professional portfolio

Page 1


RAFAEL MORAIS +351 933608750 arqrafaelmorais@gmail.com


RAFAEL MORAIS IS A PORTUGUESE ARCHITECT BORN IN SAO PAULO, BRASIL IN 1986. IN 2004 IS ADMITED IN UNIVERSIDADE LUSIADA DE VILA NOVA DE FAMALICAO, WHERE STUDIED ARCHITECTURE BETWEEN 2004 AND 2011. IN 2011 HE ACCOMPLISHED HIS STUDY IN ARCHITECTURE WITH THE THESIS “PRAISE OF THE LIGHT: THE ART OF ARTIFICIAL LIGHTING IN THE URBAN CONTEXT”. IN JULY 2011, HE STARTS HIS INTERNSHIP TO ENTER IN THE ORDER OF ARCHITECTS OF PORTUGAL. HIS INTERNSHIP WAS IN THE OFFICE VASTUDIO FROM PORTO. DURING THIS TIME HE WAS RESPONSIBLE FOR ARCHITECTURAL CONCEPTION AND DESIGN, VIRTUAL MODEL MAKING, RENDERISATION, POST PRODUCTION AND GRAPHIC DESIGN. RAFAEL ALSO ATTENDS SOME WORKSHOPS LIKE IN POST PRODUCTION FOR ARCHITECTURE AND ONE WITH THE JAPANESE ARCHITECT KENGO KUMA. HE ALSO ATTENDS AND SOME FORMATIONS SUCH AS ARCHICAD, REVIT, RHINO, AND CULTIVATES HIS INTERESTS IN PHOTOGRAPHY, COMICS, MUSIC AND POST-PRODUCTION. MY SKILLS SET, HOW I WORK!

EDUCATION AND TRAINING

II LIKE TO WORK IN DIFFERENT WAYS AND WITH DIFFERETN STYLES, SO I

2011 I RHINO 3D + VRAY COURSE I FBAUP I PORTO, PORTUGAL

USED TO COMBINE A LOT OF THESE SOFTWARES TOGETHER, INTERACTION 2004 - 2011 I MASTER OF ARCHITECTURE I UNIVERSIDADE LUSIADA VILA

AND VIRTUAL MODEL MAKING AND FREEHAND DRAWING.

NOVA DE FAMALICAO I FINAL CLASSIFICATION 13/20

ARCHICAD LEVEL ADVANCED

PHOTOSHOP LEVEL ADVANCED

AUTOCAD LEVEL ADVANCED

INDESIGN LEVEL ADVANCED

RHINOCEROS LEVEL INTERMEDIATE

ILLUSTRATOR LEVEL INTERMEDIATE

FAMALICAO, PORTUGAL

ARTLANTIS STUDIO LEVEL ADVANCED

WINDOWS LEVEL ADVANCED

2006 I ARCHICAD COURSE I INFOR I GAIA, PORTUGAL

COREL DRAW LEVEL ADVANCED

MAC OS LEVEL ADVANCED

2011 I MASTER’S THESIS I PRAISE OF LIGHT, THE ART OF LIGHTING IN THE

Portfolio

IS A GREAT WEAPON OF CHOICE. ALSO, I AM EXPERIENCED IN PHYSICAL

URBAN CONTEXT I FINAL CLASSIFICATION 14/20 2008 I AUTODESK REVIT BUILDING COURSE I UNIVERSIDADE LUSIADA I

EXTERNATO DELFIM FERREIRA I RIBA D’AVE I PORTUGAL I FINAL CLAS-

I AM ON THE INTERNET, OF COURSE

SIFICATION 14,4/20 COMPETITIONS AND WORKSHOPS

I HAVE UPLOADED MY MATERIAL ONLINE FROM THE BEGINNING TO CON-

2012 I “KK POROSITY” KENGO KUMA WORKSHOP I UNIVERSIDADE LUSIADA

FRONT MYSELF IN A WORLDWIDE RANGE, ALSO TO KEEP IN TOUCH WHITH

I PORTO, PORTUGAL

Self-Presentation

2001 - 2004 I SECONDARY LEVEL OF EDUCATION: NATURAL-SCIENTIFIC I

OTHER CREATIVES OF EVERY CULTURE AND COUNTRY, TO BE INSPIRED AND TO INSPIRE, AND SO TO PROFESSIONALLY GROW.

2012 I SCHOOL REHAB AND AMPLIATION COMPETITION I VELAS, S. JORGE,

arqrafaelmorais@gmail.com 2011 I BEACH REHAB COMPETITION I FIGUEIRA DA FOZ/BUARCOS, PORTUhttp://cargocollective.com/rafaelmorais

GAL I COLLABORATION WITH VASTUDIO 2011 I PUBLIC SWIMMING POOL COMPETITION I S. JOAO DA MADEIRA,

http://issuu.com/rafaelmorais http://archi-bug.blogspot.pt/ http://ad360degrees.blogspot.pt/ http://www.linkedin.com/pub/rafael-morais/45/761/51b

PORTUGAL I COLLABORATION WITH VASTUDIO 2011 I LAMP LIGHTING SOLUTIONS AWARDS COMPETITION LANGUAGES PORTUGUESE (MOTHER TONGUE)

http://www.facebook.com/rafael.morais.393

ENGLISH (ADVANCED WRITING AND SPEAKING) SPANISH (EMPIRIC KNOWLEDGE)

