Portfolio ARCHIT TECTUR RE - INTERIOR DESIGN 2015 - 2020 PHUNG HONG
Phung Hong (402)-440-2001 phungtaihong@gmail.com
With an undergraduate degree in interior design and a graduate degree in architecture,these degrees have oered me a unique perspective on the built environment and the people who inhabit it. I am excited to continue to make connections between these degrees towards enhancing the human experience. Design is one of the most powerful forces in our lives and can trigger the physical, physiological and psychological wellbeing. As modern society citizens spend 90 percent of their time indoors, buildings and urban spaces should be designed around their occupants. Design should address growing societal needs including aordability and sustainability towards a sensible yet enduring architecture. The discipline of architecture, urban planning, and landscape architecture help shape the built environment. To participate in the built environment, one must consider not only space but experience through social and cultural identities. Additionally, the design of the built environment must continually consider the historic and scientific influences while looking towards the future. I am a sensitive designer who is passionate about the potential that design has for human wellbeing. With this passion and dedication to the built environment I am excited to apply the knowledge I have learned in school to the profession of architecture.
Resume Education:
Computer Skills:
MASTER OF ARCHITECTURE University of Nebraska Lincoln • August 2015 - May 2018 BACHELOR OF SCIENCE IN INTERIOR DESIGN MINOR IN PRODUCT DESIGN University of Nebraska Lincoln • August 2010 - May 2015
Rhino 3D Modeling Revit Adobe Creative Suite 3D Rendering Enscape AutoCAD Google Sketchup Microsoft Office
Job History:
Professional Skills:
DLR Group. Lincoln, NE. • June 2018 - April 2020: Architect
Precix 3-Axis Router/CNC Plastics Fabrication Metal Fabrication Branding
DLR Group. Lincoln, NE. • September 2016 - May 2018: Intern Architect University of Nebraska Lincoln. Lincoln, NE. • September 2017: Graduate Intern Position. OPN Architects. Cedars Rapid, IA. • June 2016-August 2016: Intern Architect Paul Daniels Interiors. Lincoln, NE. • May 2014-August 2014: Interior Design Intern
Achievements: Design Futures Council Graduate Presentation Program - 2018 • Awarded by DFC jury based on six characteristics of a DFC Scholar: design excellence, collaborative work ethic, ability to positively influence others, sustainable design, technology adoption, and design for health. SARA National Design Award-Bee Research Facility - 2017 SARA-NY Design Award-Bee Research Facility - 2017
Involvement:
Hazel V. Emley Scholarship - Spring 2015
SARA [Society of American Registered Architects] • July 2017 - Present
Hazel V. Emley Scholarship - Spring 2015
AIA [The American Institute of Architecture] • July 2015 - Present
Reference: John Badami - DLR Lincoln office Principal • (402) - 972 - 4123 • Jbadami@dlrgroup.com
Elmer Rhoden Merit Scholarship - Fall 2014 George and Mary Haskell Scholarship - 2012; 2013 University of Nebraska-Lincoln Deans’ List/Honor - 2011
Academic Works ARCH 610 - FALL 2017
re-FORM ARCHITECTURE: Alliance Wellness Center
ARCH 311 - SPRING 2016
AGORAPHOBIA ARCHITECTURE Suburban Agoraphobia
IDES 451 - SPRING 2015
INTERIOR DESIGN - CAPSTONE PROJECT The Hub
ARCH 511 - FALL 2016
TECTONIC ARCHITECTURE Roofscape
Alliance is a city in Box Butte County, in the Northwestern part of the state of Nebraska, in the Great Plains region of the United States. Its population was 8,491 at the 2010 census. It is the county seat of Box Butte County. Alliance is facing an aging population problem. Lack of healthcare, education, and job opportunities draw younger generations to bigger towns. By focusing on several aspects such as Civic, Commercial, and Residential, the intention of the project is to create programs that support community Healthcare/Wellness in small towns.
22.2%
14%
7.6%
ra
He
n s p r t a ti o o
an
M
The goal of the project is to create architecture strategies to help small towns move forward based on the decline in small town USA.
Total Employees 319
T
Professor: Kevin Augustyn Lisa Marie Miller
Total Employees 594
a lt h c a r e
u f a c t u ri n
g
ALLIANCE WELLNESS CENTER
Total Employees 934
n
re-FORM ARCHITECTURE:
8,491
20%
Population in 2010
15%
8,476
10%
Population in 2016
5%
8,451 Population in 2021
<5
5-17
17-24
25-34
35-44
45-54
55-59
60-61
62-64
65-74
>75
LIBRARY/ RECEPTION ADMINISTRATION LABORATORY OUTPATIENT CARE
SURGERY
INPATIENT CARE
Facade Renovation with Alternative Circulation FOOD SERVICE
INDOOR GREEN SPACE
RADIATING/MEDICAL IMAGE EMERGENCY
REC CENTER/PHYSICAN
Site Isometric
Wellness Center _ Programing
Reno va tio n
R en ov at io
n
m triu A -
ork Reception eW -W
Public Program _ Section Perspective
We lln e
ss
Ce
rnte
LOUNGE
Cafeteria
INPATIENT CARE
CAFETERIA
LIBRARY/ RECEPTION
INDOOR GREEN SPACE
OUTDOOR PLAZA
REC CENTER
Wellness Program _ Section Perspective
C C
RE R ETA TAIL L
C C
B
C
RETA RE TAIL TA L D
1 3
RETA RE TAIL TA IL RE ETA TAIL L
RETA RE TA AIL
2 6
4
7
5
A A
8 A
A
LEGEND _ WELLNESS CENTER 1. INDOOR GREEN GARDEN 2. REC CENTER/ PHYSICIAN 3. FOOD SERVICE 4. RADIATING/MEDICAL IMAGE 5. EMERGENCY 6. CAFETERIA 7. COMMUNITY LOUNGE 8. RECEPTION 9. INPATIENT CARE 10. OUTPATIENT CARE 11. ADMINISTRATION 12. LABORATORY 13. SURGERY 14. LIBRARY / RECEPTION 15. LOUNGE
A
N First Floor
South Elevation
I H D
LEGEND _ PUBLIC SPACE
G
F LOOK TO BELOW
A. BUSINESS INCUBATOR B. BIG HOUSING UNIT C. SMALL HOUSING UNIT D. CLASSROOM / CONFERENCE E. KITCHEN F. WEWORK G. RECEPTION H. WORKSHOP I. LOUNGE
LOOK TO BELOW
LOOK TO BELOW
F
LOOK TO BELOW
E
D
11
14
12
13
I
9
10
N 9
Second Floor
North Elevation
SUBURBAN ARCHITECTURE:
BEE RESEARCH FACILITY Professor: David Karle Team Member: Darin Hanigan Brooke Sayler Award: â&#x20AC;˘ SARA New York - Unbuilt Suburban Project - 2017 â&#x20AC;˘ SARA National Design Award - Unbuilt Suburban Project - 2017
Our intention is to give back to the rural landscape. We are creating an environment for a therapeutic and unique opportunity to bee keep and provide education of bees. The program, along with architecture, interacts with the existing landscape in order to educate and encourage interaction with the rural environment. The challenge in this project is to create a calm environment and to provide enough nutrition for bee living habitat.
Chadron
Valentine Zone D: Pros: •close to river •adjacent ponds Cons: •far from highway
Norfolk Scottsbluff
Zone B: Pros: •easily accesible •surrounded by ponds •paths to river and trees Cons: •no direct path to river
Columbus Omaha
Zone A: Pros: •easily accesible Cons: •too close to highway •not enough enclosure
North Platte Grand d Island
Gothenburg Lexington
Kearney
York
Bee Farm
Zone C: Pros: •paths to river and trees •surrounded by ponds Cons: •too far from highway
Parking
Site Selection: •close enough to highway to be accesible •far enough from highway to include site interaction •surrounded by ponds •close to river •close to trees
Lincoln
Hastings
McCook
Wind Breaking Replanting Hackberry + American Sycamore
Buffering Zone Tree Lilac + Miyabe Maple
Apples, Pears, Sour Cherries, and Plums
Berries + Flowering Plants
Landscaping Analysis
Workshop
Classroom
Video
Lounge
Cafe/Retail
N
Floor Plan
Roof slope Direct sunlight Create space Influence circulation
Indirect sun Bee access Bee habitat Create space
Indirect sun Bee access Multiple bee habitat Human access Create space
8
7 Bee / Human
Human
Access
Bee Access
Bee Oculus Diagram
Perforated Metal Panel Metal Flashing Translucent Roof Panel Wood Sheathing W/ Waterproof Membrane White Oak Glue-Lam
Glazing Perforated Metal Panel Metal Flashing White Oak Glue-Lam Hollow Core W/ Concrete Top Rigid Insulation Concrete Pier
Bee/Human Oculi Section Perspective - Structure Details
White Oak Glu-lam Grid
Perforated Metal
Main Entrance
Curtain Wall
Concrete
Cedar Decking
Cafeteria
Concrete
Material Diagram
Building on Site Perspective
Bee Occupied/Education
Forest
Human Occupied/Entertainment
Bee
Circulation
Public
Water
Section Perspective
INTERIOR DESIGN - CAPSTONE PROJECT:
THE HUB Professor: Tom Allisma
The design goal is to create a place where people can have a relaxing time reading their book within their privacy zone but still able to communicate with others if needed. The Branding comes from the facts below: • People come to the library because they want to have their own place, with privacy, to enjoy reading books • They also want the chance to get involved with people in their community at the same time The Hub represents private space to individuals but also demonstrates a place where people can gather together to enjoy the books. Transformation is the main concept of “The Hub” because of: • The changing of the Haymarket area at downtown Lincoln from a historical area to the mixture of modern and historical pieces we see nowadays • The influence of technology on people’s reading habit • The changing in size from traditional libraries to compact libraries
UP
UP UP
UP
First Floor Plan
DN UP DN
UP DN
N Second Floor Plan
Public Lounge
Private Lounge
- R ec
eption
Pu b
Pu b
lic
a are
lic
a are
eteria - C af
Section
TECTONIC ARCHITECTURE:
ROOFSCAPE Professor: David Karle Team Member: Darin Hanigan
The diversity of program types which exist within a strip mall can attract many different users. Our program is intended to take that diversity of users which already exists within the strip mall environment and strengthen the relationship. Through activities that are creative based, we look to create opportunityies for the users to take advantage of resources they might not otherwise have access to. Part of this creative program would also give an opportunity for those users to utilize vacant space within the strip mallâ&#x20AC;&#x2122;s first floor, thus creating opportunity for local business growth
p |
g
Light & Water Control Sound Control
Maker Space Circulation Circul Circu Ci lation latio ti n
Circulation
ulin in nary ary Culinary
Circulation
Music
Circulation
Music
K-S eir
of
nel Pa
Me tal T
g
ss Tru es
ss ru
onrete Slab eC or
Green -ro o
Wood D ec k
Hollo w
C
Wood C eil in
Meta lR o
Folded Plate Truss Function Diagram
iew fV
N Material and Structure Diagram
Site Plan
Music
Maker
Culinary
5 5
1
2
3 UP
5
2nd and 3rd Floor Plan Scale: 1/32” = 1’-0”
1
Culinary
2
Commons
3
Maker
4
Music
5
Veritical Circulation
M
N
n ai
nce tra n E
4
5
N
Second and Third Floor Plan
LONG SPAN METAL DECK METAL ROOF SHEATHING
1
WOOD BLOCKING METAL FASCIA
STRUCTURAL STEEL
CURTAIN WALL
METAL ROOF
RIGID INSULATION LONG SPAN METAL DECK
BRIDGE TRUSS
SHEATHING EXTERIOR FINISH STUCCO COUNTER FLASHING METAL ROOF RIGID INSULATION LONG SPAN METAL DECK STEEL TRUSS
METAL FURRING
WOOD BLOCKING AIR BARRIER .08 ALUMINUM FLASHING BACKER ROD AND SEALANT CURTAIN WALL STEEL BRIDGE TRUSS
FINISH WOOD CEILING
Section Perspective - Culinary
GLASS RAILING
DECK
HOLLOW CORE TOPPING
STEEL BRIDGE TRUSS
12" HOLLOW CORE
CULINARY FLOOR 122'-8"
CURTAIN WALL
SHEATHING .08 ALUMINUM FLASHING EPDM MEMBRANE ROOF OVER NEW PARAPET CAP
AIR BARRIER GROWING MEDIUM CL
STRUCTURAL STEEL
EXTERIOR FINISH STUCCO RIGID INSULATION
STRUCTURAL STEEL EXISTING ROOF DECK DRAINAGE LAYER
Section Perspective - Common Public Place
Section Perspective - Music
Professional Works Projects worked on while previously employed with DLR Group
01
BLACK HILLS CORPORATION
02
OMAHA PUBLIC HIGH SCHOOL
03
C Y THOMPSON LIBRARY
04
HAYDEN PLACE
Apartment Building
01 BLACK HILLS CORPORATION Team member: Scott Shiffermiller - Project Manager Jenna Kurger - Project Architect Phung Hong - Project Designer
Exterior Scheme 1
Exterior Scheme 2
Exterior Scheme 3
Exterior Scheme 4
Location: Council Bluffs, Iowa Complete Date: 2020 Responsibilities: Schematic Massing Design Construction Document
Black Hills, based in Rapid City, South Dakota, provides natural gas service to Lincoln and more than 300 cities and towns in Nebraska. The project started with a new center in Lincoln, and small offices at Papillion and Cheyenne. The project then led to a big headquarter in Council Bluffs, and 18 offices in small cities around Nebraska. The intention is to allow better control costs and position Black Hill Engergy services well to continue to be committed to serving customers across Nebraska.
APPLIED FILM WITH CUSTOM GRAPHIC PREFIN MTL COPING 2
MECHANICAL EQUIP. SEE MECH
MTL PNL 2
PREFIN MTL COPING 1
MTL PNL 1
PJ
PJ PRECAST CONC.
PRECAST CONC.
PRECAST CONC.
ACM PANEL SYSTEM (MTL PNL 3)
T.O. WALL - ENTRANCE 143' - 6"
PJ
MTL PNL 2
PREFIN MTL COPING 1
MTL PNL 2
PRECAST CONC.
4' - 0"
4' - 0"
5' - 6"
24' - 0" 4 EQ SPACED JOINTS
5' - 6"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
5' - 6"
24' - 0" 4 EQ SPACED PANELS
5' - 6"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
30' - 0" 5 EQ SPACED JOINTS
3' - 11"
3' - 11"
3' - 11"
MTL PNL 2
8' - 8"
MTL PNL 2
STONE VENEER
8' - 8"
MTL PNL 1
MTL PNL 1
6" GUTTER
T.O. PARAPET 134' - 0"
T.O. PARAPET 134' - 0"
PJ MTL PNL 2
STONE VENEER
6" GUTTER
B
B
1' - 9"
7' - 4"
$
DOWNSPOUT
1' - 3"
5' - 6"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 8"
6' - 2"
7' - 2"
J
1' - 1" 6' - 10"
T.O. WALL - WAREHOUSE 119' - 6"
LIGHTING DEVICE, SEE ELEC. TYP
1' - 9"
LEVEL 02 115' - 4"
7' - 4"
T.O WALL - OFFICE 114' - 0"
7' - 2"
8' - 0"
8' - 0"
DOWNSPOUT
T.O. WALL - WAREHOUSE 119' - 6"
T.O WALL - OFFICE 114' - 0"
$ TYP
B106B
B1
B2
8' - 0"
D
8' - 0"
TYP
J1
MTL BUILDING FRAME
TYP
H
46 A10.1
B100A
CJ
CJ
FOOTINGS, SEE STR
CJ
2' - 8"
CJ
2' - 8"
C103B CJ
CJ
CARD READER, SEE ELEC
4" DOWNSPOUT CONNECTION BEHIND COLUMN. SEE CIVIL. CONTINUE HEAT TRACE SYSTEM 3' INTO UNDERGROUND PIPE.
West Elevation
DOOR ACTUATOR AND CARD READER ON SWITCH POST
WALL HYDRANT, SEE MECH
CJ
CJ
CJ
CJ
CJ
CJ
CARD READER, SEE ELEC
WALL HYDRANT, SEE MECH
LEVEL 01 100' - 0"
CJ
FOOTINGS, SEE STR WALL HYDRANT, SEE MECH
PR-13
PRECAST BEHIND MTL PNL 1 SLOPES TO MATCH T.O. PARAPET, SEE DETAILS
PREFIN MTL COPING 2 MTL PNL 1
10' - 0"
10' - 0"
10' - 0"
PJ
6" GUTTER
T.O. WALL - ENTRANCE 143' - 6"
PJ
STANDING SEAM MTL ROOF
8' - 2" 2 EQ
10' - 0" PJ 2 EQ
LOUVER, SEE MECH
DOWNSPOUT CONNECTION, TYP. SEE CIVIL. CONTINUE HEAT TRACE SYSTEM 3' INTO UNDERGROUND PIPE.
PRECAST CONC.
12' - 0"
PJ
DOWNSPOUT
6" GUTTER
PREFIN MTL COPING 1
PJ (END OF PRECAST BEHIND MTL PNL 1)
MTL PNL 2
1' - 0"
LIGHTING DEVICE, SEE ELEC. TYP
LEVEL 01 100' - 0"
10' - 0" PJ 2 EQ
PJ
19' - 9" 5 EQ
4' - 0" PJ
23' - 7" 6 EQ
PJ
7' - 4" PJ 2 EQ
T.O. PARAPET 134' - 0" ROOF 130' - 8"
LOUVER, SEE MECH
STANDING SEAM MTL ROOF
MTL PNL 2
MTL PNL 2 ACM PANEL SYSTEM (MTL PNL 4) T.O. WALL - WAREHOUSE 119' - 6" 2' - 6" 3' - 0" 3' - 0" 3' - 0" 3' - 0"1' - 6"
T.O WALL - OFFICE 114' - 0" L A113A
A112A
A111A
A110A
A108
L
A107 E1
E1
E1
ACM PANEL SYSTEM (MTL PNL 3)
E1
LEVEL 01 100' - 0"
THERMALLY INSULATED OVERHEAD DOOR, TYP.
