Pipeliner May 2022

Page 50

TRENCHLESS CONSTRUCTION

Trenchless digging or open cut? Vermeer Australia talks through the different considerations and how environment plays a part when deciding what digging method to use on pipeline construction projects.

T

he horizontal directional drilling (HDD) industry has come a long way since Vermeer Australia introduced its first rig to Aussie shores in 1991. The

equipment, technology and expertise of the operators have all become more sophisticated, which has helped expand the range of projects drills can be used for. However, there is still a

significant and growing market for open-cut methods, like trenching and ploughing in the Australian construction industry. According to Nigel Dobier, Pipeline Sales


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Event photos

0
pages 68-69

2022 Convention & Exhibition

2min
pages 64-65

Advertiser’s index

0
pages 74-76

CRC positions Australia as water infrastructure leader

9min
pages 60-63

A new approach to safety and design of pig trap quick actuating closures

4min
pages 58-59

The ongoing journey of composite repairs for pipelines, process piping, tank and vessel repairs

4min
pages 56-57

HDD: helping make critical infrastructure more resilient in the face of climate change

4min
pages 52-53

Iplex furthers capabilities with restrain PVC-U pipe

2min
pages 54-55

Trenchless digging or open cut?

3min
pages 50-51

Priming rusty surfaces for success with CorrVerter

2min
pages 48-49

Denso’s VISCOTAQTM coating systems leading the way

4min
pages 46-47

Making smarter decisions for network longevity

3min
pages 44-45

Quality is key: kwik-ZIP

3min
pages 42-43

Durable solutions to safeguard pipeline assets

4min
pages 40-41

STATS Group primed to support industry with net-zero goals

2min
pages 36-37

Backing the industry through experience and expertise

6min
pages 38-39

Verbrec engineering solutions for energy transformation

5min
pages 34-35

The mechanics of the new hydrogen economy

6min
pages 32-33

GF Piping Systems prepares to supply future fuel revolution

6min
pages 30-31

AMEC report calls for changes to open up hydrogen and renewable gas development

3min
pages 28-29

Gas and energy policy

4min
pages 12-13

Right systems and people key to success: Carol Bond

5min
pages 14-15

Pipelines in NSW

3min
pages 18-19

Reaching net-zero by 2050 one step at a time

7min
pages 24-25

Members & memos

5min
pages 10-11

Energy transition - stop talking, start doing

11min
pages 20-23

Monitoring the next energy transition

4min
pages 26-27

Hydrogen is the next step forward for pipelines

3min
pages 16-17
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.