Pedro Alban - Architecture and Art Portfolio

Page 1



pedro alban calmon art and architecture portfolio

Summary resume 2 de Julho Masterplan 2 de Julho Social Housing AA visiting School Japanese Restaurant Art

4 6 8 12 14 16


cv pedro alban

Architecture and Urbanism undergraduate Faculty of Architecture - Universidade Federal da Bahia

resume

Pedro Alban is a Brasilian Architecture and Urbanism student, currently receiving an interchange scholarship from the Science Without Borders program to study at Leeds Metropolitan University. Besides having creative skills in the development of projects on different platforms - Revit, Photoshop, Autocad, Indesign - he is also highly interested in issues linked to architectural educatiion, theory and pragmatics. Currently running a blog of his own drawings, Pedro has a varied professional experience in architectural offices. He won, as part of a team, the first prize in the workshop “Que Cidade é Essa?” for urban proposals in salvador.

Education

Universidade Federal da Bahia (March 2011- in course) Faculty of Architecure and Urbanism Graduate prediction November 2017 Leeds Metropolitan Univesity (January 2014 - in course) Ba Architecture - Faculty of Architecture and Arts

Languages

Portuguese - Native English - Speaks and Writes fluently Spanish - speaks and writes fluently

Internships

GMF Arquitetos - January 2012 Development of architecural project for Festival de Verão - music Festival Participation in construction supervision at the festival Urplan - September 2012 - January 2013 Development of Residential Institutional and Urbanism projects Production of physical and digital models Execution of road plans and sections participation in the creative process of projects Dendê Arquitetura - February - July 2013 Development of residential and institutional projects Production of physical and digital models Participation in the creative process of projects Cinematic Commons - June 2014 - In course Research on the Essay Film Genre at Leeds Metropolitan University March Unit Research and writing Production of drawings and diagrams

collectives

ZSU Skateramps - Partner Execution of projects for skateparks in Brazil Projects for Salvador’s City Hall, aproved, not built FDN Skate Crew - Partner Organization of skateboarding events, reproposition of use in public squares


academic

Universidade Federal da Bahia - 2013 Faculty of Architecture and Urbanism Director of External relations at the students directory Organization of Architectural Week - Lectures, Workshops and expositions Cinematic Commons - June 2014 - In course Research on the Essay Film Genre at Leeds Metropolitan University March Unit Research and writing Production of drawings and diagrams Erea Niterói - April 2013 Regional Encounter of Architecture Students Lectured in a workshop about origami techiniques applied to architecture

FREELANCE

Fellas Skateboarding Brand Skateboard Graphic Illustration

workshops

AA visiting school - July 2013 Workshop on Landscape Urbanism with Eva Castro (Plasma Studio) and Frederico Ruberto (Remix Studio) Development of Urban Projects for São Paulo Parametric design (Rhino and Grasshopper) Que Cidade é Essa? Competition for urban proposals in Salvador First Prize as a team

publications and ehxibitions

Museu da Misericórdia Exposition of projects from Que Cidade é Essa Workshop http://issuu.com/pedroalban Digital Portifolio, CV and Essays http://tedioprodutivo.tumblr.com Art Blog

competences

Photoshop Illustrator Indesign Premiere (in course) Autocad Revit Rhino and Grasshopper (in course)

Contact

albanarq@gmail.com +44 7762921278

4/5


2 de julho masterplan 2 de Julho is a neighbourhood Located in Salvador’s historical centre, Bahia. It’s great views towards the sea and strategic location within the city have been driving a massive gentrification process in the place. The relatively low density of the community and the already existing infrastructures of the site were key factors to the development of a masterplan. The project aimed a redesign of the neighbourhood from the perspective of their present residents but which also allowed and prepared the site for more dense occupation. Through research with the locals and the tracing of various narratives, The masterplan developed a sense of identity which lacks in the current government planing. Spaces and Connections were the main drivers of the plan. The idea was to reassemble the site, which presents a speed highway and a strong topography slope dividing it, and its both existing and future planned infrastructures. The rethinking of the community’s squares and plazas looked for a more optimized use by the many groups of inhabitants, commerciaries, residents, children, and addressed the issues of security and violence through architectural and urban design. Flexibility and nonregulated design were also key to the project. The manner that old people playing chess, ephemeral structures of street commerce and wooden tables of bars occupy the square, with densities that change on the day/ night, weekdays/weekends basis was taken into account for the role it plays in site and its identity. Between the planned and the unplanned, 2 de rethinks identity’s role in Salvador’s new developments.