PERSONAL INTERESTS

FRENCH (BASIC WRITING AND SPEAKING)

PHOTOGRAPHY / ART / RENDERING / COMICS / MUSIC

DRIVING LICENSE OF CATEGORY B

1

AZORES I COLLABORATION WITH VASTUDIO


PROFESSIONAL WORKS

PROFESSIONAL WORKS

PROFESSIONAL WORKS

COMPETITION_PUBLIC SWIMMING

COMPETITION_BEACH REHAB_

POOL_S. JOAO DA MADEIRA

FIGUEIRA DA FOZ / BUARCOS

(COLLABORATION WITH OFFICE

(COLLABORATION WITH OFFICE

VASTUDIO)

VASTUDIO)

WORKSHOP

ACADEMIC WORKS

ACADEMIC WORKS

CORK NE(S)T

BUSINESS CENTER (PROJECT II)

RESIDENCE (PROJECT I)

ACADEMIC WORKS

THESIS

PUBLISHED WORKS

CREATIVE INDUSTRIE (PROJECT III)

PRAISE OF LIGHT_ THE ART OF

SHOWROOM A+D

LIGHTING IN THE URBAN CONTEXT

(COLLABORATION WITH OFFICE

COMPETITION_SCHOOL REHAB AND AMPLIATION_VELAS S. JORGE (COLLABORATION WITH OFFICE

Index

Portfolio

VASTUDIO)

2

“POROSITY” WITH KENGO KUMA

VASTUDIO)


Professional Works

como referência o alinhamento das piscinas exteriores existentes, que se pretendem integrar na proposta,

passando pela demolição dos campos de ténis existentes, respectivas bancadas e o edifício composto pela associação, cafetaria e instalações sanitárias.

O conceito de intervenção parte da “casa pátio” como elemento matriz para o desenvolvimento do projecto. Este foi reinterpretado e levado ao extremo, tendo como referência os núcleos urbanos característicos das povoações gregas e romanas, onde o pátio é um elemento espacial e social de extrema importância.

No conceito “casa pátio”, o pátio surge como elemento unificador, ordenador do espaço. A morfologia do edifício adquire a sua essência com a sua presença, não sendo possível dissociar a casa do pátio e vice versa. O pátio não surge assim como espaço sobrante da construção mas sim é o vazio que juntamente com o cheio fazem um todo.

cheios e vazios que vão permitir abrir o edifício no seu

interior e para o exterior, criando uma dinâmica planimétrica e altimétrica.

Esta abordagem permitirá uma integração do volume no terreno existente, respeitando a sua morfologia e condicionalismos, convidando os espaços verdes envolventes a interagir e invadir o volume proposto através dos negativos dos mesmos.

wich makes it not possible to separate the house from the courtyard and vice versa.

The patio does not arise as

a space leftover of the building, instead of that, is the empty along with the filled form a whole.

Formally, the intervention goes of an orthogonal module as a whole. The subtraction and addition of irregular polygons gives it an identity, creating full and empty spaces that will allow opening of the building inside and outside, creating a dynamic planimetric and altimetry.

This approach will enable an integration of existing volume on the ground, while respecting their morphology and constraints, inviting green space to interact and invade surrounding the proposed volume through the negative thereof.

3

Formalmente, a intervenção parte da um modulo ortogonal como um todo. A subtracção e adição de polígonos irregular e dar-lhe-á uma identidade própria, criando

T

The deployment of the volume of the equipment, take as reference the alignment of the existing outdoor pools, which are to be included in the proposal, through the demolition of the existing tennis courts, the respective benches and the building made by the association, café and toilets. The concept of intervention part of the “home court” as the matrix element for the development of the project. This was reinterpreted and taken to the extreme, with reference to the urban characteristic of Greek and Roman settlements, where the patio is an element wich has an extreme importance at the spatial and social context. In the concept “home court”, the court appears as a unifying element, originator of the space. The morphology of the building acquires its essence with his presence,

Public Swimming Pool_Competition_S. João da Madeira

A

A implantação do volume do equipamento proposto, toma


Professional Works

Esquema de cheiros e vazios Solids and voids diagram

Public Swimming Pool_ Competition_ S. Jo達o da Madeira

Esquema de evolu巽達o formal Formal evolution diagram

Esquema sol + fotovoltaicos Sun + photovoltaic diagram

Esquema cobertura ajardinada Garden roof diagram

4

Esquema de inverno Winter diagram

Esquema de ver達o Summer diagram


Piso -1 Basement plan

Professional Works Public Swimming Pool_Competition_S. Jo達o da Madeira

Corte A Section A

5

1 - Parking 2 - Technical area/machinery 3 - Technical gallery 4 - Compensation tanks 5 - Technical area


6

Public Swimming Pool_ Competition_ S. Jo達o da Madeira

Professional Works

Planta R/c Ground floor plan

6 - Atrium 7 - Reception 8 - Store 9 - Bar 10 - Technical Spot 11 - Bathroom

Corte B Section B

12 - Staff balneary 13 - Store room 14 - Male balneary 15 - Female balneary 16 - Dressing for children accompanied 17 - Teachers Bathhouse

