Technical Memorandum #8 Needs Plan
February 12, 2015
This page is intentionally blank.
Path Forward 2040 Long Range Transportation Plan
EXECUTIVE SUMMARY This technical memorandum summarizes the planning process used to develop the Needs Plan and documents the iterations used in the planning process.
Through the planning process, these needs were confirmed and compiled to create the initial draft needs plan. Several iterations of the plan were developed based on stakeholder input and the results of the public involvement process.
The process used to develop the needs plan was built on the foundation of the extensive planning that has occurred since the completion of the 2035 Long Range Transportation Plan. Extensive local government coordination was performed where our stakholders put forth needs and candidate projects for consideration.
Needs were summarized in several program areas and a summary of the needs in proportion to the estimate revenue available for these projects is shown in Table E‐1.
Table E‐1. Summary of Needs Versus Revenue in Present Day Costs Need (Millions) $19,503 $306 $417 $273 $20,499 $2,448 $3,824 $6,272 $26,771
Type Roadway Capacity Bicycle and Pedestrian TSM&O Context Sensitive Solutions Subtotal Highways Transit Freight Subtotal Multimodal TOTAL
i
Estimated Revenue (millions) $5,537 $135 $38 $59 $5,769 $624 $1,839 $2,463 $8,232
Path Forward 2040 Long Range Transportation Plan
CONTENTS
Executive Summary ........................................................................................................................................................ i Planning Process ............................................................................................................................................................ 1 Future Land Use Alternatives ........................................................................................................................................ 2 Deficiency Analysis ......................................................................................................................................................... 3 Public Input .................................................................................................................................................................... 9 Costs .............................................................................................................................................................................. 9 Needs Plan Alternatives ................................................................................................................................................. 9 Adoption ........................................................................................................................................................................ 9 Appendix A – Draft and Final Needs Plan (Draft versions are available upon request)
LIST OF FIGURES
Figure 1. Base Year Deficiencies .................................................................................................................................... 5 Figure 2. Future Year No Build (2040) ............................................................................................................................ 6 Figure 3. Needs Plan (2040) ........................................................................................................................................... 7 Figure 4. Trend Land Use Scenario ................................................................................................................................ 8
LIST OF TABLES
Table E‐1. Summary of Needs Versus Revenue in Present Day Costs ............................................................................ i Table 1. NERPM=AB Year 2010 and 2040 Population and Employment ....................................................................... 2 Table 2. Employment in Trend and Alternate Land Use Scenarios ................................................................................ 3 Table 4. Summary of Deficiency Analysis ...................................................................................................................... 4 Table 5. Summary of Needs Versus Revenue in Present Day Costs ............................................................................ 10
ii
Path Forward 2040 Long Range Transportation Plan
NEEDS PLAN C ONSIDERING A RANGE OF ALTERNATIVES IS NEEDED TO MEET THE DIVERSE MOBILITY NEEDS OF STAKEHOLDERS WITHIN OUR REGION IS AN IMPORTANT PART OF THE PLANNING PROCESS .
PLANNING PROCESS
The Needs Plan included a six county area consisting of Baker, Clay, Duval, Nassau, Putnam and St. Johns counties. The Needs Plan is not a prioritized list of projects, nor is it constrained by financial resources.
The Needs Plan leveraged prior studies development by local governments. Maintaining the public consensus continuity of these efforts was essential to the credibility of the planning process.
Because of the level of visioning and planning that occurred within these studies, the known needs greatly exceeded the resources anticipated to be available. Building on the community consensus that was achieved, the development of the Needs Plan began with a review and confirmation of these studies. The following sources were used to define the needs.
1
Florida Department of Transportation (FDOT) Strategic Intermodal Systems Needs Plan and Cost Feasible Plan (includes 1st Five Year and 2nd Five Year) and the Strategic Intermodal System Multimodal Cost Feasible Plan and Unfunded Needs Plan. FDOT’s Adopted Work Program. North Florida Transportation Planning Organization (TPO) Transportation Improvement Program. 2035 Envision Long Range Transportation Plan. North Florida TPO Strategic Safety Plan. North Florida TPO ITS Master Plan. North Florida TPO Congestion Management Plan. North Florida TPO Regional Bicycle and Pedestrian Plan. First Coast Regional Greenways and Trails Plan North Florida TPO Freight, Logistics and Intermodal Planning Framework Plan. City of Jacksonville Mobility Plan. Local Government Comprehensive Plans.
Path Forward 2040 Long Range Transportation Plan
Committed Development Projects Provided by Local Governments. Coordination with local governments and stakeholders on additional needs.
Population forecast were based on the Bureau of Economic and Business Research medium scenario and were used as control totals at the county‐level.
FUTURE LAND USE ALTERNATIVES
Table 1 summarizes the population forecasts that were provided by the University of Florida Bureau of Economic and Business Research and used as the control totals within the modeling process.
As part of preparing the NERPM‐AB, the development of land use scenarios and forecasting of land use within the region at a parcel level was required.
Employment similarly was assigned to land uses within the region.
During the development of the base year model households, population in group quarters, school enrollment and employment by market sector were assigned to individual parcels for the six county region. As part of this process vacant and underdeveloped parcels were identified. According to the 2010 Census, 13 percent or 82,272 of the housing units within the six county area are vacant.
Table 1. NERPM‐AB Year 2010 and 2040 Population and Employment Control Totals County Year 2010 Year 2040 Population Year 2010 Year 2040 Workers Population living Population living Growth Rate NERPM‐AB Estimated Growth Rate in Households in Households 2010 ‐2040 Total Workers Workers* 2010 ‐2040 Nassau 72,771 116,159 60% 24,126 39,586 64% Duval 844,293 1,050,684 24% 519,142 636,596 23% St Johns 186,598 374,207 101% 61,714 155,227 152% Clay 189,614 314,010 66% 54,454 88,958 64% Baker 24,771 36,657 48% 7,396 13,860 87% Putnam 72,957 77,991 7% 25,148 28,051 21% Total 1,391,004 1,969,708 42% 691,980 962,278 39% * Average between BEA 10 year growth rate (2000‐2010) and NERPM‐AB growth rate of population year 2040.
2
Path Forward 2040 Long Range Transportation Plan
Table 2. Employment in Trend and Alternate Land Use Scenarios Employment Sectors
Year 2010
Year 2040 Trend
Alternate
Agriculture, Forestry, Fishing and Hunting
551 633
541
Mining, Quarrying, and Oil and Gas Extraction
276 315
271
Construction
39,403 45,140
38,677
Manufacturing
39,670 45,455
38,939
Transportation and Warehousing
24,412 27,982
23,962
104,312 119,525
102,390
376 433
369
Wholesale Trade
20,322 23,285
19,947
Retail Trade
61,371 70,362
60,240
Accommodation and Food Services
38,919 44,615
38,202
Industrial ‐ Subtotal Utilities
Commercial ‐ Subtotal
120,988 138,695
118,758
Information
13,882 17,836
17,848
Finance and Insurance
41,546 53,425
53,416
Real Estate and Rental and Leasing
11,509 14,766
14,797
Professional, Scientific, and Technical Services
28,713 37,481
36,916
5,425 6,914
6,975
Administrative and Support and Waste Management and Remediation Services
35,270 45,319
45,347
Educational Services
27,718 35,652
35,637
Health Care and Social Assistance
57,340 73,825
73,722
5,009 6,418
6,440
Other Services (except Public Administration)
21,486 27,617
27,625
Public Administration
45,944 59,123
59,070
Service ‐Subtotal
293,842 378,376
377,792
Total
519,142 636,596
584,940
Management of Companies and Enterprises
Arts, Entertainment, and Recreation
Table 3. Year 2040 School Enrollment Projections versus Age Group Projections County Kindergarten thru 8th 9th Grade thru 12th University and Grade Grade College Nassau 13,389 5,584 1,805 Duval 141,606 52,601 114,890 St. Johns 49,317 24,151 10,875 Clay 40,947 21,095 8,057 Baker 5,576 2,037 0 Putnam 9,757 3,339 9,014 Total 260,592 108,807 144,641
3
Total
20,779 309,092 84,343 70,100 7,614 22,108 514,036
NERPM‐AB Age Groups 5 thru 14 15 thru 17 Years Years 14,998 4,579 142,620 47,325 55,763 19,913 45,562 15,982 5,876 1,692 9,931 2,885 274,750 92,376
Path Forward 2040 Long Range Transportation Plan
The future land use maps and approved developments received from the local governments were used to allocate households and employment to the parcel level. The growth was allocated to the vacant and underutilized parcels before new development was considered consistent with the data provided by the local agencies.
committed model scenario in the year 2040 which represents a No Build Scenario. This approach considers only the projects that are committed for construction within the Transportation Improvement Program and FDOT Adopted Work Program. Congestion was assessed through the ratio of roadway volume to roadway capacity, known as the demand‐to‐ capacity ratio. Table 4 summarizes the systemwide deficiencies in the Base Year model scenario and the2040 No Build model scenario (existing plus committed). Figures 1 thru 4 shows the congested links (greater than 0.8) in the Base Year, No Build Scenario, Needs Plan with the trend land use scenario and the Needs Plan with the alternate land use scenario.
Reasonableness checks on the projections on parcel data included evaluation of the number of housing units associated with the residential developments and reviews of aerial photography to ensure that the projections can actually geographically fit within the parcels and traffic analysis zones. Since growth was assigned to vacant parcels first, the likelihood of a reduction of vacancy rates was evaluated. Several of the local government requested a reduction in the vacancy rate, assuming it was higher than usual due to the economic downturn.
When comparing the alternate model scenarios, making additional investments in the transportation system will allow travelers more opportunities and the overall vehicle‐miles traveled increases. This outcome is consistent with what is anticipated in the activity‐based modeling used as part of the planning process. For example, the alternate land use scenario increases the amount of travel made but results in less congested facilities there are more employment opportunities near the growth in households.
The characteristics of land uses needed for applying DaySim was performed at the parcel level by the Population Generator (PopGen) program. This program synthesizes the population to the characteristics identified in the Census and PUMS data sources and allocates it to a household/parcel and individual level. Extensive coordination occurred with the local governments as part of this process and concurrence of the land use projections and allocations was achieved.
An alternate land use scenario was also prepared in cooperation with the local governments that changed employment but not household, school or group quarter land uses. Table 2 summarizes the change in employment by market sector. Table 3 summarizes school enrollment.
DEFICIENCY ANALYSIS Future mobility deficiencies were identified through an evaluation of anticipated levels of congestion using the NERPM‐AB as the primary analysis tool. The congestion assessment was performed using the existing plus
The steering committee for the project selected the base or trend land use scenario for use in the developing the Cost Feasible Plan.
Table 4. Summary of Deficiency Analysis Demand to Capacity Ratio Model Scenario
Base Year (2010) Future Year No Build (2040) Needs Plan (2040) Trend Land Use Scenario Needs Plan (2040) Alternate Land Use Scenario
Less than 0.8 (uncongested)
Between 0.8 and 0.9 Greater than 0.9 (Moderately congested) (Severely congested)
20,430,104
4,326,337
12,660,470 37,416,912
31,269,235
6,186,343
19,361,127 56,816,706
22,608,722
4,945,698
30,687,035 58,241,455
24,788,148
4,962,631
30,470,756 60,221,535
4
Total
" ) 108
" ) 115
" )
§ ¦ ¨ 95
£ ¤ 1
2
127
A1A
A1A
¬ «
17
" ) " )
" )
105
£ ¤
108
¬ «
¬ « ¬ «
107
2
A1A
¬ «
£ ¤ 301
" ) 122
295
119
" ) 250
¬ «
§ ¦ ¨
§ ¦ ¨
" )
A1A
295
105
¬ « ¬ « 116
" ) 125
221
¬ «
" ) 124
¬ « 10
£ ¤ 90
" )
§ ¦ ¨
90
228
" ) 130
£ ¤ ¬ «
10
228
¬ «
£ ¤ 301
202
134
¬ « ¬ « 23
§ ¦ ¨ 295
Legend
£ ¤ 1
V/C Ratio < 0.80 0.81 - 0.89
¬ «
220
218
§ ¦ ¨ 95
21
¬ «
> 0.90 Roadway System 16
¬ «
Water Bodies Conservation Lands
¬ «
13
" )
" )
A1A
16
¬ «
Six Counties Boundaries
" ) 315
1
208
" )
13
£ ¤ 17
315
16
¬ « " ) ) " ) " " )
209
" )
13A
207
" )
£ ¤ 17
¬ «
206
" ) 204
20
" ) 329
Date: 1/28/2015
" ) 310
" )
200A
" ) 318
¬ «
¬ «
¬ «
75
A1A
100
315
§ ¦ ¨
5
¬ «
¬ «
" )
320
§ ¦ ¨ 95
305
26
" )
¬ «
¬ «
" )
21
A1A
214
214
" )
£ ¤
19
¬ «
" ) 309
" ) 308
Figure 1 2010 Base Year Deficiencies 5
¯
0
10,560 Feet
0
3.5
7 Miles
" ) 108
" ) 115
" )
§ ¦ ¨ 95
£ ¤ 1
2
127
A1A
A1A
¬ «
17
" ) " )
" )
105
£ ¤
108
¬ «
¬ « ¬ «
107
2
A1A
¬ «
£ ¤ 301
" ) 122
295
119
" ) 250
¬ «
§ ¦ ¨
§ ¦ ¨
" )
A1A
295
105
¬ « ¬ « 116
" ) 125
221
¬ «
" ) 124
¬ « 10
£ ¤ 90
" )
§ ¦ ¨
90
228
" ) 130
£ ¤ ¬ «
10
228
¬ «
£ ¤ 301
202
134
¬ « ¬ « 23
§ ¦ ¨ 295
Legend
£ ¤ 1
V/C Ratio < 0.80 0.81 - 0.89
¬ «
220
218
§ ¦ ¨ 95
21
¬ «
> 0.90 Roadway System 16
¬ «
Water Bodies Conservation Lands
¬ «
13
" )
" )
A1A
16
¬ «
Six Counties Boundaries
" ) 315
1
208
" )
13
£ ¤ 17
315
16
¬ « " ) ) " ) " " )
209
" )
13A
207
" )
£ ¤ 17
¬ «
206
" ) 204
20
" ) 329
Date: 1/28/2015
" ) 310
" )
200A
" ) 318
¬ «
¬ «
¬ «
75
A1A
100
315
§ ¦ ¨
5
¬ «
¬ «
" )
320
§ ¦ ¨ 95
305
26
" )
¬ «
¬ «
" )
21
A1A
214
214
" )
£ ¤
19
¬ «
" ) 309
" ) 308
Figure 2 2040 No Build Deficiencies 6
¯
0
10,560 Feet
0
3.5
7 Miles
" ) 108
" ) 115
" )
§ ¦ ¨ 95
£ ¤ 1
2
127
A1A
A1A
¬ «
17
" ) " )
" )
105
£ ¤
108
¬ «
¬ « ¬ «
107
2
A1A
¬ «
£ ¤ 301
" ) 122
295
119
" ) 250
¬ «
§ ¦ ¨
§ ¦ ¨
" )
A1A
295
105
¬ « ¬ « 116
" ) 125
221
¬ «
" ) 124
¬ « 10
£ ¤ 90
" )
§ ¦ ¨
90
228
" ) 130
£ ¤ ¬ «
10
228
¬ «
£ ¤ 301
202
134
¬ « ¬ « 23
§ ¦ ¨ 295
Legend
£ ¤ 1
V/C RATIO
< 0.8
0.81 - 0.89
¬ «
220
218
>0.9
§ ¦ ¨ 95
21
¬ «
Roadway System 16
¬ «
Water Bodies Conservation Lands
¬ «
13
" )
" )
A1A
16
¬ «
Six Counties Boundaries
" ) 315
1
208
" )
13
£ ¤ 17
315
16
¬ « " ) ) " ) " " )
209
" )
13A
207
" )
£ ¤ 17
¬ «
206
" ) 204
20
" ) 329
Date: 2/9/2015
" ) 310
" )
200A
" ) 318
¬ «
¬ «
¬ «
75
A1A
100
315
§ ¦ ¨
5
¬ «
¬ «
" )
320
§ ¦ ¨ 95
305
26
" )
¬ «
¬ «
" )
21
A1A
214
214
" )
£ ¤
19
¬ «
" ) 309
" ) 308
Figure 3 2040 Needs Plan Trend Scenario Deficiencies 7
¯
0
0
10,560 Feet
3.5
7 Miles
" ) 108
" ) 115
" )
§ ¦ ¨ 95
£ ¤ 1
2
127
A1A
A1A
¬ «
17
" ) " )
" )
105
£ ¤
108
¬ «
¬ « ¬ «
107
2
A1A
¬ «
£ ¤ 301
" ) 122
295
119
" ) 250
¬ «
§ ¦ ¨
§ ¦ ¨
" )
A1A
295
105
¬ « ¬ « 116
" ) 125
221
¬ «
" ) 124
¬ « 10
£ ¤ 90
" )
§ ¦ ¨
90
228
" ) 130
£ ¤ ¬ «
10
228
¬ «
£ ¤ 301
202
134
¬ « ¬ « 23
§ ¦ ¨ 295
Legend
£ ¤ 1
V/C Ratio
< 0.80
0.81 - 0.89
¬ «
220
218
> 0.90
§ ¦ ¨ 95
21
¬ «
Roadway System 16
¬ «
Water Bodies Conservation Lands
¬ «
13
" )
" )
A1A
16
¬ «
Six Counties Boundaries
" ) 315
1
208
" )
13
£ ¤ 17
315
16
¬ « " ) ) " ) " " )
209
" )
13A
207
" )
£ ¤ 17
¬ «
206
" ) 204
20
" ) 329
Date: 2/6/2015
" ) 310
" )
200A
" ) 318
¬ «
¬ «
¬ «
75
A1A
100
315
§ ¦ ¨
5
¬ «
¬ «
" )
320
§ ¦ ¨ 95
305
26
" )
¬ «
¬ «
" )
21
A1A
214
214
" )
£ ¤
19
¬ «
" ) 309
" ) 308
Figure 4 2040 Needs Plan Alternate Land Use Scenario Deficiencies 8
¯
0
0
10,560 Feet
3.5
7 Miles
Path Forward 2040 Long Range Transportation Plan
PUBLIC INPUT
NEEDS PLAN ALTERNATIVES
During the public meetings, stakeholder coordination and based on follow‐up correspondence (such as emails and phone calls), 155 comments were provided on the draft needs plan.
Three iterations of the Needs Plan were prepared with the stakeholder agencies during the planning process. Public comments were considered as part of the process and a series of public workshops throughout the community were conducted. These workshops are documented in the public involvement section. Several iterations of the Needs Plan were also presented the steering committee, North Florida TPO Board and committees during March, April and May of 2014 for refinement of alternatives and consensus building. The Needs Plan includes road capacity projects, multimodal projects (transit, active transportation and freight) and operations strategies. The following iterations of the plan are provided in Appendix A.
Attendees from Baker, Clay and Putnam counties favored road capacity projects as their top priority. Clay County participants were closely divided among road, transit and bicycle and pedestrian projects. Duval County attendees selected bicycle and pedestrian projects as their top priority, followed by transit. St. Johns and Nassau participants prioritized transit first, followed by bicycle and pedestrian projects.
Nassau participants also felt equally strong about safety and TSM&O projects. Overall, there was a significant increase in support for transit and bicycle and pedestrian projects from previous LRTP updates with the meeting participants.
May 22, 2014 June 4, 2014 June 12, 2014 June 19, 20141
ADOPTION The Needs Plan was adopted by the North Florida TPO Board on June 19, 2014. The adopted needs plan and interim draft plans are included in the appendices to this Technical Memorandum.
Following the Needs Plan workshops, the North Florida TPO received correspondence objecting to the construction of the SR 313 in the vicinity of Six Mile Creek. Because of the environmental fatal flaws and potential for public controversy associated with this project it was removed from the Needs Plan.
COSTS
Within the Needs Plan project cost estimates were prepared based on today’s buying power for projects. For most of the projects, estimates were available from prior studies and these estimates were reviewed and confirmed for use in this plan. Where estimates were not available from prior studies, estimates were prepared using generalized per mile project costs provided by FDOT.
In today’s dollars we have more than $7 billion of needs versus $27 billion in funding. Forecasting that over the 22‐year plan horizon, those needs increase to $46 billion with only $14.8 billion in revenues available. Table 5 summarizes the needs plan in present day dollars.
1 Following completion of the Cost Feasible Plan, minor changes to the Adopted Needs Plan were made to provide consistency between the naming of projects and limits. The final Needs Plan is included in Appendix A.
9
Path Forward 2040 Long Range Transportation Plan
Table 5. Summary of Needs Versus Revenue in Present Day Costs Need (Millions) $19,503 $306 $417 $273 $20,499 $2,448 $3,824 $6,272 $26,771
Type Roadway Capacity Bicycle and Pedestrian TSM&O Context Sensitive Solutions Subtotal Highways Transit Freight Subtotal Multimodal TOTAL
10
Estimated Revenue (millions) $5,537 $135 $38 $59 $5,769 $624 $1,839 $2,463 $8,232
Final 2040 Needs Plan November 4, 2014
PATH FORWARD 2040 LONG RANGE TRANSPORTATION PLAN FINAL 2040 NEEDS PLAN November 4, 2014
Introduction
Public Involvement Meetings
This document provides the final draft of the Path Forward 2040 Long Range Transportation Plan: Needs Plan. This Final Needs Plan was prepared using the following information:
An initial Draft Needs Plan was developed in March 2014. This initial Draft was modified based on agency review and comment and a series of public meetings were held during the month of April to receive additional input on the Draft Needs Plan. The following public meetings were conducted:
FDOT’s Strategic Intermodal Systems Needs Plan FDOT’s Strategic Intermodal Systems Cost Feasible Plan (includes 1st Five Year and 2nd Five Year) FDOT’s Adopted Work Program North Florida TPO Transportation Improvement Program 2035 Envision Long Range Transportation Plan North Florida TPO Strategic Safety Plan North Florida TPO ITS Master Plan North Florida TPO Congestion Management Plan North Florida TPO Regional Bicycle and Pedestrian Plan First Coast Regional Greenways and Trails Plan North Florida TPO Freight, Logistics and Intermodal Planning Framework Plan City of Jacksonville Mobility Plan Local Government Comprehensive Plans Committed Development Projects Provided by Local Governments Coordination with Local Governments and Stakeholders on Additional Needs
The plan is not a prioritized list of projects. During the development of the Cost Feasible Plan, these projects will be prioritized using the 2040 Northeast Florida Regional Planning Model using performance measures outlined in the Goals and Objectives. New to this plan compared to prior plans is the inclusion of needs associated with multimodal projects for freight, bicyclists, pedestrians, and safety. This Final Draft Needs Plan also identifies candidate Transportation Systems Management and Operations (TSM&O) corridors. Attached are a series of tables and maps that summarize the projects. A map identifying potential corridors for consideration of context sensitive solutions for livability needs in lieu of capacity improvements is also provided.
April 15 St. John’s County April 17 Clay County April 22 Baker County April 23 Nassau County April 24 Duval County April 28 Putnam County
This Final Needs Plan reflects the input provided by the public as additional needs were identified. A summary of the comments provided is published separately.