BOLLARD, TYP.
MECHANICAL EQUIP, SEE MECH
WALL HYDRANT, SEE MECH. TYP
ACM PANEL SYSTEM (MTL PNL 4)
FOOTINGS, SEE STR
DOWNSPOUT CONNECTION BEHIND COLUMN, SEE CIVIL. CONTINUE HEAT TRACE SYSTEM 3' INTO UNDERGROUND PIPE.
North Elevation
PR-13
SLOPED MEMBRANE ROOF MECHANICAL EQUIP. SEE MECH
PRECAST CONC.
PREFIN MTL COPING 1
MTL PNL 2, RECESS PRECAST 1/2" TO ACCOMODATE MTL PNL
PJ
6" GUTTER SCUPPER PREFIN MTL COPING 2
MTL PNL 2, RECESS PRECAST 1/2" TO ACCOMODATE MTL PNL
PREMANUFACTURED CANOPY SYSTEM
6" GUTTER
STANDING SEAM MTL ROOF
DOWNSPOUT CONNECTION, SEE CIVIL. CONTINUE HEAT TRACE SYSTEM 3' INTO UNDERGROUND PIPE.
MTL PNL 2
4' - 0"
4' - 0"
5' - 8"
24' - 11 1/2" 4 EQ SPACED JOINTS
PJ
T.O. WALL - ENTRANCE 143' - 6"
MTL PNL 2
PREFIN MTL COPING 1
MTL PNL 4
LOUVER, SEE MECH
6' - 4"
8"
6' - 8" 2 EQ
8"
6' - 4"
24' - 11 1/2" 4 EQ SPACED JOINTS
5' - 8"
4' - 0"
4' - 0"
PJ
PJ
PJ
10' - 0" 2 EQ
PJ
PJ
10' - 0" 2 EQ
PRECAST CONC.
PJ
10' - 0" 2 EQ
PJ
10' - 0" 2 EQ
PJ
8' - 10" 2 EQ
LOUVER, SEE MECH T.O. PARAPET 134' - 0"
FREE STANDING CANOPY STRUCTURE BY PEMB MFR
MTL PNL 2
8' - 8"
MTL PNL 1
MTL PNL 1 6" GUTTER
LIGHTING DEVICE, SEE ELEC, TYP
6" GUTTER
8' - 0"
PR-13 G
SECURITY DEVICE, SEE ELEC TYP
8' - 0" 7' - 4" 19'-0" T.O. EAVE STRUT
MTL BUILDING FRAME
C110B
1 1/2" HSS GALV STEEL GAURDRAIL
G
T.O. WALL - WAREHOUSE 119' - 6"
T.O. WALL - WAREHOUSE 119' - 6"
DOWNSPOUT
51 A10.1
8"
8" B138.1B
B136B
TYP
SECURITY DEVICE, SEE ELEC. TYP
51 A10.1
$
$
8"
8" B135B
TYP
$ TYP
B138.1C
DOWNSPOUT CONNECTION, SEE CIVIL. CONTINUE HEAT TRACE SYSTEM 3' INTO UNDERGROUND PIPE.
B133C
A100C
E
B133B
C110C
2' - 8" ADD-1 FOOTINGS, SEE STR
CARD READER, SEE ELEC
THERMALLY INSULATED OVERHEAD DOOR
CARD READER, SEE ELEC
WALL HYDRANT, SEE MECH
East Elevation
LEVEL 01 100' - 0"
THERMALLY INSULATED OVERHEAD DOOR, TYP.
WALL HYDREANT, SEE MECH
FOOTINGS, SEE STR
CARD READER, SEE ELEC
CARD READER, SEE ELEC
DOWNSPOUT CONNECTION, SEE CIVIL. CONTINUE HEAT TRACE SYSTEM 3' INTO UNDERGROUND PIPE.
AST ELEVATION AREA B & A
BOLLARD THERMALLY INSULATED OVERHEAD DOOR PR-13
PREFIN MTL COPING 2 MTL PNL 2
10' - 0" 2 EQ PJ
10' - 0" 2 EQ PJ
10' - 0" 2 EQ PJ
PREFIN MTL COPING 1
MECHANICAL EQUIP, SEE MECH
PRECAST CONC.
10' - 0" 2 EQ PJ
10' - 0" 2 EQ PJ
10' - 0" 2 EQ PJ
10' - 0" 2 EQ PJ
LOUVER, SEE MECH HEAD:23/A9.3, TYP. JAMB: 33/A9.3, TYP. SILL: 43/A9.3, TYP.
10' - 0" 2 EQ PJ
10' - 0" 2 EQ PJ
MECHANICAL EQUIP. SEE MECH T.O. WALL - ENTRANCE 143' - 6"
10' - 0" 2 EQ PJ
8' - 10" 2 EQ PJ
8' - 8"
6' - 0" (PANEL BEYOND)
8' - 0" 2 EQ
MTL PNL 1
T.O. PARAPET 134' - 0"
STANDING SEAM MTL ROOF
LIGHTING DEVICE, SEE ELEC. TYP
6" GUTTER
FREE STANDING CANOPY STRUCTURE BY PEMB MFR
8' - 0"
MTL PNL 2 T.O. WALL - WAREHOUSE 119' - 6"
1' - 6"3' - 0" 3' - 0" 3' - 0" 3' - 0" 2' - 6"
19'-0" T.O. EAVE STRUT
7' - 4"
ACM PANLE SYTEM (MTL PNL 3)
PRECAST CONC. PLANTER BOX
8' - 0"
C110D
T.O WALL - OFFICE 114' - 0"
6" GUTTER AND DOWNSPOUT CONNECTION, SEE CIVIL. CONTINUE HEAT TRACE SYSTEM 3' INTO UNDERGROUND PIPE.
2' - 8"
3' - 6"
B1S3B LEVEL 01 100' - 0"
PR-03 CARD READER, SEE ELEC.
FOOTINGS, SEE STR DOWNSPOUT, TYP.
South Elevation
6 " GUTTER
SECURITY DEVICE, SEE ELEC TYP
WALL HYDRANT, SEE MECH
A111C
B1S2B LEVEL 01 100' - 0"
THERMALLY INSULATED OVERHEAD DOOR
1 1/2" GALV STEEL
PR-13
CARD READER, SEE ELEC
PR-13
20 160 VEHICLE BAY A113 1180 SF 3
VEHICLE BAY A112 1215 SF 3
VEHICLE BAY A111 1215 SF 3
20 165
VEHICLE BAY A110 1215 SF 3
WORK AREA A109 623 SF 2
RECEIVING C110 5600 SF 12
21 160
SP
SM CONF B109 113 SF 8
OFFICE B110 124 SF 2
First Floor Plan
TRA VEL D 148' ISTAN CE - 6" MD CONF B102 207 SF 14
14 160 OPEN OFFICE B122 1124 SF 12
CORR B128 106 SF
RR B125 63 SF
BREAK ROOM B126 136 SF 2
FATIGUE B127 79 SF 1
1 OFFICE C106 118 SF
1 OFFICE C107 118 SF
2
OFFICE B206 123 SF 2
2
1 - VX
61 165
1 - VX
SP
127 160 MECH/ STORAGE B144 305 SF 2
STAIR B1S3 226 SF
SP
SP OPEN OFFICE B202 2916 SF 32
OPEN TO BELOW
CORR B200 894 SF
BREAK OUT SPACE B203 121 SF 2
MD CONF B201 344 SF
23
OFFICE B224 137 SF 2
HEALTH ROOM B215 78 SF
KITCHEN B214 293 SF 3 ELEV B2E1 59 SF 1 - FB
1
OFFICE B223 137 SF 2
2
1
1 - FB
OFFICE B204 123 SF 2 126 165
OFFICE B217 115 SF
TRAVEL DISTANCE = 157' - 0"
OFFICE B205 123 SF 2
OPEN OFFICE C105 440 SF 5
1 - FB
1 - VX
1 - FB
2 OFFICE B143 116 SF
STORAGE B142 63 SF OPEN OFFICE B140 1127 SF 12
WOMEN'S B213 231 SF
BREAK OUT SPACE B222 2 137 SF
OPEN OFFICE B216 4050 SF 41
1 - FB
MED CONF B141 244 SF 17
OFFICE B218 117 SF 2
MEN'S B212 231 SF
BREAK OUT SPACE B208 123 SF 2 OFFICE B207 121 SF 2
MD CONF B221 235 SF 16
STAIR B2S1 164 SF
STORAGE B233 88 SF
WORK ROOM B229 149 SF STORAGE/ 3 MECH B234 264 SF 1 FILE STORE B230 153 SF 2
OFFICE B225 137 SF 2 OFFICE B226 137 SF 2
OPEN OFFICE B228 3026 SF 31
BREAK OUT SPACE B227 2 136 SF 1 - VX
CORR B231 214 SF
LG CONF B232 735 SF 50
126 160
STAIR B2S3 232 SF
CORR B103.3 59 SF
Second Floor Plan
N
54 160
29 160
VESTIBULE B100 248 SF
OFFICE B124 106 SF 2
1 STORAGE B139 198 SF 1
STORAGE/JAN C104 71 SF
1 - FB
SM CONF B209 122 SF 8
SM CONF B220 118 SF 8 BREAK OUT SPACE B219 118 SF 2
1 - VX
LG CONF B103.1 833 SF 56
SM CONF SP B123 134 SF 10
DATA SP B129 178 SF 1
1 - VX
IT WORKROOM B211 262 SF 3
1 - VX
8
124 340
28 325
SM CONF B108 113 SF
1
STAIR B1S1 169 SF
DATA C102 67 SF
- 0" 104'
1 - VS
EQUIP B131 57 SF
60 165
WAREHOUSE C103 7452 SF 15
CE = TAN
ELEV B1E1 59 SF
54 165 STORAGE B103.2 106 SF 1
OPEN OFFICE B106 2077 SF 21
1 - VS
LAB C100 399 SF 5
1 - FB
SP
CLASSROOM B137 1091 SF 11
1 - VX
SP
CLASSROOM B134 1092 SF 11
20 165
WOMEN'S LOCKER B121 3 245 SF
124 165
BREAK ROOM B104 1150 SF 77
CLASSROOM B132 1092 SF 11
WOMEN'S B120 224 SF
1 - VX
1 - FB
STAIR B2S2 234 SF
CORR B210 303 SF
L DIS
OFFICE B111 127 SF 2
LAB C108 618 SF 7
13 160
1 - FB
MEN'S B118 224 SF
VE TRA
BREAK OUT SPACE B113 125 SF 2 BREAK OUT SPACE B112 125 SF 2
LAB B138.1 722 SF 8
2 CORR B117 336 SF
WORK/FILE ROOM B107 276 SF 3
LAB B136 384 SF 4
LAB B135 384 SF 4
1 - FB
TECH DESKS B114 1203 SF 30
HEALTH B105 94 SF 1
LAB B133 777 SF 8
1 - VS
CORR B115 217 SF
MECH A100.1 321 SF
1 - VX MEN'S LOCKER B119 3 245 SF
1 - FB
1 - FB
1 - FB STORAGE/JAN 1 B116 153 SF
SP
1 - FB
1 - FB DATA A101 235 SF 1
1 - FB
TRAVEL DISTANCE - 143' - 0"
ELEC A102.1 393 SF 2
1 - FB
1
1 - VX STORAGE B138.2 56 SF 1
SP
2
1 - VX
STAIR B1S2 228 SF COMMON PATH OF 130 TRAVEL = 76' - 0" 165
MATERIAL MANAGEMENT A100 3636 SF 8
SP
MECH A102.3 580 SF 2
1 - VX
130 160
OPS WORK AREA A103 585 SF 2
MECH/ELEC C109 697 SF 3
OFFICE A106 124 SF 2
RR A105 76 SF
1 - VX
STOR A104 110 SF 1
S2 OCCUPANCY 14744 SF
B OCCUPANCY 24209 SF
1 - FB
WELDING A107 527 SF 2
S2 OCCUPANCY 12627 SF
SP
VEHICLE BAY A108 623 SF 2
STANDING SEAM MTL ROOF BY PEMB MFR
PREFIN MTL COPING EXT PLYWOOD
PREFIN MTL COPING 1
1" THERMAL SPACER BLOCK @ EAVE STRUT AND PURLINS
CONT. TREATED WOOD BLOCKING
10" PURLIN BY PEMB MFR
1 1/2" RIGID INSULATION BETWEEN TREATED 2x4S @ 24" O.C.
T.O. PARAPET 134' - 0"
MEMBRANE ROOF
1 1/2" ROOF INSULATION BETWEEN TREATED 2x4S @ 12" O.C.
MTL BLDG INSULATION W/ INTEGRATED AIR BARRIER BY PEMB MFR
T.O. PARAPET 134' - 0"
21
A7.7 -2,67 %($5,1* 6(( 675
TRIM BY PEMB MFR
5/8" EXT SHEATHING
EAVE STRUT
INSULATED PRECAST WALL PANEL
LINER ANGLE, TRIM, AND LINER PANEL BY PEMB MFR - WHERE OCCURS, SEE WALL SECTIONS
ROOF MEMBRANE TO EXTEND OVER TOP OF PARAPET WALL
OVERHANG FRAMING BY PEMB MFR
COVER BOARD
8' - 8"
TAPERED INSULATION IN CRICKET
INSULATED PRECAST WALL PANEL
MTL BLDG INSULATION W/ INTEGRATED AIR BARRIER BY PEMB MFR
2 - 2 1/2" LAYERS OF ROOF INSULATION
15 A9.4
STEEL ANGLE, SEE STR MTL DECK, SEE STR STEEL JOIST, SEE STR
MTL BLDG WALL PANEL BY PEMB MFR MTL STUD FURRING WALL, SEE PLAN
TRIM BY PEMB MFR
7 2 23(1,1*
2' - 0"
8" GIRT BY PEMB MFR MTL BLDG WALL PANEL BY PEMB MFR
21
8' - 0"
ALUM STOREFRONT, AS SCHEDULED
A7.7
21
PARAPET DETAIL
A7.6
METAL BUILDING EAVE AT METAL PANEL SCALE: 1 1/2" = 1'-0"
SCALE: 1 1/2" = 1'-0"
SLOPED STANDING SEAM ROOF
MTL STUD FURRING WALL, SEE PLAN
BC 21
35
A7.6
A9.4
COLD FORMED BRACE @ 16" O.C.
7 2 6,//
INSULATED PRECAST WALL PANEL
34' - 0"
26 A7.7
2' - 0"
COMPOSITE FLOOR, SEE STR
6" COLD FORMED FRAMING
LEVEL 02 115' - 4"
MTL PNL 2 CONT TREATED 2X WOOD BLOCKING R-19 BATT INSULATION 1 1/2" CONTINUOUS INSULATION BETWEEN Z FURRING CHANNELS
5' - 4"
MTL PNL 2
OVERHANG FRAMING BY PEMB MFR
DRIP AT EXTERIOR
MTL BUILDING INSULATION MTL PNL 1
8" Z GIRT PER PEMB MFR
14
1/2" TH EXT GRADE PLYWOOD SHEATHING
A9.4
15
1/4" SHIM AND SEALANT BOTH SIDES, TYP.
3 1/2"
RECEIVER CHANNEL
7 2 23(1,1*
ALUM STOREFRONT, AS SCHEDULED
A9.3
BRAKE METAL J-FORM TO MATCH ALUM. FRAME
7 2 23(1,1*
ALUM STOREFRONT AS SCHEDULED 15 A9.4
WINDOW HEAD SCALE: 1 1/2" = 1'-0"
6" PRECAST
ALUM. STOREFRONT, AS SCHEDULED FLUID APPLIED MEMBRANE AIR BARRIER
33 A7.7
MTL PNL 2, W/ 7/8" HAT CHANNEL, WHERE OCCURS INSULATED PRECAST WALL PANEL MTL STUD FURRING WALL, SEE PLAN FLOORING, SEE ROOM FINISH SCHEDULE
7 2 6,//
2' - 0"
COMPOSITE CONC. FLOOR, SEE STR
MTL STUD FURRING WALL, SEE PLAN VENEERED STONE W/ MTL LATH 3 5/8" COLD FORMED STUD FRAMING BEHIND SHEATHING, BETWEEN GIRTS
LEVEL 02 115' - 4"
LEVEL 01 100' - 0"
STEEL ANGLE UNDER MTL DECK, SEE STR
CONC. SLAB ON GRADE
STRUCTURE AND CONNECTION PLATE BEYOND, SEE STR MTL STUD FURRING WALL, SEE PLAN
54
WALL SECTION SCALE: 3/8" = 1'-0"
34 A9.3
7 2 6,// 51 A7.6
LEVEL 01 100' - 0" MTL DECK, SEE STR
A7.1
10' - 0"
CONC. SLAB ON GRADE
2' - 0"
MTL STUD FURRING WALL, SEE PLAN
8' - 0"
8' - 0"
CEILING, SEE RCP
26
A7.7
FLOOR CONNECTION DETAIL SCALE: 1 1/2" = 1'-0"
21
A7.1
WALL SECTION SCALE: 3/8" = 1'-0"
02 OMAHA PUBLIC HIGH SCHOOL Team member: Aaron Persen - Project Manager Amy Railey - Project Architect Scotty Kalb - Project Designer Adam Post - Project Designer Phung Hong - Project Designer Location: Omaha, Nebraska Complete Date: 2022 - 2023 Responsibilities: Construction document Code Research
The school located at 60th and L will be 285,000 square feet, sit on 40.52 acres of land and cost $92.4 million to build. The three-story school will have a capacity of 1,500 students. The classrooms will be on all three floors of the building, with many of the rooms having abundant natural light. School administrators wonâ&#x20AC;&#x2122;t work out of a centralized office at the front of the building but will be situated throughout the building so theyâ&#x20AC;&#x2122;re closer to students.