18 - Teachers room 19 - Learning tank 20 - Training tank 21 - Baby tank 22 - Recreational and therapeutic tank 23 - Winter garden

24 - Health club jacuzzi/hot tub 25 - Health club sauna 26 - Medical office 27 - Intern court 28 - Play area for children 29 - Terrace

30 - viewing gallery training 31 - Personal locker room 32 - Recycling room


Planta piso 1 First floor plan

Professional Works Public Swimming Pool_Competition_S. Jo達o da Madeira

Corte C Section C

39 - Monitors room 40 - Cardio-fitness room 41 - Studios room 42 - Adit to tier of benchs 43 - Tier of benchs 44 - Administration reception

45 - Adminstration 46 - Board room 47 - Lounge 48 - Adminstration bathroom

7

33 - Female balneary - gym 34 - Male balneary - gym 35 - Monitors balneary 36 - Dry route 37 - Wet route 38 - Gym reception


8

Public Swimming Pool_ Competition_ S. Jo達o da Madeira

Professional Works

Planta de Cobertura Roof plan

49 - Exterior gym 50 - Health club - natural solarium 51 - Exterior gym


Alรงado Norte North Elevation

Public Swimming Pool_Competition_S. Joรฃo da Madeira

Alรงado Este East Elevation

Professional Works

Alรงado Oeste West Elevation

9

Alรงado Sul South Elevation


10

Public Swimming Pool_ Competition_ S. Jo達o da Madeira

Professional Works EXTERIOR VIEW


Professional Works RECEPTION VIEW

Public Swimming Pool_Competition_S. Jo達o da Madeira

POOL VIEW

11


Professional Works Beach Rehab_Competition_Figueira da Foz / Buarcos

N

Numa primeira fase interpretamos a alga como um ele-

mento marítimo e o fungo como um elemento terrestre.

A

associação destes dois elementos é o que torna possível à alga sobreviver em zona terrestre.

O facto de a praia

apresentar um extenso areal, faz com que grande parte

deste, seja subaproveitado, criando uma barreira entre a utilização da praia e o espaço público.

Com o entrelaçar da alga com o fungo, esta realidade é contrariada, tornando a distância entre o mar e a marginal, menor, potenciando o espaço antes subaproveitado, agora numa maior valia. Através de uma relação simbiótica de mutualismo propomos uma estrutura amovível de madeira, bem como a colocação de equipamentos nesta estrutura. Assim, a distância entre a marginal e o mar é encurtada aproximando as pessoas do mar, e dotando um espaço subaproveitado de valências que permitam aos utilizadores, uma maior vivência e exploração deste.

Esta estrutura em conjunto

com os diversos equipamentos e espaços de socialização propostos, fazem com que a marginal se torne mais har-

12

moniosa com o seu desenho orgânico, e interactivo com os utilizadores.

O mesmo princípio do caso dos líquenes, em que as algas são responsáveis pela fotossíntese, e por sua vez o

I

Initially we interpreted the algae as an element of the sea and fungus as an earthly element. The association of these two elements is what makes it possible to survive on earth zone.

The fact that present a long

sandy beach, makes much of this, is underused, creating a barrier between the beach and the use of public space.

With the intertwining of the alga to the fungus,

this is contradicted reality, making the distance between the sea and marginally lower, enhancing the underused space before, now a higher value.

Through a symbiotic relationship mutualism suggest a removable timber structure, and placing equipment to this structure. Thus, the distance between the marginal sea is shortened and bringing people of the sea, and providing an underused area of skills that allow users greater experience.

This structure together with the

various equipment and socialization spaces proposed

make the marginal becomes more harmonious with its organic design, and interactive with users.

The same principle as the case of lichens, algae that are responsible for the photosynthesis, and in turn the fungus absorbs moisture and provides a protective cover to the seaweed used is in the proposal.

The equipment is

responsible for providing various services to create the

fungo absorve a humidade e proporciona à alga uma capa

widest variety of functions for its users. In turn, the

responsáveis por oferecer diversos serviços de modo

devices, also play a role interactive with the user, and

protectora é utilizado na proposta.

Os equipamentos são

a criar a maior variedade possível de funções para os seus utilizadores.

Por sua vez, a estrutura em madeira, oferece a base de suporte para estes equipamentos, de-

sempenhando também um papel interactivo com os utilizadores, e com o próprio ambiente.

wooden structure, provides the base support for these the environment itself.


Esquema de pavimentação Paving diagram

Esquema de percursos pedonais Footpaths diagram

Esquema de sustentabilidade Sustainability diagram

Esquema de zoneamento Zoning diagram

Esquema de estratégia de intervenção Intervention strategy diagram

Esquema de transportes Transport diagram

Esquema de vegetação Vegetation diagram

Fase 1: Edifícios Phase 1: Buildings

Fase 1: Vias principais Phase 1: Main roads

Fase 1: Cheios e vazios Phase 1: Solids and voids

Fase 2: Deck Phase 2: Deck

Fase 2: Dunas Phase 2: Dunes

Fase 3:Equipamento . Casino Fase 3: Equipamentos Phase 3: Equipment - Casino Phase 3: Equipments