Road Projects Safety and TSM&O Projects Bicycle and Pedestrian Projects Freight Projects Transit Projects Transit Mobility and Access Improvements Projects
Tables 2040 Needs Plan Road Projects .......................................................................................... 4 2040 Needs Plan Safety and TSM&O Projects .................................................................. 11 2040 Needs Plan Bicycle and Pedestrian Projects ............................................................ 14 2040 Needs Plan Freight Projects ..................................................................................... 18 2040 Needs Plan Transit Projects ..................................................................................... 20
Maps Year 2040 Final Draft Needs Plan Road Projects .............................................................. 22 Year 2040 Final Draft Needs Safety and TSM&O Projects ................................................ 23 Year 2040 Final Draft Needs Plan Bicycle and Pedestrians Projects ................................ 24 Year 2040 Final Draft Needs Plan Freight Projects ........................................................... 25 Year 2040 Final Draft Needs Plan Transit Local and Express Bus Service......................... 26 Year 2040 Final Draft Needs Plan Transit Other Modes Projects ..................................... 27
Baker County Road Projects ........................................................................................................ 28 Bicycle and Pedestrians Projects .......................................................................... 29 Freight Projects ..................................................................................................... 30 Transit Local and Express Bus Service................................................................... 31 Transit Other Modes Projects ............................................................................... 32 Clay County Road Projects ........................................................................................................ 33 Safety and TSM&O Projects .................................................................................. 34 Bicycle and Pedestrian Projects ............................................................................ 35 Freight Projects ..................................................................................................... 36 Transit Local and Express Bus Service................................................................... 37 Transit Other Modes Projects ............................................................................... 38 Duval County Road Projects ........................................................................................................ 39 Safety and TSM&O Projects .................................................................................. 40 Bicycle and Pedestrian Projects ............................................................................ 41 Freight Projects ..................................................................................................... 42 Transit Local and Express Bus Service................................................................... 43 Transit Other Modes Projects ............................................................................... 44 Nassau County Road Projects ........................................................................................................ 45 Safety and TSM&O Projects .................................................................................. 46 Bicycle and Pedestrian Projects ............................................................................ 47 Freight Projects ..................................................................................................... 48 Transit Local and Express Bus Service................................................................... 49
Transit Other Modes Projects ............................................................................... 50 Putnam County Road Projects ........................................................................................................ 51 Bicycle and Pedestrians Projects .......................................................................... 52 Freight Projects ..................................................................................................... 53 Transit Local and Express Bus Service................................................................... 54 Transit Other Modes Projects ............................................................................... 55 St. Johns County Road Projects ........................................................................................................ 56 Safety and TSM&O Projects .................................................................................. 57 Bicycle and Pedestrian Projects ............................................................................ 58 Freight Projects ..................................................................................................... 59 Transit Local and Express Bus Service................................................................... 60 Transit Other Modes Projects ............................................................................... 61
2040 Final Needs Plan Road Projects
11/4/2014
County
Map ID
Facility
From
To
Improvement Type
Baker
453
I-10
Baker/Columbia County Line
CR 125
Add 4 Express Lanes
Baker
404*
I-10
W of CR 125
W of SR 121
Add 4 Express Lanes
Baker
405*
I-10
W of SR 121
Baker/Nassau County Line
Add 4 Express Lanes
Baker
720
I-10/US 90 Parallel Reliever
South Mac Clenny
East Baldwin
Future Corridor
Baker/Clay/Duval
721
Future Corridor Initiative
Tampa Bay
Northeast Florida
Future Corridor
Baker/Duval
91
Outer Loop Facility
SR 228 Normandy Boulevard
SR 228 Normandy Boulevard
Future Corridor
Clay
900
Baxley Road
CR 220 Doctors Inlet Road
SR 21 Blanding Boulevard
Widen to 4 Lanes
Clay
13
Cheswick Oak Avenue Extension
Oakleaf Plantation Parkway
Savannah Glen Boulevard
New 4 Lane Road
Clay
902
College Drive
CR 220 Doctors Inlet Road
SR 21 Blanding Boulevard
Widen to 6 Lanes
Clay
14
College Drive Extension
SR 21 Blanding Boulevard
Challenger Drive (Branan Field Road )
New 4 Lane Road
Clay
905
CR 209 Russell Road
CR 739 Henley Road
US 17
Widen to 4 Lanes
Clay
906
CR 209 South
Decoy Road
US 17
Reconstruct 2 Lanes
Clay
24
CR 218
SR 21 Blanding Boulevard
CR 739 Henley Road
Widen to 4 Lanes
Clay
909
CR 218
SR 16
CR 739 Henley Road
Widen to 4 Lanes
Clay
1026
CR 218
US 301
Cosmos Avenue
Widen to 4 Lanes
Clay
1027
CR 218
Cosmos Avenue
Pine Tree Lane
Widen to 4 Lanes
Clay
25
CR 218 Extension
CR 739 Henley Road
SR 23 First Coast Expressway
New 4 Lane Road
Clay
26
CR 218 Extension
SR 23 First Coast Expressway
CR 315
New 4 Lane Road
Clay
33
CR 220 Doctors Inlet Road
SR 21 Blanding Boulevard
Knight Boxx Road
Widen to 4 Lanes
Clay
34
CR 220 Doctors Inlet Road
College Drive
US 17
Widen to 6 Lanes
Clay
31
CR 315
SR 16
CR 315B
Widen to 4 Lanes
Clay
32
CR 315
CR 315B
US 17
Widen to 4 Lanes
Clay
904
CR 739B Sandridge Road
CR 739 Henley Road
CR 209 Russell Road
Widen to 4 Lanes
Clay
907
Decoy Road
US 17
CR 209 South
Reconstruct 2 Lanes
Clay
46
Governors Park Road
US 17
SR 16
New 4 Lane Road
Clay
901
Knight Boxx Road
CR 220 Doctors Inlet Road
SR 21 Blanding Boulevard
Widen to 6 Lanes
Clay
915
Lake Asbury East West 1
NS3
CR 209 Russell Road
New 2 Lane Road
Clay
914
Lake Asbury North South Road 3
CR 739B Sandridge Road
CR 209 Russell Road
New 2 Lane Road
Clay
911
Long Bay Road Extension North
Old Jennings Road
Long Bay Road
New 2 Lane Road
Clay
913
Oakleaf Village Parkway Extension
Oakleaf Plantation Parkway
Oakleaf Village Parkway
New 2 Lane Road
Clay
450
SR 100
Clay/Bradford County Line
Clay/Putnam County Line
Widen to 4 Lanes
Clay
106
SR 16
CR 218
SR 15A Oakridge Avenue
Widen to 4 Lanes
Clay
908
SR 16
US 17
Shands Bridge
Widen to 4 Lanes
Clay
114
SR 21 Blanding Boulevard
SR 16
CR 215 Blanding Boulevard
Widen to 4 Lanes
Clay
903
Town Center Boulevard
US 17
CR 220 Doctors Inlet Road
Widen to 4 Lanes
Clay
912
Tynes Road
Pipit Place
Oakleaf Plantation Parkway
New 2 Lane Road
Clay
133
US 17
CR 315
Town Center Boulevard
Widen to 6 Lanes
Clay
1037
US 17
Governor Street
Haven Avenue
Widen to 4 Lanes
Clay
424
US 301 SR 200
Clay/Bradford County Line
Duval/Clay County Line
Widen to 6 Lanes
Clay
910
Wells Road
Aquarius Concourse
SR 21 Blanding Boulevard
Reconstruct and New 2 Lane Road
Duval
2
Alta Drive / Yellow Bluff Road
I-295
New Berlin Road (north )
Widen to 4 Lanes
Duval
1
Alta Drive Realignment
SR 105 Zoo Parkway
North of New Berlin Road (south)
New 4 Lane Road
Duval
936
Argyle Forest Boulevard
SR 23 First Coast Expressway
Old Middleburg Road
Widen to 6 Lanes
Duval
1006
Blount Island Boulevard Extension
Spoil Island
Jacksonville Port Authority
New 2 Lane Bridge
Duval
939
Braddock Parkway
SR 115 Lem Turner Road
Pecan Park Road
New 2 Lane Road
Duval
1016
Cahoon Road
Lenox Avenue
US 90 Beaver Street
Reconstruct 2 Lanes
Page 4 of 61
CSS
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Road Projects
11/4/2014
County
Map ID
Facility
From
To
Improvement Type
Duval
972
Cecil Field Connector
Commerce Center
SR 23 First Coast Expressway
New 2 Lane Road
Duval
971
Chaffee Road
SR 228 Normandy Boulevard
Crystal Springs Road
Widen to 5 Lanes
Duval
1020
Clark Road Extension
Broward Road
Clark Road
New 3 Lane Road
Duval
932
Collins Road
Old Middleburg Road S
Shindler Drive
Widen to 4 Lanes
Duval
16
Collins Road
at US 17 Roosevelt Boulevard
Duval
16B
Collins Road Realignment
Pine Verde
US 17 Roosevelt Boulevard
New 4 Lane Road, Two Overpass and New Interchange
Duval
1036
Davis / 9B Parcel
SR 9B
SR 152 Baymeadows Road
Widen to 4 Lanes
Duval
942
Duval Station Road
US 17/SR 5 Main Street
Starratt Road
Widen to 4 Lanes
Duval
37***
Eastport Road
SR 105 Heckscher Drive
Pulaski Road
Widen to 3 Lanes
Duval
1021
Florida Boulevard
Penman Road
SR 10 Atlantic Boulevard
Widen to 3 Lanes
Duval
43
Gator Bowl Boulevard
Liberty Street
Hart / Mathews Bridge
Widen to 6 Lanes and Remove Ramps
Duval
943
Harlow Boulevard
SR 134 103rd Street
Lane Avenue
Widen to 3 Lanes
Duval
43B
Hart Expressway Ramps
Liberty Street
Hart / Mathews Bridge
Remove Ramps
Duval
49
Hartley Road
SR 13 San Jose Boulevard
Old St. Augustine Road
Widen to 3 Lanes
Duval
963
Harts Road
SR 104 Dunn Avenue
I-295
Widen to 4 Lanes
Duval
401
I-10
SR 23 First Coast Expressway
I-295
Add 4 Express Lanes
Duval
406
I-10
US 301
SR 23 First Coast Expressway
Add 4 Express Lanes
Duval
432
I-10
I-295
I-95
Add 4 Express Lanes
Duval
454
I-10
at I-295
Duval
403*
I-10
Nassau/Duval County Line
US 301
Add 4 Express Lanes
Duval
119
I-295
SR 9B
I-295
Add 4 Express Lanes
Duval
407
I-295
I-95 North
SR 105 Dames Point Bridge/Heckscher Drive
Add 4 Express Lanes
CSS
New Interchange
CSS
Modify Interchange
Duval
408
I-295
North of Trout River
I-95
Add 4 Express Lanes
Duval
409
I-295
US 1 New Kings Road
North of Trout River
Add 4 Express Lanes
Duval
410
I-295
SR 134 103rd Street
I-10
Add 4 Express Lanes
Duval
411
I-295
I-10
US 1 South of New Kings Road
Add 4 Express Lanes
Duval
431
I-295
US 17 Roosevelt Boulevard
SR 134 103rd Street
Add 4 Express Lanes
Duval
964
I-295
US 17 at Roosevelt Boulevard
Duval
1022
I-295
I-95 South
SR 13 San Jose Boulevard
Add 2 Express Lanes
Duval
1023
I-295
SR 202 J. T. Butler Boulevard
SR 9B
Add 2 Express Lanes
Duval
121
I-295
SR 113 Southside Connector
SR 202 J. T. Butler Boulevard
Add 4 Express Lanes
Duval
68
I-95
at SR 102 Airport Road
Duval
413
I-95
SR 104 Dunn Avenue
SR 102 Airport Road
Add 4 Express Lanes
Duval
414
I-95
North of Fuller Warren Bridge
SR 104 Dunn Avenue
Add 4 Express Lanes
Duval
419
I-95
at US 1/SR 15 MLK
Duval
433
I-95
SR 202 J. T. Butler Boulevard
SR 10 Atlantic Boulevard
Add 4 Express Lanes
Duval
434
I-95
I-295
SR 202 J. T. Butler Boulevard
Add 4 Express Lanes
Duval
962
I-95
SR 115 at Southside Boulevard
Duval
418A
I-95
Duval/St. John's County Line
I-295
Add 4 Express Lanes
Duval
944
Jones Road
US 90 Beaver Street
Pritchard Road
Intersection Improvements
Duval
73
Kernan Boulevard
SR 202 J. T. Butler Boulevard
Glen Kernan Parkway
Widen to 6 Lanes
Duval
945
Merrill Road
Hartsfield Road
SR 113 Southside Connector
Widen to 6 Lanes
Duval
946
Monument Road
Tredinick Parkway
I-295
Widen to 6 Lanes
Duval
947
Monument Road
I-295
Lee Road
Widen to 6 Lanes
Duval
1033
National Cemetery Road
Lannie Road
Arnold Road
New 2 Lane Road
Duval
948
New Berlin Road
Pulaski Road
Yellow Bluff Road
Widen to 4 Lanes
Duval
949
New Berlin Road
Yellow Bluff Road
Cedar Point Road
Widen to 4 Lanes
Modify Interchange
Modify Interchange
Modify Interchange
Modify Interchange
Page 5 of 61
CSS
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Road Projects
11/4/2014
County
Map ID
Facility
From
To
Improvement Type
CSS
Duval
1034
New World Avenue
SR 23 First Coast Expressway
Chaffee Road
New 2 Lane Road
Duval
1035
New World Avenue
SR 23 First Coast Expressway
Chaffee Road
Widen to 4 Lanes
Duval
85
Norfolk Southern Railroad Overpass
West 12th Street
US 23 New Kings Road
New 3 Lane Road / Bridge
Duval
951
Old Kings Road
SR 111 Edgewood Avenue
Plummer Road
Intersection Improvements
Duval
1015
Old Middleburg Road
Argyle Forest Boulevard
SR 134 103rd Street
Widen to 4 Lanes
Duval
90
Old St. Augustine Road
Bartram Park Boulevard
US 1/SR 5 Phillips Highway
Widen to 6 Lanes and Overpass
Duval
1010
Old St. Augustine Road
at Greenland Road
Duval
952
Pecan Park Road
Braddock Boulevard
JIA North Access Road
Widen to 4 Lanes
Duval
92
Pecan Park Road
I-95
US 17 Main Street
Widen to 4 Lanes
Duval
953***
Pulaski Road
Eastport Road
I-295
Widen to 4 Lanes
Duval
97
Pulaski Road / Starratt Road
I-295
Duval Station Road
Widen to 4 Lanes
Duval
935
Ramona Boulevard
Hammond Boulevard
Cahoon Road South
Widen to 5 Lanes
Duval
98
Rampart / Firestone Road
Collins Road
SR 134 103rd Street
Widen to 4 Lanes
Duval
1038
Ranch Road
Tradeport Road
SR 102 North of Airport Road
Widen to 4 Lanes
Duval
934
Ricker Road
Morse Avenue
Old Middleburg Road
Widen to 3 Lanes
Duval
99
Salisbury Road Extension
SR 152 Baymeadows Boulevard
Belfort Road
New 3 Lane Road
Duval
101
Shindler Drive
Collins Road
SR 134 103rd Street
Widen to 3 Lanes
Duval
714
SR 10 Atlantic Boulevard
at Girvin Road
Intersection Improvements
Duval
715
SR 10 Atlantic Boulevard
at Hodges Boulevard
Intersection Improvements
Duval
716
SR 10 Atlantic Boulevard
at San Pablo Boulevard
Intersection Improvements
Duval
152
SR 101 Mayport Road
at SR 116 Wonderwood Drive
Intersection Improvements
CSS
Duval
152B
SR 101 Mayport Road
SR 116 Wonderwood Drive
Mayport Main Gate
Add 2 Northbound Lanes
CSS
Duval
421
SR 102 Airport Road
Airport Entrance
I-95
Widen to 6 Lanes
Duval
940
SR 104 Dunn Avenue
US 1/SR 15 New Kings Road
I-295
Widen to 4 Lanes
Duval
941
SR 104 Dunn Avenue
Old Kings Road
US 23 New Kings Road
Intersection Improvements
Duval
100
SR 115 Arlington Expressway
SR 109 University Boulevard
SR 10 Atlantic Boulevard
Widen to 6 Lanes*
Duval
153
SR 115 Arlington Expressway *
at SR 109 University Boulevard
Duval
102
SR 115 Southside Boulevard
US 1/SR 5 Philips Highway
I-95 Ramps
Widen to 6 Lanes*
CSS
Duval
103
SR 115 Southside Boulevard
SR 202 J. T. Butler Boulevard
US 90 Beach Boulevard
Widen to 6 Lanes*
CSS
Duval
104
SR 115 Southside Boulevard
US 90 Beach Boulevard
SR 10 Atlantic Boulevard
Widen to 6 Lanes*
CSS
Duval
960
SR 115 Southside Boulevard
Hogan Road
Gate Parkway
Intersection Improvements
Duval
966
SR 115 Southside Boulevard
at SR 202 J. T. Butler Boulevard
Modify Interchange
Duval
967
SR 115 Southside Boulevard
at SR 152 Baymeadows Road
Underpass
CSS
Duval
968
SR 115 Southside Boulevard
at SR 10 Atlantic Boulevard
Intersection Improvements
CSS
Duval
937
SR 152 Baymeadows Road
I-95
SR 115 Southside Boulevard
Widen to 6 Lanes
CSS
Duval
938
SR 152 Baymeadows Road
US 1 /SR 5 Philips Highway
I-95
Widen to 6 Lanes*
CSS
Duval
9
SR 21 Blanding Boulevard
I-295
Wilson Boulevard
Widen to 6 Lanes
CSS
Duval
957A
SR 21 Blanding Boulevard
at Collins Road
Intersection Improvements
Duval
957B
SR 21 Blanding Boulevard
at SR 134 103rd Street
Intersection Improvements
Duval
957C
SR 21 Blanding Boulevard
at Cedar Hills Boulevard
Duval
47
SR 228 Hart Bridge
SR 228 Hart Expressway - Downtown
SR 10 Atlantic Boulevard
New 6 Lane Bridge
Duval
86
SR 228 Normandy Boulevard
US 301
Bell Road (Equestrian Park )
Widen to 4 Lanes
Duval
87
SR 228 Normandy Boulevard
SR 23 First Coast Expressway
SR 111 Cassat Avenue
Widen to 6 Lanes
Duval
701
SR 243 JIA North Access Road
SR 102 Airport Road
Pecan Park Road
Widen to 4 Lanes
Duval
18
SR 9B
US 1/SR 5 Philips Highway
I-295
Widen to 6 Lanes
Duval
1024
SR 9B
US 1/SR 5 Philips Highway
I-295
Add 2 Auxiliary Lanes
Duval
151
SR A1A
SR 116 Wonderwood Drive
Naval Station Mayport North Gate
Widen to 4 Lanes*
Intersection Improvements / Add 1 Lane
Modify Interchange
Intersection Improvements
Page 6 of 61
CSS
CSS
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Road Projects
11/4/2014
County
Map ID
Facility
From
To
Duval
2331
SR A1A St Johns River Ferry
Duval
954
Duval Duval
Improvement Type
CSS
Starratt Road
Duval Station Road
Yellow Bluff Road
Widen to 4 Lanes
129
Touchton Road
Belfort Road
SR 115 Southside Boulevard
Widen to 4 Lanes
955
Trout River Boulevard
Old Kings Road
US 23 New Kings Road
Widen to 4 Lanes
Duval
6
US 90 Beaver Street
SR 23 First Coast Expressway
Cahoon Road
Widen to 4 Lanes
Duval
82
US 1/SR 15 New Kings Road
Soutel Drive
I-295
Widen to 6 Lanes
Duval
83
US 1/SR 15 New Kings Road
I-295
Old Kings Road
Widen to 6 Lanes
Duval
950
US 1/SR 15 New Kings Road
SR 111 Edgewood Avenue
Soutel Drive
Intersection Improvements
Duval
93
US 1/SR 5 Philips Highway
Nocatee Parkway / Race Track Road
SR 9B
Widen to 6 Lanes
CSS
Duval
94
US 1/SR 5 Philips Highway
SR 9B
I-295
Widen to 6 Lanes*
CSS
Duval
95
US 1/SR 5 Philips Highway
I-95 at the Avenues
SR 202 J. T. Butler Boulevard
Widen to 6 Lanes*
CSS
Duval
96
US 1/SR 5 Philips Highway
SR 202 J. T. Butler Boulevard
SR 126 Emerson Street
Widen to 6 Lanes
Duval
1017
US 17 Main Street
New Berlin Road
Pecan Park Road
Widen to 4 Lanes
Duval
959
US 17 Main Street
at Eastport Road
Duval
123
US 301 SR 200
US 90
Duval/Nassau County Line
Widen to 4 Lanes
Duval
425
US 301 SR 201
Duval/Clay County Line
I-10
Widen to 6 Lanes
Duval
7
US 90 Beaver Street
Cahoon Road
McDuff Avenue
Widen to 4 Lanes
Duval
79
US 90 / SR 115 Mathews Bridge
Alt. US 1 MLK Jr. Parkway
SR 109 University Boulevard
New 6 Lane Bridge and Transit
Duval
956
Yellow Bluff Road
Starratt Road
New Berlin Road (north)
Widen to 4 Lanes
Duval/Clay
57
I-295
SR 13 San Jose Boulevard
W of US 17 Roosevelt Boulevard
Add 4 Express Lanes on Bridge
Duval/Nassau
88
Northern Outer Beltway
I-10
I-95
Future Corridor
Duval/Nassau
74
SR 115 Lem Turner Road
I-295
US 1 / Callahan S Kings Road
Widen to 4 Lanes
Duval/Nassau
78
US 17 Main Street
Pecan Park Road
SR 200 / SR A1A
Widen to 4 Lanes
Nassau
988
Abaco Island Drive Extension
Abaco Island Drive
Zion Court
New 2 Lane Road
Nassau
704
Amelia Island Parkway
South 14th Street
CR 105A Buccaneer Trail
Widen to 4 Lanes*
Nassau
980
Arrigo-Parliament Reconnection
Arrigo Boulevard
Parliament Drive
New 2 Lane Road
Nassau
1001
Barnwell-0' Neil Scott Connector
Barnwell Road
O'Neil Scott Road
New 2 Lane Road
Nassau
1002
Brady Point-Clements Connector
Brady Point Road
Clements Road
New 2 Lane Road
Nassau
976
Cardinal Street North Extension
Cardinal Avenue
SR 200 SR AIA Yulee Backage Roads
New 2 Lane Road
Nassau
975
Cardinal Street South Extension
Spring Meadow Avenue
William Burgess Boulevard
New 2 Lane Road
Nassau
995
Christian Way Extension
Christian Way
Hampton Club Way
New 2 Lane Road
Nassau
996
Commodore Point Drive Extension
Commodore Point Drive
Blackrock Road
New 2 Lane Road
Nassau
501
Concourse Loop Road
License Road
Amelia Concourse
New 2 Lane Road
Nassau
705
CR 105A Buccaneer Trail
South Fletcher Avenue
Canopy Drive
Turn Lane Improvements*
Nassau
993
Crosby Avenue Extension
US 17 SR 5
Pinewood Drive
New 2 Lane Road
Nassau
991
Dove Road Extension {west}
Harper Chapel Road Extension
Mentoria Road
New 2 Lane Road
Nassau
974
east Dove Road Extension
Harper Chapel Road
William Burgess Boulevard
New 2 Lane Road
Nassau
36
East Nassau Connector
I-95
Chester Road
New 4 Lane Road
Nassau
969
East Nassau Connector
at I-95
Nassau
986
Flora Parke-Wal Mart Connector
Flora Parke Boulevard
Walmart Supercenter
New 2 Lane Road
Nassau
985
Gene Lasserre Boulevard Extension
Gene Lassere Boulevard
SR 200A Pages Dairy Road
New 2 Lane Road and Roundabout
Nassau
977
Goodbread Road Reconstruction
US 17 SR 5
Hamilton Street
New 2 Lane Road
Nassau
1000
Hamilton Street Extension
Goodbread Circle
Ferry Slip Replacement
New Interchange
CSS
CSS
New Interchange
New 2 Lane Road
Nassau
989
Harper Chapel Extension
Harper Chapel Road
Dove Road Extension
New 2 Lane Road
Nassau
402*
I-10
Baker/Nassau County Line
Nassau/Duval County Line
Add 4 Express Lanes
Nassau
710
Lofton Creek Crossing
Hendricks Road
Avant Road
New 2 Lane Bridge
Nassau
982
Macaw Avenue Extension
Cardinal Street
US 17 SR 5
New 2 Lane Road
Page 7 of 61
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Road Projects
11/4/2014
County
Map ID
Facility
From
To
Improvement Type
Nassau
990
Mentoria-Wm Burgess Connector
William Burgess Boulevard
Harper Chapel Road
New 2 Lane Road
Nassau
987
Pages Dairy Road East Extension
Chester Road
Blackrock Road
New 2 Lane Road
Nassau
983
Pages Dairy Road South Extension
SR 200 SR A1A
Sowell Road
New 2 Lane Road
Nassau
1003
SR 200 Overpass
at US 17 SR 5 and Railroad Tracks
Nassau
998
SR 200 William Burgess Connector
William Burgess Boulevard
SR 200 SR A1A
New 2 Lane Road
Nassau
992
SR 200 Yulee Backage Roads
Cardinal Street North Extension
Old Yulee Road
New 2 Lane Road
Nassau
427
SR 200 SR A1A
at US 17
Nassau
703
SR 200 SR A1A
Amelia Island Parkway
Nassau
979
SR 200A Pages Dairy Road
at Felmor Road
Nassau
706
SR A1A
South Fletcher Avenue
Amelia Island Parkway
Turn Lane Improvements*
Nassau
707
US 17
Nassau/Duval County Line
Harts Road
Intersection Improvements
Nassau
709
US 17
SR 200 SR A1A
Georgia State Line
Widen to 4 Lanes
Nassau
984
US 17 Pages Dairy Connector w/roundabout
US 17 SR 5
SR 200A Pages Dairy Road
New 2 Lane Road and Roundabout
Nassau
994
US 17 Powerline Corridor
Vegas Boulevard
Radio Avenue
New 2 Lane Road
Nassau
999
US 17 Yulee Backage Roads
US 17 SR 5
North of Koen Lane
New 2 Lane Road
Nassau
708
US 301 SR 200
US 1 at S Kings Road
Nassau
981
Various SR 200 Intersections Modifications
Nassau
997
Woodbridge Parkway Extension
Woodbrigde Parkway
Clements Road
New 2 Lane Road
Putnam
503
Buffalo Road
Buffalo Road west
Buffalo east
New 2 Lane Bridge
Putnam
505
Comfort Road
Port Road
US 17
Widen to 4 Lanes
CSS
Overpass
Intersection Improvements Sadler Road
Widen to 6 Lanes Roundabout Projects CSS
Intersection Improvements Intersection Improvements
Putnam
451
SR 100
Clay/Putnam County Line
US 17 SR 5
Widen to 4 Lanes
Putnam
965
SR 19 Connector
SR 19
Putnam County Boulevard
New 4 lane road / bridge
Putnam
422
SR 20
Putnam/Alachua County Line
SW 56th Avenue
Widen to 4 Lanes
Putnam
423
SR 20
SW 56th Avenue
CR 315 Interlachen
Widen to 4 Lanes
Putnam
428
US 17 SR 15
West of Dunn Creek Bridge
Horse Landing Road
Widen to 4 Lanes
Putnam
429
US 17 SR 15
CR 309 Satsuma
West of Dunn Creek Bridge
Widen to 4 Lanes
Putnam
430
US 17 SR 15
Putnam/Volusia County Line
Pomona Park/Feagle Avenue
Widen to 4 Lanes
Putnam
452
US 17 SR 15
Pomona Park/Feagle Avenue
CR 309 Satsuma
Widen to 4 Lanes
St John's
801
Brinkhoff Road
SR 207
Wildwood Drive
New 2 Lane Road
St John's
803
CR 16A
SR 16 Connector
SR 13
Widen to 4 Lanes
St John's
802
CR 16A Extension
CR 16A
Leo Maguire Parkway
New 2 Lane Road
St John's
805
CR 210
I-95
near US 1
Widen to 6 Lanes
St John's
807
CR 210
Greenbriar Road
Cimarrone Road
Widen to 4 Lanes
St John's
849
CR 210 W
Longleaf Pine Parkway
Greenbriar Road
Widen to 4 Lanes
St John's
809
CR 214
Holmes Boulevard
US 1
Widen to 3 Lanes*
St John's
810
CR 2209
SR 23 First Coast Expressway
CR 210
New 6 Lane Road
St John's
811
CR 2209
SR 16 Connector
SR 23 First Coast Expressway
New 6 Lane Road
St John's
812
CR 2209
International Golf Parkway
SR 16 Connector
New 6 Lane Road
St John's
813
CR 2209
CR 214
CR 208
New 4 Lane Road
St John's
814
CR 2209
SR 207/CR 305
CR 214
New 4 Lane Road
St John's
815
CR 2209
SR 16
International Golf Parkway
New 4 Lane Road
St John's
816
CR 2209
CR 208
SR 16
New 4 Lane Road
St John's
843
CR 2209
at CR 210
St John's
818
CR 305
CR 204
SR 206
New 2 Lane Road
CSS
New Interchange
St John's
850
CR 305
SR 206
SR 207
Widen to 4 Lanes
St John's
1025
Dixie Highway / Pellicer Lane
SR 207
CR 214 West of King Street
Reconstruct 2 Lanes and Widen to add Sidewalks and Bike Lanes
St John's
819
Durbin Parkway
9B Extension
Nocatee Parkway
New 4 Lane Road
Page 8 of 61
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Road Projects
County
Map ID
Facility
From
To
Improvement Type
St John's
844
Durbin Parkway
at US 1/SR 5 Dixie Highway
St John's
821
Holmes Boulevard
CR 214
St John's
138
I-95
at US 1/SR 5 Ponce De Leon Boulevard and at SR 206
St John's
400
I-95
St. John's/Flagler County Line
SR 206
Add 4 Express Lanes
St John's
420
I-95
SR 206
International Golf Parkway
Add 4 Express Lanes
St John's
846
I-95
at CR 210
St John's
418B
I-95
International Golf Parkway
St. John's/Duval County Line
Add 4 Express Lanes
St John's
823
International Golf Parkway
I-95
Turn/Bend
Widen to 4 Lanes*
St John's
825
Mickler Road
Palm Valley Road
SR A1A
Widen to 4 Lanes
St John's
826
Palm Valley Road
Intracoastal Waterway
Mickler Road
Widen to 4 Lanes
St John's
827
Race Track Road
St. Johns Parkway
Bartram Park Boulevard
Widen to 4 Lanes
St John's
828
Race Track Road
Bartram Park Boulevard
Bartram Springs
Widen to 4 Lanes
St John's
851
Race Track Road Connector
Durbin Parkway / 9B Extension
Race Track Road
New 2 Lane Road
St John's
110
SR 16
I-95
SR 313
Widen to 6 Lanes
St John's
835
SR 16
South Francis Road
International Golf Parkway
Widen to 4 Lanes
St John's
836
SR 16
CR 208 Outlet Mall
South Francis Road
Widen to 4 Lanes
St John's
829
SR 16 Connector
SR 16/CR 16A
CR 2209
New 4 Lane Road
St John's
113
SR 207
I-95
South Holmes Boulevard
Widen to 6 Lanes
St John's
830
SR 207
Holmes Boulevard
SR 312
Widen to 6 Lanes
St John's
115
SR 312
US 1/SR 5 Dixie Highway
SR A1A
Widen to 6 Lanes
St John's
832
SR 313
SR 16
US 1 Dixie Highway
New 4 Lane Road
Race Track Road
Widen to 6 Lanes
CSS
Modify Interchange Four Mile Road
Widen to 6 Lanes Modify Interchange
Modify Interchange CSS
St John's
839
SR 313
at US 1/SR 5 Dixie Highway
St John's
833
SR 9B Extension
St. Johns Parkway
New Interchange
St John's
842
SR 9B Extension
at Durbin Parkway
St John's
128
SR A1A
Solana Road
St John's
1008
SR A1A
at Red Cox/Coquina Rd
St John's
800
SR A1A
Mickler Road
Palm Valley Road
Widen to 4 Lanes
St John's
1031
SR A1A Anastasia Boulevard
Casanova Road
Bridge of Lions
CSS
St John's
848
St. Johns Parkway
CR 2209
9B Extension
Widen to 6 Lanes
St John's
845
US 1 SR 5
at CR 210
St John's
130
US 1/SR 5 Dixie Highway
SR 206
Lewis Point Road
Widen to 6 Lanes
St John's
131
US 1/SR 5 Dixie Highway
SR 313
International Golf Parkway
Widen to 6 Lanes
St John's
132
US 1/SR 5 Dixie Highway
International Golf Parkway
Race Track Road
Widen to 6 Lanes
St John's
1029
US 1B King Street
US 1 Ponce de Leon Boulevard
Avenida Menendez
Context Sensitive Solutions (CSS)
CSS
St John's
1030
US 1B San Marco Avenue
Bridge of Lions
SR 16
Context Sensitive Solutions (CSS)
CSS
St John's
834
Veterans Parkway
Greenbriar Road
Longleaf Pine Parkway
New 4 Lane Road
New Interchange SR 202 J. T. Butler Boulevard
Widen to 6 Lanes*
CSS
Intersection Improvements CSS
Modify Interchange
A, B Projects must be done together to provide logical termini. *Project identified as potential CSS improvements. **Projects must be done together to provide logical termini.
