1
2349
£ ¤ ¬ « 1
13
CS S2
109
¬ «
Roadway System
10
¬ «
Water Bodies
115
202
¬ «
A1A
« ¤¬ ¬ « õ ô ó ö £
ó õ ô öó õ ô ö2385
¬ «
Figureó 4-18 Cost Feasible Plan õ ô ö ¬ «5 õ ô ó ö Nassau County Transit Projects BRT, Commuter Rail, Skyway, Streetcar õ ô ó ö 4-22
Railroad System
A1A
¬ «
2325
¬ «
S1 CS
116
7
Date: 11/10/2014
õ ô ó ö
8
£ ¤
228
8
Bus Rapid Transit Corridors St John's River Ferry
¬ «
109
2 23
" ) 123
228
10
CS S3
õ ô ó öó ó õ ô ö õ ô ö
§ ¦ ¨
90
5 23
3
CSS 18
CSS6
23C
CS S1
CSS9
3
23D
" )
Commuter Rail Corridors
2331
S7 CS
CS S 12
§ ¦ ¨
" ) " )
125
Streetcar Springfield
A1A
õ ô ó ö
õ ô ó ö
) " )" 121
JTA Mobility and Transit Access Improvement
2326
¬ « õ ô ó
301
Airport
A1A
® q
õ ô ó ö
® q
¬ « ¬ « ¬ «
2356
2
¬ «
A1A
212
¯
90
0
ó õ ô ö õ ô ó ö 203 10,560 Feet
" )
Conservation Lands Six Counties Boundaries 0
3.5
7 Miles
õ ô ó ö ó õ ô ö õ ô ó ö
ó õ ô ö õ ô ó ö õ ô ó ö
2 23
õ ô ó ö
115
¬ «
7
2308
2358
õ ô ó ö
ó õ ô ö õ ô ó ö
202
¬ « ¤ n
§ ¦ ¨ 295
¬ « A1A
" )
210A
2325
ó õ ö õ ô ó ö õ ô ó öô õ ô ó ö õ ô ó ö
õ ô ó ö
§ ¦ ¨ 295
õ ô ó ö
2 23
ó õ ô öó õ ô ö
õ ô ó ö
7
õ ô ó ö St. Augustine Inset
" ) 13B
õ ô ó ö
õ ô ó ö
" ) 210
13
5 23
¬ «
8 2 23 7
16
¬ «
16
¬ «
" ) 13A
® q
õ ô ó ö
¤ n
£ ¤
" ) 13
1
ó õ ô ö õ ô ó ö
16
¬ «
" ) 208
2 23
§ ¦ ¨ 95
" ) 13A
¬ « A1A
¤ n
See inset
õ ô ó ö
7
õ ô ó ö 312
¬ «
" ) 214
õ ô ó ö
" ) 13A
Legend ® q ¤ n ¤ n õ ô ó ö
1
£ ¤
207
¬ «
" ) 209
Airport
£ ¤ Amtrak Station ¬ « Passenger Rail Station 17
¬ « A1A
" ) 305
15
206
¬ «
Park and Ride Parking Lot 09 Commuter Rail 2Corridors
" )
Bus Rapid Transit Corridors Railroad System
" )
207A
Roadway System Water Bodies
" ) 13
19
¬ « ® q ) Conservation Lands ¬ «" 100 1447
2016 Six Counties Boundaries
" )
" ) 310
Date: 9/29/2014
" ) 204
100
¬ « Figure 4-19 Cost Feasible Plan St. John's County Transit Projects BRT and Commuter Rail 4-23
¯
0
0
10,560 Feet
1.5
3 Miles
Path Forward 2040 Long Range Transportation Plan
Table 4-2. Federal and State Transit Capacity Projects Cost Feasible Plan 57 Improvement Type BRT
2308
Facility SR 21 Blanding Boulevard
From Wells Road
To CR 218
Phase CAP
2321
SR 134 103rd Street
SR 21 Blanding Boulevard
SR 228 Normandy Boulevard
CAP
2322
SR 228 Normandy Boulevard
Downtown Jacksonville
SR 134 103rd Street
CAP
2323
US 1 SR 5 New Kings Road
Downtown Jacksonville
SR 111 Edgewood Avenue
CAP
2325
SR 115 Southside Boulevard
US 90 Beach Boulevard
Avenues Mall
CAP
2326
I-95
Gateway Mall
Jacksonville International Airport
CAP
2385
East First Coast Flyer 59
Downtown Jacksonville
SR A1A 3rd Street (Jacksonville Beach)
CAP
2386
Southwest First Coast Flyer 60
Downtown Jacksonville
Wells Road
CAP
Commuter Rail 61
2327
Southeast (FEC)
Downtown Jacksonville
St. Augustine (St. Johns County)
CAP
Ferry Slip Replacement
2331
SR A1A St. Johns River Ferry
57
ID
58
CAP
Fund Source State and Federal Transit Transit Local Match Total State and Federal Transit Transit Local Match Total State and Federal Transit Transit Local Match Total State and Federal Transit Transit Local Match Total State and Federal Transit Transit Local Match State and Federal Transit Transit Local Match Total State and Federal Transit Transit Local Match Total State and Federal Transit Transit Local Match Total State and Federal Transit Transit Local Match Total FTA Passenger Ferry Grant Total
Years 2019-2020
Years 2021-2025 $37.97 $12.66 $50.63 $17.22 $5.74 $22.96 $31.39 $10.46 $41.85
Years 2026-2030
Years 2031-2040
$11.37 $3.79 $15.16
$12.07 $4.02 $16.09 $18.23 $6.08 $24.30 $12.35 $4.12 $16.47 $24.50 $8.17 $32.67 $17.24 $5.75 $22.99 $114.69 $38.23 $152.93 $6.62 $6.62
$151.14 $50.38 $201.52
22-Year Total $37.97 $12.66 $50.63 $17.22 $5.74 $22.96 $42.76 $14.25 $57.01 $12.07 $4.02 $16.09 $18.23 $6.08 $24.30 $12.35 $4.12 $16.47 $24.50 $8.17 $32.67 $17.24 $5.75 $22.99 $265.83 $88.61 $354.44 $6.62 $6.62
The revenue estimate to support these projects includes statewide New Starts Program funding which are allocated on a statewide basis. New Start Programs are not shown in the FDOTâ&#x20AC;&#x2122;s Adopted Work Program. Transit Local Match funding will be provided from Jacksonville Transportation Authority Operating Revenue and Duval County Transit Surtax. 59 Corridor includes SR 115 Arlington Expressway, SR 115 Southside Boulevard and SR 10 Atlantic Boulevard and other routes near downtown. 60 Corridor includes SR 21 Blanding Boulevard and other routes near downtown in Riverside. 61 The funding for rail capacity improvements needed to accommodate commuter rail for the segments from Green Cove Spring to Downtown Jacksonville and Downtown Jacksonville to Yulee are shown in the Strategic Intermodal System Multimodal Program projects. 4-24 58
Path Forward 2040 Long Range Transportation Plan Table 4-2. Federal and State Transit Capacity Projects Cost Feasible Plan Improvement Type Streetcar 62
Regional Transportation Center
Park and Ride Lots
ID
57 58
2349
Facility Downtown - Sports Complex
From
2350
Five Points/Core/Brooklyn
CAP
2352
Riverside/Avondale
CAP
2354
Springfield
CAP
2355
Downtown Multimodal Transit Intermodal Facility
CAP
State and Federal Transit Transit Local Match
Regional
CAP
State and Federal Transit Transit Local Match Total
Grand Total Table 4-3. Summary of Funding Source for Transit Fund Source FTA Passenger Ferry Grant 63 FTA Passenger Ferry Grant Total State and Federal Transit
State and Federal Transit Total Transit Local Match
Transit Local Match Total Grand Total 62
Improvement Type Ferry Slip Replacement BRT Commuter Rail Park and Ride Lots Streetcar Regional Transportation Center BRT Commuter Rail Park and Ride Lots Streetcar Regional Transportation Center
To
Phase CAP
Fund Source State and Federal Transit Transit Local Match Total State and Federal Transit Transit Local Match Total State and Federal Transit Transit Local Match Total State and Federal Transit Transit Local Match Total
Years 2019-2020
Years 2021-2025
Years 2026-2030 $45.91 $15.30 $61.22
Years 2031-2040
$129.41 $43.14 $172.55 $26.58 $8.86 $35.44 $70.29 $23.43 $93.73
$9.26 $3.09 $12.34 $84.10
Years 2019-2020
$53.81
$30.38 $10.13
$30.38 $10.13
$238.76
$229.30
$467.79
$9.26 $3.09 $12.34 $1,019.95
Years 2021-2025 $6.62 $6.62 $117.16
Years 2026-2030
Years 2031-2040
$11.37 $114.69
$151.14
$45.91
$199.71
$171.98 $3.79 $38.23
$350.84
$15.30
$66.57
$57.33 $229.30
$116.95 $467.79
$9.26
$63.07 $17.94
$26.58 $30.38 $174.11 $39.05
$50.38
$3.09
$21.02 $84.10
22-Year Total $45.91 $15.30 $61.22 $129.41 $43.14 $172.55 $26.58 $8.86 $35.44 $70.29 $23.43 $93.73
$8.86 $10.13 $58.04 $238.76
22-Year Total $6.62 $6.62 $182.34 $265.83 $9.26 $272.20 $30.38 $760.00 $60.78 $88.61 $3.09 $90.73 $10.13 $253.33 $1,019.95
The final transit technology will be determined during the alternative analysis phase. Other capital improvements for the St. Johns River Ferry are also recommended but are unfunded at this time. They are included in the Long Range Plan as illustrative projects: 2329, Drydock and Ferry Repairs, 2333 Long-term Site Improvements, 3344 Relocation of Ferry Offices, and 2346 Short-term Site Improvements. 4-25
63
Path Forward 2040 Long Range Transportation Plan This page is intentionally blank
4-26
Path Forward 2040 Long Range Transportation Plan
ACTIVE TRANSPORTATION AND CONTEXT SENSITIVE SOLUTIONS E FFECTIVE BICYCLE AND PEDESTRIAN CONNECTIONS ARE ESSENTIAL FOR A VIBRANT REGION .
INTRODUCTION
NEEDS PLAN
Our Path Forward 2040 LRTP addresses the mobility needs of our residents. For many, access to transit and the ability to walk to work or shop may be more important than driving. Our older generations need more choices for personal mobility that do not rely on automobiles and younger generations are choosing more active lifestyles that include bicycles and walking. For these reasons, our plan places an increased emphasis on addressing the needs for bicyclists and pedestrians to connect our neighborhoods with jobs, recreation and social services. The combination of these projects is summarized as “Active Transportation” projects.
DEDICATED BICYCLE AND PEDESTRIAN PROJECTS As part of the planning process, we identified a set of regional bicycle and pedestrian projects as shown on Figures 4-20 through 4-25 and summarized in Table 4-4. These needs were identified through an extensive coordination process with the local governments that built on the previously adopted plans of the North Florida TPO and local municipalities.
4-27
19 21
" ) 108
" ) 115
0 .1
2120
2130
127
8
2
A1A
¬ «
2063
" )
¬ «
105
§ ¦ ¨ 20 6
9
2103
2091
4
2021
2082
23
2 20
§ ¦ ¨ 295
2087
220
2005
2086
¬ «
2007
£ ¤
2147
¬ «
4 21
5
3
2002
2010
16
¬ «
£ ¤
9
1
21 4
" ) 315
Priority Ranking 1 2 4
" ) 209
13A
13
17
" )
207
¬ «
17
100
1
204
¬ «
213 4
" ) £ ¤ 318
" ) 329
301
5 200 201
« £ ¤¬ £ ¤ ¬ «" " ) ) " ) ¬ « ) ¬ « " ) " ) ¬ ¬ «" «
" ) 316
335
7 20
326
Date: 8/14/2014
2051
7
500
2016
6
225
2017
207
3 208
27
¬ «
225A
25A
441
25
200A
200
326 326
309
" ) 308
2137
8 201
202 1
2145
75
" )
213 5
2136
§ ¦ ¨
19
2103
2029
2071 2104
2026
2070
" )
200A
2142
320
310
2154
" )
" )
2
2153
2079
21
2040
2078
335
" )
3 21
4
2052
" ) " )
2105
¬ «
206
¬ «
8 2046
A1A
4 21
6 20
204 5
2140
" )
20
2055
5
¬ «
21 3
315
2034
£ ¤
3
¬ «
" )
2059
2152
2145
21 3
26
Six Counties Boundaries
" )
§ ¦ ¨ 95
305
Roadway System Conservation Lands
¬ «
2146
¬ «
" )
Water Bodies
A1A
2141
2138
214
214
5
2151
21 3
3
208
£ ¤
315
16
¬ « " ) " " ) ) " )
7
9 200
Pedestrian and Bike Needs Projects
207 3
2142
16
¬ «
4
95
4 21
§ ¦ ¨
21
Existing Florida Greenways and Trails
A1A
2148
¬ « Legend
2139
4 215
5 21
202
6
" )
" )
2003
13
2056
2022
1
5
2006
£ ¤ ¬ «
2020
6 20
2001
3
90
0
2037
7 20
2008
218
21 0
2093
00
2015
10
¬ «
3
301
8 20
20
¬ «
£ ¤
7
130
7 20
" )
134
¬ « ¬ «
228
1
228
116
2096
10
2036
8 20
" )
§ ¦ ¨
2080
202 5
90
20 7
" )
2104
2122
2042
2034
295
2051
¬ « £ ¤
124
2106
2031
221
2055
2030
" ) 125
¬ « ¬ «
2058
" )
20 4
295
1
2049
§ ¦ ¨
119
" )
A1A
2064
122
250A
2097
301
250
A1A
17
£ ¤
" )
2108
21 2
" )
¬ «
2127
¬ « ¬ «
8 211
2
2107
A1A
£ ¤
" ) " ) 108
¬ «
" )
2129
95
1
17 21
2 21
§ ¦ ¨
£ ¤
105
107
326
Figure 4-20 Bicycle and Pedestrian Needs 4-28
¯
0
10,560 Feet
0
4
8 Miles
Legend
Existing Florida Greenways and Trails Nassau County Bicycle Needs Florida Greenways and Trails
½ ¾ ¾ ½
Roadway System Water Bodies
Conservation Lands
Six Counties Boundaries
" )
10
¬ « 2
" ) 127
" ) 2
" ) 121
" ) 122
" )
½ ½ ¾ ¾
½ ¾ ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾
23D
" )
2122
23C
¬ « 121
229
½ ½ ¾ ½ ¾ 2106 121 ¾ ½ ½ ¾ ½ ¾ 301 ½ ¾ ¾
" )
" )
½¾ ¾ ½
139B
¬ « 228
" ) 23A
§ ¦ ¨ 10
" )
" )
228 ½ ½ ¾ ¾
½ ¾ ¾ ½
" ) 130
" ) 229
0 20
" ) 231
½ ¾
½ ¾
0
½ ¾
½ ¾
½ ¾
½ ¾
" ) " ¬ « ) ) " £ ¤ " ) " ) 228
228
228
217
301
217
218
¾½
¾½
¾½
½ ¾ ¾ ½ ¾ ½
½ ¾
301
½ ¾
125
½ ½ ¾ ½ ¾ ¾ ½ ¾
Figure 4-21 Baker County Bicycle and Pedestrian Corridors Date: 10/14/2014
4-29
½ ¾
" )
£ ¤
½ ¾
123
90
½ ¾
½ ¾
10
" )
£ ¤
§ ¦ ¨
½ ¾
124
" ) £ ¤ ¤ £
½ ¾
" )
250A
119
" ) " )
250
" )
" )
½ ¾
127
½ ¾
½ ¾ ¾ ½
125
½ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ¾
" )
¯
0
0
10,560 Feet
1.5
3 Miles
202 5
2027
7 20
2031
4
6
8 20
7 20
2011
2090
2083
2081
2104
2082
7
2 20
3
§ ¦ ¨
2087
295
" )
£ ¤ " ) 217
224
¬ «
23
¬ «
5 207
2065
2008
" )
2001
209
2086
301
1179
5 21 0
" )
" ) " ) 1189
2005
2004
220
2003
2148
" ) 13B
2007
2147
2155
220A
" ) 15A
" ) 220
" ) 218
" ) 739
" ) ¬ « 21
2010
" ) 16A
" ) 739B
" ) 209
2002
215
2143
13
¬ «
" ) 315
15
¬ «
16
¬ «
16
¬ « 17
£ ¤ 230
¬ «
" ) 226
2149
" ) 315
" ) 209
2009
" ) 315
Legend
" )
Existing Florida Greenways and Trails
352
21
¬ «
" ) 214
Pedestrian and Bike Needs Projects Priority Ranking
" ) 214
" ) 209
1 2 3
" ) 315
4 5
21
¬ « ¬ «
Roadway System
" )
Water Bodies
21 3
3
" ) 209
309D
26
Conservation Lands
Six Counties Boundaries
Figure 4-22 Clay County Greenways & Trails and Bicycle Priorities Date: 8/14/2014
4-30
¯
0
0
10,560 Feet
1.5
3 Miles
21 2
9
2123
2115 2034
8 211
¬ «
£ ¤
8
21 2
6 20
8
A1A 23
115
2097
£ ¤ 17
A1A
¬ «
2064
2038
95
£ ¤
202 5
2034 2053
2103
2029
2
152
¬ «
2095
3 4
95
2148
Roadway System
43 21
Water Bodies Conservation Lands
4 215
2155
§ ¦ ¨
5
2139
Six Counties Boundaries
4 21 4
Date: 8/14/2014
2052
1
Figure 4-23 Duval County Greenways & Trails and Bicycle Priorities
200
¬ «
Priority Ranking
6
2007
Pedestrian and Bike Needs Projects
202
7 20
2004
2147
4-31
1
Airport Existing Florida Greenways and Trails
¬ «
1
13
2003
¬ «
£ ¤ ¬ «
2006 2005
2065 2086
2009 2001
¬ «
£ ¤ 17
A1A
2142
21
2008
5
2087
§ ¦ ¨
2020
7 20
224
3
2083
2 20
295
¬ «
90 2022
2091
2082 2081 21 04
23
¬ «
£ ¤
2048
2031
2090
7
134
¬ «
2011
7 20
¬ «
2027
® q
2056
2096
17
2094
£ ¤
2035
128
¬ «
202
Legend
2037
10
¬ « 2021
4
301
2016
8 20
£ ¤
228
2015
8 201
2101
20 0
0
207 4
10
17
2036
2062
2014
2093
£ ¤§ ¦ ¨ 90
2080
2040
2051
2 207
¬ «
116
2041
2106
2030
2066
2070
2042
2054
2122
2055
Downtown Jacksonville Inset
A1A
¬ «
8
2033
§ ¦ ¨ 295
5 201
2016
6 207
6 20
207 3
9
7
1
201 7
1
£ ¤
2078
7 20
20 9
2040
5 20
§ ¦ ¨
2105
2079
2049
0 205
2
2046
2083
104
¬ «
8 20
2070
2063
¬ «
2055
2058
301
2069
£ ¤
2071
2039
2026
207 3
2060
¬ «
2029
A1A
® q
2104
2059
¯
0
10,560 Feet
0
3
6 Miles
21 2
0 .2
" ) 108
" ) 115
£ ¤ 301
" )
£ ¤ 17
" )
" ) 200A
21 2
0.