Calha em perfil metálico detalhe em escala 1/20 demonstrando relação visual de criança no nível mais baixo

6/7


2 de julho SOCIAL Housing 2 de Julho’s interest in a social housing comes from the present hospitals, schools, transport facilities and other infrastructures already present in the site. Developed as a continuous design process of the masterplan, the building presents in its conception many of the same interests which drove the project at the urban scale. Flexibility and Identity are taken to the level of self construction. The idea of a house which is designed for self-constructed ampliations, exhausted by architects such as Alejandro Aravena, takes here a vertical approach. The flats­ (accessible not included) are designed without partitions and with a double ceiling height, allowing for the inhabitants to choose their own furniture, layout... Three meter spans permit easily constructible floors. Hydraulic facilities and stairs already installed make possible to build with minimum effort. Through this decisions, the project obtains, besides flexibility, a sense of identity lacking in most of government housing projects. Formally, The building is comes from the stacking of blocks (flats), which differ in length and height according to family types and accessibility. While still maintaining a optimized structure series of cantilevers and voids are generated by the operation. A slight rotation of the blocks aims better ventilation and less sun exposition. The result is a building that, in its form and program, shows the role community should play in design decisions. The project is a experiment in what lacks at the neighbourhood current developments, identity.

Acessible flat

Families

Single Inhabitant


8/9


art


10/11


AA visiting school AA’s 2013 São Paulo visiting school had as a theme the drawing of future scenarios for Campo de Marte’s site, currently a private flight airport in city centre. The place, really close to the polluted city’s canal Tietê, presented future potentials, with the planning of a high-speed train station and the many possible revitalizations of the river. Taking both precise reality data and delirious forward thinking, the team tried to develop a plan which changed spatial conditions in time. The project had as a main feature the generation of new topographies based on the piling up of construction waste. The waste, leftover from demolished buildings and constructions in general, would arrive from the Hidroanel, an existing plan which makes a ring of navigable waters through Tietê and other rivers in the city. By receiving the dumped material, the site not only makes money, but develops a spatial condition in constant growth, which them affects uses, paths of access, water flows and so on. Analyses of the site, in present and future time, inform and change de design, studying uses according to slope, wind... Buildings and landscape are generated at the same time, taking in account the radiuses and speeds of the machinery and the yearly amount of waste. Between an understanding of real conditions and the ability to suggest new futures, Campo de Marte rises as a new way of linking spaces and developments through urban planning. Hidroanel circuit, important collect and disposal sites

1 2 3 4 5 6 7 8

1 2 3

4 5 6 7 8

SLOPES

1 2 3 4 WATER FLOW

FLOOD RISK medium risk

5 6 7

highest risk

8

CONSTRUCTION WASTE + SOIL 133000000 Ton/year 45500 m³/year

REUSABLE or RECYCLABLE waste as aggregation


Leisure Uses

Comercial Uses

Culture Uses

THE EXCAVATOR

CAPACITY 592 kg 0.9 m3 MAX RADIUS 118m MIN RADIUS 45m MAX ROTATION 184.5º

TRAJECTORY 184.5º max rotation

175º

180º

180º

180º

184º

12/13


Japanise restaurant Studies of transparency drove the this project for a Japanese restaurant in Rio vermelho, a bohemian area in Salvador. The concept driving the project was that of the illusions of transparency, which is achieved by nontransparent but reflective materials. The relationship between metallic sheets guides the look of observers up, keeping degrees of privacy for the users. From the inside, the short distance and lower position of the table area doesn’t allow the “periscopes” to function properly, keeping a calm and isolated environment. Issues of the site’s size and logistical relationships in industrial kitchens were also taken into account, making for a functional project which tries to simplify complexities inherent to this kinds of project.

