PGAL: An Evolution of Aviation Design

Page 1

AVIATION DESIGN STUDIO

PORTFOLIO OF SELECTED WORKS

AVIATION DESIGN STUDIO

PORTFOLIO OF SELECTED WORKS

TABLE OF CONTENTS

DALLAS/FORT WORTH INTERNATIONAL AIRPORT TERMINAL C HIGH GATES

RONALD REAGAN WASHINGTON NATIONAL AIRPORT NEW NORTH CONCOURSE

DALLAS/FORT WORTH INTERNATIONAL AIRPORT PUBLIC SAFETY HEADQUARTERS

NEWARK LIBERTY INTERNATIONAL AIRPORT TERMINAL A REDEVELOPMENT

LOS ANGELES INTERNATIONAL AIRPORT TERMINAL 1.5 DEVELOPMENT PROGRAM

LOS ANGELES INTERNATIONAL AIRPORT TERMINAL 1 MODERNIZATION

RONALD REAGAN WASHINGTON NATIONAL AIRPORT AMERICAN AIRLINES NEW REGIONAL CONCOURSE

HARRY REID INTERNATIONAL AIRPORT TERMINAL 3

JOHN F. KENNEDY INTERNATIONAL AIRPORT TERMINAL ONE

GEORGE BUSH INTERCONTINENTAL AIRPORT INTERNATIONAL ARRIVALS BUILDING

WASHINGTON DULLES INTERNATIONAL AIRPORT JAMES A. WILDING INTERNATIONAL ARRIVALS HALL

GEORGE BUSH INTERCONTINENTAL AIRPORT TERMINAL B + C MASTER PLAN

GEORGE BUSH INTERCONTINENTAL AIRPORT TERMINAL B SOUTH CONCOURSE

GEORGE BUSH INTERCONTINENTAL AIRPORT TERMINAL C NORTH CONCOURSE

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT TERMINAL 4 REDEVELOPMENT + EXPANSION

CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT CONSOLIDATED RENTAL CAR FACILITY + GROUND TRANSPORTATION CENTER

BRADLEY INTERNATIONAL AIRPORT CONSOLIDATED RENTAL CAR FACILITY + GROUND TRANSPORTATION CENTER

BOSTON LOGAN INTERNATIONAL AIRPORT CONSOLIDATED RENTAL CAR FACILITY

RENO/TAHOE INTERNATIONAL AIRPORT CONSOLIDATED RENTAL CAR FACILITY + GROUND TRANSPORTATION CENTER

RONALD REAGAN WASHINGTON NATIONAL AIRPORT TERMINAL B/C

PHILADELPHIA INTERNATIONAL AIRPORT TERMINAL A WEST

PHILADELPHIA INTERNATIONAL AIRPORT RAMP CONTROL TOWER

BOSTON LOGAN INTERNATIONAL AIRPORT UNITED AIRLINES CLUB

AUSTIN-BERGSTROM INTERNATIONAL AIRPORT DELAWARE NORTH CONCESSIONS

GEORGE BUSH INTERCONTINENTAL AIRPORT TERMINALS A, B, C + D, WORLD DUTY FREE GROUP RETAIL CONCESSIONS

DALLAS/FORT WORTH INTERNATIONAL AIRPORT TERMINALS A + C, 3SIXTY DUTY FREE BOUTIQUE + PAY CONCESSIONS

AIRPORT CARGO + MAINTENANCE FACILITIES

HOUSTON WILLIAM P. HOBBY AIRPORT GALAXY FBO

SUGAR LAND REGIONAL AIRPORT REGIONAL AIRPORT TERMINAL

SAN DIEGO INTERNATIONAL AIRPORT ADMINISTRATION OFFICE BUILDING

AUSTIN-BERGSTROM INTERNATIONAL AIRPORT PARKING GARAGE + ADMINISTRATION BUILDING

Today PGAL has 250+ architects, engineers, planners, and interior designers located in offices from coast to coast

ALEXANDRIA HOBOKEN BOCA RATON ATLANTA HOUSTON AUSTIN LOS ANGELES LAS VEGAS DALLAS/FORT WORTH SAN DIEGO SALT LAKE CITY DENVER

LEGACY. DESIGN. SERVICE.

PGAL’s Team of aviation specialists understand the myriad of challenges that face airports and airlines to enhance customer service while facilitating secure and efficient operations. Close and interactive working relationships with our aviation clients has led to demonstrated successes in the implementation of compelling, functional, and fiscally responsible designs worldwide.

Our aviation experts have completed more than 15 million-square-feet of airport terminal space, both new construction and renovations, at over 60 airports across the nation and internationally.

We understand the critical nature of ongoing operations and the overall importance of providing a positive customer experience. Nothing is more important in the process of terminal planning, ticketing lobby design, and baggage design than ensuring that the end result provides a stress-free and efficient passenger experience. Our unparalleled aviation facility design and planning experience demonstrates responsive and innovative thinking with the satisfaction of the traveler always in mind.

7 AVIATION DESIGN STUDIO
Airside View
Exterior

TERMINAL C HIGH GATES

DALLAS/FORT WORTH INTERNATIONAL AIRPORT

The DFW High C Gates project was the first of its kind in North America to employ a modular construction technique to an Airport Terminal.

The $115 million Terminal C High Gates Demolition and Rebuild project provides a new state-of-the art facility to replace the existing outdated infrastructure and to help DFW meet its growing demands. Serving as Prime-Architect, PGAL worked closely with DFW Airport and other key stakeholders, providing preconstruction, design and construction phase services for the replacement and addition of five new gates at Terminal C. The project involved abating and demolishing the Terminal C extension that was built in 1988 as a temporary structure for five gates. The new facility will provide passengers an improved level of service and added capacity to meet current and future airport needs.

Our progressive design-build team, led by Design-Builder Archer Western, was responsible to overcome multiple critical project challenges. The project would need to be built directly adjacent an active terminal space and in the midst of an active ramp area and the construction would need to take place without disrupting the airline operations or the passenger experience. To overcome this, the team creatively expedited the schedule using modular construction shell structures, which were fabricated off-site and transported across the runway to

the site in the middle of the night, in order to minimize runway closures. PGAL, tasked with design for this project, led the off-site design of the entire team including engineering and specialty consultants. PGAL was a critical team member in the relocation and installation of the modular terminal facility. Our team’s innovative approach allowed the project to be delivered under budget and 20% faster than DFW’s original schedule.

The project replaced the outdated structure by constructing a new two-level, almost 80,000-square-foot terminal consisting of a pre-fabricated modular envelope (shell and core). The gates at the new domestic flight terminal will accommodate five narrow-body aircraft or regional jets.

DFW

AT A GLANCE

COMPLETION DATE

2022

ROLE + SERVICES

Planning, Programming, Architecture, Interior Design, Construction Administration

PROGRAM

Pre-fabricated modular envelope for expedited project delivery

Five new gates to accommodate narrow-body aircraft

Abatement and demolition of the existing extension immediately adjacent to an occupied terminal

9 AVIATION DESIGN STUDIO
11 AVIATION DESIGN STUDIO
Concourse
+ Holdroom
Concessions+ Holdrooms

NEW NORTH CONCOURSE

RONALD REAGAN WASHINGTON NATIONAL AIRPORT

Part of a $1billion Terminal B/C Redevelopment Program, the New North Concourse project enhances the passenger experience at DCA by providing 14 regional aircraft gates replacing the existing ground-loaded regional aircraft operation.

The Metropolitan Washington Airports Authority (MWAA) selected PGAL as part of the AIR Alliance Joint-Venture Architectural/Engineering team for design and construction documentation services for this $1 billion capital improvement program at Ronald Reagan Washington National Airport.

The Authority’s program, also known as “Project Journey”, is intended to address decreasing level of service at the existing terminal facilities due to overcrowding caused by record passenger growth in recent years.