Private Projects
11/4/2014
County
Map ID
Facility
From
To
Improvement Type
Baker
500
Northern Cross Town Corridor
CR 125
SR 121
New 2 Lane Road
Clay
41
SR 23 First Coast Expressway
at CR 218
New Interchange
Clay
1011
SR 23 First Coast Expressway
at SR 21 Blanding Boulevard
New Interchange
Clay
1012
SR 23 First Coast Expressway
at CR 739
New Interchange
Clay
8202
SR 23 First Coast Expressway
SR 21 Blanding Boulevard
US 17
Page 9 of 61
CSS
New 4 Lane Road
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Road Projects
11/4/2014
County
Map ID
Facility
From
To
Improvement Type
Clay
1013
SR 23 First Coast Expressway
at SR 16
Clay/Duval
8201
SR 23 First Coast Expressway
I-10
SR 21 Blanding Boulevard
Widen to 6 Lanes
Clay/St. John's
8203
SR 23 First Coast Expressway
US 17
I-95
New 6 Lane Road
Putnam
502
Connector Road
US 17
Distribution Center
New 2 Lane Road
St John's
840
SR 23 First Coast Expressway
at I-95
New Interchange
St John's
841
SR 23 First Coast Expressway
at CR 16 A
New Interchange
St John's
847
SR 23 First Coast Expressway
at CR 2209
New Interchange
CSS
New Interchange
Page 10 of 61
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Safety and TSMO Projects
11/4/2014
County
Map ID
Facility
From
To
Improvement Type
Clay
201
CR 209 Russell Road
Old Ferry Road
CR 220 Doctors Inlet Road
Safety Projects - Corridors
Clay
202
CR 215
SR 16
SR 21 Blanding Boulevard
Safety Projects - Corridors
Clay
203
CR 218
N Mimosa Avenue
CR 739 Henley Road
Safety Projects - Corridors
Clay
608
CR 220 Doctors Inlet Road
SR 21 Blanding Boulevard
CR 224 College Drive
Safety Projects - Corridors
Clay
204
CR 220A Long Bay Road
CR 220 Doctors Inlet Road
Old Jennings Road
Safety Projects - Corridors
Clay
241
SR 21 Blanding Boulevard
SR 16
CR 218
Safety Projects - Corridors
Clay
209
SR 21 Blanding Boulevard
at Arora Boulevard
Safety Projects - Intersections
Clay
212
SR 21 Blanding Boulevard
at SR 16
Safety Projects - Intersections
Clay
215
SR 21 Blanding Boulevard
at Youngerman Circle
Safety Projects - Intersections
Clay
219
SR 21 Blanding Boulevard
at Argyle Forest Boulevard
Safety Projects - Intersections
Clay
221
SR 21 Blanding Boulevard
at Wells Road
Safety Projects - Intersections
Clay
231
SR 21 Blanding Boulevard
at CR 215
Clay
605
SR 21 Blanding Boulevard
Everett Avenue
Old Jennings Road
Safety Projects - Corridors
Clay
606
SR 21 Blanding Boulevard
Old Jennings Road
Argyle Forest Boulevard
Safety Projects - Corridors
Clay
327
US 17 SR 15
CR 315
Kingsley Avenue
Arterial Management System
Duval
300
Alt US 1 Hart Bridge Expressway
Monroe Street
US 90 Beach Boulevard
Freeway Management System
Duval
200
Collins Road
Shindler Drive
Rampart Road
Safety Projects - Corridors
Duval
205
Firestone Road
Morse Avenue
SR 208 Wilson Boulevard
Safety Projects - Corridors
Duval
206
Harlow Boulevard
SR 134 103rd Street
SR 21 Blanding Boulevard
Safety Projects - Corridors
Duval
607
I-295
Old St Augustine Road
SR 228 Normandy Boulevard
Safety Projects - Corridors
Duval
610
I-295
SR 228 Normandy Boulevard
SR 115 Lem Turner Road
Safety Projects - Corridors
Duval
233
Jammes Road
Morse Avenue
San Juan Avenue
Safety Projects - Corridors
Duval
306
Monument Road
SR 10 Atlantic Boulevard
Fort Caroline Road
Arterial Management System
Duval
234
Morse Avenue
Ricker Road
Jammes Road
Safety Projects - Corridors
Duval
657
Mt. Pleasant Road
McCormick Road
Girvin Road
Arterial Management System
Duval
235
Old Middleburg Road
Argyle Forest Boulevard
SR 134 103rd Street
Safety Projects - Corridors
Duval
236
Old Middleburg Road
SR 134 103rd Street
Lenox Avenue
Safety Projects - Corridors
Duval
658
Old St. Augustine Road
I-95
US 1/ SR 5 Philips Highway
Arterial Management System
Duval
237
Rampart Road
Argyle Forest Boulevard
Park City Drive
Safety Projects - Corridors
Duval
238
Ricker Road
Morse Avenue
SR 134 103rd Street
Safety Projects - Corridors
Duval
239
Ricker Road
SR 134 103rd Street
Old Middleburg Road
Safety Projects - Corridors
Duval
240
Shindler Drive
Collins Road
SR 134 103rd Street
Safety Projects - Corridors
Duval
650
SR 10 Atlantic Boulevard
Monument Road
Intracoastal Waterway
Arterial Management System
Duval
651
SR 10 Atlantic Boulevard
Hart Bridge Expressway
SR 109 University Boulevard
Arterial Management System
Duval
663
SR 106 Merrill Road
SR 109 University Boulevard
SR 113 Southside Connector
Arterial Management System
Duval
653
SR 109 Cesery Boulevard
SR 109 University Boulevard
SR 115 Arlington Expressway
Arterial Management System
Duval
659
SR 109 University Boulevard
St. Augustine Road
US 90 Beach Boulevard
Arterial Management System
Duval
660
SR 109 University Boulevard
Arlington Road
Merrill Road
Arterial Management System
Duval
661
SR 109 University Boulevard
SR 10 Atlantic Boulevard
SR 109 Cesery Boulevard
Arterial Management System
Duval
305
SR 115 Lem Turner Road
I-95
I-295
Arterial Management System
Duval
301
SR 115 Arlington Expressway
US 17 / US 17 SR 228 State Street
SR 10 Atlantic Boulevard
Freeway Management System
Duval
654
SR 116 Fort Caroline Road
Merrill Road
McCormick Road
Arterial Management System
Duval
655
SR 116 Wonderwood Connector
Fort Caroline Road East
Mt. Pleasant Road
Arterial Management System
Duval
656
SR 116 Wonderwood Connector
SR 113 Southside Connector
Fort Caroline Road East
Arterial Management System
Safety Projects - Intersections
Page 11 of 61
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Safety and TSMO Projects
11/4/2014
County
Map ID
Facility
From
To
Improvement Type
Duval
662
SR 116 Wonderwood Connector
Mt. Pleasant Road
SR 101 Mayport Road
Arterial Management System
Duval
304
SR 126 Emerson Street
I-95
Bedford Road
Traffic Operations Improvements
Duval
310
SR 13 Acosta Bridge
I-95
Broad Street
Freeway Management System
Duval
207
SR 134 103rd Street
at New World Avenue
Safety Projects - Intersections
Duval
218
SR 134 103rd Street
at Firestone Road , I-295 Interchanges
Safety Projects - Intersections
Duval
222
SR 134 103rd Street
at Harlow Boulevard
Safety Projects - Intersections
Duval
225
SR 134 103rd Street
at SR 21 Blanding Boulevard
Safety Projects - Intersections
Duval
226
SR 134 103rd Street
at Shindler Drive , Old Middleburg Road
Safety Projects - Intersections
Duval
311
SR 134 103rd Street
SR 228 Normandy Boulevard
I-295
Arterial Management System
Duval
603
SR 134 103rd Street
SR 228 Normandy Boulevard
Wesconnett Boulevard
Safety Projects - Corridors
Duval
602
SR 134 Timuquana Road
Wesconnett Boulevard
US 17 Roosevelt Boulevard
Safety Projects - Corridors
Duval
315
SR 202 J. T. Butler Boulevard
US 1/SR 5 Philips Highway
SR A1A
Freeway Management System
Duval
712
SR 202 J. T. Butler Boulevard
SR 115 Southside Boulevard
Hodges Boulevard
Safety Projects - Corridors
Duval
601
SR 208 Wilson Boulevard
Fouraker Road
SR 103 Lane Avenue
Safety Projects - Corridors
Duval
242
SR 21 Blanding Boulevard
Argyle Forest Boulevard
US 17 Roosevelt Boulevard
Safety Projects - Corridors
Duval
317
SR 21 Blanding Boulevard
Collins Road
US 17 Roosevelt Boulevard
Arterial Management System
Duval
230
SR 21 Blanding Boulevard
at Collins Road
Safety Projects - Intersections
Duval
232
SR 21 Blanding Boulevard
at I-295 NB Off Ramp
Safety Projects - Intersections
Duval
208
SR 228 Normandy Boulevard
at Fouraker Road
Safety Projects - Intersections
Duval
220
SR 228 Normandy Boulevard
at Blair Road South
Duval
318
SR 228 Normandy Boulevard
SR 134 103rd Street
I-295
Arterial Management System
Duval
609
SR 228 Normandy Boulevard
I-295
SR 111 Cassat Avenue
Safety Projects - Corridors
I-295
Safety Projects - Corridors
Safety Projects - Intersections
Duval
611
SR 228 Normandy Boulevard
SR 23 First Coast Expressway
Duval
213
SR 23 First Coast Expressway
at US 90 , I-10 Beaver Street
Duval
324
US 1 Main Street Bridge
I-95
Bay Street
Arterial Management System
Duval
325
US 1 MLK Parkway
SR 115 Arlington Expressway
I-95
Freeway Management System
Duval
224
US 1/SR 15 New Kings Road
at Moncrief Road
Duval
307
US 1/SR 15 New Kings Road
I-95
Duval
229
US 1/SR 5 Philips Highway
at Bowden Road
Duval
326
US 17 Main Street
Bay Street
I-295
Arterial Management System
Duval
322
US 17 / US 17 SR 228 State Street
I-95
Liberty Street
Arterial Management System
Duval
323
US 17 / US 17 SR 228 Union Street
I-95
Liberty Street
Arterial Management System
Duval
313
US 301 SR 200
SR 228 Normandy Boulevard
US 90 Beaver Street
Rural ITS
Duval
223
US 90 Beach Boulevard
at Forest Boulevard
Duval
652
US 90 Beach Boulevard
Parental Home Road
San Pablo Road
Arterial Management System
Duval
600
Wesconnett Boulevard
SR 21 Blanding Boulevard
SR 21 Blanding Boulevard
Safety Projects - Corridors
Duval / Nassau
314
US 301 SR 200
US 90 Beaver Street
Mickler Street (Callahan)
Rural ITS
Duval / St. John's
319
SR 9B
CR 2209
I-295
Freeway Management System
Nassau
320
SR 200 SR A1A
I-95
Fernandina Beach
Arterial Management System
Nassau
604
SR 200 SR A1A
I-95
Chester Road
Safety Projects - Corridors
St. John's
302
CR 210 Palm Valley Road
SR 13
SR A1A
Rural ITS
St. John's
303
CR 214 King Street/Anastasia Boulevard
I-95
SR A1A
Arterial Management System
St. John's
216
International Golf Parkway
at SR 16
Safety Projects - Intersections
St. John's
217
International Golf Parkway
at US 1/SR 5 Dixie Highway
Safety Projects - Intersections
Safety Projects - Intersections
Safety Projects - Intersections I-295
Arterial Management System Safety Projects - Intersections
Safety Projects - Intersections
Page 12 of 61
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Safety and TSMO Projects
11/4/2014
County
Map ID
Facility
From
To
Improvement Type
St. John's
308
Race Track Road
SR 13 San Jose Boulevard
US 1
Arterial Management System
St. John's
309
SR 13
Shands Bridge
Julington Creek Road
Arterial Management System
St. John's
312
SR 16
CR 13
US 1
Arterial Management System
St. John's
211
SR 16/SR 13
at CR 13
St. John's
316
SR 207/SR 312
I-95
SR A1A
Rural ITS
St. John's
321
SR A1A
SR 206
CR 214
Rural ITS
St. John's
330
US 1, A1A & SR 5A
St. John's
210
US 1/SR 5 Dixie Highway
at SR 312
St. John's
214
US 1/SR 5 Dixie Highway
at SR 206
St. John's
328
US 1/SR 5 Dixie Highway/Ponce De Leon Boulevard
SR 312
SR 16
Arterial Management System
St. John's
329
US 1/SR 5 Ponce De Leon Boulevard
SR 5A King Street
SR 16
Access Management Plan
Safety Projects - Intersections
Transportation Management Plan Safety Projects - Intersections Safety Projects - Intersections
Page 13 of 61
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Pedestrian and Bicycle Projects
County
Map Id
Corridor
From
To
Improvement Type
Baker
2000
SR 121 Rail Trail Corridor
Baker/Union County Line
Baker/Nassau County Line
Florida Greenway
Clay
2001
Cecil Field Conservation Corridor
CR 218
Duval/Clay County Line
Land Trail Opportunities
Clay
2002
CR 218
SR 16
SR 21
Florida Greenway
Clay
2003
CR 220 Doctors Inlet Road
SR 21
College Drive
Florida Greenway
Clay
2004
CR 220 Doctors Inlet Road
College Drive
US 17
Multi-Use Trail
Clay
2005
Long Bay Road
SR 21 Blanding Boulevard
Old Jennings Road
Multi-Use Trail
SR 23 First Coast Expressway
Clay
2006
Old Jennings Road
Long Bay Road
Clay
2007
US 17
at CR 220 (Fleming Island Area)
Clay
2009
US 17 Roosevelt Boulevard / Park Avenue
Palatka
Clay
2008
US 17 Park Avenue
at Kingsley Avenue (Orange Park)
Clay / St. John's
2010
SR 16
Kingsley Lake Drive
Multi-Use Trail Accommodate Pedestrians and Bicyclist
Clay/Duval County Line
Florida Greenway
SR 13 San Jose Boulevard
Florida Greenway - Multi-Use Trail
Accommodate Pedestrians and Bicyclist
Duval
2012
5th Street
Lane Avenue
Melson Avenue
Bike Lane
Duval
2013
Arlington Road
Lone Star Road
King Arthur Road
Bike Lane
Duval
2014
Arlington Road West
Cesery Road
King Arthur Road
Bike Lane
Duval
2019
Bay Street
Myrtle Avenue
Lee Street
Bike Lane
SR 13 San Jose Boulevard
Bi-directional 12 ft. Shared Use Path
Duval
2020
Baymeadows Road
SR 115 at Southside Boulevard
Duval
2023
Beauclerc Road
I-295
Accommodate Pedestrians and Bicyclist
Duval
2026
Boulevard Street
5th Street
12th Street
Bike Lane
Duval
2027
Bowden Road
US 1 Philips Highway
Spring Park Road
Bike Lane
Duval
2028
Bowden Road
Spring Park Road
Southpoint Parkway
Bike Lane
Duval
2029
Broad Street
Water Street
5th Street
Bike Lane
Duval
2031
Cecil Field Conservation Corridor
Duval/Clay County Line
US 90 Beaver Street
Florida Greenway
Duval
2032
Clark Road
Broward Road
US 17 Main Street
Bike Lane
Duval
2033
Commonwealth Avenue
Imeson Road
Lane Avenue
Bike Lane
Duval
2034
CSX Corridor North
US 17 Main Street / S Rail Line
US 17 Main Street / Trout River Drive
Multi-Use Path
Deerwood Park Boulevard
Gate Parkway
Duval
2035
Deerwood Area
Duval
2036
Downtown Jacksonville
Multi-Use Path Accommodate Pedestrians and Bicyclist
Duval
2037
Downtown Neptune/Atlantic Beach
at Sherry Drive, 2nd Street, Ocean Street, Cherry Street, SR A1A
Duval
2039
Duval Road
Airport Road
Accommodate Pedestrians and Bicyclist Airport Center Drive
Bike Lane
Duval
2040
Duval Street
Lee Street
Georgia Street
Bike Lane
Duval
2041
East Coast Greenway - Duval County Corridor
St. John's/ Duval County Line
Nassau/Duval County Line
Florida Greenway
Duval
2043
Edgewood Avenue
St. Johns Avenue
Post Street
Bike Lane
Duval
2045
Forest Street
Acosta Street
Lime Street
Bike Lane
Duval
2046
Forsyth Street
Myrtle Avenue
Lee Street
Bike Lane
Duval
2047
Gate Parkway East
Gate Parkway
St. Johns Town Center Boulevard
Multi-Use Path
Duval
2048
Gate Parkway South East
Deerwood Parkway
St. Johns Town Center Boulevard
Bike Lane
Duval
2052
Hogan's Creek Greenway
Market Street
North Riverbank
Multi-Use Path
Duval
2053
Hubbard Street
Orange Street
14th Street
Bike Lane
Duval
2054
Imeson Road
Commonwealth Avenue
Baldwin Rail Trail
Bike Lane
Duval
2055
Jacksonville Baldwin / East Coast Corridor
Bulls Bay Highway (Jacksonville Baldwin Corridor)
St Johns River Ferry (East Coast Greenway Corridor)
Florida Greenway
Duval
2056
Jacksonville Beach Area
at 3rd Avenue, Ocean Street, 2nd Avenue, South 10th Street
Duval
2057
Jefferson Street
Water Street
1st Street
Bike Lane
Accommodate Pedestrians and Bicyclist Florida Greenway
Duval
2058
Kernan Boulevard
Baymeadows Road (SR 152)
SR 116 Fort Caroline Road
Duval
2059
Laura Street
8th Street
S-Line
Pavement Markings and Signage
Duval
2060
Laura Street
Bay Street
8th Street
Pavement Markings and Signage
Duval
2061
Lee Street
Water Street
Duval Street
Bike Lane
Duval
2062
Lone Star Road
Mill Creek Road
SR 113 Southside Connector
Bike Lane
Duval
2065
Mandarin Road
San Jose Boulevard (SR 13)
I-295
Bi-directional 12 ft. Shared Use Path
Duval
2089
Mary Street
San Marco Boulevard
US 17 Main Street Bridge
Bike Lane
Duval
2066
McCoys Creek Boulevard / Fitzgerald Street
McDuff Avenue
Leland Street
Bike Lane
11/4/2014
Page 14 of 61
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Pedestrian and Bicycle Projects
County
Map Id
Corridor
From
To
Improvement Type
Duval
2067
McCoys Creek Boulevard / Fitzgerald Street
Nixon Street
Forest Street
Multi-Use Path
Duval
2068
Moncrief Road
13th Street
Golfair Boulevard
Bike Lane
Duval
2069
Monument Road and SR 10 Atlantic Boulevard
SR 113 Southside Boulevard
N Regency Square Boulevard
Bike Lane
Duval
2070
Myrtle Avenue
Forest Street
Kings Road
Bike Lane
Duval
2071
Newnan Street
Bay Street
Orange Street
Pavement Markings and Signage
Duval
2073
Old Kings Road
S-line
Martha Street
Bike Lane
Duval
2074
Old Middleburg Road
Herlong Road
Lenox Avenue
Bike Lane
Duval
2075
Old St Augustine Road
Losco Road
SR 13 San Jose Boulevard
Bike Lane
Duval
2078
Riverplace Boulevard
Prudential Drive
US 1 Main Street
Bike Lane
Bowden Road
Bike Lane
Duval
2080
Riverside/Five Point Area
at Stockton Street, Rossell Street, I-95, St. John's River
Duval
2090
Southpoint Parkway
Belfort Road
Accommodate Pedestrians and Bicyclist
Duval
2015
SR 10 Atlantic Boulevard
Hart Expressway (SR 228 Alt. US 1)
SR A1A
Bi-directional 12 ft. Shared Use Path
Duval
2016
SR 10 Atlantic Boulevard
US 90 Beach Boulevard
SR 228 Alt. US 1 Hart Expressway
Bike Lane
Duval
2017
SR 10 Atlantic Boulevard
Kings Road
US 90 Beach Boulevard
Bike Lane
Duval
2018
SR 10 Atlantic Boulevard
SR 228 Hart Expressway
SR 109 University Boulevard
Bike Lane
Duval
2038
SR 104 Dunn Avenue
Biscayne Avenue
US 17 Main Street
Bike Lane
Duval
2049
SR 105 Zoo Parkway
Busch Drive
I-295
Bike Lane
Duval
2050
SR 105 Zoo Parkway
US 17 Main Street
SR A1A
Multi-Use Path
Duval
2102
SR 109 University Boulevard North
SR 10 Atlantic Boulevard
Cesery Boulevard
Bike Lane
Duval
2103
SR 109 University Boulevard North
