Pipeliner May 2022

Page 36

HYDROGEN & EMISSIONS REDUCTION

STATS Group onsite at Kinder Morgan installing an isolation Co2 pipeline.

STATS Group primed to support industry with net-zero goals Pipeline technology specialist, STATS Group, is in a strong position to capitalise on new opportunities arising in the transition to more sustainable energy supplies and a carbon net-zero future.

W

ith decades of experience working on oil and gas pipeline projects, the Aberdeenshire-headquartered company has at its disposal the skills and proven technologies to deploy in carbon capture and storage (CCS), related CO2 pipelines, and natural gas pipelines blended with hydrogen. STATS Group chief executive officer Leigh Howarth says STATS technologies have been STATS technologies have been helping its customers reduce emissions for 20 years.

36

helping its customers reduce emissions for 20 years. “Our focus on innovation means we’re ideally placed to continue this support, not only in the traditional hydrocarbon sector, but also as the industry transitions to more sustainable energy supplies,” he says. With investment in both CCS and hydrogen projects accelerating, there is a growing focus on how existing pipeline infrastructure can be repurposed for both CO2 and blended or pure hydrogen transportation. Over the past two decades, STATS Group has played a central role in numerous pipeline interventions, repairs and maintenance projects, giving the company a deep knowledge base of the very infrastructure that, in the future, may be repurposed. In that same period, and directly relevant to CCS, STATS has established itself as the “go-to” provider of intervention and isolation services on high-pressure liquid CO2 pipelines. “After safely completing multiple workscopes for Kinder Morgan on their high-pressure (up to 138 bar) CO2 pipelines in New Mexico in the United States, we’re in an excellent position to support CCS infrastructure owners and operators with future pipeline maintenance and upgrade projects,” Howarth says. The Australian Pipeliner | May 2022

30-inch BISEP Isolation Co2 pipeline, Kinder Morgan, USA.

“With an eye to the future, STATS is partnering in a joint industry project with DNV and a number of pipeline owners and operators, looking at the implications on natural gas pipelines to transport natural gas blended with hydrogen.” Notwithstanding the opportunities in relation to CCS and hydrogen, STATS continues to support its customers to reduce emissions, recognising the pivotal role that natural gas is playing as the world seeks to first reduce carbon emissions ahead of a longer term transition to more sustainable sources of energy. Using the company’s proprietary double-blockand-bleed pipeline isolation technologies, localised repair and maintenance worksites can be safely isolated without the need to depressurise large sections of the pipeline, thereby avoiding the need to discharge significant quantities of emissions into the atmosphere. “We’re excited about the future energy transition and the role STATS is playing in supporting our customers to achieve their net-zero goals,” Howarth says.

For more information visit www.statsaustralia.com.au


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Event photos

0
pages 68-69

2022 Convention & Exhibition

2min
pages 64-65

Advertiser’s index

0
pages 74-76

CRC positions Australia as water infrastructure leader

9min
pages 60-63

A new approach to safety and design of pig trap quick actuating closures

4min
pages 58-59

The ongoing journey of composite repairs for pipelines, process piping, tank and vessel repairs

4min
pages 56-57

HDD: helping make critical infrastructure more resilient in the face of climate change

4min
pages 52-53

Iplex furthers capabilities with restrain PVC-U pipe

2min
pages 54-55

Trenchless digging or open cut?

3min
pages 50-51

Priming rusty surfaces for success with CorrVerter

2min
pages 48-49

Denso’s VISCOTAQTM coating systems leading the way

4min
pages 46-47

Making smarter decisions for network longevity

3min
pages 44-45

Quality is key: kwik-ZIP

3min
pages 42-43

Durable solutions to safeguard pipeline assets

4min
pages 40-41

STATS Group primed to support industry with net-zero goals

2min
pages 36-37

Backing the industry through experience and expertise

6min
pages 38-39

Verbrec engineering solutions for energy transformation

5min
pages 34-35

The mechanics of the new hydrogen economy

6min
pages 32-33

GF Piping Systems prepares to supply future fuel revolution

6min
pages 30-31

AMEC report calls for changes to open up hydrogen and renewable gas development

3min
pages 28-29

Gas and energy policy

4min
pages 12-13

Right systems and people key to success: Carol Bond

5min
pages 14-15

Pipelines in NSW

3min
pages 18-19

Reaching net-zero by 2050 one step at a time

7min
pages 24-25

Members & memos

5min
pages 10-11

Energy transition - stop talking, start doing

11min
pages 20-23

Monitoring the next energy transition

4min
pages 26-27

Hydrogen is the next step forward for pipelines

3min
pages 16-17
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.