NUMBER
55
THE IPLOCA NEWSLETTER JUNE 2013
Washington DC Convention Update page 12
Contents: Letter from the President page 4 News from Geneva page 5 Member News page 7 New Technologies page 14 WITH NEWS FROM: THE INDUSTRY, MEMBERSHIP, ALLIED & SISTER ASSOCIATIONS
Experience the Progress. AATS global sales organisation Breukersweg 4, NL-7471, ST, Goor, the Netherlands Tel. +31 547 260 000, Fax +31 547 261 000 www.maats.com
Liebherr-Werk Telfs GmbH Hans Liebherr-Str. 35 A-6410 Telfs Tel.: +43 50809 6-100 Fax: +43 50809 6-7772 www.liebherr.com
The Group
IPLOCA Mission To provide value to members through a forum for sharing ideas, engaging the industry and its stakeholders, facilitating business opportunities and promoting the highest standards in the pipeline industry.
Contents Letter from the President
4
News from Geneva
5
Board Meeting Update
5
Member News 7 Membership Centre 10 Health, Safety & the Environment 11 Washington DC Convention Update 12 New Technologies 14 Elections to the IPLOCA Board of Directors 18 Training Committee 19 Australia’s Longest Underwater ‘Pipe Pull’ 19 Regional Meetings 20 Upcoming Conferences
IPLOCA Secretariat
21
IPLOCA Newsletter
Cover Photo Courtesy of Stroygazmontazh
International Pipe Line & Offshore
Editor
Contractors Association
Elizabeth Spalding
Chemin des Papillons 4
Lay-out
IPLOCA Yearbook
1216 Cointrin / Geneva
Peter Schoonenberg
Advertising
Switzerland
Advertising
p.schoonenberg@pedemex.nl
Telephone +41 22 306 02 30
p.schoonenberg@pedemex.nl
Listing changes listing@iploca-yearbook.com
Fax +41 22 306 02 39
Comments & copy
E-mail info@iploca.com
elizabeth.spalding@iploca.com
Website www.iploca.com
IPLOCA © 2013
NUMBER 55 JUNE 2013
3
Letter from the President The Washington DC Convention Registration Brochure (23 – 27 September 2013) was mailed out at the end of April and is also available electronically via the IPLOCA website. Every year we urge attendees to plan their travel and register early and this year is no exception, as we expect large numbers of delegates and do not want you to be disappointed. We will be presenting three industry awards during the Open General Meetings in Washington. On Thursday and Friday, 26 and 27 September we will be announcing the winners of the IPLOCA 2013 Health and Safety Award, sponsored by Chevron, the IPLOCA 2013 New Technologies Award, sponsored by BP, and the IPLOCA Corporate Social Responsibility Award. The March Novel Construction meeting in Rome was very well supported, with 31 attendees from 27 companies in attendance and some excellent presentations. More information is on page 14 of this newsletter. My thanks to the organisers of the Europe Mediterranean Regional Meeting (Cassis, 25 April 2013) and to Iosif Panchak of Stroygazmontazh, for the meeting to be held in Moscow (4-5 June 2013), just as this newsletter is being delivered. I look forward very much to seeing everyone in Washington.
Sincerely,
Doug Evans
4
THE IPLOCA NEWSLETTER
News from Geneva
This will be the first time the event has been held in
The Washington DC Convention arrangements are now
the USA; in 2009 the convention took place in San Francisco
well underway.
and in 1987 it was held in Boston.
Online registration opened on 1 May, and we encourage everyone to go to www.iploca.com to 1) secure a hotel room and then 2) register for the convention as soon as possible.
Washington, D.C. and only the 3rd time it has been held in
If you have not already done so, register today at www.iploca.com.
Board Meeting Update
Greg Miller, Jan Koop, Scott Summers and Doug Evans,
Marrakech, Morocco
to participate in the committee.
The 2012-2013 IPLOCA Board of Directors met in Marrakech
Convention Committee
at the end of February.
The third committee suggested was the Convention
along with Juan Arzuaga, have indicated their willingness
Committee, whose key role would be to assist the Following are highlights from that meeting.
Secretariat with advance selection of convention locations.
Scholarship Committee
Directors who volunteered to serve on this committee were
A Scholarship Committee is being formed to evaluate the
Marco Jannuzzi, Adam Wynne Hughes, Bruno Maerten and
feasibility of offering annual scholarships through IPLOCA
JĂŠsus Garcia Pons.
and examine what other similar organisations have done to encourage new entrants into the pipeline field. Further
HSE Committee
discussion will be held at the May meeting in Stockholm
Safety Video
and any resulting plan will be presented to the Board of
Permission has been received from the INGAA Foundation
Directors in Washington for a decision.
to upload its safety video to the IPLOCA website. This will be done as soon as soon as practicable.
Directors who volunteered to serve on this committee were Doug Evans, Scott Summers, Ibrahim Zakhem, Jean-Claude
Prevention of Catastrophic Losses Workshop
Van de Wiele. Juan Arzuaga will also serve.
This workshop will be held at the Moevenpick Hotel in
Client Engagement Committee
Geneva on 11 July 2013. Information will be communicated to the membership and posted on the website.
A Client Engagement Committee is also being formed with the purpose of bringing the clients closer to the IPLOCA
Award Submission Deadlines:
membership. While clients have expressed interest, the
IPLOCA New Technologies Award: 17 May 2013
main impediments are time, and knowing which individuals
IPLOCA Health & Safety Award: 24 May 2013
in the company to engage.
IPLOCA Corporate Social Responsibility Award: 31 May 2013
NUMBER 55 JUNE 2013
5
Training Initiatives
Washington, D.C. Convention
The Training Committee is contacting the IPLOCA Associate
Juan showed a copy of the tour programme for DC, and the
Members to request details of training programs that can
website for the Omni Shoreham Hotel. Information would
be made available on the IPLOCA website. This will be
be mailed out in April and registration would open in May.
further discussed at the next Board of Directors meeting in Stockholm in May.
Novel Construction Agenda
Sponsorship The Board discussed the scheduling difficulties often associated with the Wednesday evening Former Presidents’
IPLOCA is in the process of adding chapters to Onshore
Cocktails. It was noted that this event sometimes interfered
Pipelines: The Road to Success and work groups are
with dinner plans outside the hotel for the one free evening of
quite active. This work should be finished and new
the convention. Several alternative suggestions were made,
chapters printed and on the wiki prior to the convention in
including Monday evening or Tuesday evening (prior to the
Washington, D.C. The next meeting (Rome, 21-22 March
President’s Dinner). The schedule will be investigated further.
2013) will review the third edition of Onshore Pipelines: The
It was noted that Dodsal will no longer sponsor the Monday
Road to Success and moving forward. Part of that meeting
night Welcome Dinner. IPLOCA will plan the Monday event for
will cover new technologies and training opportunities.
Washington D.C. and, if needed, offer several sponsorships (cocktails, wine, dinner, entertainment). PLM’s sponsorship
IPLOCA is collaborating in two research projects, funded by
support of Friday’s pre-Final Banquet cocktails (previously the
IPLOCA, the INGAA Foundation and PRCI.
John Fabick Cocktail Party) will now be contributed toward the
Treasurer’s Report
Thursday Caterpillar evening, with several Caterpillar dealers combining their financial support toward this event. Gulf
Harald Dresp presented the Treasurer’s Report, noting that
Interstate Engineering will sponsor the Friday night cocktails
IPLOCA expected a cost underrun this year. It was noted
in Washington D.C. Wilhelm Maats noted that Maats Pipeline
that the association has a total of CHF 2.9 million in its
Equipment would again sponsor the Golf Outing.
accounts, CHF 1.8 million of which is set aside in reserves in case of unexpected convention cancellation or dissolution
Convention Speakers
of the association.
The list of potential speakers and a draft schedule for the OGMs were reviewed. The final slate of speakers will be
To date, approximately seventy percent of membership fee payments have been received. Board members will follow
approved in Stockholm.
up in their region, according to the list provided, and in
Regional Meetings
communication with Sarah Junod, Accounting Manager.
Moscow, Russia: The Russian Regional Meeting is being
Membership
arranged for Tuesday and Wednesday, 4 and 5 June, at the Radisson Blue, Moscow, following the Stockholm Board of
Applications
Directors Meeting. Gazprom and Rostneft will be present
New membership applications were approved by the Board
at the Regional Meeting. Representatives from the branch
as follows:
office of Gulf Interstate Engineering would also like to
-- GOM Resources Sdn. Bhd. Malaysia (Regular Member)
attend. Michael Rae will provide an interpreter.