University Boulevard / Cesery Boulevard
Gable Lane
Bike Lane
Duval
2030
SR 111 Cassat Avenue
SR 21 Blanding Boulevard
SR 111 Edgewood Avenue
Bike Lane Bike Lane
Duval
2042
SR 111 Edgewood Avenue
SR 111 Cassat Avenue
US 1/SR 15 New Kings Road
Duval
2099
SR 111 Tallulah Avenue
US 17 Main Street
68th Street
Bike Lane
Duval
2091
SR 115 Southside Boulevard
Avenues Mall (US 1)
SR 10 Atlantic Boulevard / Regency Square Mall
Bi-directional 12 ft. Shared Use Path
Duval
2092
SR 115 Southside Boulevard
US 1 Philips Highway
Belle Rive Boulevard
Multi-Use Path
Duval
2093
SR 115 Southside Boulevard
Deerwood Park Boulevard
US 90 Beach Boulevard
Sidewalk Improvements
Duval
2094
SR 115 Southside Boulevard
Gate Parkway
Touchton Road
Sidewalk Improvements
Duval
2095
SR 115 Southside Boulevard
US 1 Philips Highway
Belle Rive Boulevard
Sidewalk Improvements
Duval
2044
SR 126 Emerson Street
Hendricks Avenue
US 1 Philips Highway
Bike Lane
Duval
2088
SR 128 San Juan Avenue
SR 21 Blanding Boulevard
SR 211 Herschel Street
Bike Lane
Duval
2051
SR 13 Hendricks Avenue
SR 13 San Jose Boulevard
San Marco Boulevard
Bike Lane
Duval
2083
SR 13 San Jose Boulevard
Racetrack Road
Downtown (Southbank)
Bi-directional 12 ft. Shared Use Path
Duval
2084
SR 13 San Jose Boulevard
SR 152 Baymeadows Road
Hendricks Avenue
Bike Lane
Duval
2085
SR 13 San Jose Boulevard
Old St. Augustine Road
SR 152 Baymeadows Road
Bike Lane
Duval
2086
SR 13 San Jose Boulevard
Julington Creek Road
Plummers Cove Road
Bike Lane
Duval
2087
SR 13 San Jose Boulevard
Loretto Road
SR 152 Baymeadows Road
Accommodate Pedestrians and Bicyclist
Duval
2011
SR 134 103rd Street
Old Middleburg Road
Old Middleburg Road North
Bike Lane
Duval
2024
SR 21 Blanding Boulevard
Blackburn Road
Appleton Avenue
Bike Lane
Duval
2025
SR 21 Blanding Boulevard
Harlow Boulevard
Wilson Boulevard
Bike Lane
Duval
2079
SR 211 Riverside Avenue
St. Johns Avenue
Forest Street
Bike Lane
Duval
2098
SR 211 St. Johns Avenue
Woodmere Street
Talbot Avenue
Bike Lane
Duval
2072
SR 228 Normandy Boulevard
SR 103 Lane Avenue
SR 111 Cassat Avenue
Bike Lane
Duval
2096
SR A1A
SR 202 J. T. Butler Boulevard
SR 10 Atlantic Boulevard
Bi-directional 12 ft. Shared Use Path
Duval
2097
SR A1A
St. John's River Ferry
Duval/Nassau County Line
Bi-directional 12 ft. Shared Use Path
Duval
2100
UNF East
Kernan Boulevard
UNF West
Bike Lane
Duval
2101
UNF West
I-295
UNF East
Bike Lane
Duval
2076
US 1 Philips Highway
Racetrack Road
Downtown (Southbank)
Bi-directional 12 ft. Shared Use Path
Duval
2077
US 1 Philips Highway
Southside Boulevard (SR 115)
Southbank Riverwalk
Rails-W-Trails
Duval
2063
US 17 Main Street
Eastport Road
Pecan Park Road
Bi-directional 12 ft. Shared Use Path
Duval
2064
US 17 Main Street
Trout River Bridge
New Berlin Road
Rails-W-Trails
11/4/2014
Page 15 of 61
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Pedestrian and Bicycle Projects
County
Map Id
Corridor
From
To
Improvement Type
Duval
2081
US 17 Roosevelt Boulevard
I-295
Edison Avenue
Bi-directional 12 ft. Shared Use Path
Duval
2082
US 17 Roosevelt Boulevard
Duval/Clay County Line
Forest Street
Rails-W-Trails
Duval
2104
US 17 Roosevelt Boulevard
Duval/Clay County Line
Forest Street
Florida Greenway
Duval
2021
US 90 Beach Boulevard
San Pablo Boulevard
Downtown (Southbank)
Bi-directional 12 ft. Shared Use Path Bike Lane
Duval
2022
US 90 Beach Boulevard
at Hodges Boulevard
Duval
2105
Water Street
Lee Street
Pearl Street
Accommodate Pedestrians and Bicyclist Bulls Bay Highway
Duval / Nassau
2106
Jacksonville Baldwin Corridor
West of Baldwin
Nassau
2107
8th Street
at Sadler Road
Accommodate Pedestrians and Bicyclist
Florida Greenway
Nassau
2108
Amelia Island Parkway
at Amelia Road
Accommodate Pedestrians and Bicyclist
Nassau
2109
Amelia Island Parkway Path Segment 1
Bailey Road
8th Street/ SR A1A
Multi-Use Trail
Nassau
2110
Amelia Island Parkway Path Segment 2
14th Street
Bailey Road
Multi-Use Trail
Nassau
2111
Amelia Island Parkway Path Segment 3
Via Del Rey
14th Steet
Multi-Use Trail
Nassau
2112
Amelia Island Parkway Path Segment 4
SR A1A Fletcher Avenue / Amelia Island Trail
Via Del Rey
Multi-Use Trail
Nassau
2113.1
Amelia Island Trial - Central (1st Ave)
Bill Melton
Matanzas Way
Trail
Nassau
2113
Amelia Island Trial - South (Buccaneer Trail)
Fletcher Avenue
Amelia Island Pkwy
Trail
Nassau
2113.2
Amelia Island Trial- North ( Friendly/Clinch)
Bailey Road
Atlantic Avenue
Trail
Nassau
2114
American Beach Loop
American Beach Loop Julia Street Segment
American Beach
Bike Lane
Nassau
2115
American Beach Loop
American Beach Loop Burney Road Segment
American Beach
Multi-Use Path
Nassau
2116
American Beach Loop
American Beach Loop Ocean Avenue Segment
American Beach
Multi-Use Path
Nassau
2117
Crandall Parkway Corridor
East Coast Greenway (US 17)
SR A1A East Coast Greenway Corridor
Florida Greenway
Nassau
2118
East Coast Greenway - Nassau County Corridor
Nassau/Duval County Line
Fernandina Beach
Florida Greenway Multi-Use Path
Nassau
2120.1
ENCPA DSAP 1- Central (Old Yulee Vicinity)
East Nassau Community Planning Area
East Nassau Community Planning Area
Nassau
2120.2
ENCPA DSAP 1- North (Owens Rd Vicinity)
East Nassau Community Planning Area
East Nassau Community Planning Area
Multi-Use Path
Nassau
2120
ENCPA DSAP 1- South (Harper Chapel Vicinity)
East Nassau Community Planning Area
East Nassau Community Planning Area
Multi-Use Path
Nassau
2121
Highland Broom Street
Proposed Highland Broom Street Multi-use Trail
Proposed Highland Broom Street
Multi-Use Path
Nassau
2123
Maxine Street
Maxine Street Path
Maxine Street Path
Multi-Use Path
Nassau
2124
Ocklawaha Trail
Via Del Rey / Bill Melton Road
Sadler Road
Multi-Use Trail
Nassau
2125
Orange Avenue
Orange Avenue Path
Orange Avenue Path
Multi-Use Path
Nassau
2126
Simmons Connector
Simmons/AIP Connector
Simmons/AIP Connector
Multi-Use Trail
SR 200 SR A1A
Bi-directional 12 ft. Shared Use Path
Nassau
2127
SR 200 SR A1A
at SR 200 Bridge
Nassau
2129
US 17
Nassau/Duval County Line
Accommodate Pedestrians and Bicyclist
Nassau
2119
US 17 / SR A1A East Coast Greenway
Fernandina Beach
Georgia State Line
Florida Greenway
Nassau
2128
US 301/ SR 200 Trans Nassau Trail Corridor
CR 119
US 17 Main Street / Yulee
Florida Greenway
Nassau
2130
William Burgess Boulevard
SR 200 SR A1A
US 17
Multi-Use Trail
Nassau / Duval
2122
CR 121/CR 119 Jacksonville Baldwin Rail Trail Northern Extension Corridor
Beaver Street (US 90)
US 301/SR 200 Trans Nassau Trail Corridor
Florida Greenway
Putnam
2131
CR 216
SR 100
US 17
Multi-Use Path
Putnam
2132
Cross Florida Greenway Corridor
Existing Cross Florida Greenway Trail
Palatka
Florida Greenway
Putnam
2133
SR 100
Clay/Putnam County Line
Palatka
Florida Greenway
Putnam
2134
SR 20
Hawthorne
Palatka
Florida Greenway
Putnam
2135
US 17
Putnam/Volusia County Line
Palatka
Florida Greenway
Putnam
2136
US 17 Crescent City (parallel facilities)
Prospect Street
CR 308
Multi-Use Path
Putnam / St. John's
2137
SR 207
Palatka
St. Augustine
Florida Greenway
St. John's
2138
County Road 214 Corridor
SR 13 San Jose Boulevard
SR 207
Florida Greenway
St. John's
2149
CR 13 Spuds Palmo Trail Corridor
Spuds (SR 207)
SR 13 San Jose Boulevard
Florida Greenway
St. John's
2139
CR210
at SR A1A
St. John's
2140
Deep Creek to ECG Corridor
SR 207
SR A1A
Florida Greenway
St. John's/Duval County Line
Florida Greenway
Accommodate Pedestrians and Bicyclist
St. John's
2141
Downtown and Uptown St. Augustine
at US 1, Park Avenue, River, South Street, Riberia Street
St. John's
2142
East Coast Greenway - St. Johns County Corridor
St. John's/Flagler County Line
Accommodate Pedestrians and Bicyclist
St. John's
2143
Nocatee Corridor
San Jose Boulevard (SR 13)
SR A1A
Florida Greenway
St. John's
2147
Race Track Road
San Jose Boulevard (SR 13)
US 1 Philips Highway
Bi-directional 12 ft. Shared Use Path
11/4/2014
Page 16 of 61
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Pedestrian and Bicycle Projects
County
Map Id
Corridor
From
To
Improvement Type
St. John's
2148
Racetrack Corridor
San Jose Boulevard (SR 13)
Nocatee Corridor
Florida Greenway
St. John's
2150
SR 13 San Jose Boulevard
Roberts Road
Julington Creek
Bi-directional 12 ft. Shared Use Path
St. John's
2155
SR 13 William Bartram Trail Corridor
CR 13
St. John's/Duval County Line
Florida Greenway
St. John's
2151
SR 16
I-95
Collins Avenue
Bi-directional 12 ft. Shared Use Path Bicycle accommodations
St. John's
2152
SR A1A
at SR 312
St. John's
2153
St. Augustine Bike Plan
Areawide
Areawide
Accommodate Pedestrians and Bicyclist SR 207
St. John's
2145
US 1 Dixie Highway
Putnam/Flagler County Line
St. John's
2146
US 1 Dixie Highway
at SR 312
St. John's
2144
US 1 Dixie Highway / Ponce De Leon Boulevard
San Marco Avenue (US 1 B) (St. Augustine)
Racetrack Road
Bi-directional 12 ft. Shared Use Path
St. John's
2154
US 1 St. Augustine to Nocatee Corridor
St. Augustine
Nocatee Corridor
Florida Greenway
11/4/2014
Bi-directional 12 ft. Shared Use Path Accommodate Pedestrians and Bicyclist
Page 17 of 61
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Freight Projects
County
Map Id
Agency
Location
Time Frame
Improvement Type
Clay
2200
CSX Transportation
at Wells Road
Mid-Term
Grade Separation
Clay
2201
CSX Transportation
at SR 224 Kingsley Avenue
Mid-Term
Grade Separation
Duval
2355
Amtrak
Downtown Facility
Unknown
Transportation Center
Duval
2202
CSX Transportation
at SR 104 Busch Drive
Long-Term
Grade Separation
Duval
2204
CSX Transportation
Beaver Street Interlocking
Mid-Term
Capacity Upgrade
Duval
2205
CSX Transportation
North Rail Corridors Phase 1
Unknown
Multi Modal Corridor
Duval
2206
CSX Transportation
Westlake Cecil Commerce Connector
Duval
2242
CSX Transportation
at US 301 (SR 200) / Baldwin
Mid-Term
Grade Separation
Duval
2258
CSX Transportation
North Rail Corridors Phase 2
Unknown
Multi Modal Corridor
Duval
2207
Florida East Coast Railway
at Bowden Intermodal
Mid-Term
Capacity Upgrade
Duval
2208
Florida East Coast Railway
at Jacksonville Bridge
Short-Term
Bridge
Duval
2259
Florida East Coast Railway
at Sunbeam Road
Unknown
Grade Separation
Duval
2260
Florida East Coast Railway
at Shad Road
Unknown
Grade Separation
Duval
2209
Jacksonville International Airport
Construction of Runway 7R/25L
Mid-Term
Construct Runway
Duval
2210
Jacksonville International Airport
Air Cargo Ramp Improvements
Short-Term
Expand Apron
Duval
2211
Jacksonville International Airport
Air Cargo Surface Storage
Short-Term
Expand Apron
Duval
2212
Jacksonville International Airport
Design & Construct By-Pass Taxiways
Short-Term
Construct Taxiway
Duval
2213
Jacksonville International Airport
Intermodal Terminal Facility Development
Short-Term
Terminal Development
Duval
1006
Jacksonville Port Authority
Spoil Island Connector Bridge
Unknown
New 2 Lane Bridge
Duval
2215
Jacksonville Port Authority
Blount Island / Dames Point Marine Terminals Rail
Long-Term
Internal Rail
Duval
2216
Jacksonville Port Authority
Blount Island Marine Terminal Berth Upgrades
Long-Term
Docks
Duval
2217
Jacksonville Port Authority
Blount Island Marine Terminal Facility Upgrades
Long-Term
Intermodal Transfer Improvement
Duval
2218
Jacksonville Port Authority
Dames Point Marine Terminal Berth Upgrades
Long-Term
Docks
Duval
2219
Jacksonville Port Authority
Dames Point Marine Terminal Facility Upgrades
Long-Term
Intermodal Transfer Improvement
Duval
2220
Jacksonville Port Authority
New Cranes for Talleyrand and Blount Island Marine Terminals
Long-Term
Intermodal Transfer Improvement
Duval
2221
Jacksonville Port Authority
Talleyrand Marine Terminal Berth Upgrades
Long-Term
Docks
Duval
2222
Jacksonville Port Authority
Talleyrand Marine Terminal Facility Upgrades
Long-Term
Intermodal Transfer Improvement
Duval
2223
Jacksonville Port Authority
Talleyrand Marine Terminal Rail
Long-Term
Internal Rail
Duval
2224
Jacksonville Port Authority
Blount Island Marine Terminal Facility Upgrades
Mid-Term
Intermodal Transfer Improvement
Duval
2225
Jacksonville Port Authority
Dames Point Marine Terminal Facility Upgrades
Mid-Term
Intermodal Transfer Improvement
Duval
2226
Jacksonville Port Authority
New Cranes for Talleyrand and Blount Island Marine Terminals
Mid-Term
Intermodal Transfer Improvement
Duval
2227
Jacksonville Port Authority
Talleyrand Marine Terminal Facility Upgrades
Mid-Term
Intermodal Transfer Improvement
Duval
2228
Jacksonville Port Authority
Blount Island / Dames Point Terminals - Rail and Bridge
Short-Term
Internal Rail
Duval
2229
Jacksonville Port Authority
Blount Island Marine Terminal Berth Upgrades
Short-Term
Docks
Duval
2230
Jacksonville Port Authority
Blount Island Marine Terminal Facility Upgrades
Short-Term
Intermodal Transfer Improvement
Duval
2231
Jacksonville Port Authority
Dames Point Marine Terminal Berth Upgrades
Short-Term
Docks
Duval
2232
Jacksonville Port Authority
Dames Point Marine Terminal Facility Upgrades
Short-Term
Intermodal Transfer Improvement
Duval
2233
Jacksonville Port Authority
Harbor Deepening
Short-Term
Dredging Harbor
Duval
2234
Jacksonville Port Authority
New Cranes for Talleyrand and Blount Island Marine Terminals
Short-Term
Intermodal Transfer Improvement
11/4/2014
Multi Modal Corridor
Page 18 of 61
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Freight Projects
County
Map Id
Agency
Location
Time Frame
Improvement Type
Duval
2235
Jacksonville Port Authority
Talleyrand Marine Terminal Berth Upgrades
Short-Term
Docks
Duval
2236
Jacksonville Port Authority
Talleyrand Marine Terminal Facility Upgrades
Short-Term
Intermodal Transfer Improvement
Duval
2237
Jacksonville Port Authority
Talleyrand Marine Terminal Rail
Short-Term
Internal Rail
Duval
2214
Norfolk Southern
at Norfolk Southern Railway (Near Simpson Yard)
Short-Term
Grade Separation
Duval
2257
Norfolk Southern
Soutel Drive to Norfolk Southern Intermodal Yard
Duval/Baker
2238
CSX Transportation
MacClenny to Jacksonville
Mid-Term
Upgrade to Accommodate Freight and Passenger Service*
Duval/Clay
2239
CSX Transportation
Green Cove Springs to Jacksonville
Mid-Term
Upgrade to Accommodate Freight and Passenger Service
Duval/Nassau
2240
CSX Transportation
Jacksonville to Yulee
Mid-Term
Upgrade to Accommodate Freight and Passenger Service
Duval/St. John's
2241
Florida East Coast Railway
St. Augustine to Jacksonville
Mid-Term
Upgrade to Accommodate Freight and Passenger Service
Nassau
2203
CSX Transportation
at SR A1A (SR 200) / Yulee
Mid-Term
Grade Separation
Nassau
2243
CSX Transportation
at US 301 / Crawford Diamond
Mid-Term
Grade Separation
Nassau
2244
Port of Fernandina
Berth Improvements
Short-Term
Docks
Nassau
2245
Port of Fernandina
Cruise / Cargo Berth
Short-Term
Docks
Nassau
2246
Port of Fernandina
Rail Track Improvements
Short-Term
Internal Rail
Nassau
2247
Port of Fernandina
at Fernandina Port
Unknown
Access Improvements
Putnam
2248
City of Palatka
SR 100 CR 309D
Long-Term
Runway expansion
Putnam
2249
County
Barge Port
Mid-Term
Operational and Capital Improvements
Putnam
2250
CSX Transportation
at SR 15 Reid Street
Mid-Term
Grade Separation
St. John's
2251
City of Saint Augustine
Historic Commercial Areas
Statewide
2252
Florida East Coast Railway
Amtrak Service Miami to Jacksonville
Short-Term
New Passenger Service
Statewide
2253
Florida East Coast Railway
Miami to Jacksonville Upgrade Bolt and Clip System
Short-Term
Track Upgrade
Statewide
2254
Intercity Passenger Rail
New Orleans to Jacksonville
Long-Term
New Passenger Service
Statewide
2255
Intercity Passenger Rail
Jacksonville to Savannah
Mid-Term
New Passenger Service
Statewide
2256
Intercity Passenger Rail
Orlando to Jacksonville
Mid-Term
New Passenger Service
11/4/2014
New Connector
Mobility & Distribution Improvements
Page 19 of 61
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Transit Projects
County
Map ID
Facility *
From
To
Improvement Type/ Mode
Baker
2301
West Extension (CSX)
MacClenny (Baker County)
Baldwin (Duval County)
Commuter Rail
Baker
2302
US 90
MacClenny (Baker County)
Downtown Jacksonville (Duval County)
Local Bus Service
Baker
2303
Area wide ****
Duval
2304
Center Street
North of Drew Street (Baldwin)
Park and Ride Lots
Duval
2305
Drew Street
at Center Street (Baldwin)
Park and Ride Lots
Baker
2306
South of Glen St. Mary
Duval
2307
Yellow Water Road
North of I-10
Clay
2308
SR 21 Blanding Boulevard
CR 218
Clay
2310
Area wide ****
Clay
2311
SR 21 Blanding Boulevard
at Tanglewood
Park and Ride Lots
Clay
2312
SR 21 Blanding Boulevard
at Old Jennings Road
Park and Ride Lots
Clay
2313
SR 21 Blanding Boulevard
at Edson Drive
Park and Ride Lots
Clay
2314