To enhance the overall level of service, the primary component of the program includes the construction of the 230,000-square-foot New North Concourse facility which replaces the existing ground-loaded 14 regional jet aircraft hardstand operation. The new facility provides passengers with spacious next-generation holdrooms, access to aircraft via

passenger boarding bridges, improved concession choices and a seamless connection to the rest of the terminal facilities. The concourse design includes architecture that remains consistent with Terminal B/C’s exposed structure, glass walls and domed ceilings while optimizing open, welcoming public areas with expansive views of Washington, D.C.

DCA

AT A GLANCE

COMPLETION DATE 2021

ROLE + SERVICES

Planning, Programming, Architecture, Interior Design, Construction Administration

PROGRAM

230,000 SF New Concourse

14 Regional Aircraft Gates with Access to Aircraft via Passenger Boarding Bridges

Spacious Next-Generation Holdrooms

13 AVIATION DESIGN STUDIO
AVIATION DESIGN STUDIO Connector Pier End Concessions + Holdrooms Pier End Holdrooms
Concessions+ Holdrooms
Exterior View

PUBLIC SAFETY HEADQUARTERS

DALLAS/FORT WORTH INTERNATIONAL AIRPORT

The new 140,000-square-foot public safety headquarters building at DFW Airport houses the administrative and operational offices for the airport’s police, fire, and special services staff, as well as a detention center.

PGAL facilitated collaborative programming/planning sessions with representatives from all departments to determine space needs and optimize efficiency and functionality, while satisfying the airport’s overall objectives. Together the stakeholders prioritized departmental needs and agreed on a program that satisfied the airport’s objectives.

The DFW DPS has placed high importance on the security and safety of their personnel and property. This facility has strategic collaborative spaces to foster interdepartmental interaction and planning. Specific spaces include: administrative offices, support personnel offices, sally port, detention facility, apparatus bay, conference rooms, huddle areas, training/ seminar rooms, crime investigation room, interrogation rooms, SWAT deployment area, and fitness center with lockers and showers.

Well-being was paramount in the design and construction process, including bus service at the front door, abundant natural lighting, exterior views and ample open exterior spaces (31% of the overall area is vegetated). This allows employees

a place to walk, rest, and take necessary breaks; in addition, the police dogs have areas to exercise. A state-of-the-art fitness facility is available as well as a large staff Café and various “huddle” spaces. A stringent Construction Indoor Air Quality Management Plan was followed specifically for the project and all materials contain low to zero VOC’s.

The design maximizes north and south orientation while limiting eastern and western solar exposure. Exterior sunshades were installed on south-facing windows and all glass is high performance Low-e. The building is 21.35% more efficient than the ASHRAE 90.1-2010 Standard and uses 100% Green Power with the purchase of Renewable Energy Credits and Carbon Offsets.

DFW

AT A GLANCE

COMPLETION DATE

2019

ROLE + SERVICES

Programming, Architecture, Interior Design, Construction Administration

PROGRAM

140,000-square-foot

Two-story Public Safety Headquarters Building

Collaborative Spaces to Foster Interdepartmental Interaction

Design-Build project delivery method

17 AVIATION DESIGN STUDIO
19 AVIATION DESIGN STUDIO
Exterior View
Departures Roadway

TERMINAL A REDEVELOPMENT

NEWARK LIBERTY INTERNATIONAL AIRPORT

Designed in a “T” configuration, this three-level, 1 million-square-foot terminal building provides 33 new domestic aircraft gates for Newark Liberty International Airport.

From 2012 through 2016, PGAL served as the Prime Consultant and Lead Architect for the advanced planning, concept development and production, and coordination of bridging documents for the new Terminal A. In 2016, The Port Authority of New York & New Jersey (PANYNJ) selected a design-build team led by Tutor Perini Parsons to complete design development and construction documents. PGAL assumed the role of Executive Architect to support PANYNJ in ensuring subsequent design work conformed to established performance and design criteria.

The terminal is organized to provide efficient passenger processing and movement. An expandable security screening checkpoint provides increased passenger queue space and dedicated lanes for premium passengers, crew, and physically challenged travelers. The infrastructure serving check-in and screening operations will adapt to changing and future processing requirements. Dedicated airline check-in areas are also provided for premier passengers.

The baggage claim area includes six claim units with immediate access to airline services offices and passenger amenities for

two defined arrivals areas from the departures concourses. PGAL maximized airline support for ramp operations and consolidated baggage processing and screening areas for efficient outbound and inbound baggage operations.

The terminal facilities include a high level of passenger services including a broad range of retail and food and beverage options integrated into the hold room seating areas. Hold rooms are designed to address a diverse aircraft fleet mix that includes wide body aircraft. Airline lounges are immediately accessible after the security checkpoint, and the mezzanine locations offer direct views of the airfield and the primary concourse area.

With a specific emphasis on an enhanced passenger experience, PGAL was also engaged to lead the integration of large format digital “sense of place” displays, advertising and a local Public Art program in Terminal A. In collaboration with Moment Factory, the team integrated the design of a “Digital Passenger Journey” to provide a personalized and iconic experience with unique multimedia zones that share the incredible story of New Jersey’s people, places and culture.

AT A GLANCE

COMPLETION DATE

January 2023

ROLE + SERVICES

Planning, Programming, Concept Design, Bridging Documents, Architectural Program Management

PROGRAM

1 Million SF New Terminal Building

33 New Domestic Aircraft Gates

New 3,000 Space Parking Structure with New Departures and Arrivals

Roadway System

Multiple Construction Packages

AVIATION DESIGN STUDIO

21
EWR
Aerial View
Circulation Core

TERMINAL 1.5 DEVELOPMENT PROGRAM

LOS ANGELES INTERNATIONAL AIRPORT

The Terminal 1.5 Development Program entails the development of a new Terminal facility at Los Angeles International Airport (LAX) to support various airlines over the next 20 years or more.

Initially, Terminal 1.5 will be utilized by Southwest Airlines along with various other airlines. Airline operations and support spaces for airlines operating from the Midfield Satellite Concourse will be located within Terminal1.5.

Following the completion of the new Midfield Satellite Concourse (MSC), passengers will be processed through the expanded ticketing lobby and security screening checkpoint in Terminal 1.5 via a bus gate which will shuttle passengers between Terminal 1.5 and the new MSC.

The new four-level, multi-tenant terminal building includes baggage claim, ticketing, security checkpoint, airside connector between T1 and T2, retail concessions and leasable office space. Also included are a bus gate, an outbound baggage

system expansion (including CBIS) and an inbound baggage system, loading dock with receiving area, vertical circulation, and support spaces for building services such as mechanical, electrical, plumbing and information technology.

The project also includes a vertical circulation core which provides connectivity between the terminal and the future automated people mover. As planned, the building is approximately 225,000-square-feet.

LAX

AT A GLANCE

COMPLETION DATE

2020

ROLE + SERVICES

Programming, Planning, Architecture, Interior Design, Construction Administration

PROGRAM

225,000 SF New Terminal

Secure Passenger Connection between Terminals 1 and 2

Vertical circulation core which provides connectivity between the terminal and the future automated people mover

Phased Construction to Provide Continuous Airport Operations and Passenger Services

AVIATION DESIGN STUDIO

25

Ticketing Security Screening Checkpoint Baggage Claim
Circulation Core
Post-Security Screening Checkpoint

TERMINAL 1 MODERNIZATION

LOS ANGELES INTERNATIONAL AIRPORT

Part of a $7.3 billion Los Angeles International Airport capital improvement program, the $508 million Terminal 1 renovation and improvement project expanded and upgraded facilities for Southwest Airlines operations.

The new terminal provides a smoother, more intuitive passenger-centered experience in the 346,000-square-foot terminal. The terminal’s entrance, ticket counters, and Skycap operations were moved from the east end of the building to the west side to ease traffic congestion — a problem motorists frequently encountered when entering the central terminal area at peak travel times.

A reprogrammed departures and arrivals level features a “Lobby of the Future,” which includes self check-in and self-tag bag drop kiosks, a 12-lane security screening checkpoint, two large bag claim devices, and a high-speed in-line screening baggage handling system. Combined, these features help to make departure and arrivals systems more balanced and efficient both curbside and within the terminal.