-- Perma-Pipe Inc., USA (Associate Member) Marseilles (Cassis), France: The French Regional Meeting Name Changes
is being arranged for Thursday, 25 April, with expected
Regular Member Sicilsaldo Srl has changed its name to
attendance from Total, GRT Gaz, and Serimax. The agenda
Sicilsaldo S.p.A.
is on the IPLOCA website.
Resignations
Central Europe: Harald Dresp and Jan Koop are planning
Two resignations had been received:
a meeting for Central Europe, date to be determined.
-- Challenger Special Oil Services, France (Associate Member since 2003) -- TD Williamson, Belgium (Associate Member since 2003)
Honorary Members
6
Wikipedia Visibility Michael Rae has been working with the Secretariat to try to establish a new, general Wikipedia page for IPLOCA. After some difficulties with the current moderator, he has
The procedure for candidatures for Honorary Member was
formally requested that this moderator be replaced, and is
reviewed, along with the list of current Honorary Members.
currently awaiting a response.
THE IPLOCA NEWSLETTER
Member News Bilfinger Voted Among Most Attractive Employers for Engineers The engineering and services group Bilfinger counts among the most attractive employers for future engineers, according to a recent study from the Trendence Institute in Berlin in cooperation with Manager Magazin. The company ranked ninth among the most popular employers for engineers. In the study, 35,000 students nearing their final exams in the fields of business, engineering and IT were asked about their preferred employers. About half of these students were studying engineering. The company offers a wide
and testing of North-Dolginskaya 3 well. A fleet of four
variety of entry-level opportunities and development
offshore support vessels including two owned by GSP will
prospects with a growing and international environment
assist the rig during the drilling operations scheduled in the
in a vast array of engineering fields. Bilfinger succeeded
Pechora Sea. GSP Jupiter is currently being mobilized to
in convincing the current graduating class with
operate offshore Tunisia, to drill Hammamet West-3 within
sustainable and responsible corporate values as well as
the Bargou Exploration Permit.
a secure and dynamic working environment. Other top rankings highlight the positive perception of Bilfinger as an employer. The company’s career website has already been ranked third in the Trendence Study 2012,
Herrenknecht Gripper TBM Completes Second Tunnel for Limmern Hydropower Plant
and the Universum survey of young professionals puts Bilfinger in the top 30.
Fluor Awarded FEED Contract for Qatar Petroleum / Shell Al-Karaana Petrochemical Project Fluor Corporation has announced that it has been awarded a front-end engineering and design (FEED) contract by Qatar Petroleum (QP) and Shell Global Solutions for a proposed grassroots petrochemical project located in Ras Laffan Industrial City, Qatar. Fluor will book the undisclosed contract value into backlog in the first quarter of 2013. The potential scope of the Al-Karaana petrochemical project includes a mix-feed steam cracker, two train monoethylene glycol units, linear alpha olefins
On March 13, 2013 a tunnel boring machine from
and oxo alcohol units, and required utilities, infrastructure
Herrenknecht successfully completed excavation of the
and offsites. Fluor will lead the FEED project execution
second headrace tunnel for the new pumped storage
from its Haarlem, the Netherlands, office with support
power plant at Limmern (Switzerland). Equipped with a
from other global Fluor locations.
new safety concept for securing the machine, the Gripper TBM was able to cope with the 40 degree gradient of the
GSP Offshore to Provide Offshore Drilling and Support Services for Gazprom Neft
two tunnels without incident. A Herrenknecht Gripper TBM (Ø 5,200 mm) bored two 1,030 meter long headrace tunnels through hard rock, connecting the upper reservoir
Operations are scheduled to start at the beginning of June
to the machine hall cavern. With the breakthrough of the
and will be carried out in the Dolginskoye oil field, located
second tunnel on March 13, 2013 another key milestone
in the Pechora Sea, in the south eastern part of the Barents
in the major project »Linthal 2015« was reached. Linthal is
Sea, the continental shelf of the Russian Federation. MODU
expected to commence operations in 2015 as the currently
GSP Jupiter will perform the drilling, logging, completion
largest hydroelectric power project in Switzerland. In
NUMBER 55 JUNE 2013
7
Marti Tunnelbau AG, the engineers from Herrenknecht AG
Petrofac Awarded USD 500 Million Offshore Project in Abu Dhabi
developed a solution for safe tunnelling at a gradient of
Petrofac has been awarded an engineering, procurement,
40 degrees. The immense gradient called for an extremely
installation and commissioning (EPIC) contract by Abu
reliable safety concept to hold the machine securely in
Dhabi Marine Operating Company (ADMA-OPCO) for
place during tunnelling. At all costs it had to be ensured
Satah Al Razboot (SARB) package 3 project, offshore Abu
that the TBM could not slip back when the grippers were
Dhabi. The competitively tendered contract will commence
moved. For the Linthal project the construction company
shortly and will be delivered by April 2016. The SARB
Marti Tunnelbau AG and Herrenknecht AG developed a
Project is a high priority and new field development
double anti-reverse lock with full back-up redundancy of
off the northwest coast of Abu Dhabi. Drilling will be
the available bracing levels for the 130 meter long and
conducted from two artificial islands (SARB1 and SARB2)
800 tonne TBM.
with the well fluid sent by subsea pipeline to a facility on
cooperation with the construction company, Swiss firm
Zirku Island for processing, storage and export. Under
Lincoln Electric Promotions
the terms of the contract Petrofac will deliver 200km of subsea pipelines for well fluid, water injection, gas
Lincoln Electric Holdings, Inc. has
injection, flare and export, along with 3km of onshore
announced that Michael S. Mintun
pipeline and 55km of subsea power and communication
has been named Vice President,
cables. Further offshore scope of the contract includes
Sales and Marketing – North
the provision of two riser platforms and four flare
America. In his new role, Mr. Mintun
platforms with four interconnecting bridges and one
will focus on the development
single point mooring (SPM) buoy located at the north of
and implementation of strategic
Zirku Island. The onshore scope of the contract includes
sales and marketing initiatives for
the following: drilling utilities, foundations on SARB1 and
the Company’s North American
SARB2, transport, install, hook up and assistance in the
business. After he joined Lincoln
commissioning of the accommodation modules.
Electric as a sales trainee in 1984, Mr. Mintun worked as a Technical Sales Representative in the company’s New York Southwest Ontario District in Canada, and U.S. National
Petrofac Consortium Awarded USD 3.7 Billion Abu Dhabi Contract
Accounts Manager. In 2000, he was promoted to Vice
Petrofac Emirates, Petrofac’s joint venture with Mubadala
President of Sales, Lincoln Electric Company of Canada,
Petroleum, has been awarded a contract by Zakum
and was named U.S. National Sales Manager in 2002. He
Development Company (ZADCO) for the Upper Zakum,
was promoted to Sales Manager – North America in 2006
UZ750 field development in Abu Dhabi. The contract
and became Vice President, Sales – North America in 2008.
is worth approximately USD 3.7 billion and has been
Mr. Mintun earned a bachelor’s degree in metallurgy and
secured by Petrofac Emirates in consortium with
materials engineering at Lehigh University.
Daewoo Shipbuilding & Marine Engineering Co Ltd
City and Pittsburgh district offices, District Manager of the
(DSME). Petrofac Emirates’ share of the contract is valued In addition, Phil Bouchard has
at USD 2.9 billion. ZADCO is an Abu Dhabi National Oil
been named to the position of
Company subsidiary in which ExxonMobil and Japan
U.S. Sales Manager. Mr. Bouchard
Oil Development Company are other Shareholders. The
will be responsible for driving
project comprises engineering, procurement, construction
the strategy and daily activities
transportation and commissioning of island surface
of the Company’s U.S. sales
facilities (EPC-2) on four artificial islands. Specifically, this
organization. Mr. Bouchard
will include wellhead control, manifolds, crude oil process
joined Lincoln Electric in 1990 as
facilities, water injection and gas lift, oil export pumps,
a Sales Trainee and worked as a
power generation and associated utilities. These facilities
Technical Sales Representative in
will commence operations during 2016.
the Atlanta and Fort Wayne offices and District Manager in the Baton Rouge and Chicago offices. In 2006, he was Regional Manager. He earned a bachelor’s degree in
Alain-Pierre Raynaud Named Chief Financial Officer of SNC-Lavalin
manufacturing engineering at Wentworth Institute of
SNC-Lavalin has named Alain-Pierre Raynaud as its
Technology.
new Chief Financial Officer and member of the Office of
promoted to his most recent position as North Central
8
THE IPLOCA NEWSLETTER
the President effective June 1, 2013, to be based at the
2013 for its outstanding working conditions and community
company’s head office in Montreal. Mr. Raynaud is a
involvement.
graduate of the Institut d’Etudes Politiques in Paris and holds a doctorate in Economics. He has spent 32 years considerable international experience with major global
Valentine Maritime Awarded a Project from Maersk Oil, Qatar
corporations specializing in project management in
On 3 April 2013, Valentine Maritime (Gulf) L.L.C, Abu Dhabi
Europe and Asia. He began his career as a financial analyst
was awarded by Maersk Oil-Qatar, an EPIC contract for a
before moving to Renault in 1987, where he later became
24” water injection pipeline in the Al Shaheen field.