SR 21 Blanding Boulevard
at Wells Road
Park and Ride Lots
Clay
2315
SR 21 Blanding Boulevard
at SR 224 Kingsley Avenue
Park and Ride Lots
Clay
2316
CR 220 Doctors Inlet Road
at Hollow Road
Park and Ride Lots
Clay
2317
Youngerman Circle
at Argyle Forest Boulevard
Park and Ride Lots
Clay
2318
SR 21 Blanding Boulevard
North and South of Bolton Road
Clay
2319
Southwest Extension (CSX)
Palatka (Putnam County)
Clay
2320
US 17 Roosevelt Boulevard
at Wells Road
Duval
2321
SR 134 103rd Street
SR 228 Normandy Boulevard
SR 21 Blanding Boulevard
BRT
Duval
2322
SR 228 Normandy Boulevard
SR 134 103rd Street
Downtown Jacksonville (Duval County)
BRT
Duval
2323
US 1/SR 15 New Kings Road
Downtown Jacksonville (Duval County)
Edgewood Avenue
BRT
Duval
2324
US 1
Lewis Speedway (St. John's County)
Avenues Mall (Duval County)
BRT
Duval
2325
SR 115 Southside Boulevard
Avenues Mall
Regency Square Mall
BRT
Duval
2326
I-95
Gateway Mall
Jacksonville International Airport
BRT
Duval
2327
Southeast (FEC)
St. Augustine (St. John's County)
Downtown Jacksonville (Duval County)
Commuter Rail
Duval
2328
West (CSX)
Baldwin (Duval County)
Downtown Jacksonville (Duval County)
Commuter Rail
Duval
2329
SR A1A St Johns River Ferry
Duval
2330
I-95
Downtown Jacksonville (Duval County)
Yulee (Nassau County)
Duval
2331
SR A1A St Johns River Ferry
Duval
2332
Area wide ****
Duval
2333
SR A1A St Johns River Ferry
Ft. George/Mayport
Long Term Site Improvements
Duval
2334
SR 134 103rd Street
at SR 228 Normandy Boulevard
Park and Ride Lots
Duval
2335
SR 21 Blanding Boulevard
at Weconnett Boulevard
Park and Ride Lots
Duval
2336
Duval Road
at I-95
Park and Ride Lots
Duval
2337
SR 115 Lem Turner Road
at SR 104 Dunn Avenue
Park and Ride Lots
Duval
2338
Mayport Road
at SR A1A
Park and Ride Lots
Duval
2339
US 90 Beach Boulevard
West and East of Kernan Boulevard
Park and Ride Lots
Duval
2340
SR 21 Blanding Boulevard
North and South of Wilson Boulevard
Park and Ride Lots
Duval
2341
SR 21 Blanding Boulevard
North and South of SR 134 103rd Street
Park and Ride Lots
Duval
2342
US 17 Roosevelt Boulevard
at SR 128 San Juan Avenue
Park and Ride Lots
Duval
2343
SR A1A
North and South of SR 202 J. T. Butler Boulevard
Park and Ride Lots
11/4/2014
Local Bus Service
Park and Ride Lots Park and Ride Lots Wells Road
BRT Local Bus Service
Park and Ride Lots Green Cove Springs (Clay County)
Commuter Rail Park and Ride Lots
Drydock / Ferry Repairs Express Bus Service Ferry Slip Replacement Local Bus Service
Page 20 of 61
2041-11-03 Needs Updated List Table.xlsx
2040 Final Needs Plan Transit Projects
County
Map ID
Facility *
From
To
Improvement Type/ Mode
Duval
2344
SR A1A St Johns River Ferry
JPA Property
Mayport Terminal
Relocation of Ferry offices
Duval
2345
SR A1A St Johns River Ferry
Mayport
Ft. George Island
Service & Capital Improvements
Duval
2346
SR A1A St Johns River Ferry
Ft. George/Mayport
Duval
2347
Five Points/Core/Brooklyn
Central Station
Brooklyn Station
Skyway Extension **
Duval
2348
Southbank/San Marco
Kings Avenue Station
Southwest of Railroad Tracks (Southbank)
Skyway Extension **
Duval
2349
Downtown - Sports Complex
Downtown Jacksonville (Bay Street & Main Street)
Jacksonville Municipal Stadium
Streetcar **
Duval
2350
Five Points/Core/Brooklyn
Five Points
Downtown Jacksonville (Bay Street & Main Street)
Streetcar **
Duval
2351
La Villa/Core
Transportation Center
Duval Street & Monroe Street to Ocean
Streetcar **
Duval
2352
Riverside/Avondale
Riverside (King Street)
Five Points
Streetcar **
Duval
2353
Southbank/San Marco
Kings Avenue Station
Baptist Hospital / MOSH & Atlantic Boulevard
Streetcar **
Duval
2354
Springfield
FSCJ Station
8th Street/ Medical Complex
Streetcar **
Duval
2355
Downtown Facility
Duval
2356
North (CSX)
Downtown Jacksonville (Duval County)
Yulee (Nassau County)
Commuter Rail
Duval
2357
Northwest (CSX)
Downtown Jacksonville (Duval County)
Callahan (Nassau County)
Commuter Rail
Duval
2358
Southwest (CSX)
Green Cove Springs (Clay County)
Downtown Jacksonville (Duval County)
Commuter Rail
Duval
2359
US 90 Beach Boulevard
at San Pablo Road
Park and Ride Lots
Duval
2360
SR 21 Blanding Boulevard
at 105th Street
Park and Ride Lots
Duval
2361
SR 115 Lem Turner Road
at Soutel
Park and Ride Lots
Duval
2362
SR 115 Lem Turner Road
at I-295
Park and Ride Lots
Duval
2363
US 1/SR 15 New Kings Road
Timucuan DRI
Park and Ride Lots
Duval
2364
SR 21 Blanding Boulevard
North of I-295
Park and Ride Lots
Nassau
2366
North Extension (CSX)
Yulee
Fernandina Beach
Commuter Rail
Site Improvements
Transportation Center
Nassau
2368
I-95
Downtown Jacksonville (Duval County)
Yulee (Nassau County)
Express Bus Service
Nassau
2369
Cumberland Island Ferry
Fernandina
Cumberland Island
Ferry Service
Nassau
2370
Area wide ****
Nassau
2371
SR 200 SR A1A
at I-95
Park and Ride Lots
Nassau
2372
SR 200 SR A1A
east of Yulee
Park and Ride Lots
Putnam
2374
Area wide ****
St. John's
2377
Southeast Extension (FEC)
St. John's
2378
Area wide ****
St. John's
2379
SR A1A
St. John's
2380
Anastasia Island (Amphitheatre)
St. John's
2381
CR 210
east of US 1
Park and Ride Lots
St. John's
2382
Racetrack Road
at US 1
Park and Ride Lots
St. John's
2383
St. Augustine Airport
St. John's
2384
US 1
at Lewis Speedway Road
Duval
2385
East First Coast Flyer
Downtown Jacksonville (Duval County)
St. John's
2385
SR 16***
Duval
2386
Southwest First Coast Flyer
St. John's
2386
SR 207***
11/4/2014
Local Bus Service
Local Bus Service Palm Coast (Flagler County)
City of St. Augustine
Commuter Rail Local Bus Service
at Palm Valley Road
Park and Ride Lots Park and Ride Lots
Park and Ride Lots Park and Ride Lots 3rd Street (Jacksonville Beach)
BRT Park and Ride Lots
Wells Road
Downtown Jacksonville (Duval County)
BRT Park and Ride Lots
Page 21 of 61
2041-11-03 Needs Updated List Table.xlsx
" )
Ò " ) Ê
78
27
500
225
326
Date: 11/4/2014
721
225A
25A
25
200A
200
326 326
326
956 2
82 9
31
826 11 3
413 414
133
84 9
902
909
1023 1023
11 9
410
934 431 98
101
104
411 411
944
971 91 2
114
441
850
310
¬ «
818
9 42
138
204
8 42
19
¬ «
" ) 309
430
" ) 308
502 425
200
« " ) £ ¤¬ £ ¤ ¬ «" " ) ) " ) ¬ « ¬ « ) " ) " ¬ «" ) ¬ « 316
335
95 4
1017
701
88 123
425
91
424
05 4301
404
453
¬ «
Ò " ) Ê
A1A
425
453
318
206
20
403
" ) £ ¤
138
Ò " Ê " ) )
91
329
§ ¨ ¦
¬ «
" )
5
¬ «
95
965
® q
88
424
" )
¬ «
400
315
720
115
130
" )
1008
400
100
¬ «
200A
500
809
420
50 5
1007
420
£ ¤
n A¬ ¤ 1A í« ì ë é è í ì ë é è
2 45
335
75
110
214
" )
17
3 50
" ) " )
§ ¨ ¦
1
£ ¤
832
26
21
1 13
451
" )
83 6
305
¬ «
" )
13
" )
423
320
13A
839
Ò " ) Ê q ¤® n
207
Six Counties Boundaries
" )
907
823
16
214
422
128
17
£ ¤
2 13
Conservation Lands
1 15
Water Bodies
81 2
814
Roadway System
840
208
209
315
846
95
¬ « " ) " " ) ) " )
" )
" ) 45 0
16
¬ «
820
906
Future Corridor TBD
841
¬ «
845
844
816
315
Northern Outer Beltway Corridor
Ò " ) Ê 46
" )
First Coast Expressway
847
5 80
802
803
106
819
Ò" " ) Ò Ò " ) Ê Ê Ê) Ò " Ê Ò " ) Ê ) § ¨ ¦ Ò " ) Ê ) Ò " Ê
842
418
Operational Improvements
827
811
16
Ò " ) Ê Ò " ) Ê
32
A1A
93
25 41 26
1013
¬ «
220
904
¬ «
Express Lanes
" )
Ò " ) Ê
24
80 0
1
34
1012 905
202
£ ¤ 13
1
1036
New 6 Lane Road
119
716
10 2
90
73
New 4 Lane Road
Ò " ) Ê
810
21
¬ «
1022
848
1027
33
Ò " ) Ê
715
18
New 3 Lane Road
962
49
834
" ) 218
57
903
New 2 Lane Road
1011
§ ¨ ¦ 295
152
£ ¤ ¬ «
121
721
4 43
Context Sensitive Solutions
57
964 16
911
1026
960
960
14
Widen to 6 Lanes
960
103
913 23
16
957
715
10
714
Ò " ) Ê è í ì ë Ò " ) Ê é í ì ë é è Ò " ) Ê 416
í) ì ë é è Ò " Ê
116
968
153
95
23
957
0 97
Widen to 5 Lanes
¬ «
86
957
¬ « ¬ « è í ì ë é
Ò " ) Ê è ¬é í ì ë é íè ì ë é èè í ì ë í « ì ë é 3 43
301
£ ¤
415
è í ì ë é í ì ë é è
431
" )
228
134
¬ « ¬ «
105
100
79
432
Ò " ) Ê
87
Ò " ) Ê
9
" )
7
432
935
¬ «
§ ¨ ¦
419
96
10
228
Widen to 4 Lanes 130
" )
§ ¨ ¦
6
A1A
295
3 43
404
90
£ ¤
406
85
410
405
406
710
¬ «
959
407
951
221
Ò " ) Ê Ò " ) Ê
295
119
¬ «
705
A1A
§ ¨ ¦
" ) 401
A1A
704
1005 92
408
145 940
" )
250A
74
301
£ ¤
124
453 Widen to 3 Lanes 453
® q
83
Reconstruct 2 Lanes
939
2
500
¬ «
706
127
Ò " ) Ê
17
£ ¤
¬ « ¬ «
3 70
A1A
1006
" ) ® Airport q ¤ Amtrak Station n Rail Station ¤ Passenger" n 122 ) í Intersection Projects ì ë é è Projects Ò " 250 ) Ê Interchanges " ) 125 " ) Lanes
í ì ë é è
707
105
107
501
994
" ) " )
708
" )
981
981
í ì ë é è
108
2
427
984
95
88
«
36
í ì ë é Ò Ò " " § ¨ ¦èéëìí ) ÊÊè
1
£ ¤
Legend ¬
969
97
115
9 70
108
" )
23
2040 Final Needs Plan Roadway Projects Page 22 of 61
¯
0
10,560 Feet
0
4
8 Miles
" ) 108
" ) 115
" )
§ ¦ ¨ 95
1
£ ¤
604
2
" ) 127
A1A
A1A
¬ «
320
17
£ ¤
" ) " ) 108
¬ «
105
¬ « ¬ «
107
2
A1A
¬ «
301
£ ¤ 305
314
295
23
200
315
317 230 215
607
1
£ ¤
2 20
16
¬ «
220
2 30
9 30
§ ¦ ¨ 95
30 2
20 3
217
309
16
¬ «
212
Water Bodies
" ) 315
211
16
208
" )
13A
305
17
£ ¤
26
¬ « 660
214
206
A1A
¬ «
¬ «
100
315
325
5
¬ «
¬ «
" ) 326
§ ¦ ¨ 95
330
" )
¬ «
321
207
" )
A1A
210
¬ «
214
323
303
214
Downtown Jacksonville
307
312
321
13
17
£ ¤
315
1
£ ¤
¬ « " ) " " ) ) " )
209
" )
216
328
Conservation Lands
Six Counties Boundaries
¬ «
330
Roadway System
¬ «
" )
A1A
308
13
241
TSM&O
202
30 2
21
¬ «
Safety Priority Corridors
90
£ ¤ ¬ «
295
327
Safety Priority Intersections
608
201
204
" ) 218
650
§ ¦ ¨
6 60
5 60
712
662
234
209
Legend
229
602
652
652
223
662
316
¬ «
301
£ ¤
603
225
10
¬ «
301
30 0
116
329
130
228
134
¬ « ¬ «
310
301
655
¬ « ¬ «
31 6
" )
313
" ) 250A
207
8 31
220
651
242
" ) 228
§ ¦ ¨ 10
208
611
660
610
90
£ ¤
205
124
240
¬ «
" )
654
663
323
609
213
236
221
105
See inset
307
659
" ) 125
233
250
235
" )
224
325
119
¬ «
§ ¦ ¨
§ ¦ ¨
" )
A1A
295
306
122
326
" )
" ) 204
20
¬ «
322 301
" ) 661
0 31
21
" ) 310
651
320
" ) " ) 335
" )
200A
§ ¦ ¨ 75
" ) £ ¤ 318 304
" ) 329
301
316
27
500
225
326
Date: 10/9/2014
225A
441
25A
309
" ) 308
200
« £ ¤¬ £ ¤ ¬ «" " ) " ) ) ¬ « ¬ « ) " ) " ¬ «" ) ¬ «
" )
335
19
¬ «
30 0
" )
659
" )
25
200A
200
326 326
326
2040 Final Needs Plan Safety and TSM&O Projects Page 23 of 61
¯
0
10,560 Feet
0
4
8 Miles
½ ¾ ½ ¾ ½ ¾ ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ¾ ¾ ½ ½ ½ ¾ 19 21
108
115
2120
17
8 21 2
2
A1A
¬ «
2063
2034
20 6
9
2103
2091
2058
2084
½ ¾
½ ¾
½ ¾
21 4
9
½ ¾ ¾ ½
21 3
7
½ ¾ ½ ¾
½ ¾
½ ¾
½ ¾
½ ¾
½ ¾
½ ¾
½ ¾
½ ¾
½ ¾ ½ ¾
1
½ ¾ ½ ¾ ½ ¾
½ ¾ ½ ¾
½ ¾ ¾ ½ ½ ¾ ½ ¾
2136
½ ¾
2026
½ ¾
2029
21 3
½ ¾
½ ¾ ¾ 21 ½2071 ¾ ½ 04 ¾ ½
2103
½ ¾
200A 202 1
½ ¾
326
½ ¾
½ ¾
½ ¾
½ ¾
Page 24 of 61
½ ¾ ½ ¾ ¾ ½ ¾ ½
¨¨ © ©¨ © ©¨ ¨ ©¨ © ©¨ ¨ ©¨ © ©¨ ¨ ©¨ © ©¨ ¨ ©¨ © ©¨ ¨ ©¨ © ©¨ ¨ ©¨ ©
½ ¾
2051
½ ¾
½ ¾
½ ½ ¾ ¾ 8 201
2040 Final Needs Plan Bicycle Corridors Priorities ½ ¾
Date: 10/14/2014
½ ¾
½ ¾
2034
½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ 308
2146
½ ¾
326 326
" )
½ ½ ¾ ½ ¾ ¾
½ ¾ ½ ½ ¾ ¾
2070
½ ¾
½ ¾ ½ ¾ ¾ ½
½ ¾
½ ¾
½ ¾
207 9
2082
½ ¾ 2002
½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾ ½
5 201
200
2141
2145
25A
309
½ ¾
200
25
St. Augustine
½ ¾
½ ¾
½ ¾
¬ «
" )
½ ¾
7
225A
½ ¾
½ ¾ ¾ ½
19
½ ¾
7 20
326
2016
441
204
213 5
¾½
6
225
500
2017
207
27
310
2
¬ «
½ ¾
316
" )
2137
301
« £ ¤¬ £ ¤ ¬ «" " ) ) " ) ¬ « ¬ « ) " ) " ¬ «" ) ¬ «
" )
335
206
¬ «
A1A
2140
½ ¾
½ ¾
318
329
3 208
¾½
" ) £ ¤
" )
2036
3 21
" )
" )
75
305
2154
2080
213 4
200A
§ ¨ ¦
§ ¨ ¦
2153
½ 335 ¾
½ ¾ ¾ ½
½ ¾
2105
" )¾½
21
5
¬ «
95
4
2052
" ) ½ " ¾ )
20
¬ «
" )
2146See Inset 2152
¬ «
" )
¬ «
½ ½ ¾ 2142 ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾
315
Downtown Jacksonville
17
100
2138
214
A1A
2141
207
£ ¤ ¬ «
" )
2059
2043 020
13A
13
2151
4 21
8
204 5
2046
17
½ ¾¾ ½
6 20
½ ¾
" ) 209
16
¬ « " ) " " ) ) " )
2145
¬ «
3
£ ¤
½ ¾
½ ¾ ¾ ½ ½ ½ ¾ ½ ¾ ¾ ½ ¾ ¾ ½ ¾ ½
21 3
26
Six Counties Boundaries
2055
1
208
£ ¤
" )
Conservation Lands
207 3
16
214
Water Bodies
½ ¾
§ ¨ ¦
½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾
" ) 315
3
2142
¾½
¾½
Priority 1 Pedestrian Focus Areas
4 21
5
¬ «
" )
½ ¾ ½ Florida Greenways and Trails ¾
8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : Pedestrian Focus Area 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : © ¨ © © ¨ 8 9 m8 : 9 m¨ : 8 9 m8 : 9 m : 8 9 m8 : 9 mBicycle Corridors : ©¨ ¨ ©¨ © ©¨ ¨ ©¨ © Roadway System
2010
315
Clay Multi-Use Path Needs
¬ «
95
9 200
Saint Augustine Bicycle Plan
A1A
2148
4
16
¬ «
½ ¾ ½ Hogan's Creek Greenway ¾
£ ¤
2147
¬ « 5 21
2139
1
13
2007
21
Jacksonville Pavement and Signage Needs
Land Trail Opportunities
220
¬ «
Jacksonville Bike Lane Needs
Jacksonville Multi-Use Path Needs
206 5
4 21
Nassau County Bicycle Needs
" )
2003
2005
" ) 218
202
4 215
Ferry Service
0
2056
2022
2020
2087
½ ¾
2001
Existing Florida Greenways and Trails
2008
90
£ ¤ ¬ «
6
2006
295
21 0
2037
7 20
Legend
§ ¨ ¦
¾½
0
23
2021
2093
0 20
¬ «
301
£ ¤
3
130
7
" )
¬ « ¬ «
228
8 20
" )
134
7 20
228
250A
See Inset
2081
10
2104
" )
§ ¨ ¦
½ ¾ ¾ ½ ½ ¾ ¾ ¾ ½ ½ 20 ¾ ½ 74 ¾ ½ ¾ ½ ¾ ½ ¾ ½ 2042 2030
½ ¾
½ ¾
2122
90
£ ¤
2015
10
¬ «
½ ¾
124
2036
½ ½ ¾ ¾
" )
2080
2331
116
2040
2051
¬ «
2031
2106
221
2055
½ ¾
125
105
¬ « ¬ «
½ ¾
" )
295
½ ¾
250
§ ¨ ¦
½ ¾ ¾ ½
119
¬ «
§ ¨ ¦
2049
½ ¾
" )
A1A
295
1
2064
122
20 4
" ) " )
2097
301
£ ¤
½ ¾
127
A1A
2108
£ ¤
" ) " )
" )
¬ «
2127
¬ « ¬ «
8 211
2
2107
A1A
2129
2130
108
¬ «
107
0 .1
95
105
" )
17 21
2 21
§ ¨ ¦
1
£ ¤
½ ½ ¾ ½ ¾ ¾
½ ¾
" )
" )
2369
¯
0
10,560 Feet
0
4
8 Miles
½ ¾
" ) 108
115
§ ¨ ¦ 95
1
£ ¤
" ) " ) X Ã
127
2
2213 2212 2209 2211
301
122
2214
" ) 125
221
¬ «
" ) 124
2254
250A
90
£ ¤
" )
§ ¨ ¦ 10
X Ã
2242
2206
228
" ) 130
228
¬ «
301
£ ¤
Legend
2254
2238
Westlake Cecil Commerce Connector
X Ã
2202
2204
A1A
l ¥ ¢
105
2208
10
X Ã
202
X ÃX Ã
§ ¨ ¦ 295
2260
1
£ ¤
A1A
¬ «
13
4 22
¬ «
1
220
21
90
£ ¤ ¬ «
2207
2259
" )
§ ¨ ¦ 95
3 22 9
5 22
¬ «
¬ « ¬ «
¬ «
See inset
2200
¬ «
2227
116
X Ã
23
" )
§ ¨ ¦ 295
2216 2225 2222 2234 2226 2220 2217 2229 2236 2237 2221 2232 2230 2231 2224 2219 2235 2215 2223 2228 2233 2218
134
218
2
FEC Rail Projects
CSX Rail Projects
16
¬ «
Norfolk Rail Projects
16
® nq ¤
¬ «
1
4 225
Putnam Barge Port Projects
" ) 315
Port of Fernandina Projects JaxPort Projects
Commuter Rail Corridors
16
208
" )
13
17
£ ¤
315
13A
207
¬ «
" )
Intercity Passenger Rail Corridor
" )
17
£ ¤
¬ «
Transportation Intermodal Center
100
¬ «
" ) 315
Railroad System
20
¬ «
Roadway System
§ ¨ ¦ 95
305
26
2248
2249
l ¤ ¥
® q ¢ X n Ã
A1A
¬ «
206
¬ «
2250
5
¬ «
A1A
¬ «
6 225
CSX Rail Corridors
¤ n
214
214
FEC Rail Corridors
£ ¤
¬ « " ) " " ) ) " )
209
" )
Aviation Projects
¢ n
¬ «
0 224
2201
Passenger Rail Station
l ¤ ¥ l ¥ ¤ l ¥ ¢
2257
¬ « ¬ «
Airport
X Ã X Ã X Ã
295
X Ã X Ã
Amtrak Station
A1A
2210
X Ã
X ¨ ç ¦ X Ã
119
® q ¤ n ¤ n
®n q ¢
2258
" )
" )
2205
North Rail Corridor
" ) 250
¬ «
¬ «
2243
£ ¤
" )
A1A
A1A
2240
" )
105
17
2240
2
2244
£ ¤
108
¬ «
2244
107
2203
X Ã
2247 2245
l¬ ¥ ¤ « " ) 2246
2255
" )
" ) 204
Water Bodies
Conservation Lands
" ) 21
Six Counties Boundaries
" ) 2254
2255
" ) " )
5 22
2355
4
" )
200A
§ ¨ ¦ 75
19
¬ «
" ) £ ¤ 318
32208 29
" )
" ) 309
" ) 308
301
200
« £ ¤¬ £ ¤ ¬ «" " ) ) " ) ¬ « ) ¬ « " ) " ¬ «" ) ¬ «
" ) 316
335
225A
25A
1
500
4 22
225
2
27
441
5 22
2239
310
Downtown Jacksonville
320
38 2254 22335
" )
5 22
200A
200
326 326 6
326
25
326
2040 Final Needs Plan Freight Projects Date: 10/6/2014
Page 25 of 61
¯
0
0
10,560 Feet
4.5
9 Miles
" ) 108
" ) 115
95
2
" ) 127
2
õ ô ó ö
122
§ ¨ ¦ 295
" ) 119
A1A
¬ «
® q
" ) 250
¬ «
17
301
" )
ó õ ô ö õ ô ó ö ó õ ô ö õ ô ó ö
A1A
¬ «
§ ¨ ¦ 295
105
¬ « ¬ «
" )
116
125
221
¬ «
" ) 124
õ ô ó ö
10
90
£ ¤
" )
¬ «
õ ô ó öó ó õ ô ö õ ô ö
§ ¨ ¦ 10
" )
" ) 130
õ ô ö ¬ «ó 228
301
£ ¤
134
¬ « ¬ « 23
õ ô ö óó õ ô ö õ ô ó ö õ ô ó ö õ ô ó ö õ ô ó ö õ ô ó ö 295 õ ô ó öó õ ô ¨ ö§ ¦ õ ô ó ö õ ô ó ö õ ô ó ö õ ô ó ö
ó õ ö õ ô ó öô 220 ) õ ô ó ö"
" ) 218
Legend
ó õ ô ö 90 ó õ ô ó ö£ õ ô ö ¤
See Inset
228
250A
A1A
A1A
£ ¤
" ) " ) £ ¤
ó õ ô ö ® q ¤ n ¤ n
õ ô ó ö
108
¬ «
105
¬ « ¬ «
107
§ ¨ ¦ õ ô ó ö
1
£ ¤
" )
¬ «
¬ «
õ ô ö ó õ ô ö ó
§ ¨ ¦ 95
16
¬ «
16
® ó õ ô ö ¤q n 1 £ ¤ õ ô ó ö õ ô ó ö 16 ¬ « ¤ n ó õ ô ö
¬ «
Airport
Amtrak Station
" ) 315
Passenger Rail Station Express Bus Service
" ) " " ) ) " ) 208
" ) 209
13
17
£ ¤
" ) 315
Ferry Service
A1A
13
21
Local Bus Service
õ ô ó ö
1
£ ¤
¬ «
Park and Ride Parking Lot
13A
207
" ) 305
17
£ ¤
« Transportation Intermodal Center ¬ 26
Roadway System
® q 20
õ ô ó ö Boundaries Six Counties Downtown Jacksonville
320
" ) " ) 335
318
329
500
326
Date: 10/9/2014
225A
441
25A
" ) 204
" ) 309
St. Augustine
¤ n
õ ô ó ö
" ) 308
301
õ ô ó ö
200
« £ ¤¬ £ ¤ ¬ «" " ) ) " ) ó õ ô ö ¬ « " ¬ « ) ó õ ô ö õ ô ó ö " ) õ ô ó ¬ ö «" ) ¬ «
" ) 316
225
19
¬ «
" ) £ ¤
" ) 27
310
" )
§ ¨ ¦
25
¬ «
206
ó õ ô ö õ ô ó ö
" )
200A
75
335
" )
A1A
¬ «
ó õ ô ö ¤ n
¬ « 21
5
¬ «
100
315
Conservation Lands
§ ¨ ¦ 95
¬ «
" )
Water Bodies
¬ «
See Inset
ó õ ô ö
¬ «
" )
A1A
õ ô ó ö
214
214
Community Shuttle Area
" )