1

5 2

3

2

4

5

6

7

8

22,08

0,15

B

1,05

TRIAGEM

2,05

8,24 m²

1,60

E=28,00 P=17,06 1 RAMPA i=8%

2 3 4

LIXO

5 6 7 8

0,90

1,18

0,42

SALÃO PRINCIPAL 58,93 m² -0,15

4 1

2,20

2,37 3,61 m²

1,54

+0,15

1,06

0,55

0,15

A

1,20

RECEPÇÃO

E=28,00 P=17,33

2

4

0,42

3

2,08

5

1,95

6

1

4,18 2

3,50 m²

3,27 m²

1

VEST FEM

VEST M

1,85

2,20

4,90

1,95

PNE

2,48 m² -0,16

PASSEIO

1,96 m²

14,95 m² -0,15

7,34

4 1

RESERVATÓRIO

1,64

CARGA E DESCARGA

3,80

5,19 m²

1,78

0,92

1,55

3,16

3,14

4,05

3,05

3,55

4,59

2,10

1,01

21,85 PASSEIO

PASSEIO

+0,00

+0,00

5 2

1

2

3 6,05

1,05

5

6

7

8 N

3,12

4 5 2

1,35

1,25

B

escritório

1

2,66

8,16 m²

2

SANITÁRIO MASC

3 4

7,43 m² +2,75

5

COCÇÃO

6

20,56 m² +2,75

5,51

1,10

8 9

7,10

4 1

7

4 1

10 11

2,50

1,66

12 13

LAVAGEM

14

8,00 m²

DEPÓSITO

15

9,00 m²

16 17

0,84

1

2

3

4

5

6

7

8

9

10

11

12

13

14

16

5,57 m² +2,75

15

SANITÁRIO FEM

1,04 m²

1,05

0,84

DML

A 1,26

3,85 3,14

2,60 4,05

1,50

1,03

3,05

10,24 3,55

5 2

1,01 4,59

2,10

1,01


TELHA METÁLICA i=4.5%

0,40

RUFO METÁLICO

0,12

PLATIBANDA COM REVESTIMENTO EM CHAPA METÁLICA h = 40 cm

VIGA METÁLICA PERFIL I h =40cm

RIPADO DE SEÇÃO 50X30mm E ESPAÇAMENTO DE 70mm

BRISE EM CHAPA METÁLICA DOBRADA ESP:3mm

MONTANTE VERTICAL DA ESQUADRIA

0,15

BIT DE SUTENTAÇÃO DO VIDRO COM JUNTA DE SILICONE

0,39

BIT DE SUTENTAÇÃO DO VIDRO COM JUNTA DE SILICONE

SUPORTE METÁLICO EM AÇO INOX PRESO EM CHAPA APARAFUSADA AO PILAR

8

7

6

5

4

3

2

Estrutura em madeira

0,52

VISTA A

Telha metálica i=5%

TUBULAÇÃO PARA ESCOAMENTO DE AGUAS

PILAR ESTRUTURAL EM AÇO SEÇÃO 20X15 cm

SALÃO PRINCIPAL

COCÇÃO

PNE

RESERVATÓRIO

COCÇÃO

LIXO

CIRCULAÇÃO

CARGA E DESCARGA

VISTA A

0,30

5,63

PASSEIO

SANITÁRIO

5,33

5,85

0,33

0,15

0,05

0,05 0,20 0,05

0,60

1

2

VISTA AA

3

ESCALA 1 : 20 PROJETO

ALUNO

PLANTA BAIXA TÉRREO ESCALA 1 : 20 ORIGAMI - RESTAURANTE JAPÔNES

14/15



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.