PREFIN MTL COPING-1 PREFIN MTL COPING-1
/(9(/
3&
15' - 4"
15' - 4"
/(9(/
3&
/(9(/
)%
)%
)%
&2856( %5,&. 5(9($/
)%
03
3&
3& &-
&-
&-
3&
)%
)%
&-
&-
&-
/(9(/
&-
44' - 8" 14' - 8"
44' - 8"
14' - 8"
3& )%
14' - 8"
14' - 4"
/(9(/
&-
WALL HYDRANT, SEE MECH
24
A5.1
SCALE: 1/8" = 1'-0"
&-
MASONRY GRAFFITI PROTECTANT UP TO 14'-4" A.F.F.
SOUTHWEST ELEVATION - AREA F _Area F Southeast Elevation
21
24"x24" LOCKABLE ACCESS PANEL (AD-3) PAINT HPC TO MATCH BRICK
3&
/(9(/
MASONRY GRAFFITI PROTECTANT UP TO 14'-4" A.F.F.
MASONRY GRAFFITI PROTECTANT UP TO 14'-4" A.F.F.
Northeast Elevation F NORTHEAST ELEVATION - AREA_Area F
14' - 8"
14' - 4"
14' - 4"
/(9(/
)%
LIGHTING, SEE ELEC. TYP
&-
/(9(/
)%
14' - 4"
/(9(/
&2856( %5,&. 5(9($/
)%
)%
14' - 8"
4"
3&
14' - 4"
&2856( %5,&. 5(9($/
3&
4"
03
4"
03
44' - 8"
)%
14' - 8"
14' - 4"
)%
03
A5.1
LOUVER, SEE MECH
4"
3' - 7 1/2"
7 2 :$//
4"
03
)%
LOUVER, SEE MECH
PREFIN MTL COPING-2
3&
4"
)%
11' - 8 1/2"
03
7 2 :$//
)%
)%
)%
PREFIN MTL COPING-1
7 2 :$//
7 2 :$//
SCALE: 1/8" = 1'-0"
25 A5.1
Northeast Elevation _Area F
NORTHEAST ELEVATION - AREA E SCALE: 1/8" = 1'-0"
PREFIN MTL COPING-1
7 2 :$//
)% 03
03
3&
CJ
)%
CJ
CJ
7 2 :$//
7 2 :$// (/ 9$5,(6 /(9(/
CJ
7 2 :$//
03
03
3&
03
3&
03
3&
)%
&-
&-
&-
&-
&-
&-
15' - 4" )%
/(9(/
&-
MASONRY GRAFFITI PROTECTANT UP TO 14'-4" A.F.F.
MASONRY GRAFFITI PROTECTANT UP TO 11'-4" A.F.F.
WALL HYDRANT, SEE MECH
NORTHWESTElevation ELEVATION - AREA _Area F Northeast F
SOUTHWEST ELEVATION - AREA F _Area F Southeast Elevation
41
A5.1
3&
/(9(/ *5281' /(9(/ (/ 9$5,(6
DOWNSPOUT NOZZLE, SEE MECH
WALL HYDRANT, SEE MECH
03
11' - 4"
03
14' - 8"
FB-2
LOUVER, SEE MECH
03
/(9(/
)%
)%
14' - 8"
03
)%
14' - 4"
)%
8"
LIGHTING, SEE ELEC. TYP 03
)%
LIGHTING, SEE ELEC. TYP
/(9(/
4"
3&
32' - 11 1/2"
)% 03
44' - 8"
&2856( %5,&. 5(9($/
14' - 8"
)%
14' - 4"
)%
&-
3&
4"
3&
)%
&-
PREFIN MTL COPING-2
03
3&
2' - 11 1/2"
)%
15' - 4"
)%
45
SCALE: 1/8" = 1'-0"
A5.1
SCALE: 1/8" = 1'-0"
PREFIN MTL COPING-1 7 2 :$//
)%
12' - 0"
)%
)% 3&
3&
03
&-
&-
&-
&-
&-
&-
&-
03
)%
03
PREFIN MTL COPING-2
7 2 :$//
3& 3&
4"
3&
&-
&-
3& )%
&-
/(9(/
)% )%
)%
3' - 4"
)% 3&
03
3&
3&
LIGHTING, SEE ELEC. TYP
4"
)%
&2856( %5,&. 5(9($/
14' - 4"
03
3& &-
&20326,7( 0(7$/ 3$1(/ &2/801 &29(5
03
3&
)% &-
% 2 62)),7
03
03
&-
&-
&-
)%
&-
&-
&-
&-
+
/(9(/
5$7(' '225 WALL HYDRANT, SEE MECH
*
MASONRY GRAFFITI PROTECTANT UP TO 14'-4" A.F.F.
Northwest Elevation _Area E A5.1
&
NORTHWEST ELEVATION - AREA E
SCALE: 1/8" = 1'-0"
TRUE NORTH
%
' ) (
51
20
$
&,3
&,3 &-
&20326,7( 0(7$/ 3$1(/ &2/801 &29(5
10
.(< 3/$1 -
03 )%
5
SCALE: 1/8" = 1'=0"
)%
)%
03
44' - 8"
03
18' - 0"
03
11' - 4"
14' - 4"
0
03
(48,30(17 6&5((1 21 522) PREFIN MTL COPING-3 PREFIN MTL COPING-1
PREFIN MTL COPING-1
7 2 :$//
03
)%
)%
03
35(),1 07/ &23,1*
03
3&
7 2 :$//
3& /(9(/
03
)%
7 2 :$//
)%
03
3& LIGHTING, SEE ELEC. TYP
03 &20326,7( 0(7$/ 3$1(/ &2/801 &29(5
&,3
&20326,7( 0(7$/ 3$1(/ &2/801 &29(5
&2857<$5' %(<21'
&,3
&,3
)%
)%
03
&,3
)%
03
3&
3&
&-
&,3 WALL HYDRANT, SEE MECH
&-
18' - 0"
44' - 8"
% 2 62)),7
03
&-
14' - 4"
03
&20326,7( 0(7$/ 3$1(/ &2/801 &29(5
/(9(/
03
&-
&-
14' - 8"
03
32' - 8"
3& 03
&2856( %5,&. 5(9($/
14' - 8"
03
4"
03
14' - 4"
+5
+285 :,1'2:
&,3
/(9(/ *5281' /(9(/ (/ 9$5,(6
&-
DOWNSPOUT NOZZLE, SEE MECH
MASONRY GRAFFITI PROTECTANT UP TO 14'-4" A.F.F.
LEVEL 01 100' - 0"
NORTHEAST - AREA B Northeast Elevation _Area _ Area BB 25
21
A5.2
SCALE: 1/8" = 1'-0"
SCALE: 1/8" = 1'-0"
35(),1 07/ &23,1* 7 2 :$//
35(),1 07/ &23,1*
8"
35(),1 07/ &23,1*
35(),1 07/ &23,1*
&20326,7( 0(7$/ 3$1(/ &2/801 &29(5 &,3
DOOR ACTUATOR ON BOLLARD
SOUTHWESTElevation ELEVATION - AREA_ B &Area E Southeast B&E A5.2
3' - 4"
)%
4'-0" TYP.
11' - 4"
PREFIN MTL COPING-2
03
4"
PREFIN MTL COPING-2
03
15' - 4"
03
6.(:(' (/(9$7,21 PREFIN MTL COPING-2
03
03
/(9(/
)%
18' - 0"
44' - 8"
/(9(/
4"
03
03
&20326,7( 0(7$/ 3$1(/ &2/801 &29(5
4' - 0"
&,3 )%
3&
3& &-
&-
&-
)%
&-
&-
&-
&-
&-
11' - 4"
03
)%
03
% 2 62)),7
)%
14' - 8"
)%
14' - 4"
9' - 0"
32' - 8"
10' - 6" )%
LIGHTING, SEE ELEC. TYP
4' - 2"
)%
5' - 8" 5' - 8"
+5
03 3&
03
&2856( %5,&. 5(9($/
03
03
14' - 8"
03 )%
7 2 :$//
03
)%
14' - 4"
)%
4' - 2"
5' - 8"
)%
4"
3&
03
7 2 :$//
4' - 0" TYP.
03
12' - 0"
9' - 0"
)% 03
35(),1 07/ &23,1*
14' - 8"
)%
3' - 4"
)%
6' - 8"
5' - 8"
7 2 :$//
03
&,3
/(9(/
&-
LEVEL 01 100' - 0"
DOWNSPOUT NOZZLE, SEE MECH WALL HYDRANT, SEE MECH
MASONRY GRAFFITI PROTECTANT UP TO 14'-4" A.F.F.
DOWNSPOUT NOZZLE, SEE MECH
FIRE DEPARTMENT CONNECTION
WALL HYDRANT, SEE MECH
)%
SOUTHEASTElevation ELEVATION - AREA _ F Area F Southeast
NORTHEAST ELEVATION - AREA B _ Area B Northeast Elevation
41
A5.2
45
SCALE: 1/8" = 1'-0"
A5.2
SCALE: 1/8" = 1'-0"
PREFIN MTL COPING-1
35(),1 07/ &23,1*
7 2 :$//
8"
(48,30(17 6&5((1 21 522)
5' - 8"
7 2 :$//
)%
03
14' - 8"
)%
03
03
03
4"
3&
03
03
0
3&
)%
)% &-
&-
&-
&-
)%
03
&-
)% &-
&-
&DOWNSPOUT NOZZLE, SEE MECH
WALL HYDRANT, SEE MECH
03
&-
&-
3&
)%
&
$ +
/(9(/
MASONRY GRAFFITI PROTECTANT UP TO 14'-4" A.F.F.
'
%
*
WALL HYDRANT, SEE MECH
) (
SOUTHEASTElevation ELEVATION - AREA _ E Area E Southeast 51
A5.2
20
03
14' - 8"
)%
03
5' - 8"
03
4' - 0"
14' - 4"
)%
5' - 8"
4"
/(9(/
03
10
.(< 3/$1 -
3&
/,*+7,1* 6(( (/(& 7<3
5
SCALE: 1/8" = 1'=0"
44' - 8"
03
'/
03
03
14' - 8"
03
'/ %8,/',1* 6,*1 &225',1$7( 7(;7 '(6,*1 3/$&(0(17 :,7+ 2:1(5
)%
9' - 0"
14' - 4"
)%
5' - 8"
/(9(/
)%
&2856( %5,&. 5(9($/
03
9' - 0"
)% 03
SCALE: 1/8" = 1'-0"
TRUE NORTH
/(9(/ $
6' - 8"
26 A7.6
7 2 %5,&.
FB-1
7 2 :$//
STEEL PIPE HAND RAIL ATTACHED TO WALL
1' - 0"
FB-1
1' - 0"
/(9(/
CJ
LEVEL 01 100' - 0"
1' - 0" 1' - 0"
LEVEL CONCESSIONS 97' - 0"
SEGMENTED RETAINING WALL
SOUTHElevation ELEVATION - AREA_ D Area D South
ELEVATION - AREA B NorthNORTH Elevation _ Area B
11
A5.3
35(),1 07/ &23,1*
BRICK LEDGE
WEST RAMP ELEVATIONAREA B West Ramp Elevation _ Area B
13
SCALE: 1/8" = 1'-0"
A5.3
15' - 4"
PC-1
3' - 4"
5' - 1"
CJ
CJ
18' - 4"
15' - 4" 14' - 8"
10' - 0"
CJ
7 2 :$//
7 2 :$//
BCJ
3' - 0"
FB-1
1 1/4" GALV STEEL GUARDRAIL, SEE CIVIL
4' - 2 1/2"
7 2 :$//
)%
BCJ
6' - 0 1/2"
8"
35(),1 07/ &23,1*
/(9(/
3' - 0"
PC-1
FB-2
BCJ
34' - 0"
PC-1
522) /$''(5
MASONRY GRAFFITI PROTECTANT UP TO TOP OF BRICK T.O. WALL 115' - 4"
8' - 8"
FB-1
3' - 0"
FB-1
3' - 4"
7 2 %5,&.
PREFIN MTL COPING-1 BCJ SKEWED ELEVATION
14
SCALE: 1/8" = 1'-0"
SCALE: 1/8" = 1'-0"
A5.3
PREFIN MTL COPING-1
PREFIN MTL COPING-1
PREFIN MTL COPING-1
PREFIN MTL COPING-1
PREFIN MTL COPING-1
PREFIN MTL COPING-1
35(),1 07/ &23,1*
35(),1 07/ &23,1*
35(),1 07/ &23,1*
35(),1 07/ &23,1*
35(),1 07/ &23,1*
35(),1 07/ &23,1*
03
03
03
03
03
03
FB-1
FB-1
FB-1
FB-1
FB-1
FB-1
35(),1 07/ &23,1*
PREFIN MTL COPING-1
03
7 2 :$//
)%
15' - 4"
)%
FB-2
FB-2
FB-2
FB-2
% 2 62)),7
FB-1
FB-1
FB-1
FB-1
)%
7 2 :$//
3&
3& )%
KNOX BOX
)%
BCJ
FB-1
BCJ
BCJ
3&
BCJ
3&
BCJ
BCJ
3&
BCJ
BCJ
3&
BCJ
BCJ
BCJ
3&
BCJ
BCJ
3&
CJ
/(9(/
BCJ
CJ
CJ
7 2 :$//
CJ
6' - 0" 2' - 0" 2' - 0" 2' - 0"
MASONRY GRAFFITI PROTECTANT UP TO 11'-4" A.F.F.
SOUTHElevation ELEVATION - AREA _ B&DArea B & D South
WESTElevation ELEVATION - AREA_ B Area B West
21
A5.3
)%
11' - 4"
FB-1
11' - 4"
(,)6
15' - 0"
3' - 4"
5' - 4"
03
7 2 :$//
522) /$''(5
11' - 4"
FB-2
14' - 8"
FB-2
3' - 4"
FB-2
03
35(),1 07/ &23,1*
30' - 0"
SIGN TYPE: 8" VINYL LETTERING FONT TYPE: FUTURA MD
)%
/(9(/
3' - 4"
35(),1 07/ &23,1*
1 COURSE 1/2" BRICK REVEAL
3&
8"
9' - 4"
4"
5' - 4"
03
25
SCALE: 1/8" = 1'-0"
A5.3
SCALE: 1/8" = 1'-0"
(48,30(17 6&5((1 21 522) 35(),1 07/ &23,1* 0$6215< *5$)),7, 3527(&7$17 83 72 723 2) %5,&.
4' - 0"
35(),1 07/ &23,1* 26 A7.6
)%
03
TYP.
BCJ
7' - 4"
)% 26 A7.6
)%
8' - 8"
5' - 4"
26 A7.6
TYP.
26 A7.6
3' - 4"
TYP.
7 2 :$// CJ
BCJ
)%
7 2 :$//
3' - 8 5/8"
TYP.
7 2 %5,&.
4"
)%
)%
BCJ
/289(5 6(( 0(&+
)%
)%
)%
CJ
)% TOP OF FOOTING
BCJ
DOWNSPOUT NOZZLE
&CJ
CJ
CJ
9 1/2"
6' - 0"
3& &-
CJ LEVEL 00 84' - 8"
BCJ
WALL HYDRANT
LEVEL 01 100' - 0"
*5281' /(9(/ (/ 9$5,(6
8"
CJ
4' - 0"
1" EJ CJ
8' - 8"
3' - 4" BRICK LEDGE COORDINATE W/ FINISH GRADE, TYP.
)%
BRICK LEDGE COORDINATE W/ FINISH GRADE, TYP.
15' - 4"
15' - 4"
14' - 8"
3&
18' - 8"
8"
22' - 4"
3&
)% FB-2
3&
3&
FB-1
9' - 4"
3&
FB-2
03
FB-2
)%
5' - 4"
)% 3&
2' - 0"
3&
)%
2' - 0"
FB-1
5' - 4"
8' - 8"
FB-2
3' - 4"
35(),1 07/ &23,1*
6' - 8"
35(),1 07/ &23,1*
34' - 0"
35(),1 07/ &23,1*
30' - 0"
8' - 8"
WALL HYDRANT
39' - 8"
17' - 4"
0$6215< *5$)),7, 3527(&7$17 83 72 $ ) )
8' - 8"
9' - 1 3/8"
0$6215< *5$)),7, 3527(&7$17 83 72 723 2) %5,&.
WEST ELEVATION_- AREA A & BA & B West Elevation Area 41
A5.3
SCALE: 1/8" = 1'-0"
35(),1 07/ &23,1*
2' - 0"
7' - 0"
2' - 0"
35(),1 07/ &23,1*
2' - 0"
2' - 0"
2' - 0" 2' - 0"
8' - 7"
2' - 0"
2' - 0" 2' - 0"
8' - 0"
2' - 0" 2' - 0"
2' - 0" 3' - 9" 2' - 10"
1' - 4" 2' - 0"
2' - 0" 2' - 0"
6' - 3"
CJ
2' - 0" 6' - 0"
26 A7.6
2' - 0" 2' - 0"
6' - 0"
7 2 :$//
)%
2' - 0" 4' - 7 5/8"
03
CJ
7 2 :$//
3& '/
)% 03
TYP.
FB-1
)%
PC-1
2' - 0"
CJ
03
)%
2' - 0" 2' - 0"
(,)
5' - 4"
18' - 8"
2' - 0" 6' - 0"
3&
7 2 :$//
)%
)%
3&
3&
)%
BCJ
DOWNSPOUT NOZZLE, SEE MECH
BCJ
BCJ
22' - 4 7/8"
16' - 8"
TOP OF FOOTING
2' - 0"
WALL HYDRANT, SEE MECH
1' - 8"
15' - 4"
14' - 8"
)% BCJ
DOWNSPOUT NOZZLE, SEE MECH
(-
BCJ
0
BCJ
BCJ
BCJ
BCJ
03 LEVEL 01 100' - 0"
MASONRY GRAFFITI PROTECTANT UP TO TOP OF BRICK
DOWNSPOUT NOZZLE, SEE MECH
+
SOUTH ELEVATION - AREA A South Elevation _ Area A 51
A5.3
SCALE: 1/8" = 1'-0"
*
52
A5.3
SCALE: 1/8" = 1'-0"
TRUE NORTH
' ) (
SOUTH ELEVATION - AREA B South Elevation _ Area B
& %
TOP OF FOOTING MASONRY GRAFFITI PROTECTANT UP TO 14'-8" A.F.F.