ó õ ô ö õ ô ó ö
202
¬ «
200A
200
326 326
326
õ ô ó ö 2040 Final Needs Plan Transit Local and Express Bus Service Page 26 of 61
¯
0
10,560 Feet
0
4
8 Miles
2369
" ) 108
115
2255
" )
§ ¨ ¦ 95
1
£ ¤
17
£ ¤
" ) " )
" ) 127
2
A1A
® q 7 235
2356
301
£ ¤
2356
" ) 122
" ) 125
130
¬ «
301
£ ¤
2350
134
¬ « ¬ « 23
202
§ ¨ ¦ 295
4
0 23
Bus Rapid Transit
1
£ ¤
8
Skyway Extension
21
95
8
7
Streetcar Downtown
16
¬ «
16
® nq ¤
¬ «
1
9 231
Streetcar La Villa
Streetcar Riverside
" ) 315
Streetcar Springfield
Intercity Passenger Rail Corridor Ferry Service
13A
17
¬ « 315
® q
204
® q
20
¬ «
¤ n
7
55 22
23 5
8
320
2355
" )
318
308
25
200
7
326 326
200A 6 238
0
Date: 10/14/2014
225A
" )
200
2 23
326
25A
309
2377
500
225
441
2348
235 0
0
27
2353
¤ n
" )
301
« £ ¤¬ £ ¤ ¬ «" " ) ) " ) ¬ « " ) ¬ « " ) ¬ «" ) ¬ «
2352
19
¬ «
" ) £ ¤
7
238 6
2
2349
316
310
385 200A
75
" )
St. Augustine
" )
2385
§ ¨ ¦
" ) 329
2385
2 23
335
2386
21
2354 2351
" )
8
" )
7
23 5
6
2 23
5 23
335
" )
2356
323
2254
206
¬ «
A1A
100
Downtown Jacksonville 2
" ) " )
95
¬ «
" )
Six Counties Boundaries
5
« § ¨ ¦¬ ¬ «
305
£ ¤
¬ «
6 225
" )
A1A
See Inset
214
207
" )
Conservation Lands
¤ n
¬ «
26
Water Bodies
13
17
£ ¤
214
Transportation Intermodal Center Roadway System
208
" )
315
16
¬ « " ) ) " ) " " )
209
" )
£ ¤ 2377
Streetcar San Marco
5 23
2 23
Streetcar Five Points
§ ¨ ¦
5 23
¬ «
¬ «
13
220
218
A1A
¬ «
" )
" )
Existing Skyway Express
2328
2385
2 23
Legend
2358
" )
228
90
£ ¤ ¬ «
7
2321
228
250A
2385
2 23
" )
§ ¨ ¦
2 232
10
2386
2254
90
£ ¤
6
2301
2386
124
10
¬ «
See Inset
8 23
" )
2328
2301 2301
2348
221
¬ «
2331
116
232 3
2325
250
105
¬ « ¬ «
2325
" )
¬ «
§ ¨ ¦
295
119
A1A
295
§ ¨ ¦
" )
" )
¬ «
2326
2353 2354
2
A1A
A1A
¬ «
108
¬ «
" )
105
¬ « ¬ «
107
2366
326
2040 Final Needs Plan Transit BRT, Commuter Rail, Skyway, Streetcar Page 27 of 61
¯
0
10,560 Feet
0
4
8 Miles
Legend Intersection Projects
è í ì ë é Ò " ) Ê
Interchanges Projects
Lanes
Reconstruct 2 Lanes Widen to 3 Lanes Widen to 4 Lanes Widen to 5 Lanes Widen to 6 Lanes Context Sensitive Solutions New 2 Lane Road New 3 Lane Road New 4 Lane Road New 6 Lane Road Express Lanes Operational Improvements
" ) 108
Northern Outer Beltway Corridor
¬ « 2
Future Corridor TBD Roadway2 System
" ) 127
" )
Water Bodies Conservation Lands
88
Six Counties Boundaries
" ) 121
" ) 122
£ ¤ 301
88
" ) 125
" ) 119
" ) 127
" ) 119
" ) " ) 23D
" ) 250
23C
" ) £ ¤ ¤ £ 121
" )
" ) 124
£ ¤
250A
121
139B
90
" )
¬ «
§ ¦ ¨
" ) 123
453
10
§ ¦ ¨ 10
720
453
404
" ) 23A
" ) 125
" )
¬ « 228
405
405
" ) 228
" ) 229
90
217
301
86
425
" ) " ¬ « ) ) " £ ¤ " ) " ) 228
228
228
217
301
" ) 231
217
218
424
23
2040 Final Needs Plan Baker County Roadway Projects Date: 11/4/2014
Page 28 of 61
406 406
" )
£ ¤
130
721
301
403 403
402
91
" ) 229
123
500
¯
1026 0
0
10,560 Feet
1.5
3 Miles
Legend
Existing Florida Greenways and Trails Nassau County Bicycle Needs Florida Greenways and Trails
½ ¾ ¾ ½
Roadway System Water Bodies
Conservation Lands
Six Counties Boundaries
" )
10
¬ « 2
" ) 127
" ) 2
" ) 121
" ) 122
" )
½ ½ ¾ ¾
½ ¾ ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾
23D
" )
2122
23C
¬ « 121
229
½ ½ ¾ ½ ¾ 2106 121 ¾ ½ ½ ¾ ½ ¾ 301 ½ ¾ ¾
" )
" )
½¾ ¾ ½
139B
¬ « 228
" ) 23A
§ ¦ ¨ 10
" )
" )
228 ½ ½ ¾ ¾
½ ¾ ¾ ½
" ) 130
" ) 229
0 20
" ) 231
½ ¾
½ ¾
0
½ ¾
½ ¾
½ ¾
½ ¾
" ) " ¬ « ) ) " £ ¤ " ) " ) 228
228
228
217
301
217
218
¾½
¾½
¾½
½ ¾ ¾ ½ ¾ ½
½ ¾
301
½ ¾
125
½ ½ ¾ ½ ¾ ¾ ½ ¾
2040 Final Needs Plan Baker County Florida Greenways & Trails Bicycle Corridors Priorities Date: 10/14/2014
Page 29 of 61
½ ¾
" )
£ ¤
½ ¾
123
90
½ ¾
½ ¾
10
" )
£ ¤
§ ¦ ¨
½ ¾
124
" ) £ ¤ ¤ £
½ ¾
" )
250A
119
" ) " )
250
" )
" )
½ ¾
127
½ ¾
½ ¾ ¾ ½
125
½ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ¾
" )
¯
0
0
10,560 Feet
1.5
3 Miles
Legend
CSX Rail Projects
X Ã
Commuter Rail Corridors FEC Rail Corridors
CSX Rail Corridors
Intercity Passenger Rail Corridor Railroad System
Roadway System Water Bodies
Conservation Lands
Six Counties Boundaries
" )
108
¬ « 2
" ) 127
" ) 2
" ) 121
" ) 122
" ) 125
" ) 119
" ) 127
" ) " ) 23D
" ) 250
23C
" )
¬ « 121
229
" )
" )
139B
124
" ) 250A
2254
§ ¦ ¨ 10
" ) 23A
" ) 125
" )
2242
301
§ ¦ ¨ 10
228
123
90
2238
¬ «
" )
£ ¤
121
AMTK
2254
" ) Xã ¤ ¤ £
" )
2
£ ¤ 301
" ) 228
130
" ) 229
" ) " ¬ « ) ) " £ ¤ " ) " ) 228
228
228
217
301
" ) 231
217
218
2040 Final Needs Plan Baker County Freight Projects Date: 10/6/2014
Page 30 of 61
¯
0
0
10,560 Feet
1.5
3 Miles
Legend ö õ ô ó
Park and Ride Parking Lot Local Bus Service Railroad System
Roadway System Water Bodies
Conservation Lands
Six Counties Boundaries
" ) 108
¬ « 2
" ) 127
" ) 2
" ) 121
" ) 122
£ ¤ 301
" ) 125
" ) 119
" ) 127
" ) 119
" ) " ) 23D
" ) 250
23C
" )
¬ « 121
229
250A
121
" )
" )
139B
124
" ) 123
£ ¤ 90
" )
" ) £ ¤ ¤ £
§ ¦ ¨ 10
¬ « 228
" ) 23A
" )
§ ¦ ¨ 10
ö õ ô ó 125
90
301
217
301
" ) 228
" )
" )
£ ¤
130
" ¬ ) " « ) ) " £ ¤ " ) " ) 228
" ) 229
228
228
217
301
" ) 231
217
218
2040 Final Needs Plan Baker County Transit Local Bus Service Date: 10/9/2014
Page 31 of 61
¯
0
0
10,560 Feet
1.5
3 Miles
Legend
Commuter Rail Corridors
Intercity Passenger Rail Corridor Railroad System
Roadway System Water Bodies
Conservation Lands
Six Counties Boundaries
" ) 108
¬ « 2
" ) 127
" ) 2
" ) 121
" ) 122
£ ¤ 301
" ) 125
" ) 119
" ) 127
" ) 119
" ) " ) 23D
" ) 250
23C
" )
¬ « 121
229
" )
" )
250A
§ ¦ ¨ 10
228
" ) 23A
" )
90
301
10
¬ « 125
2301
§ ¦ ¨
2301
123
£ ¤ 2254
2301
" )
90
" )
121
139B
124
" ) £ ¤ ¤ £ 217
301
" ) 228
" )
" )
£ ¤
130
" ) " ¬ « ) ) " £ ¤ " ) " ) 228
" ) 229
228
228
217
301
" ) 231
217
218
2040 Final Needs Plan Baker County Transit Commuter Rail Date: 10/9/2014
Page 32 of 61
¯
0
0
10,560 Feet
1.5
3 Miles
2328
98
101
970
í ì ë é è
9
425
936
932
1015
86
957
16
431
Ò " ) ÊÊ Ò " )
431
910
301
217
23
" )
57
§ ¦ ¨ 295
57
49 1022
224
13
¬ «
14
91 2
¬ «
964
1179
913
£ ¤ " )
16
1022
" )
220A
Ò " ) Ê
1011
6
900
2 10
" ) " ) 1189 220
33
" ) 13B
34
23
" )
915
739
24
904
" ) 739B
25
" ) ¬ «
909
21
" ) 209
41
26
13
¬ « 32
15
¬ «
803
Ò " ) Ê
" ) 315
114
215
Ò " ) Ê
133
" )
15A
1013
16
¬ «
" ) 16A
106
Ò " ) Ê
16
¬ «
841
0 82
31
721
1027
" )
914
218
Ò " ) Ê
903
" )
1012
220
905
84 9
" )
901
911
902
424
209
908
17
£ ¤ 230
¬ «
" ) 226
46
" ) 315
906
" ) 209
907
" ) 315
Legend
" ) 21
Interchanges Projects
Lanes
45 0
¬ «
Intersection Projects
è í ì ë é Ò " ) Ê
352
Reconstruct 2 Lanes
" ) 214
" )
209 to 3 Lanes Widen Widen to 4 Lanes Widen to 5 Lanes
" ) 214
Widen to 6 Lanes
" ) 315
Context Sensitive Solutions New 2 Lane Road
451
21
¬ « ¬ «
" ) 309D
26
" ) 209
New 3 Lane Road New 4 Lane Road New 6 Lane Road Express Lanes
505
Operational Improvements First Coast Expressway 965
Future Corridor TBD Roadway System Water Bodies
Conservation Lands 422
Six Counties Boundaries
423
2040 Final Needs Plan Clay County Roadway Projects Date: 11/4/2014
Page 33 of 61
¯
0
0
10,560 Feet
1.5
3 Miles
220
205
238
603
230
242
237
317
240
5 31
602
225
234
200
236
229
600 218
226
233
239
311
313
207
206
23 5
318
232
607
215 221
301
" ) 1179
209
£ ¤ " ) 217
§ ¦ ¨ 295
224
¬ «
23
¬ «
" ) 209
6 60
220A
204
308
" ) " ) 1189
5 60
" ) 13B
220
327
201
608
309
" ) " ) 220
" ) 739
20 3 231
" ) ¬ «
" ) 16A
212
739B
" ) 209
13
¬ « 15
¬ «
21
" ) 315
241
2 20
" )
30 2
215
15A
30 2
" ) 218
" )
309
16
¬ «
16
¬ « 17
£ ¤ 230
¬ «
" ) 226
" ) 315
" ) 209
" ) 315
" ) 352
21
¬ «
" ) 214
" ) 214
" ) 209
Legend
Safety Priority Intersections
" ) 315
Safety Priority Corridors TSM&O
21
¬ « ¬ «
Roadway System
" )
" )
2Water 09 Bodies
309D
26
Conservation Lands Six Counties Boundaries
2040 Final Needs Plan Clay County Safety and TSM&O Projects Date: 10/9/2014
Page 34 of 61
¯
0
0
10,560 Feet
1.5
3 Miles
½ ¾
" ) 209
2002 ½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½
¾ ½
½ ¾
2083
2086
½ ¾ ½ ½¾ ¾
½ ¾
½ ¾ ½ ¾ ½ ¾
½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½
½ ¾ ¾ ½
½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾
¾½ ¾½ ¾½
209
½ ¾
½ ¾
Priority 1 Pedestrian Focus Areas
8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : Pedestrian Focus Area 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ©8 ¨ © ¨ © © 9 m8 : 9 m¨ : 8 9 m8 : 9 m¨ : 8 9 m : ©¨ ¨ ©¨ ©¨ ©Bicycle Corridors ©¨ ¨ ©¨ ©¨ ©Roadway System
" ) ½ ¾
" )
" )
209 Water Bodies
309D
½ ¾
2
½133 ¾
½ ¾
½ ¾
½ ¾
Conservation Lands
Six Counties Boundaries
½ ¾
¯
2040 Final Needs Plan Clay ¾½County ½ ¾ Florida Greenways & Trails ¾½ ¾ ½ 0 ½ ¾ Bicycle Corridors Priorities ½ ¾ ¾ ½ ¾ ½ Page 35 of 61
0
10,560 Feet
1.5
½ ¾
3 Miles
½ ½ ¾ ¾
½¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ½ ¾ ¾ ½ ¾ ¾ ½ ¾ ½ ¾ ½ ½ ¾
½ ¾
½ ¾ ¾ ½ ¾ ½ ¾ ½
½ ¾
315
½ ¾
½ ¾
" )
Land Trail Opportunities
½ ¾ ½ ¾ ½ ¾
½ ¾
½ ¾ ½ ¾
Putnam Multi-Use Path Needs 209 Florida Greenways and Trails
½ ¾ ½ ¾ ¾ ½ ¾ ½ ½ ¾
" ) 214
½ ¾ ½ ¾ ½ ½ ¾ ¾ ½ ¾ ½ ¾
½ ¾
½ ¾
¾½ ½ ½ ½ ¾ ¾ ¾ ½ ¾ ½ ½ ¾ ¾ ½ ¾ ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾
½ ¾
Clay Multi-Use Path Needs
½ ¾
Date: 10/14/2014
½ ¾
" )
¾½
26
2149
Existing Florida Greenways and Trails
214
21
226
Legend
352
¬ «
¬ « ¬ «
" )
2009
315
" )
½ 21 ¾ ½ ¾
" )
¬ «
½ ½ ¾ ¾
½ ¾
¾½ ¾½
¾
¾½
315
" )
½ ¾
½ ¾ ½ ¾ ½ ¾ ¾ ½ 16 ¾ ½ ¾ ½ ½ ¾
¾½
" )
¾½
½ ¾
½ ¾
¾½ ¾ ½ ½ ¾ ½ ¾
17
½ ¾
½ ¾
¾½
£ ¤
¾½
½ ¾
½ ¾
½ ¾
315
½ ¾
½ ¾
" )
½ ¾ ¾ ½ ¾ ½ ¾ ½
½ ¾
½ ¾ ¾ ½
¾ ½
¾ ½
230
¬ «
½ ¾
15
¬ «
2010 ½ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ 16 ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½¾ 16A ½ ¾ ½ ¾ ½ ¾ ½ ¾
¬ «
13
¬ «¾½ ¾½ ½ ¾
21
" )
2155
¾½ ½ ¾
½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ 208¾ ½ ¾ ½ ¾ 2104 1 ½ ¾ ½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ½ ¾ 2082 ½ ¾ ½ ¾ ¾ ½ ½ ¾ ½ ½¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ½ ¾
202 5
2031
½ ¾ 739B
½ ¾ ¾ ½ ¾ ½ ¾ 3 ½ 214¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½
½ ¾
½ ¾
2005
½ ½ ¾ ¾
" )
¾ ½
½ ¾
2001
739
½ ¾ ½ ¾ ¾ ½
" )
" ) ¬ « 215
2007
½ ¾
220
" )
13B
½ ¾
" )¾½ ¾½
½ ¾ ¾ 1 ½ 2½ 2 ¾48 ¾ ½147 ¾ ½ ¾ ½
" )
15A
½ ¾ 218
2065
2008
" )
½ ¾
5 207
220
2087
295
½ ¾ ¾ ½ ¾ ½ ¾ ½
2003 ½ ½ ¾ ¾ ¾ ½
2004
§ ¦ ¨
0
" ) " )¾½
½ ¾ ¾ ½
½ ¾
3
5 21
" )
1189
220A
7
½ ¾
2 20
½ ¾
" )¾½ ¾½ 209
7 20
224
¬ « ¾½
23
¬ «
6
217
½ ¾
£ ¤ " )
7 20
" )
4
½¾ ¾ ½ ¾ ½
301
1179
8 20
½ ¾ ½ ¾ ½ ¾
2090
½ ¾
½ ¾
½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾ ¾ ½ ½ ¾ ½
2011
2027
½ ¾
½ ¾
½ ¾
½ ¾ ½ ¾
½ ¾
½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½
½ ¾
½ ¾
½ ¾
4 22
X Ã
2207
1 5 22 6
5 22 2
X Ã
301
" ) 1179
£ ¤ " ) 217
224
¬ «
23
¬ «
X Ã
2200
§ ¦ ¨ 295
2201
" ) 209
" )
" ) " ) 1189
220A
" ) 13B
220
" ) 15A
" ) 220
" ) 739
5 22 4
" ) 218
" ) 739B
" ) 209
13
3 22
¬ «
9
" ) ¬ « 215
15
¬ «
21
" ) 315
16
¬ «
" ) 16A
16
¬ « 17
£ ¤ 230
¬ «
" ) 226
" ) 315
" ) 209
Legend ® Airport q ¤ Amtrak Station n ¤ Passenger Rail Station n
" ) 315
" ) 352
21
¬ «
" ) 214
X Ã X Ã
" ) 214
FEC Rail Projects
CSX Rail Projects 209 Commuter Rail Corridors
" )
FEC Rail Corridors
CSX Rail Corridors
" ) 315
Intercity Passenger Rail Corridor Railroad System
21
¬ « ¬ «
Roadway System 209 Water Bodies
" )
" )
309D
26
Conservation Lands
Six Counties Boundaries
2040 Final Needs Plan Clay County Freight Projects Date: 10/6/2014
Page 36 of 61
® q
¯
0
10,560 Feet
0
1.5
X Ã
3 Miles
õ ó ô ó ö õ ô ö õ ô ó ö
õ ô ó ö ó õ ô ö õ ô ó ö õ ô ó ö õ ô ó ö
õ ô ó ö
õ ô ó ö
301
õ ô ö õ ô ó ö óó õ ô ö õ ô ó ö õ ô ó ö õ ô ó ö 1179 224 õ ô ó ö ¬ « õ ô ó ö 209 õ ô ó ö
" )
£ ¤ " ) 217
23
¬ «
§ ¦ ¨ 295
" )
õ ô ó ö
" ) 220A
õ ô ó ö
" ) " )ó õ ô ö 1189
" ) 13B
220
" ) 15A
" ) 220
" ) 218
" ) 739
" ) ¬ « 215
" ) 739B
" ) 209
13
¬ « 15
¬ «
21
" ) 315
16
¬ «
" ) 16A
16
¬ « 17
£ ¤ 230
¬ «
" ) 226
" ) 315
" ) 209
" ) 315
" ) 352
21
¬ «
" ) 214
Legend 209 Park and Ride Parking Lot õ ô ó ö
" ) 214
" )
Express Bus Service Local Bus Routes
" ) 315
Railroad System Community Shuttle Area
21
¬ « ¬ «
Roadway System 209 Water Bodies
" )
" )
309D
26
Conservation Lands
2040 Final Needs Plan Clay County Transit Projects Local and Express Bus Service Date: 10/9/2014
Page 37 of 61
¯
Six Counties Boundaries 0
0
10,560 Feet
1.5
3 Miles
2
2 23
2 23
7 5 22
2321
2386
6
§ ¦ ¨ 295
301
" ) 1179
£ ¤ " ) 217
224
¬ «
23
¬ «
" ) 209
0 23
" )
8
" ) " ) 1189
220A
" ) 13B
220
" ) 15A
" ) 220
" ) 739
215
8
" ) ¬ «
5 23
" ) 218
" ) 739B
" ) 209
13
¬ « 15
¬ «
21
" ) 315
16
¬ «
" ) 16A
16
¬ « 17
£ ¤ 230
¬ «
" ) 226
" ) 315
" ) 209
9 231
" ) 315
" ) 352
21
¬ «
" ) 214
Legend
" ) 214
" ) 209
Bus Rapid Transit
Commuter Rail Corridors
" ) 315
Intercity Passenger Rail Corridor Railroad System
21
¬ « ¬ «
" ) 309D
26
Roadway System 209 Water Bodies
" )
Conservation Lands Six Counties Boundaries
2040 Final Needs Plan Clay County Transit Projects BRT and Commuter Rail Date: 10/14/2014
Page 38 of 61
¯
0
0
10,560 Feet
1.5
3 Miles
Ò Ò " ) ) Ê" Ê
í ì ë é è
í ì ë é è
501
í ì ë é è
705
70 7
706
Ò " ) Ê
706
710
78
708
A1A
¬ «
952
939
1005
413
407
104
9 40
948
40 7
Ò " ) Ê £ ¤ 17
949
951
¬ «
82
95
§ ¦ ¨
£ ¤
1036
Operational Improvements
414
104
102
1022
119
119
£ ¤ 1
§ ¦ ¨
5 82
Northern Outer Beltway Corridor
80 0
Future Corridor TBD Roadway System Water Bodies
95
828
41 4
833
Ò " ) Ê
90 3
902
901
911
New 6 Lane Road
First Coast Expressway
827
2040 Final Needs Plan Ò " Duval County Roadway Projects) Ê Page 39 of 61
¬ «
826
91 3 91 2
Ò " ) Ê
New 4 Lane Road
202
819
Ò " ) Ê
Conservation Lands
844
Ò " ) Ê Ò " ) Ê 2 13
900
34
New 3 Lane Road
93
33
152
¬ «
962
90
¬ «
¬ «
1023
410
431
934
101 5 101
98
123 123 425
424
1022
17
New 2 Lane Road
A1A
Express Lanes
8 41
1011
966
967
Ò " ) Ê
49
£ ¤
Context Sensitive Solutions
128
295
Widen to 6 Lanes
1
18
23
Date: 11/4/2014
§ ¦ ¨
Widen to 5 Lanes
94
21
57
Widen to 4 Lanes
1024
14
¬ «
57
152
960
418
224
964
13
Ò " ) Ê
è í ì ë é í ì ë é è í ì ë é è Ò " ) Ê
4 43
Ò " ) Ê
910
16
10 2
90
960
95
16
¬ «
200
¬ «
416
129
716 714 715
10
¬ « è í ì ë é íè ì ë é íè ì ë é
í ì ë é è
£ ¤
99
í ì ë é è
957
820
102 6
Ò " ) Ê
4 43
970
13
960
9
721
930
932
936
431
23
¬ «
17
968
73
134
820
415
957
¬ «
í ì ë é è
Interchanges Projects
1023
411 411
944 971
957
228
86
Ò " ) Ê
¬ « ¤ í £ ì ë é è í ì ë é è
87
100
3 43
91
17
128
¬ «
301
£ ¤
947
946
103
5 103
Ò " ) Ê
3 43
4 103
79
43
96
820
405
£ ¤
Ò " ) Ê
935
432
¬ «
121
972
7
153
Intersection Projects
Widen to 3 Lanes
152
A1A
116
¬ «
945
121
406
419
47
10
1006
950
405
90
401
Ò " ) Ê
85
Airport
Reconstruct 2 Lanes
295
432
0 41
404
403
402
720
406
£ ¤§ ¦ ¨
6
Lanes
§ ¦ ¨
1019
454
® q í ì ë é è Ò " ) Ê
A1A 1
20 10
1
500
Legend
37
¬ «
963
940
40 8
88
83
¬ «
954
2
115
1 94
68
Ò " ) Ê
1038
301
¬ «
97
421
A1A
956
701
74
® q
88
£ ¤
92
953
1033
1017
£ ¤ 23
845
¯
Six Counties Boundaries
0
10,560 Feet
0
3
6 Miles
31 4
A1A
¬ «
£ ¤ 23
A1A
¬ «
® q
£ ¤ 301
115
¬ « £ ¤ 17
104
A1A
¬ «
326
61 0
¬ «
§ ¦ ¨ 95
224
§ ¦ ¨ 295
5 30
£ ¤
663
323
322
325
314
301
0 31
213
311
238
233
218
17
225
200
21
¬ «
90
652
A1A
¬ «
229
230 232
607
712
202
¬ «
Legend Safety Priority Intersections Safety Priority Corridors
295
TSM&O Roadway System
£ ¤ 1
17
658
13
¬ « 327
608
Airport
® q
§ ¦ ¨
£ ¤
6 60
204
£ ¤
152
224
Date: 10/9/2014
¬ «
¬ « ¬ «
200
652
A1A
662
650
10
652
315
209
¬ «
¬ «
657
¬ «
223
602
221
5 60
116
234
236
23
¬ «
603
226
222
£ ¤
309
134
¬ «
239
242
¬ «
207
601
240
301
228
304
¬ « 600
£ ¤
220
650 301
974 30 0
128
23 5
313
318
£ ¤ 317
611
651
17
208
205
10
609
237
£ ¤§ ¦ ¨ 90
306
660
307
655
656 654
659
1
§ ¦ ¨
Conservation Lands
95
308
2040 Final Needs Plan Duval County Safety and TSM&O Projects Page 40 of 61
Water Bodies
319
2 30
Six Counties Boundaries
¯
0
10,560 Feet
0
3
6 Miles
½ ¾
½ ¾ ½ ½ ¾ ¾
½ ¾
½ ¾
½ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ¾ ¾ ½
½ ¾
½ ¾
½ ¾
21 2
½ ¾ ½ ¾
2115
2035
½ ¾ ¾ 210 ½2071¾ ½ 4¾ ½ ¾ ½
2026
2052
2070
2060
2029
½ ¾
½ ¾ ½ ¾ ½ ¾
¾½ Downtown Jacksonville
¾½
½ ¾ ½ ¾ ½ ½ ¾ ½ ¾ ¾
½ ¾ ¾ ½ ½ ¾ ¾ ½
¾½
¾½
½ ¾
½ ¾ ¾ ½ ¾ ½
® q
202
0
1
Airport Existing Florida Greenways and Trails
½ ¾
¾ ½2139
5 201
2016
Legend ½ ¾
½ ¾
2086
2155
¾½
½ ¾ ¾ ½ ½ ¾ ½ ½ ¾ ¾ ¾ ¾ ½ ½ ¾ ½ ½ ¾ ¾ ¾ ½ ½ ½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ½ ½ ¾ ½ ¾ ½ ¾
2093
2091 2095
2083
½ ¾
2058
2069
2103
2051
¾½
202 5
½ ¾
¾½ ½ ¾
½2079 ¾ ½ ¾
2063
2064 2034
½ 2053 ¾ ½ ¾
2070
½ ¾
2029
2042
2054
207 4
½ ¾ ½ ¾
½ ¾
2005
½ ¾
8 21 2
2030
½ ¾
½ ¾
2031
½ ¾ 081 21 ½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½ 2009 ½ ¾ ½ ¾ ½ 2¾ ½ ¾ 0 ½04 2½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾82 ¾ ½
½ ¾
½ ¾
2001
½ ¾
2122
½ ¾
½¾
½ ¾
½ ¾
½ ¾
½ ½ ¾ ¾ ¾ ½ ¾ ½ ¾ ½ ½ ¾
½ ¾
½ ¾
½ 2000 ¾ ½ ¾
½ ¾
½ ¾ ½ ¾ ½ ¾ ¾ ½ ½ ¾
½ ¾
½ ½ ¾ ¾ ½ ¾ ½ ¾
½ ¾
½ ¾
½ ¾
½ ¾
½ ¾
½ ¾ ¾ ½
½ ¾
¯
201 7
Nassau County Bicycle Needs Jacksonville Bike Lane Needs Jacksonville Multi-Use Path Needs Jacksonville Pavement and Signage Needs
½ ¾ ½ ¾
Hogan's Creek Greenway
½ ¾ ½ ¾
