CampaignManager Case

Page 1

the Campaign Manager story


2011 IMI Mobile approached to redesign a product called “DaVinci Campaign Manager�


“DaVinci Campaign Manager� is a product used by telecom operators themselves and also provide it as a service to their customers to create, manage, monitor and gain insight of voice, text, and email marketing campaigns.


pain-points

1

Diversity of very complex to very simple processes that the product is used for

2

Diversity of user roles using the product

3

Unclear mental model amongst users and even developers

4

Uncontrolled and unorganized development efforts

5

Loss of clients due to the bad user experience

6

Lack of one single person who understood the product completely

7

Too many steps (at times undoable) for some tasks

8

Lack of overview during compels tasks


1

In a short time understand the entire product including the target users and tasks

2

Engage the key stakeholders in the process

3

Showing results quickly to get buy in from senior management to continue the project

4

Designing an experience with a simple mental model but allows complex tasks to be performed

5

Allowing new users to easily learn complex processes

challenges


stage 1: understanding and insight

1

Session with key stakeholders explaining UXD as a process, explaining the process that we will go through, their roles, understanding their expectations and constraints, and finally some rough time expectations

2

Sessions with key stakeholders charting the existing product to understand the product from a cumulative perspective. Took this opportunity to brainstorm as well

3

Sessions to identifying and going through the key tasks of the product in details with the product manager and developer

4

Quick user testing key tasks (in the presence of developer and product manager) with 5 users with different roles and gain insight


a mountain of screens and flows

current product review



their understanding of the product

group perception session


stage 2: discovery, scope and goals

1

Looked at some competitor products and how the existing product is being used at client sites and the difficulties they are facing

2

From all the sessions, user tests, and business objectives, defined the key goals and scope of the project keeping in mind long and short term in collaboration of the product manager


reorganizing the pieces

group brainstorming session


key strategy considerations

1

Better and clearer mental model

2

More aesthetically pleasing

3

Always provide context

4

More forgiveness and lesser perceived step

5

More responsive

6

7

Hide what is not needed for a certain user in a certain context Include personalization for users as well as customers


1

2

stage 3: interaction design

Starting with the overall mental model and information architecture Moved first to more complex processes and either simplifying them or making the process understandable

3

Each major tasks were taken and several iterations of wire framing was done

4

At key points, other major stakeholders, developers and users were also involved to get feedback


Add Target Group

Add Target Group Select Existing

Name:

Source

Create New

Select Existing

Use Query Builder

Daily Subscribers with no balance

Mobile

Type:

Mobile, Email, Parameterized

File Upload, FTP, API Call, SQL Query

File Upload

Source

Browse

Load

Name:

Immediate

Daily Subscribers with no balance

Use Query Builder

Mobile

Type:

Data Store >>

Store

Available Data Stores

On Demand, Immediate

Create New

> <

Selected data stores

<<

Enable Event Update

URL Call:

Load

http://usr-store-location

Location:

FTP

Directory:

D:\tg_june\

Update every:

00

Append

Append, Override

Override

Append, Override

FTP, SQL Query, API Call, Source

Enable Batch Update

Start Time:

Option:

Option:

Option:

Override

Cancel

Add

Use Current Time

30 Hours

24 Hrs

On Demand

Hrs Mins

Calendar

Select Existing Create New

Daily

Cancel

Add

understanding the details as you go

initial interaction design


Powered by:

DaVinci Campaign Manger: Lite Campaigns

Repositories

Custom filter set – P&L, OBIS ID, Campaign

List

Thumbnail

Analytics

Powered by:

DaVinci Campaign Manger: Lite

Logged in as: Rajib Ghosh | Log out | Settings

Campaigns

Repositories

Create Campaign

What are you looking for?

Create Folder

2 4

Select and: Move | Delete |

-

Name

Type

Channel

Created on

Start date

End date

Awaiting

Assigned to

New years

Folder

Multiple

30.12.2011

30.12.2011

01.12.2012 Draft

1

1

Pre event

SMS

SMS

30.12.2011

30.12.2011

30.12.2011 Draft

-

-

New year eve

Interactive

Phone

31.12.2011

31.12.2011

31.12.2012 Draft

-

-

New year morning

+

+ +

Status

Thumbnail

Analytics

Search

Create Campaign

What are you looking for?

