Nuevos protagonistas: Países emergentes mineros

Page 1

78

ISSN 0717-0580 I Año / Year 18

Bilingual Edition

enero-febrero / january-february 2013 www.latinomineria.com

NUEVOS PROTAGONISTAS

Países emergentes mineros NEW PROTAGONISTS

The emerging mining countries Perú: Antapaccay inició producción de cobre

El rol clave de las empresas de ingeniería

Peru: Copper production begins at Antapaccay

The key role of engineering companies

Disponible para tablet en:



komatsu.cl


Prospectors & Developers Association of Canada

PDAC2013 Where the world’s mineral industry meets

Only going to one mining investment show this year?

Make it PDAC. March 3 – 6 International Convention, Trade Show & Investors Exchange Metro Toronto Convention Centre Toronto, Canada

www.pdac.ca



EVENTO ASOCIADO A

8 DE AbrIl 2013

SHErATON SANTIAgO HOTEl & CONVENTION CENTEr www.explorationforum.com Debate: ¿qué se necesita hacer para fomentar la exploración minera en chile? TEMAS

Desafíos para la industria Restricción de capital para la exploración y su impacto en la industria minera. Visión global. Sustentabilidad en el negocio de exploración minera

Auspicios Contacte a su ejecutiva comercial, llámenos al (56-2) 27574239 o escríbanos a ventas@editec.cl

inscripciones Brenda Valenzuela bvalenzuela@editec.cl • (56-2) 27574289 rosa María Gajardo rgajardo@editec.cl • (56-2) 27574286

ORGANIZA

AUSPICIO RUBÍ

AUSPICIOS DIAMOND

PRODUCE

MEDIO OFICIAL NACIONAL

MEDIO OFICIAL INTERNACIONAL

L A

LA EDITORIAL TÉCNICA Y DE NEGOCIOS LÍDER DE CHILE

R E V I S TA

D E

L A

I N D U S T R I A

M I N E R A

E N

A M E R I C A

L AT I N A

explorationforum@explorationforum.com



The emerging mining countries Major mining projects are being developed in countries in Latin America that were previously closed to or ignored by the large-scale formal mining industry.

Foto / Photo: Juan Carlos Recabal - LATINOMINERÍA.

summary

08

Xstrata Peru: Copper production begins at Antapaccay The mine will produce an average of 160,000 tons a year of copper in concentrates as well as gold and silver as byproducts during the first years of production. The key role of engineering companies Estimates of mine investments through 2020 suggest a busy time for the region’s engineering firms. However, changing market conditions and the cancelation of some projects is leading to greater caution.

30 65

Enami EP: Working to determine Ecuador’s mineral potential

16

CEO of B2Gold: “We are not reckless, we listen and measure the risks”

21

Latin News

27

Hans Rasmussen, CEO of Colombia Crest Gold: “There are lots of opportunities in Colombia”

35

Colussus Minerals: Serra Pelada to begin production in mid-2013

37

Paul Rollinson, CEO of Kinross: “South America is an important jurisdiction for us”

40

Mining debate in Argentina: Growth confined to clear rules and more exploration

43

Goldcorp Argentina: Cerro Negro advancing towards production

46

Charles Jeannes, CEO of Golcorp: “We don’t know when the EIS for El Morro will be finished”

50

Pirquitas Mine progresses in the completion of its production plan

52

Lime production in Argentina: Wagering on a growth in mining demand

55

Ross Gallinger: “PDAC 2013 offers unparalleled opportunities”

61

Chile Engineering: Chile wants to become the engineering hub of the region.

63

Rockwell Automation: Latin America leads growth

71

Energy mix and Carbon Footprint

72

Latinmarket / Calendar

76

A difficult year for juniors The last few months have been difficult ones for junior mining companies. The climate of economic uncertainty which has dominated 2012, reflecting the fiscal situation of the United States, the problems in the Eurozone and the slight slowing of the giant Chinese economy affected investors’ expectations, restricting financing for high-risk projects. And mine exploration by its nature is a highly uncertain business. Talking to LATINOMINERIA, many companies in the sector recognize that the reduced flow of funds represents a difficult situation and also a phenomenon which affects the whole industry, given that the bulk of grassroots exploration, the source of future mines, is today carried out by junior mining companies. However, most of the firms are not lamenting their lot. On the contrary, convinced of the merits of their professionals, the potential of their properties and their own efforts, companies such as B2Gold are trusting in the strength of their arguments to win over the market. That is the position of B2Gold’s CEO and director Clive Johnson, who once led Bema Gold: “If you have a mine project, it is probable that one is going to face lots of perfectly valid questions: How are you going to pay for it? How many shares will you emit? Who is going to build the mine? However, if you have a good record on construction, production, liquidity and credibility, you should not have any problems,” he argues.

On the cover: Construction work Cobre Panama project. Photo courtesy of Minera Panama. LATINOMINERIA ™ ISSN 0717-0580 is a magazine for the mining, industry of Latin America. The publication was started in 1991 by G&T International (BVI) headquartered in Road Town, Tortola, British Virgin Islands. Editorial offices are located at level 6, 444 Antonio Bellet Street, Providencia, Santiago, Chile. P.O. BOX 750-000, tel.: 56-2-757-4200, fax: 56-2-757-4201, web: www.latinomineria.com

Similarly, companies are also looking for alternative means of accessing resources. For example, through partners with strong financial backing, like Peru’s Zincore, which formed an alliance with First Quantum (see edition No 77), or by resorting to off-take agreements, as Ross Gallinger, executive director of the Prospectors and Developers Association of Canada, explains in this issue. The convention which this organization holds annually – and of which the Editec Publishing Group is a media partner – is the leading industry showcase for presenting the progress made at a large number of projects and for building up networks. Proof of the sector’s dynamism despite its difficulties, is the estimate by SNL Metals Economic Group that the global exploration budget for non-ferrous metals will hit a historic high of US$21.5 billion during 2012, an increase of US$3.3 billion from 2011. In addition, the body’s Pipeline Activity Index rose in both September and October, a signal which SNL MEG urged to be taken with caution. While financing remains a difficult issue, it is not an insurmountable barrier for junior mining companies which are doing their job seriously. Meanwhile, serious host countries must offer stable ground rules and a favorable climate for mine investment. The central report on emerging mining jurisdictions reveals the importance of an adequate regulatory framework.

SIGUENOS EN

@Latino_mineria

Publisher: Ricardo Cortes (rcortes@editec.cl • Asociate Publisher: Roly Solis (rsolis@editec.cl) • Editorial Manager: Pablo Bravo P. (pbravo@editec.cl) • Editor: Miguel Toledo (mtoledo@editec.cl) • Web editor: Pamela Castellanos (pcastellanos@editec.cl) • Journalist in Argentina: Flavia Seva • Commercial journalist: Karina Jimenez (kjimenez@editec.cl) • English edition: Tom Azzopardi, Roberto Andrade • Sales Manager: Julio Herrera (jherrera@editec.cl) • Head for international Sales: Alejandra Cortés (acortes@editec.cl) • Photographers: Juan Carlos Recabal, Jorge Loyola • Design: Ediarte, Inc.; Art Director: Alfredo Eloy, Graphic Design: Susana Monreal M. • Printer: Morgan Impresores.


contenidos Países emergentes mineros Importantes proyectos mineros se están desarrollando en países de América Latina que hasta ahora estaban al margen de la minería formal y a gran escala. Xstrata Copper Perú: Antapaccay inició producción Producirá un promedio de 160.000 toneladas anuales de cobre en concentrado, además de contenidos de oro y plata como subproductos.

Un año complejo para las junior Los últimos meses han sido complicados para las empresas mineras junior. El clima de incertidumbre económica que imperó durante 2012 con motivo de la situación fiscal de Estados Unidos y los problemas en la Eurozona, así como la leve moderación en el dinamismo del gigante chino, afectaron las expectativas de los inversionistas, restringiendo el financiamiento para iniciativas consideradas de mayor riesgo. Y la exploración minera es por esencia una actividad que debe lidiar con la incertidumbre. En las conversaciones que LATINOMINERÍA ha mantenido con diversas compañías del sector, reconocen que este menor flujo de fondos constituye un escenario complejo y también una señal que afecta a la industria, toda vez que hoy son las mineras junior las que lideran la exploración grass root, base para los futuros yacimientos. No obstante, la mayoría de estos actores no se han quedado en lamentaciones. Por el contrario, respaldados en la solidez de sus equipos profesionales, un trabajo riguroso y el potencial de sus propiedades, compañías como B2Gold confían en la fuerza de sus argumentos para convencer al mercado. Así lo señala en esta edición Clive Johnson, CEO y director de esta minera, y quien también lideró Bema Gold: “Si uno tiene un proyecto minero, es probable que deba enfrentar muchas preguntas perfectamente válidas: ¿Cómo vas a pagar? ¿Cuántas acciones vas a emitir? ¿Quién va a construir la mina? No obstante, si tienes un buen récord de construcción, producción, liquidez y credibilidad, no debiera haber problema”, argumenta.

De igual modo, las empresas también están buscando vías alternativas para acceder a recursos. Por ejemplo, a través de socios con mayores espaldas financieras, como lo hizo la peruana Zincore en su alianza con First Quantum (ver edición Nº 77), o bien recurriendo a acuerdos Off-Take, como lo menciona en estas páginas Ross Gallinger, director ejecutivo de la Prospectors and Developers Association of Canada. Precisamente la convención que anualmente realiza esta entidad -evento del cual Grupo Editorial Editec es media partner- constituye la principal vitrina de la industria para dar a conocer el estado de avance de los diversos proyectos y generar redes de contactos. Prueba de que pese a las dificultades el sector se mantiene activo es el hecho que según estimaciones del SNL Metals Economics Group el presupuesto de exploración mundial de metales no ferrosos habría vuelto a registrar un máximo histórico en 2012, alcanzando los US$21.500 millones, esto es US$3.300 millones por encima de 2011. Asimismo, el Índice de Actividad de Proyectos que elabora esta entidad anotó un incremento en septiembre y nuevamente en octubre, señal que en todo caso el SNL MEG llama a tomar con cautela. Por todo esto, si bien el financiamiento es un tema complejo, no es una barrera infranqueable para las mineras junior que realizan con seriedad su trabajo. Una historia distinta, si embargo, es el clima para la inversión minera y la estabilidad de las reglas del juego por parte de los países anfitriones. El reportaje central sobre jurisdicciones emergentes en minería da cuenta del impacto que tiene un adecuado marco regulatorio.

Nuestra portada: Trabajos de construcción del proyecto Cobre Panamá. Foto gentileza de Minera Panamá. LATINOMINERIA (M.R.) ISSN 0717-0508 es una publicación para la industria minera en América Latina, creada en 1991 por G & T International (BVI) Ltd., con sede en Cutlass Building, Wickham´s Cay, Road Town, Tortola, British Virgin Islands. Oficinas editoriales: Antonio Bellet 444 piso 6, Providencia, Santiago. C.P. 750-000, Santiago, Chile. Tel. (56-2) 757 4200, Fax (56-2) 757 4201, web: www.latinomineria.com

08 30

El rol clave de las empresas de ingeniería Las cifras estimadas en inversiones mineras hacia 2020 platean un escenario dinámico para las empresas de ingeniería en la región. No obstante, existe una mayor cautela.

65

Enami EP: Avanzando en la determinación de recursos mineros de Ecuador

16

CEO de B2Gold: “No somos imprudentes, escuchamos y analizamos los riesgos”

21

Latino Noticias

27

Hans Rasmussen, CEO de Colombia Crest Gold: “En Colombia hay muchas oportunidades”

35

Colossus Minerals: Serra Pelada iniciaría producción a mediados de 2013

37

Paul Rollinson, CEO de Kinross: “Sudamérica es una jurisdicción importante para nosotros”

40

Debate minero en Argentina: Crecimiento ceñido a reglas claras y más exploración

43

Goldcorp en Argentina: Cerro Negro avanza con paso firme

46

Charles Jeannes, CEO de Goldcorp: “No sabemos cuándo EIA de El Morro será completado”

50

Mina Pirquitas avanza en el cumplimiento de su plan de producción

52

Cal en Argentina: Apostando por el crecimiento en la demanda minera

55

Ross Gallinger: “PDAC 2013 ofrece oportunidades sin igual”

61

Chile Engineering: Chile busca ser centro regional de ingeniería

63

Rockwell Automation: Latinoamérica lidera crecimiento

71

Matriz energética y Huella de Carbono

72

Mercado Latino / Agenda

76

SIGUENOS EN

@Latino_mineria

Director: Ricardo Cortés D. (rcortes@editec.cl) • Subdirector: Roly Solís S. (rsolis@editec.cl) • Gerente Editorial: Pablo Bravo P. (pbravo@editec.cl), Editor: Miguel Toledo B. (mtoledo@editec.cl) • Editora online: Pamela Castellanos (pcastellanos@editec.cl) • Colaborador en Argentina: Flavia Seva • Redacción comercial: Karina Jiménez (kjimenez@editec.cl) • Versión en inglés: Tom Azzopardi, Roberto Andrade • Gerente Comercial: Julio Herrera (jherrera@editec.cl) • Jefa de Ventas Internacionales: Alejandra Cortés (acortes@editec.cl) • Diseño y Producción: Ediarte S.A. Director de Arte: Alfredo Eloy, Diseño Gráfico: Susana Monreal M. • Fotografía: Juan Carlos Recabal, Jorge Loyola • Impresión: Morgan Impresores.


reportaje / news report N U E V O S P R O TA G O N I S TA S

Países emergentes mineros

Importantes proyectos mineros se están desarrollando en países de América Latina que hasta ahora estaban al margen de la minería formal y a gran escala. El éxito de estas iniciativas podría contribuir a abrir las puertas a esta actividad en nuevos y atractivos mercados, donde todavía es vista con recelo.

A

mérica Latina tiene una peso protagónico en la industria minera. No por nada ha venido liderando en los últimos años el gasto en exploración, atrayendo en 2011 el 25% del total, según cifras del Metals Economic Group. Países como Chile, Perú y México, son actores consolidados de este rubro, pero en el último tiempo se están sumando nuevas jurisdicciones que ven en la minería -siguiendo el modelo de los anteriores- una oportunidad de crecimiento y mejora para sus sociedades. Son distritos emergentes en materia de actividad extractiva. Todavía con debates internos no resueltos y en muchos

8

l

Latinominería l enero-febrero / january-february 2013

casos carentes de un marco regulatorio establecido en este campo, pero que tienen el potencial y la oportunidad de transformarse en actores relevantes, gracias al desarrollo de proyectos de clase mundial. Uno de los casos más avanzados lo constituye Pueblo Viejo, en República Dominicana, el cual al cierre de esta edición ya se encontraba en su fase de puesta en marcha. Según cronograma, se esperaba iniciar la producción comercial en diciembre. El yacimiento está ubicado en el distrito histórico de Cotuí, en la provincia de Sánchez Ramírez, a unos 100 km de la capital Santo Domingo, en el mismo sector donde se desarrolló la antigua operación minera que manejaba la mina Rosario Dominicana.


reportaje / news report Proyecto Cobre Panama, de Inmet.

NEW PROTAGONISTS

Cobre Panama project, developed by Inmet.

The emerging mining countries Major mining projects are being developed in countries in Latin America that were previously closed to or ignored by the largescale formal mining industry. The success of these projects could help the sector to open the doors to new and attractive markets where it is still viewed with suspicion.

Foto cortesía de Minera Panamá / Photo courtesy of Minera Panama

L

El proyecto está siendo administrado y será operado por Barrick Pueblo Viejo, una subsidiaria de Barrick Gold. En 2006, Barrick adquirió los activos de Placer Dome en todo el mundo, que incluían los derechos mineros de Pueblo Viejo. Para desarrollar este proyecto, Barrick se encuentra asociado con Goldcorp (40% de la propiedad). La inversión requerida para la construcción de este depósito se eleva a unos US$3.800 millones. Las cifras que maneja Barrick apuntan a obtener una producción media anual de oro, correspondiente a su 60% de participación, del orden de 625.000 a 675.000 onzas, con un cash cost total en su primer quinquenio de operación de US$300 US$350 por onza.

atin America is a key region for the mining industry. In recent years, it has led the way in terms of spending on exploration, attracting 25% of global expenditure on this item during 2011, according to figures from the Metals Economic Group. Countries such as Chile, Peru and Mexico are consolidated participants in the industry, but recently new jurisdictions have begun to see in mining – following the model set by the established countries - an opportunity to grow their economies and improve their societies. These are emerging regions for the extractive industries. Although there are still unresolved internal debates and, in many cases, a lack of a regulatory framework, but they have potential and the opportunity to become major participants, thanks to the development of world-class projects. One of the most advanced examples is Pueblo Viejo in the Dominican Republic which was starting up when this issue went to print. Commercial production is expected to begin in December. The deposit is located in the historic district of Cotuí in the province of Sanchez Ramirez, around 100 kilometers from the capital Santo Domingo, in the same area where the Rosario Dominicana mining operation once existed. The project is being managed and will be operated by Barrick Pueblo Viejo, a subsidiary of Barrick Gold. In 2006, Barrick acquired the global assets of Placer Dome, which included the mining rights for Pueblo Viejo. Barrick has allied with Goldcorp (which owns 40% of the property) to develop the project. Building the project is expected to cost around US$3.8 billion. Barrick expects to achieve average annual gold production of 625,000-675,000 ounces, based on its 60% stake, with a cash cost during its first five years of operation of US$300-350 an ounce.

CONTRIBUTION

The document Analysis of the Economic and Social Effects of the Pueblo Viejo Mining Project published last June by the Centre for Social Responsibility in Mining (CSRM) at the University of Queensland, Australia, examines the development opportunities which the mining industry can offer Latin America and the Caribbean. The report highlights that since 2004, the mining industry’s contribution to the region’s internal product has tripled from US$100 billion to more than US$315 million in 2010. “If this trend continues (based on the current portfolio of mine projects), the figure could exceed US$400 billion annually by 2020. This would represent an historic contribution of 12.5% to Latin America’s total internal product,” says the study, based on data produced by the United Nations’ Economic Commission for Latin America and the Caribbean (ECLAC). But beyond this contribution, CSRM underlines that the current expansion of mining “represents a unique opportunity to improve the region’s socioeconomic conditions, assuming that the growth of brute internal product represents the creation of added value and economic wealth.” In other words, the materialization of new mine projects increases the economic resources available to the states where these deposits are located; increases the demands for goods and services required by the mining industry; creates better job opportunities and intensifies efforts to increase the productivity of existing jobs. “Effects which constitute key aspects for the development of social capital,” the report concludes. In the concrete example of Pueblo Viejo, the project is expected to generate added value equivalent to 2.4%-2.9% of the Dominican Republic’s gross domestic product, or the equivalent of around US$1.232 billion annually, during its first ten years of production, including direct and indirect effects. “Considering that the Dominican Republic’s GDP has increased constantly (with the exception of the years of 2003 and 2004) from US$10 billion in 1990 to US$46.8 billion in 2009, an important effect could be its contribution to economic stability to strengthen national added value and reduce the risk of strong falls in GDP,” the study states.

enero-febrero / january-february 2013 l Latinominería l

9


En sus 28 años de trayectoria, Constructora Gardilcic ha liderado importantes proyectos en el ámbito de la construcción, minería y energía, contribuyendo así al desarrollo del país. Hoy se presenta como una compañía sólida, confiable y dinámica, que se adelanta a los requerimientos del mercado gracias a su vasta experiencia, un valioso equipo de trabajo y el fuerte compromiso con sus clientes.

Certificada en las normas :

ISO 9001 ··· ISO 14001 ··· OHSAS 18001


reportaje / news report

Fotos cortesía de Barrick Pueblo Viejo / Photos courtesy of Barrick Pueblo Viejo

Desde 2004 la contribución al PIB del sector minero de América Latina se ha triplicado desde US$100.000 millones a más de US$315.000 millones en 2010. Si esta tendencia continúa (basado en la cartera actual de proyectos mineros) la cifra podría exceder los US$400.000 millones por año para 2020.