Fase 1: Acessos Phase 1: Accesses

13

Fase 1: Lugar Phase 1: Site

Beach Rehab_Competition_Figueira da Foz / Buarcos

Esquema de condicionantes Conditions diagram

Professional Works

Esquema da rede viária Road network diagram

Fase 3: Final Phase 3: Final


14

Beach Rehab_Competition_Figueira da Foz / Buarcos

2

3

Planta da intervenção Intervention plan

Professional Works


1

Professional Works

Beach Rehab_Competition_Figueira da Foz / Buarcos

15

Planta da intervenção Intervention plan


16

Beach Rehab_Competition_Figueira da Foz / Buarcos

Professional Works

1

Planta da praรงa Plaza plan 1 - Showroom 2 - Terrace

3 - Driveway 4 - Tram

5 - Bicycle path 6 - Skate-Park


2 Professional Works Beach Rehab_Competition_Figueira da Foz / Buarcos 17

Planta Caras Direitas Caras Direitas plan 1 - Market 2 - Access to underground parking

3 - Pedestrian access to underground parking 4 - Cafe

5 - Recycling center 6 - Theater


18

Beach Rehab_Competition_Figueira da Foz / Buarcos

Professional Works

3

Planta de Buarcos Buarcos plan 1 - Bus stop 2 - Tram 3 - Bicycle path 4 - Surf school

5 - First aid and warehouse 6 - Bathing support for users with a disability 7 - Balneary 8 - Warehouse

9 - Bathroom 10 - Cafe 11 - Pool


Perfil da rua Street section

Beach Rehab_Competition_Figueira da Foz / Buarcos

Perfil da rua e do bar Street and bar section

Professional Works

Perfil do apoio de praia Beach support section

19

Perfil da fonte Fountain section


20

Beach Rehab_Competition_Figueira da Foz / Buarcos SHOWROOM VIEW CHILDREN PARK VIEW

Professional Works


Professional Works

CASINO VIEW

Beach Rehab_Competition_Figueira da Foz / Buarcos

SKATE-PARK VIEW

21


Professional Works School Rehab and Ampliation_Competition_Velas S.Jorge

O

O território localiza-se no concelho de Velas, da Ilha de São Jorge do grupo central do arquipélago dos Açores. É caracterizado por elementos montanhosos cuja maior elevação é o Pico da Esperança. A paisagem é dominada por campos agrícolas reticulados e terrenos de pasto.

Assim sendo, da observação destes elementos deu-se uma primeira forma estruturante à intervenção, ou seja, a inter-relação entre elemento vertical ( os Picos e os relevos orograficos) que parecem sugerir uma forma ao edifício numa sucessão de coberturas e águas inclinadas, expostas e interactivas de maneira sustentável com os

elementos atmosféricos, e a parte numa cota mais baixa

(o planalto) que funciona de plataforma para a implantação do edifício. Nas zonas baixas da ilha, a divisão das propriedades agrí-

22

colas e a separação das culturas levaram ao recorte

do território em socalcos geométricos delineados por muros de pedra, e arbustos.

Este tipo de cultivo sugere

portanto um padrão que vem aplicado na composição do espaço exterior do projecto, numa sucessão de formas geométricas, que definem a alternância entre espaços

T

The territory is located in Velas, Sao Jorge Island in the central group of the Azores archipelago. It is

characterized by mountainous elements whose highest elevation is the

Pico da Esperança. The landscape is

dominated by agricultural fields and pasture land.

Through the observation of these elements we made a first action to its structure, that is, the interrelationship between the vertical member (Peaks reliefs and orographic) that would suggest a building to form a succession of sloping roofs, exposed in a sustainable way and interactive with the atmospheric elements, and in the lower level (the plateau) that functions as a platform for the deployment of the building. In the lowlands of the island, the division of farms and the separation of cultures led to the division of the

region delineated by geometric terraced stone walls, and shrubs.

This type of culture therefore suggests a

pattern that is applied to the composition of the outer

space of the project, a series of geometric shapes that

define the alternation between lawns and wooded areas, paved areas, places of residence and recreation.

relvados e arborizados, espaços pavimentados, espaços

The combination of urban arrays consisting of square and rectangular forms of the split lines of coverage,

A combinação das matrizes urbanas, constituídas de for-

ing road system, give life and shape the implementation

de estadia e espaços de recreio.

mas quadradas e rectangulares subdivididas das linhas

das coberturas, encaixadas numa malha urbana identifi-

cativa do sistema viário da envolvente, dão vida e forma à implantação do edifício

engaged in identifying the urban fabric of the surroundof the building


Evolução formal Formal Evolution

Professional Works

Esquema de integração Integration Diagram

School Rehab and Ampliation_Competition_Velas S. Jorge

Esquema conceptual Conceptual Diagram

23

Esquema Programático Program Diagram


Planta de implantação Integration plan

24

School Rehab and Ampliation_Competition_Velas S.Jorge

Professional Works


Professional Works

1 - Lobby kindergarten 2 - Reception kindergarten 3 - Storage 4 - Activity room 5 - Children toilets 6 - Cleaning supplies storage 7 - Educational material storage 8 - Support room and storage for school milk 9 - Circulation area 10 - Outdoor recreational area 11 - Covered outdoor atrium 12 - Multipurpose room 13 - Atrium 14 - Reception 15 - Classroom 16 - Children/Adult toilets 17 - Storage 18 - Cleaning supplies storage 19 - Educational material storage 20 - Circulation area