Create Folder

1

MMS

MMS

01.12.2011

01.12.2011

01.12.2011 Draft

Assets

Praveen Ar...

Interactive

Phone

01.12.2011

01.12.2011

01.12.2011 Inactive

-

-

New years

Folder

Multimple

30.12.2011

30.12.2011

01.12.2012 Inactive

1

1

Holi

Interactive

Email

01.12.2011

01.12.2011

01.12.2011 Inactive

-

-

Holi

Interactive

SMS

01.12.2011

01.12.2011

01.12.2011 Active

-

-

Holi

Interactive

Voice

01.12.2011

01.12.2011

01.12.2011 Stopped

-

-

Holi

Interactive

Phone

01.12.2011

01.12.2011

01.12.2011 Draft

-

-

New years

Folder

Multiple

30.12.2011

30.12.2011

01.12.2012 Draft

1

1

1

New years

Folder

SMS

30.12.2011

30.12.2011

01.12.2012 Active

1

1

1

New years

Interactive

Email

30.12.2011

30.12.2011

01.12.2012 Complete -

-

-

Name

Type

Channel

Created on

Start date

End date

New years

< Previous 15 | Next 15 > + +

Status

Awaiting

Assigned to

Help | FAQs

5

6

P&L

SME

ORBIS ID

ORBIS ID 3

Multiple

30.12.2011

30.12.2011

01.12.2012 Draft

1

1

SMS

SMS

30.12.2011

30.12.2011

30.12.2011 Draft

-

-

New year eve

Interactive

Phone

31.12.2011

31.12.2011

31.12.2012 Draft

-

-

New year morning

MMS

MMS

01.12.2011

01.12.2011

01.12.2011 Draft

Assets

Praveen Ar...

Export | Share | More Report

Holi

Interactive

Phone

01.12.2011

01.12.2011

01.12.2011 Inactive

-

-

Title

New years

Folder

Multimple

30.12.2011

30.12.2011

01.12.2012 Inactive

1

1

Holi

Interactive

Email

01.12.2011

01.12.2011

01.12.2011 Inactive

-

-

Holi

Interactive

SMS

01.12.2011

01.12.2011

01.12.2011 Active

-

-

Holi

Interactive

Voice

01.12.2011

01.12.2011

01.12.2011 Stopped

-

-

Holi

Interactive

Phone

01.12.2011

01.12.2011

01.12.2011 Draft

-

-

New years

Folder

Multiple

30.12.2011

30.12.2011

01.12.2012 Draft

1

1

1

New years

Folder

SMS

30.12.2011

30.12.2011

01.12.2012 Active

1

1

1

New years

Interactive

Email

30.12.2011

30.12.2011

01.12.2012 Complete -

-

List

+ +

-

Channel

Created on

Start date

End date

Awaiting

Assigned to

Folder

Multiple

30.12.2011

30.12.2011

01.12.2012 Draft

1

1

Pre event

SMS

SMS

30.12.2011

30.12.2011

30.12.2011 Draft

-

-

New year eve

1

Interactive

Phone

31.12.2011

31.12.2011

31.12.2012 Draft

-

-

Target not defined yet NewBase year morning

MMS

MMS

01.12.2011

01.12.2011

01.12.2011 Draft

Assets

Praveen Ar...

You need to define a Target Base Holi before you can run a campaign.

