Eliminate pour strips with the PS=Ø® Mechanical Reinforcement Splice System Pour strips are often specified to control shrinkage, creep, and elastic shortening in post-tensioned and cast-in-place concrete. The PS=Ø® System elminates pour strips, while allowing for volume change in the slab and providing structual integrity. Reduce Costs Accelerate construction Improve safety No leave-outs
No redesign ACI-permitted ICC-approved Made in the USA
Introducing The Pour Strip Alternative Now you can eliminate pour strips - and the extra costs, construction delays and safety issues they bring - with the PS=Ø® Mechanical Reinforcement Splice System. Using proven coupler technologies recognized worldwide, PS=Ø® features a tapered thread on one end and grout-filled sleeve on the other. This patented system is an ACIpermitted method of splicing rebar, is ICC-approved, and made in the USA. REDUCE COSTS. Closing pour strips is the most expensive concrete pour on a job. Formwork, shoring, and backshoring must stay in place for weeks, and crews must reassemble for small pours. The PS=Ø® system eliminates this costly and time-consuming step.
ACCELERATE CONSTRUCTION. Pour strips are a drag on any construction schedule. They not only require re-pouring the leaveout, but also restrict worker access. By eliminating pour strips, the PS=Ø® system can cut weeks or even months from construction schedules.
IMPROVE SAFETY. An open leave-out in a floor is a major safety hazard. Pour strips are particularly hazardous because they run the entire width of the slab and are impossible to avoid. The PS=Ø® system replaces dangerous leave-outs with a narrow, grouted joint.
PS=Ø® Applications:
No stressing strip
Stressing strip
Wall
Completed pours at no stressing strip
Completed pours at stressing strip
Completed pours at wall
Available sizes and specifications: #6 rebar (60ksi) #7 rebar (60ksi) #8 rebar (60ksi) Type 1 and Type 2 ASTM A536 (65ksi) Epoxy coating available
PS=Ø® packaging contains all necessary items for a complete installation including: Threaded and continuation rebar BASF 885 grout Shop drawings Technical support On-site installation support
Eliminate pour strips on your next job with the PS=Ø® Mechanical Reinforcement Splice System. Call 800-355-8414 for more information.
PS=Ø®
Tech Sales, LLC
192 West Ninth St., St. Paul, MN 55102
pourstrip0.com
800.355.8414
©2021 PS=Ø®