21 - Outdoor recreational area 22 - Covered outdoor atrium 23 - Atrium 24 - Auditorium 25 - Backstage 26 - Technical material storage 27 - Audiovisual storage 28 - Projection room 29 - Kitchen 30 - Thawing and preparing food 31 - Bursar / Refrigeration 32 - Self-service 33 - Dirty cup 34 - Clean cup 35 - Compacting waste separation 36 - Containerisation and packaging waste 37 - Reception and control products

38 - Laundry 39 - Dressroom and toilets 40 - Refectory 41 - Storage 42 - Socializing students room 43 - Socializing teachers room 44 - Special education 45 - Relaxation room 46 - Psychology office 47 - Social / medical office 48 - Pantry 49 - Cleaning supplies storage 50 - Storage 51 - Balneary and toilets 52 - Changing room 53 - Special education office 54 - Continued support room 55 - Buffet / storage 56 - Stationery / storage 57 - Students association 58 - Maintenance workshop

59 - Cleaning supplies storage 60 - Children / adult toilets 61 - Lockers 62 - Normal classroom 63 - Audiovisual storage 64 - Exterior material storage 65 - Physical / chemical storage 66 - Physical / chemical laboratory 67 - Preparation room 68 - Reagents storage 69 -Biology / geology / natural sciences laboratory 70 - Biology / geology / natural sciences storage 71 - Educational material storage 72 - Technology education room 73 - Storage

74 - Equipment for water heating room 75 - First aid room 76 - Control station 77 - Balneary/toilets teachers 78 - Teachers room 79 - Sports material storage 80 - Balneary/toilets disabled students 81 - Cleaning supplies storage 82 - Balneary/toilets students 83 - Referee room 84 - Storage 85 - Gym 86 - Circulation area 87 - Outdoor recreational area

School Rehab and Ampliation_Competition_Velas S. Jorge

Planta R/c Ground floor plan

25

Alรงado Sul South elevation

Alรงado Este East elevation

Alรงado Oeste West elevation

Alรงado Norte North elevation


Professional Works School Rehab and Ampliation_Competition_Velas S.Jorge 26

First floor plan 88 - President of the assembly office 89 - Parents association office 90 - Service parents office 91 - Executive board president room 92 - Vice-president room 93 - Class directors room 94 - Meeting room 95 - Department coordinators room 96 - Storage 97 - Reprography 98 - Secretary 99 - School management services office 100 - File room 101 - Safe 102 - Media library 103 - Library

Corte A Section A

Corte B Section B

Corte C Section C

Corte D Section D

104 - Computers 105 - Newspaper library 106 - Receiving area 107 - Dvd and Cd library 108 109 - Normal classroom 110 - Computers room 111 - Music room 112 - History / Geography storage 113 - Languages storage 114 - Storage 115 - Small groups room 116 - Mathematics storage 117 - Educational material storage 118 - Clean supplies storage 119 - Toilets children / adults / disabled 120 - Technological and visual education room

121 - Audiovisual storage 122 - Group activities room 123 - Draw room 124 - Storage 125 - Sports room ( theorical) 126 - Benches 127 - Circulation area 128 - Outdoor recreational pre-school area 129 - Outdoor recreational school area 130 - Outdoor recreational secundary school area


Professional Works

OUTDOOR RECREATION VIEW

School Rehab and Ampliation_Competition_Velas S. Jorge

OUTDOOR RECREATION VIEW

27


28

School Rehab and Ampliation_Competition_Velas S.Jorge

Professional Works ENTRANCE SCHOOL VIEW

ATRIUM VIEW


Professional Works

29

CLASSROOM VIEW

School Rehab and Ampliation_Competition_Velas S. Jorge CORRIDOR VIEW


Workshop_Porosity with Kengo Kuma

A

Ao longo de 3 dias, o desafio proposto consistia em desenvolver uma proposta para um espaço no “campus” da Universidade Lusíada do Porto, utilizando como material de eleição a cortiça, proposta essas que ao longo da

Cork Ne(s)t

sua génese foi alvo de apreciações pontuais por parte do

Arquitecto Kengo Kuma. Após um estudo das propriedades da cortiça, costatouse que esta é um material 100% natural, é um material que tem memória e um elevado nível de elasticidade.O lo-

cal de intervenção foi um antigo reservatório de água em que o objectivo seria a criação de um espaço de dormir para duas pessoas.

O conceito utilizado como para a intervenção, surgiu

através de uma analogia com o método de fazer cestos,

30

um método tradicional

100% natural (re)criando deste

modo um padrão, a partir da textura da cortiça.

A

cortiça foi assim utilizada como um tecido que cai

sobre o volume, acentuando a intensidade dos percursos a seguir com diferentes transparências

Deste modo foi criada uma pele que envolveria todo o

O

Over 3 days, the challenge proposed was to develop a proposal for a space in the “campus” of the University of Lusíada Porto, using cork as material, proposed that these throughout its genesis was the target of occasional assessments by the architect Kengo Kuma. After a study of the properties of the cork, we saw that this is a 100% natural material which has memory and a high level of elasticity.The site of the interven-

tion was an old water reservatory in which the objective would be to create a sleeping space for two people.