Interactive

Phone

01.12.2011

01.12.2011

01.12.2011 Inactive

-

-

Folder

Multimple

30.12.2011

30.12.2011

01.12.2012 Inactive

1

1

Interactive

Email

01.12.2011

01.12.2011

01.12.2011 Inactive

-

-

Holi

Interactive

SMS

01.12.2011

01.12.2011

01.12.2011 Active

-

-

Holi

Interactive

Voice

01.12.2011

01.12.2011

01.12.2011 Stopped Rajib- Ghosh

Holi

Interactive

Phone

01.12.2011

01.12.2011

01.12.2011 Draft

New years

Folder

Multiple

30.12.2011

30.12.2011

01.12.2012 Draft

1

1

1

New years

Folder

SMS

30.12.2011

30.12.2011

01.12.2012 Active

1

1

1

New years

Interactive

Email

30.12.2011

30.12.2011

01.12.2012 Complete -

-

1

-

Please provide 3 images with the specification I sent by email

Name

Type

Channel

Created on

Start date

End date

Awaiting

Assigned to

New years

Folder

Multiple

30.12.2011

30.12.2011

01.12.2012 Draft

1

1

Pre event

SMS

SMS

30.12.2011

30.12.2011

30.12.2011 Draft

-

-

New year eve

Interactive

Phone

-

-

1

31.12.2011

31.12.2011

31.12.2012 Draft

Name: Holi MMS Start date: Interactive End date:Phone Valid till: Campaign Group Multimple Created by:

01.12.2011

01.12.2011

Origination address: 01.12.2011 Draft Email Assets

Praveen Ar...

01.12.2011

01.12.2011

-

-

30.12.2011

30.12.2011

Data encoding scheme: 01.12.2011 Inactive Routed: Throttle rate:

01.12.2012 Inactive

1

1

Holi

Interactive

Email

01.12.2011

01.12.2011

01.12.2011 Inactive

-

-

Holi

Interactive Edit

SMS

01.12.2011

01.12.2011 Edit

01.12.2011 Active

-

-

Name: Holi User numbers: DND: Holi Black listed: Type: New years + rate: Success

Interactive

01.12.2011

01.12.2011

Comment: 01.12.2011 Stopped

-

-

Target Base information

+

Edit .

Schedule information

MMS

.

Interactive

Message information Type: Email Voice Template: 12345 Message Phone content:

Edit .

.

Advanced information

Comments and alerts Alert:

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29 4

Pay and Go

Consumer

Thumbnail

My To-dos

ORBIS ID 3 Xmas Panto

Analytics

Search

What are you looking for?

Create Campaign

Create Folder

The base to use for the Holi c...

Title

Campign ID: ACD3457D

Summary

Instruction comes here based on user action

Type

Name: Holi New year morning ID: 12345 Holi Created on: Type: New years Channel: + Created by:

12

Add a note

New years

Basic information

11

1

Help | FAQs

Status

10

My Notes

Name

New years + Click on this row for options to define a Target Base. Holi

9

1

Instruction comes here based on user action

Status

8

32 campaigns

Folder

-

7

Add criteria

< Previous 15 | Next 15 > Instruction comes here based on user action

4

Pre event 1

+

3

Custom filter set – P&L, OBIS ID, Campaign

Campaign

Select and: Move | Delete |

Holi

My Alerts

Repositories

April 4, 2011 - April 11, 2011

Custom filter set – P&L, OBIS ID, Campaign

List

Logged in as: Rajib Ghosh | Log out | Settings

Campaigns

April 4, 2011 - April 11, 2011 Search

Powered by:

DaVinci Campaign Manger: Lite

Logged in as: Rajib Ghosh | Log out | Settings

Edit .

1

Edit .

01.12.2011

01.12.2011

01.12.2011 Draft

-

-

Campaign Group

Multiple

30.12.2011

30.12.2011

01.12.2012 Draft

1

1

1

New years

Campaign Group

SMS

30.12.2011

30.12.2011

01.12.2012 Active

1

1

1

New years

Interactive

Move | Test | Activate | 30.12.2011 Deactivate | Start | PauseComplete | Stop | Edit Email 30.12.2011 01.12.2012 - | Delete - | View Analytics

View Report

Summary

View Report

Help | FAQs


Powered by:

DaVinci Campaign Manger Dashboard

Campaigns

Resources

Reports

Dashboard

What are you looking for?

Dashboard March 1, 2011 - March 31, 2011

Powered by:

DaVinci Campaign Manger

Logged in as: Rajib Ghosh | Log out Mode: Basic | Settings

My Favorites

Campaigns

Resources

Reports

Dashboard

What are you looking for?