Senior Vice-President and Corporate Controller. In 2003,
The work scope covers detailed engineering, residual
he moved to Japan as a member of Nissan’s Executive
procurement, concrete weight coating, transportation and
Committee to oversee the group’s Cost Control and IT
the installation of 24” X 7.33 km subsea pipeline and 24”
services departments and led its financial operations.
X 1.0 km of spurline including interconnecting subsea
Between 2006 and 2011, Mr. Raynaud was CFO of Areva,
tie-in spools. In addition the work scope includes the
where he successfully oversaw the implementation of the
installation of risers, subsea tie-ins, J-tubes and the pre-
company’s change management program, which included
commissioning of the pipeline system. The project is due
organizational restructuring, supply chain optimization
for completion by the 4th Quarter of 2013.
in the energy, automotive and banking sectors, gaining
and a new investment plan. He was subsequently named Chairman and Chief Executive Officer of Areva UK.
Valentine Maritime Awarded Offshore Contract from Dubai Petroleum
Technip Awarded contract for P-76 FPSO in Brazil
Valentine Maritime (Gulf) LLC has won an EPIC contract
Technip, leader of a 50/50 consortium with Techint, was
from Dubai Petroleum, for pipeline installation work
awarded by PNBV a substantial contract for the topside
in 2013. The scope of work for the project covers
construction and integration, the commissioning and
detailed engineering, procurement, installation and pre-
start up assistance of the P-76 floating production storage
commissioning of 3 pipelines. 30”dia x 6.7 km oil pipeline
and offloading (FPSO) unit. Located in the Santos Basin
including risers, 30”dia x 4 km oil pipeline including risers ,
pre-salt area offshore Rio de Janeiro, Brazil, this unit
16”dia x 6km water injection pipeline. The work scope also
will produce 180,000 barrels of oil and 7 million cubic
includes the pipeline system associated crossings, risers,
meters per day of gas. Technip’s operating center in Rio de
subsea tie-ins, spools. The project is due for completion by
Janeiro will perform the project management, engineering
September 2013.
and procurement. The 24,000-ton modules fabrication, integration and commissioning will be performed in Techint’s yard, in the South of Brazil. The project is
Van Oord’s Artemis Commissioned
scheduled to be completed by mid-2017.
Technip Receives Top Employers 2013 Certification for its Human Resources Practices Technip has been certified as a Top Employer Europe 2013, a prize rewarding companies for the good care they take of their people. This independent certification, delivered by the CRF Institute, underlines the quality of Technip’s human resources (HR) policies as well as its outstanding employee offerings. This year, 20 organizations received this special award for excellence in the application of their HR policies and practices in Europe. To qualify as a Top Employer in Europe, organizations were required to successfully achieve the criteria set in at least five European countries. Technip was certified as a Top Employer in nine European countries:
Van Oord’s newest addition to its fleet – the self-propelled
Belgium, France, Germany, Greece, Italy, the Netherlands,
cutter suction dredger Artemis – was recently moored
Norway, Spain and the United Kingdom. Moreover, Technip
in Rotterdam and available for visit before departing to
was selected as one of Canada’s 100 Top Employers for
western France for its first assignment. Under a contract
NUMBER 55 JUNE 2013
9
with the Grand Port Maritime de la Rochelle, Artemis will
Osman Birgili Appointed CEO of Tekfen Group of Companies
be deepening the harbour basin and dredging a trench in the access channel to the harbour. An exceptional feature of the ship is its hydraulically buffered spud carriage which will permit it to continue to work even in poor weather conditions. Air springs installed under the deck house will minimize noise and vibration for the employees on board. Artemis is a sister vessel to Athena, delivered at the end
Our sincere
of 2011, and currently being deployed on the Ichthys LNG
congratulations to
project in Darwin, Australia.
Osman Birgili, Immediate Past President and a board member of
Willbros Names Allcorn as Senior Vice President, Sales
IPLOCA, formerly Senior Vice-President of
Willbros Group, Inc. has named
Tekfen Construction, who has been appointed Chief
John K. Allcorn Senior Vice
Executive Officer of Tekfen Group of Companies
President of Sales. Allcorn is not
as of May 10, 2013. Mr. Birgili has been working at
new to Willbros where he served
Tekfen Construction for 35 years in a number of
for nine years in various executive
positions both in Turkey and abroad, and will continue
positions. While previously with
representing Tekfen in IPLOCA.
Willbros he was responsible for worldwide operations, including overseeing the group’s engineering
in pipeline design and construction. Additionally, he has
and construction companies. He
vast domestic and international experience in operations
rejoins Willbros from Integrated Pipeline Services, Inc. (IPS)
and executive management. He earned a Bachelor of
where he served as President and CEO. While with IPS he
Science degree in accounting from the University of
established an investment strategy to grow the business
Houston. He is a past board member of the International
through a mix of organic expansion as well as through
Pipeline and Offshore Contractor’s Association (IPLOCA), the
mergers and acquisitions. He has also held positions with
Pipe Line Contractor’s Association of America (PLCA) and
US Pipeline, Inc. and Gregory & Cook. Allcorn has more than
the Interstate Natural Gas Association of America (INGAA)
27 years of experience in the pipeline industry, specializing
Foundation, where he also served as Chairman.
Membership Centre
such as pipeline end terminations (PLETs), pipeline
We welcome a new Associate Member to IPLOCA.
fabricated and pre-insulated district heating and cooling
The information below is also posted at www.iploca.com
piping systems for efficient energy distribution to multiple
under the Membership Centre.
locations from central energy plants; pre-fabricated
New Associate Member
10
end manifolds (PLEMs), trees, manifolds, jumpers; pre-
industrial and secondary containment piping systems for transporting chemicals, hazardous fluids and petroleum
PERMA-PIPE®, INC.
products; prefabricated and pre-insulated piping for
Perma-Pipe, Inc. is a division of MFRI, a public company
and butane pipelines.
formed in 1961, is headquartered in Chicago and listed on
NASDAQ. Perma-Pipe engineers, designs, manufactures
Perma-Pipe, Inc.
and applies thermal insulation to pipelines and subsea
7720 North Lehigh Avenue
equipment for the oil and gas industry from six plants
Niles, Illinois 60714-3491
located throughout the world: New Iberia, Louisiana,
U.S.A.
USA; Lebanon, Tennessee, USA; Camrose, Canada; Fujairah,
T +1 847 966 2235
UAE; Dammam, Saudi Arabia and Gujara State, India.
F +1 847 470 1204
The company provides: insulation for onshore and offshore
E reuserh@permapipe.com
deep and shallow water pipelines and subsea equipment
I www.permapipe.com
THE IPLOCA NEWSLETTER
cryogenic applications such as LNG, ammonia, propane
Health, Safety and Environment HSE Committee Meets in Geneva The HSE Committee, under the chairmanship of Bruno Maerten (Geocean) met at the Geneva Secretariat on 26 March 2013. Martin Coleman of Spiecapag has resigned from the Committee due to a change of position. He is replaced by Alain Gauthiez. We offer our sincere thanks to Martin for his commitment over the past years.
Review of the Health & Safety Statistics and Environmental Statistics Returns We are still anticipating receipt of further Health & Safety statistics returns. Some 60 percent of required returns have been received so far, although the deadline was
According to a decision made by the Board of Directors
8 March. We urge those Regular Members who have
in 2012, member companies will not be allowed to
not yet done so, to submit this required information
register for the Annual Convention until their H&S
immediately. Submission of Environmental Statistics is
statistics have been received.
also highly encouraged.
