PROJECT TOTALS
909,550±SF : TOTAL BUILDING FOOTPRINT 1,819,100±SF : TOTAL BUILDING AREA (2 STY) 192 MW : TOTAL IT DATA 270 MW : TOTAL POWER REQUIREMENT
W ME AL R LI IDE NG N FO RD
INDEX KEY
50 FT PROPERTY BUFFER
2
ELECTRIC SWITCHYARD / SUBSTATION & POWER GENERATION FACILITY
JIM WAS HERE
JIM WAS HERE TOO
JIM WAS HERE
15
Gated Emergency Entry
HERE
JIM WAS HERE
A G T IN SF A D ILD51± W U ,3 M B 32 32
Web: www.stadiaeng.com E-Mail: Info@stadiaeng.com 516 Vauxhall Street - Suite 103 New London, Connecticut 06320 (860) 333-3533
JIM WAS
ENGINEERS ∙ ENVIRONMENTAL PLANNERS ∙ SURVEYORS
JIM WAS JIM WAS HERE HERE
13
JIM WAS HERE
14
SS O R Y C A R W U K B R L I PA W
S TADIA E NGINEERING A SSOCIATES, INC.
DEVELOPMENT DATA & FOOTPRINT
TA N
1
KW
1
T
O
D BUILATA 156, DING 8
A G T IN SF A D ILD51± W U ,3 M B 32 32
36 32 M ± SF W
3
AD
1
D BUILATA DIN 156
4 5
FOR CLIENT DISCUSSIONS
FA
R
M
S
G ,836 32 M ± SF W
RO
T C
R
DR OA D
36 32 M ± SF W
U
15
D BUILATA 156, DING 8
E
OO
SUBPOWER STA TIO NS
CL&
DRIVE
WALLINGFORD DEVELOPMENT North Farms Road, Tower Drive, Tankwood Road
NO
RT H
-WA Y
Wallingford, Connecticut
TOW DRI ER VE CONCEPTUAL LAYOUT PLAN
Gated Main Entry
ER ST © copyright 2021 Stadia Engineering Associates, Inc.
Gated Emergency Entry
T-OF
Gated Main Entry
LI NG
BA N ES INDUR ST ROADRIAL N.
7,17 G 0 16 M± SF W
D BUI ATA LDIN 8
7
D BUI ATA LDIN 8
7,17 G 0 16 M± SF W
6
P EL ECT RIC RIG H
CONNECTICUT DATA CENTER DEVELOPMENT
E
16 June 2021 Parcel & design modificationsAR
D
14 June 2021 Parcel & design modificationsAR
C
7 June 2021 Parcel & design modificationsAR
Fairfield Boulevard Extension
(Requires Municipal Approval
2021-100 25 May 2021
Former Data Center Campus Layout (Dated: 23 February 2021, Last Revised: 03 June 2021)
16 June 2021
FAIRFIELD BOULEVARD
DATA CENTER CAMPUS LAYOUT
A. Reinhart
D-399