Campaigns March 1, 2011 - March 31, 2011

Powered by:

DaVinci Campaign Manger

Logged in as: Rajib Ghosh | Log out Mode: Basic | Settings

Campaigns

Logged in as: Rajib Ghosh | Log out Mode: Basic | Settings

Resources

Reports

What are you looking for?

Campaigns March 1, 2011 - March 31, 2011

Add to favorites

Add to favorites

Create Interactive Campaign

Color coded error, notification, confirmation messages come here. (Auto-dismiss on a user action. Provide 1 Undo step here.)

Create SMS Campaign Create Email Template

Campaign: Holi

Share (2) | Export

Create Campaign

My Alerts

Title

-

My To-dos Summary

+

View Report

Title

Title + +

My Notes

Create Group

Hide Hide draft draft campaigns campaigns Hide Hide past past campaign campaign

Name

Type

Channel

Created on

Start date

End date

New years

Campaign Group

Multiple

30.12.2011

30.12.2011

Pre event

SMS

SMS

30.12.2011

New year eve

Interactive

Phone

New year morning

MMS

MMS

Status

Awaiting

Assigned to

01.12.2012 Draft

1

1

30.12.2011

30.12.2011 Draft

-

-

31.12.2011

31.12.2011

31.12.2012 Draft

-

-

01.12.2011

01.12.2011

01.12.2011 Draft

Assets

Praveen Ar...

Add a note

Summary

Interactive

Phone

01.12.2011

01.12.2011

01.12.2011 Inactive

-

-

New years

Campaign Group

Multimple

30.12.2011

30.12.2011

01.12.2012 Inactive

1

1

Holi

Interactive

Email

01.12.2011

01.12.2011

01.12.2011 Inactive

-

-

Holi

Interactive

SMS

01.12.2011

01.12.2011

01.12.2011 Active

-

-

Holi

Interactive

Voice

01.12.2011

01.12.2011

01.12.2011 Stopped

-

-

Holi

Interactive

Phone

01.12.2011

01.12.2011

01.12.2011 Draft

-

-

New years

Campaign Group

Multiple

30.12.2011

30.12.2011

01.12.2012 Draft

1

1

1

New years

Campaign Group

SMS

30.12.2011

30.12.2011

01.12.2012 Active

1

1

1

New years

Interactive

Email

30.12.2011

30.12.2011

01.12.2012 Complete -

-

1

Dashboard

Campaigns

Reports

Hol

Holi-2011

Campaigns: All

Holi-2011 Holyday-2010

Campaigns: Running Campaigns: Past

Campaign

Dashboard

Campaigns

Resources

Holi-2010

Report

holi.jpeg

Image

holi.mp3

Audio

Create Campaign

Create Group

Create a Campaign group

Campaign

Resources

Reports

What are you looking for?

-

Media List Templates List

Target Bases Upload Media Create Template +

Create Schedule

+

Create Target Base

Dashboard

Campaign

Resources

Reports

Reports: Last 7 days Reports: Last Create Custom Report

Hide Hide draft draft campaigns campaigns Hide Hide past past campaign campaign

Select and: Move | Delete

Channel

Created on

Start date

End date

New years

Campaign Group

Multiple

30.12.2011

30.12.2011

Pre event

SMS

SMS

30.12.2011

New year eve

Status

Awaiting

Assigned to

01.12.2012 Draft

1

1

30.12.2011

30.12.2011 Draft

-

-

1

Interactive

Phone

31.12.2011

31.12.2011

31.12.2012 Draft

-

-

Target not defined yet NewBase year morning

MMS

MMS

01.12.2011

01.12.2011

01.12.2011 Draft

Assets

Praveen Ar...

You need to define a Target Base Holi before you can run a campaign.

