1 minute read

Our Planning

Next Article
Evaluation

Evaluation

OUR PLANNING

Gantt Chart

Advertisement

Points for Consideration

• Although this is our initial plan we assume that timings will change as we find more efficient methods of production. • Our final plan and journal can be seen at the end of this project with the appropriate adjustments. • We have considered each week to equate to 5 hours of our time, thus the entire project equates to 125 hours of our time. • Although within the residential trip we spent three whole days working on the project, we have counted that as the equivalent to one week.

This article is from: