The Valley - MBAM Centre 2017

Page 30

VALLEY

101

INTRODUCTION

New MBAM Centre must be a new building paradigm in Malaysia The proposed centre is an iconic structure with artistically crafted landscape, and a sustainable architecture that is more than a landmark It is not designed as a shell with functions, but with an ambition to become a place that can flourish the community of the industry

DESIGN & CONCEPT

Form

When a common of space has the power to catch the public attention, it then becomes the heart of the building To create such space, the main concept starts with craving out an elongated void that runs from the ground front to the upper end of the building The void appears from outside like a cave filled with trees, or a funnel that can inhale While slowly ascending towards the end on third floor, the cave-like space gradually opens up itself and turns into a valley The landscaped valley is imagined as the spine of the building It is served as entrance, atrium, circulation, and meeting place

Urban Extension Landscape

A sustainable architecture shall not isolate itself like a free standing object on ground It shall be conceived as a part of a larger urban context that merges seamlessly with the public space The front landscape served as multi-purpose public plaza generates closer relationship among people, the city and itself

The landscaped path can function as an alternative circulation linking from Ground to 3rd floor Dining space can be extended from indoor to outdoor Pockets of social corner with crafted vegetation are also scattered along the path

Facade Structure

One of the sustainable strategies is to reduce the usage of airconditioner by making all common area and corridor naturally ventilated The facade running along the corridor is a double skins system where inner layer is glass louver, outer layer is self-support corrugated metal mesh

Bubbledeck is a flooring IBS structure system Apart from being a good thermal insulated material and fast to install, more importantly it is highly flexible in spatial planning The wall of valley is entirely made of reinforced concrete as load bearing wall Hence, by reducing number of column, it increases the efficiency of internal space, and achieves better structural integrity

THE VALLEY LANDSCAPE

The valley landscape is designed to be a journey walking through a jungle valley with public spaces merge seamlessly as part of the landscape It is also acting as an interstitial zone before going into the interior spaces The language of the landscape is the same as the folding concrete wall with the triangular seating, planter, flooring pattern, etc so that the whole of valley looks as if they are a naturally crafted cave

SUNKEN SPACE

The end of valley is sunken so that its border is not visible with an infinity view towards the lush greemeries

MPH PRE-FUNCTION AREA

Covered with seats rhat act as waiting area in the midst of valley jungle

DINING TABLES & CHAIRS

Outdoor dining area of F&B & restaurant & bar in the valley

STEPS AS SEATING

PLANTER SEATING

Act as seating area and shading

TRIANGULAR SEATING

THE ARRIVAL PLAZA

The extension of the landscape from the internal to the external which acts as a public space for leisure activates as well as an introduction before walking through the walk of forest valley

RAMP
SECTIONAL PERSPECTIVE
THE VALLEY GATEWAY
MPH PREFUNCTION AREA
A VIEW OF VALLEY THE WALK OF FOREST

THE AMBIENCE

1. The valley is to let the user experience the journey of walking through the forest

2. The warmness of timber deck merging with the cold concrete wall 3. The ambience of the library 4. The atmosphere of dining in the forest
4 3 5 2 6 VALLEY LIBRARY 1 2 3 4 5 5 6
5. Concrete wall with plants

PLANS

SITE PLAN N.T.S

GROUND FLOOR PLAN

SCALE 1: 250

BANQUET HALL WORKSHOP WORKSHOP WORKSHOP BANQUET KITCHEN BANQUET STORAGE GRAND LOBBY DROP OFF AREA 1ST FLOOR PLAN SCALE 1: 250 RETAIL/ F&B
STORE
CAFETERIA
2ND FLOOR PLAN SCALE 1: 250 STORAGE STORAGE
RESTAURANT & BAR RESTAURANT & BAR
DISCUSSION AREA MULTIPURPOSE HALL DISCUSSION AREA OFFICE RECEPTION MPH PREFUNCTION AREA SERVER ROOM SERVER ROOM LOUNGE
3RD FLOOR PLAN SCALE 1: 250 FURNITURE & EQUIPMENT STORAGE
PANTRY
SECURE DOCUMENT ROOMOFFICE BEARER ROOM