APORTE

En el documento Análisis de los Efectos Económicos y Sociales del Proyecto Minero Pueblo Viejo, elaborado por el Centro de Responsabilidad Social en Minería (Centre for Social Responsibility in Mining, CSRM) de la Universidad de Queensland, Australia, y dado a conocer en junio último, uno de los aspectos abordados lo constituyen las oportunidades de desarrollo que se están presentando en América Latina y el Caribe, por efecto de la actividad minera. Al respecto, el informe destaca que desde 2004 la contribución al PIB del sector minero de la región se ha triplicado desde US$100.000 millones a más de US$315.000 millones en 2010. “Si esta tendencia continúa (basado en la cartera actual de proyectos mineros) la cifra podría exceder los US$400.000 millones por año para 2020. Esto representaría una contribución histórica del 12,5% al PIB total de América Latina”, añade el estudio, sobre la base de datos de la Cepal. Pero más allá de este aporte, el punto que subraya el CSRM es que el actual aumento de actividades mineras “representa una oportunidad única para mejorar las condiciones socioeconómicas de la región, asumiendo que el crecimiento del producto interno bruto representa la creación de valor agregado y riqueza económica”. En otras palabras, la materialización de nuevos proyectos mineros incrementa los recursos económicos disponibles por los Estados donde se ubican estos yacimientos; aumentan la demanda de los bienes y servicios que soportan tales actividades mineras; crean mejores oportunidades de trabajo e intensifican los esfuerzos para incrementar la productividad de los trabajos actuales. “Efectos que constituyen aspectos claves para el desarrollo del capital social”, concluye.

Pueblo Viejo está ubicado en el distrito histórico de Cotuí, en la provincia de Sánchez Ramírez, a unos 100 km de la capital Santo Domingo. Pueblo Viejo is located in the historic district of Cotuí in the province of Sanchez Ramirez, around 100 kilometers from the capital Santo Domingo.

En el caso concreto de Pueblo Viejo se espera que el proyecto genere un valor agregado entre 2,4% a 2,9% del PIB de República Dominicana, vale decir unos US$1.232 millones por año, durante la primera década de operación, incluyendo los efectos directos e indirectos. “Considerando que el PIB de República Dominicana ha aumentado de manera constante (a excepción de los años 2003 y 2004) de US$10.000 millones en 1990 a US$46.800 millones en 2009, un importante efecto puede ser su contribución a la estabilidad económica, al fortalecer el valor agregado nacional y disminuir el riesgo de fuertes caídas en el PIB”, puntualiza el estudio. Asimismo, se estima que Pueblo Viejo podría exportar unos US$1.330 millones anuales, con lo cual su contribución al total de los envíos del país caribeño será de un 15% (estos cálculos se realizaron asumiendo un precio fijo del oro de US$1.400 por onza).

PANAMÁ

Otro caso emblemático es Panamá. En esta nación -más conocida hasta hora por ser la puerta que conecta los océanos Atlántico y Pacífico- se desarrolla uno de los proyectos cupríferos más grandes del mundo, medido por costos de capital y recursos: Cobre Panamá. De hecho al cierre de esta edición su controladora, la canadiense Inmet (80% de la propiedad, mientras que el otro 20% está en manos del consorcio KPMC) anunciaba un incre-

In addition, it is estimated that Pueblo Viejo could export around US$1.33 billion annually, implying that it would account for 15% of the Caribbean country’s total exports (these calculations are based on a fixed gold price of US$1,400 an ounce).

PANAMA

Another emblematic case is Panama. This country, best known today for being the gateway between the Atlantic and Pacific Oceans, is today home to one of the world’s largest copper projects, whether measured by capital costs or resources: Cobre Panama. As this magazine went to press, its controlling shareholder, Canada’s Inmet (which owns 80% of the property, while the other 20% is in the hands of the consortium KPMC) had just announced a 27% increase in the proved and probable mineral reserves to approximately 11,9 million tons. The estimated gold content also rose by 41% to 7.3 million ounces. The resources committed to its construction total US$6.18 billion, representing the largest private investment ever undertaken in the history of Panama. The project’s merits have attracted the interest of major mining companies keen to take control of Inmet. At the end of November, its board rejected an unsolicited offer from First Quantum Minerals, leading analysts to speculate that other major participants in the industry, such as Teck or Freeport McMoRan could present offers.

enero-febrero / january-february 2013 l Latinominería l

11


Once in commercial operation, which is scheduled to begin in 2016, the open pit mine will produce around 266,000 tons of copper annually, as well as byproducts: 87,000 ounces of gold, 1.5 million ounces of silver, and 2,900 tons of molybdenum annually, according to data made available last December. The Cobre Panama project consists of three deposits which will be exploited successively through the construction of three open pit mines. The process begins with the extraction of copper-bearing rocks which are then transported to the grinding and floatation plants. The milled ore is then processed in 300 cubic meter floatation tank cells to produce a rougher concentrate and tailings. The copper concentrate is pumped through underground pipelines from the floatation plant to port installations on the Caribbean Sea from where it will be exported by ship to smelters overseas. Extracted waste rock will be stored in deposits near the pits which will be recovered through reforestation. Once operational, Cobre Panama will make this country become one relevant exporter of copper. It will also establish the foundations for a model of responsible mining. In fact the company has taken on the challenge of “showing that twenty-first century mining is environmentally and socially responsible.

CENTRAL AMERICA

In the rest of Central America, another country which has opened its doors to mining investment is Nicaragua. In an interview published in this edition of LATINOMINERIA (see page 21), Clive Johnson, director and CEO of the mining company B2Gold, which owns two operating gold mines in the country - Limón and La Libertad - highlights the country’s positive investment climate and that the company has become one of Nicaragua’s biggest foreign investors. “And we have become the country’s third largest employer,” he says. B2Gold expects to produce around 200,000 ounces of gold in this country in 2013. The Nicaragua Chamber of Mines highlights that in recent years exports of gold have been second only to those of coffee. Given the dynamism of the sector, the industry predicts that gold mining will become the largest sector in the country’s economy by 2015. According to official figures, gold production rose from 83,200 ounces in 2009 to 186,910 ounces in 2011. “We are continuing to invest in exploration, guaranteeing annual growth of 10%, and we are continuing to investigate the geology,” the chamber’s vice-president Denis Lanzas recently stated. The situation differs in other countries in the isthmus. Businessmen in Guatemala

12

l

Foto cortesía de Minera Panamá / Photo courtesy of Minera Panama

reportaje / news report

Una vez en operación, Cobre Panamá convertirá a este país en un destacado exportador de cobre. Once operational, Cobre Panama will make this country become one relevant exporter of copper.

mento del 27% en las reservas probadas y probables de mineral, a aproximadamente 11,9 millones de toneladas. El contenido estimado de oro también aumentó, en un 41%, a 7,3 millones de onzas. Los recursos comprometidos para su construcción ascienden a cerca de US$6.180 millones, siendo así la mayor inversión privada realizada en la historia de este país. El atractivo de este proyecto se ha manifestado, además, en el interés por parte de otras grandes compañías mineras por tomar el control de Inmet. A fines de noviembre su junta directiva rechazó una oferta no solicitada por parte de First Quantum Minerals, en tanto que analistas no descartaban la presentación de ofertas por parte de otros grandes actores del rubro, como Teck o Freeport McMoRan. Una vez en operación comercial, la cual está prevista para 2016, la mina a rajo abierto produciría del orden de 266.000 toneladas anuales del metal rojo, y como subproductos: 87.000 onzas de oro, 1,5 millones de onzas de plata y 2.900 ton de molibdeno por año, según los datos vigentes hasta diciembre último. El proyecto Mina de Cobre Panamá contempla tres yacimientos, los cuales serán explotados sucesivamente mediante la conformación de tres tajos a cielo abierto. El proceso se inicia con la extracción de las rocas con mineral de cobre. Estas rocas son transportadas a las plantas de trituración y de flotación.

Latinominería l enero-febrero / january-february 2013

El mineral molido se procesa a través de la flotación en tanque de celdas de 300 m 2 para producir un concentrado más áspero (rougher) y relaves. El concentrado del mineral de cobre es conducido por medio de una tubería de lodos subterránea, desde la planta de flotación hasta las instalaciones del puerto en el Mar Caribe, desde donde se exportará por barco a varias fundiciones extranjeras. Las rocas extraídas sin mineral de cobre se almacenarán en depósitos cercanos a los rajos, para su recuperación por medio de revegetación. Una vez en operación, Cobre Panamá convertirá a este país en un destacado exportador de cobre. Junto con ello, sentará las bases de un modelo de minería. De hecho, en la compañía asumen como un reto “demostrar que la minería del siglo XXI es responsable ambiental y socialmente”.

CENTRO AMÉRICA

En el resto de Centro América otro de los países que ha abierto sus puertas a la inversión minera es Nicaragua. Clive Johnson, CEO y director de la minera B2Gold, que cuenta con dos faenas auríferas en producción en ese país -Limón y La Libertad- en entrevista que llevamos en esta edición de LATINOMINERÍA (ver pág. 21), destaca el buen clima que ha encontrado en ese país, al punto que la compañía se ha transformado en uno de los mayores inversionistas en Nicaragua, “y nos hemos convertido en el tercer empleador más grande del


reportaje / news report país”, acota. B2Gold espera producir unas 200.000 onzas de oro en ese país en 2013. Desde la Cámara Minera de Nicaragua (Caminic) han hecho hincapié que en el último tiempo las ventas de oro al exterior solo son superadas en monto por las de café. Y producto del dinamismo que muestra el sector, avizoran que para 2015 la minería aurífera podría convertirse en el rubro número uno. La producción en onzas troy del oro y la plata pasaron de 83.200 en 2009 a 186.910 en 2011, de acuerdo con balances oficiales. “En exploración seguimos invirtiendo, garantizando así un crecimiento anual del 10%, y continuamos con las investigaciones en el área de geología”, señaló recientemente el vicepresidente de la entidad gremial, Denis Lanzas. En otros países del istmo, sin embargo, el escenario es distinto. En Guatemala los empresarios del sector han manifestado su preocupación ante la resistencia de las comunidades a esta actividad, así como por el retraso en la aprobación de los permisos y las reformas a la Ley de Minería. Otro tema que generó ruido en 2012 fue la posibilidad de una modificación constitucional que permitiría al Estado

participar con hasta el 40% en la propiedad de los nuevos proyectos extractivos, provocando inquietud entre inversionistas y empresarios. Cabe destacar que en este país, luego de dos años de no otorgar licencias mineras, el Ministerio de Energía y Minas autorizó la exploración en los departamentos de Alta Verapaz, El Progreso, Zacapa, Jalapa, Jutiapa, Quiché y Santa Rosa. Uno de los proyectos más relevantes en marcha lo constituye la mina de plata Escobal, de la compañía minera Tahoe Resources. Al tercer trimestre de 2012 el contrato EPCM del molino y las instalaciones presentaba un avance del 60%, en línea con el cronograma y el presupuesto, según informó la empresa; en tanto que el desarrollo subterráneo presentaba un avance de 55%. El presupuesto de capital de este emprendimiento asciende a US$327 millones En la vecina Honduras, en tanto, la Asociación Nacional de Industriales (Andi) ha urgido al Congreso Nacional la aprobación de una nueva Ley de Minería, con el objetivo de atraer inversión extranjera al rubro. Adolfo Facussé, presidente de la entidad, señaló a medios locales que "Honduras tiene un gran potencial minero, pero su explotación debe regularse”.

Since 2004, the mining industry’s contribution to the region’s internal product has tripled from US$100 billion to more than US$315 million in 2010. If this trend continues (based on the current portfolio of mine projects), the figure could exceed US$400 billion annually by 2020.

have expressed concern about the resistance shown by local communities towards the industry, as well as the delays in approving permits and reforms to the mining law. Another issue causing concern in 2012 was a possible modification of the constitution which would allow the state to own up to 40% of new extractive projects, worrying investors and business leaders. After two years during which no mining licenses were granted, the Ministry of Energy and Mines authorized exploration in the departments of Alta Verapaz, El Progreso, Zacapa, Jalapa, Jutiapa, Quiché and Santa Rosa. One of the biggest projects in development is the Escobal silver mine, owned by the mining company Tahoe Resources. By the third quarter of 2012, the EPCM contract for the mill and installations was 60% complete, on schedule and within budget, the company reported. Meanwhile, underground development of the mine is 55% complete. The project is expected to require an investment of US$327 million.

Países como Chile, Perú y México, son actores consolidados en minería, pero en el último tiempo se están sumando nuevas jurisdicciones que ven en esta actividad una oportunidad de crecimiento y mejora para sus sociedades. Countries such as Chile, Peru, and Mexico are consolidated participants in mining, but recently new jurisdictions have begun to see in this industry an opportunity to grow their economies and improve their societies.

enero-febrero / january-february 2013 l Latinominería l

13


Fertilizers &Chemicals

Metals &Mining

600+

delgados de la industria

8-10 de abril 2012, Grand Hyatt, Santiago, Chile

LA 12ª

T

Conferencia Mundial del Cobre 2013

Hasta un 25% de descuento por inscripción de grupos

La Conferencia Mundial del Cobre más importante del mundo

www.worldcopperconference.com Los oradores destacados son:

En asociación con

Hernán de Solminihac Tampier, Ministro de Minería, Gobierno de Chile

Robert M. Friedland, Director Ejecutivo y Fundador, Ivanplats Limited

Seminario El Mercado del Ácido Sulfúrico

Thomas Keller, CEO, Codelco

Richard Adkerson, President & CEO, FreeportMcMoRan Copper & Gold

Foro Mercado de Molibdeno ‘El foco está en China’

Diego Hernandez C. CEO, Antofagasta Minerals Martin Abbott, CEO, Bolsa de Metales de Londres Andrew Harding, CEO, División Cobre, Rio Tinto

Vanessa Davidson, Gerente de Grupo, Cobre, CRU Sean I. Waller, Presidente y Director, Candente Copper Corp

Martes 9 de abril, 2013: 15:00 - 17:30

Miércoles 10 de abril, 2013: 15:00 - 17:00 ¡No se lo pierda!

Cumbre Minería, Energía y Agua Jueves 11 de abril, 2013: 09:00 - 17:30

Interpretación simultánea Inglés/Español /Simultaneous English/Spanish interpretation Avalado por:

Auspiciador Gold:

Auspiciador Silver:

Socio de medios: www.cescoweek.com

Organised by CRU Events


reportaje / news report

Foto gentileza de Kinross Ecuador / Photo courtesy of Kinross Ecuador

Meanwhile, in neighboring Honduras, the national industry association Andi has urged the National Congress to approve the new mining legislation with the aim of attracting to foreign investment to the sector. Adolfo Facussé, chairman of the organization, told local media that "Honduras has huge potential for mining, but its development must be regulated.” In 2011, exports of gold, silver, lead, zinc, iron ore and other minerals totaled US$238 million, according to the Honduran National Association of Metallic Mining (Anamih) and the country’s central bank.

ECUADOR

Mientras el Gobierno de Ecuador y Kinross buscan llegar a un acuerdo satisfactorio para ambas partes, la multinacional continúa avanzando en estudios para optimizar Fruta del Norte. While the Ecuatorian government and Kinross seek a mutually satisfactory agreement, the multinational has continued to push ahead with studies to optimize Fruta del Norte.

En 2011 el valor exportado de oro, plata, plomo, zinc, óxido de hierro y otros alcanzó unos US$238 millones, según cifras de la Asociación Nacional de Minería Metálica de Honduras (Anamih) y el Banco Central de esa nación (BCH).

ECUADOR

La convención PDAC 2012, en Canadá, sirvió de caja de resonancia para la ceremonia mediante la cual el Gobierno Ecuatoriano firmaba en Quito el primer contrato de explotación para una iniciativa de minería a gran escala en su territorio: el proyecto de cobre Mirador, impulsado por la firma de capitales chinos Ecuacorriente. En esa oportunidad el presidente Rafael Correa afirmó en Ecuador que se iniciaba “una nueva era". No obstante, a pesar del gran potencial geológico que posee el país y la presencia de una serie de emprendimientos, el camino ha resultado más empedrado que lo previsto. Durante buena parte de 2012 el Gobierno y la minera Kinross han estado en un constante “tira y afloja” en la negociación para dar luz verde al segundo convenio de explotación para un gran yacimiento en el país andino: la futura faena aurífera Fruta del Norte. Mientras se busca llegar a un acuerdo satisfactorio para ambas partes, la multinacional continúa

avanzando en estudios para optimizar FDN (ver nota pag. 40) Entre tanto, la minera Iamgold optó por vender a la canadiense INV su proyecto Quimsacocha. A fines de año la compañía International Minerals Corporation (IMC) anunciaba una decisión similar, comunicando que se desprendía de sus concesiones Río Blanco y Gaby en la provincia ecuatoriana del Azuay. Condiciones como el pago de regalías anticipadas, el margen de soberanía del Estado para tener al menos el 50% de las utilidades mineras, y el impuesto a las ganancias extraordinarias, han constituido algunas de las principales piedras de tope entre el Gobierno y los privados. La solución a estas discrepancias por ambas partes constituiría un importante aliciente para la inversión minera. De esta forma el escenario minero en la región muestra que hay grandes oportunidades para seguir creciendo y desarrollando la minería, pero contar con los recursos geológicos o financieros no es suficiente. Demostrar los beneficios sociales que genera la minería responsable y formal es clave; los proyectos que hoy se están materializando en los nuevos países que han abierto sus puertas a la minería moderna, sin duda, serán un referente.

The PDAC 2012 convention, In Canada, served as a sounding board for the ceremony at which the government of Ecuador signed in Quito the first production contract for a large-scale mining project in its territory; the Mirador copper project, owned by Chinese-backed Ecuacorriete. President Rafael Correa stated in Ecuador that it marked the beginning of “a new era.” However, despite the country’s huge geological potential and the existence of a series of projects, the path has proved harder than expected. During a large part of 2012, the government and the Kinross mining company have been involved in a constant “to and fro” in negotiations to green-light the second production contract for a large mine in the Andean country: the future Fruta del Norte mine. While both sides seek a mutually satisfactory agreement, the multinational has continued to push ahead with studies to optimize FDN (see article on page 40). Meanwhile, mining company Iamgold opted to sell its Quimsacocha project to Canada’s INV. At the end of the year, International Minerals Corporation announced a similar decision, stating that it will sell its Rio Blanco and Gaby concessions in the Ecuadorian province of Azuay. Conditions such as the anticipated payment of royalty, the state’s margin of sovereignty over at least 50% of a mine’s profits and the tax on super-profits are the main obstacles to agreement between the government and the private sector. Reaching a solution to the discrepancies between the two sides would be very encouraging to mine investment. There are signs that there are major opportunities for the mining industry to continue growing and developing but that having sufficient financial or geological resources is not enough. Demonstrating the social benefits which can derive from responsible and formal mining is key; there is no doubt that the projects which today are being developed in these new countries which have opened their doors to modern mining will set the benchmark.

enero-febrero / january-february 2013 l Latinominería l

15


reportaje / news report

ENAMI EP

The state company is working on a diverse portfolio of mineral and non-metallic projects which it hopes can be exploited in a sustainable manner.

"T

here are great expectations about mining in Ecuador, following our government{s decision to foment the sector and make it one of the drivers of our development,” says the engineer Fabian Rueda, chief executive of the state mining company Enami EP. The central aim of the organization he leads is to administrate the strategic sector of non-renewable natural resources in the mining sector so they can be exploited in a sustainable manner, in line with Ecuador’s Mining Law. I n c o n v e r s a t i o n w i t h L AT I N OMINERIA, the executive explains that one of the priority tasks for the next four to eight years under this framework is to determine the size of the reserves, “to know on a scientific basis what resources we have and to see if these can be transformed into real projects,” he says. The company is working on a portfolio of projects of diverse characteristics which Rueda describes as “quite interesting and highly strategic within the context of large-scale mining in the coming years.” They include a series of projects focused on determining copper and molybdenum resources distributed across Ecuador, from north to south. “This copper belt which comes from Chile, passes through Peru, and continues through Ecuador towards Colombia,” he adds. One of these is being explored as the subject of a possible alliance with the giant copper producer Codelco. Rueda underlines the importance of this agreement given the knowledge

16

Foto gentileza de Enami EP / Photo courtesy Enami EP

Working to determine Ecuador’s mineral potential

ENAMI EP

Avanzando en la determinación de recursos mineros de Ecuador La empresa estatal cuenta con una variada cartera de proyectos de minerales y productos no metálicos, que busca evaluar para su eventual aprovechamiento sustentable.