1
115
£ ¤ 1
0 213
21 17
£ ¤
105A
105
« ¬ « ¬ 2107
211 9
2127
" ) 107
" ) 108
2108 105 2113
§ ¦ ¨ 95
23
" )
A1A
2129
2120
2118
107
¬ « ¬ «
A1A
2123
2115
" ) 108
A1A
21 2
8
¬ « ¬ « ¬ «
" ) 2
2
¬ «
15
¬ «
Legend
105
A1A
® q
® q
Existing Florida Greenways and Trails
2039
£ ¤ 301
104
2064
¬ «
20 9
§ ¦ ¨
) " )¬ « " 23A 121
Date: 8/14/2014
228
200
¬ « £ ¤ 301
23
¬ « ¬ « ¬ « 134
134
213
2030
207 4
¬ «
20 0
¬ «
15
21 0
4
¬ « £ ¤¬ « 17
211
2080
2053
£ ¤ ¬ «
8 201
1
13
2069
2103
2052
2036
2015
109 Figure 4-24 Nassau County « 211
Roadway System
¬ «
10
¬ «
Water Bodies
2037
2021
2022
115
21 " ) and Bicycle ¬ « Greeways & Trails ¬ «5 Priorities
4-32
5
1
A1A
2062
7
" ) 123
8
2072
2
109
¬ «
2040
7 20
228
228
¬ «
8 20
116
4
2058
10
2055
20 4
¬ «
2091
§ ¦ ¨
90
2042
2054
2122
£ ¤
2033
207 3
9
202
¬ «
Conservation Lands
2096
2106
0
125
2031
" )
2 3
8
23D
23C
2049
2034
295
6 20
" ) " )
1
¬ «
119
2070
121
Priority Ranking
A1A
2032
) " )"
Pedestrian and Bike Needs Projects
2063
115
¬ «
2097
" ) 127
Airport
Six Counties Boundaries
A1A
« ¤¬ ¬ « £ 212
¯
90
2056
0
" ) 203
10,560 Feet
0
3.5
7 Miles
209
" )
½ ¾
½ ½ ¾ ½ ¾ ¾
½ ½ ¾ ½ ¾ ¾ ½ ¾ ¾ ½
" )
½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾
½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ½ ¾ ½ ¾ ¾ ½
¾½
2132 ½ ½ ¾ ½ ¾ ¾
½ ¾
½ ½ ¾ ¾ ¾ ½
½ ¾
19
¬ «
¾½
21
½ ½ ¾ ½ ¾ ¾
½ ¾
½ ¾
½ ¾
½ ¾
½ ¾
310
½ ¾
" )
¾½ ¾½
¾½
¾½
" )
" ) 309
" ) 308
½ ¾ ½ ¾
½ ¾
" ) 309
½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾
Roadway System Water Bodies
½ ¾
½ ¾
Six Counties Boundaries
½ ½ ¾ ½ ¾ ¾½ ½ ¾ ¾
½ ¾
" ) 314
Date: 10/14/2014
½ 213 ¾ ¾ 5 ½ ½ ¾ ½ ¾
Figure 4-25 Putnam County Greenways & Trails and Bicycle Priorities 4-33
½ ½ ¾ ¾ ¾ ¾ ½ ½ ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½¾ ¾ ½ ¾
Land Trail Opportunities
Conservation Lands
½ ¾
½ ¾ 308B
½ ¾
Clay Multi-Use Path Needs
" )
15
¬ «
17
½ ¾
½ ¾
½ ¾ ½ Florida Greenways and Trails ¾
35
½ ¾
½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½
Existing Florida Greenways and Trails Putnam Multi-Use Path Needs
½ ¾
½ ¾
Legend ½ ¾
½ ¾
¾ ½
½ ¾
½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½
½ ¾
½ ¾ ½ ¾ ½ ½ ¾ ¾
½ ¾ ¾ ½ ¾ ½ ¾ ½ ½ ¾
£ ¤
¾½
½ ¾
½ ¾
20
¬ «
½ ½ ¾ ¾
" )
" )
309B
¾½
½ ¾
½ ¾
½ ½ ¾ ¾
½ ¾
½ ¾
2136
½ ¾
½ ¾
½ ¾
½2134 ¾
310
½ ¾
" ) 315
¬ «
½ ¾ ¾ ½ ¾ ½¾ ½ 100¾ ½ ½ ¾
¬ «
" )
½ ½ ¾ ¾
7
½ ¾
½ ¾
½ ¾
½ ½ ¾ ¾
½ ¾
3 21
½ ¾
½ ¾
1
½ ¾
½ ¾
3 21
½ ¾
½ ¾
½ ¾
½ ¾
½ ½ ¾ ½ ¾ ½ ¾ ¾
216
" )
½ ¾
½ ¾
9
½ ¾ ½ ¾
" )
½ ¾
½ ¾
¾½
½ ½ ¾ ¾
½ ¾
" )
207A
½ ¾
½ ¾
2140
½ ¾
½ ¾
21 4
½ ¾
½ ¾
½ ¾
¾½
½ ¾
30
207
½ ½ ¾ ½ ¾ ¾
½ ¾ ½ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾ ¾ ½ ½ ¾ ½ ¾
½ ¾
" )
¬ «
½ ¾
½ 2133 ¾ ½ ¾
309C
" )
¾ ½ ¾ ½ ¾ ½
½ ¾
½ ¾
¬ «
½ ¾ 20 ½ ¾ ¾ ¾ ½ ½ ¾ ½ ¾ ½
13A
½ ¾
½ ¾
21
½ ¾ ½ ¾ ½ ½ ¾ ¾ ¾ ¾ ½ ½¾ ½ 20A ½ ¾ ¾ ½ ½ ½ ¾ ½ ¾ ¾
½ ¾
¬ «
" ) ¾½
100 ¾ ½ ¾ ½ ¾ ¾ ½ ½ ¾ ½ ¾ ½ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾ ½
" )
214 ¾ ½ 2138 ½ ½ ¾ ¾ ¾ ½ ½ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ½ ¾ ¾
¾½
26
¬ «
209
¾½ ¾½ ¾½ ½ ¾ ½ ¾
½ ¾
219
" )
½ ¾
" )
309D
½ ¾
" )
13A
½ ¾
214
" )
½ ¾
214
" )
13
½ ¾ ¾ ½ ½ ¾ ½ ¾
" )
315C
" )
½ ¾
" ) ½ ¾
352
½ ¾
½ ¾
¾½
208
½ ¾
½ ¾
" )
½ ¾
2009
" ) 315
" )
13A
½ ½ ¾ ¾ ½¾ ½ ¾ ½ ¾
" ) 315
½ ¾
21
" )
½2155 ¾ ½ ¾
¾½
226
½ ¾
¬ «
16A
¾½
" )
¾½
¾½
" ) ½ ¾
½ ¾ ¾ ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾
15A
¾½
½ ¾
¾½ ½ ½ ¾ ¾ ½ ¾
½ ¾
00A
½ ¾
½ ¾
315
½ ¾
16A
½ ¾
½ ¾
¾ ½
½ ¾
2002 ½ ¾ ¾ ½ ¾ ½ ½ ¾
" )
2010 ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½¾ ½ ¾ ½ ¾ ½ ¾
½ ¾ ¾ ½ " )
" )
¾ ½
½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ½ ¾ ¾
½ ¾
½ ¾
½ ¾
½ ¾ ¾ ½ ¾ ½ 2 ½ ¾ ½210¾ ½ ¾ ¾ ½143 ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ½ ¾ ¾ ½
½¾ ¾ ½
½ ¾
½¾ ½¾ ¾ ½
½ ½ ¾ ¾
½ ¾
¾ ½
215
½ ¾
739
¾½
" )
¾½
4
" )
" )
½ ¾
209
¾½
225
" )
½ ½ ¾ ¾
" )
" )
15A
½ ¾
00A
" )
½ ½ ¾ ¾
4 21
2001
13B
½ ¾
220
218
½ ¾
¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½
" )
2148 ½ ½ ¾ ¾
½ ¾ " ) ½ ¾
" )
½ ½ ¾ ¾
½ ¾
½ ¾ ¾ ½
" )
220A
¯
0
0
10,560 Feet
2
4 Miles
½ ¾
½ ¾
4
2082
8 20 7 20
2104
7
5 207
§ ¨ ¦ 295
2041
" )
3
2139
2086
2145
A1A
5 21
2142
2065
¬ «
210A
2095
2087
2008
295
2091
3
§ ¨ ¦
2083
2081
2 20
202
¬ «
115
¬ « 2020
2137
2048
3 209
2154
2151
2090
2058
¤ n
2142
St. Augustine Inset 0
7 20
5 21
" ) 13B
2007
6
2004
2148
2147
4 215
" ) 210
2143
4 21
13
4
¬ «
1 20
16
16
¬ «
215 5
" ) 13A
¤ n
® q
£ ¤
21 4
9
¬ «
0
" ) 13
1
16
¬ «
" )
¬ « A1A
¤ n
2151
208
2141
§ ¨ ¦ 95
13A
2152
21 3
7
214
3
2009
" )
312
¬ «
2146
2138
5 21
" )
Legend
13A
Airport
Amtrak Station
Passenger Rail Station209
" )
Existing Florida Greenways and Trails 17
£ ¤ Pedestrian and Bike Needs Projects ¬ « Priority Ranking 1 2
305
2140
2134
A1A
206
¬ «
209
" ) 207A
21
31
" ) 13
33 Roadway21System 19
® q Water Bodies
¬ « ) ¬ «" 100 1447
Conservation Lands2016
" )
" ) 204
100
¬ « 2135
" )
2132
310 Six Counties Boundaries
Figure 4-26 St. John's County Greenways & Trails and Bicycle Priorities Date: 8/14/2014
¬ «
" )
3 5
1
" )
15
4
£ ¤
207
¬ «
2145
® q ¤ n ¤ n
" )
4-34
¯
0
0
10,560 Feet
1.5
3 Miles
Path Forward 2040 Long Range Transportation Plan Putnam
4-33
Path Forward 2040 Long Range Transportation Plan St. Johns
4-34
Path Forward 2040 Long Range Transportation Plan Table 4-4. Dedicated Bicycle and Pedestrian Project Needs by County County Map Id Corridor Baker 2000 SR 121 Rail Trail Corridor Clay 2001 Cecil Field Conservation Corridor Clay 2002 CR 218 Clay 2003 CR 220 Doctors Inlet Road Clay 2004 CR 220 Doctors Inlet Road Clay 2005 Long Bay Road Clay 2006 Old Jennings Road Clay 2007 US 17 Clay 2009 US 17 Roosevelt Boulevard / Park Avenue Clay 2008 US 17 Park Avenue Clay / St. Johns 2010 SR 16 Duval 2012 5th Street Duval 2013 Arlington Road Duval 2014 Arlington Road West Duval 2019 Bay Street Duval 2020 Baymeadows Road Duval 2023 Beauclerc Road Duval 2026 Boulevard Street Duval 2027 Bowden Road Duval 2028 Bowden Road Duval 2029 Broad Street Duval 2031 Cecil Field Conservation Corridor Duval 2032 Clark Road Duval 2033 Commonwealth Avenue Duval 2034 CSX Corridor North Duval 2035 Deerwood Area Duval 2036 Downtown Jacksonville Duval 2037 Downtown Neptune/Atlantic Beach Duval 2039 Duval Road Duval 2040 Duval Street Duval 2041 East Coast Greenway - Duval County Corridor Duval 2043 SR 111 Edgewood Avenue Duval 2045 Forest Street Duval 2046 Forsyth Street Duval 2047 Gate Parkway East Duval 2048 Gate Parkway South East Duval 2052 Hogan's Creek Greenway Duval 2053 Hubbard Street Duval 2054 Imeson Road Duval 2055 Jacksonville Baldwin / East Coast Corridor Duval 2056 Jacksonville Beach Area Duval 2057 Jefferson Street Duval 2058 Kernan Boulevard Duval 2059 Laura Street Duval 2060 Laura Street Duval 2061 Lee Street Duval 2062 Lone Star Road Duval 2065 Mandarin Road Duval 2089 Mary Street Duval 2066 McCoys Creek Boulevard / Fitzgerald Street Duval 2067 McCoys Creek Boulevard / Fitzgerald Street
From Baker/Union County Line CR 218 SR 16 SR 21 College Drive SR 21 Blanding Boulevard Long Bay Road at CR 220 (Fleming Island Area) Palatka at Kingsley Avenue (Orange Park) Kingsley Lake Drive Lane Avenue Lone Star Road Cesery Road Myrtle Avenue SR 115 at Southside Boulevard I-295 5th Street US 1 Philips Highway Spring Park Road Water Street Duval/Clay County Line Broward Road Imeson Road US 17 Main Street / S Rail Line Deerwood Park Boulevard at Sherry Drive, 2nd Street, Ocean Street, Cherry Street, SR A1A Airport Road Lee Street St. Johns / Duval County Line St. Johns Avenue Acosta Street Myrtle Avenue Gate Parkway Deerwood Parkway Market Street Orange Street Commonwealth Avenue Bulls Bay Highway (Jacksonville Baldwin Corridor) at 3rd Avenue, Ocean Street, 2nd Avenue, South 10th Street Water Street SR 152 Baymeadows Road 8th Street Bay Street Water Street Mill Creek Road SR 13 San Jose Boulevard San Marco Boulevard McDuff Avenue Nixon Street 4-35
To Baker/Nassau County Line Duval/Clay County Line SR 21 College Drive US 17 Old Jennings Road SR 23 First Coast Expressway Clay/Duval County Line SR 13 San Jose Boulevard Melson Avenue King Arthur Road King Arthur Road Lee Street SR 13 San Jose Boulevard 12th Street Spring Park Road Southpoint Parkway 5th Street US 90 Beaver Street US 17 Main Street Lane Avenue US 17 Main Street / Trout River Drive Gate Parkway
Airport Center Drive Georgia Street Nassau/Duval County Line Post Street Lime Street Lee Street St. Johns Town Center Boulevard St. Johns Town Center Boulevard North Riverbank 14th Street Baldwin Rail Trail St. Johns River Ferry (East Coast Greenway Corridor) 1st Street SR 116 Fort Caroline Road S-Line 8th Street Duval Street SR 113 Southside Connector I-295 US 17 Main Street Bridge Leland Street Forest Street
Improvement Type Florida Greenway Land Trail Opportunities Florida Greenway Florida Greenway Multi-Use Trail Multi-Use Trail Multi-Use Trail Accommodate Pedestrians and Bicyclist Florida Greenway Accommodate Pedestrians and Bicyclist Florida Greenway - Multi-Use Trail Bike Lane Bike Lane Bike Lane Bike Lane Accommodate Pedestrians and Bicyclist Bi-directional 12 ft. Shared Use Path Bike Lane Bike Lane Bike Lane Bike Lane Florida Greenway Bike Lane Bike Lane Multi-Use Path Multi-Use Path Accommodate Pedestrians and Bicyclist Accommodate Pedestrians and Bicyclist Bike Lane Bike Lane Florida Greenway Bike Lane Bike Lane Bike Lane Multi-Use Path Bike Lane Multi-Use Path Bike Lane Bike Lane Florida Greenway Accommodate Pedestrians and Bicyclist Bike Lane Florida Greenway Pavement Markings and Signage Pavement Markings and Signage Bike Lane Bike Lane Bi-directional 12 ft. Shared Use Path Bike Lane Bike Lane Multi-Use Path
Path Forward 2040 Long Range Transportation Plan Table 4-4. Dedicated Bicycle and Pedestrian Project Needs by County County Map Id Corridor Duval 2068 Moncrief Road Duval 2069 Monument Road and SR 10 Atlantic Boulevard Duval 2070 Myrtle Avenue Duval 2071 Newnan Street Duval 2073 Old Kings Road Duval 2074 Old Middleburg Road Duval 2075 Old St Augustine Road Duval 2078 Riverplace Boulevard Duval 2080 Riverside/Five Point Area Duval 2090 Southpoint Parkway Duval 2015 SR 10 Atlantic Boulevard Duval 2016 SR 10 Atlantic Boulevard Duval 2017 SR 10 Atlantic Boulevard Duval 2018 SR 10 Atlantic Boulevard Duval 2038 SR 104 Dunn Avenue Duval 2049 SR 105 Zoo Parkway Duval 2050 SR 105 Zoo Parkway Duval 2102 SR 109 University Boulevard North Duval 2103 SR 109 University Boulevard North Duval 2030 SR 111 Cassat Avenue Duval 2042 SR 111 Edgewood Avenue Duval 2099 SR 111 Tallulah Avenue Duval 2091 SR 115 Southside Boulevard Duval 2092 SR 115 Southside Boulevard Duval 2093 SR 115 Southside Boulevard Duval 2094 SR 115 Southside Boulevard Duval 2095 SR 115 Southside Boulevard Duval 2044 SR 126 Emerson Street Duval 2088 SR 128 San Juan Avenue Duval 2051 SR 13 Hendricks Avenue Duval 2083 SR 13 San Jose Boulevard Duval 2084 SR 13 San Jose Boulevard Duval 2085 SR 13 San Jose Boulevard Duval 2086 SR 13 San Jose Boulevard Duval 2087 SR 13 San Jose Boulevard Duval 2011 SR 134 103rd Street Duval 2024 SR 21 Blanding Boulevard Duval 2025 SR 21 Blanding Boulevard Duval 2079 SR 211 Riverside Avenue Duval 2098 SR 211 St. Johns Avenue Duval 2072 SR 228 Normandy Boulevard Duval 2096 SR A1A Duval 2097 SR A1A Duval 2100 UNF East Duval 2101 UNF West Duval 2076 US 1 Philips Highway Duval 2077 US 1 Philips Highway Duval 2063 US 17 Main Street Duval 2064 US 17 Main Street Duval 2081 US 17 Roosevelt Boulevard Duval 2082 US 17 Roosevelt Boulevard
From 13th Street SR 113 Southside Boulevard Forest Street Bay Street S-line Herlong Road Losco Road Prudential Drive at Stockton Street, Rossell Street, I-95, St. Johns River Belfort Road SR 228 Hart Expressway US 90 Beach Boulevard Kings Road SR 228 Hart Expressway Biscayne Avenue Busch Drive US 17 Main Street SR 10 Atlantic Boulevard University Boulevard / Cesery Boulevard SR 21 Blanding Boulevard SR 111 Cassat Avenue US 17 Main Street Avenues Mall (US 1) US 1 Philips Highway Deerwood Park Boulevard Gate Parkway US 1 Philips Highway Hendricks Avenue SR 21 Blanding Boulevard SR 13 San Jose Boulevard Racetrack Road SR 152 Baymeadows Road Old St. Augustine Road Julington Creek Road Loretto Road Old Middleburg Road Blackburn Road Harlow Boulevard St. Johns Avenue Woodmere Street SR 103 Lane Avenue SR 202 J. T. Butler Boulevard St. Johns River Ferry Kernan Boulevard I-295 Racetrack Road SR 115 Southside Boulevard Eastport Road Trout River Bridge I-295 Duval/Clay County Line 4-36
To Golfair Boulevard N Regency Square Boulevard Kings Road Orange Street Martha Street Lenox Avenue SR 13 San Jose Boulevard US 1 Main Street Bowden Road SR A1A SR 228 Hart Expressway US 90 Beach Boulevard SR 109 University Boulevard US 17 Main Street I-295 SR A1A Cesery Boulevard Gable Lane SR 111 Edgewood Avenue US 1/SR 15 New Kings Road 68th Street SR 10 Atlantic Boulevard / Regency Square Mall Belle Rive Boulevard US 90 Beach Boulevard Touchton Road Belle Rive Boulevard US 1 Philips Highway SR 211 Herschel Street San Marco Boulevard Downtown (Southbank) Hendricks Avenue SR 152 Baymeadows Road Plummers Cove Road SR 152 Baymeadows Road Old Middleburg Road North Appleton Avenue Wilson Boulevard Forest Street Talbot Avenue SR 111 Cassat Avenue SR 10 Atlantic Boulevard Duval/Nassau County Line UNF West UNF East Downtown (Southbank) Southbank Riverwalk Pecan Park Road New Berlin Road Edison Avenue Forest Street
Improvement Type Bike Lane Bike Lane Bike Lane Pavement Markings and Signage Bike Lane Bike Lane Bike Lane Bike Lane Accommodate Pedestrians and Bicyclist Bike Lane Bi-directional 12 ft. Shared Use Path Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Multi-Use Path Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Bi-directional 12 ft. Shared Use Path Multi-Use Path Sidewalk Improvements Sidewalk Improvements Sidewalk Improvements Bike Lane Bike Lane Bike Lane Bi-directional 12 ft. Shared Use Path Bike Lane Bike Lane Bike Lane Accommodate Pedestrians and Bicyclist Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Bi-directional 12 ft. Shared Use Path Bi-directional 12 ft. Shared Use Path Bike Lane Bike Lane Bi-directional 12 ft. Shared Use Path Rails-W-Trails Bi-directional 12 ft. Shared Use Path Rails-W-Trails Bi-directional 12 ft. Shared Use Path Rails-W-Trails
Path Forward 2040 Long Range Transportation Plan Table 4-4. Dedicated Bicycle and Pedestrian Project Needs by County County Map Id Corridor Duval 2104 US 17 Roosevelt Boulevard Duval 2021 US 90 Beach Boulevard Duval 2022 US 90 Beach Boulevard Duval 2105 Water Street Duval / Nassau 2106 Jacksonville Baldwin Corridor Nassau 2107 8th Street Nassau 2108 Amelia Island Parkway Nassau 2109 Amelia Island Parkway Path Segment 1 Nassau 2110 Amelia Island Parkway Path Segment 2 Nassau 2111 Amelia Island Parkway Path Segment 3 Nassau 2112 Amelia Island Parkway Path Segment 4 Nassau 2113.1 Amelia Island Trial - Central (1st Ave) Nassau 2113 Amelia Island Trial - South (Buccaneer Trail) Nassau 2113.2 Amelia Island Trial- North ( Friendly/Clinch) Nassau 2114 American Beach Loop Nassau 2115 American Beach Loop Nassau 2116 American Beach Loop Nassau 2117 Crandall Parkway Corridor Nassau 2118 East Coast Greenway - Nassau County Corridor Nassau 2120.1 ENCPA DSAP 1- Central (Old Yulee Vicinity) Nassau 2120.2 ENCPA DSAP 1- North (Owens Road Vicinity) Nassau 2120 ENCPA DSAP 1- South (Harper Chapel Vicinity) Nassau 2121 Highland Broom Street Nassau 2123 Maxine Street Nassau 2124 Ocklawaha Trail Nassau 2125 Orange Avenue Nassau 2126 Simmons Connector Nassau 2127 SR 200 SR A1A Nassau 2129 US 17 Nassau 2119 US 17 / SR A1A East Coast Greenway Nassau 2128 US 301/ SR 200 Trans Nassau Trail Corridor Nassau 2130 William Burgess Boulevard Nassau / Duval 2122 CR 121/CR 119 Jacksonville Baldwin Rail Trail Northern Extension Corridor Putnam 2131 CR 216 Putnam 2132 Cross Florida Greenway Corridor Putnam 2133 SR 100 Putnam 2134 SR 20 Putnam 2135 US 17 Putnam 2136 US 17 Crescent City (parallel facilities) Putnam / St. Johns 2137 SR 207 St. Johns 2138 County Road 214 Corridor St. Johns 2149 CR 13 Spuds Palmo Trail Corridor St. Johns 2139 CR210 St. Johns 2140 Deep Creek to ECG Corridor St. Johns 2141 Downtown and Uptown St. Augustine St. Johns 2142 East Coast Greenway - St. Johns County Corridor St. Johns 2143 Nocatee Corridor St. Johns 2147 Race Track Road St. Johns 2148 Racetrack Corridor St. Johns 2150 SR 13 San Jose Boulevard St. Johns 2155 SR 13 William Bartram Trail Corridor
From Duval/Clay County Line San Pablo Boulevard at Hodges Boulevard Lee Street West of Baldwin at Sadler Road at Amelia Road Bailey Road 14th Street Via Del Rey SR A1A Fletcher Avenue / Amelia Island Trail Bill Melton Fletcher Avenue Bailey Road American Beach Loop Julia Street Segment American Beach Loop Burney Road Segment American Beach Loop Ocean Avenue Segment East Coast Greenway (US 17) Nassau/Duval County Line East Nassau Community Planning Area East Nassau Community Planning Area East Nassau Community Planning Area Proposed Highland Broom Street Multi-use Trail Maxine Street Path Via Del Rey / Bill Melton Road Orange Avenue Path Simmons/AIP Connector at SR 200 Bridge Nassau/Duval County Line Fernandina Beach CR 119 SR 200 SR A1A US 90 Beaver Street SR 100 Existing Cross Florida Greenway Trail Clay/Putnam County Line Hawthorne Putnam/Volusia County Line Prospect Street Palatka SR 13 San Jose Boulevard SR 207 at SR A1A SR 207 at US 1, Park Avenue, River, South Street, Riberia Street St. Johns /Flagler County Line SR 13 San Jose Boulevard SR 13 San Jose Boulevard SR 13 San Jose Boulevard Roberts Road CR 13 4-37
To Forest Street Downtown (Southbank) Pearl Street Bulls Bay Highway
8th Street/ SR A1A Bailey Road 14th Street Via Del Rey Matanzas Way Amelia Island Pkwy Atlantic Avenue American Beach American Beach American Beach SR A1A East Coast Greenway Corridor Fernandina Beach East Nassau Community Planning Area East Nassau Community Planning Area East Nassau Community Planning Area Proposed Highland Broom Street Maxine Street Path Sadler Road Orange Avenue Path Simmons/AIP Connector SR 200 SR A1A Georgia State Line US 17 Main Street / Yulee US 17 US 301/SR 200 Trans Nassau Trail Corridor US 17 Palatka Palatka Palatka Palatka CR 308 St. Augustine SR 207 SR 13 San Jose Boulevard SR A1A St. Johns /Duval County Line SR A1A US 1 Philips Highway Nocatee Corridor Julington Creek St. Johns /Duval County Line
Improvement Type Florida Greenway Bi-directional 12 ft. Shared Use Path Accommodate Pedestrians and Bicyclist Bike Lane Florida Greenway Accommodate Pedestrians and Bicyclist Accommodate Pedestrians and Bicyclist Multi-Use Trail Multi-Use Trail Multi-Use Trail Multi-Use Trail Trail Trail Trail Bike Lane Multi-Use Path Multi-Use Path Florida Greenway Florida Greenway Multi-Use Path Multi-Use Path Multi-Use Path Multi-Use Path Multi-Use Path Multi-Use Trail Multi-Use Path Multi-Use Trail Accommodate Pedestrians and Bicyclist Bi-directional 12 ft. Shared Use Path Florida Greenway Florida Greenway Multi-Use Trail Florida Greenway Multi-Use Path Florida Greenway Florida Greenway Florida Greenway Florida Greenway Multi-Use Path Florida Greenway Florida Greenway Florida Greenway Accommodate Pedestrians and Bicyclist Florida Greenway Accommodate Pedestrians and Bicyclist Florida Greenway Florida Greenway Bi-directional 12 ft. Shared Use Path Florida Greenway Bi-directional 12 ft. Shared Use Path Florida Greenway
Path Forward 2040 Long Range Transportation Plan Table 4-4. Dedicated Bicycle and Pedestrian Project Needs by County County Map Id Corridor St. Johns 2151 SR 16 St. Johns 2152 SR A1A St. Johns 2153 St. Augustine Bike Plan St. Johns 2145 US 1 Dixie Highway St. Johns 2146 US 1 Dixie Highway St. Johns 2144 US 1 Dixie Highway / Ponce De Leon Boulevard St. Johns 2154 US 1 St. Augustine to Nocatee Corridor
From I-95 at SR 312 Areawide Putnam/Flagler County Line at SR 312 San Marco Avenue (US 1 B) (St. Augustine) St. Augustine
4-38
To Collins Avenue Areawide SR 207 Racetrack Road Nocatee Corridor
Improvement Type Bi-directional 12 ft. Shared Use Path Accommodate Pedestrians and Bicyclist Bicycle accommodations Bi-directional 12 ft. Shared Use Path Accommodate Pedestrians and Bicyclist Bi-directional 12 ft. Shared Use Path Florida Greenway
Path Forward 2040 Long Range Transportation Plan
CONTEXT SENSITIVE SOLUTIONS Context sensitive solutions provide street environments that meet the needs of adjacent land uses and traffic flow. They may involve strategies to enhance livability including those where the automobile is prioritized less than transit, pedestrian and bicycle modes. Livability and context sensitive solutions as a specific improvement type within the LRTP is a new approach from prior LRTP updates. This issue paper explains the background, policy, candidate corridor selection process and elements of context sensitive solutions, and identifies strategies that could be considered within the candidate projects for inclusion in the LRTP.