HSE Workshop
(e.g. Total Recordable Injury Frequencies). The committee’s
Preventing Catastrophic Losses
executives of the IPLOCA membership in these discussions,
IPLOCA’s HSE Committee has scheduled a one-day workshop
provide thought leadership in this area. The agenda is under
at the Moevenpick Hotel, Geneva on Thursday, 11 July 2013 to
development and will include the following:
tackle the topic of preventing catastrophic losses.
-- Debunking the injury pyramid
goal with the workshop is to engage HSE managers and invite knowledgeable speakers to address the topic and
-- Preventive Systems & Predictive Metrics for Catastrophic Losses. Please register by 8 June at www.iploca.com/hseworkshop. In order to participate, attendees will be required to submit by Friday, 21 June, a 3-4 slide presentation about their most instructive experiences resulting from a catastrophic loss. We look forward to welcoming you to Geneva for a productive session to discuss ways to continue reducing the catastrophic losses in our Industry.
Workshop Preventing Catastrophic Losses 11 July 2013 The conventional wisdom that “recordables” are a sound
Moevenpick Hotel, Geneva, Switzerland
predictor of fatalities is really coming under assault
Hotel booking form and other information can be
across the occupational safety and risk management
found at www.iploca.com/hseworkshop
professions. We now have to re-wire how we approach high
Registration deadline: Friday, 8 June
consequence/low probability events (for example, fatalities)
Questions? Contact sarah.junod@iploca.com
versus low consequence/high probability safety events
NUMBER 55 JUNE 2013
11
A C O L IP n2013
Washington D.C.
ention l Conv a u n n 47th A gto
n Washi
Convention Update
RE
HU N BROC
TRATIO REGIS
Convention registration is well under way. If you have not already been to www.iploca.com to reserve your hotel room and register your participation, be sure to do so soon. Full details regarding the event can be found at www.iploca.com by clicking on the image of the 13 ber 20 . Septem .C 23 - 27 ashington, D W
Convention Brochure.
Registration for the 47th Annual Convention
Washingto n
, D.C.
opened on 1 May! Go to www.iploca.com today
Founded on 16 July 1790, Was cities beca hington, D.C use it was . is establishe States to d by the Co unique among Am serve as the erican nstitution nation’s ca embroiled of the Un pital. From in politica ited l its beginnin manoeuvri race, natio g it has be ng, section nal identi en ty, comprom al conflict s and issue ise and, of George W s of course, po ashington, wer. the first pre chose the sident an site. Envis d namesa ioned by as well as ke of the its founders the seat of city, as a comm governmen already inc ercial centr t, its locati luded two e on on the existing po and Alexan Potomac rt towns of dria, Virgi River Ge nia, which orgetown for tobacco served as , Marylan and whea regional sh d, t. ipp ing centres During the War of 18 12 most of British for the city wa ces invad ed the cit s bu buildings, rne d to the gro y and burne including und. d public an the White invading Yo d governm House, in rk (now To ent response ronto). Ho of the Co to America mmandant wever, the n forces Br of itish spare the Marine sign of res d the home pect. It is now the old s, located on Marine use in the est governm Barracks, nation’s ca as a ent building pital. The also spare Patent Of in continu d because fice and the ous Dr. William pleaded wi Post Offic Thornton th British e were , Superinten officers tha a disservi dent of Pa t the know ce to mank tents, ledge lost ind. therein wo uld be
to reserve your hotel room and register.
Do you need an ESTA or other visa? Citizens of many countries will need a visa to travel to the USA. To find out, please visit www.usembassy.gov k
o Special Lo Tour 2 - A n gto at Washin r
lis
c Annapo
istori Tour 1 - H
ber 23 Septem h) Monday ding lunc .00 (inclu 09.00 - 17 , Annapolis ic or st hi for front All aboard aint water qu for is Th travellers Maryland! elcomed ity has w riginally commun d years. O re nd hu ree ntly ical almost th and curre d of histor al capital, ique blen me of ill take the coloni itors a un tal and ho guides w offers vis state capi ed lis s d’ um po st an na yl co (the al Mar emy, An Academy tas. Coloni aval Acad the U.S. Naval aritime vis the U.S. N wing the llege, and scenic m vie d Co , ’s an ur e to hn d ur e Jo the Unite architect prehensiv Hall), St. in use in Bancroft on a com ill d ts st e an e an b us cip m parti ate ho ch line th nes’ to st hi Jo w st s ul de en ol Pa hn d gard is the Chapel, Jo homes an se, which y historic State Hou Maryland ss the man n. will also pa ling waterfront tow e e Drydock W . es Stat nch at th bust the ndwich lu ets of this enjoy a sa en Hall on quaint stre ants will in Dahlgr d cip te rti ca pa lo , nt is e tour ra th au g st in re w h Follo ndary sing throug . This lege emy. and brow Restaurant aval Acad any r shopping the U.S. N ing the m ve time fo at ha ig campus of ill st w ve in rticipants s, or just parting pa s and shop Before de g boutique polis. interestin d in Anna un the many fo ns attractio historical
4
Tours 4 & 12 Hazy Cen - The Udvar ter of the National Air & Spa ce Museum
Monday 23 Septembe r AND Wednesd ay 25 Sept ember 13.00 - 17 .00
10
ewseum
Tour 3 - N
ber 23 Septem Monday .00 13.00 - 17 s-iest’ it the ‘new ts will vis capital, Participan e nation’s th in 14 m museu e are over um. Ther e seventhe Newse within th s rie lle ga news and different useum of all ractive m ’s Berlin W um level inte se ew N . The display of journalism e largest th s de of clu outside s. Other Gallery in rlin Wall king new of the Be l of News w of brea sections -winning Great Hal inuous flo litzer Prize while the by a cont Pu l y, d of an de n io un rm Ge dio, as wel surro collect TV and ra ehensive itors to be Internet, allows vis ost compr ory of the de the m st hi clu e in th s , gallerie assembled phs ever photogra Tuesday 24 Septem 1 Gallery. as the 91 ber 10.0
The Steven F. Udvar-H azy Center companion is the facility to the Smith National sonian Air and Sp ace Museu National m Mall. The on the building w provide m as built to ore space for the Sm to display ithsonian the thousa nds of avia space artif tion and acts that cannot be sites show exhibited case the la on the Nat rgest colle ional Mal ction of av Participan l. Together iation and ts will visi , the two space artif t the large the Lockhe acts in th Bo eing Aviat ed SR-71 e world. io Bl n Hangar ackbird, th Space Han th e at houses fastest jet gar, which aircraft su in the wor opened in spacecraft, ch as ld. The Ja Novembe rockets, sa mes S. M r 2004, di tellites an centre-pie cDonnell splays hu d space-re ce being th ndreds of lated smal e Space Sh fa m ous l artifacts uttle Disco , the new very. est
Tours 6 & 11 States Ca - The United pitol Tu
esday 24 Septembe r AND Wednesd ay 25 Sept ember 08.30 - 12 .30
12
be 23 Septem Monday .30 08.30 - 12 ete e a compl will provid C. This tour hington, D. as W of White overview Park, the Lafayette ute, including parade ro l ra gu au e in ngton House, th the Washi g, in ild Bu tol the FBI U.S. Capi t and the ake Monumen ill also m w s bu e Th orial, the Building. coln Mem Lin e th l and stops at Memoria Veterans Your Vietnam emorial. M ar W of Art. t out the the Korean l Gallery re to poin su be ill e Nationa guide w ms and th an Museu ni so ith Sm
Capitol H ill is the ce ntre of ac nation’s ca tivity in th pital. This e tour prov in-depth ides an look at th e U.S. Cap ito l Bu The Chief ilding. Guide of the U.S. C from the ap
THE IPLOCA NEWSLETTER
Tour 5 - N ati Mall Shutt onal le
0 - 17.00 The Smith sonian In stitution, world’s la the rgest mus eum and complex, research includes 19 museums galleries. and Participan ts will wel convenienc come the e of this pr ivate shut tle to the On the w museums ay to the that line th National of the vario Mall a licen e Nationa us museu l Mall. sed tour gu ms and th able to ch ide will pr eir curren oose which ovide an ov t special ex museum bus throug er view hi bi they wou ts. Particip hout the da ld like to vi ants will be y as it suits sit and st them. ep on and off the Stops to in clude: • The Sm ithsonian Castle • The Free r& • The Nat (Asian Art Sackler Galleries iona ) American l Museum of the • The Nat Indian ional Galle • Th ry e N of ational M • The Nat Art useum of ional Mus History Natural eu m of African • The Hirs hhorn Mus Art • The N ational M eum & Sc Garden useum of ulpture History American
architectur e of the bu ilding. Onc Burmidi Co e inside, yo rridors to u will wal Statuary H Chamber k through all, which until 1857 the ornate served as . Each stat famous ci ly painted the e was aske tizens to d to contrib House of Represen be on disp tatives’ lay in the ute statue The tour w ha s of its tw ll. ill continue o m ost with an in at its mag -depth ov nificent ar er ch view of th itecture an growth as e Rotund d stun a dem
Convention Sponsorship Opportunities
You will see quite a few changes in sponsorship this year. Available items disappeared very quickly. Any and all contributions to the Convention Fund are still welcome. Please contact caroline.green@iploca.com right away if you are interested in this opportunity.