"E

l actual momento de la minería en Ecuador es de mucha expectativa, debido a la decisión de nuestro gobierno nacional de impulsar la actividad y que pase a constituirse en uno de los elementos del desarrollo”, afirma el ingeniero Fabián Rueda, gerente general de la Empresa Nacional Minera, Enami EP. Precisamente el objetivo principal de la entidad que encabeza es la gestión del sector estratégico de los recursos naturales no renovables en la actividad minera, para su aprovechamiento sustentable, conforme a la Ley de Minería de Ecuador. En este marco, el ejecutivo, explica en conversación con LATINOMINERÍA, que

l Latinominería l enero-febrero / january-february 2013

una de las tareas prioritarias a la cual están abocados los próximos cuatro a ocho años es la determinación de reservas, “es decir, saber a ciencia cierta qué es lo que tenemos de recursos y ver si estos se pueden transformar en proyectos reales”, puntualiza. Para ello, la empresa cuenta con un patrimonio de proyectos de diversas características, que Rueda califica como “bastante interesantes y muy estratégicos dentro del contexto de la minería a gran escala de los próximos años”. Entre estos hay una serie de emprendimientos enfocados a la determinación de los recursos en el área del cobre y el molibdeno, desde el norte al sur del territorio ecuatoriano: “Precisamente por


reportaje / news report

One of the priority tasks for the next four to eight is to determine the size of the reserves.

este cinturón cuprífero que viene desde Chile, pasa por Perú y continúa por Ecuador hacia Colombia”, añade. Dentro de estos prospectos hay uno que están trabajando en posible alianza con el gigante cuprífero Codelco. Al respecto, Rueda hace hincapié en la relevancia de este acuerdo, por todo el conocimiento que puede aportar la empresa estatal chilena y su tradición en minería cuprífera. “Es así que siendo este proyecto en el área norte del país uno de los primeros (que están impulsando en Ecuador), queremos hacerlo bien; es decir, cumpliendo con elevados estándares técnicos, una alta responsabilidad social y respeto al

La empresa cuenta con un patrimonio de proyectos de diversas características. The company is working on a portfolio of projects of diverse characteristics.

medio ambiente (…) Codelco sabe hacerlo, entonces consideramos que en un futuro será el aliado ideal para el inicio de la minería en Ecuador y de apoyo a la Empresa Nacional Minera”, afirma. Consultado sobre la etapa en que se encuentra esta iniciativa, Rueda dice que durante los últimos dos años lo que se ha hecho son estudios prospectivos, de geofísica, geoquímica, para establecer con certeza si existe una anomalía muy importante. “Hemos visto que sí es posible que exista un buen recurso -añade-, por lo tanto es necesario pasar a siguientes etapas”. Esto implica realizar estudios de exploración inicial y avanzada, para lo cual están trazando los primeros pasos para cumplir con la legislación local, en cuanto a los licenciamientos ambientales y todo lo que se requiera para en el futuro cercano pode realizar exploración “y determinar de manera exacta qué recursos tenemos en esa concesión”, acota. En esta fase prospectiva están trabajando en la zona geólogos ecuatorianos junto con profesionales de Codelco. Otro grupo de proyectos interesantes que conforman la cartera Enami EP son los de arenas ferrosas, “para lo cual el cuidado del ambiente es incluso de más alta prioridad”, subraya. El ingeniero sostiene que hay muy buenos prospectos de que en sectores del litoral ecuatoriano existan interesantes reservas de arenas ferrotitaníferas:

which Chile’s state mining company and its experience of copper mining could provide. “As a result, this project in the northern part of the country is one of the first (to be developed in Ecuador), and we want to do it well; this means complying with high technical standards, a high degree of social responsibility and respect for the environment (…) Codelco knows how to do this, so we believe that in the future they would be the ideal partner to launch mining in Ecuador and to support the state mining company Enami,” he says. Asked at what stage this project is currently, Rueda says that prospective geophysical and geochemical studies have been carried out during the last years to establish if there is a significant anomaly. “We have seen that there is a possibility that there is a good resource there so it is now necessary to move to the subsequent stages,” he adds. This implies carrying out initial and advanced exploration for which they are taking the first steps to comply with local legislation, in terms of environmental licenses and everything that is required to be able to carry out exploration in the near future “and determine exactly what resources we have in the concession,” he adds. During the prospective stages, Ecuadorian geologists are working in the area alongside professionals from Codelco.

Foto gentileza de Enami EP / Photo courtesy Enami EP

Una de las tareas prioritarias a la cual están abocados en Enami EP los próximos cuatro a ocho años es la determinación de reservas.

enero-febrero / january-february 2013 l Latinominería l

17


reportaje / news report

Investor signs Chilean lawyer Jerónimo Carcelén, partner of the law firm Carcelén & Cia., advises Codelco on the project being developed in conjunction with Enami EP. The professional with broad international experience in this field, since he has been involved in both projects with international organizations supporting institutionality development and mining regulation, and advising companies looking for business in the region. Countries such as Ecuador, Bolivia and Colombia, and others in Central America, are following the logic of generating new regulatory frameworks for mining, adds the expert. There are not unique recipes, but several alternatives. However, he acknowledges that the trend goes toward more restrictive regulatory frameworks than those Chile and Peru have; these nations are already consolidated in this sector, so an interest by the states to be more directly involved in this activity is noted. But beyond more or fewer restrictions, for Carcelén what is relevant is to have stable and clear rules. “The new institutionality always requires an implementation time and that could generate more uncertainty (for mining companies)" he warns. In order to meet that challenge, he advocates for good protection policies for foreign investors and to provide nondiscriminatory treatment“; starting from that there is already a good basis for companies to do their investments” says.

Another group of interesting projects in the Enami EP portfolio are the iron sands, “for which care for the environment is still the highest priority,” he underlines. The engineer explains that there are very good prospects in parts of the Ecuadorian coast where there are interesting reserves of ferro-titaniferous sands: “we are beginning a whole process of the first attempt to socialize these projects and see if one can really develop this operation, without affecting tourism, ecosystems or the development of the coastal communities.” Rueda is optimistic that it will be possible to exploit these minerals. Another project which Enami EP is evaluating is lime production in the south of the country. He says that they are trying to determine the size of the

18

“Estamos iniciando todo un proceso en primera instancia de socializar y ver si verdaderamente se puede ejecutar esta explotación, sin afectar al turismo, ni ecosistemas, ni el desarrollo de las comunidades costeras”. Rueda se muestra optimista de que en un futuro próximo sea posible extraer racionalmente estos minerales. Otras iniciativas que está evaluando Enami EP apuntan a la explotación de calizas en el sur del país. Precisa que están tratando de determinar reservas, y a base de eso, plantearse a futuro la eventual construcción de plantas cementeras ligadas a minas de calizas. “Aspiramos a que durante el próximo año podamos saber exactamente si tenemos un recuso que permita la factibilidad de avanzar hacia la fase de construcción de una planta en la parte sur del país”, puntualiza. En cuanto a los metales preciosos, Rueda dice que existe mucho potencial en la explotación de oro y plata. No obstante, explica que en sus inicios Enami EP ha dado un impulso con una visión más social, especialmente enfocada en la minería de oro aluvial en las áreas de Esmeraldas y del oriente ecuatoriano: “Hemos conformado asociaciones con las propias comunidades para una explotación racional, técnica y no contaminante en aquellos sitios donde hasta hace muy poco se realizaba mucha minería ilegal y se dejaba destruido el entorno”. Ahora la empresa está realizando un trabajo en conjunto con esas comunidades, lo cual se ha convertido en un proyecto de carácter social y de remediación de todo ese entorno que fue afectado.

“El actual momento de la minería en Ecuador es de mucha expectativa”, afirma el ingeniero Fabián Rueda, gerente general de la Empresa Nacional Minera, Enami EP. “There are great expectations about mining in Ecuador,” says the engineer Fabian Rueda, chief executive of the state mining company Enami EP.

PRIVADOS

Sobre la participación de los privados, Rueda comenta que las puertas están abiertas a la inversión, sobre todo en estas fases iniciales de la minería, donde buscar socios estratégicos con mucha experiencia en las áreas donde quieren incursionar, es vital. “No solamente se trata de conseguir inversión, sino un so-

Señales para el inversionista El abogado chileno Jerónimo Carcelén, socio del estudio jurídico Carcelén & Cía., asesora a Codelco en en el proyecto que está desarrollando en conjunto con Enami EP. El profesional cuenta con una amplia experiencia internacional en este campo, pues ha participado tanto en proyectos con organismos internacionales apoyando el desarrollo de institucionalidad y regulación minera, como también asesorando a empresas que quieren hacer negocios en la región. El especialista comenta que países como Ecuador, Bolivia y Colombia, así como otros en Centro América, están en esa lógica de generar nuevos marcos regulatorio para la minería. Para lo cual estima que no hay recetas únicas, sino diversas alternativas. Reconoce, no obstante, que la tendencia es a

l Latinominería l enero-febrero / january-february 2013

marcos regulatorios más restrictivos que los que poseen Chile y Perú, naciones ya consolidadas en este rubro, por cuanto aprecia un interés por parte de los estados de participar más directamente en esta actividad. Pero más allá de mayores o menores restricciones, para Carcelén lo relevante es contar con normas estables y claras. “La nueva institucionalidad siempre requiere un tiempo de implementación y eso sí puede generar más incertidumbre (para las compañías mineras)”, advierte. Para enfrentar ese desafío, aboga por buenas normas de protección al inversionista extranjero y procurar un trato no discriminatorio; “a partir de eso ya hay una buena base para que las compañías hagan sus inversiones”, sostiene.


reportaje / news report

reserves and, based on this, propose the construction of cement plants in the future linked to lime quarries. “We hope that during the next year we could know exactly if we have a resource which makes feasible the construction of a plant in the southern part of the country,” he says. Turning to precious metals, Rueda says that Ecuador has significant potential to produce gold and silver. However, he explains that since its origins, Enami EP has developed a social vision, focused especially on the mining of gold placers in the area of Esmeraldas and the east of the country. “We have formed associations with the communities themselves to ensure rational, technical and non-polluting operations in areas where until recently there was a lot of illegal mining and the environment was being destroyed.” The company is now working together with these communities on a social project to remediate all the environment which has been affected.

PRIVATE SECTOR

cio que sepa hacerlo con los más altos estándares, porque todos estos años de experiencia mundial han hecho que actualmente se pueda hacer minería de una manera muy amigable con el ambiente, y eso es lo que buscamos, socios de ese nivel”, reitera. Asimismo, señala que en Ecuador existen muchas concesiones que están en manos de privados y se encuentran desarrollándose en la fase exploratoria. Y añade que el gobierno nacional, a través del ministerio de Recursos Naturales No Renovables, emprenderá negociaciones en el corto plazo para poner en

licitación algunas áreas que puedan desarrollar nuevos inversionistas privados. Finalmente, consultado sobre el crecimiento de Enami EP, el gerente general de la compañía dice que terminan 2012 con aproximadamente 150 profesionales y que durante 2013 esperan llegar a unos 300, “porque nosotros vamos creciendo en los proyectos y ahora vamos a iniciar fases exploratorias en las cuales debemos tener 15 (expertos) en cada uno de estos emprendimientos, dedicados a la determinación de recursos mineros. Vamos escalando y creciendo de acuerdo a las necesidades operacionales de la empresa”, concluye.

Asked about the participation of private investors in the industry, Rueda says that the doors are open to investment, especially in the early phases of mine development where they want to seek strategic partners with significant experience in the areas which interest them. “It’s not just a question of attracting investment but also a partner who knows how to comply with the highest standards because all these years of global experience means that mining can now be undertaken in a very environmentally friendly way, and this is what we are looking for, partners of this pedigree,” he reiterates. In addition, he says that there are a large number of concessions in Ecuador in hands of private companies which are currently being explored. And he adds that the national government, working through the Ministry of Non-Renewable Natural Resources, will soon begin negotiations to hold tenders in some areas which could be developed by new private investors. Finally, asked about the growth of Enami EP, the company’s chief executive says that it will end 2012 with a staff of approximately 150 professionals and during 2013 they expect to reach 300 “as we develop the projects and we begin exploration. We need fifteen (experts) in each one of these projects, dedicated to determining mineral resources. We will continue expanding and growing in line with the company’s operational needs,” he concludes.

enero-febrero / january-february 2013 l Latinominería l

19


Su empreSa no pueDe eStar auSente CATÁLOGO OFICIAL

medIO OFICIAL

+ 5000 ejemplares

expOnOr 2013

L A

R E V I S TA

D E

L A

I N D U S T R I A

M I N E R A

E N

A M E R I C A

L AT I N A

Distribución en feria

Cierre comercial: 24 de abril de 2013

revise las tarifas y formatos del catálogo aquí o ingrese a www.latinomineria.com/exponor

La mejor vitrina para sus productos y servicios EXPONOR LATINO 1/2 HOR.indd 1

20-12-12 13:04


entrevista / interview

CEO DE B2GOLD:

Foto gentileza de B2Gold / Photo courtesy of B2Gold

“No somos imprudentes, escuchamos y analizamos los riesgos”

La producción de B2Gold en Nicaragua en 2013 debiera ser de alrededor de 200.000 onzas. Foto de la mina Limón. Production in 2013 will probably be around 200,000 ounces out of Nicaragua. Limon Mine’s picture.

De acuerdo con Clive Johnson, el enfoque no tradicional de B2Gold que favorece la exploración es la causa de su éxito. Nuevos descubrimientos en Nicaragua y una lucrativa fusión en Filipinas debieran incrementar las cifras de producción de la compañía en 2013.

D

esde su creación en 2007, B2Gold ha dejado su marca en la producción de oro al enfocarse en áreas del globo que no suelen estar en la primera línea de la industria minera. Con proyectos en regiones tan diversas como Nicaragua, Namibia y Colombia, la compañía canadiense con sede en Vancouver se ha hecho conocida por sus riesgos calculados. Hasta el momento, el balance de su aproximación es ampliamente positivo. Fundada por el equipo ejecutivo de Bema Gold poco después que esta compañía fuera adquirida por Kinross, el

modus operandi de B2Gold consiste en comprar intereses en propiedades que posiblemente abrigan yacimientos de oro. La adquisición es seguida por sondeos y perforaciones. Si los resultados son favorables, la compañía acaba construyendo y operando la mina. El éxito del modelo es demostrado por los dos yacimientos que el grupo opera en Nicaragua: La Libertad y Limón. El CEO y director de B2Gold, Clive Johnson, fue una figura clave en el crecimiento de Bema Gold, desde ser una junior especializada en exploración hasta transformarce en una empresa mediana, enfocada en la producción de oro. A la cabeza de B2Gold

CEO OF B2GOLD:

“We are not reckless, we listen and measure the risks” According to Clive Johnson, B2Gold’s non-traditional approach to exploration is the cause of their success. New discoveries in Nicaragua and a lucrative merger in the Philippines should boost the company production numbers in 2013.

S

ince its inception in 2007, B2Gold has left its mark on gold production by focusing on areas of the globe that are not usually in the first line of the mining industry. With projects in regions as diverse as Nicaragua, Namibia and Colombia, the Vancouver-based company is becoming known for their calculated risks. So far the balance of such approach is firmly in the black.

enero-febrero / january-february 2013 l Latinominería l

21


entrevista / interview

Founded by the Bema Gold management team after the company was acquired by the Kinross Corporation, B2Gold modus operandi is to purchase interests in properties likely to host gold deposits. Explorations and drilling campaigns follow. If the results are positive, the company itself will develop and operate the mines in the area. The model has been proven successful by the two mines the company owns in Nicaragua: La Libertad and Limón.

B2Gold is now one of the largest corporate investors in Nicaragua, and we are the third main employer in the country.

The CEO and director of B2Gold, Clive Johnson, was a key figure in Bema’s transition from junior exploration company to intermediate gold producer. As the head of B2G, Johnson oversees the long-term growth strategy and supervises the corporation’s day-to-day business. - Why has the company focused on areas that are not in the first line of mining, such as Nicaragua, Costa Rica, Colombia and Uruguay? We look for countries in economical and/or political transition, and enter when it’s safe –like Colombia. When we were in Bema in the late Eighties, we invested in Chile when our research told us the country was heading towards democracy and a free market economy. We were aware of the country’s mining history and wondered why more people didn’t look for gold there. The key is to maintain an open mind: (as Bema) we went to Russia in 1998, everybody thought we were crazy, and it was a very successful effort. There is less competition if you go to places others don’t feel comfortable. We also work well with governments by being transparent with the local authorities and respectful of the local peoples. - What are the advantages and challenges of this approach? Besides less competition, now we have built a lot of credibility. If we are talking to a government anywhere in the world and they wonder if we are going to do a good job, we point to our track record and environmental and social programs in Nicaragua and elsewhere. Also, if you are successful in one project, normally it will lead to other

22

B2Gold es ahora uno de los mayores inversionistas en Nicaragua y nos hemos convertido en el tercer empleador más grande del país.

desde su fundación, Johnson supervisa tanto la estrategia de crecimiento a largo plazo como las operaciones diarias de la firma. -¿Por qué B2Gold se ha enfocado en áreas que no están en la primera línea minera, como Nicaragua, Costa Rica, Colombia y Uruguay? Buscamos países que estén pasando por una transición política y económica e ingresamos cuando ofrecen seguridad, como en el caso de Colombia. Cuando con mi equipo estábamos en Bema, a fines de los ochenta, invertimos en Chile tan pronto tuvimos certeza de que el país caminaba rumbo a la democracia y adoptaba una economía de libre mercado. También estábamos al tanto de su tradición minera y nos preguntamos por qué la exploración aurífera era tan mínima. La clave es mantener una mente abierta. Cuando con Bema fuimos a Rusia en 1998, todo el mundo pensó que estábamos locos y resultó ser una operación muy exitosa. Hay menos competencia si uno va a lugares donde otros no se sienten cómodos. También nos esforzamos en mantener buenas relaciones con los gobiernos que nos reciben, siendo transparentes con las autoridades locales y respetuosos con la población local. - ¿Cuáles son las ventajas y desafíos de este enfoque? Fuera de una reducción en el número de competidores, a estas alturas tenemos bastante credibilidad. Si estamos hablando con un gobierno cualquiera y preguntan si haremos un buen trabajo, nuestro historial y el compromiso social y medioambiental demostrado en Nicaragua y otras partes del mundo nos avalan. Adicionalmente, si uno de nuestros proyectos es exitoso, es posible que resulte en otros hallazgos, gracias a que arribamos temprano y llegamos a conocer el entorno. En Rusia esto sucedió dos veces, en Chile descubrimos dos yacimientos mayores y ahora en Nicaragua nuestras exploraciones han sido muy promisorias. Respecto de las desventajas, por cierto que este es un negocio difícil y hay riesgos, pero estamos preparados. No somos imprudentes, escuchamos y ana-

l Latinominería l enero-febrero / january-february 2013

lizamos los peligros. Actualmente en el sector minero las compañías más grandes evitan aventurarse. Nosotros somos emprendedores en los negocios y sólidos en exploraciones, es una combinación inusual. - ¿Cómo ha sido su experiencia en Nicaragua? Hemos cumplido con nuestras promesas y el Gobierno nos ha correspondido. B2Gold es ahora uno de los mayores inversionistas en Nicaragua y nos hemos convertido en el tercer empleador más grande del país. Los estadounidenses deben sacudirse de sus prejuicios en relación con Nicaragua. Necesitan observar lo que el Gobierno está haciendo antes de juzgarlo por su pasado. Es una situación mutuamente beneficiosa. Trabajamos duro por ser rentables para nuestros accionistas y nuestra presencia ha sido positiva para Nicaragua. - ¿Alcanzó B2Gold sus objetivos de producción para las minas de Limón y La Libertad? Estamos en camino. Llevamos once trimestres consecutivos superando nuestras propias proyecciones. Aún tenemos que determinar los números a los que aspiramos en 2013, debido a que hicimos un descubrimiento significativo de oro de alta pureza cerca de La Libertad. Cuando ya tienes una mina funcionando y traes mineral de esas características, la producción crece sin aumentar el costo de operaciones. Debido a este hallazgo y a otros proyectos que hemos recogido, estimamos que nuestra producción en Nicaragua en 2013 debiera ser de alrededor de 200.000 onzas. - ¿Cuál es el estatus del proyecto Bellavista en Costa Rica? Ha sido una gran decepción. Cuando nos involucramos, ya sabíamos que Costa Rica no tenía una gran tradición minera y que enfrentábamos cierta oposición de conservacionistas. El Gobierno no ha sido muy directo. Nos dicen una y otra vez que nuestra licencia tiene precedencia, aun cuando hay una moratoria, pero siempre existe alguien que nos dificulta el camino. No estamos interesados en arrastrar un conflicto con las autoridades. Si tuviéramos la ocasión de vender, lo haríamos. Al final del día, hicimos un gran esfuerzo. - ¿Está la propiedad en Mocoa, en Colombia, aún en etapa de exploración? Mocoa es un yacimiento de alta calidad, rico en cobre y molibdeno. No son el tipo de minerales que B2Gold normalmente produce. Estamos debatiendo si desarrollarlo nosotros, en conjunto con


entrevista / interview una entidad especializada en cobre, o si crear una compañía que pueda usar Mocoa como su punto de partida. Pero nos gusta el proyecto. - ¿En qué está Cebollati en Uruguay? Cebollati ha sido un proyecto no tradicional muy interesante. Vimos una oportunidad en un país que tiene una sola mina de oro y no es conocido por su industria minera, pero que sin embargo está abierto a desarrollar una. Nos involucramos por la calidad del yacimiento: oro de alta densidad que no se ve muy seguido. Su origen es un misterio. Curiosamente, el tipo de mineralización que hemos encontrado en Cebollati es similar al de nuestro proyecto en Namibia, Otjikoto. Estamos investigando las razones de este fenómeno. No creemos que se trate de un enriquecimiento superficial secundario. También estamos explorando una propiedad al este de Nicaragua, Primavera, en una operación conjunta. Nos gusta mantener dos o tres proyectos como Cebollati porque así es como ocurren descubrimientos de calidad.

