Introduction to Steel Structure Warehouse for Norwegian Project CONTENTS

I General view II Steel structure III Bolts IV Roof and wall panel V Packing VI Project cases


I General view


I General view

1. Our steel structure warehouses are customer-oriented. With complete cost-calculating and designing system, we can provide applicable building systems to our customers and meet their every demands.

2. Decisive factors for the total cost of steel structure industrial building: The local weather condition, the purpose of the building, the customers’ requirements etc. will greatly influence the quantity of steel structure, the selection of wall and roof panel, and the layout of the building and any other decisive factors of total cost.

3. Technical info we considered In our cost calculation and designing, we’ve considered the wind load: 0.8kN/m2, snow load: 1.5kN/m2.


II Steel structure

1. Primary structure 2. Secondary structure 3. Roof and wall purlin 4. Gutter


1. Primary structure

The steel structure we proposed for the 621 m2 warehouse is of portal frame. Its primary steel structure includes steel column and steel girder.


1. Primary structure Steel for main frame will be Q 345B (high-strength low alloy steel). They will be applied with anti-rust paint, double-layered primer paint, double layered finish paint. The specification of steel will be as follows:

Chemical Property

Physical Property


1. Primary structure

A sample of primary steel structure


2. Secondary structure

Secondary steel structure of the 621 m2 warehouse mainly includes tie bar, diagonal braces and purlin brace. These structures are mainly for strengthening the primary structure.


2. Secondary structure Steel for secondary steel structure will be Q235B(carbon constructional steel) . The specifications are as follow:

Chemical Property

Physical Property


2. Secondary structure

Tie bar


2. Secondary structure

Diagonal brace for wall structure


2. Secondary structure

Sample design of diagonal brace for roof structure


2. Secondary structure

Wall brace connection with frame web

Roof brace connection with frame web


2. Secondary structure

Purlin brace


2. Secondary structure

Sample design of roof purlin brace


3. Roof and wall purlin Roof and wall purlin for the warehouse will be fully galvanized.

Technical data for galvanized steel panel, which will be further cold-rolled as roof and wall purlin


3. Roof and wall purlin Roof purlin we proposed for the warehouse will be Zsection. External wall purlin will be C-section.

Z-section roof purlin


3. Roof and wall purlin

C-section wall purlin


4. Gutter Gutter of the warehouse will be made of 0.8mm color steel panel.

Gutter


III Bolts

1. Common bolt 2. Foundation bolt 3. High-strength bolt


1. Common bolt We will use M12 common bolt for fixing purlin and purlin braces with roof and wall girders. All the common bolts will be galvanized.


2. Foundation bolt We will use M24 foundation bolt for fixing column with foundation. The foundation bolts are made of ÎŚ 25 steel bar.

Foundation bolt


3. High-strength bolt M20 high-strength bolt will be used to fix girder with columns, girder with girder and tie bar with column. All the common bolts will be 20MnTiB.


IV Roof and wall panel


IV. Roof and wall panel Roof panel we proposed for the 621 m2 warehouse will be 100mm corrugated PU sandwich panel. Wall panel will be 100mm PU sandwich panel.


IV. Roof and wall panel

PU sandwich wall panel


IV. Roof and wall panel

roof panel

Corrugated PU sandwich roof panel


V Packing


V Packing We will pack the steel structure and other materials with steel pallet. There are wheels on one end of the pallet. Thus it will be easier to load and unload.

Steel pallet with wheels on one end


V Packing We will pack the steel structure and other materials with steel pallet. There is wheel on one end of the pallet. Thus it will be easier to load and unload.

Loading with steel pallet


V Packing For bolts and small accessories of the structure and doors, we will put them in the wooden box and prepare a detailed list for them. Thus these items will not be missed or mixed.

Wooden box for putting bolts and accessories


VI Project cases


VI Project cases

SYP Special Glass Co., Ltd.


VI Project cases

Merchants Logistics Branch


VI Project cases

Handelsveem B.V.


VI Project cases

720 Strap Steel Mill


VI Project cases

HUF


VI Project cases

Baowan International Logistics Center


VI Project cases

Tahiti Warehouse Project Building area: 1650 m2


VI Project cases

Mauritius warehouse Building area: 1000 m2

Note: We’ve sent to Mauritius 23 steel structure warehouses and workshops since 2007 and will start a new warehouse project of 621 m2 at the beginning of 2010.


VI Project cases

Mauritius warehouse project Building area: 1907 m2


VI Project cases

Warehouse in Romania Building area: 2600 m2