Special Functions: The First Time Attendees Cocktails Pipeline & Gas Journal and Vacuworx Global Welcome Cocktails Vermeer and Midwestern Worldwide Machinery Welcome Dinner Worldwide Machinery Directors & Wives Dinner Ritchie Bros. Auctioneers and Tekfen Construction and Installation Co., Inc
Tour 4 - Udvar Hazy Center World Pipelines
Flowers at Final Banquet Ledcor Group of Companies
Tour 5 - National Mall Shuttle Stroygazmontazh LLC
Band at Final Banquet HABAU and PPS and PSE
Tour 6 - The United States Capitol Erciyas Steel Pipe
Entertainment at Final Banquet HABAU and PPS and PSE
Tour 7 - Show me the Money! Jindal Saw Ltd.
Audio Visual at Final Banquet Nuova Patavium Srl
Tour 8 - Holocaust Museum Magnatech Group BV
Car for Lottery Volvo Construction Equipment and Renault Trucks
The CRC-Evans Luncheon CRC-Evans Pipeline International Inc.
Tour 9 - Mount Vernon Garden & Estate Spiecapag and Geocean
The Caterpillar Party Caterpillar and Pipeline Machinery International, Mantrac/Unatrac Group, Zeppelin Russia, Compagnia Generale Trattori
Tour 10 A & B - Segways in the City Max Streicher GmbH & Co. KG aA
Fireworks (to be confirmed) Laurini Officine Meccaniche The Spy Ladies Brunch Pipeline Inspection IPLOCA Membership Cocktails Zakhem International Construction Ltd. IPLOCA Membership Lunch - Buffet Fluor IPLOCA Membership Lunch - Wine Magnatech Group BV Gulf Interstate Cocktail Party Gulf Interstate DJ & Lights for Dancing ‘til Dawn American Augers Open Bar for Dancing ‘til Dawn Specialty Polymer Coatings, Inc. Decoration for Dancing ‘til Dawn Spiecapag and Geocean Maats Golf Tournament Maats Pipeline Equipment
Tour Programme: Tour 1 - Historic Annapolis Serimax and Pending Confirmation
Tour 10 C - Segways in the City ITW Welding Tour 11 - The United States Capitol (repeat) ARB Inc. Tour 12 - Udvar Hazy Center (repeat) Zhejiang Kingland Pipeline & Technologies Co., Ltd.
Photographers at the Convention TECHNIP Convention Photo CD PTPS Printing of Pocket Programme Goriziane Group S.p.A. Printing of Final Banquet Menu Goriziane Group S.p.A. Printing of Attendance List Pipeline & Gas Journal
Convention / IPLOCA Functions:
Russian Simultaneous Translation Argus Limited
Registration Desk Herrenknecht
Shopping Shuttle Max Streicher GmbH & Co. KG aA
Welcome Drinks at Registration (Sat/Sun) ROSEN Group
Meet & Greet at the Airport Applus RTD
Internet Centre Consolidated Contractors Company (CCC)
Transfer Back to the Airport UniversalPegasus International, Inc.
Audio Visual for Thursday’s Open General Meeting Argus Limited
Convention Fund Contributions Available
Audio Visual for Friday’s Open General Meeting Argus Limited
Gifts:
Coffee breaks at Open General Meetings The C.A.T. Group Registration Bags for the Gentlemen ShawCor
Travel Guide Maats Pipeline Equipment Liebherr Model Liebherr Gift DENSO GmbH
Registration Bags for the Ladies Wasco Energy
Tour 2 - Special Look at Washington Techint Engineering & Construction
Bottled Water for Tours Erciyas Steel Pipe
Tour 3 - Newseum Lincoln Electric
Wine at Final Banquet Willbros Group, Inc.
NUMBER 55 JUNE 2013
13
New Technologies Committee
Geert Dieperink – Maats Pipeline Equipment -- RESON PDS2000: Software that Makes Your Project Ionnis Mougiakos, JGC -- Operational Data of Equipment Andreas Clauss, Caterpillar
On 21 and 22 March 2013 IPLOCA hosted a Novel Construction Initiative meeting at the Hilton Fiumicino
We thank the presenters for their support and for the
Airport Hotel (Rome) with 29 delegates in attendance.
summaries of some of the presentations that were made available to us and follow below.
Now that new content for Onshore Pipelines:The Road to Success is almost finalised and will soon be uploaded to the wiki, the initiative is beginning to focus more tightly on additional new technology developments in pipeline construction, to become more of a forum for exchange and research on new technologies and training opportunities for the industry. To this end, several presentations were made to the delegates in Rome. These included: -- iFalcon – Intelligent Fleet Analysis, Logistics and Control, and iRisk – Risk Management Solution Aref Boualwan – CCC Manager Development/BPR -- Securing the Top Layer of Pipes during Transportation Idsart Van Assema – Dhatec -- Straightening Out all Bending Issues
iFALCON Fleet Management Solution - CCC
performance and for assistance in preventive maintenance and decision support in any fleet-related strategies. These features not only serve as a security measure, to keep track
The solution provides the ability to capture the positional,
of the whereabouts of every asset at near-real-time, but
operational, and diagnostic data of a company’s assets,
can also assist in improving project operations, availability,
including equipment, vehicles, and personnel.
productivity rates, resource management, limiting misuse of equipment, optimizing service and repair requirements
It allows monitoring of assets detection and reporting of
thereby lowering operating and owning costs, as well as
deviations to defined constraints, such as over-speeding,
enforcing any health, safety, or environmental regulations
over-revving, geofence breaches, etc., in both online and
that should be abided by on site.
offline modes responding to critical events when needed, such as alerting operators via buzzers or supervisors via
Components include:
email using the collected data for analysis of workloads and
A hardware device fitted on the asset to capture the related data metrics, detect deviations and respond to them, and transmit all the resulting information to the central data storage area for processing; a hosting service where the data storage area resides, and which is accessible to the various client portals; client portals, consisting of a Windows-based application for administration purposes, and a Web-based or Tablet-based application for basic monitoring purposes; business Intelligence (BI) capabilities for data analysis and reporting. In the case of equipment and vehicles, multiple options for hardware devices can be adopted, depending on the level of managerial and data acquisition requirements, and provided their functionality can be incorporated with the iFALCON
14
THE IPLOCA NEWSLETTER
back-end system. As for personnel monitoring, a custom-made,
based speed, clutch switch, cruise control, etc., tachograph
minimal and autonomous device has been designed to cater
information, vehicle distance, engine hours, total fuel
for the required functionality. Each device is equipped with
consumption, axle load.The collected metrics are exposed and
on-board GPS for positioning and on-board GPRS modem for
managed by the different client portals, which are used to track
online connectivity, as well as digital, analogue, and/or CAN
the assets, view immediate and historical itineraries, monitor
ports to acquire other data metrics, including but not limited to:
for violations and apply control actions when needed, as well
ignition status, engine speed (RPM), speed information: wheel-
as manage the various entities comprising the full solution.
iRisk, Risk Management Solution - CCC
-- Risk Identification At this stage, Risk items are identified and stored inside
Developed around best practices and international
the system. Starting from this stage and all subsequent
standards, iRisk implements the Active Threat Opportunity
stages, the project risk team can consult a data
Management methodology (ATOM), designed to help with:
completeness report generated by iRisk to check the data completeness and correct any omissions before moving
-- Management Information and decision making can
on to the next stage.
be significantly improved through a wide range of consistent reports. These can be used to display
-- Risk Assessment
both project performance and also the quality and
At this stage, risks have already been identified. A “risk
completeness of risk management data.
owner�, nominated for each risk, assesses it in terms of
-- Ensure that all practitioners follow the same process
probability and impact. Risk owners also categorize their
-- Identify and then deploy process improvements
risks using the appropriate Risk Breakdown Structure
consistently across all users -- Collect and present risk data in a consistent manner across all projects and other activities -- Build a database of risk information over time to assist a company to learn from experience. Governed by ATOM, iRisk fully supports all phases of
(RBS) and project Work Breakdown Structure (WBS). iRisk offers the Probability Impact Matrix (PIM) to help visually display the project risk profile in terms of both severe risks in case of Threats and most beneficial risks in terms of Opportunities. -- Risk Response Planning
ATOM including: Initiation Phase, First Risk Assessment,
As already discussed, iRisk helps the user to identify the
which consists of Risk Identification, Risk Assessment, and
most significant risks in the system and it then encourages
Risk Response Planning, Review and Control, Post-Project
them to plan appropriate response strategies to help
Review and close out.
exploit or to mitigate these risks. Risk owners develop
ďżź
response strategies, backed up by detailed action plans.