Planta La Libertad, en Nicaragua.

MIRANDO AL ESTE

Se espera que B2Gold se fusione en el futuro inmediato con el consorcio minero australiano CGA, un acuerdo que les daría a los canadienses acceso a la mina Masbate en Filipinas, actualmente operativa. La transacción debiera incrementar considerablemente las proyecciones de producción aurífera para 2013. - ¿Está satisfecho con los niveles de producción alcanzados? Queríamos avanzar por un camino que nos permitiera crecer sin tener que hacer otras adquisiciones. Con los niveles obtenidos por Nicaragua y Namibia y el potencial de Colombia (la mina Gramalote debiera estar produciendo en 2016), confiábamos en llegar a las 500.000 onzas al año. Sin embargo, ahora que vamos a

findings because you were there early and got to know the country. In Russia we had two successes, in Chile we made two major discoveries, and in Nicaragua we are having some great explorations. As disadvantages go, sure, this is a tough business and there are hazards, but we are prepared to take them on. We are not reckless, we listen and measure the risks. Right now in the mining industry, the bigger companies are shying away from it. We are entrepreneurial on the deal side and we are good at exploration, that’s an unusual combination. - How do you evaluate your experience in Nicaragua? We have delivered what we promised and the government has responded in turn. B2Gold is now one of the largest corporate investors in Nicaragua, and we are the third main employer in the country. Americans have to get their heads out of the box on their policy towards Nicaragua. They need to see what the local government is doing before judging people based on their past. It’s a mutually beneficial situation, we work hard to be profitable for our shareholders and our presence has been great for Nicaragua. - Did B2Gold reached production targets for 2012 in Limón and La Libertad? We are on track. This is the eleventh consecutive quarter we beat our own projections. We still have to come out with new numbers for 2013 because we made a significant discovery near La Libertad of

Foto gentileza de B2Gold / Photo courtesy of B2Gold

La Libertad plant, in Nicaragua.

- ¿Tiene nuevos proyectos en Latinoamérica en la mira? Siempre estamos buscando. Nos gusta mucho Latinoamérica, pero ahora B2Gold tiene presencia en Asia y estamos haciendo negocios con Namibia, país que creemos es el mejor en África para la actividad minera. Nuestra compañía tiene la capacidad para cubrir todas las etapas del proceso productivo, desde sondeo hasta producción y reciclaje. La mayoría de las corporaciones del sector deben comprar onzas o fusionarse con otras. Este año, nuestro presupuesto para exploraciones fue entre US$35 y US$40 millones y se hizo un buen trabajo.

enero-febrero / january-february 2013 l Latinominería l

23


entrevista / interview

more than double the grade of gold. When you have a producing mine and bring higher grade to the mill, you increase production and reduce your operating cost. Because of this and other projects we’ve been picking up along the way, production in 2013 will probably be around 200,000 ounces out of Nicaragua. - What’s the status of the Bellavista project in Costa Rica? It has been a real disappointment. Going in, we knew Costa Rica didn’t have a lot of mining history and there has been some opposition from conservationists. The government hasn’t been very upfront. They tell us time and time again that we have a grandfather mining license even though there is a moratorium, but there is always someone waxing the way. We are not interested in protracting a battle with the authorities, so if we had an opportunity to sell, we would. At the end of the day we tried hard, but we feel like we’ve been played. - Is B2Gold’s Colombian property Mocoa still in exploration phase? Mocoa is a rich cooper molybdenum deposit, it has some good grades, but doesn’t really suit B2Gold. We are debating if develop it ourselves, as a joint venture with a cooper company, or create a basement company and use Mocoa as starting point. But we like the project. - Any developments on the Cebollati project in Uruguay? Cebollati has been a very intriguing expedition from outside the box. We saw this opportunity in a country that has one gold mine and is not known for mining, but it’s open to it. We went in because of the amount of high grade gold, which you don’t see very often. It’s a bit of a mystery where is it come from. Interestingly enough, there is some unusual kind of mineralization, only similar to our Otjikoto project in Namibia. We are trying to figure it out where the high grade comes from. It doesn’t look like secondary surface enrichment, so we believe it comes from depth. We also have a trade venture in Eastern Nicaragua, Primavera. We always want to have two or three grassroots projects in the company because that’s how you make world class discoveries. - Do you foresee any new projects in Latin America? We are always looking. We really like Latin America, but B2Gold is in Asia now and we have proved we can do business in a country we believe is best for mining in Africa, Namibia. This year, our expedition budget was US$35-40 million and there was a lot of good work done.

24

Mapa de proyectos de B2Gold en Latinoamérica B2Gold Projects Map in Latin America

NICARAGUA

Trébol Calibre JV

Natividad (Pavon) Limón

MANAGUA

La Libertad

COLOMBIA Gramalote JV* Quebradona JV* Mocoa

URUGUAY Cebollati

Minas en producción/ Producing mines Proyectos en desarrollo/ Development projects

(*) Joint Venture con AngloGold Ashanti / Joint Venture with AngloGold Ashanti. Fuente/Source B2Gold

sumar a Filipinas -si el acuerdo con CGA se concreta-, esperamos duplicar nuestra producción. Esta es una mina que lleva dos años y medio operativa. Al final, si no descubrimos una onza de oro más, aun así espero que la producción de las minas que operamos –Nicaragua, Namibia, Gramalote y potencialmente Filipinas- alcance 700.000 onzas en tres años. Ahora estamos generando 200.000 onzas; es un crecimiento importante. - ¿Cómo ha afectado el clima económico el desarrollo de B2Gold? Todo el mundo está preocupado por el precipicio fiscal en Estados Unidos. Mucha gente ha estado vendiendo sus acciones en compañías auríferas para

l Latinominería l enero-febrero / january-february 2013

Proyectos de exploración/ Exploration projects Revista Latinominería

obtener liquidez. Ha sido un período duro, pero nos las hemos arreglado para ser uno de los valores de mejor desempeño en el mercado en el último tiempo. No hemos tenido que emitir acciones para generar recursos por dos años y medio. Tenemos suficiente liquidez gracias a nuestras operaciones mineras. Este año fue de alrededor de US$150 millones. El próximo debiera superar los US$300 millones, ya que no tenemos ninguna deuda. La gente piensa que es difícil encontrar financiamiento. Si uno tiene un proyecto minero, es probable que deba enfrentar muchas preguntas perfectamente válidas: cómo vas a pagar, cuántas acciones vas a emitir, quién va a construir la mina. No obstante, si tienes un buen récord


entrevista / interview

Clive Johnson supervisa tanto la estrategia de crecimiento a largo plazo como las operaciones diarias de la firma.

Foto gentileza de B2Gold / Photo courtesy of B2Gold

Clive Johnson oversees the long-term growth strategy and supervises the corporation’s day-to-day business.

"Buscamos países que estén pasando por una transición política y económica e ingresamos cuando ofrecen seguridad, como en el caso de Colombia".

de construcción, producción, liquidez y credibilidad, no debiera haber problema. Hay mucho dinero disponible que no está entrando al mercado, basta mirar el interés en comprar bonos. Otra razón por la que B2Gold está bien perfilada dentro del sector es porque muchas compañías pequeñas la están pasando pésimo debido a la carencia de técnicos calificados. - B2Gold opera en países cuya regulación medioambiental no está particularmente desarrollada. ¿A qué estándares la compañía adhiere en semejantes escenarios? Creo que estamos a la vanguardia en términos de prácticas medioambientales. Independientemente de en qué país estamos o del estado de su legislación, nos preocupa cumplir con nuestras pautas y las del Banco Mundial. Si una compañía busca reducir costos en esta área para financiar sus operaciones, no recibiría el beneplácito del Banco Mundial. Me parece un tremendo avance que instituciones financieras secunden un set de reglas, más allá de si el país anfitrión hace cumplir las suyas o no.

"We look for countries in economical and/or political transition, and enter when it’s safe, like Colombia." GO EAST

B2Gold is expected to merge with the Australian mining company CGA, a deal that would give the Canadians access to the operational mine of Masbate in the Philippines and further boost their production estimates for 2013. - Are you satisfied with the production levels achieved? We wanted a path that would allow us to grow without another acquisition. With the levels reached by Nicaragua and Namibia, and the potential of Colombia (Gramalote is expected to start producing in 2016), you could see us reaching 500,000 ounces a year. But now that we’ll be adding the Philippines if the deal with CGA comes through, we’ll be doubling our production. This is an acquisition that’s already built, it’s been running for two and a half years. At the end of the day, if we don’t find another ounce of gold, I still expect the production of our existing assets over the next three years -Nicaragua, Namibia, Gramalote and potentially Philippines- to reach 700,000 oz. This, from 200,000 oz. right now. That’s some dramatic growth. - How is the economic climate affecting B2Gold’s development? Everybody is worried about the fiscal cliff in the US and some have been selling

their gold stock to get cash at certain time. It has been a tough time, but we have managed to be one of the best performing stocks for the last couple of years. We are not out there trying to raise money by issuing shares; we haven’t had to do an equity share for two and a half years. We have a lot of cash flow for mining operations, this year was around US$ 150 million, next year it will grow to over US$ 300 million because we don’t have any debt. People think is hard to finance right now. If you have a mining project, you’re likely to be asked a lot of valid questions: How are you going to pay for it, how many shares you’ll put out, who is going to build the mine. But if you have a good track record of construction and production, cash flow and credibility, it shouldn’t be an issue. There is a lot of money in the sidelines, just look at the high-yield bonds. Another reason we look good within our sector is because many small companies are having a terrible time due to lack of technically-qualified people in mining. We need more companies to emerge together. - B2Gold operates in countries whose environmental regulation is not particularly developed. To what standard does the company adheres in such scenarios? We have a very high standard of environmental practices, I believe we are on the cutting edge. We don’t really care what country we are in terms of the status of their regulations, we would meet our and the World Bank standards. If a company wants to cut corners to finance their operation, the World Bank would not sanction that project. I think it’s a great development that international banks stand behind a set of rules, even if the hosting government chooses to be lax.

enero-febrero / january-february 2013 l Latinominería l

25


AGENDA 2013 CONFERENCIAS & FERIAS Grupo Editorial Editec pone nuevamente a su disposición su área de Conferencias y Ferias, como plataformas únicas de generación de negocios para su empresa.

13, 14 y 15 de mayo

8 de abril

22 y 23 de abril

Santiago • www.explorationforum.com

Santiago • www.pyrotech.cl

23 de mayo

25 de junio

IV FORUM SUSTENTARE Santiago • www.elecgas.cl

Copiapó • www.atacamamin.cl

Santiago • www.forumsustentare.cl

2 de julio

Agosto 2013

3 de septiembre

II SEMINARIO INSUMOS CRITICOS

Foro sIC

Foro Eléctrico del SUR

Concepción • www.forosic.cl

Santiago • www.medmin.cl

Santiago • www.insumoscriticos.cl

14, 15 y 16 de octubre

24 y 25 de octubre

5 de noviembre

Antofagasta • www.forosing.cl

Concepción • www.elignum.cl

Santiago • www.cifamin.cl

Octubre 2013

14 de noviembre

27 y 28 de noviembre

Concepción • www.pesca-sur.cl

Santiago • www.relpas.cl

Antofagasta • www.airemin.cl

INSCRIPCIONES:

Brenda Valenzuela • bvalenzuela@editec.cl • (56-2) 27574289 Rosa María Gajardo • rgajardo@editec.cl • (56-2) 27574286

AUSPICIOS: Contacte a su ejecutiva comercial o en el e-mail ventas@editec.cl

LA EDITORIAL TÉCNICA Y DE NEGOCIOS LÍDER DE CHILE


latino noticias / latin news

IMC decidió vender sus proyectos en Ecuador: Río Blanco y Gaby La firma International Minerals Corporation (IMC) decidió poner a la venta las concesiones Río Blanco y Gaby en la provincia ecuatoriana del Azuay. Ambos proyectos forman parte de cinco iniciativas principales destinadas a iniciar la minería metálica a gran escala en ese país, junto con: Mirador, de Ecuacorriente; Fruta del Norte, de Kinross; y Quimsacocha, vendido por Iamgold a la canadiense INV a mediados de año.

El 21 de noviembre pasado la empresa informó en un reporte de prensa que ha seleccionado a un potencial comprador del proyecto Río Blanco. Detalló, sin embargo, que la finalización del acuerdo de venta está pendiente porque requiere la aprobación previa del Estado ecuatoriano. También informó en el mismo comunicado que seleccionó un potencial comprador del proyecto Gaby. No reveló el nombre de los interesados. Ambos proyectos tienen reservas por un total de 991.000 onzas de oro y 4,7 millones de onzas de plata, según reportes de la compañía con sede en Arizona (EE.UU.). Estas minas pueden generar recursos por hasta US$14.500 millones, según datos del Plan de Desarrollo Minero.

IMC decides to sells Rio Blanco and Gaby projects International Minerals Corporation has decided to put the Rio Blanco and Gaby concessions in the Ecuadorian province of Azuay up for sale. They are amongst five leading projects to develop large-scale metallic mining in the country, together with Ecuacorriente´s Mirador, Kinross´s Fruta del Norte, and Quimsacocha, which Iamgold sold to Canada´s INV at the start of the year. On November 21st, the company said in a press release that it has selected a potential buyer for the Rio Blanco project. It explained, however, that finalization

of the sales agreement remains pending because prior approval by the Ecuadorian government of the proposed transaction is required. The company also said it has selected a separate potential buyer for the Gaby property without naming the interested party. According to the Arizona-based company, the two projects contain a total 991,000 ounces of gold and 4.7 million ounces of silver in reserves. According to the government´s mining development plan, the mines could generate resources totaling up to US$14.5 billion.

MEM prevé inversiones por US$15.000 millones en 2013

Mines and Energy Ministry predicts investments worth US$15 billion in 2013

El Ministerio de Energía y Minas del Perú (MEM) proyecta mantener una tasa de inversiones anuales de aproximadamente US$15.000 millones en 2013, lo que garantizaría un crecimiento económico del 6% para el país, estimó el titular del sector, Jorge Merino Tafur. Recordó que el sector Energía y Minas concentra más del 75% de las inversiones productivas en el país, y solo en el caso de la actividad minera se esperan inversiones de aproximadamente US$10.000 millones en 2013. "En el sector minero, para 2012 se proyectaban inversiones de hasta US$7.000 millones, pero en 2013 estamos

Silver Standard culminó positivo estudio de factibilidad del proyecto Pitarrilla Silver Standard Resources anunció los resultados del estudio de factibilidad para su proyecto Pitarrilla, ubicado en el Estado de Durango, México. El estudio fue completado por M3 Engineering & Technology Corporation junto con Silver Standard. El estudio destaca reservas de mineral probables de 479 millones de onzas de plata, lo cual representa un importante aumento frente a las 91,7 millones de onzas informadas previamente. Costos totales de construcción de US$741 millones, incluyendo US$157 millones de costos operativos de preproducción y US$131 millones de ingresos de pre-producción.

“El término del estudio de factibilidad de Pitarrilla representa un hito relevante para la compañía”, dijo John Smith, presidente y CEO de Silver Standard. “Al adoptar un concepto de minería a tajo abierto hemos definido una de las minas de plata más grandes de México y un sustancial incremento de reservas argentíferas”, señaló. “Ahora estamos activamente comprometidos en iniciar la fase de construcción”, sostuvo, agregando que la compañía está buscando asegurar el financiamiento de la nueva mina. “Nuestro objetivo es tener el proyecto listo para tomar la decisión de construcción en 2013”, dijo.

Silver Standard announces positive Feasibility Study for Pitarrilla Silver Standard Resources Inc. announced the results of the Feasibility Study for its 100% owned Pitarrilla Project, located in the State of Durango, Mexico. The Feasibility Study was completed by M3 Engineering and Technology Corporation and Silver Standard. The Feasibility Study highlights probable mineral reserves of 479 million ounces of silver, approximately 5.2x the 91.7

million ounces reported previously. Total construction costs of US$741 million, including US$157 million of pre-production operating costs and US$131 million of pre-production revenue. "The completion of the Pitarrilla Feasibility Study represents a major milestone for the Company," said John Smith, President and CEO of Silver Standard. "In adopting an open-pit mining

estimando una inversión de US$9.500 millones y esperamos poder llegar a US$10.000 millones", resaltó el titular del MEM. Precisó que estos indicadores son importantes porque el Plan Multianual de Crecimiento Económico del Perú proyecta llegar al 6% anual, y esa cifra depende del desarrollo de los proyectos mineros. En el rubro de Hidrocarburos, el ministro señaló que se espera convocar inversiones de hasta US$2.000 millones, mientras que en el rubro de Energía se proyecta la llegada de capital para proyectos por más de US$2.000 millones.

concept, we have defined one of Mexico's largest silver mines and substantially increased silver reserves. We are now actively engaged in activities to bring the project into construction. While recognizing Silver Standard's strong balance sheet, we are also looking to secure financing for the project. Our aim is to have the project ready for a construction decision in 2013."