Interactive

Phone

01.12.2011

01.12.2011

01.12.2011 Inactive

-

-

Campaign Group

Multimple

30.12.2011

30.12.2011

01.12.2012 Inactive

1

1

Interactive

Email

01.12.2011

01.12.2011

01.12.2011 Inactive

-

-

Holi

Interactive

SMS

01.12.2011

01.12.2011

01.12.2011 Active

-

-

Holi

Interactive

Voice

01.12.2011

01.12.2011

01.12.2011 Stopped Rajib- Ghosh

Holi

Interactive

Phone

01.12.2011

01.12.2011

01.12.2011 Draft

New years

Campaign Group

Multiple

30.12.2011

30.12.2011

01.12.2012 Draft

1

1

1

New years

Campaign Group

SMS

30.12.2011

30.12.2011

01.12.2012 Active

1

1

1

New years

Interactive

Email

30.12.2011

30.12.2011

01.12.2012 Complete -

-

< Previous 15 | Next 15 >

Reports: All

Add to favorites

Type

Instruction comes here based on user action What are you looking for?

What are you looking for?

Name

New years + Click on this row for options to define a Target Base. Holi

Schedules

Reports

Campaigns March 1, 2011 - March 31, 2011

Create a Campaign

Dashboard

Powered by: Logged in as: Rajib Ghosh | Log out Mode: Basic | Settings

Report Campaign

Created on

Start date

End date

New years

Campaign Group

Multiple

30.12.2011

30.12.2011

Pre event

SMS

SMS

30.12.2011

New year eve

Interactive

Phone

1

-

Please provide 3 images with the specification I sent by email

Select and: Move | Delete Help | FAQs

Status

Select and: Move | Delete

Awaiting

Assigned to

01.12.2012 Draft

1

1

30.12.2011

30.12.2011 Draft

-

-

-

-

1

31.12.2011

31.12.2011

31.12.2012 Draft

01.12.2011

01.12.2011

Origination address: 01.12.2011 Draft Email Assets

Praveen Ar...

01.12.2011

01.12.2011

-

-

30.12.2011

30.12.2011

Data encoding scheme: 01.12.2011 Inactive Routed: Throttle rate:

01.12.2012 Inactive

1

1

Holi

Interactive

Email

01.12.2011

01.12.2011

01.12.2011 Inactive

-

-

Holi

Interactive Edit

SMS

01.12.2011

01.12.2011 Edit

01.12.2011 Active

-

-

Name: Holi User numbers: DND: Holi Black listed: Type: New years + rate: Success

Interactive

01.12.2011

01.12.2011

Comment: 01.12.2011 Stopped

-

-

Edit .

Schedule information

MMS

.

Type: Email Voice Template: 12345 Message Phone content:

.

Advanced information

Comments and alerts Alert:

Edit .

1

Edit .

01.12.2011

01.12.2011

01.12.2011 Draft

-

-

Multiple

30.12.2011

30.12.2011

01.12.2012 Draft

1

1

1

New years

Campaign Group

SMS

30.12.2011

30.12.2011

01.12.2012 Active

1

1

1

New years

Interactive

Move | Test | Activate | 30.12.2011 Deactivate | Start | PauseComplete | Stop | Edit Email 30.12.2011 01.12.2012 - | Delete - | View Analytics

Instruction comes here based on user action

Interactive

Message information

Edit .

Campaign Group

< Previous 15 | Next 15 >

Help | FAQs

Resources

Channel

Name: Holi MMS Start date: Interactive End date:Phone Valid till: Campaign Group Multimple Created by:

+

Help | FAQs

DaVinci Campaign Manger

Type

Target Base information

Select and: Move | Delete

Hide Hide completed completed campaign campaign

Name

Name: Holi New year morning ID: 12345 Holi Created on: Type: New years Channel: + Created by:

View Report

Tips and instruction comes here based on user action

-

Hide Hide draft draft campaigns campaigns Hide Hide past past campaigns campaigns

Create Group

Basic information

Instruction comes here based on user action

View Report

Create Campaign

Campign ID: ACD3457D 1

Holi

< Previous 15 | Next 15 >

Summary

The base to use for the Holi c...