Initiation Phase
iRisk then encourages them to perform a post-response
During this initial phase a Risk Management Plan (RMP)
assessment of their risks to indicate the expected cost-
will be drafted for the project in consultation with key
effectiveness of the planned actions. It is also possible
stakeholders. The RMP defines how the risk process
to identify and record control measures to maintain or
will be performed in the project, including defining the
monitor risks at a given level, as well as contingency plans
Risk Assessment criteria and the Risk Work Breakdown
to be enacted in the event of a risk occurring.
Structure to be used. iRisk includes the ability to link to those aforementioned data to help classify and assess risk
Post-Project Review Phase
records later in the coming phases.
At the end of the project, or at significant milestones or
First Risk Assessment Phase
phase gateways, the project team will want to review risk data for a meeting to identify risk-related lessons. iRisk
The bulk of iRisk data input falls under this phase. Risks
provides the means to generate a single-risk register for
are identified and then assessed, based on their probability
each and every risk in the system, detailing all related data
of occurrence and their impact. Once a risk is assessed, a
to each risk item managed by the system. In a nutshell,
response strategy can be prepared to manage the likelihood
iRisk, helps projects to implement an effective risk
or effects of having a risk occur. In some cases, contingency
management process. It offers tools to identify, evaluate
plans can be established to respond to a risk should it occur.
and manage both threats and opportunities and thus
First Risk Assessment is split into the following sub-phases:
improve the chances of project success.
NUMBER 55 JUNE 2013
15
Securing Top Layer of Pipes during Transportation - Dhatec
vertical load securing forces on all pipes as represented by the red arrows. The bar behaves like a spring which presses down the pipes in the middle with such a force
Dhatec focuses on developing and manufacturing products
that the pipes are properly secured. The load securing bar
that guarantee a flawless delivery of the pipes to the
is equipped with a rubber antiskid layer which presses on
construction sites. Examples of these products are bevel
the pipes without damaging the coating. Handles on top
protectors, pipe closure solutions, blasting plugs, coating
of the bar fit on any fork lift in order to arrange for easy
couplings, pipe storage systems and transport equipment
positioning on the top layer of pipes.
for line pipes. The latest development deals with the problem of securing the top layer of pipes during transportation. Pipe loads are generally secured with tie-downs. These tie-downs press the pipe load on the trailer bed which prevents it from shifting during transport. But when the top layer consists
Figure 1: (Problem) Multiple pipes in top layer cannot be secured
out of more than two pipes it is difficult to secure the pipes
with tie-downs only
in the middle because the tie-downs do not exert sufficient securing force on these pipes. Figure 1 gives a visual presentation of this problem. The red arrows represent the vertical load securing force but the pipes in the middle do not receive this vertical securing force. Dhatec’s engineers have found a solution for this problem
Figure 2: (Solution) Dhatec designed a curved load securing bar to
by designing a load securing bar that grips onto the pipes
secure pipes in the top layer.
in the middle in order to secure the load. The load securing bar is pre-shaped in a contour that was calculated by the engineering team. As figure 2 shows the bar is curved like a banana. When the bar is positioned on the pipes the ends of the bar will be equipped with tie downs. When the tie downs are tensioned the curve is pulled out of the bar which results in a vertical load securing force on all pipes. In figure 3 the black arrows represent the pulling force of
Figure 3: (Solution) With tie-downs the bar is tensioned until it has
the tie downs which straightens the bar, resulting in equal
straightened, resulting in a secured load.
Straightening Out all Bending Issues Maats Pipeline Equipment Maats had a vast rental fleet with all kinds of equipment, including a pool of about fifty pipe bending machines in all
This change in pipe specifications results in: -- A change in steel quality, where this used to be X52 or even lower, this nowadays is commonly X70, with X80 and even X100 as viable options -- An increase in wall thickness for used pipes.
common sizes and from all major brands. But next to the change in pipe specifications is an increasing Over the years the company has gathered a lot of
variety in pipe specifications, even on the same project. This
experience with these machines and especially over the
is because:
last five years has seen a rapid change in the use of these
-- There is pressure on project pricing and this mostly
bending machines. For this there are a number of reasons:
means a pressure on quality -- Owners use different pipe suppliers on the same project;
-- Pipelines are designed to cover greater distances -- Owners use higher pressures to increase capacity of their pipeline -- Pipelines are constructed for “new� fluids / gases like CO2, LNG, methane, etc.
16
THE IPLOCA NEWSLETTER
we have seen up to six suppliers on the same jobsite -- With new developments in design possibilities, owners can exactly calculate the necessary wall thickness -- Stricter requirements for permits, other pipe specifications for road and rail crossings or environmentally vulnerable areas
This resulted in the following solutions: Quality -- Use of first class and long term suppliers: Liebherr, Sauer Danfoss -- Where possible use of local suppliers, making QC easier -- Proven quality, field-tested components like a dozer engine package -- Use of Liebherr’s global service network Ease of operation -- One control panel, minimum chance for change of settings -- Straightforward design, less parts, less confusion An increasing number of projects use heavy wall pipe.
Powerful -- More powerful but not bigger and only slightly heavier
This results in:
-- Bending test carried out with X80 pipe 914 x 23,4 mm
-- A wide variety of pipe specifications, wall thicknesses,
-- The first project was with X70 pipe 762 x 30,8 mm
coating thicknesses, ovality -- The possibility that one bending machine cannot cover all these specifications.
Health, Safety and Environment -- A safety lever for operators’ platform (CE-certified) -- A beacon during bending operations
During our rental projects, the above resulted in some issues that had a direct effect on the quality of services,
-- Silent: only 75dB(A) at operators platform (Directive 2000/14/EC)
such as: -- Poor availability of complete pipe specifications, with
Fuel saving and cost reduction
pipes often outside standard specifications, resulting in
The machine is equipped with a variable hydraulic pump,
problems with bending sets
load sensing control and hyperbolic power regulation,
-- Older machines working at the limit of their capacity, resulting in frequent breakdowns -- Damage to coating due to variation in coating thickness at a jobsite
ensuring low fuel consumption and low emission. In other words, the engine only delivers power when needed, achieving the maximum in power, fuel and economic efficiency.
-- The use of spiral weld pipe which is cheaper but more difficult to bend because of its easier deformation (buckling), but sometimes even deforms when stored -- The fact that there are fewer and fewer experienced bending operators
For more information, or to get involved with the Novel Construction Initiative, please contact the appropriate work group leader listed below.
-- Confusion about the use of bending mandrels. Planning and Design The above made Maats to decide to engineer a complete new
Criss Shipman (GIE), cshipman@gie.com
bending machine that would solve most of the above issues
Earthworks & Crossings
and would be ready for a further development in the pipe
Paul Andrews(Fluor), paul.I.andrews@Fluor.com
specifications on future projects.
Welding & NDT & Testing Jan Van Der Ent (ApplusRTD), jan.vanderent@applusrtd.com
New machine design criteria:
Future Trends & Innovation
-- A technical lifespan of at least 25 years
Zuhair Haddad (CCC), zuhair@ccc.gr
-- Service and repairs easy, everywhere in the world
Coatings
-- Operation of the machine should be simple
Sean Haberer (ShawCor), shaberer@shawcor.com
-- Powerful: suitable for X100 pipe with a wall thickness of 1”
Environment
-- Safe: assessment of health and safety issues
Sue Sljivic (RSK Group), ssljivic@rsk.co.uk
-- State of the art: use of latest technologies
Logistics
-- Universal: suitable for all available pipe specifications
Bruno Pomare (Spiecapag), bruno.pomare@spiecapag.com
and all conditions, also for -/-40°C.