Florida Greenways and Trails Land Trail Opportunities Priority 1 Pedestrian Focus Areas
8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : Pedestrian Focus Area 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : © ¨ © ¨ © ¨ © ¨ 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ©¨ ¨ ©¨ ©¨ © Bicycle Corridors ©¨ ¨ ©¨ ©¨ ©
½ ¾
½ ½ ¾ ½ ¾ ¾ ¾ ¾ ½ ½ ½ ½ ¾ 2142 ½ ¾ ½ ¾ ½ ¾ ¾
4
½ ½ ¾ ¾
½ ¾ ¾ ½ ¾ ½ ¾ ½ 41¾ Page ½of 61 ¾ ½
4 215
4 21
¾½
2040 Final Needs Plan Duval County ¾½ ¾½ Florida Greenways & Trails and Local ½ ¾ ½ Bicycle ¾ ½ ¾ ½ ¾ ¾ Corridors Priorities ½ ¾ ½ ¾ ½
½ ¾
½ ¾
½ ¾ ¾ ½
½ ¾
½ ¾
95
43 21
6
2007
¾½
§ ¦ ¨
½ ¾ ¾ 4 ½ 21¾ ½7 ¾ ½2148¾ ½ ¾ ½ ¾ ½
½ ¾ ½ ¾ ¾ ½
1
13
½ ¾
202
¬ «
£ ¤ ¬ « ½ ¾
½ ½ ¾ ¾
6 207
¬ «
2036
1
A1A
½ ¾ ¾ ½
7
90 2022
½ ¾
½ ¾
5 20
£ ¤
½ ¾
2065
½ ½ ¾ ¾
½ ¾
½ ¾
¾ ½
¾ ½
½ ¾
Date: 10/14/2014
152
¬ «
2037
2056
7 20
½ ¾
½ ¾ ½ ½ ¾ ¾
½ ¾
2020
5
¬ «
½ ¾
2004
295
½ ¾ ¾ ½ ¾ ½
½ ¾
200
½ ¾ ¾ ½ ¾ ½
17
3
2087
§ ¦ ¨
½ ¾
½ ¾
2006
½ ¾
½ ¾
£ ¤
2 20
7 20
½¾ ¾ ½ 21
¬ «
2008
2090
2048
½ ¾
224
¬ «¾½
7
½ ¾
23
¬ «
2003 ½ ½ ¾ ¾
7 20
4
½ ½ ¾ ¾
2011
134
¬ «
8 20
228
¬ «
¬ «
2021
2027
½ ¾
½ ½ ¾ ½ ¾ 6 ¾ ¾ ½ ½ ½ ½209¾ ½ ¾ 2041 ½¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾
17
¬ «
10
2094
£ ¤
¬ «¾½
21
¾ ¾ ½ ½ ¾ ¾ ½ ½ ½ ¾ ½ ¾
128
¬ «
2015
8 201
2016
2062
2014
½ ¾ A1A
116
½ ¾ ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½1 ¾ 0
207 ½ ¾ 3 ½ ¾ ½ ½ ¾ ¾ ½ ¾ ½ ¾ ½ 2055 ½ ¾ ¾ 2 ½ ¾ ½2033 ¾ ¾ ¾ ¾ ½ ¾ ½ ½ ½ ¾ ½6 ¾ ¾ 0¾ ½ 206 ½ ½ 40 ½ ¾ ¾ ½ ½ ¾ ¾ ½ ½ 2036 ¾ ¾ ½ 2106 2 2080 ½ ¾ 207 ½ ¾ ½ ¾ ½ ¾ ½ 17 ½ ¾ ¾ 90 £ ¤ ½ ¾½ ¾ £ 10 ¤
½ ¾
½ ¾ ½ ¾
8
½ ¾
6 20
½ ½ ¾ ½ ¾ ½ ¾ ¾
½ ¾
½ ¾¾ ½
½ ¾
½ ¾
See Inset
¬ «
2105
2040
7 20
295
2080
A1A
¾½
§ ¦ ¨
½ ¾
½ ½ ¾ ¾
9
¾ ½
20 9
1
¾½
0 205
2049
½ ¾ ½ ¾ ¾ ½
95
82
¾ ½
17
§ ¦ ¨
20
½ ¾ ½ ¾ ½ 2097 ¾ ½ ¾ ½ ¾ ¾ ½ ½ ¾
£ ¤
2038
½ ¾
2046
½ ½ ¾ ¾
½ ¾ ¾ ½
½ ¾
½ ½ ¾ ¾
½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾ ½
104
¬ «
2059
½ ¾
¬ «
½ ¾ 115
¬ «
207 3
A1A
2055 ½ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾
2039
§ ¦ ¨
8
½ ¾
½ ¾ ¾ ½ ¾ ½ ½ ¾ ½ ¾
½ ¾ ½ ¾
® q
½ ¾
6 20
½ ¾
½ ¾
½ ½ ¾ ½ ¾ ¾
½ ¾
½ ¾
8 211
½ ¾ ½ ¾
¬ «
£ ¤
£ ¤
301
½ ¾
A1A
£ ¤
£ ¤
2034
½ ¾
9
2123
23
301
½ ½ ¾ ¾
½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½
½ ¾
½ ¾
10,560 Feet
Roadway System Water Bodies
Conservation Lands Six Counties Boundaries
0
3
6 Miles
A1A
2240
X Ã
2243
1005
2255
¬ «
£ ¤ 23
2254 2238
A1A
¬ «
® q ¢ n
2210
3 22
2205 2212 2209 2211 2213
301
2216
§ ¦ ¨
1
0 224
X Ã
X Ã £ ¤ 17
10
2222 2234 2226 2220 2217 2229 2236 2237 2221 2232 2230 2231 2224 2219 2235 2215 2223 2228 2233 2218 2225
2208
10
¬ «
See Inset
£ ¤ 90
128
£ ¤ 17
2206
301
Westlake 228 Cecil Commerce Connector
¬ «
X Ã
134
¬ « 23
¬ «
202
¬ «
2239
2200
X Ã X Ã
295
CSX Rail Projects Norfolk Rail Projects Port of Fernandina Projects JaxPort Projects Aviation Projects
CSX Rail Corridors
2260
152
¬ «
Intercity Passenger Rail Corridor
® q
¬ «X Ã £ ¤
£ ¤ 1
17
Roadway System Water Bodies
4 22 1
§ ¦ ¨
Conservation Lands
95
13
4 22
¬ «
Six Counties Boundaries
1
2040 Final Needs Plan Duval County Freight Projects Page 42 of 61
Airport Railroad System
1
2201
Passenger Rail Station
FEC Rail Corridors 2259
§ ¦ ¨
Amtrak Station
Commuter Rail Corridors
4 22
21
¬ «
Date: 10/6/2014
FEC Rail Projects
¢ n
2207
2
224
200
X Ã X Ã X Ã
l ¤ ¥ l ¥ ¢
A1A
5 22
X Ã
¬ «
Airport
6
¬ «
® q ¤ n ¤ n
5 22
2254
£ ¤
¬ «
116
¬ «
2254
A1A
¬ «
6
2227
295
2238
Legend
l ¥ ¢
95
5 22
2240
1
¬ «
§ ¦ ¨
2355
Downtown Jacksonville
A1A
1006
X Ã
2202
2214
£ ¤§ ¦ ¨ 90
4 22
17
¤ X ã
2242
2
£ ¤ X Ã
104
¬ «
2257
2254
5 22
2258
2204
X Ã
2208
115
¬ «
North Rail Corridor
X Ã
2254
2355
2255
£ ¤
22
54
9
¯
0
10,560 Feet
0
3
6 Miles
õ ô ó ö
õ ô ó ö
A1A
¬ «
£ ¤ 23
A1A
¬ «
® q
õ ô ó ö 301
£ ¤
115
¬ « õ ô ó ö ¬ «ó õ ô ö
£ ¤ õ ô ó ö 17
104
õ ô ó ö
A1A
¬ «
§ ¦ ¨ 95
§ ¦ ¨ 295
1
£ ¤
A1A
¬ «
116
¬ «
õ ô ó öó ó õ ô ö õ ô ö
17
£ ¤
£ ¤§ ¦ ¨ 90
10
10
¬ «
See Inset
Downtown Jacksonville
ó õ ô ö õ ô ó ö£ ¤ ó õ ô ö 90
128
¬ «ó õ ô ö õ ô ó ö õ ô ó ö £ ¤ õ ô ó ö õ ô ó ö õ ô ó ö
Legend
A1A
¬ «
ó õ ô ö ® q
17
£ ¤ 301
õ ô ó ö
228
¬ «
134
¬ «
õ ô ó ö
23
¬ «
Railroad System
295
£ ¤
17
13
¬ «
Transportation Intermodal Center
õ ô ó ö
1
Community Shuttle Area Roadway System
§ ¦ ¨ 95
Water Bodies
õ ô ó ö
õ ô ó ö
Conservation Lands
õ ô ó ö
Six Counties Boundaries
200
¬ « 2040 Final Needs Plan Duval County Transit Projects Local and Express Bus Service Date: 10/9/2014
Ferry Service
§ ¦ ¨
21
õ ô ó ö
Local Bus Service
152
224
Airport Express Bus Service
¬ «
ó õ ô ö õ ô ó õ ô ó ö ö õ ô ó ö ó õ ô ö õ ô ó ö õ ô ó ö ¬ « £ ¤ õ ô ö õ ô ó ö ¬ «ó õ ô ó ö
ó õ ô ö õ ô ó ö
202
¬ «
Park and Ride Parking Lot
Page 43 of 61
¯
0
10,560 Feet
0
3
6 Miles
5 23
A1A
¬ «
£ ¤ 23
A1A
23 5
2301
2301
2301
90
£ ¤§ ¦ ¨ 10
2254
£ ¤ 17
2352
2354
2349
238 6
2348
® q
¬ «
Streetcar Five Points
2 23
2385
90
7
£ ¤
2385
Streetcar Downtown
A1A
¬ «
Streetcar La Villa
£ ¤ 17
8 23
134
¬ «
¬ «
Streetcar Springfield Streetcar San Marco
5 22
2358
Streetcar Riverside
202
6
301
2321
2386
£ ¤
228
¬ «
152
¬ «
Commuter Rail Corridors
2325
2386
2358
¬ «
2325
6
23
§ ¦ ¨
Intercity Passenger Rail Corridor
295
2 23
Ferry Service
7
224
¬ « 21
¬ «
Roadway System 13
¬ «
§ ¦ ¨ 95
200
¬ «
Date: 10/14/2014
Water Bodies
4
8
1
17
2 23
0 23
Railroad System
£ ¤
£ ¤
Airport
Skyway Extension
10
See Inset
128
6
Existing Skyway Express
¬ «
2353
23 8
Bus Rapid Transit
A1A
116
¬ «
¬ «
2 232
2353
235 0
2356
2255
2356
295
2349
Legend
2331
§ ¦ ¨
1
2385
Downtown Jacksonville
¬ «
£ ¤
2385
7
A1A
95
2328
2385
2352
§ ¦ ¨
2350
7
2386
17
232 3
2355
4 23
8
2254
£ ¤
104
¬ «
2351
55
32 7 2
5 23
115
22
6
2 23
2326
¬ «
7 235
301
7
8
¬ «
® q
£ ¤
23 5
2328
2354
2356
232 3
2040 Final Needs Plan Duval County Transit Projects BRT, Commuter Rail, Skyway, Streetcar Page 44 of 61
Conservation Lands
¯
Six Counties Boundaries 0
10,560 Feet
0
3
6 Miles
0
10 0
7 97
996
987
983
í ì ë é è
995
78
" )
994
115
í ì ë é è
" )
£ ¤ 301
SR 200 Projects Inset
707
Legend
108
9 70
975
969
Ò " ) Ê £ ¤ 17
" ) 115
981
£ ¤ 1
í ì ë é è
994
501
501
1001
981
997
See Inset
710
" )
705
" ) 107
78
708
í ì ë é è
108
703
706
Widen to 4 Lanes Widen to 5 Lanes
115
£ ¤ 301
104
40 8
Ò " ) Ê
40 7
959
134
134
1016
410
228
¬ « £ ¤¬ « 17
208
414
15
410
87
957
2 11
9
« é è í ì ë " )¬ " ) ¬ « 2040 Final Needs Plan í ì ë é è 213
21
211
£ ¤ Ò " ) Ê ¬ « Ò " ¬ «) Ê ¬ «
Page 45 of 61
100
153
1
415
13
Nassau County Roadway Projects
Date: 11/4/2014
79
947
í ì ë é è
968
104
411 411
944
123 425
301
23
¬ « ¬ « ¬ «
Ò " ) Ê ¬ «
43
416
109
5
1 15
23A 121
200
¬ « £ ¤
10
109
¬ « Ò " ) Ê
116
¬ «
í ì ë é è
960
714 715 716
10
¬ «
í ì ë é íè ì ë é íè ì ë é è
115
Future Corridor TBD
¯
¬ « 10 2
Roadway System
1
Water Bodies Conservation Lands
A1A
« ¤¬ ¬ « £ 212
960
è í ì ë é í ì ë é è ¬ « í ì ë é è Ò " ) Ê
Northern Outer Beltway Corridor
152
A1A
121
) " )¬ « " 228
¬ «
972
§ ¦ ¨
945
121
405
406
432
432
419
1006
¬ «
721
406
7
Ò " ) Ê
96
453
85
3 43
" ) 123
8
90
820
228
403
£ ¤
6
401
454
First Coast Expressway
47
91
402
Express Lanes
950
295
23C
720
¬ «
82
§ ¦ ¨
" ) " )
500
New 6 Lane Road
A1A
Operational Improvements
41 4
119
23D
125
New 4 Lane Road
951
) " )"
" )
949
1
9 40
121
New 3 Lane Road
956
948
37
¬ «
954
407
963
940
1 94
Ò " ) Ê
413
88
127
¬ «
83
" )
New 2 Lane Road
2
74
421
68
Context Sensitive Solutions
A1A
1005
® q
Widen to 6 Lanes
105
92
97
¬ «
952
939
953
¬ «
1033
15
Interchanges Projects
Widen to 3 Lanes
¬ « ¬ « ¬ «
1017
2
701
" )
Intersection Projects
Reconstruct 2 Lanes
A1A
A1A
2
Airport
Lanes
105
¬ « ¬ «
706
Ò " ) Ê
108
í ì ë é è
987
105
« ¬ « ¬
A1A
200A
1003
ÊÊ
982
95
23
" )
) è" í ì ë Ò " Òé " ) ) 427
707
§ ¦ ¨
£ ¤
88
998
107
979
984
" )
" )
36
® q í ì ë é è Ò " ) Ê
105A
704
501
982
981
986
971
6 97
Ò " Ò " ) Ê) Ê
97 6
9 99
1003
í ì ë é è
427
979
70 7
984
985
70 9
202
¬ «
0
90
10,560 Feet
" ) 203
Six Counties Boundaries
0
3.5
7 Miles
" ) 108
" ) 115
£ ¤ 301
17
" )
604
£ ¤ 1
200A
" ) 108
320
§ ¦ ¨
£ ¤
105
« ¬ « ¬
A1A
" )
95
23
105A
" )
£ ¤
115
" )
107
105
¬ « ¬ «
A1A
" ) 107
" ) 108
A1A
" ) 2
2
¬ «
¬ « ¬ « ¬ «
15
¬ «
105
A1A
® q 127
115
¬ «
£ ¤ 301
61 0
314
¬ «
119
Safety Priority Intersections
" ) " )
" ) 123
Date: 10/9/2014
8
¬ «
¬ «
) " )« ¬ " 23A 121
228
200
¬ « £ ¤ 301
318
23
611
208
235
313
228
228
¬ « 208
109
15
¬ « £ ¤¬ « 17
211
£ ¤ ¬ « 1
13
660
301
304
30 0
¬ « 2040 Final Needs « Plan Nassau County ¬ « " )¬ " ) ¬ « ¬ « ¬ ¬ « « Safety and TSM&O Projects 134
213
134
21
Page 46 of 61
211
301
654
109
5
652
650
652
223
115
¬ «
655
306
651
659
10
90
242
§ ¦ ¨
£ ¤
609
656
¬ «
325
322
23C
0 31
125
Airport
® q
224 307
§ ¦ ¨ 295
23D
" )
Legend
A1A
305
) " )" 121
104
¬ «
326
" )
116
¬ «
Safety Priority Corridors
662
662
TSM&O Roadway System
A1A
¬ «
Water Bodies
10
¬ «
Conservation Lands
¯¬« 202
A1A
« ¤¬ ¬ « £
652
212
0
90
10,560 Feet
" ) 203
Six Counties Boundaries
0
3.5
7 Miles
0 .2 2369
½ ¾
½ ¾
½ ¾
21 2
" )
21 2
½ ¾ ½ ½ ¾ ½ ½ ¾ ½ ¾ ¾ ½ ¾ ¾ ¾ ½ ½ ¾ ½ ¾¾ ½ ½ ½ ¾ ¾
1
0 213
2120
§ ¦ ¨ 95
211 9
2127
" ) 107
½ ¾
½ ¾
½ ¾
½ ½ ¾ ¾ ½ ¾
8 21 2
2063
2064 2034
¬ «
½ ¾ ¾ ½ ¾ ½
¬ « 2021 2101
202
¬ «
¯
Roadway System
½ ¾
2037
2058
2091
2069
½ ¾ ¾ ½
½ ¾
2070
½ ¾
½ ¾ ¾ ½
½ ¾ ½ ¾ ¾ ½ ¾ ½ ½ ¾ ¾ ½
2030
2029
2042
2054
207 4
2122
½0 ¾ ½ ¾
20 0
½ ¾
½ ¾
½ ¾
½ ¾
2103
½ ¾ ½ ¾ ½ ½ ¾ ¾ ½ ¾ ½ ¾
½ ¾
115
10
¾½
½ ¾ 2015
A1A
2022
A1A
« ¤¬ ¬ « £ 212
90
0
2056
½ ¾
½ ¾
½ ¾
½ ¾
½ ¾ ½ ¾ ½ ½ ¾ ½ ¾ ¾
½ ¾
½ ¾ ½ ½ ¾ ¾ ½ ¾
½ ¾
109
¬ «
211 21 2040 Final Needs Plan Nassau County ¬ « ¬ «5 Florida Greenways & Trails and Local Bicycle Corridors Priorities
Page 47 of 61
½ ¾
1
13
¾½
10,560 Feet 203
" )
½ ¾ ¾ ½ ½ ½ ¾ ¾
" )
£ ¤ ¬ «
8 201
Priority 1 Pedestrian Focus Areas
¾½
¬ «
Florida Greenways and Trails
8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : Pedestrian Focus Area 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : © ¨ © ¨ © ¨ © ¨ 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ©¨ ¨ ©¨ ©¨ © Bicycle Corridors ©¨ ¨ ©¨ ©¨ ©
041
2 11
½ ¾
17
½2036 ¾
½ ¾ ½ ¾
2 ½ 2096 ½ ¾ ½ ¾ ½ ¾ ¾
134
213
¬ « £ ¤¬ «
2062
¬ «
½ ½ ¾ ¾
134
« " )¬
4
½ ¾
2040
Jacksonville Pavement and Signage Needs
A1A
½ ¾
116
109
Jacksonville Multi-Use Path Needs
2331
¬ «
¬ «
Jacksonville Bike Lane Needs
½ ¾ ½ ½ ¾ ¾
¬ « ¬ « ¬ «
208
15
¾½
2080
½ ¾ ½ ½¾ ½ ¾ ¾
¬ «
21 0
½ ½ ¾ ¾
½ ¾
228
2072
2
¾ ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ¾ ½ ½ ¾ ½ ¾ ¾ ½
½ ¾
301
23
½ ¾ ¾ ½ ½ ¾ ¾ ½
Date: 10/14/2014
200
¬ « £ ¤
§ ¦ ¨ 10
8 20
9
7
228
2055 ½ ¾ ¾ ½ ¾ ½ ½ ¾ ½ ¾
2049
7 20
) " )« ¬ " ½ ¾ 23A 121
2033
¾½
123
½ ¾ ¾ ½ ½ ¾
" )
8
¬ «
½ ¾ ¾ ½ ½ ¾ ½ ¾ ½ 90 ¾ ¾ ½ £ ¤ 2106
½ ¾ ¾ ½ ½ ½¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ¾
207 3
½ ¾
½ ¾ ½ ¾ ¾ ½
228
¬ «
295
8
125
20 9
§ ¦ ¨ ½ ¾
" )
23C
2032
6 20
23D
104
¬ «
Nassau County Bicycle Needs
7
115
¬ «
½ ¾ 2031 ¾ ¾ ½ ½ ½ ¾
½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾
" ) " )
Ferry Service
9 20
½ ¾
2039
Airport Existing Florida Greenways and Trails
½ ½ ¾ ¾
½ ¾ ½ ¾
½ ½ ¾ ¾ 121
® q
A1A
® q
301
119
Legend
105
£ ¤
) " )"
A1A
½ ¾
15
½ ¾
127
¬ « ¬ « ½ ¾
¬ « ¬ « ¬ «
¬ «
½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½
" )
2108 105
A1A
½ ¾
½ ¾
2
108
½ ¾
½ ¾
½ ¾ ½ ¾
" )
2
¬ «
" )
2107
2115
½ ¾
" ) 108
105
« ¬ « ¬
A1A
2113
£ ¤ 23
¾½
2129
£ ¤
21 17
105A
½ ¾ ¾ ½ ¾ ½ ¾ ½
1 0.
" )
½ 200A¾
" )
½ ½ ¾ ¾
½ ¾
¾½ ½ ¾
" )
107
2113.2
½ ¾
½ ¾
£ ¤ 17
115
2118
" )
½ ¾
½ ¾
¾ ½ ¾ ½ ¾ ½
½ ½ ¾ ¾
½ ¾
½ ½ ¾ ¾
301
½ ½ ¾ ½ ¾ ¾
£ ¤
½ ¾ ¾ ½
" )
½ ¾
108
115
Water Bodies Conservation Lands Six Counties Boundaries
0
3.5
7 Miles
" ) 108
" ) 115
£ ¤ 301
" )
17
2255
115
" ) 107
£ ¤ X Ã
£ ¤ 1
2203
2246
" ) 105A
105
« ¬ « ¬
200A
" ) 108
Legend
105
95
23
2244
A1A
" )
§ ¦ ¨
£ ¤
2247 2245
l ¥ ¤
2244
¬ « ¬ «
A1A
" ) 107
" ) 108
A1A
X Ã
15
¬ «
2243
105
®n q ¢ 2205
2212 2209 2211
" ) 127
£ ¤
115
2258
104
¬ « X Ã
) " )" 119
2257
123
Date: 10/6/2014
¬ «
¬ «
) " )« ¬ " 23A 121
228
2254
200
¬ « £ ¤ 301
90
2206
228
¬ «
15
¬ « £ ¤¬ « 17
23
¬ « ¬ « ¬ « 134
134
208
¬ «
211
JaxPort Projects Aviation Projects
Roadway System Water Bodies
10
¬ «
X Ã
£ ¤ ¬ «
Conservation Lands
1
13
213 109 ¬ « " ) 211 Plan 2040 Final 21 Needs " ) ¬ « ì Nassau County Freight Projects X «5
Page 48 of 61
¬ «
2208
A1A
« ¤¬ ¬ « £ 212
1
" )
8
£ ¤
39 22 54 22
A1A
4 22
228
§ ¦ ¨ 10
2204
Port of Fernandina Projects
Railroad System
116
¬ «
2
X Ã
2242
2238
Norfolk Rail Projects
Intercity Passenger Rail Corridor
0 224
¬ « X Ã
CSX Rail Projects
CSX Rail Corridors
109
2254
Passenger Rail Station
FEC Rail Corridors
2225 2218 2222 2234 2226 2220 2217 2229 2236 2237 2221 2232 2230 2231 2224 2219 2235 2215 2223 2228 2233
5 22
125
¬ «
l ¥ ¢
23C
FEC Rail Projects
Amtrak Station
Commuter Rail Corridors
A1A
2216
§ ¦X ¨ Ã
X Ã X Ã X Ã ¢ n
2227
23D
" )
X Ã
Airport
l ¤ ¥ l ¥ ¢
2202
2214
295
" ) " )
2213
¬ «
North Rail Corridor
301
121
A1A
2210
2240
2
2240
" )
2
¬ «
¬ « ¬ « ¬ «
® q ¤ n ¤ n
115
¬ «
¯¬« 202
0
90
10,560 Feet
" ) 203
Six Counties Boundaries
0
3.5
7 Miles
" ) 108
" ) 115
£ ¤ 301
17
" ) £ ¤ 1
200A
" ) 108
õ ô ó ö
105
§ ¦ ¨ 95
£ ¤
105
« ¬ « ¬
A1A
" )
õ ô ó ö 23
105A
107
£ ¤
115
" )
" )
¬ « ¬ «
A1A
" ) 107
" ) 108
A1A
" ) 2
2
¬ «
¬ « ¬ « ¬ «
15
¬ «
105
õ ô ó ö
" ) 127
A1A
® q
ó õ ô ö ® q
115
¬ «
£ ¤ 301
ó õ ô ö « õ ô ó ö¬ 104
119
¬ «
Ferry Service
§ ¦ ¨ 295
Community Shuttle Area 116
¬ «
23D
109
¬ «
23C
" )
§ ¦ ¨
£ ¤ õ ô ó öó ó õ ô ö õ ô ö 90
" ) 123
Date: 10/9/2014
õ ô ó ö
Railroad System
A1A
¬ «
Roadway System
10
10
228
8
¬ «
¬ «
) " )« ¬ " 23A 121
228
200
¬ « £ ¤ 301
¬ « 228
¬ «
£ ¤ ¬ « £ ¤ õ ô ó ö¬ « ¬ « õ ô ó ö ¬ « õ ô ó ö 2040 Needs Plan ¬ " « ) Final õ ô ó " ö ) ¬ « Nassau County õ ô ó ö « õ ô ó ö Transit Projects ¬
¬ « « ¬ « õ ô ó ö¬ 134
134
213
208
211
21
13
211
Local and Express Bus Service
õ ô ó ö
Water Bodies
1
15 17
23
Airport
Local Bus Service
" ) " )
125
Park and Ride Parking Lot
Express Bus Service
A1A
õ ô ó ö
õ ô ó ö
) " )" 121
Legend
Page 49 of 61
109
5
ó õ ô ö õ ô ó ö 115
¬ «
¯
202
¬ «
Conservation Lands
A1A
« ¤¬ ¬ « £ ó õ ô ö 212
0
90
10,560 Feet
ó õ ô ö õ ô ó ö " ) 203
Six Counties Boundaries
0
3.5
7 Miles
" ) 108
" ) 115
£ ¤ 301
" )
105A
107
£ ¤ 17
2255
115
" )
" ) " ) 200A
£ ¤ 1
105
« ¬ « ¬
A1A
" ) 108
236 6
105
§ ¦ ¨ 95
£ ¤ 23
¬ « ¬ «
Legend
A1A
" ) 107
® q
" ) 108
Bus Rapid Transit
A1A
" ) 2
¬ « ¬ « ¬ «
15
¬ «
105
7 235
127
Streetcar La Villa
Commuter Rail Corridors
§ ¦ ¨ 295
Intercity Passenger Rail Corridor
23C
Date: 10/14/2014
) " )« ¬ " 23A 121
228
200
¬ « £ ¤ 301
2 232
23
6 23 8
228
¬ «
15
6
90
208
23 8
£ ¤
¬ « £ ¤¬ « 17
211
109
¬ «
134
134
21
Page 50 of 61
211
Roadway System
¬ «
1
¬ « « 2040 Final Needs Plan ¬ " « )¬ " ) ¬ « County Transit Projects ¬ ¬ « ¬ « «BRT,Nassau Commuter Rail, Skyway, Streetcar 213
A1A
10
£ ¤ ¬ « 13
Railroad System
¬ «
2350 2 349
Water Bodies
2385
109
5
115
¬ «
¯
202
¬ «
Conservation Lands
A1A
« ¤¬ ¬ « £
2385
212
7
123
8
¬ «
§ ¦ ¨ 10
2352
¬ «
2 23
" )
228
2301
2328
2254
58 23
116
2354
2325
232 3
2353
" ) " ) ¬ «
¬ «
119
23D
2301
Streetcar Springfield
A1A
Streetcar San Marco
) " )"
2301
Streetcar Riverside
2356
104
¬ «
" )
Streetcar Downtown
115
£ ¤
125
Streetcar Five Points
2326
¬ «
301
121
Skyway Extension
A1A
® q
" )
Existing Skyway Express
2356
2
¬ «
Airport
0
90
10,560 Feet
" ) 203
Six Counties Boundaries
0
3.5
7 Miles
" ) 226
" ) 315
906
" ) 13
" ) 13A
" ) 209
907
" ) 315
21
45 0
¬ «
" )
13A
" ) 352
" )
315C
" ) 214
" ) 214
" )
309D
" ) 219
100
¬ «
26
¬ « 45 1
21
¬ «
505
" )
207A
" ) 216
965
" )
309C
" ) 315
422
100
¬ «
" ) 310
20
423
¬ «
" ) 20A
è í ì ë é Ò " ) Ê
£ ¤
" )
309B
19
¬ «
" ) 21
" ) 310
8 42
429
15
¬ «
2 45
Legend
20
¬ « 17
3 50
" )
5
46
Intersection Projects
Interchanges Projects
Lanes
" )
308B
Reconstruct 2 Lanes
430
" ) 309
Widen to 3 Lanes Widen to 4 Lanes Widen to 5 Lanes
" ) 308
Widen to 6 Lanes
Context Sensitive Solutions New 2 Lane Road
" ) 309
New 3 Lane Road New 4 Lane Road New 6 Lane Road Express Lanes
Operational Improvements Roadway System Water Bodies
Conservation Lands
" ) 314
Six Counties Boundaries
2040 Final Needs Plan Putnam County Roadway Projects Date: 11/4/2014
Page 51 of 61
¯
0
0
10,560 Feet
1.5
3 Miles
209
" )
½ ¾
½ ½ ¾ ½ ¾ ¾
½ ½ ¾ ½ ¾ ¾ ½ ¾ ¾ ½
" )
½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾
½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ½ ¾ ½ ¾ ¾ ½
¾½
2132 ½ ½ ¾ ½ ¾ ¾
½ ¾
½ ½ ¾ ¾ ¾ ½
½ ¾
19
¬ «
¾½
21
½ ½ ¾ ½ ¾ ¾
½ ¾
½ ¾
½ ¾
½ ¾
½ ¾
310
½ ¾
" )
¾½ ¾½
¾½
¾½
" )
" ) 309
" ) 308
½ ¾ ½ ¾
½ ¾
" ) 309
½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾
Roadway System Water Bodies
½ ¾
½ ¾
Six Counties Boundaries
½ ½ ¾ ½ ¾ ¾½ ½ ¾ ¾
½ ¾
" ) 314
Date: 10/14/2014
½ 213 ¾ ¾ 5 ½ ½ ¾ ½ ¾
2040 Final Needs Plan Putnam County Florida Greenways & Trails and Local Bicycle Corridors Priorities Page 52 of 61
½ ½ ¾ ¾ ¾ ¾ ½ ½ ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½¾ ¾ ½ ¾
Land Trail Opportunities
Conservation Lands
½ ¾
½ ¾ 308B
½ ¾
Clay Multi-Use Path Needs