Once through security, passengers experience a bright, modern concourse. Twelve gates feature new, enlarged, light-filled hold rooms with integrated concessions and passenger amenities. An additional 25,000 square feet of retail and dining space highlights a variety of finishing materials and sculpted

facades, nearly doubling the past concessions area. Other improvements include enhanced lighting and daylighting, better views to the terminal exterior, improved signage, and vertical transportation. New architectural elements blend in with existing terminal treatments to effectively blur the line between existing and new building areas. To accommodate the airline’s larger Boeing 737 aircraft, new passenger boarding bridges were installed, along with upgraded aircraft apron pavement, a hydrant fueling system, and electric vehicle chargers.

The project was phased to ensure continuous airport operations throughout the construction phase.

LAX

AT A GLANCE

COMPLETION DATE

2018

ROLE + SERVICES

Programming, Planning, Architecture, Interior Design, Construction Administration

PROGRAM

346,000 SF Renovated + Upgraded Space

61,000 SF New Space

13-Gate Facility (737-800W Basis-of-Design Aircraft)

New Enlarged Hold Rooms

Expanded Integrated Concessions

Phased Construction to Provide Continuous Airport Operations and Passenger Services

AVIATION DESIGN STUDIO

29
Concourse Holdroom + Concourse Departures Curbside
Post-Security Screening Checkpoint
Administrative Huddle Rooms

AMERICAN AIRLINES NEW REGIONAL CONCOURSE DEVELOPMENT

RONALD REAGAN WASHINGTON NATIONAL AIRPORT

American Airlines (AA) tasked PGAL with planning, programming, design and documentation services associated with the new 20,000-square-foot operations and administrative spaces in the New North Concourse at Ronald Reagan Washington National Airport (DCA).

The new operations and administrative spaces would serve as the new home for Piedmont Airlines as part of the overall DCA Terminal B/C Redevelopment Program dubbed Project Journey by the Metropolitan Washington Airports Authority.

As part of the initial phase PGAL developed a detailed project definition document which included the confirmation of the proposed program space requirements; interviewing different user groups to identify existing and future operational needs; and created a programming document and multi-color floor plans for presentation to AA senior management.

The overall goal of the project was to enhance the airline’s employee experience, echoing the passenger enhancements being implemented throughout the public spaces of the New North Concourse. The PGAL team developed design strategies to maximize space utilization and functionality while observing the American Airlines corporate design standards and creating an inspiring space for the airline employees.

Project scope included the design of new administrative office suites, airline operations offices, employee restrooms and locker rooms, kitchenettes, break rooms for ramp and gate operations employees, supply storage, aircraft maintenance facilities, flight crew lounges, and building systems rooms. Interior finishes were carefully selected to deliver a branded environment that provided durability, quality acoustics, and ease of maintenance.

The completed project provides airline employees with a modern and dynamic workspace with expansive airfield views allowing employees to be fully immersed in daily operations. From design inception through project completion, PGAL remained client-focused and committed to delivering a modern state-of-the-art space that would provide a warm, welcoming, and highly functional environment for American Airlines employees.

DCA

AT A GLANCE

COMPLETION DATE

2021

ROLE + SERVICES

Planning, Programming, Architecture, Interior Design, Construction Administration

PROGRAM

19,400 SF Operations Level and 550 SF Concourse Level

Administrative and operations spaces to accommodate airline crew and staff

Design incorporated American Airlines corporate design standards

33 AVIATION DESIGN STUDIO
Piedmont
Administrative Suite
35 AVIATION DESIGN STUDIO
Duty Manager Office Crew Lounge Operations Office

TERMINAL 3

HARRY REID INTERNATIONAL AIRPORT

Inspired by Nevada’s vast desert region and mountainous terrain, Terminal 3’s abstract shape is derived from natural, unique geometric rock formations and enclosures.

The 1.9-million-square-foot, three-level complex includes an integrated 14-gate concourse and federal inspection services (FIS) facility to support an additional 30 gates in the existing Terminal D satellite facility. Designed to operate at the cutting edge of passenger processing, the terminal incorporates advanced aviation-related technologies and systems, supported by a sophisticated, highly flexible infrastructure.

Thirty-two security screening lanes at two separate checkpoints located on different levels of the terminal offer passenger processing flexibility based on passenger departure peaks. Within the baggage claim hall, selected areas and associated claim devices can be configured for use by secure international and non-secure domestic arrivals depending on flight activity levels. The terminal is a fully common user terminal equipment (CUTE) facility, providing further flexibility in the positioning of airlines and their code

share partners. Gates have self-boarding equipment to expedite boarding. A vast infrastructure backbone enhances coordination of multiple airport command centers and accommodates the latest technology, including the first major U.S. installation of unstaffed exit vestibules from secure side operations. An accompanying 5,200-car garage features dynamic signage, a full-service valet, and an electronic parking system.

All roads and facilities were completed a full year ahead of the project schedule. Though the terminal was designed for a phased opening, because construction activities progressed significantly ahead of schedule, all gates and systems came on line prior to the original completion date and the airport opened its domestic and international operations concurrently. The project was also delivered below budget.

37 AVIATION DESIGN STUDIO Ticketing Check-In Lobby AT A GLANCE COMPLETION DATE 2012 ROLE + SERVICES Prime Consultant + Lead Architect PROGRAM 1.9 Million SF New Terminal 14 New Gates (7 Swing /7 Domestic) New FIS Processes 1,600 International Arrivals/Hour LAS

I have been continually impressed by PGAL’s genuine effort to provide the highest caliber of professional services. They have proven to be responsive and attentive to the demands of this $2B program and remain committed to working with the Department of Aviation and its stakeholders to deliver a functional, flexible, and operationally efficient design on time and within budget.

39 AVIATION DESIGN STUDIO
Departures Hall Airside Aerial View
Aerial View

TERMINAL ONE

The $7 billion Public Private Partnership, led by Carlyle Airport Group (CAG), began in 2017 working with the Port Authority’s planning staff to program, plan, and design a 2.8 millionsquare-foot international terminal.

PGAL served as the Prime Architect in a Public Private Partnership, led by Carlyle Airport Group (CAG), to program, plan, and design a 2.8 million square-foot international terminal as part of the Port Authority’s overall $13 billion redevelopment of the entire JFK campus. Envisioned to serve as the new gateway to New York, Terminal One will provide 22 international wide-body and 1 narrow-body aircraft gates and offer a world-class passenger experience.

The $7 billion program began in 2017 working with the Port Authority’s planning staff refining and optimizing plans presented in the original proposal. The teams’ focus was to bring a unique New York experience to the customer inside and outside of The New Terminal One building. Working with all the stakeholders, PGAL established a program that improves the passenger process and deploys forward thinking technologies to create a seamless journey for every passenger from curbside to pushback. The check-in hall will utilize current and planned technology enhancements with self-bag check-in and biometric data to move passengers from the curbside to the checkpoint more conveniently. The checkpoint is designed

to use the latest advancement in TSA screening technology to process passengers efficiently. Gate boarding has been arranged to utilize biometric scanners to enable passengers to board the aircraft more efficiently. Working sessions with Customs and Border Protection created the opportunity to plan an FIS facility that can be flexible and reconfigurable to accommodate today’s entry systems along with future planned CBP digital entry systems with infrastructure.

The design features an elevated sterile passageway for international arrivals that are reminiscent of New York’s elevated pedestrian park the “High Line” providing views to the Departures concourses and primary commercial plaza. The Arrivals Hall features an expansive glazed curtain wall that provides a dramatic experience for passengers with curated digital presentations and art integrated into the space. The landside departures and arrivals frontages are designed with multiple curbsides on each level with dynamic signage clearly identifying segregated transportation types. Passengers are provided with a direct connection from the Arrivals Hall to the AirTrain for inter-terminal and light rail connections.

