OUR PLANNING Gantt Chart

Points for Consideration • • • •

Although this is our initial plan we assume that timings will change as we find more efficient methods of production. Our final plan and journal can be seen at the end of this project with the appropriate adjustments. We have considered each week to equate to 5 hours of our time, thus the entire project equates to 125 hours of our time. Although within the residential trip we spent three whole days working on the project, we have counted that as the equivalent to one week.

Engineering Education Scheme: The Report | Our Planning

10