20
.(< 3/$1 $
WALL HYDRANT, SEE MECH MASONRY GRAFFITI PROTECTANT UP TO TOP OF BRICK
10
BRICK LEDGE COORDINATE W/ FINISH GRADE, TYP.
/(9(/
5
SCALE: 1/8" = 1'=0"
03
)%
3' - 4"
8"
/(9(/ FB-2
4' - 8"
2' - 0" 2' - 0"
(,)
03
34' - 0"
)%
2' - 0" 2' - 0"
CJ
3' - 4"
CJ
2' - 0" 6' - 0"
15' - 0"
7 2 :$//
2' - 0"
&2856( %5,&. 5(9($/
11' - 4"
2' - 5"
35(),1 07/ &23,1*
3' - 4"
35(),1 07/ &23,1*
35(),1 07/ &23,1*
35(),1 07/ &23,1*
30' - 0"
35(),1 07/ &23,1*
15' - 4"
35(),1 07/ &23,1*
4"
35(),1 07/ &23,1*
(THE CAPACITY OF DOORS ARE DETERMINED AS FOLLOWS: CLEAR OPENING WIDTH IN INCHES DIVIDED BY 0.2)
WALL SEPARATION LEGEND
13
2
2 -F
215 320
55 385 2 -FB
SP 1 -FB
1 -FB
6 220
CORRIDOR 100V
0 -C
1S-04
83
8
& ^ ` ^ ` & &$3$&,7<
CLASSROOM 127 888 SF
46
&/$66 , 67$1'3,3(
0" 11' W 1 -E
CLASSROOM 126 893 SF
325 325
0 -C 0 -C
CLASSROOM 128 952 SF
67$,5 :,'7+ ,16,'( )$&( 2) *8$5'5$,/ 72 ,16,'( )$&( :$//
/6& &$/& & ^:Q ` ^ `
X 1 -V STAIR 4
0 -C
7
COLLABORATION COMMONS 13 127A 258 SF 0 -C
0 -C
0 -C
0 -C FE
0 -C
X 1 -V
STAFF TOILET 128A
0 -C
FUTURE ADDITION
SP SP
SMALL GROUP ROOM 125 145 SF
FEC
COLLABORATION COMMONS 126A 118 SF
0 -C
0 -C
STAFF TOILET 128B
STUDENT TOILET 128C
1
321 335
0 -C
1
SP
2 -F
0 -C 0 -C
131 325 42
SP
0 -C
ELEC 122B 101 SF
CORRIDOR 100W
0 -C 0 -C
22 335
21 160
DENTAL HEALTH 131 2075 SF
3
0 -C
1
0 -C FEC
0 -C HEAD END 130 294 SF
0 -C
0 -C
0 -C
SP
STORAGE 131A 151 SF
SP
0 -C
0 -C
0 -C 0 -C FEC/FB
3
SP
2
SP
S
W
0 -C
35 160
93 160 S 1 -V
0 -C
ELEV 2 1E-02
0 -C GALLERY SPACE 121G 209 SF
ART STORAGE 122A 303 SF
SP
0 -C
S 1 -V
23
0 -C
0 -C
1 -V
SP
0 -C
1
0 -C
SP 1 S 1 -V
SP
0 -C
ELEC 121K 130 SF
SP I.T. WORKROOM 121F 270 SF
STORAGE 121J 50 SF HALL 121H 290 SF
SP
B
0 -C
35 160
68
SP 1 SP
0 -C
2 -F
46 127( 21( +285 ),5( 5$7(' :$// &216758&7,21 0867 &217,18( 0,1 )520 (;,7 67$,5 $6 6+2:1
47
WOMEN'S TOILET 129A
MEN'S TOILET MECHANICAL 129C 129 740 SF
3
%8,/',1* 7<3( ,,% &216758&7,21 ( 2&&83$1&< 6)
W
45
2
SOCIAL WORKER 143M 151 SF
1 -F
76
68
I.T. STORAGE 121E 135 SF
17
0 -C
0 -C
CLASSROOM 133 904 SF
0 -C
0 -C FVC 112 227
HX
0 -C 0 -C FE MEN'S TOILET 132C
15
COLLABORATION 121D 338 SF
83
3D ART 124 1502 SF
2D ART 123 1354 SF
2D ART 122 1354 SF
e Non
X 1 -V
RESOURCE 134 296 SF
10
2
-C
0 -C
1 0 -C
24
FEC DATA 133A 119 SF
0 -C
0 -C
& ^ ` ^ ` & &$3$&,7<
0 -C
2
3
ART STORAGE 124A 274 SF
FEC/FB
33 160
0 -C
25 160
X 1 -V
67$,5 :,'7+ ,16,'( )$&( 2) *8$5'5$,/ 72 ,16,'( )$&( :$//
/6& &$/& & ^:Q ` ^ `
6
COLLABORATION COMMONS 137A 269 SF
COLLABORATION COMMONS 135A 199 SF
COMMUNITY COUNSELOR 143K 152 SF
227 FVC
0 -C
STAFF TOILET 133B
STAFF TOILET 133C
CORRIDOR 100Y
2
0 -C 0 -C COLLABORATION SMALL GROUP ROOM COMMONS 136A 138 110 SF 474 SF
325 335
0 -C
0 -C
STAIR 6 1S-06
83
0 -C
151
67 MEDIA 84 LEARNING STAIR = 151
LIBRARY OFFICE 121A 152 SF
CORRIDOR 100U
W
X 1 -V
0 -C FEC
0 -C
SPEECH 142 228 SF
3
0 -C
0 -C
43 160
ACP TOILET 139A
0 -C
325 325
32 160
33 160
57
2
25 160
1
2 -F
64
27 160
ACP CLASSROOM 141 1264 SF
140A 97 SF
W 1 -E.
HALL 2 143P FEC HALL COUNSELOR 143N 143G COUNSELOR 149 SF 143E 2 COUNSELOR 145 SF 143C 2 150 SF 0 CONFERENCE ROOM HALLWAY 2 143L 143Q 20 RECORDS STORAGE PSYCHOLOGIST 302 SF 143B 143A 0 -C 171 162 SF 150 SF
8
ELEC 140B 69 SF
X 1 -V
35 160
LIBRARY 121 3330 SF
SMALL GROUP ROOM 121B 126 SF
2
COUNSELING RESOURCE CENTER 143 810 SF
KILN ROOM 124B 213 SF
45 160
272 320
EQ COUNSELOR 143D 145 SF
380
B
%8,/',1* 7<3( ,,% &216758&7,21 $ 2&&83$1&< 6)
93 335
W 1 -E
COUNSELOR 143H COUNSELOR 156 SF 143F 2 156 SF
950 975
2 -F
SMALL GROUP ROOM 121C 124 SF
&/$66 , 67$1'3,3(
STAIR 5 1S-05
0" 10' -
127( 21( +285 ),5( 5$7(' :$// &216758&7,21 0867 &217,18( 0,1 )520 (;,7 67$,5 $6 6+2:1
OUTDOOR COURTYARD 144 5691 SF
W
7
83
EQ
190 325
127( 21( +285 ),5( 5$7(' :$// &216758&7,21 0867 &217,18( 0,1 )520 +285 ),5( :$// $6 6+2:1
1
2 -FW
-FW
7
W 1 -E 100 160
,%& 3(50,76 83 72 2) :$// $5($ 72 %( 813527(&7(' 23(1,1*6 :,7+ ),5( 6(3$5$7,21 ',67$1&( 2) ; $5($ 2) :$// 23(1,1*6
109 SF
HEALTH SCIENCE 139 1123 SF
BACK AISLE 120F
VESTIBULE 100T 342 SF
FEC 2
0" 10' -
4
2 -FW
& ^ ` ^ ` & &$3$&,7<
127( 21( +285 ),5( 5$7(' :$// &216758&7,21 0867 &217,18( 0,1 )520 (;,7 67$,5 $6 6+2:1
ACP CLASSROOM 140 1105 SF SENSORY 56 141A 60 SF SENSORY
1 SOUND LOCK 120G
950 975
67$,5 :,'7+ ,16,'( )$&( 2) *8$5'5$,/ 72 ,16,'( )$&( 2) :$// /6& &$/& & ^:Q ` ^ `
831
5
1 -FB 1
TICKET BOOTH 120H 55 SF
& ^ ` ^ ` & &$3$&,7<
STORAGE 139B 78 SF
1 -FB
2
1 -FB
CAFETERIA STORAGE 120N 381 SF
2 -FW
FEC
25 160
SP
SP 1 -FB
1 -FB
1 -FB
131 325
COMMONS / CAFETERIA 100A 12080 SF
30 160
74 325
2 -FW
56 325 B 1 -F
0 -C
4 335 SP
2 -FW
2 -FB 1 -FB
2 -FW
2 -FW
LIGHT ROOM 120C 345 SF
SOUND LOCK 120K 87 SF
%8,/',1* 7<3( ,,% &216758&7,21 $ 2&&83$1&< 6)
190 450
1 -FB
24 325 1 -FB
1 -FB
1 -FB
SP
27 160
1 -FB
0 -C
SIDE AISLE 120B
2 -FW
2 -FW
%8,/',1* 7<3( ,,% &216758&7,21 % 2&&83$1&< 6)
COURTYARD FENCE AND GATES FUTURE BID PACKAGE
511
1 -FB
27
3
10
1 -VS
SERVERY 112 2610 SF
DISHWASHING 112A 535 SF
FEC
VESTIBULE 100 424 SF
1 -FB
0 -C 1 -FB
2 -FW 2 -FW 75$9(/ ',67$1&(
0 -C 0 -C
1
1 -FB
SCHOOL STORE 111D 300 SF
1095 1095
50 200 1 -VS
325 325
0 -C 0 -C 0 -C
0 -C
CONFERENCE ROOM RESOURCE OFFICER 101F RESOURCE OFFICER 101A 185 SF 101B 104 SF
WOMEN'S TOILET MEN'S TOILET 111E 111F
266 325
12 CONFERENCE ROOM 101G 182 SF
6
1
35 160
3
1 -VX
1 -VX
1
900 975
SP
33 160
106 SF
8 PRINCIPAL 101K 218 SF
0 -C
111 200
131 200
7 200
SP
SP
2
1 -FB
PRODUCTION 111C 181 SF
67$,5 :,'7+ ,16,'( )$&( 2) *8$5'5$,/ 72 :$// /6& &$/& & ^:Q ` ^ `
933 975
FEC
2
AUDITORIUM 120 3867 SF
STORAGE 120A 56 SF
165 200
SIDE STAGE 119A -FB 108 SF
SP SP
2 ASSISTANT PRINCIPAL 101L 149 SF
1 -VX
1
%8,/',1* 7<3( ,,% &216758&7,21 $ 2&&83$1&< 6)
1 -FB
ELEV 1 1E-01 58 SF
1 -VS 325 325
FE
SIDE AISLE 120L
%8,/',1* 7<3( ,,% &216758&7,21 $ 2&&83$1&< 6)
W 1 -E
106 160
34 160
124 SF
STAIR 1 1S-01
2 -FW
1
0 -C
81 160
1 2 WORKROOM 101T 505 SF NURSE'S TOILET 6 101R ATTENDANCE 182 SF 101D PRIVATE COT ROOM MOTHER'S ROOM STAFF TOILET 134 SF 101Q 101V 101X 120 SF RECEPTION / 1 76 SF SP SECRETARIAL 2 SP 101 STAFF TOILET STORAGE SECRETARY 735 SF 101Y 101H 101J 2
2 -FW '1
152 220
177
STORAGE 120M 221 SF
1
0 -C
1 -FB
3 0 -C
1 -FB
47
COT ROOM 101M 299 SF
TREASURER 101C 139 SF
SP
24 160
STAGE 119 2648 SF
B
STAFF DINING 102 694 SF
1 -FB 25 160
130 200
111 200 2 -FW
0 -C 0 -C
CORRIDOR 100E
MEN'S TOILET WOMEN'S TOILET 102B 102A
2 -FW
CORRIDOR 100Q 1438 SF
67250 6+(/7(5 $5($
16) 6) 86$%/( )/225 $5($ $/&29(
16) 6) 86$%/( )/225 $5($ &/$665220
16) 6) 86$%/( )/225 $5($ '5(66,1* 52206 72,/(7 2)),&(
727$/ 86$%/( )/225 $5($ 6) 2&&83$17 67$1',1* 6) 2&&83$17 :+((/&+$,5 3(5 2&&83$176
2&&83$17 /2$' 67$1',1* 2&&83$176 :+((/&+$,56
5
1 -F
25
0 -C
4
ELEC 101S 114 SF
2 -FW
0 -C 2 -FW 1 -FB 284 325
0 -C
0 -C COMMUNITY HEALTH CENTER 103 2481 SF
NURSE 101N 327 SF
NURSE'S OFFICE 101P 131 SF
CLASS I STANDPIPE 2 -FW
0 -C
125
117 200 '1 1 -FB
11
1 SP
SCENE SHOP 117 1120 SF
2 -FB
FE
FE-K 14 160
FOOD PRODUCTION 112C 2219 SF
1 -FB
&/$66 ,,, 67$1'3,3( : +26( &211(&7,21
SIDE STAGE 119B 109 SF
1
46 325
STORAGE 117A 100 SF
ALCOVE 118D 152 SF
STAFF TOILET 112N
JANITOR 112P 102 SF
51 ELEC 111B 101 SF
DRAMA OFFICE 118A 86 SF
414 445
VESTIBULE 100S
1 -FB
DRAMA CLASSROOM / BLACK BOX 118 1802 SF
B
16 DATA 110E 102 SF
STAFF TOILET 112M
2
1
6
46 160
STUDENT TOILET 112K
FE-K
STORAGE 111A 218 SF
6
414 445
47 160
1
0 -C
FEC
2 -FB
ELEC 118B 93 SF
DRESSING ROOM DRESSING ROOM 118H 118E 248 SF 246 SF
STUDENT TOILET 112L
SP
INNOVATION / ROBOTICS 111 2542 SF
WOMEN'S TOILET 110F
0 -C CORRIDOR 100C
1 -FB
1 -VX 325 325 2 -FW
0 -C
0 -C 0 -C
35 325
0 -C
ALCOVE 118C 85 SF
FUTURE ADDITION
0 -C
0 -C
1
COOLER 112G 560 SF
SP 1
STORAGE 109A 127 SF
2
0 -C
TOILET 118F 84 SF
1
2
OFFICE 112D 187 SF
%8,/',1* 7<3( ,,% &216758&7,21 ( 2&&83$1&< 6) 20 160
DATA 112J 105 SF
FREEZER 112H 403 SF
SP
CORRIDOR 100M
47
1 -F
0 -C
%8,/',1* 7<3( ,,% &216758&7,21 % 2&&83$1&< 6)
0 -C
2 -FW
0 -C
48
6 CONCESSIONS 110C 390 SF
0 -C
FEC 245 405
JAN 102C 98 SF
FABRICATION 109 2377 SF
2
FEC
TOILET 118G 82 SF
FE
1 -FB
DRY STORAGE 112E 543 SF
MUSIC LIBRARY 114A 195 SF
0 -C
6 0 -C
6
SP
ENSEMBLE ROOM 116 932 SF
INSTRUMENTAL OFFICE 115A 149 SF
CORRIDOR 100R 1890 SF
BREAK AREA 113C 221 SF
8 SP
0 -C
122 240
%8,/',1* 7<3( ,,% &216758&7,21 $ 2&&83$1&< 6)
0 -C CORRIDOR 100D
1 -FB
0 -C
1
1 -FB
8 325
RECEIVING 113B 598 SF
0 -C
4
FAMILY TOILET 110B
2&&83$17 /2$' )25 %/($&+(56 6($76 3(5 52: ; 52:6 6($76 3(5 52: ; 52:6 %27720 52: 6($76 3/86 $'$ 6($76 $'$ 6($76 &203$1,21 21 3/$7)250 727$/ +$/) (;,7 83 (*5(66 /(9(/ ,6
0 -C
1
2
CUSTODIAL WORKROOM 113E 364 SF
30 325
0 -C
FEC
RECEIVING 109B 304 SF
1 -FB
SERVERY / LOUNGE 110D 378 SF
0 -C
2
1 -VX 338 365 MEN'S TOILET 110
%8,/',1* 7<3( ,,% &216758&7,21 $ 2&&83$1&< 6)
ELEC 108 326 SF
1 -FB
0 -C
2&&83$17 /2$' )25 %/($&+(56 6($76 3(5 52: ; 52:6 6($76 3(5 52: ; 52:6 $'$ &203$1,21 6($76 (;,7 83 21/<
CORRIDOR 100J 1082 SF
298 325
474 485
1 -EW
10' - 0"
STAIR 3 1S-03
0 -C
CUSTODIAL OFFICE 113D 128 SF
1 -FB
1 75$9(/ ',67$1&(
0 -C
127( 21( +285 ),5( 5$7(' :$// &216758&7,21 0867 &217,18( 0,1 )520 (;,7 67$,5 $6 6+2:1
1
0 -C
141 167
HX 2 -FW
1 -EW
FE 1 -FB 1 -FB
91 167
3 160
2 PRACTICE 114B 110 SF
MECHANICAL 113 2199 SF
7
94
VOCAL OFFICE 114C 137 SF
8
'1
'1
1 -VX
52 365
121 365 0 -C
FEC
A.V. ROOM 107A 27 SF
122 240
ELEC 104B 81 SF
2 -FW
SP
0 -C
CORRIDOR 100K
A.V. ROOM 106A 27 SF
60 365
1 -FB
STAFF TOILET STAFF TOILET 106C 106B 62 SF 62 SF
100 240
1 -FB
SP
1
3 FEC
1 SP 1
1
VESTIBULE 100P 102 SF
59 160
& ^ ` ^ ` & &$3$&,7<
EMER ELEC ROOM 108A 91 SF