NUMBER 55 JUNE 2013
17
Geographical Areas A list of member companies in each Geographical Area can be found as follows: East & Far East: www.iploca.com/eastandfareast Europe Central: www.iploca.com/europecentral Europe Eastern: www.iploca.com/europeeastern Europe Mediterranean: www.iploca.com/europemediterranean Europe Northwest: www.iploca.com/europenorthwest Middle East & Africa: www.iploca.com/middleeastandafrica America North: www.iploca.com/americanorth
Elections to the 2013-2014 IPLOCA Board of Directors
Latin America: www.iploca.com/latinamerica If you have any questions regarding the election process, please contact juan.arzuaga@iploca.com.
Following the membership approval of a By-Law change at the Annual General Meeting in Istanbul in September 2012, all geographical areas with more than 5 members may now
IPLOCA Board of Directors
elect two directors; the Associate Members may elect three directors to the Board.
Per the Association’s By-Laws (Istanbul 2012), the IPLOCA Board of Directors consists of a minimum of
Elections to the IPLOCA Board of Directors take place
12 and a maximum of 25 directors as follows:
every year at the annual convention as seats become vacant. Most elected board members serve for two
-- Three directors, with full voting rights on the Board
years. Below is a list of available board seats beginning
of Directors, elected by and representing the
September 2013. Elections to the IPLOCA Board take place
Associate Members of the association
every year at the annual convention. -- Sixteen directors representing Regular Members Seats becoming vacant in September include:
(two per geographical area), elected by the
1 - Europe Eastern (outgoing director Iosif Panchak)
Regular Members
1 - America North (outgoing director Douglas Evans, incoming Immediate Past President)
-- Five Officers of the Board, appointed by the full
2 - Europe Mediterranean (outgoing directors Leonardo
Board, form the Executive Committee and include
Gravina and Bruno Maerten)
The President, 1st Vice President, 2nd Vice President,
1 - East & Far East (outgoing director Andy Lukas)
Treasurer and Immediate Past President.
1 - Associate Members (outgoing director Pierluigi Zanin)
(The Immediate Past President does not represent a region; the remaining officers are counted among
If you are a Regular Member or an Associate Member
the sixteen elected directors who represent the
and you would like to run for one of the vacant seats on
geographical areas.)
the Board of Directors, please visit www.iploca.com/ elections where you will find the necessary documents
-- Up to five Directors-at-Large, appointed each year by
to be completed and returned to the IPLOCA Executive
the Board of Directors at its first meeting, make up
Secretary no later than Friday, 12 July 2013.
the remainder of the Board. The Directors-at-Large
Voting
appointed following the approval of the full Board.
Each Regular Member company is entitled to one vote.
They are selected based on their active involvement
If no-one from your company is able to attend the
and engagement in the work of the Association,
convention in order to vote, votes may be made on a
including in committee work, to capitalise on their
proxy form (also available via a link on the website)
knowledge and ensure continuity of leadership in
and must be received by the Executive Secretary in the
certain areas.
IPLOCA office at the Omni Shoreham Hotel no later than Tuesday, 24 September 2013 in order to be counted.
18
are nominated by the Executive Committee and
THE IPLOCA NEWSLETTER
Training Committee
website. We are therefore asking our IPLOCA representatives
Creation of Training Database
provide to us information that we can include in an online
Aware of the critical need for employees trained on pipeline
courses, DVDs, on-site real-time training, machine simulators,
equipment of all types, the IPLOCA Training Committee
instructor-led training and a host of other options. At a
has begun an initiative to collect training information
minimum, the following information is needed: your company
contributed by IPLOCA’s Associate Members.
name; a link to - or list of - the types of training offered by
at these OEM companies - IPLOCA’s Associate Members - to training database. The types of training might include: online
your company; whom to contact for more information. As a service to our contractors - the Regular Members of IPLOCA - we are preparing a list of the training opportunities
For more information or if you have any questions, please
offered by the OEMs (Original Equipment Manufacturers) on
contact jan.laenge@habau.at or rosemarie.kabelka@habau.at
their own equipment. This list will be posted on the IPLOCA
to contribute to this important initiative.
Australia’s Longest Underwater ‘Pipe Pull’ Narrows Crossing Project divisions and the direct sponsorship offered by the two joint venture partners’ board of directors culminated in this achievement. The segments will connect each project’s main pipelines from the Surat Basin gas fields, about 300 km inland, to liquefied natural gas plants on Curtis Island. The pipelines were co-located and installed concurrently to minimise environmental impact and disruption to boating. The harbour crossing has involved construction of temporary facilities including a 2 km-long road, two bridges and a railway line to move the pipes across two creeks, marshes and mud flats. 450,000 m3 of dredging was completed in the crossing between the mainland and Curtis Island to prepare the sub-sea trench for the pipelines. The harbour crossing used a MCJV (a Joint venture between McConnell Dowell (MCD)
temporary 450-tonne capacity winch on Curtis Island to pull
and Consolidated Contractors Company (CCC)) has
the pipes – which together weigh 13,000 tonnes – through the
completed a world-class engineering achievement by
sub-sea trench. The trench will now be filled with aggregate
simultaneously laying two 1 m-diameter gas pipelines
and rock armour to protect the pipelines.
(QCLNG and APLNG) underwater across Gladstone Harbour.
Pipe Pull Key Facts
The operation was safely completed in five days, winching
-- 450,000 m3 dredging preparation
the pipelines 2.3 km from the mainland to Curtis Island.
-- Twin pipe pull, both QCLNG and APLNG pipes
This is Australia’s longest large-diameter underwater “pipe
-- Each pipe 42 inch (1060mm) diameter X70 steel with
pull” conducted so far. This engineering feat is significant
concrete weight coating 93mm and 100mm thick
on a world scale in terms of scope and complexity and its
-- Each string length 3.9km (covering wet section of
completion characterizes MCJV as pioneers in executing the world’s first project to convert CSG to LNG.
Marshland and Narrows) -- Winch speed – 2 metres per minute -- Winch capacity 450 t
With a workforce of 520 individuals on site, managed by
-- Total weight of pipe 13,000 t
a dedicated leadership team, every member of the project
-- Total of 630 welded pipe joints
team participated in meticulous preparation and planning
-- Longest continual pull length 2.9 km
over the last 12 months to make this pipe pull a success.
-- 200,000T of rock protection to be installed after pipe
The teamwork among pipelines, heavy civil and marine
installation.
NUMBER 55 JUNE 2013
19
French Regional Meeting
The meeting was hosted by Bruno Maerten of Geocean,
Cassis, 25 April 2013
President Bruno de La Roussière of Entrepose. IPLOCA
Sixty-six people from 40 companies attended the French
to meet delegates and make a presentation regarding the
Regional Meeting held in Cassis, close to Marseille,
association. The programme included presentations in
on 25 April at the Oustau Calendal Conference Center.
French on different aspects of the French pipeline industry.
Jean-Claude Van de Wiele of Spiecapag, and IPLOCA Past Executive Secretary Juan Arzuaga was also in attendance
The following companies were represented: A Hak,
We thank the following guest presenters for their
Action Plus Services, Air Liquide Welding, Axson
contributions to the meeting:
Coatings, Bergerat Monnoyeur, Betafence N.V., Denys, DLE Specialites, Doris, Dunkerque Promotion, Entrepose
-- Jean Noël Connangle, Georges Seimandi, GRT Gaz
Contracting, Eureteq, Euro Anticorrosion, Europipe, Fluxys,
Programmation GRT Gaz des Grands Projets: Retour
Geocean, Geostock Sagess, Groupe Rosen, GRT Gaz, HDI,
d’expérience des Grand Projets (48”) Accès Plat Bords /
Lastechniek Europa BV, Maats Pipeline Equipment, Masap, MCO Services, Penspen, Polytec, Renault Trucks, Serimax,
Accès en Sable -- Jean-Michel Hartmann, Serimax: Transfer of Welding
Sicim, Somico-SBD Inc., SPAC, Spiecapag, Spiecapag
Technologies from Offshore to Onshore Pipeline
Regions Sud, Streicher, Technipipe, Total, Visser & Smit,
Construction
Volvo, Vopak/Necotrans.
-- Pascal Baylocq, Geostock: Les Gaz de Schistes en France
IPLOCA Media Partners (September 2010 to August 2013) OILDOM PUBLISHING COMPANY OF TEXAS, INC.