Peru’s Ministry of Energy and Mines forecast that investment will continue at an annual rate of approximately US$15 billion in 2013, which will guarantee economic growth of 6% for the country, said the minister Jorge Merino Tafur. He highlighted that the energy and mining sectors account for more than 75% of investment in the country. Approximately US$10 billion are expected to be invested in mining alone during 2013. “In the mining sector, investments worth up to US$7 billion were forecast for 2012, but in 2013, we are estimating an investment of US$9.5 billion and we hope we could reach US$10 billion,” the minister said. He noted that these indicators are important because Peru’s Multiannual Economic Growth Plan is based on annual growth of 6% and this figure depends on the development of mine projects. In the oil and gas sector, the minister said that he expects investments worth up to US$2 billion, while investment in energy projects is estimated at more than US$2 billion.

enero-febrero / january-february 2013 l Latinominería l

27


Aviso 180x122mm REVISTA.indd 1

12-11-12 12:57


latino noticias / latin news

Gold Fields evaluará otras opciones para desarrollar Chucapaca vamente altos costos operativos y de capital esta opción no brindará retornos aceptables”, dijo la empresa. Gold Fields precisó que los estudios futuros se enfocarán en otras opciones para desarrollar la mina, incluyendo una operación subterránea o un modelo combinado de rajo abierto y subterránea. Gold Fields había dicho previamente este año que esperaba comenzar a producir oro en Chucapaca a fines de 2015, aunque esto dependería también de las negociaciones con las comunidades y los permisos reglamentarios.

SNL MEG adelanta cifra récord de inversiones en exploración en 2012 De acuerdo con la edición Nº 23 de Estrategias Corporativas de Exploración (CES por sus siglas en inglés) de SNL Metals Economics Group, el presupuesto estimado de exploración mundial de metales no ferrosos habría aumentado en 2012 a la cifra récord de US$21.500 millones. El SNL MEG añade que no obstante la permanencia del clima de incertidumbre económica en Europa y Estados Unidos, junto con las preocupaciones por una menor demanda por parte de China, la mayoría de los precios de los metales han permanecido bien posicionados durante el presente ejercicio, por sobre su valor promedio de largo plazo, dando soporte a la industria.

Como resultado de este panorama, puntualiza la entidad, los presupuestos de exploración crecieron en total US$3.300 millones, un aumento de 19% con respecto al ya máximo histórico anotado en 2011. Asimismo, el SNL MEG difundió que su Índice de Actividad de Proyectos registró un incremento en septiembre y nuevamente en octubre, alcanzando los niveles más altos desde marzo último. El Financiamiento también muestra incipientes señales de mejoría durante octubre. No obstante estos favorables indicadores, SNL Metals Economics Group hace un llamado de cautela, precisando que dicho período del año tradicionalmente marca el peak para informes de perforación y financiamiento de las compañías junior.

SNL MEG announces record investment in exploration in 2012 Good news for the mining activity. According to the twenty-third edition of SNL Metals Economic Group´s Corporate Exploration Strategies, the estimated budget for global nonferrous metals exploration increased in 2012 to a record US$21.5 billion. SNL MEG said that despite continued uncertainty in Europe and the United States, along with concerns over waning demand in China, most metals prices remained well above their long-term averages in 2012, giving modest support to the industry. As a result, the organization said that exploration budgets increased by $3.3 billion, up 19% from the previous all-time high set in 2011. In addition, SNL MEG also announced that its Pipeline Activity Index increased in both September and October, reaching the highest levels seen since last March. Financing also showed early signs of improvement during October. Despite these favorable indicators, SNL Metals Economics Group called for caution, noting that this time of the year traditionally marks the peak period for drilling reports and financing by junior companies.

South African miner Gold Fields reported that a feasibility study showed it would be too costly to move forward with the planned open pit mine to Chucapaca, a project in Peru of about 1,200 million dollars, therefore a model that generates higher profits will be seek. Gold Fields, the fourth gold producer in the world, is developing its Chucapaca plan in northern Peru, in a venture with local miner Buenaventura. "The first draft of the feasibility study is finished and as a result of

relatively high operational and capital costs, this option will not provide acceptable returns", said the company. Gold Fields said that future studies will focus on other options to develop the mine, including underground mining or a combined model of open pit and underground. Gold Fields said earlier this year that expected to start producing gold in Chucapaca late 2015, although this would also depend on negotiations with communities and regulatory permits.

Aprueban EIA para ampliación de Cerro Verde Cerro Verde tiene aprobación para iniciar la II Etapa de su proyecto minero. El 3 de diciembre pasado, la Dirección General de Asuntos Ambientales Mineros del Ministerio de Energía y Minas (MEM) aprobó el Estudio de Impacto Ambiental del proyecto (EIA). Mediante un escueto comunicado –según con-

signa el diario La República-, la empresa controlada por la multinacional Freeport McMoRan agradeció a quienes ayudaron a su elaboración. No precisaron cuándo iniciarían las obras, aunque estas están supeditadas a la construcción de una planta de aguas servidas en la cuenca del Chili. Este proyecto permiti-

rá a Cerro Verde triplicar su extracción y procesamiento de mineral de sulfuros. Para ello invertirá 4.400 millones de dólares. Voceros de la empresa señalaron que la expansión incrementará la producción anual de Cerro Verde en 600 millones de libras de concentrados de cobre y 15 millones de libras de molibdeno.

Cerro Verde has been granted approval to begin the second stage of its mine project. On December 3rd, the General Office of Mining Environmental Affairs at the Ministry of Energy and Mining approved the Environmental Impact Study for the project. In a brief statement, reported by the La Republica newspaper, the company, controlled by multinational Freeport McMoRan, thanked those who had supported the elaboration of the study. It did

not specify when work would begin although this is subject to the construction of a waste water plant in the Chili basin. The project will allow Cerro Verde to triple the production and processing of sulfide ores and require an investment of US$4.4 billion. Spokespeople for the company indicated that the expansion will increase Cerro Verde´s annual production by 600 million pounds of copper in concentrates and by 15 million pounds of molybdenum.

Foto Minera Buenaventura / Photo Buenaventura Mining

La minera sudafricana Gold Fields reportó que un estudio de factibilidad mostró que sería demasiado costoso avanzar con la mina a rajo abierto prevista para Chucapaca, un proyecto en Perú de unos US$1.200 millones, por lo que buscarán un modelo que arroje mayores ganancias. Gold Fields, la cuarta productora de oro del mundo, está desarrollando su plan Chucapaca en el norte peruano, en un emprendimiento con la minera local Buenaventura. “Se finalizó el primer borrador del estudio de factibilidad y como resultado de relati-

Gold Fields to evaluate other options for developing Chucapaca

Cerro Verde obtains approval for expansion

enero-febrero / january-february 2013 l Latinominería l

29


reportaje / news report

Copper production begins at Antapaccay The mine will produce an average of 160,000 tons a year of copper in concentrates as well as gold and silver as byproducts during the first years of production.

W

ith an investment of around US$1.5 billion, the new Antapaccay mine is one of the largest projects developed in Peru. Unlike other major mine investments in South America, which have attracted attentions for the delays and cost increases they have suffered, Xstrata Copper’s mine began commercial production “on schedule and on budget”, chief executive Charlie Sartain said in a statement. Its first shipment was delivered to the Port of Matarani for delivery to customers worldwide. Antapaccay will extend and increase production and the life of the neighboring Tintaya operation, which is reaching the end of productive life. In addition, together with Las Bambas - Xstrata Copper’s other major project in Peru -, it forms a key piece in the mining company’s development strategy to consolidate itself as one of the world’s leading copper producers. “Antapaccay is a major copper operation with a mine life of more than 20 years, including a new mine and state-of-the-art concentrator facility,” the company noted. The mine will produce an average of 160,000 tons of copper in concentrate a year, plus gold and silver by-products, in the initial years of production. “When Xstrata acquired the Tintaya mine, located in the Region of Cusco, in 2006, its mineral resources limited it to a short life. It was expected that it would have to close around 2014, ending all the contributions it made to the province,” Luis Rivera, Vice-President for Operations in Peru, told to LATINOMINERIA. In response, the executive added, the company invested heavily in exploration and feasibility studies with the aim of finding new mineral resources in the area that would allow the continuation of mining together with the sustainable development of the Province of Espinar. “Antapaccay will allow us to extend our operations in the area, maintaining jobs beyond 2030 and ensuring production higher than that of Tintaya,” notes Rivera.

30

Foto cortesía de Xstrata Copper Perú / Photo courtesy of Xstrata Copper Peru

XSTRATA’S NEW MINE IN PERU

N U E V A F A E N A D E X S T R ATA E N P E R Ú

Antapaccay inició producción de cobre Producirá un promedio de 160.000 toneladas anuales de cobre en concentrado, además de contenidos de oro y plata como subproductos durante los primeros años de operación.

C

on una inversión del orden de los US$1.500 millones, la nueva operación cuprífera Antapaccay constituye uno de los principales proyectos materializados en Perú. A diferencia de otras grandes inversiones mineras en Sudamérica, que han acaparado la atención por las demoras y alzas de costos que han sufrido, la faena de Xstrata Copper inició su producción comercial “conforme al cronograma y al

l Latinominería l enero-febrero / january-february 2013

presupuesto original”, como lo destacó en un comunicado su presidente ejecutivo, Charlie Sartain. Es así como a principios de noviembre último efectuó su primer despacho al puerto de Matarani, para su posterior envío a clientes de todo el mundo. Antapaccay permitirá extender e incrementar la actual producción de cobre del vecino yacimiento de Tintaya, el cual se encuentra finalizando su vida productiva. Asimismo, en conjunto con la otra gran iniciativa de Xstrata Copper en Perú, el pro-


reportaje / news report yecto Las Bambas es pieza clave dentro del desarrollo estratégico de esta minera, con el objetivo de consolidarse como uno de los productores de cobre más importantes a nivel mundial. “Antapaccay es una faena de gran envergadura, cuyas operaciones se prolongarán por más de 20 años. Cuenta con una mina nueva y una planta concentradora con tecnología de vanguardia”, subrayan desde la compañía. Producirá un promedio de 160.000 toneladas anuales de cobre en concentrado, además de contenidos de oro y plata como subproductos durante los primeros años de producción.

HITOS

“En 2006 Xstrata adquirió la mina Tintaya, ubicada en la región de Cusco, la misma que tenía recursos minerales limitados a una corta vida, presumiéndose que hacia 2014 debía cerrar su operación y con ella todas las contribuciones a favor de la provincia”, recuerda el VP Ejecutivo de Operaciones Perú, Luis Rivera, consultado por LATINOMINERÍA. Por este motivo, agrega el ejecutivo, la compañía realizó una importante inversión en exploración y estudios de factibilidad, con el fin de buscar en el entorno nuevos recursos minerales que permitieran prolongar el quehacer minero junto con el desarrollo sostenible de la provincia de Espinar. “Antapaccay permitirá ampliar las operaciones en la zona, manteniendo los puestos de trabajo más allá de 2030, asegurando una producción superior a la que tenía Tintaya”, puntualiza Rivera.

-A la luz de los retrasos y mayores costos que están experimentando muchos proyectos, ¿a qué atribuyen que Antapaccay se haya realizado dentro del cronograma y presupuesto previstos? Antapaccay ha iniciado su producción conforme al cronograma y presupuesto original de US$1.500 millones, gracias a la planificación rigurosa tanto en los estudios preliminares como en la ingeniería y en la etapa de construcción. Esto se debe al excelente trabajo de profesionales técnicos operarios y obreros, en su mayoría peruanos, que han demostrado su gran capacidad y experiencia. -¿Qué sinergias existen entre la operación de Tintaya y la futura mina Las Bambas? Xstrata Copper ha formado alianzas estratégicas importantes para desarrollar sus proyectos, que proporcionan sinergias significativas entre Tintaya y Las Bambas. Ha firmado un contrato de Ingeniería, Abastecimiento, Construcción y Gestión (EPCM, por sus siglas en inglés) con Bechtel, y contratos de suministro de equipos grandes con FLSmidth y Siemens, entre varios otros proveedores de equipos principales. Además, el desarrollo del concepto de Concentradora Estándar también proporciona sinergias importantes. El proyecto también comparte infraestructura de transporte importante con Tintaya, en forma de la red vial existente, el centro de logística establecido en Are-

Given the delays and increased costs which many projects are experiencing, how do you explain that Antapaccay has been developed in line with the forecast budget and schedule? Antapaccay has begun production in line with its original schedule and budget of US$1.5 billion thanks to rigorous planning, both in the preliminary studies, such as the engineering, and in the construction stage. This reflects the excellent work undertaken by professionals, technical operators and workers, most of them Peruvians, who displayed great skill and capacity. What synergies have been developed between the Tintaya operation and the future Las Bambas mine? Xstrata Copper has developed major strategic alliances to develop its projects, which have provided significant synergies between Tintaya and Las Bambas. It has signed an EPCM contract (Engineering, Procurement, Construction and Management) with Bechtel and large equipment supply contracts with FLSmidth and Siemens, among others. In addition, the development of the Standard Concentrator concept also provides significant synergies. The project also shares important transport infrastructure with Tintaya, including the existing road network, the logistics center in Arequipa and the expansion of the port installations. Shared support functions in legal services, information technology, supply and contractor management, corporate affairs and finance will further reduce general expenditure. In addition, Las Bambas will benefit from the experience of the team which worked on the Tintaya-Antapaccay project, who will share knowledge and human resources to develop the mine.

Xstrata Copper ha formado alianzas estratégicas importantes para desarrollar sus proyectos.

Fotos cortesía de Xstrata Copper Perú / Photos courtesy of Xstrata Copper Peru

Xstrata Copper has developed major strategic alliances to develop its projects.

enero-febrero / january-february 2013 l Latinominería l

31


22 y 23 de abril 2013 • HOTel HyaTT, SanTiagO www.pyrotech.cl Debate: desafíos ambientales de las fundiciones de concentrados de cobre. TEMAS

Aspectos normativos de fundiciones. Visión de los operadores. Tecnología en fundiciones de cobre.

Auspicios Contacte a su ejecutiva comercial, llámenos al (56-2) 27574239 o escríbanos a ventas@editec.cl

ORGANIZAN

inscripciones Brenda Valenzuela bvalenzuela@editec.cl • (56-2) 27574289 rosa María Gajardo rgajardo@editec.cl • (56-2) 27574286

MEDIO OFICIAL NACIONAL

MEDIO OFICIAL INTERNACIONAL

L A

LA EDITORIAL TÉCNICA Y DE NEGOCIOS LÍDER DE CHILE

R E V I S TA

D E

L A

I N D U S T R I A

M I N E R A

E N

A M E R I C A

L AT I N A

pyrotech@pyrotech.cl


reportaje / news report quipa y la ampliación de las instalaciones portuarias. Las funciones de apoyo compartido en las áreas de legal, TI, abastecimiento y gestión de contratistas, asuntos corporativos y finanzas reducirán aún más los gastos generales.

te los primeros seis años y un promedio de 140.000 tpa durante los 20 años previstos de vida útil. La ampliación de Antamina hasta una capacidad de procesamiento de 130.000 tpd de mineral proporciona a Xstrata

"Antapaccay ha iniciado su producción conforme al cronograma y presupuesto original de US$1.500 millones, gracias a la planificación rigurosa tanto en los estudios preliminares como en la ingeniería y en la etapa de construcción". Además, Las Bambas se beneficia de la experiencia del equipo del proyecto Tintaya-Antapaccay, que transmitirá los conocimientos y capacidad de recursos humanos para el desarrollo de esta operación. -¿Cuánto cobre producirá Xstrata Copper en el Perú una vez que se concreten todas estas iniciativas? Casi 700.000 toneladas de cobre en concentrados por año, incluyendo Antamina (donde la minera tiene una participación de 33,75%). Se estima que Las Bambas producirá 400.000 tpa en su primer quinquenio y un promedio de 310.000 tpa durante la vida de la mina, de por lo menos 18 años. Antapaccay producirá 160.000 tpa de cobre contenidos en concentrados duran-

Luis Rivera, VP Ejecutivo de Operaciones Perú.

Fotos cortesía de Xstrata Copper Perú / Photos courtesy of Xstrata Copper Peru

Luis Rivera, vice-president for Operations in Peru.

Copper un adicional de 40.000 tpa de cobre, por encima del promedio actual de 100.000 tpa de cobre, durante los primeros cinco años. -Además del beneficio para la empresa, ¿cuáles son los aportes previstos de Antapaccay y Las Bambas para el Perú? El desarrollo de estos proyectos proporcionará un valor significativo no sólo a Xstrata, sino también a las comunidades del área de influencia de nuestras operaciones, a través de oportunidades de empleo directo y sobre todo indirecto, capacitación, infraestructura, desarrollo de negocios locales, pago de impuestos y regalías, e inversión en alianzas y proyectos comunitarios. -¿Utilizarán proveedores locales en ambas iniciativas? Las políticas y prácticas para desarrollar proveedores locales son comunes a todas las unidades de Xstrata. Hemos implementado un modelo de desarrollo de proveedores locales que promueve el crecimiento de negocios en el área, en línea con nuestra Política de Desarrollo Sostenible y el Sistema Común de Administración de Contratos y Compras. Damos prioridad a los proveedores locales que se encuentran capacitados para ofrecer los bienes y servicios que requerimos, en materia de calidad, oportunidad de entrega, aspectos de salud, seguridad, medio ambiente y relaciones comunitarias. -¿Qué planes tienen para el depósito cuprífero de Coroccohuayco? Coroccohuayco, ubicado también en Cusco, se encuentra todavía en estudio de prefactibilidad. Por lo tanto, aún no contamos con un perfil de inversión. No obstante, tenemos recursos del orden de 320 Mt con una ley alta de 0,92.

"Antapaccay has begun production in line with its original schedule and budget of US$1.5 billion thanks to rigorous planning, both in the preliminary studies, such as the engineering, and in the construction stage." How much copper will Xstrata Copper produce in Peru once all these projects have been developed? Almost 700,000 tons of copper in concentrate a year, including Antamina (where the mining firm holds a 33.75% stake). It is estimated that Las Bambas will produce 400,000 tons a year during its first five years and an average of 310,000 tons a year during its mine life which will last at least 18 years. Antapaccay will produce 160,000 tons of copper contained in concentrates during the first six years and an average of 140,000 tons a year during a useful life lasting 20 years. The expansion of Antamina to a processing capacity of 130,000 tons of ore a day will provide an additional 40,000 tons a year of copper to Xstrata Copper, on top of existing production of 100,000 tons a year, during its first five years. As well as the benefit to the company, what contribution will Antapaccay and Las Bambas make to Peru? The development of these projects will provide significant value not only to Xstrata but also to the communities in our operations’ area of influence, through opportunities for direct employment, but also indirect jobs, training, infrastructure, the development of local business, tax and royalty payments and investment in community alliances and projects. Will local suppliers be used in both projects? All of Xstrata’s units share the same policies and practices for developing local suppliers. We have implemented a development model for local suppliers which promotes the growth of businesses in the area, in line with our Sustainable Development Policy and Common System for Managing Contracts and Purchases. We prioritize local suppliers which are trained to offer the goods and services which we require, in terms of quality, timely delivery, health, safety, environment and community relations. What plans do you have for the copper´s deposit Coroccohuayco? Coroccohuayco, which is also located in Cusco, is still at the prefeasibility stage. So we still do not have an investment profile. However, we have around 320 million tons of resources, with a high grade of 0.92%.

enero-febrero / january-february 2013 l Latinominería l

33


En Bertotto-Boglione S.A. desde 1948, proveemos soluciones creativas y de altísima calidad, para resolver necesidades relativas al almacenaje de líquidos, a escala internacional. La tecnología de última generación incorporada a los procesos productivos, el estricto cumplimiento de las normas

Estación Portátil FIREGUARD

MOSS de Trasvase

ISO 9001 certificadas, certificación de productos UL e INMETRO y la fabricación bajo licencias mundialmente reconocidas, nos ha permitido la diversificación de nuestra producción desde tanques simples a estaciones de servicios completas de alto valor agregado y última tecnología.