JFK

AT A GLANCE

COMPLETION DATE

2017 Master Planning

2019 Concept Design

2021 D/B Bridging Documents

ROLE + SERVICES

Planning, Programming, Concept Design, Bridging Documents

PROGRAM

Public-Private-Partnership delivery method

World-Class passenger experience

Curated digital experience and art integration

Designed to LEED Gold Certification requirements

41 AVIATION DESIGN STUDIO
43 AVIATION DESIGN STUDIO Post-Security Screening Checkpoint
Ticketing Hall
Central

INTERNATIONAL ARRIVALS BUILDING

GEORGE BUSH INTERCONTINENTAL AIRPORT

The largest Federal Inspection Services (FIS) facility in the U.S., this 900,000-square-foot International Arrivals Building has 84 immigration booths to process up to 4,500 passengers per hour.

Located between Terminals C, D, and E, the $250 million facility provides access to an automated people mover for transportation to Terminals B and C. This underground passenger train links all terminals, with free shuttle service to and from the city’s economy lot. The building features an extensive baggage system and a spacious meet-and-greet hall as well as a ticketing lobby for Continental Airlines departures from Terminals D and E.

The facility is designed with flexible security checkpoints equipped to accommodate future expansion of processing lanes and TSA equipment upgrades.

Project phasing ensured that airport operations continued uninterrupted, and the design team met an aggressive 12-month design schedule and delivered the project under budget.

The building was the largest component in the Houston Airport Authority’s $450 million multi-project International Services Expansion Program.

AT A GLANCE

COMPLETION DATE

2005

ROLE + SERVICES

Programming, Architecture, Interior Design, Construction Administration

PROGRAM

850,000 SF New Space

New FIS to Process 4,500

International Arrivals/Hour

Extension of Automated

People Mover and New APM Station

New 2,500 Space Parking Structure and Roadway access

Multiple Construction Packages

45
DESIGN STUDIO
AVIATION
IAH

“During the construction phase, your team has managed to keep the busiest portion of George Bush Intercontinental Airport operating while constructing over $400 million worth of eye-catching additions... accomplished without undue hardship to the traveling public and all under the increased security requirements brought on by the events of 9/11.”

Primary Inspection Hall
47 AVIATION DESIGN STUDIO
International Baggage Claim Central Ticketing Hall East Atrium

JAMES A. WILDING INTERNATIONAL ARRIVALS HALL

WASHINGTON DULLES INTERNATIONAL AIRPORT

A $147 million expansion to the International Arrivals Building supports the airport’s rapid growth while improving the passenger experience and reducing processing delays at U.S. Customs and Border Protection facilities.

Increasing the building’s size from 136,000-square-feet to 340,000-squarefeet, the expansion nearly doubled processing capacity to more than 2,400 passengers per hour. Architectural forms and building placement respect the landmark character of the airport’s main terminal, designed by Eero Saarinen in 1958 and listed on the National Register of Historic Places. To honor the terminal’s iconic design, the expanded facility’s massing is composed of simple architectural cubic forms, subservient to the main terminal building. A westward extrusion of the existing building extended the original north wall sloped architectural pre-cast panel system, continuing its role as a plinth for the main terminal building.

An 8,000-square-foot interior mezzanine serves as an entry platform for the airport’s unique mobile lounge vehicle transportation system for passengers from international arriving aircraft. The mezzanine also includes two VIP

customs processing lounges. Design of the mezzanine level within the twostory volume helps orient passengers to their surroundings and creates a strong sense of arrival.

Natural light and interior finishes and materials reinforce passenger orientation and support intuitive wayfinding. Functional layouts transport passengers smoothly through CBP processing, baggage retrieval, and to the terminal’s greeter areas. Varied ceiling materials, interior lighting, LED backlit directional signage, and patterns in terrazzo flooring help guide passengers, while numerous public art pieces further enhance the passenger experience. The project was designed and constructed in three annual phases to reduce construction impact on existing operations. The project was delivered $20 million under budget.

AVIATION DESIGN STUDIO

AT A GLANCE

COMPLETION DATE

2011

ROLE + SERVICES

Programming, Planning, Architecture, Interior Design, Construction Administration

PROGRAM

200,000 SF New Space

50,000 SF Renovated Space

New FIS to Process 2,000

International Arrivals/Hour

Phased Construction

49
DESIGN STUDIO
AVIATION
IAD
International Arrivals Hall AVIATION DESIGN STUDIO International Arrivals Hall View From Mezzanine International Baggage Claim Primary Inspection Hall

PGAL’s timely design for the International Arrivals Building Expansion project gives the Authority the ability to meet our future needs by providing a welcoming, state of the art facility that presents a great first impression for travelers entering the Country through Dulles Airport. PGAL’s commitment to the project and their continued involvement during construction has been essential to the successful opening of the first phase of the expansion.

Primary Inspection Hall + Baggage Claim
Terminal B Master Plan

TERMINAL B + C MASTER PLAN

GEORGE BUSH INTERCONTINENTAL AIRPORT

In 2006, PGAL was retained to develop a three-phase Master Plan to greatly expand airside operations and provide for projected airline growth into the future.

PGAL developed a three-phase Master Plan to greatly expand airside operations and take United into the future. Phase 1 of that Master Plan was the Terminal B South Concourse project, which consolidated most of United’s regional jet operations to the south side, replacing two of the existing flight stations and pad operations. Phase 2 began the redevelopment of the north side of Terminal B, master planned to include three concourse piers to support the operation of up to 40 gates for both international and domestic flights. Phase 3, PGAL updated the Terminal B Redevelopment Program Definition Manual (PDM) in 2012 to incorporate the final planning for the reconstruction of IAH Terminal D and document United’s planning goals for the final phase to replace the remaining flight stations.

Following the development of the Master Plan, PGAL was selected to lead the design for Phase I New Terminal B South, Phase 2 New Terminal C North and Phase 3 Terminal B North Redevelopment Program Definition Document.

AT A GLANCE

COMPLETION DATE

Phase !: 2014

Phase 2: 2018

Phase 3: 2026

ROLE + SERVICES

Programming, Planning, Architecture, Interior Design, Construction Administration

PROGRAM

Master Plan to meet airline and airport current and future needs

Multi-Phased Program

53
DESIGN STUDIO
AVIATION
IAH
Concourse + Holdrooms

TERMINAL B SOUTH CONCOURSE

GEORGE BUSH INTERCONTINENTAL AIRPORT

The first phase of a $1billion redevelopment of Terminal B, this 225,000-square-foot South Concourse replacement ushered in a new era at the airport.

Developed as a public-private partnership between United Airlines and Houston Airport Systems, the new building is a state-of-the-art facility that replaced the airline’s original concourse, built in 1966.

Four times the size of the original concourse, the striking interior environment houses 17 local and national dining/ retail vendors and offers stunning architectural elements. The contemporary environment features lively music, abundant daylight, and numerous amenities.

The majority of United Airlines’ regional jet operations are consolidated at the new concourse, which now supports more than 300 flights daily. A complete reconfiguration of the airfield apron facilities increased efficiency and capacity, nearly doubling the number of gates.

The airport’s first LEED Silver certified project, the concourse was honored in the Public-Private Partnership category of the 2015 Landmark Awards, sponsored by the Houston Business Journal.

Future phases will redevelop the north side of Terminal B to include three concourse piers that support the operation of up to 40 gates for both international and domestic flights. PGAL developed the three-phase master plan to greatly expand airside operations and facilitate projected airline growth.

AT A GLANCE

COMPLETION DATE

2013

ROLE + SERVICES

Programming, Planning, Architecture, Interior Design, Construction Administration

PROGRAM

225,000 SF

30 Regional Aircraft Gates

LEED Silver Certified

55
DESIGN STUDIO
AVIATION
IAH

As you know there is a reason PGAL was selected as Continental’s design team for Terminal B. We appreciate that regardless of project size and complexity PGAL will complete on time and within budget. These are tough times for the industry and now more than ever we are relying on you to cut to the chase, maximize our budget and exceed our customer’s expectations.

