IN FOCUS / PRESTON HIRE SUPERDECKS
A SUPERDECK SOLUTION FOR EVERY PROJECT Approximately 50 x 4.2 SuperDecks are being used on the One Sydney Harbour project managed by Lendlease.
Preston Hire’s SuperDeck loading platforms have been in high demand recently, playing an important role on a number of major projects along the East Coast. WITH THREE MAIN SIZES AVAILABLE in the SuperDeck range, and multiple options available in between, Preston Hire continues to demonstrate their ability to provide solutions for even the most challenging of projects, delivering safe, easy to use, and highly efficient materials handling results. Recently appointed general manager of Preston Hire, Mike Thomas, explained the versatility of the company’s SuperDeck fleet and what they can bring to a work site. “The SuperDecks’ main use is the loading of materials, equipment, and supplies to and from the various levels of a building under construction,” he said. “They can solve a number of challenges on site thanks to their proven design that has been put to the test for decades and always delivers.” Thomas went on to provide details of a number of projects that have relied heavily on Preston Hire SuperDecks. Each project has different requirements and unique circumstances that have easily been overcome by the SuperDeck system demonstrating the varying size, scope, and uses of each platform.
ONE SYDNEY HARBOUR The One Sydney Harbour project features three residential towers with 68 levels and 322 apartments that include full floor or part floor homes. The second of the three towers will reach 230 metres and will look over the Sydney Harbour Bridge, Opera House and back west across the Darling Harbour. “Approximately 50 x 4.2 SuperDecks are being used on the One Sydney Harbour project managed by Lendlease. It is a 78 / CAL May/June 2022
www.cranesandlifting.com.au