Estación Semi-Móvil para Minería

Conoce nuestros productos en www.bertotto-boglione.com BERTTOTTO BOGLIONE DE CHILE San Pio X Nº 2460 - Oficina 904 Stgo. de Chile –CHILE Tel 56 (2)2 231 41 50 – 2-234 55 96 infochile@bertotto-boglione.com.ar

BERTOTTO-BOGLIONE.indd 1

BERTOTTO BOGLIONE DO BRASIL COMBUSTANQ Ind. Com. Imp. Exp. de tanques e Acessorios Ltda AV. NOSSA SENHORA DA PAZ, 2358- SALA 4-BAIRRO MACENO CEP: 15055-500 – SAO JOSE DO RIO PRETO-SP-BRASIL infobrasil@bertotto-boglione.com vendas@combustanq.com.br Tel 55 17 3234 1977 Fax 55 3234 3394

BERTTOTTO BOGLIONE S.A. ARGENTINA

Ruta Nac. Nº 9 KM 442,7 Marcos Juárez (X2580CDK) Córdoba –ARGENTINA Tel 54 (0) 3472 425095 – Fax 54(0) 3472 425096

20-12-12 15:13


entrevista / interview

Foto cortesía de Colombia Crest Gold / Photo courtesy of Colombia Crest Gold

Actualmente Colombia Crest cuenta con dos propiedades contiguas en la zona aurífera del Cauca Medio: Fredonia y Venecia.

HANS RASMUSSEN:

“En Colombia hay muchas oportunidades”

E

HANS RASMUSSEN:

“There are lots of opportunities in Colombia” The president and CEO of Colombia Crest Gold highlights the good climate for investing mining in the country as well as the potential it offers for gold discoveries.

C

El presidente y CEO de Colombia Crest Gold destaca el buen clima imperante para invertir en minería en este país, así como el potencial que ofrece para descubrimientos auríferos. l gran potencial de oro que posee Colombia, sumado al hecho que durante 40 años no se realizó exploración moderna en este ámbito en el país sudamericano -hasta que compañías como AngloGold Ashanti ingresaron en los ’90-, son algunas de las razones que esgrime Hans Rasmussen, presidente y CEO de Colombia Crest Gold, para ingresar a este mercado. “Vi la oportunidad y llegué en 2009 para buscar propiedades”, recuerda en conversación con LATINOMINERÍA.

Colombia Crest currently owns two contiguous properties in the Middle Cauca gold district: Fredonia and Venecia.

Otra razón de peso fue el buen clima imperante que encontró en este país para atraer inversión que potenciara la industria minera local, una experiencia opuesta a la que le tocó vivir en Bolivia, donde la compañía minera de capitales canadienses (antes conocida como Eaglecrest Exploration) mantiene el emprendimiento aurífero San Simón (al norte de Santa Cruz), en proceso de venta al momento de esta entrevista. “Para nosotros era un muy buen cambio, porque Bolivia empezó a poner dificultades por parte del Gobierno… Colombia es diferente. Fue un giro de 180 grados de diferencia”, comenta.

olombia’s huge gold potential as well as the fact that no modern mine exploration has been carried out in the South American country for the last forty years – until companies like AngloGold Ashanti returned in the nineteen nineties – are some of the reasons outlined by Hans Rasmussen, president and chief executive of Colombia Crest Gold to enter this market. “I saw the opportunity and I arrived in 2009 to look for properties,” he recalls in conversation with LATINOMINERIA. Another key reason was the friendly climate he found in the country towards investment in its mining industry. It contrasted strongly with his experience in Bolivia where the Canadian mining company (previously known as Eaglecrest Exploration) operates the San Simon gold operation (to the north of Santa Cruz), which it was the process of selling at the time of the interview. “It was a very good change for us, because the Bolivian government was beginning to make life difficult… Colombia is different. It was 180 degree change,” he comments. Asked if they are considering moving into other countries, he states: “there are lots of opportunities in Colombia…There is lots of gold,” confirming his aim of focusing his efforts in the country.

enero-febrero / january-february 2013 l Latinominería l

35


entrevista / interview

Colombia Crest currently owns two contiguous properties in the Middle Cauca gold district: Fredonia and Venecia, which together cover a total of 30,873 hectares. The mining company says that these prospects lie in an area of huge potential where more than sixty million ounces of gold have been discovered during the last ten years, including AngloGold Ashanti’s La Colosa deposit. In April 2011, the company began grassroots exploration, having obtained US$6 million of funds. Exploration has focused on two high priority targets known as Arabia 1 and 2, where mineralized outcropping displays strong indications of a porphyry gold system. Sixteen holes had been drilled at the target by the middle of October. Rasmussen comments that the campaign’s initial target was to complete around eighteen holes, then evaluate the results, and seek fresh funds to continue exploration during 2013. “Using the holes at Arabia, we have to investigate where we will drill during the next campaign. We have to drill deeper, that is clear, and it seems that there are banks on the sides too…we will find out in the studies,” he explains. Rasmussen says that they plan to drill around 3,000 meters at other targets such as Garrucha, which is close to Bellhaven’s La Mina copper and gold prospect. “As well as Garrucha, our teams have plans to complete surface sampling and fieldwork at other targets on the original list of more than twenty identified in FredoniaVenecia,” Rasmussen said in a recent letter to shareholders. The executive explains to LATINOMINERIA that they are searching for new areas of interest in Colombia and they would like to seal one or two agreements with partners to develop new projects. “We have reviewed 200 properties so far and we chose two or three which are very good…we are negotiating the terms (to develop them).” While the executive recognizes that the market conditions for raising capital for exploration are difficult, he believes that his company has some advantages: “With the team we have, the properties that we possess and the interest in Colombia (from investors), I think that with some work we will be able to find some funds,” he notes. He notes that the company’s team includes a group of international professionals with significant experience in major and junior companies from the Andes – “I worked in Chile and Argentina,” he notes – to Alaska. Referring to his Colombian colleagues, he recognizes that they are still new to the industry, “but they are well-educated, and they work very hard,” he adds. For these reasons, Hans Rasmussen is confident of the potential of his projects in the South American country. “What we need now is a good hole with lots of gold,” he chuckles.

36

Foto/Photo: Miguel Toledo - LATINOMINERÍA

PROPERTIES

“Vi la oportunidad y llegué en 2009 para buscar propiedades (en Colombia)”, recuerda Hans Rasmussen, presidente y CEO de Colombia Crest Gold. “I saw the opportunity and I arrived in 2009 to look for properties (in Colombia),” Hans Rasmussen, president and chief executive of Colombia Crest Gold.

Asimismo, consultado si están evaluando ingresar a otros países, señala que “en Colombia hay muchas oportunidades… Hay mucho oro aquí”, ratificando así su objetivo de concentrar los esfuerzos en este país.

PROPIEDADES Actualmente Colombia Crest cuenta con dos propiedades contiguas en la zona aurífera del Cauca Medio: Fredonia y Venecia, las que en conjunto suman 30.973 hectáreas. En la minera subrayan que estos prospectos se encuentran en una zona de gran potencial, donde en los últimos diez años han sido descubiertas más de 60 millones de onzas de oro, incluyendo el depósito de La Colosa (AngloGold Ashanti). En abril de 2011 inició la exploración de tipo grass root . En esa oportunidad la minera logró conseguir fondos por US$6 millones. La exploración se ha centrado en los objetivos de más alta prioridad, denominados

l Latinominería l enero-febrero / january-february 2013

Arabia 1 y 2, donde el afloramiento mineralizado muestra fuertes indicios de un sistema de pórfidos de oro. Hasta mediados de octubre último habían realizado 16 pozos, en dicho blanco. Rasmussen comenta que la meta de la campaña inicial era completar unos 18 pozos, para luego evaluar los resultados y buscar nuevos fondos para proseguir la exploración en 2013. “De los pozos en Arabia tenemos que investigar donde perforamos en la próxima campaña. Tenemos que perforar con más profundidad, eso es obvio y parece que hay bancos al lado también… se va a saber con los estudios”, puntualiza. Asimismo, señala que pretenden perforar unos 3.000 metros en sus otros blancos, como Garucha, que se encuentra próximo al prospecto de oro y cobre La Mina, de la compañía Bellhaven. “ Ade m á s de G a rruc ha , n u es t ro s equipos tienen planes para completar el muestreo de superficie y la revisión de campo de varios otros objetivos identificados en el listado original de más de 20 en Fredonia-Venecia”, señaló Rasmussen en una reciente carta a los accionistas El ejecutivo precisa a LATINOMINERÍA, que están buscando nuevas áreas de interés en Colombia y que les interesaría formar uno o dos acuerdos con otros socios para desarrollar nuevos emprendimientos. “Hemos revisado 200 propiedades hasta ahora, y elegimos dos o tres que son muy buenas… estamos negociando los términos (para desarrollarlos)”. Y si bien el ejecutivo reconoce que el mercado está complejo para salir a levantar capitales para exploración, considera que su compañía cuenta con elementos favorables: “Con el equipo que tenemos, las propiedades que poseemos y el interés en Colombia (por parte de los inversionistas), me parece que podemos encontrar algunos fondos, con trabajo”, advierte. Precisamente respecto al equipo de la minera, valora que poseen un grupo de profesionales extranjeros con mucha experiencia en compañías major y junior, desde Los Andes -“yo trabajé en Chile y Argentina”, acota- hasta Alaska. Con respecto a sus pares colombianos, reconoce que en este ámbito todavía están débiles, “pero tienen una buena educación, trabajan muy duro”, añade. Por todos estos motivos, Hans Rasmussen está confiando en el potencial que tienen sus proyectos en el país sudamericano, “lo que falta ahora es un buen pozo con mucho oro”, comenta entre risas.


entrevista / interview PROYECTO DE COLOSSUS MINERALS EN BRASIL

Serra Pelada iniciaría producción a mediados de 2013

COLOSSUS MINERALS IN BRAZIL

Serra Pelada to begin production in mid-2013

Colossus posee el 75% de Serra Pelada, en tanto que la participación restante está en manos de la Cooperativa de Mineração dos Garimpeiros de Serra Pelada. Colossus owns 75% of Serra Pelada while the remaining shares are held by the Garimpeiros de Serra Pelada Mining Cooperative.

El depósito de oro, platino y paladio, ubicado en el estado de Pará, destaca por contar con áreas de elevadas leyes.

C

olossus es una compañía minera con base en Canadá, orientada a la exploración y desarrollo de proyectos. Actualmente su objetivo prioritario es avanzar en la pronta entrada en producción de su yacimiento de metales preciosos de Serra Pelada, en el estado brasileño de Pará. “El desarrollo comenzó en 2010 y esperamos que esté completo a mediados de 2013”, señala Ann Wilkinson, vicepresidenta de Investor Relations, en entrevista con LATINOMINERÍA. En la firma hacen hincapié que Serra Pelada alberga uno de los depósitos de oro, platino y paladio con mayores leyes a

nivel mundial. Asimismo, tiene el potencial de estar en el cuartil más bajo de costos. Colossus posee el 75% de la propiedad, en tanto que la participación restante está en manos de la Cooperativa de Mineração dos Garimpeiros de Serra Pelada. En cuanto a las características de la futura faena, el yacimiento será explotado en forma subterránea mediando el método de Corte y Relleno (underhand cut & fill) para el 100% de la extracción del mineral. DRA Internacional es responsable de la ingeniería de la planta de procesamiento, en tanto que Merit Consultants International Inc. está a cargo de supervisar su construcción. Se espera que las obras estén terminadas en la primera mitad de 2013.

Foto cortesía de Colossus Minereals / Photo courtesy of Colossus Minereals

The gold, platinum and palladium deposit, located in Para state, is noted for its high grade zones.

C

olossus is a mining company based in Canada and focused on project development. Its priority today is to bring its Serra Pelada precious metals deposit in the Brazilian state of Para into production. “Development began in 2010 and we expect work to be completed by the middle of 2013,” says Ann Wilkinson, vice-president for Investor Relations, in interview with LATINOMINERIA. The company highlights that Serra Pelada contains some of the world’s highest grade deposits of gold, platinum and palladium. It has the potential to enter the lowest cost quartile, taking into account existing global production. Colossus owns 75% of the project while the remaining shares are held by the Garimpeiros de Serra Pelada Mining Cooperative. The deposit will be exploited through the underhand cut & fill method of underground mining to extract 100% of the ore. DRA International has been hired to provide engineering for the silver processing circuit while Merit Consultants International Inc. will oversee construction of the mine. Work is due to be completed during the first half of 2013. The mining company has already acquired the main equipment for the processing plant. At the time of the interview, the Gekko reactors and Falcon concentrators were due to arrive at the mine site by the end of 2012. The conveyor belt system has also been awarded and is due for delivery in the third quarter of 2013. But Serra Pelada is not the only project that Colossus has in the area; in the coming months, the mining company will begin drilling the Cutia deposit, located around 13 kilometers from its main investment.

BRAZIL

- What led you to explore in Brazil and how long have you been present in the country? Brazil is endowed with significant mineral wealth and a politically stable climate, the perfect combination for business. We’ve been involved in Brazil since 2007.

enero-febrero / january-february 2013 l Latinominería l

37


- How do you view the business climate in Brazil currently for mining and exploration? Good. GDP growth is robust and inflation is moderating due to the efforts of the federal government. - At what stage is your Serra Pelada project? We are currently constructing the processing plant and developing the underground access to the mineralized deposit. We expect to be in production mid-year 2013.

“Hemos invertido US$180 millones hasta el momento y esperamos gastar entre US$225 y US$250 millones en total”, dice Ann Wilkinson, vicepresidenta de Investor Relations.

- What are the deposit’s characteristics and potential? Serra Pelada is a gold, platinum, palladium deposit which is a unique combination of minerals. Serra Pelada is also characterized by areas of extremely high grades. In some of the drilling to date, intercepts of over a kilo per tonne of gold have been encountered. - How much will you produce? We expect to be in production mid-year 2013 and to process 1,000 tonnes per day once full production is achieved. We are in the process of completing the work necessary to publish an estimate of the initial mineral resources/reserves, likely representing one year’s production, and accordingly expected annual production of all three metals will be provided closer to production. - How much have you invested so far and how much will construction of the project cost? We’ve invested $180 million thus far and expect to spend between $225 and $250 million total.

INFRASTRUCTURE

- What infrastructure and logistics does the project require, considering where it is located? The Carajas region is relatively infrastructure rich with roads, rail lines and power in close proximity. Centrais Eléctricas do Parà (“CELPA”), Pará State’s electrical transmission provider, entered into an agreement with the Company in November 2011 to construct a 32 kilometre, 34.5kV power line to site at a net cost of approximately R$1.4 million (US$800.000). During the third quarter of 2012, CELPA received the installation license with SEMA (the State environmental authority) and construction has commenced. - How big is the team at Colossus and in Brazil in particular? We have approximately 400 people currently on site of whom, approximately 80% coming from the local communities and another 15% who come from locations elsewhere in Brazil. -What other projects do you have in Brazil and/or where else are investing in exploration? We have the Cutia property, 13 kilometres to the southwest of Serra Pelada. Cutia

38

El yacimiento será explotado en forma subterránea mediando el método de Corte y Relleno (underhand cut & fill).

Foto cortesía de Colossus Minereals / Photo courtesy of Colossus Minereals

entrevista / interview

The deposit will be exploited through the underhand cut & fill method of underground mining.

La minera ya adquirió todo el equipamiento principal de la planta. Al momento de esta entrevista estaba previsto que los reactores Gekko y concentradores Falcon llegaran al sitio de la operación antes de finalizar 2012. También se encuentra adjudicado el sistema de correas transportadoras, previéndose su arribo para el tercer trimestre de 2013. Pero Serra Pelada no es el único emprendimiento que Colossus tiene en la zona; en los próximos meses la minera iniciará los trabajos de perforación en el depósito de Cutia, ubicado a unos 13 km de su inversión principal.

BRASIL

-¿Qué les llevó a explorar en Brasil y desde cuándo están presentes en ese país? Brasil está dotado con una importante riqueza mineral y un clima político estable, lo cual constituye una perfecta combinación para hacer negocios. Nosotros hemos estado participando en este país desde 2007. -¿Cómo ven el actual clima de negocios en Brasil para la actividad minera y de exploración? Positivo. El Producto Interior Bruto (PIB) es robusto y la inflación está moderada gracias a los esfuerzos del gobierno federal.

l Latinominería l enero-febrero / january-february 2013

-¿En qué etapa está su proyecto Serra Pelada? Estamos actualmente construyendo la planta de procesamiento y desarrollando el acceso subterráneo al depósito mineralizado. Esperamos estar en producción a mediados de 2013. -¿Qué características y potencial tiene el yacimiento? Serra Pelada es un depósito de oro, platino y paladio, lo cual constituye una combinación única de minerales. Serra Pelada también se destaca por contar con áreas de leyes extremadamente altas. En algunas de las perforaciones realizadas hasta ahora hemos encontrado intercepciones con más de un kilo de oro por tonelada -¿Cuánto producirá? Una vez que alcancemos la plena producción, esperamos procesar del orden de 1.000 tpd. Estamos en el proceso de terminar el trabajo necesario para publicar un estimado de los recursos/reservas minerales iniciales. Este representa un año de producción y, como resultado, la producción anual esperada para los tres metales será entregada más cerca al inicio de producción.


entrevista / interview

Proyecto Serra Pelada Serra Pelada Project

Pará Belém

BRASILIA

Serra Pelada

São Paulo

Parauapebas

BRASIL

Revista Latinominería

Fuente/Source Colossus Minerals

-¿Cuánto han invertido a la fecha y cuánto demandará la construcción del proyecto? Hemos invertido US$180 millones hasta el momento y esperamos gastar entre US$225 y US$250 millones en total.

INFRAESTRUCTURA

-¿Qué requerimientos en materia de infraestructura y logística demanda el proyecto, considerando la zona en que se ubica? La región de Carajás es relativamente rica en infraestructura de carreteras, líneas de ferrocarril y con centrales de generación en las proximidades. Centrais Eléctricas do Pará (Celpa), proveedor de transmisión eléctrica del estado de Pará, alcanzó un acuerdo con la empresa en noviembre de 2011 para la construcción de una línea de alta tensión de 34,5 kV de 32 kilómetros de longitud, con un costo neto de aproximadamente R$1,4 millones (US$800.000). Durante el tercer trimestre de 2012, Celpa recibió la licencia de instalación de SEMA (autoridad ambiental estatal), con lo que la construcción ha comenzado. -¿Cuántas personas conforman el equipo de Colossus y en particular su personal en Brasil? Tenemos aproximadamente 400 personas trabajando en el lugar, de las cuales alre-

dedor de un 80% provienen de comunidades locales y otro 15% de otras áreas de Brasil. -¿Qué otras iniciativas tienen en Brasil? ¿Dónde están invirtiendo en exploración? Tenemos la propiedad de Cutia, que está ubicada a 13 km al sureste de Serra Pelada. Es un depósito de veta de cuarzo, el cual ha sido explotado históricamente por mineros artesanales. Los trabajos de perforación están previstos para el primer semestre de 2013. -¿Cómo manejan los temas de relaciones con sus comunidades vecinas y protección del medio ambiente? Trabajamos duro para mantener nuestra licencia social de operación, a través de nuestras actividades de desarrollo comunitario. Hemos llevado a cabo programas de entrenamiento en varias disciplinas mineras en el Centro de Desarrollo Comunitario, que Colossus fundó en la localidad de Serra Pelada. En alianza con el Senac (Servicio Nacional de Educación Comercial) la compañía ha graduado a 20 estudiantes de costura y otros 20 en programas de cocina industrial. También hemos mantenido la campaña periódica de donación de canastas de comida -300 a la fecha- para familias de escasos recursos de las áreas próximas. A través del programa de puertas abiertas, la compañía recibe estudiantes de una escuela local técnico minera.

“We’ve invested $180 million thus far and expect to spend between $225 and $250 million total,” says Ann Wilkinson, vice-president for Investor Relations.

is a quartz vein deposit which was mined historically by artisanal miners. Drilling is anticipated in the first half of 2013. - How do you manage community relations and environmental protection? We work hard to maintain our social license to operate through our community development activities. We’ve conducted training programs in various disciplines of mining at the Company funded Community Development Center in the village of Serra Pelada. In partnership with SENAC, the National Service of Commercial Education, the Company graduated 20 students from sewing and 20 students from industrial cooking classes. The Company also continued its campaign of periodic food basket donations, with 300 baskets delivered to low income families in the local area. Through its Open Doors program, the Company welcomed students from a local Mining Technical School.

enero-febrero / january-february 2013 l Latinominería l

39


reportaje / news report PA U L R O L L I N S O N , C E O D E K I N R O S S :

"Sudamérica es una jurisdicción importante para nosotros” PAUL ROLLINSON, CEO OF KINROSS

The three operations which the company owns in the region currently account for 35% of its global production. In addition, together with its portfolio of projects, they account for 70% of its proved and probable reserves.