57 AVIATION DESIGN STUDIO Post-Security Checkpoint
Exterior Airside View Gate
Check-In

TERMINAL C NORTH CONCOURSE

GEORGE BUSH INTERCONTINENTAL AIRPORT

Part of a $1 billion airside and landside redevelopment, the new Terminal C North Concourse will add much-needed capacity, flexibility, and passenger amenities.

PGAL led the architectural and engineering team for the design and construction of this new concourse for United Airlines. The Terminal C North Concourse project is a two-level, 318,000-square-foot facility that accommodates a total of 11 new narrow and wide body-equivalent gates and three renovated gates.

Large expanses of windows throughout the concourse will provide panoramic views to passengers and visitors. The holdrooms will feature techenhanced lounge-style seating with USB ports and iPads from which guests can order food and amenities, browse the web, or play games. In addition 20 new dining and retail options conveniently integrated throughout the terminal. Dual group IV taxi lanes restricted to Boeing 757-200W or smaller aircraft will provide aircraft access to the new facility on either side of the new concourse.

Accessible via the existing Terminal C North connector, the new concourse features support areas on the lower level for airline ramp operations and passenger hold room lounges and amenities on the upper level for airline operations. Airside civil work included the reconstruction of the apron including the storm drainage system, hydrant fueling system, and electrical/ telecommunication infrastructure.

AVIATION DESIGN STUDIO

AT A GLANCE

COMPLETION DATE

2017

ROLE + SERVICES

Programming, Planning, Architecture, Interior Design, Construction Administration

PROGRAM 318,000 SF

11 Gates

Phased Construction

LEED Designed

AVIATION

59
DESIGN STUDIO
IAH
Holdroom
AVIATION DESIGN STUDIO Holdroom Concourse + Holdrooms Concourse + Concessions Concourse + Holdrooms
Concourse + Holdrooms

TERMINAL 4 REDEVELOPMENT + EXPANSION FORT

LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT

The redevelopment and expansion of Terminal 4 accommodates an increase in international flights and creates a more efficient international arrivals process.

The project encompassed an expansion of the Federal Inspection Services (FIS) facility, renovation of the baggage system, and reconfiguration of security screening check points.

The façade of the new Concourse G is elegant, yet sensible for the south Florida climate, composed of insulated precast panels with a row of high-efficiency storefront glazing at the concourse level providing dramatic passenger views to the airfield. Slotted apertures above the storefront minimize heat gain inside the concourse and create an array of shadows and natural light play, generating a dynamic vibe inside the hold rooms and circulation areas.

An equally stylish interior environment features separate FIS sterile and domestic arrival vestibules and FIS sterile bridges that carve through the double-height ceiling space inside the concourse to help guide passengers to their respective gates.

High-trafficked circulation, concessions, and TSA areas feature white terrazzo flooring, while the hold room areas include sophisticated patterned carpet. Phenolic paneling and chic wall tiles provide durable, cost-effective surfaces in spaces that will receive the most wear, including the concession area, sterile circulation, and Terminal 3 connector bridge.

This expansion accommodated a rapid increase in the number of international arriving passengers and addressed the airport’s growing challenge with its existing operations inhibiting passport control queuing. The project required intensive phasing to ensure that operations remained fully operational to maintain existing international arrival CBP operations.

PGAL served as Architect of Record and managing partner of the joint venture with Zyscovich Architects. The project was completed on a fast track modified design-build basis.

AT A GLANCE

COMPLETION DATE

2016

ROLE + SERVICES

Architect of Record

PROGRAM

500,000 SF New Terminal

100,000 SF Expansion and Renovation

14 New Swing-Gates

New FIS to Process 2,000 International Arrivals/Hour

AVIATION DESIGN

63
STUDIO
FLL

The first two phases of our Terminal 4 Project, which included new construction and renovation, has had many owner and stakeholder design changes over the last four years and, through all of that, PGAL has consistently persevered and demonstrated a solid knowledge base of terminal design as well as steadfast commitment to the Broward County Aviation Department and Fort Lauderdale-Hollywood International Airport.

65 AVIATION DESIGN STUDIO
+ Holdrooms
Concourse
Exterior Airside View Pedestrian Bridge

TERMINAL B/C

This new 1-million-square-foot terminal honors the airport’s legacy by integrating restored components of the historic 1941 Terminal A.

Featuring 35 replacement gates, Terminal B/C also provides two-level roadways for arrivals and departures, a new METRO rail station, pedestrian bridges linking rail stations to the terminal, a connector building with gate facilities, a new air traffic control tower, and concession areas that link the new and existing terminals.

Careful staging and placement of terminal foundations and structural steel enabled the team to minimize disruption to airport operations during construction, despite extremely limited staging areas.

Phased construction enabled the team to maintain existing METRO operations while constructing new elevated station platforms and linkages above a new road system. A new elevated pedestrian bridge connected the METRO station and parking garage to the new terminal.

Airside, staged terminal pier construction minimized impact to ramp operations and temporary aircraft hardstand parking positions.

PGAL served multifaceted planning, programming, and design roles during the project, managing a team of 30 architectural/ engineering consultants for predesign programming and schematic design phases. The firm’s design work for Metropolitan Washington Airports Authority remains ongoing, including modifications to Terminal B/C facilities, renovation to parts of the 1941 terminal, and plans for an airside regional jet terminal.

ROLE

Prime

1,000,000

New

67 AVIATION DESIGN STUDIO
GLANCE
1997
AT A
COMPLETION DATE
+ SERVICES
Associate
Consultant +
Architect PROGRAM
SF New Terminal
35 Gates
METRO Station
Structures
New Connector Terminal and Pedestrian Bridges Linking to the Existing Main Terminal and Parking
DCA
69 AVIATION DESIGN STUDIO Terminal Connector
National Hall Ticketing Mezzanine Meeter Greeter Lobby

TERMINAL A WEST

PHILADELPHIA INTERNATIONAL AIRPORT

The four-level, $325 million International Terminal A West was designed to serve as one of US Airways’ primary international gateways into the United States.

Terminal elements included ticketing, departure lounges, inbound/outbound baggage facilities, a 250,000-square-foot Federal Inspection Services (FIS) facility capable of processing 2,800 passengers per hour, and 13 new wide-body/narrowbody international/domestic “swing” aircraft gates. The project also involved integrating the new terminal with the existing Terminal A and ground transportation facilities.

Project phasing plans required multiple construction document packages, which facilitated ongoing airside and landside airport operations while meeting aggressive schedules. The phasing also enabled overnight transitions of passenger processing operations into the new Terminal A West facility from existing Terminal A, its FIS, and the rest of the airport’s terminal complex.

The team developed detailed phasing sequences to facilitate construction of the proposed design solution, which involved expanding the terminal’s third-level FIS facility over both

the arrivals roadway system and the adjacent light rail system. These guidelines established strict requirements for the contractor to maintain arriving vehicle traffic and limit construction durations above the catenary power system towers serving the light rail trains.

As Associate Architect, PGAL oversaw programming and development of the functional space plan, as well as detailed construction documentation.

Under a separate contract, PGAL led the design and documentation of the airport’s new 200-foot-high ramp control tower, which oversees aircraft ground movements for the new Terminal A and Terminals B, C, D, and E. PGAL also designed and developed connecting passenger bussing stations serving the Terminal A complex.

AT A GLANCE

COMPLETION DATE

2003

ROLE + SERVICES

Associate Architect

PROGRAM

785,000 SF New Terminal

17 Wide-Body Aircraft

Gates

250,000 SF New FIS

Facility to Process 2,800

International Arrivals/Hour

New In-Bound Baggage Facilities

AVIATION

71
DESIGN STUDIO
PHL
Ticketing Lobby

I would recommend PGAL without reservation for performing all Architectural/Engineering consulting services for any type of airport facility.

Facilities, US Airways
73 AVIATION DESIGN STUDIO
Sterile Corridor Ticketing Lobbby Exterior View

CONSOLIDATED RENTAL CAR FACILITY + GROUND TRANSPORTATION CENTER

CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

PGAL led a collaborative team charged with transforming the customer experience at the CVG airport with the programming, planning, and rightsizing of the rental car facility and a complete redesign of the main terminal access roadways.