%8,/',1* 7<3( ,,% &216758&7,21 ( 2&&83$1&< 6)
VOCAL 114 1870 SF
6
1 -FB
67$,5 :,'7+ ,16,'( )$&( 2) *8$5'5$,/ 72 ,16,'( )$&( :$//
/6& &$/& & ^:Q ` ^ `
68
103
SP
0 -C
1 -FB
0 -C
SP ATHLETIC STORAGE 104C 275 SF
LAUNDRY 104D 272 SF
2 0 -C
298 325
1 -FB
1 -VX 122 365 SP 0 -C
1 -FB
SP BUILDING STORAGE 104E 368 SF
WEIGHT ROOM 107 3354 SF
AEROBICS 106 1534 SF
6
ATHLETIC STORAGE 104A 101 SF
'1 STAIR 2 1S-02 492 SF
10' - 0"
& ^ ` ^ ` & &$3$&,7<
1 -EW
10' - 0"
243
67$,5 :,'7+ ,16,'( )$&( 2) *8$5'5$,/ 72 ,16,'( )$&( :$//
/6& &$/& & ^:Q ` ^ `
MECHANICAL 105 1565 SF
2 -FW
WRESTLING 104 3639 SF
127( 21( +285 ),5( 5$7(' :$// &216758&7,21 0867 &217,18( 0,1 )520 (;,7 67$,5 $6 6+2:1
STORM SHELTER WATER MAIN ENTRANCE
127( 21( +285 ),5( 5$7(' :$// &216758&7,21 0867 &217,18( 0,1 )520 (;,7 67$,5 $6 6+2:1
SP
51 160
1 -FB
1 None
PRACTICE 114D 124 SF
WATER METER 113.1 128 SF
PRACTICE 115B 117 SF UNIFORM STORAGE 6 116A PRACTICE 199 SF 115C 1 135 SF
75 325
57 325
ROBE STORAGE 114E 176 SF
WALL FIRE RATING TYPE C = CORRIDOR EW = EXTERIOR WALL FB = FIRE BARRIER FW = FIRE WALL HX = HORIZONTAL EXIT SP = SMOKE PARTITION VS = VERTICAL SHAFT VX = VERTICAL EXIT
WALL HOURLY RATING 0 = 0 HOUR 1 = 1 HOUR 2 = 2 HOUR SP = SMOKE PARTITION
DN
0 -C WOMEN'S TOILET 132A
MECHANICAL 132 741 SF
3
CLASSROOM 135 900 SF
0 -C
14
45 0 -C
X 1 -V
CLASSROOM 136 903 SF
N
45 RESOURCE 137 901 SF
45
%8,/',1* 7<3( ,,% &216758&7,21 ( 2&&83$1&< 6)
&/$66 , 67$1'3,3(
Level 01 & 01A
1 -VS
1 -VS
4
262 335
CORRIDOR 200
FEC 0 -C
0 -C
0 -C
MEN'S TOILET 203
1 -F 67$,5 :,'7+ ,16,'( )$&( 2) *8$5'5$,/ 72 ,16,'( )$&( 2) :$// /6& &$/& & ^:Q ` ^ `
STAFF TOILET 211A
0 -C
0 -C 0 -C
SP
0 -C 0 -C 0 -C 0 -C
X 1 -V 0 -C
COLLABORATION COMMONS 226A 122 SF
8
CLASSROOM 226 897 SF
0 -C
CLASSROOM 227 889 SF CLASSROOM 228 947 SF
'1
67$,5 :,'7+ ,16,'( )$&( 2) *8$5'5$,/ 72 ,16,'( )$&( :$//
/6& &$/& & ^:Q ` ^ ` & ^ ` ^ ` & &$3$&,7< &/$66 , 67$1'3,3(
0" 11' W 1 -E
46
83
X 1 -V
0
SMALL GROUP ROOM STAIR 4 2S-04 225 145 SF
0 -C
0 -C
13 0 -C
304 325
0 -C FEC
6
COLLABORATION COMMONS 227A 259 SF -C
14
224D 84 SF
CORRIDOR 224B
0 -C
SP
0 -C
0 -C
0 -C
9'-0"
0 -C
0 -C
FE
0 -C 0 -C
SP
0 -C STAFF TOILET 228B
E = 16 TANC EL DIS TRAV
MEDIUM GROUP ROOM 224C 245 SF
SPELEC
1
FUTURE ADDITION
0 -C
1
SP
SP
STAFF TOILET 228A
0 -C
0 -C 0 -C
44
COLLABORATION 223A 454 SF 24
0 -C
CORRIDOR 200G
0 -C
CLASSROOM 231 850 SF
CLASSROOM 230 855 SF
SP
SP
52 160
CORRIDOR 200H
0 -C
1
0 -C
B B
0 -C
ELEV 2 2E-02
0 -C 0 -C
1 -F
40 B 1 -FE = 175'-8"
0 -C
SP
STUDENT TOILET 228C
0 -C FEC
TANC EL DIS TRAV
S 1 -V
25
STORAGE 224E 60 SF SP
46
DATA 222B 108 SF
1 -F
45
B
CLASSROOM 233 904 SF
'1
-VS
CLASSROOM 236 855 SF
ATHLETIC DIRECTOR 234B 137 SF
-VS B 1
0 -C FE
1 -F
0 -C
2
CORRIDOR 200D
12 S1 1 -V
43
W
0 -C
135 227
127 227
2 -F
0 -C
21
1
2 SECRETARY 234 179 SF
2
+;
0 -C -C 0
CORRIDOR 200C DEAN OF STUDENTS 234A 0 -C 139 SF
SMALL GROUP 238 107 SF
COLLABORATION COMMONS 236A 415 SF
0 -C
X 1 -V
SPECIALIST 237A 164 SF
B
1 B
B
STAFF TOILET 233B STAFF TOILET 0 -C DATA 233C 233A 119 SF
0 -C
1 -F
6
FEC
0 -C
X 1 -V &/$66 , 67$1'3,3(
B
325
'1
2
& ^ ` ^ ` & &$3$&,7<
B
0 -C 304
STAIR 6 2S-06
83
1 -F
B
0 -C
B
2 X 1 -V
67$,5 :,'7+ ,16,'( )$&( 2) *8$5'5$,/ 72 ,16,'( )$&( :$//
/6& &$/& & ^:Q ` ^ `
1 -F
1 -F SPECIALIST 239A 160 SF
33
B
1 0 -C
221D 100 SF
SP
1 -F
0 -C
62
FEC/FB CONFERENCE 239 660 SF
B
-FB
0 -C
2
1 -F
1 -F
FEC/FB
0 -C ELEC
STORAGE 243A 150 SF
FEC/FB
FEC/FB
1 -F
SP
B 1
SP
62
SP ELEC 240B 97 SF
1 -F
CORRIDOR 200B
1 -F
LEARNING STAIR 221F 521 SF
CLASSROOM 223 899 SF
1
84
HALL 221G
TO BELOW
LARGE GROUP ROOM 221E 237 SF
13
B
PHYSICS 240 1204 SF
B
2
1 -F
1 -F
SPECIALIST 239B 168 SF
1
SP
61
SCIENCE 241 1202 SF
W
W
SCIENCE PREP 240A 281 SF
VIDEO PRODUCTION 221B OPEN 142 SF
TV STUDIO 221C 255 SF
CORRIDOR 200E
X 1 -V
60
SCIENCE 242 1184 SF
1 FEC/FB
65 227 0 -C
2 -F
SPECIALIST 214A 166 SF
-FW
SCIENCE 243 1162 SF
2 -F
SP
SP
2
SP
44
FEC/FB 1 SP
SP
0 -C
TEACHER PLANNING 214 865 SF
X 1 -V
83
SCIENCE PREP 242A 307 SF
4 0 -C
STORAGE 222A 155 SF
B
CADD / BIM CLASSROOM 222 1646 SF
7
FVC
STAIR 5 2S-05
163 325 X 1 -V
COLLAB 213A 78 SF
'1
HALL 221A
B
1 -F
1 -F
W 1 -E
127( 21( +285 ),5( 5$7(' :$// &216758&7,21 0867 &217,18( 0,1 )520 (;,7 67$,5 $6 6+2:1
ALCOVE 200F 194 SF
151 FEC 160
B
B
0" 10' -
X 1 -V
X 1 -V
&/$66 , 67$1'3,3(
127( 21( +285 ),5( 5$7(' :$// &216758&7,21 0867 &217,18( 0,1 )520 +285 ),5( :$// $6 6+2:1
41
1 -F
W 1 -E .
TEACHER PLANNING 213 807 SF
0" 10' -
CORRIDOR 200A
1 -F
86
43 160
1
+5 $66(0%/< %(/2: )/225 6758&785(
X 1 -V
FEC 0 -C
W
INSTRUCTIONAL LIBRARY 219 1703 SF
CLASSROOM 224 923 47 SF
1 -F
2 -F
W 1 -E .
127( 21( +285 ),5( 5$7(' :$// &216758&7,21 0867 &217,18( 0,1 )520 (;,7 67$,5 $6 6+2:1
7
ELEC 212B 84 SF
I.S.S. 224A 506 SF
INSTRUCTIONAL LIBRARY 221 905 SF
45
W 1 -E
COLLAB 212A 122 SF
42
W
43 160
52
TEACHER PLANNING 212 821 SF
2 -F
& ^ ` ^ ` & &$3$&,7<
%8,/',1* 7<3( ,,% &216758&7,21 $ 2&&83$1&< 6)
W
45 160
STAFF TOILET 211B
TEACHER PLANNING 211 1033 SF
%8,/',1* 7<3( ,,% &216758&7,21 ( 2&&83$1&< 6)
1 -FW
1 -VX WOMEN'S TOILET 201 0 -C
3
1
STAIR 1 2S-01 520 SF
2 -FW 1 -VS
1 -VX
MECHANICAL 210 824 SF
DATA 211G 68 SF
'1
SP
CLASS I STANDPIPE
FOLLOW SPOT 220C 291 SF
ELEV 1 2E-01 58 SF
2 -FW
1 -VX
2 -FW
46 127( 21( +285 ),5( 5$7(' :$// &216758&7,21 0867 &217,18( 0,1 )520 (;,7 67$,5 $6 6+2:1
45
WOMEN'S TOILET 229A
MEN'S TOILET 229C MECHANICAL
229 743 SF
3
%8,/',1* 7<3( ,,% &216758&7,21 ( 2&&83$1&< 6)
CLASSROOM 231A 821 SF
42 0 -C
0 -C
WOMEN'S TOILET MEN'S TOILET 232A 232C MECHANICAL 232 741 SF
3
CLASSROOM 235 900 SF
45
43 MULTI-USE CLASSROOM / CONFERENCE 237 949 SF
%8,/',1* 7<3( ,,% &216758&7,21 ( 2&&83$1&< 6)
47
Level 02
67$,5 :,'7+ ,16,'( )$&( 2) *8$5'5$,/ 72 ,16,'( )$&( 2) :$// /6& &$/& & ^:Q ` ^ ` & ^ ` ^ ` & &$3$&,7<
67$,5 :,'7+ ,16,'( )$&( 2) *8$5'5$,/ 72 ,16,'( )$&( :$//
/6& &$/& & ^:Q ` ^ `
BEHAVIOR CLASSROOM
& ^ ` ^ ` & &$3$&,7< &/$66 , 67$1'3,3(
127( 21( +285 ),5( 5$7(' :$// &216758&7,21 0867 &217,18( 0,1 )520 (;,7 67$,5 $6 6+2:1
3
CLASSROOM
%8,/',1* 7<3( ,,% &216758&7,21 ( 2&&83$1&<
6)
332 665 SF
3
N
&$3$&,7< &/$66 , 67$1'3,3(
%8,/',1* 7<3( ,,% &216758&7,21 ( 2&&83$1&<
6)
Level 03
(;7(1' 522) 0(0%5$1( 29(5 723 2) 3$5$3(7 :$// 72 3$67 7+( 723 2) )$&( %5,&.
EB 54 BBBBBBBBB
(;7 3/<:22' 522) 0(0%5$1( &29(5 %2$5'
43 BBBBBBBBB A9.7
7 2 +($'
75$16,7,21 0(0%5$1( (;7(1' )520 $,5 %$55,(5 72 3/<:22' 6+($7+,1* $7 %$&.6,'( 2) 3$5$3(7 :$//
BB
7"
7$3(5(' ,168/ :+(5( 2&&856 6(( 522) 3/$1
+25,= -2,17 5(,1) # 2& 812
-2,67 $1' 0(7$/ '(&. 6(( 6758&7 )25 /2&$7,21 $1' 25,(17$7,21
)$&( %5,&. 723 2) -2,67 6(( 6758&785$/
+25,= -2,17 5(,1) # 2& 812
ALUM WINDOW, TYP
BOND BEAM, TYP SEE STRUCT
A7.11
&08 6(( 3/$1 )25 7<3( 9(57,&$/ 5(,1)25&,1*
+25,=217$/ 678' 5811(5 )25 ,168/ 6723
&2/' )250 07/ 67' # 2& $,5 %$55,(5 (;7(1' 29(5 723 2) :$// 72 75$16,7,21 0(0%5$1(
PARAPET DETAIL
A7.11
TERMINATION BAR W/ SEALANT FASTENED @ APPROX 12" OC CAVITY WALL INSUL
12" CMU W/ HORIZ REINF @ 1'-4" OC, TYP
/(9(/
CAVITY DRAINAGE MATERIAL BOLTS WHERE OCCURS SEE STRUCT 6x6 FLASHING PATCH OVER BOLT WITH MASTIC ON ALL SIDES EMBEDDED FLASHING AND WEEP CAVITY VENTS @ 24" OC - APPLY FLASHING DIRECTLY TO WALL WHEN NO BOLTS OR VERTICAL PLATE ARE USED %5,&. 6(( 6(&7,216
A7.1
FLUID APPLIED AIR BARRIER
COLD FORMED METAL KICKERS, TYP
21' - 3 1/2"
15 BBBBBBBBB
EXT SHEATHING W/ FLUID APPLIED AIR BARRIER
SCALE: 1 1/2" = 1'-0"
FACE BRICK
SCALE: 1 1/2" = 1'-0"
A7.11
PARAPET DETAIL
1/2"
CMU WIDTH PER WALL TYPE
STEEL ANGLE, SEE STRUCT
44' - 8"
RECEIVER AND COUNTER FLASHING
CAVITY WALL INSUL
43 BBBBBBBBB
2 1/2" RIGID INSUL COMPRESSIBLE TUBE EXTERIOR PLYWOOD
4' - 8"
VERTICAL HSS STR @ 4' O.C W/ STUD INFILL
723 2) 0$6215< 6(( 6(&7,216
CAVITY WALL INSULATION
SCIENCE 241
40' - 0"
A9.7
FACEBRICK
EXTERIOR SHEATHING
FULL HT CAVITY DRAINGE MATERIAL
ROOF MEMBRANE
52 BBBBBBBBB
FACE BRICK
CONC SLAB ON MET DECK - SEE STRUCT
2" EJ +25,=217$/ -2,17 5(,1)25&,1* # 812
CONT TREATED WD BLOCKING TOP AND BOTTOM W/ SCREW ANCHORS @ 2'-0" OC
7 2 67((/
BOLTS WHERE OCCURS - SEE STRUCT
15 A7.1
FULL HEIGHT CAVITY DRAINAGE MATERIAL
3' - 8"
6' - 0"
1/2" CONT BRICK REVEAL 12 BBBBBBBBB
REVEAL BRICK DETAIL
A7.2
SCALE: 1 1/2" = 1'-0"
DEIFS
52
% 2 &$123< (/ CEILING, SEE CEILING PLAN TYP
CEILING, SEE CEILING PLAN TYP
43 BBBBBBBBB A9.7
8" CMU STEM WALL W/ HORIZ REINF @ 1'-4" OC, TYP
A9.7
% 2 6,//
FACEBRICK
/(9(/
'MP-1, MP-2, MP-3' MTL PNL 2 1/2" CONTINUOUS INSULATION BETWEEN 2 1/2" Z FURRING @ 2'-0" O.C. HORIZONTAL COMPOSITION CLOSURE BY MTL PNL MFR
CONTINUOUS INSUL
BASE FLASHING MTL PNL PER MFR BACKER ROD AND SEALANT 35(&$67 6,// 6(( '(7$,/ 11/ A7.7 )25 ',06
CAVITY WALL INSULATION
55 BBBBBBBBB
CAVITY WALL SUL, TYP
EXPANSION JOINT AT DOUBLE FIREWALL_FACE BRICK SCALE: 1 1/2" = 1'-0"
METAL PANEL
BACK AISLE 120F
HORIZ JOINT REINF @ 16" OC UNO TERMINATION BAR W/ SEALANT TRANSITION FLASHING FROM AIR BARRIER TO EMBEDDED FLASHING FACE BRICK
VERTICAL WALL REINFORCING, SEE STRUCT 23 BBBBBBBBB A7.5
1'-2" MIN FLASHING HEIGHT
5' - 4"
ACP CLASSROOM 141
A7.10
7' - 0"
7 2 +($'
3' - 4"
FIRE SAFING INSUL W/ INTEGRAL VAPOR BARRIER INSUL SUPPORT
2' - 8"
A7.1
COVER BOARD OVER ROOF INSUL
7 2 0$6215<
A7.10
8" COLD -FORMED STEEL FRAMING @ 16" OC W/ OPEN CELL SPRAYFOAM INSULATION BTWN STEEL
CONCRETE SLAB VAPOR RETARDER GRANULAR FILL
PRECAST SILL
EMBEDDED FLASHING & WEEPS/CAVITY VENTS TYP AROUND ENTIRE BASE OF BUILDING. EXTEND FLASHING THRU VENEER TO A DISTANCE OF 1/2" FROM THE EXTERIOR FACE. STEP AS REQ'D DUE TO SLOPE OF SITE. LOCATE WEEPS @ 16" OC @ A MAX DISTANCE OF 8" ABOVE FINISHED GRADE