"K

inross has a solid base of operations and projects located in what we believe to be some of the best districts in the whole world for gold mining,” said Paul Rollinson, CEO of the Canadian company, in a presentation at the GMP Latin America Mining Conference in Panama. The region is home to some of its most important operations and future projects. “The portfolio of operations and projects in South America represents approximately 70% of our proved and probable reserves so it is an important jurisdiction for us,” the executive highlighted. Today the multinational owns 100% of its gold mines in the region: Paracatu in Brazil, and Maricunga and La Coipa in Chile, which produce 35% of the Kinross´s global output (this year they expected to produce around 890,000-930,000 ounces of gold equivalent). In addition, it is developing two projects, Fruta del Norte in Ecuador – when this magazine went to print, the mining company was continuing to negotiate a production contract with the Ecuadorian government – and Lobo-Marte in Chile. It also owns 25% of Cerro Casale, which has been halted by its controlling shareholder Barrick Gold.

40

Foto gentileza Kinross / Photo courtesy Kinross

“ South America is an important jurisdiction for us”

En Paracatu, Brasil, se han realizado una serie de proyectos de construcción y ampliación. Paracatu, in Brazil, has carried out a series of construction and expansion projects.

Las tres operaciones que posee en la región aportan actualmente el 35% de su producción mundial. Además, junto a su cartera de proyectos, alberga el 70% de sus reservas probadas y probables.

"K

inross tiene una sólida base de operaciones y proyectos ubicados en lo que creemos son algunos de los mejores distritos de todo el mundo para la minería de oro”, dijo Paul Rollinson, CEO de la minera canadiense, en una presentación efectuada en el marco del encuentro GMP Latin America Mining Conference, en Panamá. Y precisamente en esta región se encuentran algunas de sus faenas y futuros emprendimientos más relevantes. “La cartera de operaciones y proyectos en América del Sur representa aproximadamente el 70% de nuestras reservas probadas y probables, por lo que es una jurisdicción importante para nosotros”, subrayó el ejecutivo. Hoy en día la multinacional posee el 100% de sus tres minas auríferas operativas

l Latinominería l enero-febrero / january-february 2013

en la zona: Paracatu en Brasil, y Maricunga y La Coipa en Chile, las cuales generan en conjunto del orden del 35% de la producción mundial de Kinross (para 2012 preveía un aporte de unos 890.000 a 930.000 onzas equivalentes de oro). A ellas se suman los proyectos Fruta del Norte en Ecuador –por el cual la minera seguía negociando hasta el cierre de esta edición el contrato de explotación con el gobierno ecuatoriano- y Lobo-Marte en Chile. En este país posee también el 25% de Cerro Casale, el cual se encuentra actualmente paralizado por su controlador, Barrick Gold.

WAY FORWARD KINROSS

“Mientras que hemos pasado los últimos años ampliando nuestra base de reservas y presencia operativa en América del Sur, nuestro enfoque actual apunta a optimizar nuestros activos, con énfasis en la mejora de los


reportaje / news report

Foto / Photo: Juan Carlos Recabal - LATINOMINERÍA

márgenes y el flujo de caja libre, de acuerdo con los objetivos de nuestro marco guía Way Forward Kinross”, sostuvo Rollinson, haciendo mención al plan integral adoptado por la compañía -tras asumir él como nuevo CEO en agosto último-, orientado a mejorar el manejo y la generación de valor en el largo plazo. Recordó que en Paracatu, la mayor mina de oro en Brasil y cuya vida útil se extiende por unos 30 años más, se han realizado desde mediados de la pasada década una serie de proyectos de construcción y ampliación. Los más recientes son la instalación de un circuito de flotación flash y desulfuración para mejorar las recuperaciones, así como la incorporación de un cuarto molino de bolas, cuya puesta en marcha estaba prevista para fines de 2012. Este último equipo contribuirá a mantener los niveles de producción a medida que el envejecimiento de la mina obligue a ir explotando mineral de mayor dureza. “Ahora tenemos la oportunidad de ver qué es lo que podemos hacer en Paracatu, sin la distracción de trabajos de construcción en el sitio”, indicó el CEO. Agregó que por su condición de ser una mina a cielo abierto de gran envergadura y baja ley, Paracatu es muy sensible a cambios en los precios de la energía, por lo que controlar estos costos será un factor clave: “Buscaremos mejoras en nuestros convenios de suministro y oportunidades que permitan reducir nuestro consumo en este ítem”, señaló. En cuanto a sus operaciones en Chile, Kinross tiene dos proyectos de ampliación.

En el caso de su mina Maricunga –cuya vida operativa está prevista hasta 2028- dijo que recientemente invirtieron en tecnología SART para reducir el consumo de cianuro (es un proceso diseñado para remover cobre desde la solución lixiviada y reciclar el cianuro de vuelta a la pila). “Maricunga es un importante contribuyente a la producción (de Kinross), pero no está exenta de desafíos, y vemos un conjunto de oportunidades para mejorar, como parte del proceso Kinross Way Forward”, afirmó. Por ejemplo, sostuvo que existe la posibilidad de incrementar márgenes por la vía de focalizarse más en calidad que cantidad en el planeamiento minero y en las estrategias de ley de corte. Con respecto a la otra faena aurífera ubicada en el norte de Chile, La Coipa, comentó que el descubrimiento del depósito Pompeya ofrece un “potencial futuro” para esta mina “hoy en día madura y de relativo alto costo”. Ubicado a equidistantes 65 km de ambos yacimientos ya mencionados, se encuentra Lobo-Marte. A principios de 2012, como parte de un resecuenciación general de los proyectos de crecimiento de Kinross, como consecuencia del alza de los costos de capital que afectó a la industria minera, se tomó la decisión de extender el cronograma de desarrollo para este emprendimiento. “También estamos buscando oportunidades de optimización para el proyecto -advirtió-, incluyendo la posibilidad de una faena de menor producción que la prevista originalmente, con el objetivo de reducir los requisitos de capital y el riesgo de ejecución”.

WAY FORWARD KINROSS

“While we have spent the last few years expanding our base of reserves and our operational presence in South America, our current focus is on optimizing our assets, with an emphasis in improving margins and free cash-flow in line with the objectives of our framework guide Way Forward Kinross,” said Rollinson, referring to the integrated plan adopted by the company – after he took over as CEO last August – which aims to improve long-term management and value generation. He recalled that Paracatu - Brazil´s largest gold mine, which is due to continue operating for more than thirty years - has carried out a series of construction and expansion projects since the middle of the last decade. The most recent include the installation of a flash floatation and desulfurization circuit to improve recoveries as well as the incorporation of a fourth ball mill which was due to start up by the end of 2012. This final piece equipment will help to maintain production levels as the aging of the mine obliges it to exploit harder ores. “Now we have the opportunity to see what we can do at Paracatu, without the distraction of construction work on site,” the CEO said. He added that, as a large, low-grade open pit, Paracatu is highly sensitive to changes in energy prices so controlling these costs will be a key factor: “We will seek improvements in our supply agreements and opportunities to reduce consumption of this item,” he said. Kinross is studying two expansion projects at its operations in Chile. At its Maricunga mine – which is due to continue operating until 2028 - he said that the company recently invested in SART technology to reduce cyanide consumption (the process is designed to remove copper from pregnant leach solution and recycle recovered cyanide to the pile). “Maricunga is an important contributor to (Kinross´s) production, but it is not free of challenges and we see a series of opportunities to improve as part of the Kinross Way Forward process,” he said. For example, he noted the possibility of increasing margins through focusing more on quality than quantity in mine planning and the cut-off grade strategies.

Mina La Coipa, ubicada en el norte de Chile. La Coipa mine is located in the northern of Chile.

enero-febrero / january-february 2013 l Latinominería l

41


reportaje / news report

Turning to the company´s other gold mine in northern Chile, La Coipa, he noted that the discovery of the Pompeya deposit offers a “potential future” for this mine “which is today maturing and has relatively high costs.” Lobo-Marte is located 65 kilometers from both mines. At the beginning of 2012, as part of the general rescheduling of Kinross´s growth projects, as a consequence in the rise in capital costs affecting the mining industry, the decision was taken to extend the development of this project. “We are also looking for improvement opportunities for the project,” he explained, “including the possibility of developing a smaller mine than originally planned, with the aim of reducing capital requirements and execution risk.” As previously indicated, Kinross owns 25% of the Cerro Casale copper and gold deposit in Chile. “Our partner and majority shareholder in the project, Barrick, has declared that while it represents a valuable opportunity in the long term, today Cerro Casale does not meet with its investment criteria and they will not take the decision to build it for the moment,” he explained.

Foto gentileza Kinross / Photo courtesy Kinross

“Our current focus is on optimizing our assets, with an emphasis in improving margins and free cashflow.”

Fruta del Norte constituye para Kinross un activo de gran tamaño y calidad. Fruta del Norte represents to Kinross a large and high-quality asset.

Como ya se indicó, Kinross posee el 25% del yacimiento chileno de oro y cobre de Cerro Casale. “Nuestro socio en el proyecto y dueño mayoritario, Barrick, ha declarado que si bien representa una valiosa oportunidad a largo plazo, actualmente Cerro Casale no cumple con sus criterios de inversión, y por lo tanto no tomarán la decisión de construirlo por el momento”, precisó.

FRUTA DEL NORTE

Foto gentileza Kinross / Photo courtesy Kinross

FRUTA DEL NORTE

With reserves with an average grade of 8.2 grams a ton, Fruta del Norte represents to Kinross a large and high-quality asset in a highly prospective zone and significant exploration potential. “At the moment (late 2012), we are negotiating with the Ecuadorian government on the economic conditions for FDN, with the aim of reaching a balanced agreement in terms of production and the investment security (which it requires),” the CEO said, adding that they expect conversations to continue into 2013. Meanwhile, the mining company continues advancing with studies to optimize the project. “We are exploring different alternatives for processing at FDN, including the possible use of gravity float leach. This could result in lower capital expenditure as well as reducing risk in the operation,” the executive revealed. Finally, together with broad exploration both inside and around its mining operations, Rollins said that Kinross has maximized its exposure to future opportunities through investments in a series of promising junior mining companies with exploration programs in several countries in the region.

Paul Rollinson asumió como nuevo CEO en agosto último. Paul Rollinson took over as CEO last August.

42

“Nuestro enfoque actual apunta a optimizar nuestros activos, con énfasis en la mejora de los márgenes y el flujo de caja libre.”

l Latinominería l enero-febrero / january-february 2013

Con reservas con una ley promedio de 8,2 gramos por ton, Fruta del Norte constituye para Kinross un activo de gran tamaño y calidad, localizado también en una zona altamente prospectiva y con significativo potencial de exploración. “En estos momentos (fines de 2012) estamos en negociaciones con el gobierno ecuatoriano sobre las condiciones económicas de FDN, con el objetivo de alcanzar acuerdos balanceados en materia de explotación y seguridad para la inversión (que este requiere)”, señaló el CEO, agregando que prevén que las conversaciones se prolonguen en 2013. Mientras tanto, la minera continúa avanzando en estudios para optimizar el proyecto: “Estamos explorando escenarios alternativos de procesamiento para FDN, incluyendo el posible empleo de gravedad, flotación y lixiviación (gravity float leach). Esto podría resultar en un menor gasto de capital, así como en reducir el riesgo en la operación”, adelantó el ejecutivo. Finalmente, en conjunto con sus amplias actividades de exploración tanto dentro como en los alrededores de sus operaciones mineras, Rollinson sostuvo que han maximizado su exposición a futuras oportunidades en Sudamérica, mediante inversiones en una serie de promisorias mineras junior con programas de exploración en varios países de la región.


evento / event D E B AT E M I N E R O E N A R G E N T I N A

Foto cortesía de Panorama Minero / Photo courtesy of Panorama Minero

Crecimiento ceñido a reglas claras y más exploración

MINING DEBATE IN ARGENTINA

En las dos jornadas del encuentro confluyeron representantes del rubro que hoy miran a la minería argentina enmarcada en una región. In the two-day meeting, converged industry representatives whom today look at Argentine Mining framed in a region.

La IX versión del Seminario Internacional Argentina Oro y Plata 2012 abordó las oportunidades y desafíos que tiene el país para impulsar su industria minera.

E

l evento “Argentina Oro y Plata” que se hizo en Buenos Aires sirvió de termómetro de los temas que concitan el interés para la industria minera en el país. Hubo exposiciones sobre nuevos proyectos y faenas, así como de las herramientas que tienen las provincias argentinas para obtener más renta minera. El dinamismo del sector se contrastó con escollos, como: seguridad jurídica, inflación, licencia social, financiamiento y una exploración a menor ritmo. La revista especializada Panorama Minero realizó la IX versión de este tradicional seminario internacional. En las dos jornadas del encuentro confluyeron representantes

del rubro que hoy miran a la minería argentina enmarcada en una región. “Somos muy optimistas de la actividad minera en la Argentina”, indicó Jorge Mayoral, secretario de Minería nacional. De acuerdo con los datos de la repartición que encabeza, en los próximos siete años el país duplicará la producción de oro convirtiéndose en una de las siete potencias auríferas del mundo. El funcionario remarcó, además, que son tiempos para América Latina y que debe primar una voluntad común por encima de los intereses individuales. El optimismo del secretario de Minería fue compartido moderadamente por Julio Ríos Gómez, presidente del Grupo de Empresas Mineras de la República Argentina

Growth confined to clear rules and more exploration The IX version of International Seminar on Gold and Silver Mining 2012, addressed the opportunities and challenges facing the country to boost their mining industry.

T

he event "Argentina Gold & Silver" was held in Buenos Aires, and it was used as a thermometer of topics of interest for mining industry in the country. There were exhibitions on new projects and worksites, as well as the tools that Argentine provinces have to obtain more mining income. The sector dynamism was contrasted with problems, as: legal certainty, inflation, social license, funding and a lower rate exploration. The specialized magazine Panorama Minero conducted the IX version of this traditional international seminar. In the two-day meeting, converged industry representatives whom today look at Argentine Mining framed in a region. "We are very optimistic of mining in Argentina", said Jorge Mayoral, National Mining

enero-febrero / january-february 2013 l Latinominería l

43


evento / event

Secretary. According to data from the entity, over the next seven years the country will double gold production becoming one of the seven gold world powers. The official remarked also, that these are times for Latin America and a common will must prevail over the individual interests. The mining minister's optimism was moderately shared by Julio Rios Gomez, president of Argentinean association of mine exploration companies (Gemera). “In 1993, thanks to the regulatory framework (mining), Argentina began to move forward... This framework should not be touched because it is the strength of our development. Sticks can be put in the way, but we will not stop the mining locomotive which progresses and does not stop, and it is made of steel”. The leader also argued that they are aware of what is happening internationally, in the Eurozone and the slow growth of the U.S. economy, but also emphasized, the implementation of certain internal circumstantial policies "which hit investment”. There are 23 advanced projects, remarked the official, in different provinces of Argentina, if they put into operation today, they would mean a US$ 20,000 to US$ 25,000million investment. "We asked the Mining Secretariat to continue respecting the regulatory framework and straightening sectors, which from our point of view, have produced deviations", said Ríos Gómez. Both for President of Gemera to Martín Dedeu, office holder of the Argentinean Chamber of Mining Entrepreneurs (Caem), exploration is key in the development of mining industry. Dedeu highlighted that beyond all difficulties of the world and the country, this activity came to 1.27 million meters of drilling last year. The entrepreneur stressed this phrase: "Not to utopias to scare investments". Increases in reserves position Latin American countries as "global suppliers of gold, silver and other minerals," said Mariano Lamothe, economist at Abeceb. He said the growth of mining was possible because there was an enabling legal framework, and thus mentioned that keep holding this condition is a challenge facing mining in the region "and mainly in Argentina". To illustrate the importance of preserving the rules, Lamothe estimated exports of U.S. $ 5,283 billion at the end of 2012, almost as much as in 2011, as a result of policy changes in foreign exchange settlement that was applied in the country. However, he also highlighted the potential and attractiveness of the territory, adding that Argentina is in the top ten global exploration investments to 3% of the budget for this purpose, while the growth rate of exploratory investment is 13.7%.

PROVINCES

In the Cuyo region, comprising the provinces of San Luis, Mendoza and San Juan, shines San Juan metal, because the other two jurisdictions have laws restricting the use of chemicals, such as cyanide, making the metalliferous projects unprofitable if they do not conform to the standard.

44

The debate The panel discussion that was made on the second day composed by geologist Mario Alderete, from YMAD; Jan Heinrich, managing partner of JH Green Consulting, Daniel Arroyo, of Poder Ciudadano, and Alejandro Rossi, executive director of the Environmental Lawyers Network. Below are some of the mentioned aspects. • The mining income is high according to companies, but communities say they do not get anything; there are few suppliers and few jobs. • There is a sense of injustice regarding suitable investments distribution. • More than the amount of mining income, the key is how is distributed. • There is an expectation on mining, which is not the case with the oil activities. • Social license with active participation of the State and creating an environment for the activity to be sustainable during several years. • The State asks to pay more and requires more responsibility. The companies should demand the State to fulfill its role. • Mining "is coming", we have to see how it is done in a consensual and not in a forced way. • Companies must improve standards to give information. • Transparency and communication are the keys.

Hay 23 proyectos avanzados en distintas provincias de la Argentina, que si hoy se pusieran en marcha significarían US$20.000 a US$25.000 millones de inversión.

(Gemera). “En 1993, gracias al marco regulatorio (minero), la Argentina empezó a avanzar... Ese marco no debe ser tocado porque es la fuerza de nuestro desarrollo. Nos podrán poner palos en el camino, pero no vamos a frenar la locomotora minera que avanza y no se detiene, y está hecha de acero”. El dirigente también sostuvo que no son ajenos a lo que sucede a nivel internacional, en la eurozona y el poco crecimiento de la economía estadounidense, pero también -enfatizó- a la aplicación de ciertas políticas coyunturales internas “que le pegan a la inversión”. Hizo hincapié en que hay 23 proyectos avanzados en distintas provincias de la Argentina, que si hoy se pusieran en marcha significarían US$20.000 a US$25.000 millones de inversión. “A la Secretaría de Minería le pedimos que sigamos respetando el marco regulatorio y enderezar sectores que, desde nuestro punto de vista, han producido desvíos”, indicó Ríos Gómez. Tanto para el presidente de Gemera como para Martín Dedeu, titular de la Cámara Argentina de Empresarios Mineros (Caem), la exploración es clave en el desarrollo de la industria minera. Dedeu destacó que más allá de todas las dificultades del mundo y del país, esta actividad llegó a 1.270.000 metros de perforación el último año. El empresario resaltó esta frase: “No a las utopías para espantar inversiones”. Los aumentos de reservas posicionan a los países de Latinoamérica como “los proveedores mundiales de oro, plata y otros minerales”, comentó Mariano Lamothe, economista de la Consultora Abeceb. Dijo que el crecimiento de la minería fue posible porque hubo un marco jurídico propicio, por lo que sostuvo que mantener esta condición es un desafío que enfrenta la minería en la región “y principalmente en Argentina”. Para graficar la relevancia de preservar las reglas del juego, Lamothe estimó exportaciones por US$5.283 millones al cerrar 2012, casi lo mismo que en 2011, como consecuencia del cambio normativo en la liquidación de divisas que se aplicó en el país.