The concept as used for the intervention, emerged from an analogy with the method for making baskets, a 100% natural traditional method thereby (re)creating a pattern from the texture of cork. Cork was thus used as a fabric that falls on the volume, accentuating the intensity of routes to follow with different transparencies

Thus was created a skin that involve around the reservatory using cork as a bonding material between the reservatory rock and concrete using cork as a cluster of

reservatório utilizando a cortiça como um material de

several pieces, increasing its strength by connecting the

lizando a cortiça como um aglomerado de várias peças,

Inside the reservatory the cork was used to create different levels, by a method of elastic slabs similar to a nest. By differentiating the spacing between the tracks, thus creating a diversity of sensations and standards.

ligação entre as rochas do reservatório e o betão, utireforçando a sua força através da ligação das faixas

de cortiça criando uma textura com um padrão diversificado.

No interior do reservatório utilizou-se a cortiça para a criação dos diferentes níveis, através de um método de lajes elásticas à semelhança de um ninho. Através da diferenciação do espaçamento entre as faixas, cria-se assim uma diversidade de sensações e de padrões.

bands creating a cork texture with a diverse pattern.


Workshop_Porosity with Kengo Kuma

Esquema com detalhe da pele e do degrau Skin and Step Detail Diagram

Cork Ne(s)t

Esquema conceptual Conceptual Diagram

31

Esquema de circulação Circulation Diagram


Workshop_Porosity with Kengo Kuma 32

Cork Ne(s)t

Planta de implantação Integration plan

Planta R/c Ground floor plan


Workshop_Porosity with Kengo Kuma

Planta piso 1 e 2 First and Second floor

Cork Ne(s)t 33

Corte Section


34

Cork Ne(s)t

Workshop_Porosity with Kengo Kuma EXTERIOR VIEW EXTERIOR VIEW


INSIDE VIEW

Workshop_Porosity with Kengo Kuma

Cork Ne(s)t

35


Academic Works_Project III Creative Industrie_Old Factory Rehab

A

A reabilitação da fábrica dos botões foi feita com o intuito de criar neste espaço, uma incubadora de industrias criativas. Consoante as especificidades de cada espaço dadas as suas funções, diferentes atmosferas foram criadas, fazendo com que cada espaço fosse provido de um ambiente próprio e personalizado, que possa estimular a criatividade, e presentear que visita os espaços,

the visitors with different sensations building strong

com diferentes sensações constuindo nos utilizadores

emotions on users that are different from space to

Portanto, os instrumentos utilizados na construção dos ambientes e das atmosferas foram os materiais aplicados, as texturas e a iluminação, com especial tónica neste elemento, dado que este tem a capacidade de fazer a

environments and atmospheres were applied with materi-

emoções fortes, diferentes de espaço para espaço.

metamorfose de um espaço na passagem do dia para a

noite, fazendo com que as próprias formas tenham uma

36

T

The rehabilitation of the Buttons factory was made in order to create for this space, an incubator for creative industries. Depending on the specifics of each space given their roles, different atmospheres were created, making each space provided with a suitable and personalized environment, that can stimulate creativity, gifting

percepção diferente na presença ou ausência de luz.

Relativamente ao espaço de enquadramento, este foi

pensado de forma a ser um elemento de excepção não só na sua planificação bem como da malha estruturadora da cidade.

Assim sendo, para a formalização do espaço, partiu-se do princípio do botão, fazendo uma analogia com a fábrica dos botões, para a partir da forma geométrica deste, nascerem zonas de carácter especial. Estas zonas são providas de uma atmosfera e de uma vivência

muito próprias e particulares, cada uma contendo a sua função.

A partir destas zonas, o parque é desenhado

de forma orgânica, através de feixes de iluminação, que

harmoniosamente circulam pelo local, definindo espaços.

space.

Therefore, the tools used in the construction of

als, textures and lighting, with special emphasis on this

element, as this has the ability to make the metamorphosis of an area in transition from day to night, making

that the actual shapes have a different perception in the presence or absence of light.

For the space environ-

ment, it was thought to be an exception element not only in the planning and structuring of the city’s plan.

Thus,

for the formalization of space, departed from the principle of the button, making an analogy with the

Buttons

factory, from its geometry, born on particular areas.

These areas are provided with an atmosphere and an experience of its own and individuals, each containing its function. From these areas, the park is designed organically, through illumination beam, which seamlessly roam the site, defining spaces.


Academic Works_Project III

37

Planta 1ยบ Piso First floor plan

Creative Industrie_Old Factory Rehab

Planta R/c Ground floor plan


Creative Industrie_Old Factory Rehab

Academic Works_Project III

Alรงado Norte North Elevation

Alรงado Este East Elevation

Alรงado Sudoeste South-West Elevation

38

Corte A Section A

Corte B Section B


EXTERIOR SHOWROOM VIEW BY DAY

Academic Works_Project III

Creative Industrie_Old Factory Rehab

EXTERIOR SHOWROOM VIEW BY NIGHT

39


40

Creative Industrie_Old Factory Rehab

EXTERIOR PARK VIEW BY DAY

EXTERIOR PARK VIEW BY NIGHT

Academic Works_Project III


COURT VIEW BY DAY

Academic Works_Project III

Creative Industrie_Old Factory Rehab

41

COURT VIEW BY NIGHT


42

Creative Industrie_ Old Factory Rehab

Academic Works_Project III RESTAURANT VIEW BY DAY

RESTAURANT VIEW BY NIGHT


famalicão, proporcionando uma fantástica vista da zona de intervenção.