Project included programming and planning of the facility and a complete redesign of the main terminal roadways. The 1.4 million-square-foot rental facility houses all of the airport’s car rental vendors under one roof. The consolidation is expected to boost traveler convenience and cut down on airport shuttle bus traffic from rental lots currently at various locations around the airport. The project involved converting existing facility space toward parking functions and demolishing part of the existing Terminal 2 garage to make way for a new road linking the airport and ConRAC facilities.

The $194M project included Customer Service Building (CSB), Rental Car Garage and an Elevated Quick Turnaround area (QTA). The CSB is attached to the existing terminal and houses rental car counters, Vertical Circulation core, KCAB Offices (26,000 SF) and a Ground Transportation Waiting Area.

The 5-story Rental Car Garage is connected to CSB and includes new Ground Transportation Center on the first floor and 1400 Ready/Return Spaces that is programmed to accommodate operations for 12+ rental car companies. The 5-story elevated QTA is connected to the Rental Car Garage via bridges and houses Maintenance Bays (9 light maintenance bays) on the first floor, Fueling (48 positions), Car Washes (9 wash bays) and Staging on 3 elevated floors and Car Storage on the 5th floor.

Additional work included new on-site and elevated roadways that serve the existing terminal’s arrival and departure levels, new entry and exit plazas for existing public parking garage, extensive signage and wayfinding package and Phasing Plans to keep terminal operational during construction.

AT A GLANCE

COMPLETION DATE

2021

ROLE + SERVICES

Programming, Architecture

Interior Design, Construction

Documents, Construction Administration

PROGRAM

Terminal Expansion

Consolidated Rental Car

Facility

Elevated Quick Turnaround Garage

Ground Transportation Center

75 AVIATION DESIGN STUDIO
CVG
Terminal Expansion Ground Transportation Center Elevated
Quick Turnaround Area
Rental Car Counters + Circulation Core
View
Exterior

CONSOLIDATED RENTAL CAR FACILITY + GROUND TRANSPORTATION CENTER

BRADLEY INTERNATIONAL AIRPORT

Developed by Conrac Solutions, Bradley International Airport’s (BDL) new consolidated rental car facility (ConRAC) and ground transportation center (GTC) introduces a state-ofthe-art landside aviation facility at the Airport’s front door.

Located on a 20-acre site, the 1.5 million-square-foot facility is comprised of three distinct and connected buildings: Quick Turnaround (QTA) garage; Ready/Return garage; and Vertical Circulation Core.

The five-story QTA garage consists of facilities to clean and maintain rental car fleets, and houses car washes, maintenance bays, fueling and vacuum positions, administration offices, and support/storage spaces. The five-story Ready/Return garage allows customers to rent and return vehicles adjacent to the airport terminal. The first level houses public parking, extending BDL’s existing public parking garage to meet the needs of the traveling public. The top floor of both garages provide space for rental car storage.

The four-story core provides a direct connection to Terminal A via an elevated pedestrian bridge and allows travelers to convey vertically to one of the nine Rental Car brands or public parking/ground transportation. This core is also designed for a connection to a future

Terminal B, making this new facility the central focus of the Airport’s landside operation.

Previously, the existing rental car lots were dispersed around the Airport, requiring rental car companies to operate shuttle buses to/from the Terminal. By consolidating operations and combining with public parking and ground transportation, the multi-modal facility has vastly improved the customer experience and helped mitigate curbside congestion in front of the Terminal, eliminating an estimated 250,000+ shuttle trips per year.

The new ConRAC’s program development was a response to evolving design trends and sized to meet future growth needs of the industry. The creation of a multi-level core helped to minimize the overall facility footprint, leading to a compact and efficient project, serving as a prototype for future airport facilities.

BDL

AT A GLANCE

COMPLETION DATE

2022

ROLE + SERVICES

Programming, Architecture

Interior Design, Construction Documents, Construction Administration

PROGRAM

Consolidated Rental Car Facility

Elevated Quick Turnaround Garage

Ground Transportation Center

79 AVIATION DESIGN STUDIO
View from Primary Airport Entrance
81 AVIATION DESIGN STUDIO
Circulation Core
Vertical
Service
Car Ready/Return Area
Customer
Building Rental
Rental Car Counters

CONSOLIDATED RENTAL CAR FACILITY

BOSTON LOGAN INTERNATIONAL AIRPORT

This 49-acre, LEED Gold-certified consolidated rental car facility is the center for ground transportation operations at Boston Logan International Airport.

PGAL led a collaborative team and approach for the concept design and environmental permitting study that informed the facility’s ultimate programming, planning, and development.

The environmentally friendly project includes a fourlevel parking structure for 3,200 ready/return/storage spaces and113,000-square-foot customer service terminal and four secured at-grade Quick Turnaround Areas for each family brand to fuel, clean, wash and maintain their rental car fleet. The facility is accessed via a consolidated busing system inclusive of fuel efficient hybrid buses reducing rental-car bus vehicle miles traveled by 70 percent. The roof level contains over 600 solar panels that can generate up to150 KW of power.

The ConRAC was located over previous rental car and taxi pool facilities. Phasing, without impact to existing rental car operations and functions and taxi pools, was key to the success of the the construction of the project.

A very complex building program, this development also incorporates extensive environmental mitigation measures for greenhouse gases, energy consumption, and water quality and usage.

Additional program elements include multiple roadway modifications to improve and reduce roadway and terminal curb congestion, a bus access ramp supporting the two-level customer terminal, a unified common busing system for all of Logan Airport, and improved facilities for the airport’s taxi, bus, and limousine pools.

Coordination with the neighboring community was paramount. Overall project benefits include buffering adjacent neighborhoods from airport ground transportation operations and the creation of a defined airport boundary within the residential community. The facility is also home to the Cathy Leonard-McLean Community Room, located on the lower level, for use by local civic organizations.

BOS

AT A GLANCE

COMPLETION DATE 2014

ROLE + SERVICES

Programming, Architecture, Interior Design, Construction Documents, Construction Administration

PROGRAM

Consolidated Rental Car Facility

Quick Turnaround Areas

LEED Gold Certified

83 AVIATION DESIGN STUDIO
Circulation Core
AVIATION DESIGN STUDIO Bus Canopy At-Grade Quick Turnaround Areas + Ready/Return Garage Exterior View
Rental Car Facility + Customer Helix

CONSOLIDATED RENTAL CAR FACILITY + GROUND TRANSPORTATION CENTER

RENO-TAHOE INTERNATIONAL AIRPORT

The first in strategic step in the redevelopment of RNO, this new facility will bring together landside operations in a unique public-private-partnership that meets the needs of all project stakeholders.

PGAL is leading the planning and design phases in collaboration with the Reno-Tahoe Airport Authority, the Rental Car Industry and Conrac Solutions in a developer led public-private-partnership (P3). This multi-use facility is located on a 12-acre site and will consolidate the existing rental car operations and Ground Transportation Center (GTC) into a single location. This consolidation will improve the overall customer experience, enhance operational efficiencies, return much-needed public parking to the airport, and provide the necessary land are for the future expansion of the terminal.

The four-level facility will provide 1,200 rental car spaces, a 78,000 SF GTC, and employee parking and will be accessible from the existing terminal via a new enclosed pedestrian walkway. The development will also return1,200 public parking spaces to the RTAA. The vertical circulation core provides access to all nine rental car brands located in the disburse customer service building located on levels 2, 3, and 4, each with a dedicated connection to the ready/return garage. The top floor of the garage is covered by pre-fabricated

metal canopies designed to support solar panels while providing a covered customer-friendly operation. The secured at-grade QTA consists of facilities to clean and maintain rental car fleets, and houses carwashes, maintenance bays, fueling and vacuum positions, administration offices, and support/storage spaces.