The recommended improvements for the context sensitive solutions corridors will be determined during the project development and design. The improvements are not limited to widening in the future, but the intent is to consider context sensitive solutions criteria as part of project development. The following criteria were used to identify context sensitive solutions livability corridors:
Successful applications of context sensitive solutions in our region today include the recently completed improvements along SR A1A 3rd Street in Jacksonville Beach and SR A1A Amelia Island Boulevard. These projects include bicycle and pedestrian accommodations and the development of roadway environments consistent with local communities. Other successful examples within our region include San Marco Boulevard in Jacksonville and Nocatee Parkway in St. Johns County.
The application of the livability policy within the LRTP encourages implementing agencies to consider alternatives and enhancements beyond adding lanes to increase automobile throughput. Identifying this improvement type does not preclude road widening or adding new roadway capacity. An alternatives analysis, including engineering, environmental assessment, planning and public involvement, will be performed in the project development process to determine the best solution for each corridor.
Candidate projects for context sensitive solutions were identified using the following criteria
Arterial roadways with six or more lanes were included. Corridors where mobility enhancement projects to support transit are identified were included.
Limiting the number of lanes to six general use lanes. Additional lanes are for bus rapid transit or managed lanes. Investing in each corridor consistent with an urban character defined through the project or adopted from a prior study such as the Neighborhood Vision projects performed by the City of Jacksonville or Nocatee Master Plan. For example, on some corridors an urban village concept could be used which would require wider sidewalks and on-street parking, or a “Grand Boulevard” concept that would require cyclists, pedestrians and transit considered equally with automobile mobility. Requiring land use and zoning regulations that encourage redevelopment consistent with the urban design characteristics established for the corridor. Investing in corridors where transit accessibility is a high priority with the opportunity to provide additional transit service or quality of service.
In addition to these livability corridors, the Jacksonville Transportation Authority has identified a set of Transit Accessibility and Mobility and Transit Hub Projects that will provide bicycle and pedestrian improvements, enhancements and transit hubs to support livability and transit accessibility. These projects are funded through the Duval County LOGT adopted in 2014.
Elements of the Strategic Intermodal System were excluded. FDOT is responsible for the investment strategy and focused on moving goods and 64 people. Constrained corridors identified in the North Florida TPO’s Congestion Management Plan were included. Constrained corridors include facilities that have restricted rights of way limiting the ability of these roadways to be widened.
The network of corridors where context sensitive solutions are considered a priority are shown in Figure 4-26 and are summarized in Table 4-5 and Table 4-6.
64
In consultation with FDOT, context sensitive solutions may be appropriate at crossings of Strategic Intermodal System facilities (such as intersections with arterials or through interchanges of expressways). 4-39
" ) 108
" ) 115
" )
§ ¦ ¨ 95
£ ¤ 1
2
£ ¤ 17
" ) " )
" ) 127
2
301
CSS5
" ) 122
CSS 12
¬ «
105
" ) CSS6
221
¬ «
" ) 124
£ ¤ 90
295
130
CS S2
10
228
" )
CSS1
5 S1 CS
228
¬ «
£ ¤ 301
134
¬ « ¬ « 23
1 S1 CS
S CS
116
10
¬ «
18
£ ¤ ¬ « 90
202
CSS3
" )
§ ¦ ¨
¬ « ¬ «
§ ¦ ¨
CSS19
125
" )
A1A
CSS5
CSS9
295
119
250A
¬ «
S7 CS
§ ¦ ¨
" ) 250
A1A
® q
£ ¤
" )
A1A
A1A
¬ «
108
¬ «
105
¬ « ¬ «
107
§ ¦ ¨ 295
0
Amtrak Station
§ ¦ ¨ 95
21
¬ «
Passenger Rail Station 16
¬ «
16
¬ «
Context Sensitive Solutions Corridors Roadway System
" ) 315
Water Bodies Conservation Lands
S CS
CSS6
A1A
¬ «
206
¬ «
" ) 204
® q 20
¬ «
" ) 21
18
CSS3
316
" ) 310
" )
" ) £ ¤
CS S1318 7
301
CS S1
225
225A
441
0
25A
25
200A
200
326 326
CS S1
19
¬ «
" ) 309
" ) 308
6
200
« £ ¤¬ £ ¤ ¬ «" " ) " ) ) ¬ « ) ¬ « " ) " ¬ ) ¬ «" «
" )
Date: 8/13/2014
5
¬ «
100
315
75
326
§ ¦ ¨ 95
¬ «
200A
329
500
¬ «
CS S2
" ) 27
" ) 305
" )
CSS9
5
§ ¦ ¨
335
207
17
CSS7
A1A
214
£ ¤
S7 CS CSS19
¤ n
¬ «
¬ «
1 S1 CS
335
£ ¤
13A
CSS5
CSS1
320
13
" )
CS S 12
" )
208
17
26
S1 CS
16
¬ « " ) " " ) ) " )
" )
315
£ ¤ 1
214
CSS5
CSS4 CSS8 CSS14
® nq ¤
209
" )
Six Counties Boundaries
CSS13
¬ «
¬ «
220
" )
Airport
A1A
13
" )
218
JTA Mobility and Transit Accesibility Imp
" ) " )
1
S1 CS
Legend ® q ¤ n ¤ n
£ ¤
Figure 4-27 Context Sensitive Solutions Corridors
326
4-40
¯
0
10,560 Feet
0
4
8 Miles
Path Forward 2040 Long Range Transportation Plan Table 4-5. Candidate Context Sensitive Corridors County Facility From Duval US 1 Alt. Martin Luther Myrtle Avenue King Jr. Parkway Duval Acosta Bridge I-95 Duval SR 10 Atlantic Boulevard I-95 Duval SR 10 Atlantic Boulevard SR 115 Southside Boulevard Duval SR 152 Baymeadows Southside Boulevard Road Duval US 90 Beach Boulevard SR 228 Commodore Point Expressway Duval Belfort Road SR 202 J. T. Butler Boulevard Duval SR 21 Blanding Boulevard Collins Road Duval SR 21 Blanding Boulevard Wilson Boulevard Duval SR 104 Dunn Avenue Biscayne Boulevard Duval SR 109 University Powers Avenue Boulevard Duval Duval Road SR 102 Duval Road/Airport Road Duval SR 115 Southside US 1 Philips Highway Boulevard Duval Hodges Boulevard US 90 Beach Boulevard Duval US 17 Roosevelt I-295 Boulevard Duval SR 202 J.T. Butler I-95 Boulevard Duval Kernan Boulevard SR 10 Atlantic Boulevard Duval SR 13 San Jose Boulevard Julington Creek Road Duval SR A1A Mayport Road SR 10 Atlantic Boulevard Duval Main Street I-95 Duval Old St Augustine Road Hood Landing Road Duval SR 211 Riverside Avenue Forest Street Duval US 1 Philips Highway Bus Park Boulevard Duval US 1 Philips Highway Baymeadows Way Duval US 1 Philips Highway Center Avenue Duval San Pablo Road SR 202 J. T. Butler Boulevard Duval SR 113 Southside SR 115 Arlington Expressway. Connector Duval SR 134 103rd Street Old Middleburg Road Duval St. Johns Bluff Road US 90 Beach Boulevard Duval US 23 Kings Road Martin Luther King Jr. Parkway Duval 8th Street I-95 Duval Town Center Parkway Gate Parkway Clay SR 21 Blanding Boulevard Duval/Clay County Line Clay SR 224 Kingsley Avenue SR 21 Blanding Boulevard Regional SR A1A Flagler County Line Duval and Nocatee Parkway US 1 Philips Highway St. Johns St. Johns US 1 Ponce De Leon Lewis Point Road/St. Augustine Drive Boulevard St. Johns King Street Avenida Menendez St. Johns San Marco Boulevard US 1 Ponce De Leon Boulevard
4-41
To I-95 Mary Street SR 109 University Boulevard SR A1A Mayport Road US 1 Penman Road Southpoint Parkway Duval/Clay County Line Cassat Avenue I-95 Spring Park Road US 17 Main Street SR 10 Atlantic Boulevard Chauny Road SR 129 McDuff Avenue San Pablo Road Glen Kernan Parkway SR 152 Baymeadows Road Dutton Island Road Gulf Life Drive Losco Road Water Street I-95 Baycenter Road SR 109 University Boulevard Crosswater Boulevard Regency Square Boulevard Ortega Farms Boulevard Saints Road SR 111 Edgewood Avenue Jefferson Street I-295 Old Jennings Road Professional Center Drive Georgia State Line Crosswater Parkway Old Dixie Highway US 1 Ponce De Leon Boulevard King Street
Path Forward 2040 Long Range Transportation Plan Table 4-6. Transit Accessibility and Mobility Enhancement Projects Facility Map Id From Lenox Avenue CSS8 SR 228 Normandy Boulevard Mandarin Road CSS10 SR 13 San Jose Boulevard Merrill Road CSS11 SR 109 University Boulevard Moncrief Road / Myrtle Avenue / CSS12 US 17 Main Street 8th Street Park Avenue CSS15 US 17 Plummer Cove Road CSS17 Scott Mill Road SR 104 Dunn Avenue CSS5 I-295 SR 109 University Boulevard CSS18 St. Augustine Road SR 111 Cassat Avenue CSS4 SR 21 Blanding Boulevard SR 111 Edgewood Avenue CSS6 SR 111 Cassat Avenue SR 115 Arlington Expressway CSS1 SR 115 Mathews Bridge SR 115 Lem Turner Road CSS7 Downtown SR 21 Blanding Boulevard CSS3 Duval County Line/Clay County Line SR 228 Normandy Boulevard CSS14 I-295 US 1 SR 15 New Kings Road CSS13 I-95 US 1 SR 5 Philips Highway CSS16 I-95 South US 17 Main Street CSS9 US 17 / US 17 SR 228 State Street US 90 Beach Boulevard CSS2 I-95 Myrtle Avenue Underpass CSS19 Soutel Transit Hub Countywide Transit Hubs 65 Various Locations
65
The location and scope of these projects are to be determined. 4-42
To SR 111 Cassat Avenue Westberry Road Townsend Myrtle Avenue I-95 SR 13 San Jose Boulevard I-95 Fort Caroline Road SR 111 Edgewood Avenue US 17 North Main Street Regency I-295 US-17 SR 111 Cassat Avenue US 1 Martin Luther King Jr. Parkway SR 115 Southside Boulevard Clark Road SR 115 Southside Boulevard
Path Forward 2040 Long Range Transportation Plan encourage bicycling and walking as travel options. For these and other reasons, proximity to transit service can be another reasonable criterion when prioritizing investments in bicycle and pedestrian infrastructure.
PRIORITIZATION PROCESS BICYCLE AND PEDESTRIAN PRIORITIZATION PROCESS
Transit proximity prioritization criteria were developed as follows
Bicycle and pedestrian projects in the Needs Plan were prioritized using multiple criteria including safety, transit proximity, demand and cost. A five point priority scale was used.
Safety
Roadways where there are concentrations of crashes involving bicyclists and pedestrians were used as a performance measure. While crash occurrences alone may not be indicative of an unusual safety concern without knowledge of exposure (and therefore the ability to calculate a crash rate for bicyclists and pedestrians), crash occurrences can also be indicative of demand— higher crashes occurrences derive from higher levels of bicycling and walking activity—which itself is not an unreasonable prioritization factor.
Latent Demand Analysis Latent demand analyses consider areas where bicycling or walking could be useful or popular modes if accommodating infrastructure was available (based on land use and demographic patterns that indicate a high probability for short trips which could be made by bicycling or walking). The North Florida TPO’s 2013 Bicycle and Pedestrian Plan included a latent demand analysis for arterial and collector roadways within the North Florida TPO region (exclusive of Baker and Putnam Counties), based on future population, employment and school enrollment data. Latent demand was used as a prioritization criterion to assign a score from one to five based on the latent demand prepared from the prior plan.
In 2012, the North Florida TPO completed a Regional Strategic Safety Plan, which included an analysis that looked for areas with unusual concentrations of crashes involving “vulnerable road users,” including bicyclists and pedestrians. The analysis identified statistically significant “hot spot” corridors using two different weighting schemes. Among the corridors identified as “hot spots’, the crash rate for vulnerable-user-involved crashes was calculated and sorted; the hot spots with the 20 highest vulnerable user crash rates were then identified as priority corridors and used as the basis for the safety prioritization.
Project along an existing transit route received five points. Projects intersecting an existing transit route received four points. Projects within a one mile buffer of an existing or proposed transit route.
The latent demand analysis already includes projected future school enrollment data, but an additional school criterion could be introduced, if desired, such as a project falling within a specific buffer distance (half mile, whole mile, etc.) of a school site (pending data availability).
Projects identified as priority locations were assigned five points. Projects located in a related hot spot were assigned three points. Projects within a one mile buffer of either a priority location or hot spot were assigned one point.
Transit Proximity The bicycle and pedestrian modes are integral to the success and utility of the transit mode as well. Good bicycle and pedestrian accommodation allows transit riders to get to their transit stops from their homes employment, shopping, and other destinations. Areas with transit service also often coincide with denser land use patterns which can also be practical areas to 4-43
Path Forward 2040 Long Range Transportation Plan
Prior Plan Prioritization Some of the candidate projects of the needs plan were prioritized within the plans or studies from which they are derived. Out of deference to these prior efforts, and the careful analysis and public input that may have informed them, we propose using prior prioritization as a criterion in the following ways:
Five points if a project is given a highest priority designation in the source study. Four points if a project is given a mid-level priority designation in the source study. Three points if a project is given a low-level or is not prioritized in the source study.
Weightings and Calculation The evaluation criteria were weighted as follows.
Latent demand, 40 percent Priority crash locations, 30 percent Transit proximity, 20 percent Need based on prior studies or plans, 10 percent
The composite score was then be divided by the project cost (in millions of dollars) for a final priority score. Table 4-6 summarizes the prioritization score for each project.