VERTICAL WALL REINFORCING, SEE STRUCT
CAVITY DRAINAGE MATERIAL
GRANULAR FILL
12 BBBBBBBBB
FACE BRICK CAVITY WALL INSULATION
7 2 35(&$67
CAVITY DRAINAGE MATERIAL
A7.1
CONCRETE SLAB VAPOR RETARDER
SS DRIP SET IN SEALANT BED
SIDEWALK RE: CIVIL
EMBEDDED FLASHING & WEEPS/CAVITY VENTS TYP AROUND ENTIRE BASE OF BUILDING. EXTEND FLASHING THRU VENEER TO A DISTANCE OF 1/2" FROM THE EXTERIOR FACE. STEP AS REQ'D DUE TO SLOPE OF SITE. LOCATE WEEPS @ 16" OC @ A MAX DISTANCE OF 8" ABOVE FINISHED GRADE
3' - 4"
4' - 0"
5/8" GWB - SEE WALL TYPES 15 BBBBBBBBB
TREATED 2x4 @ 24" OC W/ 3/8" DIAx6" LONG GALV ANCHOR BOLTS @ 24"OC
RIGID INSUL
1 COURSE REVEAL BRICK
CAVITY WALL INSUL
FILL VOID FULL W/ BATT INSUL, MAINTAIN 2" MIN. CLEARANCE
2x CONT TREATED WD BLOCKING W/ 2 8d NAILS @ EA 2x4 EXTERIOR PLYWD SHEATHING
FLUID APPLIED AIR BARRIER
% 2 6,//
/(9(/
CMU, SEE PLAN FOR TYPE
TERMINATION BAR W/ SEALANT
A9.7
53 BBBBBBBBB
LEVEL 01 100' - 0"
SS DRIP SET IN SEALANT BED
CONCRETE FOOTING, SEE STRUCT
FACE BRICK TO EXTEND 8" MIN BELOW GRADE COMPRESSIBLE FILLER
CMU - SEE PLAN FOR SIZE VERT WALL REINF - SEE STRUCT
PERIMETER INSUL
GROUT CAVITY FULL COMPRESSIBLE JOINT FILLER
PERIMETER INSUL
4" CMU GROUT CAVITY FULL BELOW FLASHING - TYP FLUID APPLIED AIR BARRIER
CONCRETE SLAB VAPOR BARRIER, TURN UP AT SLAB EDGE
CMU, SEE PLAN FOR TYPE FOUNDATION, SEE STRUCT
GRANULAR FILL CONCRETE FOOTING
52 A7.2
WALL SECTION SCALE: 3/8" = 1'-0"
VERTICAL WALL REINFORCING SEE STRUCT
STAINLESS STEEL DRIP EDGE
1/2" 1/2"
7 2 +($'
1'-2" MIN
54
34
VERTICAL WALL REINFORCING, SEE STRUCT
23(1 &(// 635$< ,168/
CONC SLAB ON MET DECK, TYP
)/8,' $33/,(' $,5 %$55,(5
&/26(' &(// 635$< ,168/
% 2 6,//
1/2" CONT BRICK REVEAL
&$9,7< :$// ,168/
3"
A9.7
34 BBBBBBBBB
)$&( %5,&. 723 2) 67((/ 6(( 6758&785$/
67((/ $1*/( %($0 $1' 0(7$/ '(&. 6(( 6758&7 )25 /2&$7,21 $1' 25,(17$7,21
SCIENCE 341
75$16,7,21 0(0%5$1( (;7(1' )520 $,5 %$55,(5 72 3/<:22' 6+($7+,1* $7 %$&.6,'( 2) 3$5$3(7 :$//
75($7(' [ # 2& : Â&#x2018; [ /21* *$/9 $1&+25 %2/76 # 2& : 5,*,' ,168/ ,1 ),//
522) ,168/
'(&. %($5,1* (/ 9$5,(6
MET. DECK
723 2) 0$6215< 6(( 6(&7,216
)$&( %5,&. : :((3 9(176 # 2&
CMU WIDTH PER WALL TYPE
&29(5 %2$5'
FULL HT CAVITY DRAINAGE MATERIAL
PRECAST SILL, TYP
6' - 0"
4"
522) 0(0%5$1(
7 2 0$6215<
MEMBRANE ROOFING SYSTEM
)/8,' $33/,(' $,5 %$55,(5 &$9,7< :$// ,168/
5,*,' ,168/
PREFINISHED METAL COPING
1' - 10 5/8"
(;7(5,25 6+($7+,1*
522) ,168/
OPEN CELL SPRAY FOAM INSUL BELOW PARAPET 53 BBBBBBBBB
4' - 0"
(;7 3/<:'
723 2) 678' 6(( 6(&7,216
)$&( %5,&. : :((3 9(176 # 2&
7$3(5(' ,168/ :+(5( 2&&856 6(( 522) 3/$1
A7.2
3/4"
7" 3/4"
STEEL BEAM, SEE STRUCT TYP
3/4"
5,*,' ,168/
4"
&217 [ 75($7(' :22' %/2&.,1* 723 $1' %27720 : 6&5(: $1&+256 # 2&
&217,18286 &/($7
&217 [ 75($7(' :22' %/2&.,1* 723 $1' %27720 : 6&5(: $1&+256 # 2&
&217,18286 &/($7
VARIES
4' - 2 1/2"
MET. DECK
8" COLD-FORMED MET STUDS @ 16" OC W/ CLOSED CELL SPRAYFOAM INSULATION AT PARAPET
$,5 %$55,(5 75$16,7,21 0(0%5$1(
[ &217 75($7(' :22' %/2&.,1* %27+ 6,'(6 : G 1$,/6 # ($ [
$,5 %$55,(5 75$16,7,21 0(0%5$1(
7 2 67((/
4' - 8"
[ &217 75($7(' :22' %/2&.,1* &87 72 0$7&+ 3/<:22' 6/23(
35(),1,6+(' 0(7$/ &23,1*
[ &217 75($7(' :22' %/2&.,1* %27+ 6,'(6 : G 1$,/6 # ($ [
)$67(1(5 : :($7+(5 7,*+7 :$6+(5 # 2&
3/4"
2' - 5 1/2"
MEMBRANE ROOFING SYSTEM
522) 0(0%5$1( (;7(1' 29(5 723 2) 3$5$3(7 72 3$67 7+( 723 2) 7+( )$&( %5,&.
VARIES
7 2 :$//
[ &217 75($7(' :22' %/2&.,1* &87 72 0$7&+ 3/<:22' 6/23(
35(),1,6+(' 0(7$/ &23,1*
A7.11
2' - 0 1/2"
1' - 4"
PREFINISHED METAL COPING
PERIMETER INSUL 23 A7.5
BASE EMBEDDED FLASHING SCALE: 1 1/2" = 1'-0"
55 A7.2
WALL SECTION SCALE: 3/8" = 1'-0"
2" EJ 12 A7.1
WALL BASE DETAIL SCALE: 1 1/2" = 1'-0"
Â&#x192;
OPEN CELL SPRAY FOAM INSUL. EXT GYP SHEATHING
11 1/2" 1' - 6"
11 1/2"
1' - 2
1/2"
OPEN CELL SPRAY FOAM INSUL.
FLUID APPLIED MEMBRANE AIR BARRIER
8 5/8"
WOOD BLOCKING
2 1/2" CONT. RIGID INSUL. BETWEEN 2 1/2" Z FURRING @ 2'-0" O.C HORIZONTAL - REFER TO MFR FOR ANCHORING EA
Â&#x192;
EA
EXT GYP SHEATHING
5/8" GWB OVER METAL STUDS
1' - 3 1/2".
FLUID APPLIED MEMBRANE AIR BARRIER
5 1/8"
PREFINISHED METAL FLASHING, COLOR TO MATCH MP-1
2 HOUR FIRE RATED EJ COVER
AIR SPACE CAVITY WALL INSUL.
2 HR RATED SHAFT WALL ASSEMBLY SEE PLAN FOR TYPE
EXT GYP SHEATHING AIR BARRIER 2 1/2" CONT. RIGID INSUL. BETWEEN 2 1/2" Z FURRING @ 2'-0" O.C HORIZONTAL - REFER TO MFR FOR ANCHORING
EXT GYP SHEATHING
10 5/8"
1' - 4"
2 3/4"
AIR SPACE
BK
8"
DOOR & FRAME, SEE SCHEDULE
10 5/8"
FACE BRICK
FLUID APPLIED MEMBRANE AIR BARRIER
Â&#x192;
2" OPEN CELL SPRAY FOAM INSUL.
1' - 4 5/8"
1' - 4 5/8"
COMPRESSIBLE EJ FILLER RETURN BRICK
OPEN CELL SPRAY FOAM INSUL.
FACE BRICK
1' - 4"
3 1/2"
RETURN AIR BARRIER INTO EXP JOINT
2" 1' - 2"
10"
2' - 0" 5/8" GWB OVER METAL STUDS
COMPRESSIBLE EJ FILLER
3 3/8"
FIRE RATED EJ COVER
5 3/8"
2" EJ
PREFINISHED CLOSURE TRIM BY MP MANUF.
PREFINISHED CLOSURE TRIM BY MP MANUF.
FIRE SAFING INSULATION
2 HR RATED SHAFT WALL ASSEMBLY SEE PLAN FOR TYPE
7 3/8"
METAL PANEL, SEE ELEV FOR TYPE.
2 HR RATED SHAFT WALL ASSEMBLY SEE PLAN FOR TYPE
RETURN AIR BARRIER INTO EXP JOINT
8 1/2"
1' - 2"
2" EJ 4 1/8"
2 1/2" CONT. RIGID INSUL. BETWEEN 2 1/2" Z FURRING @ 2'-0" O.C HORIZONTAL - REFER TO MFR FOR ANCHORING
METAL PANEL, SEE ELEV FOR TYPE.
1' - 6 3/8"
1' - 6 3/8"
5/8" GWB OVER METAL STUDS
1' - 6 3/8"
CAVITY WALL INSUL.
EB
EB FLUID APPLIED MEMBRANE AIR BARRIER
2" OPEN CELL SPRAY FOAM INSUL.
8"
DOOR & FRAME, SEE SCHEDULE
EXT GYP SHEATHING
5/8" GWB OVER METAL STUDS
5/8" GWB OVER METAL STUDS
10 5/8" 8"
1' - 4"
1' - 7 3/8"
E1
21 A10.4
1' - 1" E5
4 3/8"
E4
E2
PLAN DETAIL
23
SCALE: 1 1/2" = 1'-0"
A10.4
E5
PLAN DETAIL
25
SCALE: 1 1/2" = 1'-0"
A10.4
PLAN DETAIL SCALE: 1 1/2" = 1'-0"
FIRE SAFING INSIL.
2" EJ
2 HOUR FIRE RATED EJ COVER 1' - 7 3/4"
2' - 1 1/8"
METAL STUD WALL, SEE PLAN FOR WALL TYPE
A1
A1
CJ
41 BBBBBBBBB A9.6 OVERHEAD DOOR ASSEMBLY
CJ
FIRE SAFING INSULATION
8" GFCMU-1
2 HOUR FIRE RATED EJ COVER
12" CMU
2" EJ
9 1/8"
2"
FIRE RATED EJ COVER
FIRE SAFING INSUL.
R
METAL PANEL, SEE ELEVATION FOR TYPE
12" GFCMU-1
FLUID APPLIED MEMBRANE AIR BARRIER
1/2"
DOOR & HM FRAME, SEE SCHEDULE FOR TYPE - GROUT SOLID
CAVITY WALL INSUL
8"
FLUID APPLIED MEMBRANE AIR BARRIER
3' - 4" CLEAR
7 1/16"
1"
4' - 3 5/8"
BB 12" CMU WALL
6" GFCMU-1
STEEL COLUMN, SEE STRUCT.
CAVITY WALL INSUL. FACE BRICK
E5
FACE BRICK
DOOR AND FRAME, SEE SCHEDULE FOR TYPE
1/4 SHIM AND SEALANT BOTH SIDE - TYP WINDOW FRAME, SEE SCHEDULE FOR TYPE
PROVIDE BULLNOSE ON ALL OUTSIDE CORNERS, TYP
COMPRESSIBLE JOINT FILLER
OPEN CELL SPRAY FOAM INSULATION 5/8" GWB OVER 8" COLD FORM METAL STUDS
1' - 4"
FLUID APPLIED MEMBRANE AIR BARRIER
2 1/2" CONTINUOUS INSUL BETWEEN 2 1/2" Z FURRING @ 2'-0" O.C. HORIZONTAL
1/4" SHIM AND SEALANT, BOTH SIDES, TYP
OPEN CELL SPRAY FOAM INSUL.
DUCTWORK, SEE MECH. OPEN CELL SPRAY INSUL. EXT. GYP SHEATHING
FACE BRICK
RETURN GWB TO FRAME, TYP.
COMPRESSIBLE JOINT FILLER
6" GFCMU-1
6+,0 $1' 6($/$17 %27+ 6,'(6 7<3 &2035(66,%/( ),//(5
CJ
2' - 7"
1' - 4"
CJ
4"
6+,0 $1' 6($/$17 %27+ 6,'(6
1"
CJ
9"
Â&#x192;
Â&#x192;
7 3/4"
BH
1' - 7 15/16"
Â&#x192;
12" GFCMU-1
5/8" GWB OVER 8" COLD FORM METAL STUDS
CMU WALL, SEE PLAN FOR TYPE AND SIZE
8" CMU WALL
6"
4' - 8" D1
41 A10.3
PLAN DETAIL SCALE: 1 1/2" = 1'-0"
43 A10.3
PLAN DETAIL SCALE: 1" = 1'-0"
44
S
45
A10.3
SCA
A10.3
PLAN DETAIL SCALE: 1 1/2" = 1'-0"
46 A10.3
PLAN DETAIL SCALE: 1 1/2" = 1'-0"
1"
BLOCKING AS REQD.
1/2" 8 3/8"
7 3/8"
DOOR & HM FRAME, SEE SCHEDULE FOR TYPE - GROUT SOLID
Â&#x192;
WALL MOUNTED DOOR ACTUATOR
3/4"
1' - 0"
1' - 5
7 5/8"
5/8" GWB OVER METAL STUDS - SEE PLAN FOR WALL TYPES
03 C Y THOMPSON LIBRARY Team member: Scott Shiffermiller - Project Manager Choan Liewer - Project Architect Phung Hong - Project Designer Location: Lincoln, Nebraska Complete Date: January 2021 Responsibilities: Code Research Construction Document
The library was built in the 1960s and is inefficient energy-wise, with poor access for those with disabilities. Libraries used to be built as fortresses to protect the books. Now the focus is on people. A place to gather, to learn, and to discover. The updated CYT will include individual and collaborative study spaces, a cafe, learning technology, multi-media displays, meeting rooms, and a multi-disciplinary book collection.
NEW SSG CURTAIN WALL SYSTEM
8
ROOF LADDER
SCREEN WALL SYSTEM
NEW PENTHOUSE
ROOF LADDER
7
6
5
4
CERAMIC FRIT GLAZED CANOPY W/ PIN MOUNTED GLASS W/ CUSTOM FRIT PATTERN, (ALTERNATE BID 3)
3
2
NEW METAL PANEL PENTHOUSE & ROOF SCREEN 0.5
1
H
G
F
E
D
C
B
A
NEW METAL PANEL PENTHOUSE & ROOF SCREEN
MP-1 56 A7.2
SSG CURTAIN WALL SYSTEM
25 A4.2
CERAMIC FRIT PENTHOUSE LEVEL 133' - 1 1/2"
PENTHOUSE LEVEL 133' - 1 1/2"
POWER WASH EXPOSED EXISTING PRECAST
NEW D.E.F.S. SOFFIT W/ CONT. LINEAR VENTS, TYP.
NEW D.E.F.S. SOFFIT W/ CONT. LINEAR VENTS, TYP. LEVEL 02 114' - 8"
LEVEL 02 114' - 8"
LIGHT POLE BEYOND
26 A8.5
NEW PRECAST COPING W/ REVEALS TO MATCH EXISTING PATTERN
STAINLESS STEEL PLANTER BOXES
STAINLESS STEEL PLANTER BOXES LEVEL 01 100' - 0"
STAINLESS STEEL GUARDRAIL, TYP
STAINLESS STEEL GUARDRAIL, TYP
POWER WASH EXISTING PRECAST TO REMAIN, TYP.
LEVEL 01 100' - 0"
NEW PRECAST COPING W/ REVEALS TO MATCH EXISTING PATTERN
STAINLESS STEEL PLANTER BOXES
REVEALS TO MATCH EXITING PATTERN
STAINLESS STEEL PLANTER BOXES
STAINLESS STEEL GUARDRAIL, TYP
LOWER LEVEL 88' - 1 7/8"
POWER WASH EXPOSED EXISTING PRECAST
POWER WASH EXPOSED EXISTING PRECAST
LOWER LEVEL 88' - 1 7/8" HM DOOR AND FRAME
POWER WASH EXISTING PRECAST TO REMAIN, TYP.
