Stage 2 - Detail level of Urban study based on different site characteristics

Page 1

Railway Bukit Duri

Negativity

Blue Space

Blue Space

+ Building Footprint

Geographical Condition

Total energy consumption : 67,834,659.69 kWh/year Total Water Consumption : 4,112,155.26 m3/year

Flood at Kampung Melayu

Building Typology

green space around stradium

residential play ground

car park

apartment green fi eld

Recreational activity on the river

Predominant Building typology Mixed hybrid, Skyscrapers

golfgolf course course

mosque

sports fi eld

mosque shopping mall

mall mall street side hangout

Blue Space

Social Space

sports fi eld

city green

Green Structure

golf course

Building Program

Environmental risk

city green

Mobility

Asphalt map

Geographical Condition

Building Footprint

Satellite Map

Environmental Risk

Green Structure

Social Space

Mobility

Building Program

Geographical Condition

Asphalt Map

Building Footprint

Satellite Map Dependency to The River

Sample 1 - CIliwung “THE URBAN SURVIVOR”

er

Pacific place Total Land area : 30,897 M2 Total Builtup area : 230,542 M2

Larger land parcels with highrise structures

Road area : 205939.2 m2 Parking area : 43771 m2

0m

Residential Industry Office Commercial Institutional

Land level: 13m above mean sea level Contour : Moderate contours Express toll lane

Pedestrian

Private social space Pay & use social space Public social space Informal social space

: 2.60% : 0.00% : 4.15% : 7.10% : 3.30%

Private greenery Restricted greenery Passive greenery Public greenery

: 9.57% : 0.00% : 12.3% : 4.16%

Private blue space Passive blue space

100 m

: 0.5% : 0.75%

city park

Energy consumption : 330 KWh/m2/yr

car park

sa rt

irpo

Fragmented urban spaces

ard

towards east jakarta

golf course

mosque

sports fi eld

50 minutes

cafe

Basement parking

mosque

35 minutes

SHOPPING MALL

er

inn

* Well connected through arterial roads & tollways * Public transport with BRTS * Upcoming Metro rail system. d

oa

gr

rin

Neglected natural resources

tow ng

shopping mall

commercial

shopping mall

1hr 20 minutes

Non fluidity of public spaces

shopping mall

high speed lane

high speed lane

m

residential play ground

apartment green fi eld

city park

car park

city green

golfgolf course course city green

sports fi eld

t

+

mosque

mosque shopping mall

side walk

street side hangout

Social space

car lane

car lane

Busway

Busway

car lane

sudirmann road splitting the neighborhood Sudirmann road

highrise among lowrise structures

Scale of street & building

33

37

34

Section showing water stream covered in concrete slabs

mall mall

Green structure

Water consumption : 205 L/day/person

5

+

golf course

sports fi eld

Total builtup area : 114700 M2

shopping mall

COMMERCIAL

ad

ro

green space around stradium

Residence

Water consumption : 205 L/day/room

RESIDENCE

RESIDENCE

asphalt area

500 m

Energy consumption : 330 KWh/m2

Hotel

Time taken for 10km commuting in peakhours on weekdays in different modes of transport

car park

public space

Sample 2 - Sudirmann CBD “INTERNALISED CITY”

eet Str

R iv

city park

ciliwu

towards south jakarta

a gar ine Jat

21%

private green space

tow jak ard art s e a as

ng

Layout

Environmental Risk

+

N

13.5%

Neighborhood - Mobility

dir

3.0 m SemiPermanent House

+

Offices : 1,110.22 m2 x 2.5 floor = 2,775.55 m2 energy consumption : 2,775.55 x 240 kWh/m2.year = 666,132 m2 water demand : (0.2% x 48630 people) x 50 ltr/day x 365 = 1,774,995 m3/year

towards south jakarta

su

0.8 m

Commercial : 65,313.57 m2 x 2.5 floor = 163,284.3 m2 energy consumption : 163,284.3 m2 x 92 kWh/m2.year = 15,022,155.6 kWh/year water demand : (12.2% x 48630 people) x 50 ltr/day x 365 = 108,571.338 m3/year

Commuting time

t

Institutional : 25,607 m2 x 3.5 floor = 89,624.5 m2 energy consumption : 89,624.5 x 240 kWh/m2.year = 21,509,880 kWh/year water demand :(4.77% x 48630 people) x 50 ltr/day x 365 = 1,493,741.0 m3/year

Total builtup area : 114700 M2

tow jak ard art s e a as

Residential built up area : 444,050.61 m2 x 1.5 floor = 666,075.9 m2 energy consumption : 666,075.9 m2 x 46 kWh/ m2.year = 30,639,492.09 kWh/year water demand : (82.8% x 48,630 people) x 50 ltr/day x 365 = 734,847.93 m3/year