4-44
Path Forward 2040 Long Range Transportation Plan Table 4-7. Bicycle and Pedestrian Prioritization ID
Corridor
From
2022 2146 2107 2108 2013 2059 2152 2089 2071 2020 2060 2067 2139 2073 2008 2075 2037
US 90 Beach Boulevard US 1 Dixie Highway 8th Street SR A1A Amelia Island Parkway Arlington Road Laura Street SR A1A Mary Street Newnan Street Baymeadows Road Laura Street McCoys Creek Boulevard / Fitzgerald Street CR210 Old Kings Road US 17 Park Avenue Old St Augustine Road Downtown Atlantic Beach
2028 2061 2047 2086 2078 2019 2046 2105 2024 2094 2053 2066 2014 2048 2026 2045 2102 2056
Bowden Road Lee Street Gate Parkway East SR 13 San Jose Boulevard Riverplace Boulevard Bay Street Forsyth Street Water Street SR 21 Blanding Boulevard SR 115 Southside Boulevard Hubbard Street McCoys Creek Boulevard / Fitzgerald Street Arlington Road West Gate Parkway South East Boulevard Street Forest Street SR 1909 University Boulevard Jacksonville Beach Area
2062 2054 2025 2017 2057 2027 2049 2098 2052 2100 2088 2085 2029 2050 2095 2016 2039
Lone Star Road Imeson Road SR 21 Blanding Boulevard SR 10 Atlantic Boulevard Jefferson Street Bowden Road SR 105 Zoo Parkway SR 211 St. Johns Avenue Hogan's Creek Greenway UNF East SR 128 San Juan Avenue SR 13 San Jose Boulevard Broad Street SR 105 Zoo Parkway SR 115 Southside Boulevard SR 10 Atlantic Boulevard Duval Road
at Hodges Boulevard at SR 312 at Sadler Road at Amelia Road King Arthur Road 8th Street at SR 312 San Marco Boulevard Bay Street at SR 115 Southside Boulevard Bay Street Nixon Street at SR A1A S-line at Kingsley Avenue (Orange Park) Losco Road at Sherry Drive, 2nd Street, Ocean Street, Cherry Street, SR A1A Spring Park Road Water Street Gate Parkway Julington Creek Road Main Street (US 1) Myrtle Avenue Myrtle Avenue Lee Street Blackburn Road Gate Parkway Orange Street McDuff Avenue King Arthur Road St. Johns Town Center Boulevard 5th Street Acosta Street SR 10 Atlantic Boulevard at 3rd Avenue, Ocean Street, 2nd Avenue, South 10th Street Mill Creek Road Commonwealth Avenue Harlow Boulevard Kings Road Water Street US 1 SR 5 Philips Highway Busch Drive Woodmere Street Market Street Kernan Boulevard SR 21 Blanding Boulevard Old St. Augustine Road Water Street US 17 Main Street US 1 SR 5 Philips Highway US 90 Beach Boulevard Airport Road
To
Improvement Type
Lone Star Road S-Line Main Street Bridge (US 17) Orange Street 8th Street Forest Street Martha Street SR 13 San Jose Boulevard
Southpoint Parkway Duval Street St. Johns Town Center Boulevard Plummers Cove Road Prudential Drive Lee Street Lee Street Pearl Street Appleton Avenue Touchton Road 14th Street Leland Street Cesery Road Deerwood Parkway 12th Street Lime Street Cesery Boulevard
SR 113 Southside Connector Baldwin Rail Trail Wilson Boulevard US 90 Beach Boulevard 1st Street Spring Park Road I-295 Talbot Avenue North Riverbank UNF West SR 211 Herschel Street SR 152 Baymeadows Road 5th Street SR A1A Belle Rive Boulevard
SR 228 Hart Expressway Airport Center Drive
4-45
Accommodate Pedestrians and Bicyclist Accommodate Pedestrians and Bicyclist Accommodate Pedestrians and Bicyclist Accommodate Pedestrians and Bicyclist Bike Lane Pavement Markings and Signage Accommodate Pedestrians and Bicyclist Bike Lane Pavement Markings and Signage Accommodate Pedestrians and Bicyclist Pavement Markings and Signage Multi-Use Path Accommodate Pedestrians and Bicyclist Bike Lane Accommodate Pedestrians and Bicyclist Bike Lane Accommodate Pedestrians and Bicyclist Bike Lane Bike Lane Multi-Use Path Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Sidewalk Improvements Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Accommodate Pedestrians and Bicyclist Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Multi-Use Path Bike Lane Bike Lane Bike Lane Bike Lane Multi-Use Path Sidewalk Improvements Bike Lane Bike Lane
Strategic Safety Plan
Transit Proximity
3 3
3
2
5
5
Latent Demand
5 5 5 3 3 4 5 5 5 5 4 4 0 5 5 4 5
Prior Plan Priority 3 3 3 3 5 5 3 3 5 3 5 3 3 5 3 5 3
5 5 5 5 5 5 5 5 5 5 4 4 4 5 5 4 5
5 3 5 5 5 3 3 3 5 3 3 3 5 5 3 3 5
3 5 2 4 5 4 4 5 3 2 4 3 3 2 5 4 2
54 49 47 45 45 41 32 32 32 31 28 23 23 22 22 21 21 21
5
3
4
19
4 4 5 5 5 3 4 5 4 5 4 5 5 5 5 5 5
5 3 5 5 3 3 5 5 3 5 5 5 3 3 3 5 3
2 1 3 4 5 3 1 4 5 3 3 3 5 1 4 3 1
19 19 18 18 16 15 14 14 13 13 12 12 12 12 12 12 11
3 3 2 2 2 4 2 4 5 4 5 3 1 4 2 4 3
Priority Score 2773 1234 668 320 232 170 116 99 96 95 93 75 71 61 56 56
Path Forward 2040 Long Range Transportation Plan Table 4-7. Bicycle and Pedestrian Prioritization ID
Corridor
From
To
Improvement Type
2035 2032 2070 2072 2106 2044 2043 2099 2068 2018 2011 2069 2103
Deerwood Area Clark Road Myrtle Avenue SR 228 Normandy Boulevard Jacksonville Baldwin Corridor SR 126 Emerson Street Edgewood Avenue SR 111 Tallulah Avenue Moncrief Road SR 10 Atlantic Boulevard SR 134 103rd Street Monument Road and SR 10 Atlantic Boulevard SR 109 University Boulevard
Deerwood Park Boulevard Broward Road Forest Street SR 103 Lane Avenue Bulls Bay Highway Hendricks Avenue St. Johns Avenue US 17 Main Street 13th Street
Gate Parkway US 17 Main Street Kings Road SR 111 Cassat Avenue West of Baldwin US 1 SR 5 Philips Highway Post Street 68th Street Golfair Boulevard SR 109 University Boulevard Old Middleburg Road N Regency Square Boulevard Gable Lane
Multi-Use Path Bike Lane Bike Lane Bike Lane Florida Greenway Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane
2079 2074 2090 2093 2040 2007 2038 2101 2114
SR 211 Riverside Avenue Old Middleburg Road Southpoint Parkway SR 115 Southside Boulevard Duval Street US 17 SR 104 Dunn Avenue UNF West American Beach Loop
Forest Street Lenox Avenue Belfort Road US 90 Beach Boulevard Georgia Street
Bike Lane Bike Lane Bike Lane Sidewalk Improvements Bike Lane Accommodate Pedestrians and Bicyclist Bike Lane Bike Lane Bike Lane
2033 2051 2092 2012 2123 2080
Commonwealth Avenue SR 13 Hendricks Avenue SR 115 Southside Boulevard 5th Street Maxine Street Riverside/Five Point Area
Bike Lane Bike Lane Multi-Use Path Bike Lane Multi-Use Path Accommodate Pedestrians and Bicyclist
2113.1 2096 2125 2030 2141
Amelia Island Trial - Central (1st Ave) SR A1A Orange Avenue SR 111 Cassat Avenue Downtown and Uptown St. Augustine
2097 2153 2151 2034 2042 2023 2006 2121
SR A1A St. Augustine Bike Plan SR 16 CSX Corridor North SR 111 Edgewood Avenue Beauclerc Road Old Jennings Road Highland Broom Street
2004 2131 2109 2084 2130 2064 2113 2136 2127
CR 220 Doctors Inlet Road CR 216 Amelia Island Parkway Path Segment 1 SR 13 San Jose Boulevard William Burgess Boulevard US 17 Main Street Amelia Island Trial - South (Buccaneer Trail) US 17 Crescent City (parallel facilities) SR A1A SR 200
SR 228 Hart Expressway Old Middleburg Road SR 115 Southside Boulevard University Boulevard / Cesery Boulevard St. Johns Avenue Herlong Road Bowden Road Deerwood Park Boulevard Lee Street at CR 220 (Fleming Island Area) Biscayne Avenue I-295 American Beach Loop Julia Street Segment Lane Avenue SR 13 San Jose Boulevard US 1 SR 5 Philips Highway Lane Avenue Maxine Street Path at Stockton Street, Rossell Street, I-95, St. Johns River Bill Melton SR 202 J. T. Butler Boulevard Orange Avenue Path SR 21 Blanding Boulevard at US 1, Park Avenue, River, South Street, Riberia Street St. Johns Ferry Areawide I-95 US 17 Main Street / S Rail Line SR 111 Cassat Avenue I-295 SR 23 First Coast Expressway Proposed Highland Broom Street Multi-use Trail College Drive SR 100 8th Street/ SR A1A SR 152 Baymeadows Road SR A1A SR 200 Trout River Bridge Fletcher CR 308 at SR 200 Bridge
US 17 Main Street UNF East American Beach Imeson Road San Marco Boulevard Belle Rive Boulevard Melson Avenue Maxine Street Path
Matanzas Way SR 10 Atlantic Boulevard Orange Avenue Path SR 111 Edgewood Avenue
Trail Bi-directional 12 ft. Shared Use Path Multi-Use Path Bike Lane Accommodate Pedestrians and Bicyclist
Duval/Nassau County Line Areawide Collins Avenue US 17 Main Street / Trout River Drive US 1 SR 15 New Kings Road SR 13 San Jose Boulevard Long Bay Road Proposed Highland Broom Street
Bi-directional 12 ft. Shared Use Path Bicycle accommodations Bi-directional 12 ft. Shared Use Path Multi-Use Path Bike Lane Bi-directional 12 ft. Shared Use Path Multi-Use Trail Multi-Use Path
US 17 US 17 Bailey Road Hendricks Avenue US 17 New Berlin Road Amelia Island Pkwy Prospect Street
Multi-Use Trail Multi-Use Path Multi-Use Trail Bike Lane Multi-Use Trail Rails-W-Trails Trail Multi-Use Path Accommodate Pedestrians and Bicyclist
4-46
Strategic Safety Plan
2
Transit Proximity
Prior Plan Priority 3 3 3 5 5 3 5 3 3 5 3 3 5
Latent Demand
5 3 5 5 4 5 5 5
5 5 5 3 3 3 5 5 3
4 3 4 4 5 3 3 4 1
4 5 5 4
3 3 3 3 3 3
2 4 3 3 1 5
3 3 3 3 3
1 5 2 5 5
4 5 5 4 5 4 4
5 3 3 3 3 3 4 3
1 5 2 4 4 3 1 2
5 4 4 5 4 5
4 4 5 3 3 3 3 4 3
3 1 1 4 1 3 1 1 1
4 5 4 5 4 5 5 5 5 5 3 5 5
5
5
5
5
5 5
3 5 3
2
3 5
2 2 5 4 2 3 4 2 4 3 2 4 4
Priority Score 11 11 11 10 10 10 10 10 10 9 9 9 9 8 8 8 8 8 7 7 7 7 6 6 6 6 5 5 4 4 4 4 4 4 4 4 4 4 4 3 3 3 3 3 3 3 3 2 2 2
Path Forward 2040 Long Range Transportation Plan Table 4-7. Bicycle and Pedestrian Prioritization ID
Corridor
From
To
Improvement Type
2113.2 2110 2036 2031 2118 2021 2120 2116
Amelia Island Trial- North ( Friendly/Clinch) Amelia Island Parkway Path Segment 2 Downtown Jacksonville Cecil Field Conservation Corridor East Coast Greenway - Nassau County Corridor US 90 Beach Boulevard ENCPA DSAP 1- South (Harper Chapel Vicinity) American Beach Loop
Bailey Road Bailey Road
Atlantic Avenue 14th Street US 90 Beaver Street Fernandina Beach Downtown (Southbank) East Nassau Community Planning Area American Beach
2065 2150 2003 2015 2082 2081 2111 2112 2091 2147 2077 2124 2005 2087 2002 2115
Mandarin Road SR 13 San Jose Boulevard CR 220 Doctors Inlet Road SR 10 Atlantic Boulevard US 17 Roosevelt Boulevard US 17 Roosevelt Boulevard Amelia Island Parkway Path Segment 3 Amelia Island Parkway Path Segment 4 SR 115 Southside Boulevard Race Track Road US 1 SR 5 Philips Highway Ocklawaha Trail Long Bay Road SR 13 San Jose Boulevard CR 218 American Beach Loop
Duval/Clay County Line Nassau/Duval County Line San Pablo Boulevard East Nassau Community Planning Area American Beach Loop Ocean Avenue Segment SR 13 San Jose Boulevard Roberts Road SR 21
Trail Multi-Use Trail Accommodate Pedestrians and Bicyclist Florida Greenway Florida Greenway Bi-directional 12 ft. Shared Use Path Multi-Use Path Multi-Use Path
I-295 Julington Creek College Drive SR A1A Forest Street Edison Avenue Via Del Rey SR A1A Fletcher Avenue Amelia Island Trail Atlantic Boulevard (Regency Square Mall) US 1 SR 5 Philips Highway Southbank Riverwalk Sadler Road Old Jennings Road SR 152 Baymeadows Road SR 21 American Beach
Bi-directional 12 ft. Shared Use Path Bi-directional 12 ft. Shared Use Path Florida Greenway Bi-directional 12 ft. Shared Use Path Rails-W-Trails Bi-directional 12 ft. Shared Use Path Multi-Use Trail Multi-Use Trail Bi-directional 12 ft. Shared Use Path Bi-directional 12 ft. Shared Use Path Rails-W-Trails Multi-Use Trail Multi-Use Trail Accommodate Pedestrians and Bicyclist Florida Greenway Multi-Use Path
2133 2148 2117 2058 2083 2145 2126 2129 2076 2063 2120.2 2154 2144
SR 100 Racetrack Corridor Crandall Parkway Corridor Kernan Boulevard SR 13 San Jose Boulevard US 1 Dixie Highway Simmons Connector US 17 US 1 SR 5 Philips Highway US 17 Main Street ENCPA DSAP 1- North (Owens Rd Vicinity) US 1 St. Augustine to Nocatee Corridor US 1 Dixie Highway / Ponce De Leon Boulevard
Lake City (Columbia County) Nocatee Corridor SR A1A East Coast Greenway SR 116 Fort Caroline Road Downtown (Southbank) SR 27 Simmons/AIP Connector SR A1A SR 2 Downtown (Southbank) Pecan Park Road East Nassau Community Planning Area Nocatee Corridor Racetrack Road
Florida Greenway Florida Greenway Florida Greenway Florida Greenway Bi-directional 12 ft. Shared Use Path Bi-directional 12 ft. Shared Use Path Multi-Use Trail Bi-directional 12 ft. Shared Use Path Bi-directional 12 ft. Shared Use Path Bi-directional 12 ft. Shared Use Path Multi-Use Path Florida Greenway Bi-directional 12 ft. Shared Use Path
2001 2104 2041 2140 2122 2155 2055
Cecil Field Conservation Corridor US 17 Roosevelt Boulevard East Coast Greenway - Duval County Corridor Deep Creek to ECG Corridor Jacksonville Baldwin Rail Trail Northern Extension SR 13 William Bartram Trail Corridor Jacksonville Baldwin / East Coast Corridor
Land Trail Opportunities Florida Greenway Florida Greenway Florida Greenway Florida Greenway Florida Greenway Florida Greenway
2143 2137 2000 2138 2149 2128 2010
Nocatee Corridor SR 207 SR 121 Rail Trail Corridor County Road 214 Corridor CR 13 Spuds Palmo Trail Corridor US 301 SR 200 Trans Nassau Trail SR 16
Duval/Clay County Line Forest Street Nassau/Duval County Line SR A1A US 301 SR 200 Trans Nassau Trail Corridor St. Johns /Duval County Line St. Johns River Ferry (East Coast Greenway Corridor) SR A1A St. Augustine Baker/Nassau County Line SR 13 San Jose Boulevard SR 13 San Jose Boulevard US 17 Main Street Yulee SR 13 San Jose Boulevard
SR 228 Hart Expressway
Duval/Clay County Line I-295 14th Street Via Del Rey Avenues Mall (US 1) SR 13 San Jose Boulevard SR 115 Southside Boulevard Via Del Rey / Bill Melton Road SR 21 Blanding Boulevard Loretto Road SR 16 American Beach Loop Burney Road Segment Palatka SR 13 San Jose Boulevard East Coast Greenway (US 17) SR 152 Baymeadows Road Racetrack Road Putnam/Flagler County Line Simmons/AIP Connector Nassau/Duval County Line Racetrack Road Eastport Road East Nassau Community Planning Area St. Augustine San Marco Avenue (US 1 B) (St. Augustine) CR 218 Duval/Clay County Line St. Johns / Duval County Line SR 207 US 90 Beaver Street CR 13 Bulls Bay Highway (Jacksonville Baldwin Corridor) SR 13 San Jose Boulevard Palatka Baker/Union County Line SR 207 SR 207 CR 119 Kingsley Lake Drive
4-47
Florida Greenway Florida Greenway Florida Greenway Florida Greenway Florida Greenway Florida Greenway Florida Greenway - Multi-Use Trail
Strategic Safety Plan
Transit Proximity
2
4 3 5 4
2
5 3
4
5
5 5 5 5
3
5 3 5
2
4 5 5
3 3 2
Latent Demand
3 3 3 3 3 3 5 5 3 3 3 4 4 3 3 3
4 2 3 5 5 5 1 1 5 3 5 2 1 5 2 1 3 3 1 5 5 4 2 2 5 2 1 2 2
3 1 5 1 4 5 1 1
5 5
4 4
5 3 3 3 3 3 3 3 3 3 3 3 3
5 2 2
5 5 5 5 4 5 5
3 3 5 3 3 3 5
2 5 5 1 1 3 5
3 5 4
3 5 5 3 3 3 3
3 4 1 1 1 2 3
3 3 3
3 3 3 2 3 3
5
Prior Plan Priority 3 5 3 3 5 3 3 3
3 5 5 5 3 5 5 5
4 5 5
Priority Score 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0
Path Forward 2040 Long Range Transportation Plan Table 4-7. Bicycle and Pedestrian Prioritization ID
Corridor
From
To
Improvement Type
2120.1 2132 2009 2142 2134 2119 2135
ENCPA DSAP 1- Central (Old Yulee Vicinity) Cross Florida Greenway Corridor US 17 Roosevelt Boulevard East Coast Greenway - St. Johns County Corridor SR 20 US 17 SR A1A East Coast Greenway US 17
East Nassau Community Planning Area Palatka Palatka St. Johns /Flagler County Line Palatka Georgia State Line Putnam/Volusia County Line
East Nassau Community Planning Area Existing Cross Florida Greenway Trail Clay/Duval County Line St. Johns /Duval County Line Hawthorne Fernandina Beach Palatka
Multi-Use Path Florida Greenway Florida Greenway Florida Greenway Florida Greenway Florida Greenway Florida Greenway
4-48
Strategic Safety Plan
Transit Proximity
3
4 4 5 5 5 5 5
3 3
Prior Plan Priority 3 5 3 5 5 5 5
Latent Demand 1 2 5 5 2 4 2
Priority Score 0 0 0 0 0 0 0
Path Forward 2040 Long Range Transportation Plan
COST FEASIBLE PLAN The following table summarizes the contribution of the plan toward enhancements for bicycle and pedestrian mobility.
DEDICATED BICYCLE AND PEDESTRIAN PROJECTS Based on a policy decision approved by the North Florida TPO Board and committees, individual bicycle and pedestrian projects were not selected for funding in the Cost Feasible Plan. The North Florida TPO is dedicating funding through the Transportation Alternatives and Other Arterials funding programs for standalone bicycle and pedestrian projects. These revenues will be dedicated to individual projects on an annual basis as part of the Transportation Improvement Program development.
Table 4-8. Summary of Anticipated Expenditures for Bicycle and Pedestrian Projects Funding Program
Bicycle and Pedestrian Accommodations in 66 Other Projects
Other State Highways Transportation Management Area Transportation Alternatives (TALU) 67 Transportation Alternatives (TALT) 68 Transportation Regional Incentive Program 69 Clay County Duval County Nassau County St. Johns County Total
$64.87 $13.44 $0.00 $0.00 $1.06 $11.84 $43.03 $1.98 $7.97 $144.20
66
Dedicated Revenue for Standalone Projects $26.79 $0.00 $31.20 $41.30 $0.00 $0.00 $59.44 $0.00 $0.00 $158.73
These revenues are based on 5 percent of road capacity projects on arterials and other streets. These funds can only be used within the North Florida Transportation Management Area. 68 These funds are distributed by FDOT on a districtwide basis. The total shown is a districtwide total. 69 These funds are distributed by FDOT on a districtwide basis. The total shown is a districtwide total. 67
4-49
Total $91.66 $13.44 $31.20 $41.30 $1.06 $11.84 $102.47 $1.98 $7.97 $302.93
Path Forward 2040 Long Range Transportation Plan
CONTEXT SENSITIVE SOLUTIONS Table 4-9 summarizes the context sensitive solutions projects in the adopted Cost Feasible Plan. The phasing and funding of these projects were identified in the Other Road Capacity Section. Other projects were identified as candidates for context sensitive solutions but only these projects had sufficient information and consensus to be identified as context sensitive solution priorities.
Duval County is also dedicating funding through their Local Option Gas Tax program to transit accessibility and enhancement projects. These projects are summarized in Table 4-10. The projects will include enhancements such as bus shelters, lighting, landscaping and safety that will improve the quality of service for bicyclists and pedestrians. All arterial road capacity projects are required to provide accommodations for bicyclists and pedestrians (where practical) by the North Florida TPO and FDOT policy.
Table 4-9. Candidate Context Sensitive Solution Funded Projects County ID Facility From
To
Clay
1037
US 17
Governor Street
Haven Avenue
Duval
100 103
US 90 Beach Boulevard
Widen to 6 lanes
St. Johns
1030
SR 109 University Boulevard SR 202 J. T. Butler Boulevard Bridge of Lions
SR 10 Atlantic Boulevard
Duval
SR 16
St. Johns
1029
SR 115 Arlington Expressway SR 115 Southside Boulevard US 1B San Marco Avenue US 1B King Street
Improvement in Draft Needs Plan Context sensitive solutions Widen to 6 lanes
US 1 Ponce de Leon Boulevard
SR A1A Avenida Menendez
Context sensitive solutions Context sensitive solutions
4-50
Path Forward 2040 Long Range Transportation Plan Table 4-10. Duval County LOGT Transit Accessibility and Mobility and Transit Hub Projects
70
Facility Map Id Mobility and Transit Accessibility Enhancements
From
To
Improvement Type
Lenox Avenue Mandarin Road Merrill Road Moncrief Road/Myrtle Avenue/8th Street Park Avenue Plummer Cove Road SR 104 Dunn Avenue SR 109 University Boulevard SR 111 Cassat Avenue SR 111 Edgewood Avenue SR 115 Arlington Expressway SR 115 Lem Turner Road SR 21 Blanding Boulevard SR 228 Normandy Boulevard US 1 SR 15 New Kings Road US 1 SR 5 Philips Highway US 17 Main Street US 90 Beach Boulevard Myrtle Avenue Underpass Soutel Transit Hub Countywide Transit Hubs 71 Grand Total
SR 228 Normandy Boulevard SR 13 San Jose Boulevard SR 109 University Boulevard US 17 Main Street US-17 Scott Mill Road I-295 St. Augustine Road SR 21 Blanding Boulevard SR 111 Cassat Avenue SR 115 Mathews Bridge Downtown Duval County Line/Clay County Line I-295 I-95 I-95 South US 17 / US 17 SR 228 State Street I-95
SR 111 Cassat Avenue Westberry Road Townsend Myrtle Avenue I-95 SR 13 San Jose Boulevard I-95 Fort Caroline Road SR 111 Edgewood Avenue US 17 North Main Street Regency I-295 US-17 SR 111 Cassat Avenue US 1 Martin Luther King Jr. Parkway SR 115 Southside Boulevard Clark Road SR 115 Southside Boulevard
Mobility and Transit Accessibility Enhancements
70 71
CSS8 CSS10 CSS11 CSS12 CSS15 CSS17 CSS5 CSS18 CSS4 CSS6 CSS1 CSS7 CSS3 CSS14 CSS13 CSS16 CSS9 CSS2 CSS19
Lighting, Landscape, and Painting Enhancements Transit Hub Various Locations
Adopted by local Ordinance 2013-820-E. The location and scope of these projects are to be determined.