HM DOOR AND FRAME
NEW PRECAST CLAD CIP WALL & STAIR W/ PRECAST COPING, SS RAILING ASSEMBLY & ILLUMINATED HANDRAIL
ALUM STOREFRONT ENTRANCE, BASE BID (SLIDING ENTRANCE DOORS ALTERNATE BID 1)
NEW PRECAST CLADDING AT NEW CIP WALL & AT EXISTING AS REQ'D TO REACH NEAREST JOINTS
East Elevation
North Elevation NORTH ELEVATION
31
SCALE: 1/8" = 1'-0"
1HR FLOOR/CEILING BELOW
EXIT 68 OCCUPANTS 1 HR
READING ROOM 3280 SF OL = 66
CIRCULATION 3560 SF
150 OCCUPANTS EXIT TO OUTSIDE
MECH/STORAGE 308 SF OL = 1
STUDY ROOMS 420 SF OL = 28
1 HR
1 HR
FIRST LEVEL - READING ROOM 1280 SF OL = 25
TRAVEL DISTANCE: 93'-8"
EXIT
LEARNING STAIR COUNTED ON LOWER LEVEL
OPEN TO BELOW
STUDY ROOM 506 SF OL = 34
FIRST LEVEL - READING ROOM 2723 SF OL = 54
FIRST LEVEL - READING ROOM 1998 SF OL = 40
STORAGE 1286 SF OL = 5
TESTING OFFICE 707 SF OL = 7
CUSTODIAL 73 SF OL = 1
FIRST LEVEL - READING ROOM 812 SF OL = 50
READING ROOM 995 SF OL = 20
FEC
TESTING ROOM 1035 SF OL = 54
FEC
CIRCULATION 4617 SF
LEARNING STAIR 411 SF OL = 22
LEARNING STAIR 253 SF OL = 17
STUDY ROOM 225 SF 15
STORAGE 253 SF OL = 1
READING ROOM 2394 SF OL = 48
1 HR
1 HR 1 HR
EXIT FIRST LEVEL - OPEN SPACE 1737 SF OL = 116
CUSTODIAL 76 SF OL = 1
OFFICE 146 SF OL = 2
MECHANICAL 2127 SF OL = 7
1 HR 68 OCCUPANTS
FROM BELOW 1 HR
1 HR
MECHANICAL 2213 SF OL = 7
FEC
FROM ABOVE UP 1 HR 1 HR
STORAGE 148 SF OL = 1
FE
OFFICES 1742 SF OL = 17
68 OCCUPANTS
CAFE SEATING 351 SF OL = 24
CAFE SERVERY 304 SF OL = 11
READING ROOM 639 SF OL = 13
150 OCCUPANTS
1 HR
FE
OUTSIDE
UP MDF 373 SF OL = 1
EXIT 172 OCCUPANTS
1 HR
150 OCCUPANTS EXIT UP STAIRS IMMEDIATELY TO
FIRST LEVEL - OPEN SPACE 241 SF OL = 16
1HR FLOOR/CEILING ABOVE
East Elevation
SCALE: 1/8" = 1'-0"
EXIT ABOVE
A5.2
STUDY ROOM 308 SF OL = 20
31
A5.1
STUDY ROOMS 420 SF OL = 28 FE STORAGE 201 SF OL = 1
68 OCCUPANTS 1 HR
MECH/STORAGE 323 SF OL = 1
172 OCCUPANTS
STUDIO 193 SF OL = 2
FEC VENDING 95 SF OL = 1
1 HR 68 OCCUPANTS
FROM ABOVE
TRAVEL DISTANCE: 168' - 6"
EXIT 1HR FLOOR/CEILING ABOVE
TRASH 302 SF OL = 2
Basement Floor Plan
1HR FLOOR/CEILING BELOW
N
First Floor Plan
SCREEN WALL SYSTEM ROOF LADDER ROOF LADDER 0.5
1
2
NEW METAL PANEL PENTHOUSE & ROOF SCREEN
NEW METAL PANEL PENTHOUSE & ROOF SCREEN
NEW METAL PANEL PENTHOUSE & ROOF SCREEN
3
4
5
6
7
A
8
B
C
D
E
F
G
54 A9.4
H
NEW SSG CURTAIN WALL SYSTEM
CERAMIC FRIT 55 A9.4
56 A7.2
MTL PNL
GLAZED CANOPY W/ PIN MOUNTED GLASS W/ CUSTOM FRIT PATTERN, (ALTERNATE BID 3)
25 A4.2
EXISTING PRECAST FASCIA
56 A9.4
PENTHOUSE LEVEL 133' - 1 1/2"
PENTHOUSE LEVEL 133' - 1 1/2"
POWER WASH EXISTING PRECAST TO REMAIN, TYP.
FIN. SOFFIT 125' - 2" NEW D.E.F.S. SOFFIT W/ CONT. LINEAR VENTS, TYP.
EXISTING PRECAST COLUMN LEVEL 02 114' - 8"
NEW PRECAST COPING W/ REVEALS TO MATCH EXISTING PATTERN LEVEL 01 100' - 0" POWER WASH EXISTING PRECAST TO REMAIN, TYP.
STAINLESS STEEL GUARDRAIL, TYP STAINLESS STEEL PLANTER BOXES
REVEALS TO MATCH EXISTING PATTERN
LIGHTING, SEE ELEC
LEVEL 02 114' - 8"
STAINLESS STEEL PLANTER BOXES
CERAMIC FRIT
26 A8.5
POWER WASH EXISTING PRECAST TO REMAIN, TYP.
POWER WASH EXISTING PRECAST TO REMAIN, TYP.
NEW D.E.F.S. SOFFIT W/ CONT. LINEAR VENTS, TYP.
NEW SSG CURTAIN WALL SYSTEM GLAZED CANOPY W/ PIN MOUNTED GLASS W/ CUSTOM FRIT PATTERN, (ALTERNATE BID 3)
STAINLESS STEEL GUARDRAIL, TYP
STAINLESS STEEL GUARDRAIL, TYP LEVEL 01 100' - 0"
PRECAST CLAD CIP WALL W/ PRECAST COPING
ALUMINUM STOREFRONT ENTRANCE, BASE BID (SLIDING ENTRANCE DOORS ALTERNATE BID 1)
STONE CLAD STEM WALL, TYP. AT SSG CURTAIN WALL
POWER WASH EXISTING PRECAST TO REMAIN, TYP. STAINLESS STEEL PLANTER BOXES
CONCRETE
LOWER LEVEL 88' - 1 7/8"
LOWER LEVEL 88' - 1 7/8" STAINLESS STEEL GUARDRAIL, TYP
LOWER LEVEL 2 84' - 1 7/8"
West Elevation
South Elevation SOUTH ELEVATION
51
SCALE: 1/8" = 1'-0"
A5.2
West Elevation
SCALE: 1/8" = 1'-0"
1HR FLOOR/CEILING BELOW
1 HR CLASSROOM 1242 SF OL = 63
1 HR
1 HR FEC
1 HR
CUSTODIAL CIRCULATION 73 79 SF 4617 SF O =1 SECOND LEVEL - OPEN SPACEOL 1852 SF OL = 124
FIRST F RS LEVEL EVEL - READING ADING ROOM OM 812 SF OL = 50
SP
1 HR
1 HR
182 OCCUPANTS DOWN STAIRS 1 HR 1 HR
1 HR
STORAGE 167 SF OL = 1 1 HR 1 HR
1 HR
1 HR
EXIT BELOW SP
STUDIO 996 SF OL = 20
FIRST F T LLEVEL EVE - RE READING AD RO ROOM OM 1280 SF S OL = 25
TRAVEL DISTANCE: 167'
SP STUDY ROOMS 492 SF OL = 33
SP
FIIRST LEVEL EL - OPEN SPACE ACE 2411 SF S OL = 166
TRAVEL TRA VE DISTANCE: STAN 93'-8" 93' 8
LEARNING STAIR COUNTED ON FIRST LEVEL
SP
SP
SP
STUDIO 1446 SF OL = 32
SP
CAFE CAF E SERVERY SERVERY
FE
MECHANICAL 1606 SF OL = 5
FIRST F RS LEVEL VEL - READING DI G ROOM CIRCULATION 523 SF
BREAKROOM 403 SF OL = 29
FEC
STORAGE 201 SF
MECH/STORAGE E RAGE G 323 SF S
1 HR
1 HR
FEC
STUDIO 994 SF OL = 20 STUDY ROOMS 420 20 SF OL = 28
STORAGE / ELECT 271 SF OL = 1
182 OCCUPANTS DOWN STAIRS
1 HR
SP
MECHANICAL FE 1724 SF OL = 6 UP
SP
FIRST ST LEVEL EV - R READING AD RO ROOM OM 1998 SF OL = 400 COLLABORATION AREA 1438 SF OL = 15 OFFICES 2086 SF 68 OCCUPANTS OL = 21
OPEN TO O BELOW E W
OPEN TO BELOW SP
CIRCULATION 2440 SF
1 HR
51
A5.1
SP
EXIT BELOW COMMON TRAVEL PATH: 53'
N
Second Floor Plan
Penthouse Floor Plan
NEW R-38 EPDM MEMGRANE ON SLOPED METAL DECK 15 A7.3
31 A6.1
16 A7.3
NEW R-8 OPEN CELL SPRAY INSULATION AT UNDERSIDE OF EXISTING ROOF DECK, TYP.
1
2
3
4
15 A7.3
16 A7.3
51 A6.3
TIE-IN NEW ROOF AT EXISTING, TYP.
31 A6.3
5
6
7
8
NEW R-8 OPEN CELL SPRAY INSULATION TO THERMAL ENVELOPE. NEW THERMAL ENVELOPE & AIR BARRIER ENCLOSURE
25 A7.3
WEST PENTHOUSE MZ202
25
25
A7.3
A7.3
EAST PENTHOUSE MZ201
25
EXISTING ROOF TYP.
A7.3 PENTHOUSE LEVEL 133' - 1 1/2" T.O. EXIST JOISTS 132' - 7"
FIN. SOFFIT 125' - 2"
POWER WASH EXPOSED EXISTING PRECAST NEW D.E.F.S. SOFFIT W/ CONT. LINEAR VENTS, TYP. BREAK OUT 245
NEW THERMAL ENVELOPE & AIR BARRIER ENCLOSURE
ENGLER GALLERY Z202A
CORRIDOR 2CR3
SSG CURTAIN WALL SYSTEM & STONE CLAD CIP CONC STEM WALL
ENTREPRENEURIAL STUDIO 211
SSG CURTAIN WALL SYSTEM & STONE CLAD CIP CONC STEM WALL
LEVEL 02 114' - 8"
POWER WASH EXPOSED EXISTING PRECAST NEW PEDESTAL MOUNTED PLAZA PAVERS ON WATERPROOFING OVER RIGID INSUL
21 A10.2
CAFE 101
CAFE 101
FLEXIBLE COLLABORATION 106
21 A10.2
NEW CIP CONC WALL W/ PRECAST COPING & CLADDING
LEVEL 01 100' - 0" F.F. LANDING 96' - 7" FLEXIBLE COLLABORATION FLEXIBLE 010 COLLABORATION 010
FLEXIBLE COLLABORATION 010
RECEIVING / MAILROOM 093 LOWER LEVEL 88' - 1 7/8"
31 A6.2
EAST / WEST BUILDING SECTION VIEWING NORTH SCALE: 1/8" = 1'-0"
NEW R-38 EPDM MEMGRANE ON SLOPED METAL DECK 15 A7.3 TIE-IN NEW ROOF AT EXISTING, TYP. NEW R-8 OPEN CELL SPRAY INSULATION TO THERMAL ENVELOPE.
15 A7.3
NEW R-8 OPEN CELL SPRAY INSULATION AT UNDERSIDE OF EXISTING ROOF DECK, TYP.
16
31 A6.3 8
7
6
16 A7.3
31 A6.1
5
51 A6.3
A7.3 4
3
2
1
NEW THERMAL ENVELOPE & AIR BARRIER ENCLOSURE 25
EXISTING ROOF TYP.
A7.3
EAST PENTHOUSE MZ201
25
25
A7.3
A7.3
25
WEST PENTHOUSE MZ202
A7.3 PENTHOUSE LEVEL 133' - 1 1/2"
FIN. SOFFIT 125' - 2"
POWER WASH EXPOSED EXISTING PRECAST
NEW D.E.F.S. SOFFIT W/ CONT. LINEAR VENTS, TYP. ENTREPRENEURIAL STUDIO 211
FLEXIBLE COLLABORATION 202
CORRIDOR 2CR1
BREAK OUT 241
NEW THERMAL ENVELOPE & AIR BARRIER ENCLOSURE LEVEL 02 114' - 8" SSG CURTAIN WALL SYSTEM & STONE CLAD CIP CONC STEM WALL
SSG CURTAIN WALL SYSTEM & STONE CLAD CIP CONC STEM WALL
POWER WASH EXPOSED EXISTING PRECAST
PEDESTAL MOUNTED PLAZA PAVERS OVER WATERPROOFING MEMBRANE ON TAPERED INSULATION
NEW PEDESTAL MOUNTED PLAZA PAVERS ON WATERPROOFING OVER RIGID INSUL FLEXIBLE COLLABORATION 102
STAINLESS STEEL PLANTER BOXES
21 A10.2
21 A10.2
FLEXIBLE COLLABORATION 102
NEW CIP CONC WALL W/ PRECAST COPING & CLADDING LEVEL 01 100' - 0" F.F. LANDING 96' - 7"
MECHANICAL 097
MECHANICAL 099
FLEXIBLE COLLABORATION 002
LOWER LEVEL 88' - 1 7/8" LOWER LEVEL 2 84' - 1 7/8"
51 A6.2
EAST / WEST BUILDING SECTION VIEWING SOUTH SCALE: 1/8" = 1'-0"
H
1/2" SHEATING W/ AIR BARRIER OVER R-7.5 MIN. RIGID INSULATION W/ Z-GIRTS ON 6" METAL STUD FRAMING @16" O.C. W/ R-19 OPEN CELL SPRAY FOAM INSUL.
EXPOSED FASTENER METAL PANEL SYSTEM & DRIP SILL FLASHING
1/2" SHEATING W/ AIR BARRIER OVER R-7.5 MIN. RIGID INSULATION W/ Z-GIRTS ON 6" METAL STUD FRAMING @16" O.C. W/ R-19 OPEN CELL SPRAY FOAM INSUL.
EXPOSED FASTENER METAL PANEL SYSTEM & DRIP SILL FLASHING
THRU-WALL FLASHING OVER EPDM TERMINATION FLASHING
NEW 1/2"/FT MIN. SLOPE EPDM ROOFING ON TAPERED INSULATION W/ TIE-INS TO WARRANTED EXIST MEMBRANE
R-8 OPEN CELL SPRAY FOAM INSUL AT UNDRSIDE OF EXISTING DECK.
24 A8.1
REFER TO REFLECTED CEILING PLANS FOR CEILING TYPES
CONC. ON METAL DECK & STEEL FRAMING, SEE STRUCTRUAL
T.O. EXIST JOISTS 132' - 7"
PENTHOUSE LEVEL 133' - 1 1/2"
T.O. EXIST JOISTS 132' - 7"
T.O. EXIST JOISTS 132' - 7"
EXISTING STEEL TRUSS & JOIST ROOF DECK ASSEMBLY TO REMAIN
EXISTING PRECAST FASCIA, SUPPORTING STEEL FRAMING & SPRAY APPLIED INSULATION TO REMAIN NEW ENVELOPE ENCLOSURE AT CURTAIN WALL PERIMETER: • FLUID APPLIED AIR BARRIER W/ TIE-INS OVER • 5/8" GLASS MAT GYP. SHEATHING MOUNTED TO EXISTING STRUCTURE W/ • 6" METAL STUD FRAMING W/ • R-38 OPEN CELL SPRAY FOAM INSULATION
SLOTTED STEEL CHANNEL FRAMING GRID, 72" O.C. EA. WAY ABOVE BOTTOM TRUSS CHORD WITHIN CONDITIONED BUILDING FOOTPRINT, (PAINT)
SOFFIT MOUNTED LIGHT, SEE ELEC.
NEW CONTINUOUS LINEAR SOFFIT VENT
25
SCALE: 1 1/2" = 1'-0"
A7.3
NEW CONTINUOUS LINEAR SOFFIT VENT
EAST / WEST BUILDING SECTION - VIEWING NORTH - BASE
NEW VENTED SOFFIT ASSEMBLY • VENTED DIRECT APPLIED POLYMER FINISH SYSTEM, (DEFS) OVER • NEW 5/8" GLASS MAT GYP. SHEATHING MOUNTED TO • EXISTING STRUCTURE W/ • NEW METAL STUD FRAMING • (SEE A3 SHEETS FOR JOINT LAYOUT)
SCALE: 1 1/2" = 1'-0"
PRECAST FASCIA & MARBLE CHIP PRECAST COLUMN WRAPS TO REMAIN, POWER WASH EXPOSED SURFACES & RE-SEAL JOINTS, TYP.
2
DEFLECTION TYPE CURTAIN WALL ANCHORS TO EXISTING STRUCTURE
FIN. SOFFIT 125' - 2" SCHEDULED CEILING, SEE REFLECTED CEILING PLANS, & ROOM FINISH SCHEDULE, TYP.
1 HR FIRE RATED GWB ON METAL STUD STAIR ENCLOSURE
NEW STEEL REINFORCED ALUMINUM CURTAIN WALL • W/ PRESSURE PLATE GLAZED HORIZONTAL MULLIONS & • STRUCTURALLY GLAZED VERTICAL MULLIONS • SEE A9 SHEETS FOR GLAZING TYPE EXTENTS
REMOVE & SALVAGE MARBLE CHIP PRECAST COLUMN WRAP PANEL AT NEW BEAM PENETRATION, (WORK OF ALTERNATE BID 2)
REMOVE & SALVAGE MARBLE CHIP PRECAST COLUMN WRAP PANEL AT NEW BEAM PENETRATION, (WORK OF ALTERNATE BID 2)
0.5
HVAC DUCT, SEE MECH
R-8 OPEN CELL SPRAY FOAM INSULATION AT UNDERSIDE OF EXISTING ROOF DECK WITHIN CONDITIONED BUILDING FOOTPRINT, (PAINT)
PENTHOUSE LEVEL 133' - 1 1/2"
WALL SECTION - BASE OF PENTHOUSE
21 A8.1
EXISTING EPDM ROOF ASSEMBLY TO REMAIN A4 SHEETS FOR RE-ROOF EXTENTS)
CONC. ON METAL DECK & STEEL FRAMING, SEE STRUCTRUAL
A7.3
REFER TO CP0.1 FOR WALL TYPES AND INTERIOR FINISH SYSTEM (IFS-X) INFORMATION
2.