Additional related elements include enabling projects, demolition of existing buildings, construction and relocation of existing cargo and tug functions, stormwater management and the relocation of wet and dry utilities. Discussion with local utility providers to support solar power generation and extensive electrical vehicle charging facilities to create a facility that can support 100% electric vehicles in the future are ongoing and planned as a part of the project development. The new program was in response to evolving design trends and sized to meet future growth needs of the Rental Car Industry. The creation of a multi-level core helped to minimize the overall facility footprint, leading to a compact and efficient project, serving as a prototype for future airport facilities.

ROLE

Quick

87 AVIATION DESIGN STUDIO
GLANCE
2026
AT A
COMPLETION DATE
+
Interior
Documents,
SERVICES Programming, Architecture,
Design, Construction
Construction Administration
Facility
PROGRAM Consolidated Rental Car
RNO
Turnaround Areas Ground Transportation Center
View
Aerial
89 AVIATION DESIGN STUDIO
Vertical Circulation Core Pedestrian Walkway Rental Car Garage and GTC Exterior View

RAMP CONTROL TOWER

PHILADELPHIA INTERNATIONAL AIRPORT

This unique structure allows US Airways to provide aircraft movement control for all ramp areas at the airport.

PGAL developed the design and the line-of-sight studies necessary to establish the building position and its overall required height.

The 190-foot ramp control tower facility is constructed with structural steel framing and a metal panel exterior wall system on top of caissons.

The 60-foot-diameter cab is capable of accommodating 25 staffed ramp and operations agent positions. The core level is a continuous glazed curtain wall system and the tower includes an egress stairway and elevator.

The ramp control tower is used by US Airways to control nonFAA controlled air operations areas for airline operations for the six-unit concourse.

PGAL prepared architectural construction documents and coordinated all engineering systems and aviation special systems. The team also prepared documentation for review and approval by the FAA and developed construction packaging and phasing strategies for the project.

AT A GLANCE

COMPLETION DATE

2001

ROLE + SERVICES

Associate Architect

PROGRAM

Landside Site

200 FT New Tower Facility

60 FT Diameter Cab

Accommodates 25 Ramp/ Operations Agent Positions

AVIATION

91
DESIGN STUDIO
PHL
Interior View at Control Room
93 AVIATION DESIGN STUDIO
Exterior View
Main Lounge + Bar Area

UNITED AIRLINES CLUB

Located on the mezzanine level, this airline club takes full advantage of spectacular views overlooking the airfield and harbor beyond. More than 180 feet of exterior glazing floods the lounge area with natural light during the day and the twinkle of harbor lights at night.

The 8,000-square-foot club conveys a sleek, modern aesthetic while incorporating design touches that embody aviation.

Over the main lounge bar, a sweeping wood ceiling reflects the aesthetic of an airplane wing. In the flanking lounge areas, the ceiling features a tracery design that echoes the contrails that streak the sky as an aircraft flies. The aviation theme also appears in lounge artwork, including a collection of black-andwhite images from the airline’s archives.

Decorative lighting creates a high-energy environment in the bar area, while the lounge areas are toned down with more intimate lighting. Classic materials, including honed limestone flooring, sculptured Carrara marble walls, and accents of bronze and gold glass, create an atmosphere of luxury and respite. This classic theme carries over to all public areas of the lounge, including the front desk and restrooms.

The lounge provides seating for 178, with a wide variety of options ranging from club lounge chairs to table seating and the club’s signature egg chair, designed by Danish architect Arne Jacobsen. Neutral furniture fabrics and leathers allow the highflying interiors to take center stage. Power bars line a portion of the windows, providing travelers with a convenient place to charge devices and check email while enjoying the airside views.

BOS

AT A GLANCE

COMPLETION DATE

2014

ROLE + SERVICES

Prime Consultant +

Lead Architect

PROGRAM

Classic design with a strong aviation theme

Seating for 178 travelers in a variety of settings

High-energy bar area balanced by more intimate lounge space

Power bars for charging devices and checking email

AVIATION

95
DESIGN STUDIO
BOSTON LOGAN INTERNATIONAL AIRPORT
97 AVIATION DESIGN STUDIO
Lounge Bar Main Lounge
Main
Signature Seating Area Tyler’s Austin Warehouse

DELAWARE NORTH CONCESSIONS

AUSTIN-BERGSTROM INTERNATIONAL AIRPORT

In collaboration with Design Architect iCrave, this program includes the implementation of more than 20,000-square-feet of retail and food/beverage spaces at ABIA.

PGAL served as the Architect of Record for nine dynamic venues (with 8 overall brands and services) at the ABIA, providing much-needed retail and food/beverage options for travelers at the second fastest-growing airport in the U.S.

Spaces include:

Tyler’s Austin Warehouse

West Food Park

› Fly Rite Chicken

› Mandola’s Pizza

› Hat Creek Burgers

East Food Park

› Peached Tortilla

› East Bar

› Juiceland Juice Bar

› Coffee and Pastries

Salt Lick BBQ

BookPeople

Coffee & Bagel and Taco Deli

Haymaker’s Bar

Jet Set Market

Heart of Austin

› Ray’s Bar

› Jo’s Coffee

› Asleep at the Wheel Stage

› Street Taco’s Food Truck

AT A GLANCE

COMPLETION DATE

2019

ROLE + SERVICES

Architect of Record

PROGRAM

20,704 SF Concession Space

Variety of Retail, Food + Beverage options

Dynamic + Engaging Design

Caters to travelers at the second-fastest growing airport in the U.S.

AVIATION

99
DESIGN STUDIO
AUS
101 AVIATION DESIGN STUDIO
The Book People
Heart of Austin MAC Concession

TERMINALS A, B, C, + D WORLD DUTY FREE GROUP RETAIL CONCESSIONS

PGAL worked closely with World Duty Free Group (WDFG) to roll out a wide range retail program involving 18 locations in four different terminals at IAH. The program included an array of national brands such as MAC, M Fredric, and InMotion.

In addition, several local brands were introduced to the airport including Texas Monthly News, Houston Chronicle News, and the first retail locations for Culture Map Houston.

The program was rolled out in four phases, including a compressed schedule of eight weeks for the initial first five spaces. The program included a total of 16,128-square-feet with space sizes ranging from 125-square-feet kiosk to 1,930 branded news and gifts.

AT A GLANCE

COMPLETION DATE

2020

ROLE + SERVICES

Prime Consultant +

Lead Architect

PROGRAM

Open and engaging design to attract shoppers

Brands that cater to a variety of travelers

103
DESIGN STUDIO
AVIATION
IAH
Kiehl’s Concession

TERMINALS A+ C 3SIXTY DUTY FREE BOUTIQUE + PAY CONCESSIONS

DALLAS/FORT WORTH INTERNATIONAL AIRPORT

PGAL designed duty free retail concessions for the international brand 3Sixty Duty Free at Terminals A + C Concourse at Dallas-Forth Worth International Airport.

The concessions were design with a modern approach to airport retailing that is aesthetically pleasing, in line with brand guidelines, and thoughtfully planned for world-class customer experience.

These concessions consist of 1,500-square-feet of retail space with fixtures for point-of-sale, perfumes and cosmetics, confections, and liquor.

Each project entailed the demolition of existing concessions and subsequent renovation of those spaces into new retail or restaurant. The design team worked closely with the DFW Concessions and Code Departments to provide a quick turnaround for each of the projects.

DFW

AT A GLANCE

COMPLETION DATE

2020

ROLE + SERVICES

Prime Consultant +

Lead Architect

PROGRAM

High-end retail

Modern approach to airport retailing

Creating a world-class customer service experience

105 AVIATION DESIGN STUDIO
IAH New Cargo Facility

AIRPORT CARGO + MAINTENANCE FACILITIES

AIRPORTS NATIONWIDE

Cargo means business.

PGAL has been responsible for the design, planning, and construction administration of a variety of aviation cargo and maintenance facilities. Our designs respond to current trends that can have an impact on their development. Trends that include identifying new development standards, techniques for better land utilization, and how to address operational and capacity management for future growth.

PGAL understands the uniqueness of these aviation facilities. We understand how to develop these projects while minimizing impact to ongoing aircraft operations, and how to coordinate project goals with airport authorities and end user groups.

