EOS - In the Frame Newsletter (January 2022)

Page 4

IN THE FRAME

CASE STUDY Riverside Quarter, Wandsworth

CONSTRUCTION PARTNERS

OVERVIEW

Client Frasers Property

Riverside Quarter in Wandsworth is a £250 million mixed use development located on the south bank of the River Thames. Delivered in four phases, it comprises six buildings ranging from 11 to 15 storeys, as well as commercial accommodation and leisure spaces.

Main Contractor Galliford Try Architect Carey Jones Chapman Tolcher Steel Framing Systems Supplier EOS Type of Solution Pre-Assembled Frames (PAF) Light Steel Frame Non-Loadbearing Infill System

4

Galliford Try has been working with Frasers Property to deliver the prestigious project with construction work starting in 2014 and finishing in January 2020. The project has created over 750 new apartments, including 197 affordable homes. Pioneering a new systems approach, the final phase of Riverside Quarter was the first development in the UK to specify our Pre-Assembled Frames (PAF) – a non-loadbearing infill system.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.