THRU-WALL FLASHING OVER EPDM TERMINATION FLASHING
NEW 1/2"/FT MIN. SLOPE EPDM ROOFING ON TAPERED INSULATION W/ TIE-INS TO WARRANTED EXIST MEMBRANE
23
1.
CONCEAL STRUCTURAL CONNECTION W/ SALVAGED SECTIONS OF PRECAST COLUMN ENCLOSURE, SCRIBE EXISTING PANEL FOR 1/2" BACKER ROD & SEALANT, (WORK OF ALTERNATE BID 2)
EXISTING CONC FLOOR ASSEMBLY, SEE STRUCTURAL, ELECTRICAL & SYSTEMS SHEETS FOR MODIFICATION EXTENTS LEVEL 02 114' - 8"
A7.4
PIN MOUNTED GLASS & CANOPY W/ PAINTED STEEL STRUCTURE & C.I.P. CONC. FOOTINGS (WORK OF ALTERNATE BID 2)
CONCEALED GUTTER SYSTEM TO DRAIN WITHIN PRECAST COLUMN BEYOND, (WORK OF ALTERNATE BID 2)
61 A8.6
51 A8.6
CIP CONCRETE WALL W/ PRECAST COPING & CLADDING AT OUTBOARD FACE
SS GUARDRAIL ASSEMBLY, BASE BID, (GLAZED GUARDRAIL ALTERNATE BID 4) SAND SET PAVERS, SEE SITE / CIVIL SHEETS FOR ADD'L WORK
CONCEALED EDGE RESTRAINTS, TYPICAL AT PAVER PERIMETER CUSTOM SIZE CONCRETE & GRANITE PAVER TILES W/ CONCEALED EDGE RESTRAINTS, (SEE A1.1 FOR LAYOUT) OVER ADJUSTABLE PEDESTAL SYSTEM ADJUSTABLE PAVER SUPPORT PEDESTALS W/ PROTECTION PADS. PEDESTAL SPACING & QTY AS REQD' BY CUSTOM PAVER SIZE & WEIGHT UPON WATERPROOFING MEMBRANE & INSULATION CAPACITY FOR DESIGN LOADS DRAINAGE MAT & PROTECTION BOARD OVER WATERPROOFING MEMBRANE 120 MIL LIQUID APPLIED REINF. WATERPROOFING MEMBRANE W/ 1/2" COVERBOARD & 1/4" PER FT. ADHERED INSULATION. (INSULATION DEPTH AS REQ'D FOR DRAINAGE & LIMITATIONS OF PEDESTAL ASSEMBLY HEIGHT)
31 A7.4
EXISTING PRECAST TO REMAIN, TYP. COLUMN ENCLOSURE (SAWCUT AT TOP OF PAVER ELEVATION)
PEDESTAL MOUNTED SS PLANTER BOX BEYOND CIP CONC PLANTER W/ SOIL & GRANULAR BASE OVER ROOF GARDEN WATERPROOFING ASSEMBLY
THRU-WALL WATERPROOFING TERMINATION FLASHING TYPICAL AT BASE OF CURTAIN WALL FRAMING (BEYOND)
CIP CONC RAMP CHEEK WALLS, (STONE CLAD AT INBOARD WALL, (SEE STRUCTURAL)
RAMP: ADJUSTABLE PAVER SUPPORT PEDESTALS W/ PROTECTION PADS. PEDESTAL SPACING & QTY AS REQD' BY CUSTOM PAVER SIZE & WEIGHT UPON WATERPROOFING MEMBRANE & INSULATION CAPACITY FOR DESIGN LOADS
THRU-WALL WATERPROOFING FLASHING W/ SUB-SILL TERMINATION AT ENTRANCE ASSEMBLY
DRAINAGE MAT & PROTECTION BOARD OVER WATERPROOFING MEMBRANE
EXISTING PRECAST TO REMAIN, TYP. COLUMN ENCLOSURE (SAWCUT AT TOP OF PAVER ELEVATION) THRU-WALL WATERPROOFING TERMINATION FLASHING TYPICAL AT BASE OF CURTAIN WALL FRAMING WATERPROOFING MEMBRANE WALL FLASHING OVER 1/2" FRT PLYWOOD OVER Z- FURRING AT 24" O.C. & R-13 RIGID INSULATION ON C.I.P. CONC. STEM WALL
120 MIL LIQUID APPLIED REINF. WATERPROOFING MEMBRANE W/ 1/2" COVERBOARD & 1/4" PER FT. ADHERED INSULATION. (INSULATION DEPTH AS REQ'D FOR DRAINAGE & LIMITATIONS OF PEDESTAL ASSEMBLY HEIGHT)
WATERPROOFING MEMBRANE WALL FLASHING OVER 1/2" FRT PLYWOOD OVER Z- FURRING AT 24" O.C. & R-13 RIGID INSULATION ON C.I.P. CONC. STEM WALL
BUILDING ENVELOPE STEM WALL: • NEW GRANITE CLAD (EXTERIOR) OVER • C.I.P. CONC STEM WALL W/ • R-13 RIGID INSUL. • (INTERIOR: 2 1/2" FURRING W/ • PAINTED GWB W/ • SOLID SURFACE SILL & • SCHEDULED WALL BASE)
LEVEL 01 100' - 0"
PAVER EXPANSION JOINT BETWEEN SETTING ASSEMBLIES WATERPROOFING MEMBRANE TERMINATION NEW CIP CONC. PLAZA PERIMETER WALL: • OVER EXISTING, (SEE STRUCTURAL) • TO UNDERSIDE OF PAVER ASSEMBLY (THIS SECTION) • WALL INCLUDES PRECAST (CAP & CLADDING AT CONDITION BEYOND)
SEE MECHANICAL FOR STORM DRAINAGE ROUTING
EXISTING & INFILLED CIP CONC SLAB ON FILL PLAZA, (SEE STRUCTURAL) EXISTING CONCRETE PLAZA PERIMETER WALL, FOOTINGS & FILL, SEE STRUCTURAL, CIVIL & MECHANICAL FOR ADD'L WORK
EXISTING STEEL COLUMN TO REMAIN • PROVIDE NEW STEEL SUPPORT AT NEW PRECAST PANEL BASE • PREP FOR & PROVIDE WATERPROOFING FLASHING TIE-IN.
EXISTING STEEL COLUMN TO REMAIN • PROVIDE NEW STEEL SUPPORT AT NEW PRECAST PANEL BASE • PREP FOR & PROVIDE WATERPROOFING FLASHING TIE-IN.
WATERPROOFING MEMBRANE TERMINATION, (TYP EA. MEMBRANE PERIMETER)
120 MIL LIQUID APPLIED REINF. WATERPROOFING MEMBRANE W/ 1/2" COVERBOARD & 1/4" PER FT. ADHERED INSULATION. (INSULATION DEPTH AS REQ'D FOR DRAINAGE & LIMITATIONS OF PEDESTAL ASSEMBLY HEIGHT)
SCHEDULED CEILING, SEE REFLECTED CEILING PLANS, & ROOM FINISH SCHEDULE, TYP.
SEE STRUCTURAL, ELECTRICAL & SYSTEMS SHEETS FOR EXTENTS OF CONCRETE STEM WALL & FLOOR ASSEMBLY WORK
NEW CIP CONC. PLANTER SURROUND & RAMP CHEEK WALL
NEW CONCEALED DOWNSPOUT W/ SPLASH PAN AT COLUMNS ADJACENT TO GLASS CANOPY, (WORK OF ALTERNATE BID 2)
SEE MECHANICAL FOR STORM DRAINAGE ROUTING EXISTING & INFILLED CIP CONC SLAB ON FILL PLAZA, (SEE STRUCTURAL)
EXISTING CONCRETE PLAZA PERIMETER WALL, FOOTINGS & FILL, SEE STRUCTURAL, CIVIL & MECHANICAL FOR ADD'L WORK
LOWER LEVEL 88' - 1 7/8"
53 A7.1
WALL SECTION THROUGH ENTRY SCALE: 1/2" = 1'-0"
56 A7.2
WALL SECTION SCALE: 1/2" = 1'-0"
DIFFUSER, SEE MECH.
3
EXISTING STRUCTURE 1' - 11 5/8"
2' - 5 1/2"
0" 45
4 EQ RISERS @ 1' 7 9/16" = 6' 6 1/4"
3" 5/8" GWB OVER 3 5/8" METAL STUD FRAMING @ 16" O.C. BLOCKING AS REQ'D ALUMINUM U-CHANNEL W/ DRY GASKET. SATIN #4 SS CLADDING
ACT-3 WOOD LOOK CEILING SYSTEM
7/8" HAT CHANNEL SHIM AS REQ'D
LEVEL 01 100' - 0"
11' - 0"
5
4"
HWP-4 WOOD PLANK SYSTEM, MOUNT TO UNDERSIDE OF FLOATING STAIR
21
4"
20' - 1 3/8" 2' - 9 7/8"
A10.2
3' - 9"
3' - 9"
3' - 9"
3' - 9"
2' - 11 1/2"
21 A10.2
GLASS RAILING
LEVEL 01 100' - 0"
41
5/8" TH CTG, GROUND AND POLISHED EDGES WHERE EXPOSED
A8.5
22 A8.3
6' - 0 1/8"
54 A8.5
12' - 3 5/16"
11' - 10 1/8" 8 EQ RISERS AT APPROX 1' 8 5/16" EA
12' - 0 7/16"
SQUARE PROFILE SIDELITE RAIL W/ DRY GASKET AND SATIN #4 SS CLADDING FLOORING. SEE FINISH PLANS EXISTING FLOOR CONSTRUCTION
5 1/2"
4
HWP-4 WOOD AT RISERS
3' - 6"
SECTION DETAIL SCALE: 1 1/2" = 1'-0"
UPH-1 SEAT CUSHION BEYOND HWP-4 WOOD BEYOND
3" (TYP)
CEILING, SEE RCP
3
3" 1' - 8 5/8" 3"
PIN MOUNTED GLASS GUARDRAIL BEYOND
5 EQ RISERS @ 1' 7 9/16" = 8' 1 3/4"
5/8" TH CTG, GROUND AND POLISHED EDGES WHERE EXPOSED
A7.5
43 A8.5
LANDING F.F
14' - 8"
1"
A8.5
1' - 7 9/16"
2"
LEVEL 02 114' - 8"
WEST LEARNING STAIR SEATING AREA SCALE: 3/8" = 1'-0"
LEVEL 02 114' - 8"
14' - 0 1/2" 14 EQ TREADS = 14' - 0 1/2"
3
UPH-1 SEAT CUSHION
4' - 0 1/16"
11' - 11 7/16" 12 EQ TREADS = 11' - 11 7/16"
HWP-4 WOOD TREAD HWP-4 WOOD RISERS
54 A8.5
1' - 8 5/16"
41 A8.5
6' - 6 1/4" 12 EQ RISERS AT 6 1/2" EACH
LEVEL 02 114' - 8"
14' - 8"
LEVEL 01 CEILING 111' - 0"
7' - 5 15/16"
4
HWP-4 WOOD BEYOND
PORCELAIN TILE AT TREADS AND RISERS
LEVEL 01 100' - 0"
5
HWP-4 WOOD PLANK SYSTEM, MOUNT TO UNDERSIDE OF STAIR 21 A10.2
51 A8.5
5/8" GWB OVER 3 5/8" METAL STUD FRAMING @ 16" O.C. BLOCKING AS REQ'D ALUMINUM U-CHANNEL W/ DRY GASKET. SATIN #4 SS CLADDING
1"
53
21 A10.2
54 A8.5
6 1/2"
3"
SCALE: 3/8" = 1'-0"
A8.5
UPH-1 SEAT CUSHION BEYOND
8' - 1 3/4" 15 EQ RISERS AT 6 1/2" EACH
2"
METAL STUD BRACING @ 32" O.C.
EAST LEARNING STAIR SEATING AREA
25 A8.3
GLASS RAILING
LOWER LEVEL 88' - 1 7/8"
LEVEL 01 100' - 0"
5/8" TH CTG, GROUND AND POLISHED EDGES WHERE EXPOSED
SECTION DETAIL
32 A8.3
SCALE: 1 1/2" = 1'-0"
WEST LEARNING STAIR CIRCULATION AREA SCALE: 3/8" = 1'-0" GLASS GUARDRAIL 3
UPH-1 SEAT CUSHION HWP-4 WOOD TREAD AND RISER
D
SHIM AS REQ'D 5/8" TH CTG, GROUND AND POLISHED EDGES WHERE EXPOSED SQUARE PROFILE SIDELITE RAIL W/ DRY GASKET AND SATIN #4 SS CLADDING FLOORING. SEE FINISH PLANS
PORCELAIN TILE ON CONCRETE FILLED METAL STAIR
EXISTING FLOOR CONSTRUCTION 51 A8.5
LEVEL 01 100' - 0" 22 A8.3
EAST LEARNING STAIR CIRCULATION AREA
45 A8.3
SCALE: 3/8" = 1'-0"
4
15' - 0"
LOWER LEVEL 88' - 1 7/8"
5
15' - 2"
20' - 7 1/2"
20' - 0"
D
12' - 0 7/16" 4 EQ SEATING TREADS = 12' - 0 7/16"
6' - 0 1/8" LANDING
23' - 5" 7 EQ SEATING TREADS AT APPROX 3' 3 5/8" EA
9' - 0 5/16" 3 EQ SEATING TREADS = 9' - 0 5/16"
UPH-1 SEAT CUSHION ON HWP-4 WOOD TREADS AND RISERS PORCELAIN TILE TREADS AND RISERS
5' - 0"
5' - 0"
3"
32 A8.3
LOWER LEVEL CEILING 96' - 7 7/8" L-ANGLE MODIFIED TO MATCH ANGLE. 5/8" GWB OVER 3 5/8" METAL STUD FRAMING @ 16" O.C.
14' - 0 9/16" 14 EQ TREADS AT 1' 0 1/16"
7/8" HAT CHANNEL
4' - 0 1/16"
11' - 0 7/16" 11 EQ TREADS AT 1' 0 1/16"
45 A8.3
E
E
MATCH ANGLE OF STAIR BELOW 1
A7.5
SECTION DETAIL SCALE: 1 1/2" = 1'-0"
20 EQ TREADS = 23' - 3"
53 A8.3
ENLARGED PLAN - WEST LEARNING STAIR SCALE: 3/8" = 1'-0"
55 A8.3
ENLARGED PLAN - EAST LEARNING STAIR SCALE: 3/8" = 1'-0"
11' - 10 1/8" 21 EQ. RISERS AT APPROX 6 3/4" EA.
CEILING, SEE RCP 2
A7.5
04 HAYDEN PLACE Team member: Scott Shiffermiller - Project Manager Phung Hong - Project Designer
Exterior Inspiration
Location: Blair, Nebraska Complete Date: On Hold Responsibilities: Schematic Massing Design Construction Document Site Planning
Located in Blair, Nebraska, the goal is to design a modern affordable apartment with 2 and 3 bedroom units. The project was divided into 2 separate phases. â&#x20AC;˘ Phase 1 with 5 apartment buildings and 1 clubhouse â&#x20AC;˘ Phase 2 with 5 apartment buildings, sharing the same clubhouse as phase 1 By placing more amenities in common areas, our team wants to create an apartment complex that is truly more affordable while also being appealing to residents.
Apartment Building
Interior Inspiration
Fire service room Three bedroom
Two bedroom
Two bedroom
Two bedroom
5()
83
5()
5()
5()
5()
5()
83
5()
5()
83
83
Common entry/stair
Common entry/stair
Two bedroom
Two bedroom
5()
5()
'1
83
83
'1
'1
83 5()
5()
'1
5()
83
5()
First Floor Plan
5()
Three bedroom
5()
Three bedroom
5()
'1
'1 5()
'1
5()
5()
5()
'1
5()
5()
5()
Second Floor Plan
0
10
Third Floor Plan
Phase 1 Phase 2 New Road
N
Site Plan - Scheme 1
Phase 1 Phase 2 New Road
N
Site Plan - Scheme 2
Common Space Future Extension/ Outdoor Private Space Public Space
MASS:
ROTATE:
PULL:
• • •
• •
• • •
Basic massing Buildable area Program layout per brief
Building mass responding to site layout intention Rotate public and common programs to maximize view
ENTER:
OPEN:
• • •
• • •
Push mass for outdoor space Create indoor/outdoor transition for public and common activities Itentify key entry for user groups
Clubhouse
Building mass responding to program intention Pull roof to 12/12 slope Create high volume/ fun space for common and public programs
OPEN:
Open mass to create link between programs • Create interesting crash shadow/shades • Create inviting entry that welcome and commodate for public/common programs • •
Open up mass for addition entrances Extend link between programs Create indoor/outdoor transition for public activities Create opportunity for outdoor space and circulation through programs
Clubhouse Massing Diagram
8
-$1 6) "
Clubhouse - 4,830 GSF
10
55 6) "
0(&+ (/(& 6) "
6
1
Community Spcae
1
Computer room
2
3ƾGI
3
4
Mail Storage
5
Restroom
6
Gym
7
Jan
8
Storage
9
Mech/Elec
10
55 6) "
&20081,7< 63$&( 6) "
6725$*( 6) "
9
6
55 6) "
4
6
0$,/ 6725$*( 6) "
5
0$,/ +$// 6) "
*<0 6) "
7
&20387(5 6) "
3
2
2)),&( 6) "
9(67,%8/( 6) "
N
Clubhouse Floor Plan