O projecto do Centro Empresarial, é definido por uma

planta peculiar herdada da geometria de alguns mosaicos romanos, em que mediante dois poligonos como o quad-

rado e o losango, permite criar uma superfície contínua sobre um plano.

Este raciocínio e linguagem foram estuMansilla e Tuñon, com o projecto MUSAC tomado como referência. Cada sala de forma quebrada constrói um espaço diferdados nos arquitectos

enciado mas contínuo que se abrem para outras salas e transversais.

O dinamismo que a forma contém encontra-

se em sintonia com o ritmo que os vãos promovem à fachada.

No exterior o espaço público adquire forma côncava. no seu interior, uma grande superfície de espaços contínuos embora distintos, salpicados de espaços e de grandes clarabóias, dão forma a um sistema expressivo que mostra o interesse que partilha a arquitectura e a arte, a manifestação contemporânea do visível e do

permanente, do semelhante e do distinto, do universal e do transitório.

expressive system that shows the interest that sharing

architecture and art, the contemporary manifestation of the visible and permanent, and the similar the distinct, universal and transient.

43

pátios, proporcionando vistas, diagonais, longitudinais e

Business Center

um local de referência para os habitantes da cidade de

T

The place set for the proposal is located in Vila Nova de Famalicão, near the Sinçães park. This place is abandoned, in a state of great degradation and expectant. The Sinçães park presents itself as a reference site for the townspeople of Famalicão, providing a fantastic view of the area of intervention. The Business Centre project is defined by a peculiar geometry plan inherited some Roman mosaics, where by two polygons as the square and lozenge, lets you create a continuous surface on a plane. This reasoning and language were studied in architects Mansilla and Tunon, with the project MUSAC taken as reference. Each room in a broken build a differentiated space continuum but that open to other rooms and patios, providing views, diagonal, longitudinal and transverse. The dynamism that contains the form is in tune with the rhythm that promote spans the facade. Outside the public sphere acquires a concave shape. inside, a large area of continuous spaces while distinct, dotted with skylights and large spaces, forming an

Academic Works_Project II

O

O local definido para a proposta situa-se em Vila Nova de Famalicão, junto ao parque de Sinçães. Este encontra-se abandonado, num estado expectante e de grande degradação. O parque de Sinçães apresenta-se como


Academic Works_Project II 44

Business Center

Planta R/c Ground floor plan

Planta 1ยบ piso First floor plan


Alรงado posterior Back elevation

Academic Works_Project II

Alรงado Frontal Front elevation

Business Center

Alรงado lateral direito Right side elevation

45

Alรงado lateral esquerdo Left side elevation


46

Business Center WORKROOM VIEW POOL VIEW

Academic Works_Project II


Academic Works_Project II

CORRIDOR VIEW

EXTERIOR PLAZA VIEW

Business Center

47


Academic Works_Project I Residence

O

O local selecionado para a proposta de habitação multifamilar, situa-se em Famalicão, numa zona de transição entre edifícios de elevada escala, e edifícios de menor escala, nomeadamente bairros. A forma do edifício nasce

do alinhamento das estradas que estão na envolvente do terreno, promovendo continuidade e paralelismo com estas.

De seguida o volume criado foi seccionado de modo Deste modo assegura-se

a promover um maior dinamismo.

48

uma transição mais equilibrada da escala da cidade e do bairro.

Na face do edifício que se encotra voltada para

o bairro, foram adicionados volumes, reproduzindo assim uma analogia para com as casas do bairro, ligando.se a uma entidade maior, a cidade.

Os volumes adicionados

possuem um carácter diferente do resto do edifício pelo facto de estes serem apartamentos duplex.

Para além disso, o material que reveste estes volumes, é também ele diferente sendo o material, a chapa ondulada, de

modo a acentuar o contraste destes volumes para com o resto dos apartamentos em betão aparente.

No es-

paço de enquadramento foram providenciadas zonas de

lazer como quiosques, jardins e pátios para aumentar a convivência.

O acesso às habitações é feito por galeria

possibilitando uma maior interacção entre os habitantes.

A convivência e a interacção entre os habitantes são cruciais para a criação de um ambiente saudável. A comunicação vertical existente é uma constante a partir dos acessos tal como das pontes de acesso às habitações,

possibilitando assim vistas transversais de piso para piso.

T

The site selected for the proposed residence is located in Famalicão, in a transition zone between high scale buildings, and buildings of a smaller scale, in particular neighborhoods. The shape of the building rises alignment of surrounding roads that are on the ground, providing continuity and parallel therewith. Then the volume was sectioned in order to promote greater dynamism. This ensures a transition more balanced between the scale of the city and the neighborhood. In the face of the building which is faced to neighborhood, volumes were added, thus reproducing an analogy to the houses of the neighborhood, connecting to a larger entity, the city. The added volumes have a different character from the rest of the building by the fact that they are duplex apartments. In addition, the material that coats these

volumes, it is also a different material, the corrugated sheet so as to accentuate the contrast of these vol-

umes to the rest of the apartments in concrete. In the

surroundings it were provided recreational areas such as kiosks, gardens and patios to enhance coexistence.