4-51
Phase CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CAP CST
Years 2019-2020 $18.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.06 $3.39 $4.84 $26.44
Years 2021-2025
Years 2026-2030
Years 2031-2040
$0.00
$0.00
$0.00
22-Year Total $18.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.06 $3.39 $4.84 $26.44
Path Forward 2040 Long Range Transportation Plan This page is intentionally blank.
4-52
Path Forward 2040 Long Range Transportation Plan
FREIGHT AND INTERMODAL SYSTEMS A NALYSIS OF THE FREIGHT SYSTEM WITHIN THE REGION IS AN IMPORTANT ASPECT OF UNDERSTANDING THE ECONOMIC IMPACTS OF TRANSPORTATION INVESTMENT AND IN PRIORITIZING PROJECTS FOR FUTURE INVESTMENTS .
NEEDS PLAN
The following types of major freight and intermodal project needs were identified through various planning efforts of the North TPO, JAXPORT, FDOT, Ocean Highway and Port Authority (Port of Fernandina) and the Jacksonville Aviation Authority.
RAIL With the increase in demand that is anticipated to occur for freight rail and intermodal movements, the operational capacity on the existing rail infrastructure is anticipated to reach or exceed capacity within the region.
PORT
The Strategic Intermodal System Needs Plan and the 2040 Path Forward Adopted Needs Plan considered the track improvements provided by FDOT through coordination with the railroads. However, the focus of the railroad operations analysis usually does not exceed five to ten years. Currently 20 trains per day operate on the FEC line, 14 trains per day operate on CSX’s S-line main. Six trains per day operate on Norfolk Southern main line.
Mile Point Navigation Improvements Jacksonville Harbor Deepening Rail capacity projects for CSX, Norfolk Southern and FEC Intermodal Yard Improvements and access for CSX, Norfolk Southern and FEC North Area/Jacksonville Rail Corridor Port access improvements at the Port of Fernandina
4-53
Path Forward 2040 Long Range Transportation Plan With the addition of intercity passenger service proposed by Amtrak and commuter rail by the Jacksonville Transportation Authority, the available operational capacity will be further impacted.
About 1 million intermodal container twenty-foot equivalency units or (TEUs) are being shipped in North Florida today. This market is anticipated to grow to 2.8 to 4.3 million TEUs by the year 2040. Additional intermodal facility capacity is needed to meet this demand. One potential solution to meet this need is developing a public-private partnership for a joint-use intermodal facility.
Looking to the year 2040, additional track including triple tracking CSX S-line, FEC and Norfolk Southern north of their intermodal facility may be needed. Based on knowledge of the current rail system, the following locations are system bottlenecks and are the region’s highest priorities.
The planned operation of commuter rail and potentially intercity passenger rail service by Amtrak or a private operator will place increased demand on the rail operational capacity within the region. Several system bottlenecks are likely to restrict the ability to meet the rail service demand. These include the Springfield Switch, FEC Rail Crossing of the St. Johns River and the Crawford Diamond crossing of CSX and Norfolk Southern. Additional rail operational modeling is needed for the region to identify other bottlenecks and recommend specific solutions to address these needs. Figure 4-28 shows these bottlenecks. Figures 4-29 thru 4-35 show the freight needs and Table 4-11 summarize the freight needs.
Springfield Switch – this location is currently a bottleneck for the interchange of traffic between the CSX and Norfolk Southern and for trains to travel north to the JAXPORT connections along Eastport. North Rail Corridor – This new rail connector will reduce some the congestion by allowing CSX trains destined for the Intermodal Container Transfer Facility to avoid the Springfield switch downtown. A phase 2 of the corridor is needed to connect to Norfolk Southern and shared operational rights to fully leverage the capacity of the new connector. A new roadway is also recommended for inclusion in this corridor between US 17 Main Street and SR 23 New Kings Road. FEC Railroad Bridge over the St. Johns River - This bridge is a system bottleneck and will limit the capacity for trains to move through the region and access the intermodal and port facilities. Crawford Diamond - With the opening of the Winter Haven Intermodal Facility and the beginning of SunRail operations in Central Florida, CSX is shifting more a significant portion of its freight traffic daily from the A-line, which runs along US 17 to the S-line, running along US 301. This rail traffic crosses the Crawford Diamond at Norfolk Southern. The Crawford Diamond also presents an operational challenge, considering the increased traffic and the need for CSX to clear the crossing for Norfolk Southern to traverse the crossing. In the future operational improvements (or eliminating the need for some of Norfolk Southern trains to cross the diamond) are needed.
PRIORITIZATION
No quantitative prioritization of the freight projects was conducted as part of the plan since the anticipated revenues for these projects are allocated on a statewide basis and the prioritization will be performed by FDOT Central Office each year. Also, based on the estimated funding that would be available through the year 2040 for this program by escalating current funding levels and assuming the percent of the statewide funding available would be allocated proportionate to statewide formula, the anticipated revenues exceeded the needs.
The need for additional rail intermodal facility capacity beyond the Intermodal Container Transfer Facility at Dames Point in needed to meet intermodal demand needs in the future. Currently the FEC’s and Norfolk Southern’s regional intermodal facilities are operating near practical capacity. 4-54
" ) 108
115
§ ¨ ¦ 95
1
£ ¤
" ) " ) X Ã
127
2
2213 2212 2209 2211
301
122
2214
" ) 125
221
¬ «
" ) 124
2254
250A
90
£ ¤
" )
§ ¨ ¦ 10
X Ã
2242
2206
228
" ) 130
228
¬ «
301
£ ¤
Legend
2254
2238
Westlake Cecil Commerce Connector
X Ã
2202
2204
A1A
l ¥ ¢
105
2208
10
X Ã
202
X ÃX Ã
§ ¨ ¦ 295
2260
1
£ ¤
A1A
¬ «
13
4 22
¬ «
1
220
21
90
£ ¤ ¬ «
2207
2259
" )
§ ¨ ¦ 95
3 22 9
5 22
¬ «
¬ « ¬ «
¬ «
See inset
2200
¬ «
2227
116
X Ã
23
" )
§ ¨ ¦ 295
2216 2225 2222 2234 2226 2220 2217 2229 2236 2237 2221 2232 2230 2231 2224 2219 2235 2215 2223 2228 2233 2218
134
218
2
FEC Rail Projects
CSX Rail Projects
16
¬ «
Norfolk Rail Projects
16
® nq ¤
¬ «
1
4 225
Putnam Barge Port Projects
" ) 315
Port of Fernandina Projects JaxPort Projects
Commuter Rail Corridors
16
208
" )
13
17
£ ¤
315
13A
207
¬ «
" )
Intercity Passenger Rail Corridor
" )
17
£ ¤
¬ «
Transportation Intermodal Center
100
¬ «
" ) 315
Railroad System
20
¬ «
Roadway System
§ ¨ ¦ 95
305
26
2248
2249
l ¤ ¥
® q ¢ X n Ã
A1A
¬ «
206
¬ «
2250
5
¬ «
A1A
¬ «
6 225
CSX Rail Corridors
¤ n
214
214
FEC Rail Corridors
£ ¤
¬ « " ) " " ) ) " )
209
" )
Aviation Projects
¢ n
¬ «
0 224
2201
Passenger Rail Station
l ¤ ¥ l ¥ ¤ l ¥ ¢
2257
¬ « ¬ «
Airport
X Ã X Ã X Ã
295
X Ã X Ã
Amtrak Station
A1A
2210
X Ã
X ¨ ç ¦ X Ã
119
® q ¤ n ¤ n
®n q ¢
2258
" )
" )
2205
North Rail Corridor
" ) 250
¬ «
¬ «
2243
£ ¤
" )
A1A
A1A
2240
" )
105
17
2240
2
2244
£ ¤
108
¬ «
2244
107
2203
X Ã
2247 2245
l¬ ¥ ¤ « " ) 2246
2255
" )
" ) 204
Water Bodies
Conservation Lands
" ) 21
Six Counties Boundaries
" ) 2254
2255
" ) " )
5 22
2355
4
" )
200A
§ ¨ ¦ 75
19
¬ «
" ) £ ¤ 318
32208 29
" )
" ) 309
" ) 308
301
200
« £ ¤¬ £ ¤ ¬ «" " ) ) " ) ¬ « ) ¬ « " ) " ¬ «" ) ¬ «
" ) 316
335
225A
25A
1
500
4 22
225
2
27
441
5 22
2239
310
Downtown Jacksonville
320
38 2254 22335
" )
5 22
200A
200
326 326 6
326
25
326
Figure 4-28 Freight Needs Projects Date: 10/6/2014
4-55
¯
0
0
10,560 Feet
4.5
9 Miles
Legend
CSX Rail Projects
X Ã
Commuter Rail Corridors FEC Rail Corridors
CSX Rail Corridors
Intercity Passenger Rail Corridor Railroad System
Roadway System Water Bodies
Conservation Lands
Six Counties Boundaries
" )
108
¬ « 2
" ) 127
" ) 2
" ) 121
" ) 122
" ) 125
" ) 119
" ) 127
" ) " ) 23D
" ) 250
23C
" )
¬ « 121
229
" )
" )
139B
124
" ) 250A
2254
§ ¦ ¨ 10
" ) 23A
" ) 125
2242
301
§ ¦ ¨ 10
228
123
90
2238
¬ «
" )
£ ¤
121
AMTK
2254
" ) Xã ¤ ¤ £
2
301
" ) 228
" )
" )
£ ¤
130
" ) 229
" ) " ¬ « ) ) " £ ¤ " ) " ) 228
228
228
217
301
" ) 231
217
218
Figure 4-29 Baker County Freight Needs Projects Date: 10/6/2014
4-56
¯
0
0
10,560 Feet
1.5
3 Miles
4 22
X Ã
2207
1 5 22 6
5 22 2
X Ã
301
" ) 1179
£ ¤ " ) 217
224
¬ «
23
¬ «
X Ã
2200
§ ¦ ¨ 295
2201
" ) 209
" )
" ) " ) 1189
220A
" ) 13B
220
" ) 15A
" ) 220
" ) 739
5 22 4
" ) 218
" ) 739B
" ) 209
13
3 22
¬ «
9
" ) ¬ « 215
15
¬ «
21
" ) 315
16
¬ «
" ) 16A
16
¬ « 17
£ ¤ 230
¬ «
" ) 226
" ) 315
" ) 209
Legend ® Airport q ¤ Amtrak Station n ¤ Passenger Rail Station n
" ) 315
" ) 352
21
¬ «
" ) 214
X Ã X Ã
" ) 214
FEC Rail Projects
CSX Rail Projects 209 Commuter Rail Corridors
" )
FEC Rail Corridors
CSX Rail Corridors
" ) 315
Intercity Passenger Rail Corridor Railroad System
21
¬ « ¬ «
Roadway System 209 Water Bodies
" )
" )
309D
26
Conservation Lands
Six Counties Boundaries
Figure 4-30 Clay County Freight Needs Projects
® q
Date: 10/6/2014
4-57
¯
0
10,560 Feet
0
1.5
X Ã
3 Miles
A1A
2240
X Ã
2243
1005
2255
¬ «
£ ¤ 23
2254 2238
A1A
¬ «
® q ¢ n
2210
3 22
2205 2212 2209 2211 2213
301
2216
§ ¦ ¨
1
0 224
X Ã
X Ã £ ¤ 17
10
2222 2234 2226 2220 2217 2229 2236 2237 2221 2232 2230 2231 2224 2219 2235 2215 2223 2228 2233 2218 2225
2208
10
¬ «
See Inset
£ ¤ 90
128
£ ¤ 17
2206
301
Westlake 228 Cecil Commerce Connector
¬ «
X Ã
134
¬ « 23
¬ «
202
¬ «
2239
2200
X Ã X Ã
295
¬ «X Ã £ ¤
2260
® q
Aviation Projects
Airport
Water Bodies
1
Conservation Lands
95
4 22
Six Counties Boundaries
1
Figure 4-31 Duval County Freight Needs Projects 4-58
JaxPort Projects
Roadway System
4 22
§ ¦ ¨
13
Port of Fernandina Projects
Railroad System 1
¬ «
Norfolk Rail Projects
Intercity Passenger Rail Corridor
£ ¤
17
CSX Rail Projects
CSX Rail Corridors
152
¬ «
1
2201
Passenger Rail Station
FEC Rail Corridors 2259
§ ¦ ¨
Amtrak Station
Commuter Rail Corridors
4 22
21
¬ «
Date: 10/6/2014
FEC Rail Projects
¢ n
2207
2
224
200
X Ã X Ã X Ã
l ¤ ¥ l ¥ ¢
A1A
5 22
X Ã
¬ «
Airport
6
¬ «
® q ¤ n ¤ n
5 22
2254
£ ¤
¬ «
116
¬ «
2254
A1A
¬ «
6
2227
295
2238
Legend
l ¥ ¢
95
5 22
2240
1
¬ «
§ ¦ ¨
2355
Downtown Jacksonville
A1A
1006
X Ã
2202
2214
£ ¤§ ¦ ¨ 90
4 22
17
¤ X ã
2242
2
£ ¤ X Ã
104
¬ «
2257
2254
5 22
2258
2204
X Ã
2208
115
¬ «
North Rail Corridor
X Ã
2254
2355
2255
£ ¤
22
54
9
¯
0
10,560 Feet
0
3
6 Miles
" ) 108
" ) 115
£ ¤ 301
" )
17
2255
115
" ) 107
£ ¤ X Ã
£ ¤ 1
2203
2246
" ) 105A
105
« ¬ « ¬
200A
" ) 108
Legend
105
95
23
2244
A1A
" )
§ ¦ ¨
£ ¤
2247 2245
l ¥ ¤
2244
¬ « ¬ «
A1A
" ) 107
" ) 108
A1A
X Ã
15
¬ «
2243
105
®n q ¢ 2205
2212 2209 2211
" ) 127
£ ¤
115
2258
104
¬ « X Ã
) " )" 119
2257
123
Date: 10/6/2014
¬ «
¬ «
) " )« ¬ " 23A 121
228
2254
200
¬ « £ ¤ 301
90
2206
228
¬ «
15
¬ « £ ¤¬ « 17
23
211
134
134
21
4-59
211
JaxPort Projects Aviation Projects
Roadway System Water Bodies
10
¬ «
X Ã
£ ¤ ¬ «
Conservation Lands
1
13
A1A
« ¤¬ ¬ « £ 212
¬ « ¬ « Figure 4-32 " ) ¬ « X ì ¬ « ¬ « «Nassau County Freight Needs Projects 213
¬ «
2208
1
" )
8
£ ¤
39 22 54 22
A1A
4 22
228
§ ¦ ¨ 10
2204
Port of Fernandina Projects
Railroad System
116
¬ «
2
X Ã
2242
2238
Norfolk Rail Projects
Intercity Passenger Rail Corridor
0 224
¬ « X Ã
CSX Rail Projects
CSX Rail Corridors
109
2254
Passenger Rail Station
FEC Rail Corridors
2225 2218 2222 2234 2226 2220 2217 2229 2236 2237 2221 2232 2230 2231 2224 2219 2235 2215 2223 2228 2233
5 22
125
¬ «
l ¥ ¢
23C
FEC Rail Projects
Amtrak Station
Commuter Rail Corridors
A1A
2216
§ ¦X ¨ Ã
X Ã X Ã X Ã ¢ n
2227
23D
" )
X Ã
Airport
l ¤ ¥ l ¥ ¢
2202
2214
295
" ) " )
2213
¬ «
North Rail Corridor
301
121
A1A
2210
2240
2
2240
" )
2
¬ «
¬ « ¬ « ¬ «
® q ¤ n ¤ n
109
5
115
¬ «
¯¬« 202
0
90
10,560 Feet
" ) 203
Six Counties Boundaries
0
3.5
7 Miles
" )
0A
" ) 225
" ) 209
" ) 215
" ) 16A
9
" ) 16A
6
3 22
315
225
" )
" ) 15A
" ) 226
" )
0A
" ) 315
4 225
" ) 13
" ) 13A
" ) 209
" ) 315
21
¬ «
" )
" ) 13A
352
" ) 315C
" ) 214
" ) 214
" ) 309D
" ) 219
207
¬ «
100
¬ «
26
¬ « 21
¬ «
l ¤ " ) ¥
" )
2249
207A
216
2248
" ) 309C
®n q ¢
X Ã
" ) 310
20
" ) 315
2250
¬ «
100
¬ «
20
¬ « 17
" ) 20A
15
¬ «
" ) 309B
19
¬ «
" ) 21
£ ¤
" ) 310
" ) 308B
" ) 309
Legend ® q ¢ n
l ¤ ¥ X Ã
Airport
" ) 308
Aviation Projects
Putnam Barge Port Projects CSX Rail Projects
Commuter Rail Corridors
" ) 309
FEC Rail Corridors
CSX Rail Corridors
Intercity Passenger Rail Corridor Railroad System
Roadway System Water Bodies
Conservation Lands
" ) 35
Six Counties Boundaries
" ) 314
Figure 4-33 Putnam County Freight Needs Projects Date: 10/6/2014
4-60
¯
0
0
10,560 Feet
2
4 Miles
" )
2825
X Ã
¤ n
L
L
L
L
Capacity Upgrade 202
¬ «
L
L
X Ã X Ã
115
§ ¦ ¨ 295
2239
L
¬ «
L
L
L L
A1A
210A
L
X Ã
« " ) ¬
Grade Separation
2241
X Ã
§ ¦ ¨ 295
Grade Separation
L
St. Augustine Inset
2252
L
L L
" ) 13B
L
" ) 210
4 22 1
13
¬ « L 5 22 2
L
16
¬ «
16
¬ «
" ) 13A
¤ n
® q
£ ¤
" ) 13
1
16
L
¬ «
L
" )
4 225
¬ « A1A
¤ n
208
See Inset
L L
§ ¦ ¨ 95
L
" ) 13A
312
¬ «
" ) 214
L
Legend
13A
Amtrak Station
Passenger Rail Station 209
" )
£ ¤ ¬ « Norfolk Rail Projects 17
CSX Rail Projects
1
" ) 305
15
206
¬ «
Commuter Rail Corridors
¬ « A1A
L L
FEC Rail Projects
£ ¤
207
¬ « 6 225
X Ã X Ã X Ã
" )
Airport
L
® q ¤ n ¤ n
FEC Rail Corridors
" ) 209
L
CSX Rail Corridors
" )
207A
L
Intercity Passenger Rail Corridor
" ) 13
Railroad System 19
Grade Separation
2016
Conservation Lands 310
" ) 204
100
¬ «
L
¬ « ® q ) ¬ «" Water Bodies à " )X Roadway System 100 1447
" )
Six Counties Boundaries L
Figure 4-34 St. John's County Freight Needs Projects Date: 10/6/2014
4-61
¯
0
0
10,560 Feet
1.5
3 Miles
Path Forward 2040 Long Range Transportation Plan Table 4-11. Freight and Intermodal Needs County Map Id Agency Clay 2200 CSX Transportation Clay 2201 CSX Transportation Duval 2355 Amtrak Duval 2202 CSX Transportation Duval 2204 CSX Transportation Duval 2205 CSX Transportation Duval 2206 CSX Transportation Duval 2242 CSX Transportation Duval 2258 CSX Transportation Duval 2207 FEC Railway Duval 2208 FEC Railway Duval 2259 FEC Railway Duval 2260 FEC Railway Duval 2209 Jacksonville International Airport Duval 2210 Jacksonville International Airport Duval 2211 Jacksonville International Airport Duval 2212 Jacksonville International Airport Duval 2213 Jacksonville International Airport Duval 1006 JAXPORT Duval 2215 JAXPORT Duval 2216 JAXPORT Duval 2217 JAXPORT
Location at Wells Road at SR 224 Kingsley Avenue Downtown Facility at SR 104 Busch Drive Beaver Street Interlocking North Rail Corridors Phase 1 Westlake Cecil Commerce Connector at US 301 SR 200 / Baldwin North Rail Corridors Phase 2 at Bowden Intermodal at Jacksonville Bridge at Sunbeam Road at Shad Road Construction of Runway 7R/25L
Improvement Type Grade Separation Grade Separation Transportation Center Grade Separation Capacity Upgrade Multi Modal Corridor Multi Modal Corridor Grade Separation Multi Modal Corridor Capacity Upgrade Bridge Grade Separation Grade Separation Construct Runway
Air Cargo Ramp Improvements
Expand Apron
Air Cargo Surface Storage
Expand Apron
Design & Construct By-Pass Taxiways
Construct Taxiway
Intermodal Terminal Facility Development
Terminal Development
Spoil Island Connector Bridge Blount Island / Dames Point Marine Terminals Rail Blount Island Marine Terminal Berth Upgrades Blount Island Marine Terminal Facility Upgrades
New 2 Lane Bridge Internal Rail Docks Intermodal Transfer Improvement Docks Intermodal Transfer Improvement Intermodal Transfer Improvement Docks Intermodal Transfer Improvement Internal Rail
Duval Duval
2218 2219
JAXPORT JAXPORT
Dames Point Marine Terminal Berth Upgrades Dames Point Marine Terminal Facility Upgrades
Duval
2220
JAXPORT
Duval Duval
2221 2222
JAXPORT JAXPORT
New Cranes for Talleyrand and Blount Island Marine Terminals Talleyrand Marine Terminal Berth Upgrades Talleyrand Marine Terminal Facility Upgrades
Duval
2223
JAXPORT
Talleyrand Marine Terminal Rail 4-62
Path Forward 2040 Long Range Transportation Plan Table 4-11. Freight and Intermodal Needs County Map Id Agency Duval 2224 JAXPORT
Location Blount Island Marine Terminal Facility Upgrades
Duval
2225
JAXPORT
Dames Point Marine Terminal Facility Upgrades
Duval
2226
JAXPORT
Duval
2227
JAXPORT
New Cranes for Talleyrand and Blount Island Marine Terminals Talleyrand Marine Terminal Facility Upgrades
Duval Duval Duval
2228 2229 2230
JAXPORT JAXPORT JAXPORT
Blount Island / Dames Point Terminals - Rail and Bridge Blount Island Marine Terminal Berth Upgrades Blount Island Marine Terminal Facility Upgrades
Duval Duval
2231 2232
JAXPORT JAXPORT
Dames Point Marine Terminal Berth Upgrades Dames Point Marine Terminal Facility Upgrades
Duval Duval
2233 2234
JAXPORT JAXPORT
Duval Duval
2235 2236
JAXPORT JAXPORT
Harbor Deepening New Cranes for Talleyrand and Blount Island Marine Terminals Talleyrand Marine Terminal Berth Upgrades Talleyrand Marine Terminal Facility Upgrades
Duval Duval Duval Duval/Baker
2237 2214 2257 2238
JAXPORT Norfolk Southern Norfolk Southern CSX Transportation
Talleyrand Marine Terminal Rail at Norfolk Southern Railway (Near Simpson Yard) Soutel Drive to Norfolk Southern Intermodal Yard MacClenny to Jacksonville
Duval/Clay
2239
CSX Transportation
Green Cove Springs to Jacksonville
Duval/Nassau
2240
CSX Transportation
Jacksonville to Yulee
Duval/St. Johns
2241
FEC Railway
St. Augustine to Jacksonville
Nassau Nassau Nassau Nassau Nassau
2203 2243 2244 2245 2246
CSX Transportation CSX Transportation Port of Fernandina Port of Fernandina Port of Fernandina
at SR A1A SR 200 / Yulee at US 301 / Crawford Diamond Berth Improvements Cruise / Cargo Berth Rail Track Improvements 4-63
Improvement Type Intermodal Transfer Improvement Intermodal Transfer Improvement Intermodal Transfer Improvement Intermodal Transfer Improvement Internal Rail Docks Intermodal Transfer Improvement Docks Intermodal Transfer Improvement Dredging Harbor Intermodal Transfer Improvement Docks Intermodal Transfer Improvement Internal Rail Grade Separation New Connector Upgrade to Accommodate Freight and Passenger Service Upgrade to Accommodate Freight and Passenger Service Upgrade to Accommodate Freight and Passenger Service Upgrade to Accommodate Freight and Passenger Service Grade Separation Grade Separation Docks Docks Internal Rail
Path Forward 2040 Long Range Transportation Plan Table 4-11. Freight and Intermodal Needs County Map Id Agency Nassau 2247 Port of Fernandina Putnam 2248 City of Palatka Putnam 2249 County
Location at Fernandina Port SR 100 CR 309D Barge Port
Putnam Regional St. Johns
2250 2251
CSX Transportation Intermodal Logistics Center City of Saint Augustine
at SR 15 Reid Street To be determined Historic Commercial Areas
Statewide Statewide Statewide Statewide Statewide
2252 2253 2254 2255 2256
FEC Railway FEC Railway Intercity Passenger Rail Intercity Passenger Rail Intercity Passenger Rail
Amtrak Service Miami to Jacksonville Miami to Jacksonville Upgrade Bolt and Clip System New Orleans to Jacksonville Jacksonville to Savannah Orlando to Jacksonville
4-64
Improvement Type Access Improvements Runway expansion Operational and Capital Improvements Grade Separation Intermodal Logistics Center Mobility & Distribution Improvements New Passenger Service Track Upgrade New Passenger Service New Passenger Service New Passenger Service
Path Forward 2040 Long Range Transportation Plan
COST FEASIBLE PLAN
A failure to invest in meeting these future freight needs within our region could result in the railroads making investments outside of our region to meet this demand. Moving or shifting major intermodal facilities could result in reducing our economic competitiveness as a region and JAXPORT’s competitiveness for growth since access to rail and other support infrastructure are key components to the success of any port.