Select and: Move | Delete

Select and: Move | Delete Help | FAQs


Create new campaign From scratch Name

Upsell

P&L

None SMS

Simple Promotion

Description

OBD

Email

Folder

None

ID

123456

Campaign Calendar: My Calendar

Pick a calendars

Validity: 4th April – 20th April Find a calendar

Type:

Multichannel_123456

Purpose

Channels

From an existing campaign

Type calendar name

Schedule Actual Days

Name

Created on

Created by

Valid from

Valid to

Calendar 1

25/12/2011

Rajib

04/04/2011

04/05/2011

16

Week days

Month days

Start

MO, WE, FR

1st to 31st st

End

Actual days

9:00 AM

6:00 PM

16 days

st

Calendar 2

25/12/2011

Rajib

04/04/2011

04/05/2011

16

MO, WE, FR

1 to 31

9:00 AM

6:00 PM

16 days

Calendar 3

25/12/2011

Rajib

04/04/2011

04/05/2011

16

MO, WE, FR

1st to 31st

9:00 AM

6:00 PM

16 days

Calendar 4

25/12/2011

Rajib

04/04/2011

04/05/2011

16

Calendar 5

25/12/2011

Rajib

04/04/2011

04/05/2011

16

Calendar 6

25/12/2011

Rajib

04/04/2011

04/05/2011

16

Calendar 7

25/12/2011

Rajib

04/04/2011

04/05/2011

16

Run

1 time(s)

Code

123456

Cancel

Create

Edit Calendar

Campaigns : Create SMS Campaign

< Previous 15 | Next 15 >

Campaign Calendar: Not defined Immediate

Calendar 2: Schedule Week days

Month days

Start

End

Actual days

Calendar 1: Summary

MO, WE, FR

1st to 31st

9:00 AM

6:00 PM

16 days

Calendar 2: Summary

MO, WE, FR

1st to 31st

9:00 AM

6:00 PM

16 days

MO, WE, FR

1st to 31st

9:00 AM

6:00 PM

16 days

Type:

Summary

Simple Promotion

Campaign Name: SMS_123456

Status: Draft

Basics

Campaign Calendar: Not defined

Actions: Save as draft | Save and activate | Discard |

Type: Multichannel – SMS, OBD, Email ID: 123456 Group: None Name: Multichannel_123456 Purpose: Upsell Run: 1 time(s) Cost center: Undefined

Target Base Message – To user

Calendar 3: Summary Calendar 4: Summary

SMS

Preview

Campaigns : Create SMS Campaign

Pick this and go

Interactive Option Based

Campaign Summary

Status: Draft

Basics

Campaign Calendar: Not defined

Actions: Save as draft | Save and activate | Discard |

Type: Multichannel – SMS, OBD, Email ID: 123456 Group: None Name: Multichannel_123456 Purpose: Upsell Run: 1 time(s) Cost center: Undefined

Target Base

SMS

Message – To user Preview

Calendar 5: Summary Cancel

Type:

Campaign Name: SMS_123456

Preview

More calendars... Create new calendar... Message – Trigger option from user Response – Based on trigger

Create new calendar Name 2

3

4

5

6

7

4th April – 20th April

Validity

SMS_123456 8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

Schedules Week days MO

TU

WE

TH

FR

SA

Month days SU

All (7)

All (31)

Start time 9:00

AM

End time 6:00

PM

Actual Days 16 days

Actions: Save as draft | Save and activate | Discard |

Actions: Save as draft | Save and activate | Discard |

Add another schedule

Cancel

Save

dealing with complex and variable processes

a way to visualize task flow


Campaigns : Create SMS Campaign

Campaigns : Create SMS Campaign

Campaign: SMS_123456

Campaign Type:

Calendar: My calendar

Status: Draft

Properties

Define Event trigger from user

Define user action

Full Summary

Interactive Option Based

Define Status Message

Campaign: SMS_123456

Campaign Type:

Calendar: My calendar

Status: Draft

Target Base

Define Actions based on Event Trigger

Define target Base

Interactive Option Based

Properties Define Event Response

Message Event – Trigger from user Event name

Type

Status

Event 1

Recharge

Active

Event 2

Recharge 2

Active

Action 3

Recharge 3

Active

URL

Add another Event

Event - Trigger from user

Allow multiple triggers for user

Action – Based on Event trigger

Event Description

Actions

Action Type

Event 1

Action 1

Recharge

Event 2

Action 2

Recharge 2

Event 3

Action 3

Recharge 3

Action Parameter

Description

Value Type

Value

Poll

Description

Name

Poll

Poll

Description

Month

January

Poll

Description

Day

10

Action – Based on Event trigger

Message - Status message to user

Basic Configurations

Campaign Actions: Test | Save as draft | Save and activate | Discard

Campaign Actions: Test | Save as draft | Save and activate | Discard

Campaigns : Create Email Campaign Campaign Type:

Calendar: My calendar

Status: Draft

Configuration Basics

Full Summary

Simple Promotion

Properties

Configure Email Message

Define Target Base

Campaign: SMS_123456

Campaign Type:

Calendar: My calendar

Status: Draft

Basic Configurations

Full Summary

Simple Promotion

Properties

Configure Email Message

Configuration Basics

Define Target Base

Message Cell number Key code Configuration Basics

Sub ID Display sender as

9848037934

Format

HTML

Configure Message

Define Target Base

Cell number: 989828973 Ky Code: 123456 Sub ID: Undefined Validity: 24 hours Display sender as: 552323 Priority: High Message language: English Message content: English: Dear subscriber. Wish you a very happy Diwali.

Message – To user

Key code Configuration Basics

Sub ID Display sender as

9848037934

Format

Text

Body

Logical Conditions

Insert

First Name

Insert

Last Name

Insert

Data Plan

Insert

Voice Plan

Insert

SMS Plan

Dear subscriber. Wish you a very happy Diwali.

Reminder: No

Subject

Target Base

Target Base

Preview and test

Preview

Email Links Link URL

IMI Mobile

Http:www.imimobile.com

URL

Http:www.imimobile.com

URL

Http:www.imimobile.com

Define Target Base

Body

Open in editor

Link text

Configure Message

Cell number: 989828973 Ky Code: 123456 Sub ID: Undefined Validity: 24 hours Display sender as: 552323 Priority: High Message language: English Message content: English:

Reminder: No Parameters

Subject

Basic Configurations Message

Cell number

Message – To user

Campaign Actions: Test | Save as draft | Save and activate | Discard

Track

Campaign Actions: Test | Save as draft | Save and activate | Discard

Display sender as: 552323 Priority: High Message language: Hindi, English. Message content: Hindi Message content: English Reminder: Append to original Before: After:

Message - Status message to user

Basic Configurations Enable status message to user for Action 1

Campaign: SMS_123456

Message – To user

Event - Trigger from user

days

Campaigns : Create Email Campaign

Cell number: 989828973 Ky Code: 123456 Sub ID: Undefined Validity: 24 hours

Action Description

Parameter and values for Action 2

Reminder: Append to original Before: After:

Enable 10

Validity for

Eent

Display sender as: 552323 Priority: High Message language: Hindi, English. Message content: Hindi Message content: English

Message – To user

Target Base Message

Actions – Based on Event Trigger

Cell number: 989828973 Ky Code: 123456 Sub ID: Undefined Validity: 24 hours

Description

Full Summary


Campaigns : Create SMS Campaign

Campaigns : Create SMS Campaign

Campaign: SMS_123456

Campaign Type:

Calendar: Not defined

Status: Draft

Properties

Configure Message

Configuration Basics

Full Summary

Simple Promotion

Define Target Base

Campaigns : Create SMS Campaign

Campaign: SMS_123456

Campaign Type:

Calendar: My calendar

Status: Draft

Basic Configurations

Properties

Configure Message

Configuration Basics

Full Summary

Simple Promotion

Define Target Base

Message Display sender as

9848037934

Priority

High

Message language

Hindi

English

Message content: To user

Compose

Get from external source

Configuration Basics

Configure Message

Define Target Base

Cell number: 989828973 Ky Code: 123456 Sub ID: Undefined Validity: 24 hours Display sender as: 552323 Priority: High Message language: English Message content: English: Dear subscriber. Wish you a very happy Diwali.