Side Elevation

Bus

an

5.0 m SemiPermanent House

25,000 people / sqkm

Residential density

atlas

10.0 m Ciliwung River

apartment car park

Tulodong

5.0 mPublic Space

4.0 m SemiPermanent House

equity tower

iw u

er

t

e tre

d

oa

gr

rin

energy building

er

R iv

aS

ad

gro

rin

capital residence

niaga tower

R iv

ng

gar

er

pacifi c place

sequis tower

* Larger land parcels with tall striuctures along the arterial road * Predominantly Office & commercial landuse * Has direct access to inner ring road

er inn

stadium utama

Indonesia stock exchange

n

an

irm

d su

d roa

Energy & Water Calculation :

Sedimentation Railways Affected Area by Railway

nn

rt

irpo

sports fi eld

ng

iw u

ine Jat

Water Pollution Flooded Area (High Risk) Flooded Area

ai

sa

ard

police headquarters

Kampong Street Life

Dry Season

er

Toilet

Riv

Fly

art

stadium parking

golf course

a

r To Rive

ng

5.0 m Semi-Permanent House

Axonometric

indoor stadium

ast jakart

Public Space

Wet Season 1-3m Flood

elayu

jak

tow

car park

towards e

Legend :

Exteremely Wet Season 3-5m Flood

pung M over Kam

city park

ng

Shops/Kiosk

Social Space

hilton residence

ciliwu

Water Pollution Noise Pollution by traffic Land Subsidence 20-40 cm

reet

Well 1.2 m

5.0 m Permanent House

1.5 m

0.6 m

4.0 m

0.6 m 1.2 m

Semi4.0 mPermanent House with small kiosk attached

Getek (Bamboo raft) as public facility

Well

Water from River

Toilet

Space for washing and bathing Mobility

Well

4.5 m Permanent House

Getek (Bamboo Raft)

Semi3.0 m Permanent House

0.8 m

Semi5.0 m Permanent House

10.0 m

5.0 m

4.0 m Semi-Permanent

Key Plan

500 m

iwu

er

Bathing Washing

Cil

t

Riv

Drainage to River

+ Blue Space

Bukit Duri Tanjakan St

e tre

ng

iwu

Discharge Solid Waste

reet

Neighborhood

Social Space

100 m

Railway Bukit Duri

aS

Recreational Waterways

Ciliwung River High Dependency Area Medium Dependency Area Low Dependency Area

Building Footprint

0m

Private Space

gar

Cil

Bukit Duri Tanjakan St ampun

+

Blue Space : 40086.2 m 4.0%

2

Pedestrian

Manggarai Railway

Waste Disposal

g Melayu

+

Sandbags as embankments

Bedroom

Social space per capita : 2.88 sqm/person

Low & Middle-income Houses

Well

Flyover K

Bamboo Structure For bathing and washing

N

Greeneries (Trees)

ine Jat

Manggarai Railway

C il

iw u

C il

er

Public Space (Network as social space)

: 82.80% : 0.00% : 0.20% : 12.20% : 4.80%

Manggarai Railway

C il

eet Str

R iv

Squatters

layu

pung Me

am Flyover K

Building Typology

Railway Bukit Duri

a gar ine Jat

6 car lane (main road) : 2 way @4.25 m wide bus, private car,motorcycle

Train

reet

Sampan Bus Line (Traditional Waterways)

ng

er

reet

Land level: 12m above mean sea level Contour : relatively flat

iw u

R iv

er

Residential Industry Office Commercial Institutional

2 car lane : 2 way @ 4.25 m wide private car and motorcycle

Bukit Duri Tanjakan St

ng

iw u

R iv

g Melayu

ampun Flyover K

C il

Manggarai Railway

eet Str

C il

Bukit Duri Tanjakan St

ng

iw u

Total Building footprint : 536081.4 m Building Height : Residential 1-3 storey Hospital, Commercial, and Offices 3-4 storey

Railway Bukit Duri

reet

Asphalt area : 100067.0 m2 Kampung settlement : 0.7-1.50 m wide walk and motorcycle

2

*Statistic Indonesia, http://jakarta.bps.go.id

Fly

C il

er

Residential density : 48,630 people / sqkm*

Melayu

pung over Kam

Manggarai Railway

10%

53.6%

Population

eet Str

R iv

reet

g Melayu

ampun Flyover K

Bukit Duri Tanjakan St

eet Str

ng

iw u

Bukit Duri Tanjakan St

C il

Manggarai Railway

Manggarai Railway

Railway Bukit Duri a gar ine Jat

Railway Bukit Duri

a gar ine Jat

Neighborhood

Railway Bukit Duri

a gar ine Jat

Key Plan

Informal social space below flyover

car lane

side walk

Building Program

Blue space

narrow secondary roads

informal activities on secondary streets

Commercial

Total builtup area : 114700 M2 Energy consumption : 300 KWh/m2/yr Water consumption : 55 L/day

Stage 2 - Parameters of Sustainability - Team : Adelia, Bernd, Jadez, Ram, Steven


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.