Funding for the freight and intermodal projects is anticipated to occur from the statewide Strategic Intermodal System Multimodal Program. The revenues estimated to be available were based on the proportionate share based on population of the four county region. The Strategic Intermodal System Multimodal Program projects are selected on a statewide basis and there is no commitment from the FDOT at this time to fund the projects.
One potential public-private partnership that may be used to meet these needs include development of a joint-use regional intermodal facility. This concept could result in the following benefits to the region.
Investing in projects that result in regional economic development and leverage our position as America’s Logistic Center.
Creating greater balance of jobs and employment throughout the region through strategic investments in infrastructure. Relieving congestion and enhancing mobility through a systems approach to transportation investment and supporting future transit options such as commuter rail. Increasing safety by reducing truck traffic within the urbanized area. Providing direct access between one or two Class I railroads (CSX and Norfolk Southern), the FEC railroad. Expediting service to JAXPORT and off-dock container storage that can improve the operational efficiencies and practical sustained capacity at our existing port facilities without requiring additional port construction. Capturing the projected increase in freight transport on the east coast of the U.S. Increasing employment in the region. Freeing up current freight rail corridors for passenger rail service. Consolidating distribution warehouses and freight transportation in one geographical area. Improving FEC access to inland U.S. Improving FEC, CSX and Norfolk Southern freight transfer capabilities. Increasing JAXPORT freight handling capacities.
Figures 4-34 thru 4-38 show and Table 4-11 summarize the priority projects anticipated to be funded.
4-65
" )
" )
108
115
2247
l¬ ¤ ¥ « " ) 105
§ ¨ ¦
£ ¤
" ) " ) X Ã
127
2
2243
301
2205
North Rail Corridor
" ) 122
X Ã
2258
X ¨ ç ¦
2214
" )
¬ «
2233
l ¥ ¢
2240
125
¬ «
" )
221
124
£ ¤ 90
" )
§ ¨ ¦
A1A
295
§ ¨ ¦ 10
X Ã
X Ã
2242
228
¬ « 228
£ ¤
130
X Ã
105
2208
116
¬ «
2355
10
£ ¤ ¬ « 90
See inset
" )
" )
2204
¬ « ¬ «
1006
" )
250A
2202
295
119
250
A1A
® q
£ ¤
" )
¬ «
1005
2240
" )
301
A1A
17
2240
2
¬ «
¬ «
A1A
£ ¤
108
¬ «
2203
X Ã
95
1
107
X Ã
¬ « ¬ « 134
23
2207
202
2259
2200 2201
295
1
Legend
§ ¨ ¦
2260
4 22
X Ã X Ã
X ÃX Ã
£ ¤ 1
® Airport q ¤ Amtrak Station n ¤ Passenger Rail Station n
l ¤ ¥ l ¥ ¢
Port of Fernandina
" ) ¬ « 21
Florida East Coast Railway
§ ¨ ¦ 95
9
CSX Transportation
220
3 22
X Ã X Ã X Ã
¬ «
" )
218
¬ «
A1A
13
¬ «
¬ «
16
® nq ¤
16
Norfolk Southern
£ ¤ 1
" )
£ ¤
13
17
" )
13A
CSX Commuter Rail North
¬ «
§ ¨ ¦
207
" )
95
214
FEC Commuter Rail Southeast
¬ «
A1A
214
315
CSX Commuter Rail Southwest
¤ n
16
208
209
Port of Jacksonville Spoil Island Bridge
¬ « " ) " " ) ) " )
" )
315
" )
¬ « 5
¬ «
A1A
305
£ ¤
Railroad System
¬ « 100
" ) 315
Roadway System
¬ « 206
17
Transportation Intermodal Center 26 ¬ «
" )
® q
204
¬ « 20
Water Bodies Conservation Lands
" )
Six Counties Boundaries
21
" ) 310
Downtown Jacksonville 2240
" )
" )
320
§ ¨ ¦ X Ã
2355
" ) " )
9 335223
¬ «
200A
220875
19
309
" ) 308
" ) £ ¤
" )
" )
318
329
301
« £ ¤¬ £ ¤ ¬ «" " ) ) " ) ¬ « ) ¬ « " ) "
" )
200
316
335
441
4 22
1
27
25
225
500
200A
25A
225A
200
Figure 4-35 Cost Feasible Plan Freight Projects Date: 10/8/2014
4-66
¯
0
0
10,560 Feet
4.5
9 Miles
2207
4 22
X Ã
1
X Ã
301
" ) 1179
£ ¤ " ) 217
224
¬ «
23
¬ «
X Ã
X Ã
2200
§ ¦ ¨ 295
2201
" ) 209
" )
" ) " ) 1189
220A
" ) 13B
220
" ) 15A
" ) 220
" ) 739
215
21
9
" ) ¬ «
3 22
" ) 218
" ) 739B
" ) 209
" ) 315
13
¬ « 15
¬ «
16
¬ «
" ) 16A
16
¬ « 17
£ ¤ 230
¬ «
" ) 226
" ) 315
" ) 209
Legend ® Airport q ¤ Amtrak Station n ¤ Passenger Rail Station n
" ) 315
X Ã X Ã X Ã
" ) 352
21
¬ «
" ) 214
l ¤ ¥ l ¥ ¢
" ) 214
CSX Transportation
Florida East Coast Railway Norfolk Southern Port of Fernandina 209 Port of Jacksonville
" )
CSX Commuter Rail North
CSX Commuter Rail Southwest
" ) 315
FEC Commuter Rail Southeast Railroad System
21
¬ « ¬ «
Roadway System 209 Water Bodies
" )
" )
309D
26
Conservation Lands Six Counties Boundaries
Figure 4-36 Clay County CFP Freight Projects Date: 8/28/2014
4-67
® q
¯
0
0
10,560 Feet
1.5
3 Miles
X Ã 2240
2240
A1A
¬ «
23
£ ¤
X Ã
2243 2355
A1A
¬ «
® q
39 22
£ ¤ 301
North Rail Corridor
115
¬ «
£ ¤
2240
X Ã
2214
1
17
104
¬ «
X Ã
4 22
2258
2202
A1A
¬ «
l ¥ ¢
§ ¦ ¨ 95
Legend
§ ¦ ¨ 295
1
1006
X Ã
2355
2204
X Ã £ ¤ 17
£ ¤§ ¦ ¨ 90
10
2208
10
¬ «
See inset
£ ¤ 90
128
17
£ ¤ 301
£ ¤
228
X Ã
134
¬ « 23
202
21
¬ «
295
¬ «
2201
¬ «X ã ¤
CSX Transportation
Passenger Rail Station
Florida East Coast Railway Norfolk Southern Port of Fernandina Port of Jacksonville CSX Commuter Rail North
Transportation Intermodal Center Spoil Island Bridge Railroad System
1
£ ¤
17
X Ã X Ã X Ã
Amtrak Station
FEC Commuter Rail Southeast
1
224
§ ¦ ¨
2260
Airport
CSX Commuter Rail Southwest
152
4 22
X Ã
X Ã X Ã
® q ¤ n ¤ n
l ¤ ¥ l ¥ ¢
¬ «
¬ « 2259
2200
A1A
2207
2239
¬ «
¬ «
116
¬ « ¬ «
A1A
¬ «
2240
2242
Downtown Jacksonville
2233
£ ¤
X Ã
X Ã
2240
2205
2208
Roadway System
§ ¦ ¨
13
Water Bodies
95
¬ «
Conservation Lands Six Counties Boundaries
200
¬ « Figure 4-37 Duval County CFP Freight Projects Date: 10/8/2014
4-68
¯
0
10,560 Feet
0
3
6 Miles
" ) 108
" ) 115
£ ¤ 301
2247
" )
£ ¤ 17
" ) 115
X Ã
£ ¤ 1
2203
105A
105
« ¬ « ¬
200A
" ) 108
105
§ ¦ ¨
£ ¤
" )
A1A
" )
95
23
l ¤ ¥
107
¬ « ¬ «
A1A
" ) 107
Legend
" ) 108
A1A
" ) 2
2
¬ «
X Ã
¬ « ¬ « ¬ «
15
¬ «
2243
105
A1A
® q
127
115
¬ «
North Rail Corridor
£ ¤ 301
2258
X Ã
) " )" 121
104
¬ «
119
" )
295
" ) " )
Date: 10/8/2014
116
) " )« ¬ " 23A 121
228
200
¬ « £ ¤ 301
£ ¤ 90
2204 3 22
228
¬ «
2206
15
¬ « £ ¤¬ « 17
23
9
211
X Ã
109
¬ «
134
134
Florida East Coast Railway Norfolk Southern Port of Fernandina Port of Jacksonville CSX Commuter Rail North
21
4-69
211
Railroad System
A1A
¬ «
2208
Roadway System
10
¬ «
£ ¤ ¬ «
Water Bodies Conservation Lands
1
13
A1A
« ¤¬ ¬ « £ 212
¬ « Figure 4-38 ¬ « " ) ¬ « ì ¬ « ¬ « «Nassau County CFP Freight ProjectsX 213
¬ «
1
123
8
¬ «
§ ¦ ¨ 10
CSX Transportation
Passenger Rail Station
CSX Commuter Rail Southwest
4 22
228
¬ «
2242
X Ã
X Ã X Ã X Ã
Amtrak Station
FEC Commuter Rail Southeast 2240
23C
¬ «
l ¥ ¢
§ ¦ ¨
X Ã
" )
A1A 2233
Airport
l ¤ ¥ l ¥ ¢
2202
2214
23D
125
X Ã
2240
" )
2240
2205
® q ¤ n ¤ n
109
5
115
¬ «
¯¬« 202
0
90
10,560 Feet
" ) 203
Six Counties Boundaries
0
3.5
7 Miles
X Ã
¤ n
X Ã
2207
202
¬ «
2241
115
2239
¬ «
X Ã X Ã
X Ã
2200
2259
§ ¦ ¨ 295
« " ) ¬ A1A
210A
§ ¦ ¨ 295
2201
St. Augustine Inset
" ) 13B
" ) 210
13
¬ « 4 22 1
16
¬ «
16
¬ «
" ) 13A
¤ n
® q
£ ¤
" ) 13
1
16
¬ «
¬ « A1A
¤ n
" ) 208
§ ¦ ¨ 95
" ) 13A
312
¬ «
" ) 214
Legend ® q ¤ n ¤ n
X Ã X Ã X Ã
l ¤ ¥ l ¥ ¢
Airport
" ) 13A
Amtrak Station
Passenger Rail Station CSX Transportation 209
" )
Florida East Coast Railway
£ ¤ ¬ « Port of Fernandina 17
Norfolk Southern
£ ¤ 1
207
¬ «
¬ « A1A
" ) 305
15
206
¬ «
Port of Jacksonville
CSX Commuter Rail North
" ) 209
CSX Commuter Rail Southwest207A
" )
FEC Commuter Rail Southeast
" ) 13
Railroad System 19
¬ « ) ¬ «"
Roadway System 100 1447
® q
Water Bodies
" ) 2016
Conservation Lands 310
" ) 204
100
¬ «
" )
Six Counties Boundaries
Figure 4-39 St. Johns County CFP Freight Projects Date: 8/28/2014
4-70
¯
0
0
10,560 Feet
1.5
3 Miles
Path Forward 2040 Long Range Transportation Plan Table 4-12. Freight and Intermodal Funded Projects 72 Facility CSX Transportation
Improvement Type Capacity Upgrade
County Duval
Multi Modal Corridor
Duval
Roadway Grade Separation
Clay
Duval
Nassau
72
Map ID 2204
From Beaver Street Interlocking
2205
North Rail Corridors Phase 1
2258
North Rail Corridors Phase 2
2200
at Wells Road
2201
at SR 224 Kingsley Avenue
2202
at SR 104 Busch Drive
2242
at US 301 (SR 200) / Baldwin
2203
at SR A1A (SR 200) / Yulee
Phase PE ROW ENV CST Total PE ROW ENV CST Total PE ROW ENV CST Total PE ROW ENV CST Total PE ROW ENV CST Total PE ROW ENV CST Total PE ROW ENV CST Total PE ROW ENV CST Total
Fund Source SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal
Years 2019-2020
Years 2021-2025
Years 2026-2030 $1.59 $0.80 $0.80 $7.95 $11.13
SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal
$15.83 $1.02 $1.02 $79.17 $97.03 $1.62 $1.02 $1.02 $8.12 $11.77
SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal
$15.05 $0.68 $0.68 $75.25 $91.65 $15.05 $0.68 $0.68 $75.25 $91.65
SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal
Years 2031-2040
$28.55 $0.80 $0.80 $142.75 $172.89 $14.13 $0.61 $0.61 $63.32 $64.53
$14.13 $21.33 $0.80 $0.80 $106.66 $129.58
22-Year Total $1.59 $0.80 $0.80 $7.95 $11.13 $15.83 $1.02 $1.02 $79.17 $97.03 $1.62 $1.02 $1.02 $8.12 $11.77 $15.05 $0.68 $0.68 $75.25 $91.65 $15.05 $0.68 $0.68 $75.25 $91.65 $28.55 $0.80 $0.80 $142.75 $172.89 $14.13 $0.61 $0.61 $63.32 $78.66 $21.33 $0.80 $0.80 $106.66 $129.58
These revenues represent an anticipated allocation of statewide funds. The funds are distributed on a statewide priority basis and are not “guaranteed” but represent an estimate of the proportionate share of funding for projects based on population within the region. 4-71
Path Forward 2040 Long Range Transportation Plan Table 4-12. Freight and Intermodal Funded Projects 72 Facility
Florida East Coast Railway
Improvement Type
County
Capacity Upgrade for Commuter Rail
Duval/Clay
2239
Green Cove Springs to Jacksonville
Duval/Nassau
2240
Jacksonville to Yulee
Duval
2207
at Bowden Intermodal
2208
at Jacksonville Bridge
2259
at Sunbeam Road
2260
at Shad Road
Capacity Upgrade
Roadway Grade Separation
Intermodal Logistics Center
Intermodal Logistics Center
Duval
Map ID 2243
From at US 301 / Crawford Diamond
Regional
4-72
Phase PE ROW ENV CST Total PE ROW ENV CST Total PE ROW ENV CST Total PE ROW ENV CST Total PE ROW ENV CST Total PE ROW ENV CST Total PE ROW ENV CST Total PE ROW ENV CST Total
Fund Source SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal
Years 2019-2020 $7.60 $0.61 $0.61 $38.02 $46.83
Years 2021-2025
SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal
SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal
SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal
Years 2031-2040
$118.96 $1.02 $1.02 $594.79 $715.78 $109.90 $1.02 $1.02 $549.50 $661.43
SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal
SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal
Years 2026-2030
$3.61 $0.68 $0.68 $18.04 $22.99 $1.90 $0.61 $0.61 $9.48 $12.59 $21.04 $1.02 $1.02 $105.19 $128.26 $15.83 $1.02 $1.02 $79.17 $97.03 $24.77 $4.06 $4.06 $123.83 $156.72
22-Year Total $7.60 $0.61 $0.61 $38.02 $46.83 $118.96 $1.02 $1.02 $594.79 $715.78 $109.90 $1.02 $1.02 $549.50 $661.43 $3.61 $0.68 $0.68 $18.04 $22.99 $1.90 $0.61 $0.61 $9.48 $12.59 $21.04 $1.02 $1.02 $105.19 $128.26 $15.83 $1.02 $1.02 $79.17 $97.03 $24.77 $4.06 $4.06 $123.83 $156.72
Path Forward 2040 Long Range Transportation Plan Table 4-12. Freight and Intermodal Funded Projects 72 Facility Jacksonville Port Authority
Improvement Type New 2 Lane Bridge
County Duval
Harbor Dredging
Regional
Norfolk Southern
Roadway Grade Separation
Duval
2214
at Norfolk Southern Railway (Near Simpson Yard)
Port of Fernandina
Access Improvements
Nassau
2247
at Fernandina Port
Southwest (CSX)
Commuter Rail
Duval/Clay
2358
Downtown Jacksonville
Grand Total
73
Map ID 1006
2233 73
From Spoil Island Connector Bridge
Harbor Deepening
Phase PE ROW ENV CST Total CST
Total PE ROW ENV CST Total PE ROW ENV CST Total CAP Total
Fund Source SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal Federal Seaport Grant JAXPORT SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal SIS Multimodal
Years 2019-2020
Years 2021-2025
Years 2026-2030
Years 2031-2040 $32.16 $1.02 $1.02 $160.80 $194.99
$186.50 $311.00 $186.50 $684.00 $3.33 $0.61 $0.61 $16.64 $21.18 $0.97 $0.61 $0.61 $4.84 $7.02
SIS Multimodal $836.15
$220.42
$313.60
$447.62 $447.62 $2,510.64
22-Year Total $32.16 $1.02 $1.02 $160.80 $194.99 $186.50 $311.00 $186.50 $684.00 $3.33 $0.61 $0.61 $16.64 $21.18 $0.97 $0.61 $0.61 $4.84 $7.02 $447.62 $447.62 $3,880.81
Authorization was approved in the 2014 Water Resources and Reform Development Act but is not obligated. In additional to $311.00 million shown, $186.50 million is anticipated to come from local sources and $186.50 million from the Strategic Intermodal System Multimodal programs. 4-73
Path Forward 2040 Long Range Transportation Plan
This page is intentionally blank.
4-74
PART
FIVE
Systems Management, Operations and Maintenance
Path Forward 2040 Long Range Transportation Plan
TRANSPORTATION SYSTEMS MANAGEMENT AND OPERATIONS TSM&O STRATEGIES INCREASE TRAVEL CHOICES AND EFFICIENCY OF ALL MODES WHILE REDUCING EMISSIONS AND RESOURCE USE . management, arterial traffic management, freight management, special event management, road weather management, congestion pricing, managed lanes, ridesharing and demand management programs, parking management, electronic toll collection and transit smart cards, and traveler information systems.