Access to housing is done by gallery enabling greater interaction among residents. The coexistence and interaction between the inhabitants are crucial to create a healthy environment.

The existing vertical communication

is a constant hits from the bridges as access to hous-

ing, thus enabling cross-sectional views from floor to floor.


Secções nos volumes Volum cuts

Desfragmentação Defragmentation

Residence

Eixos de Força Force Axes

Academic Works_Project I

Local Site

49

Adição de Volumes Volum adiction

Forma Final Final Shape


Academic Works_Project I

Planta 1ยบ Piso First floor plan

Planta 2ยบ Piso Second floor plan

Planta 3ยบ Piso Third floor plan

50

Residence

Planta R/c Ground floor plan


Alรงado Norte North Elevation

Academic Works_Project I

Alรงado Sul South elevation

Residence

Alรงado Oeste West elevation

51

Alรงado Este East elevation


52

Residence

ADIT VIEW

PLAZA VIEW

Academic Works_Project I


Academic Works_Project I

APARTMENT VIEW

APARTMENT VIEW

Residence

53


N

No desenvolvimento deste documento abordou-se a

Academic Works

temática da iluminação artificial no contexto urbano.

Este é um tema que tem ganho um particular destaque nos últimos anos dado que pretende-se viver cada vez mais a cidade. Os habitantes pretendem gozar as características que as cidades têm de dia, à noite. Para elaborar o nosso estudo estudamos a relação que a iluminação tem com a estrutura urbana, iluminação que tanto pode ser natural como artificial. Como tal tivemos de compreender as múltiplas funções que a luz desem-

and architecture and other arts, like painting, theater

Os princípios apreendidos na relação das múltiplas funções da luz com a cidade, permitiu-nos aprofundar o con-

The principles learned in the relationship of the multiple functions of light with the city, allowed us to deepen

hecimento sobre a dicotomia existente entre a estrutura

Thesis

the multiple roles that light plays not only in the city

penha não só na cidade e na arquitectura como noutras artes, como a pintura, o teatro ou o cinema.

urbana diurna e nocturna.

Deste modo, percebemos que

a noite tem deixado de ser um entrave ao propósito de as cidades apenas serem vividas de dia, dado que cada

vez mais se incentivam actividades que possam prolongar o tempo de apreciarmos a arquitectura, o convívio e a

interacção entre pessoas, criando por vezes atmosferas únicas.

Procedemos também ao estudo da iluminação de edifícios,

54

I

In developing this document addressed the issue of artificial lighting in urban areas. This is a topic that has gained a particular attention in recent years as it seeks to live increasingly the city. The residents want to enjoy the features that cities have day, evening. To compile our study we studied the relationship that enlightenment has with the urban structure, lighting can be both natural and artificial. As such we understand

e de que forma estes podem se manifestar como parte

integrante do projecto global de iluminação da cidade, bem como de que forma podemos humanizar a cidade

através da luz, e para compreendermos este fenómeno

Lyon, e do seu plano de iluminação, bem como da associação LUCI, criada com a intenção de fazer da luz um instrumento para o desenvolvimento económico e social das cidades. No estudo da humanização da cidade, investigamos qual o papel que os espaços industriais abandonados podem ter. Através de pesquisa efectuada tentamos demonstrar e procedemos ao estudo da cidade de

or cinema.

our understanding of the dichotomy between the urban structure during day and night.

Thus, we find that night

has ceased to be an obstacle to the purpose of the

towns only be experienced in the day, given that increasingly encourages activities which may prolong the time to appreciate the architecture, the coexistence and

interaction between people, creating sometimes unique atmospheres.

We also proceed to study the lighting of buildings, and how these may manifest as an integral part of the overall project of lighting the city as well as how we can humanize the city by the light, and to understand this

Lyon, and his LUCI, created with the intention

phenomenon we proceeded to study the lighting plan and the

of making light of an instrument for economic and social development of cities. In the study of the humanization

of the city, which investigated the role that brownfield sites can have.

Through research carried out to demonstrate and try

to explain that when the network is designed lighting of

explicar que quando é projectada a rede de iluminação

a city, it is increasingly designed not only functionally,

de forma funcional, mas para ter um papel dinâmico,

their inhabitants enjoy other types of activities.

de uma cidade, esta é cada vez mais pensada não apenas empreendedor e que possa fazer com que os seus habitantes desfrutem de outro tipo de actividades.

Os resultados obtidos foram os pretendidos e os arquitectos e obras referenciadas foram várias, quer a nível prático, quer a nível teórico, e destas experiencias e conhecimentos surgiram as resoluções dos problemas. Assim, questões como de que modo manipular a luz, qual a sua importância ou como o exprimir, foram respondidas e apreendidas.

but have a dynamic role, and entrepreneur who can make

The results were as expected and architects and several works have been referenced, either in practical or theoretical level, these experiences and knowledge and the resolutions of the problems arose. Thus, issues such as how to manipulate light, what is its significance or how to express them, were seized and answered.


Published Work Collaboration with Office VAstudio

ARQUITECTURA & CONSTRUÇÃO Nº69 I October/ November

55

ATTITUDE Nº42 I November/December



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.