" )
15
¬ «
17
½ ¾
½ ¾
½ ¾ ½ Florida Greenways and Trails ¾
35
½ ¾
½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½
Existing Florida Greenways and Trails Putnam Multi-Use Path Needs
½ ¾
½ ¾
Legend ½ ¾
½ ¾
¾ ½
½ ¾
½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½
½ ¾
½ ¾ ½ ¾ ½ ½ ¾ ¾
½ ¾ ¾ ½ ¾ ½ ¾ ½ ½ ¾
£ ¤
¾½
½ ¾
½ ¾
20
¬ «
½ ½ ¾ ¾
" )
" )
309B
¾½
½ ¾
½ ¾
½ ½ ¾ ¾
½ ¾
½ ¾
2136
½ ¾
½ ¾
½ ¾
½2134 ¾
310
½ ¾
" ) 315
¬ «
½ ¾ ¾ ½ ¾ ½¾ ½ 100¾ ½ ½ ¾
¬ «
" )
½ ½ ¾ ¾
7
½ ¾
½ ¾
½ ¾
½ ½ ¾ ¾
½ ¾
3 21
½ ¾
½ ¾
1
½ ¾
½ ¾
3 21
½ ¾
½ ¾
½ ¾
½ ¾
½ ½ ¾ ½ ¾ ½ ¾ ¾
216
" )
½ ¾
½ ¾
9
½ ¾ ½ ¾
" )
½ ¾
½ ¾
¾½
½ ½ ¾ ¾
½ ¾
" )
207A
½ ¾
½ ¾
2140
½ ¾
½ ¾
21 4
½ ¾
½ ¾
½ ¾
¾½
½ ¾
30
207
½ ½ ¾ ½ ¾ ¾
½ ¾ ½ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾ ¾ ½ ½ ¾ ½ ¾
½ ¾
" )
¬ «
½ ¾
½ 2133 ¾ ½ ¾
309C
" )
¾ ½ ¾ ½ ¾ ½
½ ¾
½ ¾
¬ «
½ ¾ 20 ½ ¾ ¾ ¾ ½ ½ ¾ ½ ¾ ½
13A
½ ¾
½ ¾
21
½ ¾ ½ ¾ ½ ½ ¾ ¾ ¾ ¾ ½ ½¾ ½ 20A ½ ¾ ¾ ½ ½ ½ ¾ ½ ¾ ¾
½ ¾
¬ «
" ) ¾½
100 ¾ ½ ¾ ½ ¾ ¾ ½ ½ ¾ ½ ¾ ½ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾ ½
" )
214 ¾ ½ 2138 ½ ½ ¾ ¾ ¾ ½ ½ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ½ ¾ ¾
¾½
26
¬ «
209
¾½ ¾½ ¾½ ½ ¾ ½ ¾
½ ¾
219
" )
½ ¾
" )
309D
½ ¾
" )
13A
½ ¾
214
" )
½ ¾
214
" )
13
½ ¾ ¾ ½ ½ ¾ ½ ¾
" )
315C
" )
½ ¾
" ) ½ ¾
352
½ ¾
½ ¾
¾½
208
½ ¾
½ ¾
" )
½ ¾
2009
" ) 315
" )
13A
½ ½ ¾ ¾ ½¾ ½ ¾ ½ ¾
" ) 315
½ ¾
21
" )
½2155 ¾ ½ ¾
¾½
226
½ ¾
¬ «
16A
¾½
" )
¾½
¾½
" ) ½ ¾
½ ¾ ¾ ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾
15A
¾½
½ ¾
¾½ ½ ½ ¾ ¾ ½ ¾
½ ¾
00A
½ ¾
½ ¾
315
½ ¾
16A
½ ¾
½ ¾
¾ ½
½ ¾
2002 ½ ¾ ¾ ½ ¾ ½ ½ ¾
" )
2010 ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½¾ ½ ¾ ½ ¾ ½ ¾
½ ¾ ¾ ½ " )
" )
¾ ½
½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ½ ¾ ¾
½ ¾
½ ¾
½ ¾
½ ¾ ¾ ½ ¾ ½ 2 ½ ¾ ½210¾ ½ ¾ ¾ ½143 ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ½ ¾ ¾ ½
½¾ ¾ ½
½ ¾
½¾ ½¾ ¾ ½
½ ½ ¾ ¾
½ ¾
¾ ½
215
½ ¾
739
¾½
" )
¾½
4
" )
" )
½ ¾
209
¾½
225
" )
½ ½ ¾ ¾
" )
" )
15A
½ ¾
00A
" )
½ ½ ¾ ¾
4 21
2001
13B
½ ¾
220
218
½ ¾
¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½
" )
2148 ½ ½ ¾ ¾
½ ¾ " ) ½ ¾
" )
½ ½ ¾ ¾
½ ¾
½ ¾ ¾ ½
" )
220A
¯
0
0
10,560 Feet
2
4 Miles
½ ¾
½ ¾
" )
0A
" ) 225
" ) 209
" ) 215
" ) 16A
9
" ) 16A
6
3 22
315
225
" )
" ) 15A
" ) 226
" )
0A
" ) 315
4 225
" ) 13
" ) 13A
" ) 209
" ) 315
21
¬ «
" )
" ) 13A
352
" ) 315C
" ) 214
" ) 214
" ) 309D
" ) 219
207
¬ «
100
¬ «
26
¬ « 21
¬ «
l ¤ " ) ¥
" )
2249
207A
216
2248
" ) 309C
®n q ¢
X Ã
315
100
¬ «
" ) 310
20
" )
2250
¬ «
20
¬ « 17
" ) 20A
15
¬ «
" ) 309B
19
¬ «
" ) 21
£ ¤
" ) 310
" ) 308B
" ) 309
Legend ® q ¢ n
l ¤ ¥ X Ã
Airport
" ) 308
Aviation Projects
Putnam Barge Port Projects CSX Rail Projects
Commuter Rail Corridors
" ) 309
FEC Rail Corridors
CSX Rail Corridors
Intercity Passenger Rail Corridor Railroad System
Roadway System Water Bodies
Conservation Lands
" ) 35
Six Counties Boundaries
" ) 314
2040 Final Needs Plan Putnam County Freight Projects Date: 10/6/2014
Page 53 of 61
¯
0
0
10,560 Feet
2
4 Miles
" )
2825
" ) 225
" ) 209
" ) 215
" ) 315
" ) 16A
" ) 16A
" )
13A
" ) 15A
" ) 226
" )
A
" )
2
" ) 315
" ) 13
" ) 13A
" ) 209
" )
2
" ) 315
21
¬ «
" )
" ) 13A
352
" ) 315C
" ) 214
" ) 214
" ) 309D
" ) 219
207
¬ «
100
¬ «
26
¬ « 21
¬ «
" ) 207A
" ) 216
" ) 309C
® q
" )
20
" ) 315
100
¬ «
310
¬ «
20
¬ « £ ¤ 17
" ) 20A
15
¬ «
" ) 309B
19
¬ «
" ) 21
" ) 310
" ) 308B
" ) 309
" ) 308
" ) 309
Legend ® q
Airport Local Bus Service Roadway System
" ) 35
Water Bodies
Conservation Lands
" ) 314
Six Counties Boundaries
2040 Final Needs Plan Putnam County Transit Projects Local Bus Service Date: 10/9/2014
Page 54 of 61
¯
0
0
10,560 Feet
2
" )
2825 4 Miles
" ) 225
" ) 209
" ) 215
" ) 315
" ) 16A
15A
6
" )
5 22
16A
8 235
" )
" )
13A
9 231
" ) 226
" )
A
" )
2
" ) 315
" ) 13
" ) 13A
" ) 209
" )
2
" ) 315
21
¬ «
" )
" ) 13A
352
" ) 315C
" ) 214
" ) 214
" ) 309D
" ) 219
207
¬ «
100
¬ «
26
¬ « 21
¬ «
" ) 207A
" ) 216
" ) 309C
® q
" )
20
" ) 315
100
¬ «
310
¬ «
20
¬ « £ ¤ 17
" ) 20A
15
¬ «
" ) 309B
19
¬ «
" ) 21
" ) 310
" ) 308B
" ) 309
" ) 308
Legend ® q
" ) 309
Airport Bus Rapid Transit
Commuter Rail Corridors Intercity Passenger Rail Corridor Roadway System
" ) 35
Water Bodies
Conservation Lands
" ) 314
Six Counties Boundaries
2040 Final Needs Plan Putnam County Transit Projects Commuter Rail Date: 10/14/2014
Page 55 of 61
¯
0
0
10,560 Feet
2
" )
2825 4 Miles
) Ê
1029
103 1
49
1025
295
1022
« " ) ¬ 210A
119
1022
A1A
1024
§ ¦ ¨
962
1036
Ò " ) Ê
295
102
57
825
18
1008
80 0
94
í ì ë é è
721
St. Augustine
90
826
809
967
4 43
95
57
1023
0
964
§ ¦ ¨
1023
99
103
Ò " ) ÊÊ Ò
16
128
4 43
115
937
938
966
¬ «
202
¬ «
73
96
3 43
í ì ë é è
103
960
121
è í ì ë é í ì ë é è í ì ë é è Ò " ) Ê
Ò " ) Ê
11 9
¤ n
8 41
93
" ) 13B
828
827
842
851
5 80
834
848
833
Ò " ) Ê
843
Ò " ) Ê
Ò " Ê " ))
844
Ò " ) Ê
845
846
210
810
807
2 13
13
84 9
¬ «
Ò " ) Ê
7
847
Ò " ) Ê
840
418
802
841 803
Ò " ) Ê
811
10 3
Ò " ) Ê
9 81
1 13
0 82
16
¬ «
16
¬ «
823
812
908
82 9
106
Ò " ) Ê
" ) 13A
839
¤ n
815
5 81
816
" ) 13
16
¬ «
" )
¬ « A1A
1007
103
821
813
0
906
§ ¦ ¨
See Inset
115
83 0
13A
1025
" )
103 1
1029
809
95
" ) 214
è í ì ë é
1008
1008
312
¬ «
11 3
907
814
Lanes
n ¤ í ì ë é è
110
208
Legend ® Airport q ¤ Amtrak Station n ¤ Passenger Rail Station n í Intersection Projects ì ë é è Ò " ) Ê Interchanges Projects
1
£ ¤
83 6
832
46
835
® q
801
Reconstruct 2 Lanes Widen to 3 Lanes
" ) 13A
Widen to 5 Lanes
207
¬ «
09 Widen to 6 2Lanes
1
£ ¤
Context Sensitive Solutions 17
£ ¤ ¬ «Road New 3 Lane
" ) 305
New 2 Lane Road
850
15
New 4 Lane Road
" )
818
Express Lanes
¬ «
Ò " ) Ê
A1A
138
400
New 6209 Lane Road
206
¬ «
130
420
" )
420
Widen to 4 Lanes
207A Operational Improvements 505
First Coast Expressway 451
" ) " ) 13
Roadway System 19
¬ « ® q " ) ¬ «Bodies Water
965
Future Corridor TBD 100 1447
" ) 2016
Conservation Lands
" ) 204
100
¬ «
" )
310 Six Counties Boundaries
2040 Final Needs Plan St. John's County Roadway Projects Date: 11/4/2014
Page 56 of 61
Ò " ) Ê
¯
138
0
0
10,560 Feet
1.5
3 Miles
330
651
310
609
30 0
304
223
328
6 20
229 602
225
712
315
330
603
222
600 31 7
233
601
652
652
652
659
312
202
¬ «
115
¬ «
234
242
232
303
295
321
330
32 9
230
§ ¦ ¨ « " ) ¬
607
215 219
A1A
210A
§ ¦ ¨
209
295
St. Augustine
6 60
658
308
" ) 13B
2 30
327
9 30 302
" ) 210
13
30 2
¬ « 217
0 33
16
¬ «
16
¬ «
309
" ) 13A
211
¤ n
216
13
£ ¤ 1
330
" )
® q
16
¬ «
" )
¬ « A1A
¤ n
312
208
32 9
328
§ ¦ ¨ 95
" ) 13A
See Inset
3 30
312
¬ «
210
" ) 31 6
316
214
321
" ) 13A
£ ¤ 1
207
" ) £ ¤ ¬ « 17
Airport
" ) 305
15
Amtrak Station
¬ « A1A
321
209
Legend ® q ¤ n ¤ n
¬ «
214
206
¬ «
209 Passenger Rail Station
TSM&O
" )
Safety Priority Corridor
" )
207A
Safety Priority Intersections
" ) 13
19
¬ « ¬ ) «"
Roadway System100
® q
Water Bodies
Conservation Lands 310
1447
" ) 2016
" ) 204
100
¬ «
" )
Six Counties Boundaries
2040 Final Needs Plan St. John's County Safety and TSM&O Projects Date: 10/9/2014
Page 57 of 61
¯
0
0
10,560 Feet
2
4 Miles
2041
2058
½ ¾ ½ ¾
½ ¾
½ ½ ¾ ¾ ½ ¾
½ ¾
½ ¾
" )
½ ¾
¤ n
£ ¤
½ ¾
½ ¾
¾½
½ ¾
½ ¾
7
21 3
¾½
½ ¾
½ ½¾ ¾
½ ¾
½ ½ ¾ ¾
¾ ½
½ ½ ¾ ½ ¾ ¾
2132
½ ¾ ½ ½ ¾ ¾
½ ¾ ½ ¾ ½ ¾
½ ¾
¾ ½
½ ¾ ½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½
½ 2135 ½ ¾ ½ ¾ ½ ¾ ¾
¬ «
2140
¾ ½
½ ¾ 2040 Final ½ Needs St. John's County ¾ ½ ¾ Florida Greenways & Trails and Local ½ ¾ ½ ¾ Bicycle Corridors Priorities ½ ¾
½ ¾
¾½
Page 58 of 61
¯
0
0
10,560 Feet
1.5
3 Miles
½ ½¾ ¾ ½ ½ ¾ ½ ¾ ¾
" )
2145
½ Priority 1 Pedestrian Focus Areas ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ 21System ¾ Roadway 19 ½33 ¾ ½ ¾ 100 ® q ½ 1447 ¾ ½ ¾ Water Bodies ½ ¾ ¾ ½ ¾ ½¾ ½ ¾ ½ ¾ 100½ Conservation Lands2016 ½ ¾ ½ ¾ ¾ ½ ¾ ½ ¾ ½ ½ Counties Boundaries ¾ ½ Six ¾ 310 ½ ¾
½ ¾
¾½
½ ¾
½ ¾
¾½
½ ¾
½ ¾
½ ¾
¾½
½ ½ ¾ ½ ¾ ½ ¾ ¾
½ ¾
¬ « ) ¬ «"
¾½
½ ¾
" ) 207A
31
½ ¾
½ ¾
½ ¾
¾ ¾ ½ ½ ½ ½ ¾ ¾ ¾ ¾ ½ ½ ½ ½ ¾ ¾ ¾ ¾ ½ ½ ¾ ¾ ½ ½ ¾ ½
½ ¾
A1A
½ ¾
½ ¾
Saint Augustine Bicycle Plan
8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 209 Pedestrian Focus" Area 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ) 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : © ¨ © © ¨ 8 9 m8 : 9 m¨ : 8 9 m8 : 9 m : 8 9 mBicycle Corridors : © ¨ © ¨ © ¨ ½ ¨ ¾ © ¨ © ©Clay Multi-Use Path Needs ½ ¨ ¾ 2134
½ ¾
½ ¾
½ ¾
½ ¾ ¾ ½ ¾ ½ ¾ ½
½ ¾
13A
15
½ ¾
½ ¾
½ ½ ¾ ¾
2152
½ ¾
" )
3
½ ¾ ½ ¾ ¾ ½ ½ ¾ ½ ¾ ¾ ½
½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ½ ¾ ½ ¾ ¾
2146
5 21
½ ½ ¾ ¾
½ ¾
½ ¾
2138
209
¾½
½ ¾
Date: 10/14/2014
¾½
½ ¾
13A
½ ¾
½ ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ½ ¾
½ ¾
" )
" )
" )
½ ¾
½ ¾
½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾
¾ ½
½ ¾
2141
½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾
½ ¾
½ ¾
½ ½ ¾ ¾
" )
A1A
½ ¾
½ ½ ¾ ¾
2151
208
See Inset
8 9 m8 : 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ¨¨ © ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ © 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ¬ « ¤ n 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ©¨ ¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ © 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ©¨ ¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ © 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ©¨ ¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ © 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ½ ¾ ¾ ½ 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 95 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : § ¨ ¦ © © © ¨ © ¨ © ¨ © 8 9 m8 : 9 m¨ : 8 9 m8 : 8 9 m¨ : 8 9 m8 : 8 9 m : 8 9 m8 : 9 m : 8 9 m8 : 9 m : 8 9 m¨ : 9 m : 8 9 m : 9 m : 8 9 m : © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ ½ ¾ 8 9 m : 8 9 m : 8 9 m : 8 9 m : 312¨ © ¨ © ¨ © ¨ © ¨ © © ¨ 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ½ ¾ ¬ « 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ½ ¾ ½ ¾ ½ ¾ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ ½ ¾ ½ 214¾ 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ½ ¾ ½" ¾ ) ©¨ ¨ ©¨ ©¨ ©¨ © © ¨ 8 9 m8 : 9 m : 8 9 m8 : 9 m8 : 9 m : ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © 1 © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ 207 £ « ¬ « ©¨ ¨ ©¤ ©¨ ¨ ©¨ ©¨ © ¬ ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © 305 ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © " ) ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © 206 © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ ¬ « ¨ ©¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ 13 " ) ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © 204 ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © " ) ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ © ½ ¾
½ ¾
½ ¾
¾½
½ ½ ¾ ¾
¾½
16
¬ «
£ ¤ Existing Florida Greenways and Trails ¬ « Florida Greenways and Trails
21
1
½ ¾
9 21 4
¾½ 13
¾ ½
® q
½ ¾
13A
½ ¾
Passenger Rail Station17
½ ¾ ½ ¾ ½ ¾
½ ¾
¾½
½ ¾
½ ¾ 215 5
" )
Amtrak Station
½ ¾
½ ¾
½ ¾
½ ¾
¬ «¾½
½¾ ¾ ½ ¾ ½
½ ½ ¾ ¾ ½ ¾
½16 ¾
2009
Airport
½ ¾
¾ ½ ½ ¾ ¾ ½ ¾ ¾ ½ ½
¾½
0
½ ½ ¾ ¾
2086
½ ¾
01
¾½ ½ ½ ¾ ¾ ½ ¾
½ ¾
½ ½ ¾ ½ ¾ ½ ¾ ¾
½ ¾
4
¾ ½
2 ½ ¾ ½ ½ ¾ ¾ 16¾ ½ ¾ ½ ¾ ½
¬ «
4 21
½ ¾
½ ¾
4 215
½ ¾
½ ¾
½ ½ ¾ ¾
½ ¾ ¾ ½
½ ¾
©¨ ¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ © ¨¨ © ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©
½ ¾
2081 21 ½ ¾ ½ ½ ¾ ¾ ½ 04 ¾ ¾ ½ ¾ ½2082¾ ¾ ½ ½ ¾ ½ ½ ¾ ½ ½ ¾ ¾ ½ ¾ ½ ¾
2091
¾ ½ ¾ ¾ ½ ¾ ¾ ½ ½ ½ ¾ ½ ¾ ½
½ ¾
¬ «
" )
½ ½ ¾ ¾
½ ¾
½ ¾ ½ ½ ¾ ½ ¾ ¾
2095
6
½ ¾ ¾ ½ ¾ ½ ¾ ½
½ ¾
½ ¾
½ ¾ ¾ ½2147¾ ½ ½ ¾ ½ ¾ ¾ ½ ¾ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ ½ ¾ ½ ¾ ½¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ½ ¾ ©¨ ©¾½¨ ©¨ ©¨ ©¨ ©¨ ©¨ © ©¾½¨ ¨ ©¾½¨ ©¾½¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ¨ ©¨ ©¨ ©¨ ©¨ ©¨ © ½¨ ¾ ½¨ ¾ ©¾½¨ ¨ © © ¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ © ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ © ½¨ ¾ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ ½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ½210¾ 43 ¾ ©¨ ¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ © ½ ¾ ½ 21¾ ½ ¾ ½ ¾ ½ ¾ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ ½ ¾ ½ ½ ¾ ½ ¾ ©¨ ¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ ©¨ © © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ © ¨ ½13¾ ¾ ½
" )
2007
¾½
½ ¾
½ ¾
½ ¾
0
2148
½ ¾
½ ¾
2083
½¾ ¾ ½
7 20
½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ¾ ½ ¾ ½ ¾ ½
2152
½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ¾ ¾ ½ ¾ ½ ½ ½ ½ ¾ ½ ¾ ¾ 2142 ¾ ½ ½ ½ ¾ ¾
½ ¾
2139
½ ¾
½ ½ ¾ ¾
¾ ½ ½ ½ ¾ ¾
8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ½ ¾ ½ ¾ 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ½ ¾ 8 9 m8 : 9 m8 : 9 m8 : 9 m8 : 9 m :
½ ½ ¾ ½ ¾ ¾
¨¨ © ©¨ © ©¨ ¨ ©¨ © ©¨ ¨ © ©¾½ ½¨ ¾ © ¨ © ¨ © ¨ 13B
Legend
¾½
" )
¾½
¾½
¾½
A1A
3
St. Augustine
5 21
½ ¾
¾½
¬ «
210A
5 21
2146
½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾
½ ¾ ½ ¾
295
5
½ ¾
207 2142 ½ ½ ¾ ½ ¾ ½¾ ¾
½ ¾
2065
8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m8 : 9 m8 : 9 m8 : 9 m8 : 9 m :
® q ¤ n ¤ n
¾ ½ ½ ½ ¾ ½ ¾ ¾ ¾ ½¾ ½ ½ ½ ¾ ½ ¾ ½ ¾ ½ ¾ ¾ ½ ½ ¾ ¾
7
½ ¾
2145
½ ¾
2008
½ ¾
3
202
¬ «
§ ¨ ¦
2020
2087
8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ½ ¾ 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m8 : 9 m8 : 9 m8 : 9 m8 : 9 m :
2004
2 20
½ ¾ ¾ ½ ½ ¾ ½ ½ ¾ ¾
7 20
½ ¾
2137
½ ¾
115
¬ «8 8 9 m : 8 9 m : 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m8 : 9 m8 : 9 m8 : 9 m :
4
½ ¾
8 9 m8 : 8 9 m8 : 8 9 m8 : 8 9 m8 : 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 9 m : 9 m : 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ½8 ¾ ½8 8 9 m : 8 9 m : 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : ¾ ¾ ½ 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 295 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : § ¨ ¦ 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m : 8 9 m8 : 9 m8 : 9 m8 : 9 m8 : 9 m8 : 9 m8 : 9 m8 : 9 m :
2048
8 20
½ ¾
2141
½ ¾
2090
3 209
2154
2151
½ ¾
½ ½ ¾ ½ ¾ ½ ¾ ¾
¤ n
X Ã
¤ n
L
L
L
L
Capacity Upgrade 202
¬ «
L
L
X Ã X Ã
115
§ ¦ ¨ 295
2239
L
¬ «
L
L
L L
A1A
210A
L
X Ã
« " ) ¬
Grade Separation
2241
X Ã
§ ¦ ¨ 295
Grade Separation
L
St. Augustine Inset
2252
L
L L
" ) 13B
L
" ) 210
4 22 1
13
¬ « L 5 22 2
L
16
¬ «
16
¬ «
" ) 13A
¤ n
® q
£ ¤
" ) 13
1
16
L
¬ «
L
" )
4 225
¬ « A1A
¤ n
208
See Inset
L L
§ ¦ ¨ 95
L
" ) 13A
312
¬ «
" ) 214
L
Legend
13A
Amtrak Station
Passenger Rail Station 209
" )
£ ¤ ¬ « Norfolk Rail Projects 17
CSX Rail Projects
1
" ) 305
15
206
¬ «
Commuter Rail Corridors
¬ « A1A
L L
FEC Rail Projects
£ ¤
207
¬ « 6 225
X Ã X Ã X Ã
" )
Airport
L
® q ¤ n ¤ n
FEC Rail Corridors
" ) 209
L
CSX Rail Corridors
" )
207A
L
Intercity Passenger Rail Corridor
" ) 13
Railroad System 19
Grade Separation
2016
Conservation Lands 310
" ) 204
100
¬ «
L
¬ « ® q ) ¬ «" Water Bodies à " )X Roadway System 100 1447
" )
Six Counties Boundaries L
2040 Final Needs Plan St. John's County Freight Projects Date: 10/6/2014
Page 59 of 61
¯
0
0
10,560 Feet
1.5
3 Miles
õ ô ó ö ó õ ô ö õ ô ó ö õ ô ó ö õ ô ó ö
ó õ ô ö õ ô ó ö
¤ õn ô ó ö
ó õ ô ö õ ô ó ö
202
¬ « 115
¬ «
õ ô ó ö ó õ ô ö õ ô ó õ ô ó ö ö õ ô ó ö õ ô ó ö õ ô ó ö õ ô ó ö õ ô ó ö
õ ô ó ö
§ ¦ ¨ 295
« " ) ¬
210A
õ ô ó ö
§ ¦ ¨
A1A
295
õ ô ó ö
õ ô ó ö
St. Augustine
" ) 13B
õ ô ó ö
õ ô ó ö
õ ô ó ö
" ) 210
13
¬ «
16
¬ «
16
¬ «
® ó õ ô öq ¤ n
" ) 13A
£ ¤ 1
" ) 13
ó õ ô ö õ ô ó ö ¤ n
16
¬ « õ ô ó ö
" ) 208
§ ¦ ¨ 95
" ) 13A
¬ « A1A
õ ô ó ö
See Inset
312
¬ «
" ) 214
õ ô ó ö
" ) 13A
£ ¤ 1
207
¬ «
" ) 209
£ ¤ ¬ « 17
ó õ ô ö ® q ¤ n ¤ n
A1A
" ) 305
15
Legend
¬ «
206
¬ «
Park and Ride Parking 209 Lot Airport
" )
" )
207A
Amtrak Station
Passenger Rail Station Local Bus Service
13
19
¬ « ® q ) ¬ «" Roadway System Water Bodies
" )
100 1447
" ) 2016
" ) 204
100
¬ «
310 Conservation Lands
" )
Six Counties Boundaries
2040 Final Needs Plan St. John's County Transit Projects Local Bus Service Date: 10/9/2014
Page 60 of 61
¯
0
0
10,560 Feet
1.5
3 Miles
238 6
2 23 7
202
¬ «
2321
¤ n
115
2358
¬ «
§ ¦ ¨ 295
« " ) ¬ A1A
2325
210A
§ ¦ ¨ 295
8
2377
0 23
St. Augustine
" ) 13B
2 23 4
" ) 210
5 23 8
13
¬ « 2 23 7
16
¬ «
16
¬ «
" ) 13A
¤ n
® q
£ ¤
" ) 13
1
16
¬ «
¬ « A1A
¤ n
" )
9 231
208
§ ¦ ¨ 95
" ) 13A
See Inset
312
¬ «
" ) 214
2377
" ) 13A
£ ¤ 1
207
¬ «
" ) 209
£ ¤ ¬ « 17
® q ¤ n ¤ n
Amtrak Station
" ) 305
15
Airport
206
¬ «
" ) 209
Passenger Rail Station Bus Rapid Transit
" )
207A
Commuter Rail Corridors
" ) 13
Intercity Passenger19Rail Corridor
¬ « ® q ) ¬ «" Roadway System 100 1447
Water Bodies
A1A
6 225
Legend
¬ «
" ) 2016
" ) 204
100
¬ «
310 Conservation Lands
" )
Six Counties Boundaries
2040 Final Needs Plan St. John's County Transit Projects BRT and Commuter Rail Date: 10/14/2014
Page 61 of 61
¯
0
0
10,560 Feet
1.5
3 Miles
This page is intentionally blank.