Primarily long-span structures covered with metal cladding and few luxuries, PGAL understands that these facilities need to be operationally cost-effective while providing an impact on their local economies.

REPRESENTATIVE PROJECTS:

ATL SWISSPORT AT NORTH CARGO

BCT BOCA RATON AIRPORT – HANGAR BLDG. B9

DCA US AIRWAYS HANGAR 11

DCA US AIRWAYS CARGO

DCA HISTORIC SOUTH HANGER RENOVATION

DFW DELTA CARGO

HSV C130 MAINTENANCE HANGAR AT HUNTSVILLE, AL

IAH CONTINENTAL B-CHECK HANGAR

IAH CONTINENTAL AIRLINES NEW CARGO FACILITY

IAH UNITED CARGO COOLER STUDY

IAH UNITED CHELSEA KITCHEN FACILITY EXPANSION/ RENOVATION

IAH FIS CARGO ONE-STOP FACILITY

LAS MGM / MOLASKY HANGAR

MIA REALTERM FEDEX CARGO FACILITY

OAK SWA CARGO BUILDING REMODEL

SGR NOBLE DRILLING HANGAR AT SUGAR LAND AIRPORT

CARGO

AT A GLANCE PROGRAMS

Cost Efficient

Flexible Column Free Spaces

Secure Facilities

Environmentally Compatible Designs

High Bay Storage Areas

Accommodate Operational Requirements for Warehousing, Office + GSE

Effective Airside + Landside Interfaces

107 AVIATION DESIGN STUDIO
109 AVIATION DESIGN STUDIO IAH Aircraft Maintenance / B-Check Hangar
View
Interior

GALAXY FBO

HOUSTON WILLIAM P. HOBBY AIRPORT

The new terminal building features world-class amenities including sleek and luxurious lounges and conference rooms for patrons and operations staff.

The new Galaxy FBO includes two 39,770-square-foot aircraft hangars and one 24,220-square-foot FBO terminal to support general and corporate aviation operations.

The Black Forest Ventures Galaxy FBO provides the ultimate luxury lounge experience. The use of both contrasting colors and textures provides the customer a more inviting atmosphere. Customer-facing areas have a consistent aesthetic as one moves throughout the different spaces. The use of large format, stone-like tiles on the floors give a sense of grand luxury but is contrasted by softer materials such as wood veneer panels and trim work. The overall palette plays with both warm and cool tones yet retains the more comfortable neutrals for hues. The foyer entry, VIP Lounge, and concourse offer expansive views and bring in natural light.

The spaces provide passengers an inviting area to enjoy the offered amenities for long periods of time. The concourse offers a coffee and refresh bar, a custom wine cellar, and varied types of seating. The VIP Lounge includes a 90-degree window wall, full bar, and premium finishes. The pilots’ lounge offers a kitchenette, private shower room, quiet room, and a TV lounge.

AT A GLANCE

COMPLETION DATE

2020

ROLE + SERVICES

Architecture, Interior Design + FF&E

PROGRAM

Private Aircraft Hangar

FBO Terminal

Luxury Amenities + Finishes

111 AVIATION DESIGN STUDIO
FBO
113 AVIATION DESIGN STUDIO Airside Exterior View
Interior View

REGIONAL AIRPORT TERMINAL

SUGAR LAND REGIONAL AIRPORT

The Sugar Land Regional Airport’s focus is corporate aviation, while maintaining a balance for the surrounding community’s general aviation needs.

This 20,000-square-foot luxury corporate regional terminal facility is designed with a Texas “Hill Country” aesthetic. Special architectural features include a Texas limestone and plaster façade, a standing seam metal roof, wide porches with rocking chairs, and a two-story, state-of-the-art Tom Delay Air Traffic Control Tower.

Texas limestone extends into the interior with two stone fireplaces in the lobby, while elegant dark wood trusses add dimension and support to the building’s center spine.

Features include an executive lounge, conference and meeting rooms, airport concessions, U.S. Customs, and leased space for multiple rental car agencies. Pilot amenities include private bedrooms and shower facilities, a flight planning room, flight school, library, and a common living room.

SGR

AT A GLANCE

COMPLETION DATE

2005

ROLE + SERVICES

Architect

PROGRAM

Texas “Hill Country” aesthetic

Luxury Executive and Crew Spaces

8,000-foot runway to accommodate the largest of corporate jets

115 AVIATION DESIGN STUDIO
117 AVIATION DESIGN STUDIO
Exterior
Airside View
Exterior View

ADMINISTRATION OFFICE BUILDING

SAN DIEGO INTERNATIONAL AIRPORT

PGAL provided complete programming and bridging documents for the 129,000-square-foot administration building for the San Diego Regional Airport Authority.

The new facility, located at the airport’s West end, consolidates numerous departments, previously spread throughout multiple buildings, into one state-of-the-art, sustainable facility. The four-story, structural steel building houses administrative functions related to the Airport Authority as well as space for public functions, including a 4,200-square-foot Board Room, Innovation Room, and various meeting spaces.

The building’s design focuses on the health and wellbeing of the staff. The office features an open connecting inner staircase with a large skylight and an art feature wall that welcomes occupants to explore the four floors dedicated to the executive, external relations, finance, operations, information technology, and development divisions. Each floor has a break room and outdoor spaces overlooking San Diego’s downtown skyline.

The project is pending LEED Gold certification and features numerous WELL Building strategies focusing on environmental, building, and occupant health, including energy performance, enhanced indoor air quality, thermal comfort, daylighting, and acoustic design.

AT A GLANCE

COMPLETION DATE

2021 *Bridging Documents

ROLE + SERVICES

Design Architect

PROGRAM

Contemporary design

WELL Building strategies

Designed to LEED Gold standards

119 AVIATION DESIGN STUDIO
SAN
Exterior View

PARKING GARAGE + ADMINISTRATION BUILDING

AUSTIN-BERGSTROM INTERNATIONAL AIRPORT

The new 2.1 million-square-foot, 5,800-car parking garage and 80,000-square-foot office building is a direct result of the need to provide a consolidated location for additional office space and parking for staff and travelers at one of the nation’s fastest growing airports.

The recently completed Austin-Bergstrom International Airport (ABIA) Administration Building provides a consolidated location for City of Austin airport administrative staff within the overall ABIA campus.

The five-story, 80,000-square-foot building provides offices for the airport executive team supported by the Finance, Public Information Office, Information Technology, Security, and Badging departments. The Administration Building also features a large training room, fitness center, inviting break room with an adjacent covered patio, and a rooftop deck with views of the airport campus and Downtown Austin. The deck is designed to function for special events, in addition to daily use by employees.

In tandem with the new Administration Building, PGAL also designed the conversion of an existing 21,000-square-foot shared City of Austin Conference Center into a new Airport Career and Development Center. The Center houses ABIA Human Resources and provides a dedicated space for the

public to seek and interview for employment with ABIA, the City of Austin, airlines, and airport tenants.

The completed Administration Building was designed in conjunction with a 2.1 million-square-foot, six-level public parking garage which contains approximately 5,800 spaces. The garage was built in response to the growing parking demands created by the rapid expansion of airport activity. In addition to typical revenue control gate arms, the garage includes a spaceby-space detection system to provide customers with real time data about the availability and location of parking availability. A pedestrian spine was also designed as part of the overall site plan. This linear landscaped zone aids wayfinding in drawing the public towards the terminal from all parking areas, culminating at the garage elevator tower/escalator bank.

AT A GLANCE

COMPLETION DATE

2020

ROLE + SERVICES

Prime Consultant +

Lead Architect

PROGRAM

80,000-square-feet of administrative space

5,800-space public parking garage

21,000-square-foot Airport Career + Development Center

123
STUDIO
AVIATION DESIGN
AUS
A commitment to creating safe, comfortable, and efficient facilities that allow visitors to discover the wonder of travel.
architecture engineering interiors planning alexandria atlanta austin
boca raton dallas / fort worth denver hoboken houston
las vegas
los angeles
salt lake city
san diego
pgal.com

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.