NEEDS
This program continues a commitment of the North Florida TPO to invest in technologies for intelligent transportation systems and TSM&O strategies. The Regional ITS Plan adopted by the North Florida TPO is provided as Appendix I. Figures 5-1 thru 5-5 and Table 51 summarize the TSM&O needs for the four county area. Because of the more rural nature of Baker and Putnam Counties, TSM&O needs were not identified. Figure 5-1 thru 5-5 also summarize the safety needs which are discussed later in this report.
COST FEASIBLE PLAN
Our plan dedicates $34.21 million in revenue though the Transportation Management Area funding program for TSM&O projects. These revenues will be dedicated to individual projects on an annual basis when developing the Transportation Improvement Program.
TSM&O refers to multimodal transportation strategies to maximize the efficiency, safety and use of existing and planned transportation infrastructure. TSM&O strategies encompass many activities, such as traffic incident
The operations and maintenance costs for these projects are included in Appendix K.
5-1
" ) 108
" ) 115
" )
§ ¦ ¨ 95
1
£ ¤
604
2
" ) 127
A1A
A1A
¬ «
320
17
£ ¤
" ) " ) 108
¬ «
105
¬ « ¬ «
107
2
A1A
¬ «
301
£ ¤ 305
314
295
23
200
315
317 230 215
607
1
£ ¤
2 20
16
¬ «
220
2 30
9 30
§ ¦ ¨ 95
30 2
20 3
217
309
16
¬ «
212
Water Bodies
" ) 315
211
16
208
" )
13A
305
17
£ ¤
26
¬ « 660
214
206
A1A
¬ «
¬ «
100
315
325
5
¬ «
¬ «
" ) 326
§ ¦ ¨ 95
330
" )
¬ «
321
207
" )
A1A
210
¬ «
214
323
303
214
Downtown Jacksonville
307
312
321
13
17
£ ¤
315
1
£ ¤
¬ « " ) " " ) ) " )
209
" )
216
328
Conservation Lands
Six Counties Boundaries
¬ «
330
Roadway System
¬ «
" )
A1A
308
13
241
TSM&O
202
30 2
21
¬ «
Safety Priority Corridors
90
£ ¤ ¬ «
295
327
Safety Priority Intersections
608
201
204
" ) 218
650
§ ¦ ¨
6 60
5 60
712
662
234
209
Legend
229
602
652
652
223
662
316
¬ «
301
£ ¤
603
225
10
¬ «
301
30 0
116
329
130
228
134
¬ « ¬ «
310
301
655
¬ « ¬ «
31 6
" )
313
" ) 250A
207
8 31
220
651
242
" ) 228
§ ¦ ¨ 10
208
611
660
610
90
£ ¤
205
124
240
¬ «
" )
654
663
323
609
213
236
221
105
See inset
307
659
" ) 125
233
250
235
" )
224
325
119
¬ «
§ ¦ ¨
§ ¦ ¨
" )
A1A
295
306
122
326
" )
" ) 204
20
¬ «
322 301
" ) 661
0 31
21
" ) 310
651
320
" ) " ) 335
" )
200A
§ ¦ ¨ 75
" ) £ ¤ 318 304
" ) 329
301
316
27
500
225
326
Date: 10/9/2014
225A
441
25A
309
" ) 308
200
« £ ¤¬ £ ¤ ¬ «" " ) " ) ) ¬ « ¬ « ) " ) " ¬ «" ) ¬ «
" )
335
19
¬ «
30 0
" )
659
" )
25
200A
200
326 326
326
Figure 5-1 Safety and TSM&O Projects 5-2
¯
0
10,560 Feet
0
4
8 Miles
220
205
238
603
230
242
237
317
240
5 31
602
225
234
200
236
229
600 218
226
233
239
311
313
207
206
23 5
318
232
607
215 221
301
" ) 1179
209
£ ¤ " ) 217
§ ¦ ¨ 295
224
¬ «
23
¬ «
" ) 209
6 60
220A
204
308
" ) " ) 1189
5 60
" ) 13B
220
327
201
608
309
" ) " ) 220
" ) 739
20 3 231
" ) ¬ «
" ) 16A
212
739B
" ) 209
13
¬ « 15
¬ «
21
" ) 315
241
2 20
" )
30 2
215
15A
30 2
" ) 218
" )
309
16
¬ «
16
¬ « 17
£ ¤ 230
¬ «
" ) 226
" ) 315
" ) 209
" ) 315
" ) 352
21
¬ «
" ) 214
" ) 214
" ) 209
Legend
Safety Priority Intersections
" ) 315
Safety Priority Corridors TSM&O
21
¬ « ¬ «
Roadway System
" )
" )
2Water 09 Bodies
309D
26
Conservation Lands Six Counties Boundaries
Figure 5-2 Clay County Safety and TSM&O Projects Date: 10/9/2014
5-3
¯
0
0
10,560 Feet
1.5
3 Miles
31 4
A1A
¬ «
£ ¤ 23
A1A
¬ «
® q
£ ¤ 301
115
¬ « £ ¤ 17
104
A1A
¬ «
326
61 0
¬ «
§ ¦ ¨ 95
224
§ ¦ ¨ 295
5 30
£ ¤ 1
663
323
322
325
314
301
0 31
233
17
225
200
21
¬ «
90
652
A1A
¬ «
229
230 232
607
712
202
¬ «
Legend Safety Priority Intersections Safety Priority Corridors
295
TSM&O Roadway System
£ ¤ 1
17
658
13
Water Bodies
319
§ ¦ ¨
Conservation Lands
95
¬ « 327
608
Airport
® q
§ ¦ ¨
£ ¤
6 60
204
£ ¤
152
224
Date: 10/9/2014
¬ «
¬ « ¬ «
200
652
A1A
662
650
10
652
315
209
¬ «
¬ «
657
¬ «
223
602
221
5 60
116
234
236
23
¬ «
238
218
£ ¤
308
309
311
603
226
222
242
134
¬ «
239 205
¬ «
207
601
240
301
228
304
¬ « 600
£ ¤
220
30 0
128
23 5
313
318
£ ¤ 317
611
651
17
208
237
10
609
650 301
974
659
213
£ ¤§ ¦ ¨ 90
306
660
307
655
656 654
Figure 5-3 Duval County Safety and TSM&O Projects 5-4
2 30
Six Counties Boundaries
¯
0
10,560 Feet
0
3
6 Miles
" ) 108
" ) 115
£ ¤ 301
17
" )
604
£ ¤ 1
200A
" ) 108
320
§ ¦ ¨
£ ¤
105
« ¬ « ¬
A1A
" )
95
23
105A
" )
£ ¤
115
" )
107
105
¬ « ¬ «
A1A
" ) 107
" ) 108
A1A
" ) 2
2
¬ «
¬ « ¬ « ¬ «
15
¬ «
105
A1A
® q 127
115
¬ «
£ ¤ 301
61 0
314
¬ «
119
Safety Priority Intersections
" ) " )
" ) 123
Date: 10/9/2014
8
¬ «
¬ «
) " )« ¬ " 23A 121
228
200
¬ « £ ¤ 301
318
23
611
208
235
313
228
228
¬ «
109
15
¬ « £ ¤¬ « 17
211
£ ¤ ¬ « 1
13
660
301
304
30 0
¬ « Figure 5-4 " ) ¬ « Nassau County Safety and TSM&O Projects ¬ « ¬ ¬ « « 134
213
134
21
5-5
211
301
654
109
5
652
650
652
223
115
¬ «
655
306
651
659
10
90
242
§ ¦ ¨
£ ¤
609
656
¬ «
325
322
23C
0 31
125
Airport
® q
224 307
§ ¦ ¨ 295
23D
" )
Legend
A1A
305
) " )" 121
104
¬ «
326
" )
116
¬ «
Safety Priority Corridors
662
662
TSM&O Roadway System
A1A
¬ «
Water Bodies
10
¬ «
Conservation Lands
¯¬« 202
A1A
« ¤¬ ¬ « £
652
212
0
90
10,560 Feet
" ) 203
Six Counties Boundaries
0
3.5
7 Miles
330
651
310
609
30 0
304
223
328
6 20
229 602
225
712
315
330
603
222
600 31 7
233
601
652
652
652
659
312
202
¬ «
115
¬ «
234
242
232
303
295
321
330
32 9
230
§ ¦ ¨ « " ) ¬
607
215 219
A1A
210A
§ ¦ ¨
209
295
St. Augustine
6 60
658
308
" ) 13B
2 30
327
9 30 302
" ) 210
13
30 2
¬ « 217
0 33
16
¬ «
16
¬ «
309
" ) 13A
211
¤ n
216
13
£ ¤ 1
330
" )
® q
16
¬ «
" )
¬ « A1A
¤ n
312
208
32 9
328
§ ¦ ¨ 95
" ) 13A
See Inset
3 30
312
¬ «
210
" ) 31 6
316
214
321
" ) 13A
£ ¤ 1
207
" ) £ ¤ ¬ « 17
Airport
" ) 305
15
Amtrak Station
¬ « A1A
321
209
Legend ® q ¤ n ¤ n
¬ «
214
206
¬ «
209 Passenger Rail Station
TSM&O
" )
Safety Priority Corridor
" )
207A
Safety Priority Intersections
" ) 13
19
¬ « ¬ ) «"
Roadway System100
® q
Water Bodies
Conservation Lands 310
1447
" ) 2016
" ) 204
100
¬ «
" )
Six Counties Boundaries
Figure 5-5 St. John's County Safety and TSM&O Projects Date: 10/9/2014
5-6
¯
0
0
10,560 Feet
2
4 Miles
Path Forward 2040 Long Range Transportation Plan Table 5-1. TSM&O Needs County Map Facility ID
From
To
Improvement Type
Clay
327
US 17 SR 15
CR 315
Kingsley Avenue
Arterial Management System
Duval
300
Alt US 1 Hart Bridge Expressway
Monroe Street
US 90 Beach Boulevard
Duval
306
Monument Road
SR 10 Atlantic Boulevard
Fort Caroline Road
Freeway Management System Arterial Management System
Duval
657
Mt. Pleasant Road
McCormick Road
Girvin Road
Arterial Management System
Duval
658
Old St. Augustine Road
I-95
Arterial Management System
Duval
650
SR 10 Atlantic Boulevard
Monument Road
US 1/ SR 5 Philips Highway Intracoastal Waterway
Duval
651
SR 10 Atlantic Boulevard
Hart Bridge Expressway
Arterial Management System
Duval
663
SR 106 Merrill Road
Duval
653
SR 109 Cesery Boulevard
Duval
659
SR 109 University Boulevard
SR 109 University Boulevard SR 109 University Boulevard St. Augustine Road
SR 109 University Boulevard SR 113 Southside Connector SR 115 Arlington Expressway US 90 Beach Boulevard
Duval
660
SR 109 University Boulevard
Arlington Road
Merrill Road
Arterial Management System
Duval
661
SR 109 University Boulevard
SR 10 Atlantic Boulevard
SR 109 Cesery Boulevard
Arterial Management System
Duval
305
SR 115 Lem Turner Road
I-95
I-295
Arterial Management System
Duval
301
SR 115 Arlington Expressway
US 17 State Street
SR 10 Atlantic Boulevard
Duval
654
SR 116 Fort Caroline Road
Merrill Road
McCormick Road
Freeway Management System Arterial Management System
Duval
655
SR 116 Wonderwood Connector
Fort Caroline Road East
Mt. Pleasant Road
Arterial Management System
5-7
Arterial Management System
Arterial Management System Arterial Management System Arterial Management System
Path Forward 2040 Long Range Transportation Plan Table 5-1. TSM&O Needs County Map Facility ID
From
To
Improvement Type
Fort Caroline Road East
Arterial Management System
SR 101 Mayport Road
Arterial Management System Traffic Operations Improvements Freeway Management System Arterial Management System
Duval
656
SR 116 Wonderwood Connector
Duval
662
SR 116 Wonderwood Connector
SR 113 Southside Connector Mt. Pleasant Road
Duval
304
SR 126 Emerson Street
I-95
Bedford Road
Duval
310
SR 13 Acosta Bridge
I-95
Broad Street
Duval
311
SR 134 103rd Street
I-295
Duval
315
SR 202 J. T. Butler Boulevard
Duval
317
SR 21 Blanding Boulevard
SR 228 Normandy Boulevard US 1 SR 5 Philips Highway Collins Road
Duval
324
US 1 Main Street Bridge
I-95
Duval
325
US 1 Martin Luther King Jr. Parkway
I-95
Duval
326
US 17 Main Street
SR 115 Arlington Expressway Bay Street
I-295
Freeway Management System Arterial Management System
Duval
322
US 17 SR 228 State Street
I-95
Liberty Street
Arterial Management System
Duval
323
US 17 SR 228 Union Street
I-95
Liberty Street
Arterial Management System
Duval
313
US 301 SR 200
US 90 Beaver Street
Rural ITS
Duval
652
US 90 Beach Boulevard
SR 228 Normandy Boulevard Parental Home Road
San Pablo Road
Arterial Management System
Duval / Nassau Duval / St. Johns Nassau
314
US 301 SR 200
US 90 Beaver Street
Mickler Street (Callahan)
Rural ITS
319
SR 9B
CR 2209
I-295
320
SR 200 SR A1A
I-95
Fernandina Beach
Freeway Management System Arterial Management System
St. Johns
302
CR 210 Palm Valley Road
SR 13
SR A1A
Rural ITS
5-8
SR A1A US 17 Roosevelt Boulevard Bay Street
Freeway Management System Arterial Management System Arterial Management System
Path Forward 2040 Long Range Transportation Plan Table 5-1. TSM&O Needs County Map Facility ID
From
To
Improvement Type
St. Johns
303
CR 214 King Street and Anastasia Boulevard
I-95
SR A1A
Arterial Management System
St. Johns
316
SR 207 SR 312
I-95
SR A1A
Rural ITS
St. Johns
321
SR A1A
SR 206
CR 214
Rural ITS
St. Johns
330
US 1, A1A & SR 5A
St. Johns
328
SR 312
SR 16
St. Johns
329
US 1 SR 5 Dixie Highway/Ponce De Leon Boulevard US 1 SR 5 Ponce De Leon Boulevard
Transportation Management Plan Arterial Management System
SR 5A King Street
SR 16
Access Management Plan
5-9
Path Forward 2040 Long Range Transportation Plan This page is intentionally blank
5-10
Path Forward 2040 Long Range Transportation Plan
AUTONOMOUS AND CONNECTED VEHICLES A UTONOMOUS AND CONNECTED VEHICLES WILL FUNDAMENTALLY CHANGE THE WAY WE TRAVEL , OUR RELATIONSHIP WITH VEHICLES AND THE INFRASTRUCTURE NEEDED TO MEET OUR MOBILITY NEEDS .
INTRODUCTION
Our future infrastructure is poised to achieve significant improvements in the coming decades, including:
Safer roads — new technologies in cars and on roadways will greatly reduce motor vehicle crashes in the coming decades. Some experts predict that we can virtually eliminate traffic fatalities by using these new technologies in concert with law enforcement, better engineering and education. Less congestion — Automated and connected vehicles, operating in platoons or independently, will travel at high speeds and occupy less highway space, as on-board sensors, vehicle-to-vehicle and vehicleto-infrastructure communications allow for more active traffic management across cities and commuting corridors.
Greater sustainability — Fewer idling, fuming cars, more efficient vehicles of all kinds (many that burn no fuels), and smoother connections between transportation modes will have a highly positive impact on the environment and air quality.
These outcomes are highly desirable, and ultimately achievable. However, the path forward may require new paradigms for transportation owners from the way they plan, to how they align resources, to how they interact with the public at large.
5-11
Path Forward 2040 Long Range Transportation Plan
NEEDS PLAN
While fully autonomous vehicles might be not commonplace for ten or more years, until then there will be a steady ramp-up of automated features and communications technologies in vehicles. Within the ITS Master Plan adopted by the North Florida TPO and included in this plan, the most significant investment needed from public information is providing communication networks to address vehicle-toinfrastructure communication. With these communication networks in place cars will get FDOTprovided insights about accidents, ice, heavy rain, alternate routes and other factors — miles ahead of their current positions. Second, the agencies will get essential data about vehicle speed, wiper activity, tire slippage, traffic density and other factors, which will enable realtime responses (redirecting traffic, variable signs, invehicle alerts) to alleviate danger and congestion.
Phase I Limited Access Highways: consists of all major limited access highways in the region such as I-95, I-295, SR 202 J. T. Butler Boulevard, and I-10. Phase II, Other Limited Access Highways: consists of other limited access highways or high volume corridors in the region such as SR 212 Hart Bridge Expressway, US 90 Arlington Expressway, SR 115 Martin Luther King Expressway, SR 9B, and SR 23 Branan Field Chaffee Road. Phase III, Other State Roads: consists of state roads in the region that are heavily travelled such as, SR 21, SR 13, SR 5/US 1, SR 200, SR 212, SR 90, and SR 15/US 17. Phase IV, Other Arterials: consists of arterials that are listed in the needs arterial corridor list and not included in the previous phases such as SR 102 Airport Road, and SR 105 Heckscher Drive.
Additional information about the roadside infrastructure needs to support automated and connected vehicles is provided in Appendix J.
To provide the vehicle-infrastructure communication capability in the northeast Florida region, dedicated short range communications devices should be installed at every half-mile along priority corridors. These devices are proposed to be installed in four phases to spread the funding needed for deployment.
COST FEASIBLE PLAN
The corridors are divided into four different phases for dedicated short range communications devices deployment:
No funding is dedicated to these needs at this time. During the construction of road capacity projects and ITS deployments, a fiber optic network communications backbone is being deployed incrementally to meet these needs. Once a communications backbone is in place, the costs of the dedicated short range communication devices for roadside to vehicle communications is estimated to be $6.9 million with an annual operating and maintenance cost of $0.9 million per year in present day costs.
5-12
Path Forward 2040 Long Range Transportation Plan
SAFETY AND SECURITY T O ADDRESS THE SAFETY NEEDS IN OUR REGION , THE N ORTH F LORIDA TPO IDENTIFIED PRIORITY CORRIDORS AND PROJECTS TO BE CONSIDERED IN THE LRTP. needs identified in this plan are local priorities for FDOT to consider in the process. FDOT funds subgrants that address traffic safety priority areas are also available. These programs include:
NEEDS PLAN
The Strategic Safety Plan and Congestion Management Plan previously discussed were used to document the safety needs within the region. Regional security needs are addressed by the Regional Domestic Security Task Force and were documented earlier in this report.
COST FEASIBLE PLAN
Funding for safety projects not addressed through other road improvements is allocated on an annual basis through the following statewide programs.
Aging Road Users Community Traffic Safety Impaired Driving Motorcycle Safety Occupant Protection and Child Passenger Safety Pedestrian and Bicycle Safety Police Traffic Services Speed and Aggressive Driving Teen Driver Safety
With the projects being determined on annual basis, funding was not allocated to specific projects in this Cost Feasible Plan.
Each year the Highway Safety Grant Program Section of the Florida Department of Transportation (FDOT) Safety Office develops a comprehensive Highway Safety Plan that describes the projects recommended for federal funding during the upcoming federal fiscal year. The 5-13
Path Forward 2040 Long Range Transportation Plan Table 5-2. Priority Safety Corridors County ID Facility Clay 201 CR 209 Russell Road Clay 202 CR 215 Clay 203 CR 218 Clay 608 CR 220 Doctors Inlet Road Clay 204 CR 220A Long Bay Road Clay 241 SR 21 Blanding Boulevard Clay 209 SR 21 Blanding Boulevard Clay 212 SR 21 Blanding Boulevard Clay 215 SR 21 Blanding Boulevard Clay 219 SR 21 Blanding Boulevard Clay 221 SR 21 Blanding Boulevard Clay 231 SR 21 Blanding Boulevard Clay 605 SR 21 Blanding Boulevard Clay 606 SR 21 Blanding Boulevard Duval 200 Collins Road Duval 205 Firestone Road Duval 206 Harlow Boulevard Duval 607 I-295 Duval 610 I-295 Duval 233 Jammes Road Duval 234 Morse Avenue Duval 235 Old Middleburg Road Duval 236 Old Middleburg Road Duval 237 Rampart Road Duval 238 Ricker Road Duval 239 Ricker Road Duval 240 Shindler Drive Duval 207 SR 134 103rd Street Duval
218
SR 134 103rd Street
Duval Duval
222 225
SR 134 103rd Street SR 134 103rd Street
Duval
226
SR 134 103rd Street
Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval Duval
311 603 602 315 712 601 242 230 232 208 220 318 609 611 213
SR 134 103rd Street SR 134 103rd Street SR 134 Timuquana Road SR 202 J. T. Butler Boulevard SR 202 J. T. Butler Boulevard SR 208 Wilson Boulevard SR 21 Blanding Boulevard SR 21 Blanding Boulevard SR 21 Blanding Boulevard SR 228 Normandy Boulevard SR 228 Normandy Boulevard SR 228 Normandy Boulevard SR 228 Normandy Boulevard SR 228 Normandy Boulevard SR 23 First Coast Expressway
From Old Ferry Road SR 16 N Mimosa Avenue SR 21 Blanding Boulevard CR 220 Doctors Inlet Road SR 16 at Arora Boulevard at SR 16 at Youngerman Circle at Argyle Forest Boulevard at Wells Road at CR 215 Everett Avenue Old Jennings Road Shindler Drive Morse Avenue SR 134 103rd Street Old St Augustine Road SR 228 Normandy Boulevard Morse Avenue Ricker Road Argyle Forest Boulevard SR 134 103rd Street Argyle Forest Boulevard Morse Avenue SR 134 103rd Street Collins Road at New World Avenue at Firestone Road , I-295 Interchanges at Harlow Boulevard at SR 21 Blanding Boulevard at Shindler Drive , Old Middleburg Road SR 228 Normandy Boulevard SR 228 Normandy Boulevard Wesconnett Boulevard US 1 SR 5 Philips Highway SR 115 Southside Boulevard Fouraker Road Argyle Forest Boulevard at Collins Road at I-295 NB Off Ramp at Fouraker Road at Blair Road South SR 134 103rd Street I-295 SR 23 First Coast Expressway at US 90 , I-10 Beaver Street 5-14
To CR 220 Doctors Inlet Road SR 21 Blanding Boulevard CR 739 Henley Road CR 224 College Drive Old Jennings Road CR 218
Old Jennings Road Argyle Forest Boulevard Rampart Road SR 208 Wilson Boulevard SR 21 Blanding Boulevard SR 228 Normandy Boulevard SR 115 Lem Turner Road San Juan Avenue Jammes Road SR 134 103rd Street Lenox Avenue Park City Drive SR 134 103rd Street Old Middleburg Road SR 134 103rd Street
I-295 Wesconnett Boulevard US 17 Roosevelt Boulevard SR A1A Hodges Boulevard SR 103 Lane Avenue US 17 Roosevelt Boulevard
I-295 SR 111 Cassat Avenue I-295
Path Forward 2040 Long Range Transportation Plan Table 5-2. Priority Safety Corridors County ID Facility Duval 224 US 1/SR 15 New Kings Road Duval 229 US 1 SR 5 Philips Highway Duval 223 US 90 Beach Boulevard Duval 600 Wesconnett Boulevard Nassau 604 SR 200 SR A1A St. Johns 216 International Golf Parkway St. Johns 217 International Golf Parkway St. Johns 211 SR 16/SR 13 St. Johns 210 US 1/SR 5 Dixie Highway St. Johns 214 US 1/SR 5 Dixie Highway US 1/SR 5 Ponce De Leon St. Johns 329 Boulevard
From at Moncrief Road at Bowden Road at Forest Boulevard SR 21 Blanding Boulevard I-95 at SR 16 at US 1/SR 5 Dixie Highway at CR 13 at SR 312 at SR 206
To
SR 5A King Street
SR 16
5-15
SR 21 Blanding Boulevard Chester Road
Path Forward 2040 Long Range Transportation Plan This page is intentionally blank.