PALLADIAN PUBLICATIONS
Trenchless Technology International
BENJAMIN MEDIA North American Pipelines
Pipeline & Gas Journal
P.O. Box 190 PENINSULA, OHIO 44264 U.S.A. T +1 330 467 7588 F +1 330 468 2289 E info@benjaminmedia.com I www.trenchlessonline.com
Underground Construction
15 South Street FARNHAM, GU9 7QU SURREY U.K. T +44 1252 718 999 F +44 1252 718 992 E mail@palladian-publications.com I www.worldpipelines.com
Bernard P. Krzys President & Publisher E bkrzys@benjaminmedia.com
20
P.O. Box 941669 HOUSTON, TEXAS 77094-8669 U.S.A. T +1 281 558 6930 #212 F +1 281 558 7029 E oklinger@oildom.com I www.pgjonline.com Oliver Klinger President & Publisher E oklinger@oildom.com
THE IPLOCA NEWSLETTER
World Pipelines
Rod Hardy Director E rod.hardy@worldpipelines.com Chris Lethbridge Advertisement Manager E chris.lethbridge@worldpipelines.com
PENNWELL PETROLEUM GROUP Offshore Magazine
1455 West Loop South, Suite 400 HOUSTON, TEXAS 77027 U.S.A. T +1 713 963 6270 F +1 713 963 6228 I www.offshore-mag.com Mark Peters Vice-President/Group Publisher E markp@PennWell.com
In Memoriam
Upcoming Conferences
Leslie “Bill” Unsworth IPLOCA Regional Meeting for Europe Eastern William Leslie “Bill” Unsworth,
4-5 June 2013 - Moscow, Russian Federation
of Ontario, Canada passed away
www.iploca.com
suddenly on Friday, May 3, 2013 at his residence at the age of 56.
Onshore Pipeline Engineering Course 11-14 June 2013 - London, U.K.
Bill came to work for PipeLine Machinery International
www.ibcenergy.com
(PLM) on July 23, 2007 as a Product Support Coordinator and was promoted to Product Support
European Digital Oilfield Summit
Manager in August 2010. Years and countless
12-13 June 2013 - Vienna, Austria
experience in the pipeline industry is what he brought
www.wplgroup.com
with him and greatly contributed to the success of PLM’s vision for product support.
Gas Infrastructure - China Summit 2013 26-27 June 2013 - Beijing, China
The unwavering commitment to excellence, leadership
www.opplandcorp.com/GIC/en/index.asp
abilities, and outstanding service Bill displayed will be remembered by all who came in contact with him.
IPLOCA Workshop: Preventing Catastrophic Losses
Bill will be deeply missed not only as a work colleague
11 July 2013 - Geneva, Switzerland
but also as a friend.
www.iploca.com Tulsa Pipeline Expo
In Memoriam
26-28 August 2013 - Tulsa, OK, U.S.A. www.tulsapipelineexpo.com/home
Rolf Kohler
(Complimentary passes available to IPLOCA
By Walter Zimmermann
members from terryf@vacuworx.com)
It is my sad duty to announce the
Offshore Europe 2013
death of Rolf Köhler, aged 86, in
3-6 September 2013 - Aberdeen, Scotland, U.K.
March this year.
www.offshore-europe.co.uk
Born in 1927 in Holzminden, Germany, he married Ursula Köhler in 1953 and had two daughters. He
47th Annual IPLOCA Convention
earned a degree in civil engineering at the University
23-27 September 2013 -
of Braunschweig, Germany and from 1953 to 1976
Washington, DC, U.S.A.
served as Site Supervisor and then Managing Director
www.iploca.com
for Preussag AG. Mr. Kohler served as Treasurer of IPLOCA in 1966, the year of the association’s founding, and became President of the association in 1970 at
APIA Convention
the Monte Carlo Convention. He had more than 120
12-15 October 2013 - Brisbane, Australia
publications to his credit and served on many technical
www.apia.net.au/events/2013-convention-adelaide
committees including as member of the board and president of the technical committee of the German
OTC Brazil 2013
pipeline association (Rohrleitungsbauverband RBV)
29-31 October 2013 - Rio de Janeiro, Brazil
from 1964 to 1988. Rolf Köhler last participated in an
www.otcbrasil.org/2013/
IPLOCA Convention in Berlin in 2004. We will always hold him in the highest regard, as a much appreciated and honoured founding father of worldwide cooperation in the pipeline industry.
NUMBER 54 MARCH 2013
21
IPLOCA Board of Directors
2012-2013
Left to right, front row: Najib Khoury, Doug Evans, Osman Birgili, Harald Dresp, Juan Arzuaga (IPLOCA Executive Secretary). Second row: Raúl Vilugrón, Greg Miller. Third row: Iosif Panchak, Karl Trauner, Kaan Dogan, Leonardo Gravina. Fourth row: Jésus Garcia Pons, Jan Koop, Bruno Maerten, Ibrahim Zakhem, Marco Jannuzzi, Jean-Claude Van de Wiele. Fifth row: Adam Wynne Hughes, Andy Ball, Pierluigi Zanin, Jerrit Coward. Sixth row: Michael Rae, Sandip Sharma, Scott Summers, Wilhelm Maats. Inset: Andy Lukas
Officers Doug Evans (Gulf Interstate Engineering), President; Director, America
Jésus Garcia-Pons (Arendal), Director, Latin America
North; Chairman of the New Technologies Committee
Raúl Vilugrón (Montec), Director, Latin America
Najib Khoury (CCC), 1 Vice President; Director, Middle East
Ibrahim Zakhem (Zakhem), Director, Middle East & Africa
& Africa
Andy Lukas (A.J. Lucas), Director, East & Far East
Harald Dresp (Max Streicher), Treasurer; Director, Europe Central
Sandip Sharma (Kalpataru Power Transmission), Director,
Osman Birgili (Tekfen), Immediate Past President; Director, Europe
East & Far East
Eastern
Greg Miller (Pipeline Inspection), Director, Associate Members
st
Directors Iosif Panchak (Stroygazmontazh), Director, Europe Eastern
Pierluigi Zanin (Goriziane Group S.p.A.), Director, Associate Members
Kaan Dogan (Attila Dogan), Director, Europe Eastern
Directors at Large
Jan Koop (Bohlen & Doyen), Director, Europe Central
Jerrit Coward (Willbros Group, Inc)
Bruno Maerten (GEOCEAN), Director, Europe Mediterranean,
Marco Jannuzzi (Caterpillar)
Chairman of the HSE Committee
Wilhelm Maats (Maats Pipeline Equipment)
Leonardo Gravina (Sicim S.p.A.), Director, Europe Mediterranean
Karl Trauner (HABAU), Chairman of the Training Committee
Andy Ball (Land & Marine), Director, Europe North-West
Jean-Claude Van de Wiele (Spiecapag)
Adam Wynne Hughes (Pipeline Induction Heat), Director, Europe
22
Michael Rae (Argus Limited), Director, Associate Members
North-West
Executive Secretary
Scott Summers (ARB), Director, America North
Juan Arzuaga
THE IPLOCA NEWSLETTER
2010 Award Winner
2012 Award Winner
Spotlight on Innovation ShawCor’s Mobile Robotic Cutback System has won a 2013 OTC Spotlight on New Technology Award. The innovative technology, developed and used by Bredero Shaw, is an end-machining technology for insulated pipe that delivers consistent quality while being safer and faster than competing manual processes. The 2013 Spotlight on New Technology Award won by the Mobile Robotic Cutback System shows ShawCor’s continuous commitment to innovation and builds on the precedent created by the Thermotite® ULTRA™ novel thermal insulation coating and the Simulated Service Vessel (SSV), which were awarded OTC Spotlight on New Technology Awards in 2010 and 2012.
ShawCor – when you need to be sure
shawcor.com
2013 Award Winner
SVL-SERIES VACUUM LIFTS
SAFE and CONVENIENT One pad fits a range of pipe sizes Audio-visual warning system Wireless remote and in-cab controllers Stabilizer eliminates dangerous horizontal movement Rotating head for increased control CE and OSHA compliant Models: SVL-90 (9-ton), SVL-130 (13-ton) and SVL-220 (22-ton)
CaLL or eMaiL uS for our fuLL Line CataLog U.S. To ll F re e 800. 3 8 3 . 2 6 6 6 I I n t l . To l l F re e 8 0 0 . 9 6 7 5 . 3 9 4 8 p ip e lin e @wwm ach . c o m I w w w. wo r l d w i d e mach iner y. c om