LIBRARY

4TH FLOOR PLAN SCALE 1: 250

CLASSROOM

DISCUSSION AREA DISCUSSION AREA OFFICE FIRST AID ROOM STORAGE
CLASSROOM
STUDENT
CLASSROOM CLASSROOM
CLASSROOM CLASSROOM
LOUNGE
FEMALE SURAU MALE SURAU

STORAGE

TERRACE

BOARD ROOM

TERRACE

STORAGE

STAFF ADMIN OFFICE

LOUNGE

BOARD ROOM PRE-FUNCTION

LIBRARY (MEZZANINE)

5TH FLOOR PLAN SCALE 1: 250

PRESIDENT SUITE GENERAL SECRETARY AREA PRESS CONFERENCE & HOLDING ROOM
BASEMENT PLAN SCALE 1: 250 BUILDING MAINTENANCE OFFICE SECURITY GUARD ROOM DRIVER ROOM TNB

ELEVATIONS

FRONT ELEVATION SCALE 1:40

REAR ELEVATION SCALE 1: 40

SIDE ELEVATION

SCALE 1: 40

AXONOMETRIC

AREA SCHEDULE

GBI

Upon applying GBI Non-Residential New Construciton (NRNC) Tool, this preliminiary assessment has acheived Gold rating based on the minimun requimtent set by the competition.

EE1 MINIMUM EE PERFORMANCE

EE4: RENEWABLE ENERGY

- Renewable energy (RE) sourced will contribute 1.0% of total electrical consumption

EQ 2.

No Smoking within building Designated smoking area away from building

EQ4. INDOOR AIR POLLUTANTS

- Low VOC paint

SM 1 SITE SELECTION

- Low VOC carpets

EQ11. HIGH FREQUENCY BALLASTS

The site developed in a zone which is not:

• Prime farmland

• Forest reserve

• wetlands

• lake, river or stream that supports wildlife

• Public parkland

High frequency electronic ballasts to encourage better visual comfort

Louvered Window SC Value 0.68
Perforated Metal U value 0.98W/m2k Louvered Window + Perforated Metal OTTV : 39.5W/m2 < 50W/m2 ENVIRONMENTAL TOBACCO SMOKE (ETS) CONTROL

SM 3: DEVELOPMENT DENSITY & COMMUNITY CONNECTIVITY

The site is located in a well-connected area and the community amenities available within 1km of the site are:

- Banks

- Parks

- convenience stores

- community centre

- medical clinic/dental

- eateries,restaurants

- laundry

- pharmacy

- place of worship

- school

SM9. GREEN VEHICLE PRIORITY

SM 10. PARKING CAPACITY

SM11. STORMWATER DESIGN: QUANTITY & QUALITY CONTROL

Premium parking zone will be allocated for Green Vehicles such as hybrid or biodiesel accounting for 5% of full-time equivalent occupants

MR 4 SUSTAINABLE TIMBER

In compliance with MBSJ requirement, 1 carpark space is provided for every 500Sqft of complex therefore in total, 206 carparks will be provided For 5% of total parking spaces (10 Carparks), preferred parking will be provided to carpools and vanpools

1. Ensure no increase in storm water runoff from the site

2. Rainwater harvesting reduce actual post development

WE1: RAINWATER HARVESTING

timber furniture that comply from FSC and MTCC requirements. Encourage environmentally responsible forest management

A rainwater harvesting system will be installed and will have storage capacity of 11m3 toachieve savings of over 30% of total potable water consumption for the development Total Building Potable water consumption is 2726 36m3 annually thus rainwater harvesting will save 1203 48m3 or 44% of potable water The rainwater harvested is used for landscape Irrigation

WE 3: WATER EFFICIENT -IRRIGATION/ LANDSCAPING

Rain Harvested – 11m3

Therefore, potable water is not needed

IN

1: INNOVATIONS IN DESIGN & ENVIRONMENTAL DESIGN INITIATIVES

Recycle Content Materials

Re-sure timber into landscape decking or furniture

Recycling of all fire system water during regular testing

regular testing of fire safety systems, the test lines will be directed to discharge back to fire water tanks

Non Chemical Water Treatment

For scale and corrosion prevention, nonchemical water treatment system will be used to treat at least 50% of total water consumption.

ASSESMENT CRITERIA SCORE SUMMARY

COST PLAN