5-16
Path Forward 2040 Long Range Transportation Plan
OPERATIONS AND MAINTENANCE M AINTAINING AND OPERATING OUR TRANSPORTATION SYSTEM IS ESSENTIAL FOR OUR MOBILITY AND QUALITY OF LIFE . Our plan considers the long-term needs to maintain and operate our transportation system. Without adequate maintenance and operations, our investments in construction and capital projects will not be sustainable and the long-term costs of maintaining our system will increase. The plan dedicates federal, state and local resources as summarized in the following table.
5-17
Path Forward 2040 Long Range Transportation Plan Table 5-2. Summary of Operations and Maintenance Costs Phase 2019-2020 State Highway System O&M $991 Local Roadways O&M Clay O&M $30 Duval O&M $267 Nassau O&M $2 St. Johns O&M $53 Total Roadways $1,343 JTA Transit Bus O&M $167 Skyway/Streetcar O&M $3 BRT O&M Commuter Rail O&M Park and Ride Lots O&M $1 Subtotal JTA $171 Sunshine Sunshine Transit O&M $3 Total Transit $174 Total $1,517
5-18
2021-2025 $1,982 $85 $819 $6 $176 $3,067 $465 $10 $233
2026-2030 $2,023 $33 $108 $1,117 $7 $257 $3,546 $548 $11 $610
$2 $710 $8 $1,427 $4,494
$2 $1,171 $9 $2,351 $5,897
2031-2040 $2,216 $315 $3,612 $20 $936 $7,099 $1,400 $29 $1,557 $7,647 $5 $10,637 $23 $21,298 $28,397
22-Year Total $7,212 $33 $538 $5,816 $36 $1,422 $15,056 $2,580 $53 $2,400 $7,647 $9 $12,689 $42 $25,250 $40,305
PART
SIX
PLAN SUMMARY
Path Forward 2040 Long Range Transportation Plan
MEASURES OF EFFECTIVENESS U SING PERFORMANCE MEASURES TO EVALUATE THE PLAN AND PROVIDE FEEDBACK ON THE CONSISTENCY WITH THE GOALS AND OBJECTIVES OF THE PLAN WAS INTEGRAL TO THE PLANNING PROCESS . Consistent with the requirements of MAP-21, system wide measures of effectiveness were used to benchmark the performance of the plan alternatives. To assess improvements in safety and mobility, the NERPM-AB and other tools were used to quantify the benefits of the Cost Feasible Plan (as compared to a No Build scenario which is the Existing Plus Committed model network).
The Cost Feasible Plan also does not address all deficiencies that were identified through the planning process. Figure 6-1 shows the deficiencies that will exist in 2040 with implementation of the Cost Feasible Plan.
Table 6-1 on the next page summarizes the measures of effectiveness and benchmarks established during the planning process. Not all of the measures identified in the goals and objectives could be quantified (such as reliability) and these are noted. While not all the benchmarks established for the plan were met, the result of the planning process was a wellbalanced plan that met usersâ&#x20AC;&#x2122; needs to the greatest extent possible. 6-1
Path Forward 2040 Long Range Transportation Plan Table 6.1 Summary of Measures of Effectiveness Measure of Effectiveness
Benchmark Met
Change
Economic Competitiveness Reliability Access to jobs Delay benefit Maximize the return on investment Livability Access to transit Transit riders Miles with bike and pedestrian accommodations Reduce the cost of congestion per capita Reduce the impact on natural environment
254,088 186,639,846 6.1% 58,880 17,589 198 $116
Reduce emissions from automobiles Safety Benefits Change in total crashes Change in fatal crashes Safety benefit Quantity of Travel Person-miles traveled Truck-miles traveled Vehicle-miles traveled Walk trips
17,166 858 $126,025,695
1,188,246 78,011 1,188,246 (14,697)
Reliability could not be evaluated within the travel demand forecasting model. additional persons with access within 1/4 mile of a Cost Feasible Plan project. vehicle hours return on investment with a benefit-to-cost ratio of 3.73.
additional persons with access to new transit capacity. more persons choose transit. miles of non-Interstate projects that will include bicycle and pedestrian improvements. benefit of travel time saving per person per year. A network of constrained corridors were identified and where widening would exceed six lanes on arterial roadways, context sensitive solutions were recommended. Environmental screening was performed as part of the planning projects and projects that were identified to have fatal flaws were not included in the Cost Feasible Plan. Unable to evaluate.
crashes reduced per year. fatal crashed reduced per year. benefit per year in dollars.
additional persons are served. additional trucks served. additional vehicle miles traveled. fewer persons choose to walk - likely a result of improved access to transit.
6-2
Path Forward 2040 Long Range Transportation Plan Table 6.1 Summary of Measures of Effectiveness Measure of Effectiveness
Change
Benchmark Met
Bike trips
(2,705)
Transit riders Quality of Travel Average speed Delay Average trip time Reliability Congestion on rural facilities Accessibility Proximity to major transit hubs Miles of bicycle and pedestrian accommodations
17,589
fewer persons choose to bike - likely a result of improved access to transit. more persons choose transit
1.64 33,613
miles per hour speed improvement. vehicle hours saved.
0.05%
Unable to evaluate. reduction in delay on rural facilities
Two hubs added – Downtown and Soutel miles of non-Interstate projects that will include bicycle and pedestrian improvements. additional persons with access within 1/4 mile of a Cost Feasible Plan project. additional persons living in households within 1/3 of a Cost Feasible Plan project. additional persons with access to new transit capacity.
Access to jobs
198 254,088
Access to persons
96,244
Access to transit Utilization System congested (miles congested) Congested trips (vehicle-miles congested) Vehicles per lane mile Duration of congestion Lane miles added Transit load factor
58,880 3.07% 14,619,980 144 0.08 818
improvement in the percent of the system that is congested. reduced congested trips per day. Vehicle reduction in vehicles per lane mile minutes reduced. lane miles added. Unable to evaluate.
6-3
" ) 108
" ) 115
" )
§ ¦ ¨ 95
£ ¤ 1
2
127
A1A
A1A
¬ «
17
" ) " )
" )
105
£ ¤
108
¬ «
¬ « ¬ «
107
2
A1A
¬ «
£ ¤ 301
" ) 122
295
119
" ) 250
¬ «
§ ¦ ¨
§ ¦ ¨
" )
A1A
295
105
¬ « ¬ « 116
" ) 125
221
¬ «
" ) 124
¬ « 10
£ ¤ 90
" )
§ ¦ ¨
90
228
" ) 130
£ ¤ ¬ «
10
228
¬ «
£ ¤ 301
202
134
¬ « ¬ « 23
§ ¦ ¨ 295
Legend
£ ¤ 1
V/C Ratio
< 0.80
0.81 - 0.89
¬ «
220
218
> 0.90
§ ¦ ¨ 95
21
¬ «
Roadway System Water Bodies
16
¬ «
Conservation Lands
¬ «
13
" )
" )
A1A
16
¬ «
Six Counties Boundaries
" ) 315
1
208
" )
13
£ ¤ 17
315
16
¬ « " ) ) " ) " " )
209
" )
13A
207
" )
£ ¤ 17
¬ «
206
" ) 204
20
" ) 329
Date: 1/28/2015
" ) 310
" )
200A
" ) 318
¬ «
¬ «
¬ «
75
A1A
100
315
§ ¦ ¨
5
¬ «
¬ «
" )
320
§ ¦ ¨ 95
305
26
" )
¬ «
¬ «
" )
21
A1A
214
214
" )
£ ¤
19
¬ «
" ) 309
" ) 308
Figure 6-1 2040 Cost Feasible Plan Deficiencies 6-5
¯
0
10,560 Feet
0
3.5
7 Miles
Path Forward 2040 Long Range Transportation Plan
BALANCING OUR PLAN A PLAN THAT IS WELL BALANCED ENSURES WE PROVIDE OUR RESIDENTS WITH THE CHOICES THEY NEED AND THAT OUR INVESTMENTS ARE FAIR AND EQUITABLE . Our planning process ensured that we have a plan that is balanced with the anticipated revenues.
We have also developed a plan that is balanced geographically to ensure that resources are fairly allocated among our partners. Geographic equity is related to population distribution, but our plan is regional in nature and many of our investment benefit residents who cross county boundaries every day to work and play.
A plan is also well balanced when investments are made to provide mode choices to enhance mobility and livability within our community. Reliable and safe transportation through enhanced transit and safe walkable communities for our aging population is essential to maintain independent living. As more seniors continue to drive, highway features such as clear signing and lighting become especially important.
Social equity, social diversity, quality of life and meeting the needs of the underserved are aspects of social sustainability that were addressed during the planning process through extensive public outreach.
The Path Forward 2040 LRTP considers the aging population, changing demographics and population growth. The plan considers the transportation system needs of all user groups and recognizes that there is an increasing demand for solutions and strategies spanning the broadest spectrum of users, vehicles, and modal choice preferences.
The following tables summarize show the balance achieved in our planning process when the expenditures are compared to needs, geography and modes served.
6-5
Path Forward 2040 Long Range Transportation Plan Table 6-2. Total Expenditures by Fund Source for Capacity Programs 74 Fund Program Years Years 2019-2020 2021-2025 Strategic Intermodal System $39.82 $508.26 Other State Highways $122.33 $273.13 Transportation Management Area $28.80 $77.44 Turnpike/Tolls $0.00 $1,951.22 TRIP $0.70 $5.40 Clay County $52.88 Duval County $255.23 $362.31 Nassau County $0.00 $0.00 St. Johns County $2.75 $13.50 FTA Passenger Ferry Grant $6.62 State and Federal Transit $63.07 $174.11 Transit Local Match $21.02 $58.04 Transportation Alternatives (TALU) $2.80 $7.10 Transportation Alternatives (TALT) $3.78 $9.38 SIS Multimodal $338.65 $220.42 Federal Seaport Grant $311.00 JAXPORT $186.50 Grand Total $1,376.45 $3,719.80
74
Includes all phases. 6-6
Years 2026-2030 $874.16 $284.40 $83.98 $0.00 $5.39 $73.02 $102.89 $10.75 $32.52
Years 2031-2040 $2,635.50 $709.21 $126.18 $0.00 $10.80 $122.82 $242.68 $30.88 $118.61
$171.98 $57.33 $7.10 $9.38 $313.60
$350.84 $116.95 $14.20 $18.76 $2,510.64
$2,026.49
$7,008.08
22-Year Total $4,057.74 $1,389.08 $316.40 $1,951.22 $22.29 $248.73 $963.11 $41.63 $167.38 $6.62 $760.00 $253.33 $31.20 $41.30 $3,383.31 $311.00 $186.50 $14,130.82
Path Forward 2040 Long Range Transportation Plan Table 6-3. Total Revenue and Expenditures for Balancing Source Item Years 2019-2020 Strategic Intermodal System Other Arterials
Turnpike/Tolls
Transportation Management Area Transportation Alternatives (TALU) Transportation Alternatives (TALT) Transportation Regional Incentive Program (TRIP) State and Federal Transit
Strategic Intermodal System Multimodal Federal Seaport Grant for St. Johns River Dredging Clay
Duval County Non Transit
Revenue Expenditures Cumulative Difference Revenue Expenditures Cumulative Difference Revenue Expenditures Cumulative Difference Revenue Expenditures Cumulative Difference Revenue Expenditures Cumulative Difference Revenue Expenditures Cumulative Difference Revenue Expenditures Cumulative Difference Federal and State New Starts Total Revenue Expenditures Cumulative Difference Revenue Expenditures Cumulative Difference Revenue Expenditures Cumulative Difference Revenue Expenditures Cumulative Difference Revenue Expenditures Cumulative Difference
Years 2021-2025
Years 2026-2030
Years 2031-2040
$24.86 $24.86 $0.00 $116.70 $116.70 $0.00 $0.00 $0.00 $0.00 $28.80 $28.80 $0.00 $2.80 $2.80 $0.00 $3.78 $3.78 $0.00 $0.70 $0.70 $0.00 $56.90 $6.17 $63.07 $63.07 $0.00
$473.90 $473.90 $0.00 $260.60 $260.60 $0.00 $1,951.22 $1,951.22 $0.00 $71.90 $71.90 $0.00 $7.10 $7.10 $0.00 $9.38 $9.38 $0.00 $5.40 $5.40 $0.00 $146.50 $27.61 $174.11 $174.11 $0.00
$773.34 $773.34 $0.00 $246.40 $246.40 $0.00 $0.00 $0.00 $0.00 $71.90 $71.89 $0.00 $7.10 $7.10 $0.00 $9.38 $9.38 $0.00 $5.40 $5.39 $0.01 $153.90 $18.08 $171.98 $171.98 $0.00
$2,608.86 $2,608.86 $0.00 $538.80 $538.80 $0.00 $0.00 $0.00 $0.00 $143.80 $143.81 $0.00 $14.20 $14.20 $0.00 $18.76 $18.76 $0.00 $10.80 $10.80 $0.01 $322.80 $28.04 $350.84 $350.84 $0.00
$3,880.96 $3,880.96 $0.00 $1,162.50 $1,162.50 $0.00 $1,951.22 $1,951.22 $0.00 $316.40 $316.40 $0.00 $31.20 $31.20 $0.00 $41.30 $41.30 $0.00 $22.30 $22.29 $0.01 $680.10 $79.90 $760.00 $760.00 $0.00
$836.15 $836.15 $0.00 $311.00 $311.00 $0.00 $67.04
$220.42 $220.42 $0.00 $0.00 $0.00 $0.00 $47.79 $52.88 $61.95 $987.78 $362.31 $895.20
$313.60 $313.60 $0.00 $0.00 $0.00 $0.00 $50.62 $73.02 $39.54 $725.55 $102.89 $1,517.86
$2,510.64 $2,510.64 $0.00 $0.00 $0.00 $0.00 $110.42 $122.82 $27.14 $170.66 $202.68 $1,485.84
$3,880.81 $3,880.81 $0.00 $311.00 $311.00 $0.00 $275.87 $248.73 $27.14 $2,408.95 $923.11 $1,485.84
$67.04 $524.96 $255.23 $269.73
6-7
22-Year Total
Path Forward 2040 Long Range Transportation Plan Table 6-3. Total Revenue and Expenditures for Balancing Source Item Years 2019-2020 Duval County Transit
Local Match for St. Johns River Dredging Nassau County
St. Johns County
Charter Transit Surtax Transit Local Match Differences Revenue Expenditures Cumulative Difference Revenue Expenditures Cumulative Difference Revenue Expenditures Cumulative Difference
Years 2021-2025
Years 2026-2030
Years 2031-2040
$551.73 $58.04 $707.76 $0.00 $0.00 $0.00 $25.00 $0.00 $36.71 $61.62 $13.50 $74.23
$647.40 $57.33 $1,297.84 $0.00 $0.00 $0.00 $26.54 $10.75 $52.50 $65.47 $32.52 $107.19
$1,651.08 $116.95 $2,831.97 $0.00 $0.00 $0.00 $58.16 $30.88 $79.78 $108.18 $118.61 $96.75
$235.10 $21.02 $214.07 $186.00 $186.00 $0.00 $11.71 $0.00 $11.71 $28.86 $2.75 $26.11
Table 6-4. Summary of Funds in Proportion to Needs 75 Project Category Project Costs Road Transit TSM&O Bicycle and Pedestrian Freight Total
Table 6-5. Geographic Distribution County 2040 Population Clay 315,700 Duval 1,071,600 Nassau 116,700 St. Johns 377,000 Total 1,881,000
75
Funded $33,637 $4,164 $709 $464 $6,504 $46,081
% Population
$8,892 $2,397 $34 $303 $3,880 $14,131
Allocation 17% 57% 6% 20% 100%
See Appendix K for a summary of the needs project costs in present day dollars. 6-8
22-Year Total $3,085.31 $253.33 $2,831.97 $186.00 $186.00 $0.00 $121.41 $41.63 $79.78 $264.13 $167.38 $96.75
Percent of Need Met 26% 58% 5% 65% 60% 31%
% Allocation $2,923 $8,709 $655 $1,841 $14,131
21% 62% 5% 13% 100%
Path Forward 2040 Long Range Transportation Plan
Table 6-6. Modal Distribution Primary DecisionMaking Authority FDOT FDOT FDOT North Florida TPO North Florida TPO North Florida TPO North Florida TPO North Florida TPO North Florida TPO
Program Strategic Intermodal System 77 Turnpike/Tolls 78 SIS Multimodal 79 FDOT Subtotal Other State Highways 80 Transportation Management Area Transportation Alternatives (TALU) 81 Transportation Alternatives (TALT) 82 Transportation Regional Incentive Program (TRIP) 83 State and Federal Transit 84 North Florida TPO Subtotal
Roads
Transit
$4,057.74 $1,951.22 $7,306.37 $1,297.42 $268.75
$1,377.21 $1,377.21
$21.23 $1,587.40
$760.00 $760.00
Bicycle and Pedestrian 76
$91.66 $91.66 $13.44 $31.20 $41.30 $1.06 $178.66
TSM&O
$0.00
Freight
$2,006.10 $2,006.10
$34.21
$34.21
$0.00
Total $4,057.74 $1,951.22 $3,383.31 $10,781.34 $1,389.08 $316.40 $31.20 $41.30 $22.29 $760.00 $2.560.27
Continued on next page.
76
These expenditures are based on 5% of road capacity projects and dedicated revenues for bicycle and pedestrian projects. The revenue estimate provided by FDOT of $3,880.96 million does not include Preliminary Engineering (PE) phases. This total includes Preliminary Engineering (PE) phases as programmed in the Cost Feasible Plan. 78 The revenue estimate was provided by FDOT. 79 These funds are distributed by FDOT on a statewide basis. The funds were estimated by extrapolating the current statewide funding through the horizon of the plan and developing a reasonable estimate of the statewide funding that would be allocated to North Florida. This estimate includes $186.50 million of state funds to match the federal authorization for St. Johns River Dredging. 80 The revenue estimate provided by FDOT of $1,162.50 million does not include Preliminary Engineering (PE) phases. This total includes PE phases as programmed in the Cost Feasible Plan. 81 These funds can only be used within the North Florida Transportation Management Area. 82 These funds are distributed by FDOT on a districtwide basis. The total shown is a districtwide total. 83 These funds are distributed by FDOT on a districtwide basis. The total shown is a districtwide total. 84 The funds include $680.10 million of federal and state capacity funding for the North Florida TPO estimated by FDOT plus $79.90 of New Starts funding. The federal and state capacity funds are distributed on a statewide priority basis. The New Starts funding is allocated by the Federal Transit Administration on a competitive basis. A total of $760.30 million of New Start funds was estimated on a statewide basis by FDOT. These programs are not shown in the FDOT Adopted Work Program. 6-9 77
Path Forward 2040 Long Range Transportation Plan Table 6-6. Modal Distribution Primary DecisionMaking Authority Local Local Local Local Local Local Local Federal Grants Federal Grants
Program
Roads
Clay County Duval County Road Capacity JAXPORT Transit Local Match Duval County Subtotal Nassau County St. Johns County Subtotal Local FTA Passenger Ferry Grant Federal Seaport Grant Federal Grants Grand Total
$236.88 $860.64
$860.64 $39.64 $159.41 $1,296.58
$0.00 $8,892.93
6-10
Transit
$0.00 $253.33 $253.33
$253.33 $6.62 $6.62 $2,397.16
Bicycle and Pedestrian 76 $11.84 $43.03
TSM&O
$59.44
$0.00 $186.50
$102.47 $1.98 $7.97 $124.27
$0.00
$186.50
$0.00
$186.50
$0.00 $34.21
$311.00 $311.00 $2,503.60
$302.93
Freight
Total $248.73 $963.11 $186.50 $253.33 $1,402.95 $41.63 $167.38 $1,860.68 $6.62 $311.00 $317.62 $14,130.82
APPENDICES