English Parameters

Dear subscriber. Wish you a vry happy Diwali.

Logical Conditions

Reminder: No

Key code Configuration Basics

Sub ID Validity

24

Display sender as

9848037934

Priority

High

Message Parameters and Logical Conditions can be used only when a Parameterized Target base is selected.

Preview

Target Base Data encoding:

USSD

Enable

Properties

Configure Message

Configuration Basics

Full Summary

Simple Promotion

Define Target Base

Dear First Name 3G

Define Target Base

Dear subscriber. Wish you a very happy Diwali.

Reminder: No

Hindi

Telegu

English

Compose

Data Plan

Parameters

is Insert

First Name

Insert

Last Name

Else

You have requested for an

incorrect option End

Insert

Data Plan

Insert

Voice Plan

Insert

SMS Plan

Campaign Actions: Test | Save as draft | Save and activate | Discard No. of characters typed: 175 out of 320 No. of messages: 2

Insert

MMS Plan

Message break marker

Preview

Parameter

Reminder message Reminder schedule Send original message

Insert

Validity

24

Display sender as

9848037934

Priority

High

Message language

Logical Conditions

Dear First Name

days, for 30

Compose

Get from external source

if

Data Plan

Parameters

is

Else

You have requested for an

No. of characters typed: 175 out of 320 No. of messages: 2

USSD

Message break marker

Create new message

English

Before original message

if

Insert

is

Insert

is not

Insert

is exactly

Insert

is greater than

Insert

is less than

Insert

if

Logical Conditions

Logical Conditions

Data encoding:

Target Base

USSD

Enable Every 3

Send original message English

Preview

Parameter

Reminder schedule

days.

Insert

your 3G data plan has been activated from

Reminder message

Append to original message

Reminder: No

Telegu

English

Hindi

Activation Date

Data encoding:

Define Target Base

Dear subscriber. Wish you a very happy Diwali.

incorrect option End

Enable Every 3

Target Base

Configure Message

Cell number: 989828973 Ky Code: 123456 Sub ID: Undefined Validity: 24 hours Display sender as: 552323 Priority: High Message language: English Message content: English:

Hours

Hindi

Message content: To user

3G

3G

Logical Conditions

Configuration Basics

Sub ID

English if

Message – To user

Key code

Get from external source

your 3G data plan has been activated from

Hindi

Configure Message

Basic Configurations Message

Cell number: 989828973 Ky Code: 123456 Sub ID: Undefined Validity: 24 hours

Hindi

Activation Date

Reminder message

Basic Configurations

Display sender as: 552323 Priority: High Message language: English Message content: English:

Hours

Message content: To user English

Message break marker

Status: Draft

Cell number

Message – To user

Message language

No. of characters typed: 30 out of 160 No. of messages: 1

Campaign Type:

Calendar: My calendar

Message Cell number

Message – To user

Campaign: SMS_123456

days, for 30

days.

Append to original message

Create new message

Hindi

Dear Subscriber. Please remember to pay your bill. If you have paid within last 24 hours, please ignore this message.

Enter message here

After original message

No. of characters typed: 30 out of 160 No. of messages: 1

Enter message here

Message break marker

Preview Data encoding:

USSD

Preview

Campaign Actions: Test | Save as draft | Save and activate | Discard

Campaign Actions: Test | Save as draft | Save and activate | Discard

responsive UI that gives a sense of state

guiding through the process


1

stage 4: visual design 2

Once the stakeholders and the developers were comfortable with the overall interaction design, feasibility and viability, the visual design work commenced The design needed to be clean, vibrant and easily customizable.


a visual design that looks good and can be white labelled

simple, energetic and clean












achievements

1

Clean, vibrant and custom brand-able visual design

2

Organization of information that fits natural and simple mental model

3

Visualization of complex processes to help learn

4

Sense of context and location

5

Many personalization options depending on user needs

6

Fast and responsive UI that hides information when it is not needed

7

Cross product UI standards that can be followed later

8

Scope for future expansion without cluttering everything


failures

1

Further simplification of the UI

2

Inability to do more observation and user testing at the end of the process cycle


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.