El debate El panel del debate que se hizo en la segunda jornada estuvo compuesto por el geólogo Mario Alderete, de YMAD; Jan Heinrich, managing partner de JH Green Consulting; Daniel Arroyo, de Poder Ciudadano, y Alejandro Rossi, director ejecutivo de la Red de Abogados para la Defensa del Ambiente. A continuación, algunos aspectos mencionados. • La renta minera es alta según las empresas, pero las comunidades dicen que no les llega nada, que hay pocos proveedores y poco empleo. • Hay una percepción de injusticia del adecuado derrame de inversiones. • Más que la cantidad de renta minera, la clave es cómo se distribuye.

l Latinominería l enero-febrero / january-february 2013

• Hay una sobre expectativa con la minería, situación que no ocurre con la actividad petrolera. • Licencia social con participación activa del Estado y generar un ámbito para que la actividad sea sustentable varios años. • El Estado pide pagar más y pide más responsabilidad. Las empresas deben exigir que el Estado cumpla su rol. • La minería “se viene”, hay que ver cómo se hace en forma consensuada y no forzada. • Las empresas deben mejorar estándares para dar información. • La transparencia y la comunicación son las claves.


Foto cortesía de Panorama Minero / Photo courtesy of Panorama Minero

evento / event

Enrique Miguel González, director y fundador de Panorama Minero; Jorge Mayoral, secretario de Minería nacional; Martín Dedeu, presidente de Caem; y Julio Ríos Gómez, presidente Gemera. Enrique Miguel González, director and founder of Panorama Minero; Jorge Mayoral, Argentina’s secretary of Mining; Martín Dedeu, Caem’s president; and Julio Ríos Gómez, president of Gemera.

No obstante, también subrayó el potencial y atractivo que tiene su territorio, precisando que Argentina está en el top ten de inversiones exploratorias mundiales con el 3% del presupuesto destinado a este objetivo; en tanto que el crecimiento del ritmo de inversiones exploratorias es del 13,7% anual.

PROVINCIAS

En la región de Cuyo, que integran las provincias de San Luis, Mendoza y San Juan, brilla el metal sanjuanino, porque las otras dos jurisdicciones tienen leyes que limitan el uso de químicos -como el cianurohaciendo inviables los proyectos metalíferos si no se adecuan a la norma. “Cuyo tiene una geología favorable, pero la media de los tamaños de los yacimientos ha ido decreciendo; hoy es más caro encontrar una onza de oro”, precisó el geólogo Horacio Puigdomenech. Agregó que no hay porvenir si no se explora, “hay mucha oficina cerrada y geólogos dando vueltas. Se deben adecuar políticas para minimizar la influencia de los factores externos condicionantes”, señaló. Por su parte, Facundo Huidobro, titular de la Cámara Minera de Salta, sostuvo que la norteña región de la Puna está destinada a la producción y crecimiento, “pero hay que superar desafíos como la infraestructura y la capacitación laboral. Por cuestiones coyunturales suelen producirse desalientos importantes”.

El presidente de Cerro Cazador S.A., Danilo Silva, dijo que los depósitos minerales deben ser minados cuanto antes y que la ciencia económica es la que debe definir los parámetros económicos que hace que un proyecto sea viable. Carlos Massa, de la empresa MinSud, se refirió a lo difícil que es conseguir financiamiento y por ello remarcó que “hay que evitar que presiones del contexto lleven por otro camino. Una junior de exploración suele trabajar en un marco de incertidumbre. No faltan inversores en Argentina, sino mercados de capitales”.

PROVEEDORES

Otro tema relevante en la agenda minera argentina en el último tiempo es la política de fomento para la sustitución de importaciones. Al respecto, Mario Rodríguez, coordinador del Departamento de Desarrollo de Proveedores de Minera Alumbrera -administrada por Xstrata Copper, en la provincia de Catamarca-, hizo alusión al desafío de desarrollar proveedores locales. “Formamos estándares de proveedores; los evaluamos, buscamos empresas y las visitamos. En ese estándar observamos las obligaciones legales, la situación económico-financiera de la empresa, la capacidad operativa, su gestión de calidad, el desarrollo sostenible y la gestión comercial. Consensuamos y elaboramos un plan de trabajo para que llegue al nivel del estándar”, explicó. Minera Alumbrera sustituye importaciones desde 1997, cuando comenzó a operar. En 2011 la producción fue de 116.000 ton/cobre, 327.000 oz/oro y 28.000 oz/oro doré. La inversión total hasta diciembre de 2011 fue de US$1.701 millones. En resumen, las distintas voces coinciden en el gran potencial minero de la Argentina, pero también en que serán las decisiones que tome, las que marcarán la pauta para que esto se materialice con plenitud.

There are 23 advanced projects, in different provinces of Argentina, if they put into operation today, they would mean a US$ 20,000 to US$ 25,000million investment. "Cuyo has a favorable geology, but the average size of the deposits has been declining, today is more expensive to find an ounce of gold," said the geologist Horace Puigdomenech. He added that there is no future if there is no exploration, "There are many closed office and geologists around. Policies should be adjusted to minimize the influence of external conditioning factors”, noted. Meanwhile, Facundo Huidobro, office holder of the Mining Chamber of Salta, said the northern region of Puna is intended for production and growth, "but challenges like infrastructure and job training have to be overcome. Because of changing issues important discouragements take place”. Danilo Silva, President of Cerro Cazador SA, said mineral deposits must be mined as soon as possible and that economic science should define the economic parameters that make a project viable. Carlos Massa, from MinSud Company, described how difficult it is to get funding and therefore stressed that "we must avoid contextual pressures leading to a different path. An exploration junior usually works in a context of uncertainty. There are no lacks of investors in Argentina, yet capital markets”.

SUPPLIERS

Another relevant issue in Argentina mining agenda in recent times is the promotion policy for import substitution. In this regard, Mario Rodriguez, Supplier Development Coordinator of Alumbrera Mine -managed by Xstrata Copper, in the province of Catamarca-, alluded to the challenge of developing local suppliers. “We form supplier standards, evaluate them, look for companies and visit them. In that standard we observe legal obligations, the company economic and financial situation, operational capacity, quality management, sustainable development and business management. We agree and develop a work plan to reach the standard level ", explained. Minera Alumbrera replaces imports since 1997, when it began operating. In2011 the production was 116,000 tons/copper, 327,000 oz/gold and 28,000 oz/gold doré. The total investment up to December 2011 was U.S. $ 1,701 billion. In brief, the different voices match in the great mineral potential of Argentina, but also over the decisions that will be taken, which will establish a standard for this can be fully materialized.

enero-febrero / january-february 2013 l Latinominería l

45


reportaje / news report GOLDCORP’S PROJECT IN SOUTHERN ARGENTINA

Cerro Negro advancing towards production

EMPRENDIMIENTO DE GOLDCORP EN EL SUR ARGENTINO

Cerro Negro avanza con paso firme

The mining company expects to begin commercial operation of the Patagonian mine by the end of 2013. It is expected to produce 550,000 ounces of gold and 2 million ounces of silver annually during its first five years of production.

C

erro Negro is a mine project located in the northeastern part of the Province of Santa Cruz in southern Argentina, approximately seventy kilometers from Perito Moreno. Goldcorp owns 100% of the project through its local subsidiary Oroplata S.A., which it acquired in 2010. This gold project represents the cornerstone for future production in Argentina. The mine is advancing rapidly towards the start of production in 2013. The project is located on the plains of Patagonia at an altitude of approximately 600 meters above sea level. It consists of a series of advanced, high-grade deposits, including Mariana Central, Mariana Norte, San Marcos and Eureka. The property contains a large, very prospective land package, with a rich network of near-surface gold veins that are easily mineable at very low costs. The focus of current efforts is on growing gold reserves through exploration of these veins and testing new vein targets. Project infrastructure is excellent, with paved and gravel road access to the nearest provincial town of Las Heras, 110 kilometers to the northeast. Las Heras already provides basic manufacturing and service facilities to local on-shore oil fields located in Santa Cruz. The regional center of Comodoro Rivadavia, with a population of 140,000 inhabitants and port and airport facilities, lies 160km northeast of Las Heras. Since acquiring the property, the company has almost doubled its gold reserves and resources. New discoveries support Goldcorp’s expectations that Cerro Negro will be a “lasting, high-quality assets with low production costs.” A feasibility study updated in 2011 expanded Cerro Negro’s production profile. Based on an expected performance of 4,000 tons a day, the mine is expected to produce an average of 550,000 ounces annually during its first five years, at effective costs of less than US$200 an ounce. First production is expected during the second half of 2013.

46

La minera espera iniciar a fines de 2013 la operación comercial del yacimiento patagónico, que en su primer quinquenio tiene previsto producir anualmente 550.000 onzas de oro y 2 millones de onzas de plata.

C

erro Negro es un proyecto minero que se encuentra en la zona noroeste de la provincia de Santa Cruz, en el sur argentino, aproximadamente a 70 km de la localidad Perito Moreno. Goldcorp es propietaria del 100% a través de la subsidiaria local Oroplata S.A., adquirida en 2010. Para la compañía este emprendimiento aurífero es la futura piedra angular de la producción en la Argentina. La futura faena avanza con paso firme hacia su puesta en marcha a finales de 2013. El proyecto se localiza en las llanuras patagónicas, a una altitud aproximada de

l Latinominería l enero-febrero / january-february 2013

600 metros sobre el nivel del mar. Es un sistema de yacimientos de alta ley en estado avanzado, incluyendo los de Mariana Central, Mariana Norte, San Marcos y Eureka. La propiedad contiene una extensión de terreno grande y muy prometedora, con una rica red de depósitos de oro cercanos a la superficie, que son fácilmente explotables a muy bajos costos. El punto central de los esfuerzos actuales es aumentar las reservas auríferas por medio de la exploración, además de hacer pruebas en nuevas zonas. La infraestructura del proyecto es óptima, destacan desde la minera, con caminos de acceso pavimentados y de grava que lo conectan con la ciudad más


reportaje / news report

GOLDCORP GLOBAL

El proyecto se localiza en las llanuras patagónicas, a una altitud aproximada de 600 metros sobre el nivel del mar. The project is located on the plains of Patagonia at an altitude of approximately 600 meters above sea level.

Foto cortesía de Goldcorp Cerro Negro / Photo courtesy of Goldcorp Cerro Negro

La compañía confirmó recientemente que para 2012 su producción global se encuentra entre 2,34 – 2,45 millones de onzas de oro y 30 - 31 millones de onzas de plata.

cercana: Las Heras, 110 km al noreste. Esta localidad ya proporciona instalaciones básicas de manufactura y de servicio para los yacimientos petrolíferos establecidos en Santa Cruz. A 160 km al noroeste de Las Heras se encuentra el centro regional Comodoro Rivadavia (140.000 habitantes), con instalaciones aduaneras y aeropuerto. Desde la adquisición de la propiedad, las reservas y los recursos de oro se han casi duplicado, y nuevos descubrimientos apoyan las expectativas de Goldcorp de que Cerro Negro será un activo “duradero, de alta calidad y con bajos costos de producción”. Un estudio de factibilidad actualizado en 2011 expandió el perfil de producción de Cerro Negro. Con base en un rendimiento esperado de cuatro mil toneladas por día, se espera que la producción anual de oro en el primer lustro de producción plena promedie 550.000 onzas, a costos de efectivo de menos de US$200 por onza. La primera producción se espera en el segundo semestre de 2013. Alastair Still, director de Goldcorp Cerro Negro, precisa a LATINOMINERÍA que la compañía adquirió el proyecto “porque

“Nuestra destacada cartera de proyectos nos permitirá mantener un nivel de crecimiento sólido en el futuro. Para 2016, esperamos que la producción anual de oro alcance los 4,2 millones de onzas, es decir, un aumento del 70% en los próximos cinco años”, precisó la compañía.

Alastair Still, director of Goldcorp Cerro Negro, told LATINOMINERÍA that the company acquired the project “because it is a highgrade system, close to the surface and it is expected to generate significant gold production. One very interesting characteristic of this project is the growth opportunity which it could present in terms of ore extracted through exploration.” More than 145,729 meters were drilled during the 2012 exploration program at 421 holes. Goldcorp acquired Cerro Negro from Andean Resources for US$3.6 million. As a listed company (TSX:G NYSE:GG), each of Andean Resources’ common shares was exchanged for a partial Goldcorp action, representing the bulk of the purchase, with a smaller proportion being paid in cash.

PROJECT

- Production is expected to begin in the second half of 2013. Could that date change? The company is working to comply with the forecast production date and begin operations towards the end of 2013 es un sistema de alto grado, cerca de la superficie y se espera que genere una producción de oro significativa. Una característica muy interesante de este proyecto es la oportunidad de crecimiento que puede presentar en términos de mineral extraído a través de la exploración”. Durante 2012 el programa de exploración dentro del proyecto fue de 145.729 metros, en 421 hoyos. Goldcorp adquirió Cerro Negro de Andean Resources por un valor de US$3,6 millones. Como compañía que cotiza en bolsa (TSX:G NYSE:GG), cada acción común de Andean Resources fue cambiada por una acción parcial de Goldcorp, haciendo así la mayor parte de la compra, con una porción menor pagada en efectivo.

PROYECTO

-Are you currently at peak construction? Not yet. Today we have approximately 400 direct employees and 1,500 contractors. Peak construction will be reached by the middle of 2013. -And how many jobs will be created during the operational stage? During production, the company expects to employ a total of more than 1,000 workers, plus contractors. -Will the final construction cost rise as the result of local inflation? Construction is expected to cost US$800 million. However, there could be a new estimate by the start of 2013. Around US$500 million have been invested so far.

-Está previsto entrar en producción en el segundo semestre de 2013. ¿Puede cambiar esa fecha? La compañía está trabajando para cumplir con los plazos de producción previstos e iniciar la operación hacia finales de 2013.

-How far advanced is construction of Cerro Negro? According to the latest information for the third quarter of 2012, construction is 46% complete. The contractor with the largest number of works is Cartellone, but other major companies in the sector are also working there.

-¿Están en el pico de construcción actualmente? Aún no. Al día de hoy tenemos aproximadamente 400 empleados propios y 1.500 de contratistas. El pico de la producción será a mediados de 2013.

-Are the rules on substituting imports affecting the construction schedule? Not at the moment, as we are complying with the schedule.

-Y en la etapa de operación, ¿cuánto empleo generará? Durante la operación la compañía estima emplear más de mil empleados en total, además de contratistas.

-What permits do you still need to obtain? We have the Environmental Impact Study to build the project and related permits. We are applying for the construction permits.

enero-febrero / january-february 2013 l Latinominería l

47


reportaje / news report

GOLDCORP GLOBALLY The company recently confirmed global production in 2012 of 2.34-2.45 million ounces of gold and 30-31 million ounces of silver. “Our outstanding portfolio of growth projects will allow us to maintain solid growth in the future. In 2016, we expect that gold production will hit 4.2 million ounces of gold, which means a 70% increase over the next five years,” the company said.

-Does the project require infrastructure work? The project implies the construction of access roads to the camp plus all the services such as water, electricity and internet. All these works will benefit communities living near the project.

HIGH GRADE DEPOSIT

-Why is Cerro Negro one of the world’s lowest-cost gold projects? Because Cerro Negro is a high-grade deposit, but also due to continuous improvement of the processes, together with efficient and effective operating standards. -What is the project’s useful life? The mine has an expected useful life of twelve years. However, Goldcorp has a program to continue exploring in the Province of Santa Cruz and thereby extend Cerro Negro’s useful life. -How much will the new mine produce? Cerro Negro is expected to produce an average of 550,000 ounces of gold and 2 million ounces of silver annually during the first five years of production. -Will it be an open pit or an underground mine? Cerro Negro consists of a system of highgrade veins which will be exploited through underground mining techniques. We are at the underground development stage of three veins: Eureka, Mariana Norte and Central. -Can you describe the production process? Conventional grinding and milling, to obtain gold and silver. -Do you expect to buy any more projects in Argentina? We are focusing our efforts on starting up Cerro Negro.

SUPPLIERS

-How many suppliers do you have? We work with a huge range of suppliers, the

48

-¿El costo de la construcción final variará en función de la inflación local? El costo de la construcción está previsto, hasta el momento, en US$800 millones, sin embargo a inicios de 2013 puede haber una nueva estimación. Ya se invirtieron unos US$500 millones. -¿Qué porcentaje de construcción tiene Cerro Negro? De acuerdo con la última información del tercer trimestre de 2012, se ha completado el 46% de la construcción. El contratista con mayor cantidad de actividades asignado a la construcción es Cartellone, pero trabajan otras empresas muy importantes en el rubro. -¿Las normativas sobre sustitución de importaciones afectaron el plazo de construcción? No por ahora, ya que venimos cumpliendo en tiempo y forma con los plazos pauteados. -¿Qué permisos les falta obtener? Hemos obtenido el Estudio de Impacto Ambiental para la construcción del proyecto y los permisos inherentes. Gestionamos los permisos para la construcción. -¿Qué obras de infraestructura requerirá el emprendimiento? El proyecto implica desde la construcción de caminos de acceso, hasta el campamento con todos servicios de agua, luz, acceso a Internet. Con todas (estas obras) se benefician las comunidades cercanas al proyecto.

DEPÓSITO DE ALTO GRADO

-¿Por qué Cerro Negro es uno de los proyectos de oro de más bajo costo del mundo? Cerro Negro es un depósito de alto grado, así como porque apunta a la mejora continua de los procesos, junto con estándares operativos de efectividad y eficiencia.

-¿Cuál es la vida útil del proyecto? La mina tiene una vida útil esperada de doce años. Sin embargo, Goldcorp cuenta con un programa para seguir explorando en la provincia de Santa Cruz y así ampliar la vida útil de Cerro Negro. -¿Cuánto producirá la futura operación? Cerro Negro espera producir anualmente 550.000 onzas de oro y 2 millones de onzas de plata en promedio durante los primeros cinco años de operación. -¿La explotación será a cielo abierto o subterránea? Cerro Negro es un sistema de vetas de alto grado que serán operadas bajo sistema de mina subterránea. En la actualidad se encuentra en etapa de desarrollo subterráneo de tres vetas: Eureka, Mariana Norte y Central. -¿El proceso de producción cómo será? A través de trituración y molienda convencional para obtener el oro y la plata. -¿Tienen previsto adquirir algún otro proyecto en Argentina? Los esfuerzos están destinados a la puesta en marcha de Cerro Negro.

PROVEEDORES

-¿Cuántos proveedores tienen? Contamos con una cartera de gran variedad de proveedores, siendo la gran mayoría de Argentina. Buscamos abastecernos localmente. -¿En qué consiste el Programa de Desarrollo Estratégico destinado a Pymes proveedoras? El programa surge con el objetivo de brindar capacitación a empresas proveedoras en temáticas vinculadas con la seguridad e higiene laboral, así como temas legales y de oficios particulares. Invertir en proveedores locales permitirá que dichos

MILES DE HECTÁREAS La propiedad de Cerro Negro comprende 25.000 hectáreas y contiene diez áreas de exploración ya identificadas con manifestaciones de mineralización aurífera epitermal. Los depósitos son de oro epitermal de sulfuración baja (y potencialmente plata), albergados en yacimientos de cuarzo y la tumba de filones relacionada. Dentro del proyecto general ya se reconocen al menos seis zonas de mineralización epitermal: • Yacimiento Eureka, localizado cerca del margen occidental del área; tiene un extenso

l Latinominería l enero-febrero / january-february 2013

afloramiento de yacimientos de cuarzo sobre unos 4 km y ha registrado leyes auríferas considerables. • Mariana Central y Mariana Norte, al norte del área del yacimiento Eureka. • San Marcos, a 5 km al noreste del área del yacimiento Eureka. • Zona de Yacimientos, que fue el punto central de la exploración pasada. • Bajo Negro, a 2 km al sudoeste de la exploración de la Zona de Yacimientos.


reportaje / news report

great majority of them from Argentina. We try to seek local suppliers. -Can you describe the Strategic Development Program aimed at small and medium-sized suppliers? The aim of the program is to train supplier companies in a series of fields, linked to occupational health and safety as well as legal issues and particular trades. Investing in local suppliers will allow these businesses not only to supply Cerro Negro, but other companies in the Province of Santa Cruz and across the country. -Are you providing training to local people? Yes, we are providing an eight module course with the University of Austral Patagonia called “Introduction to Mining” aimed at people from or living in the Province of Santa Cruz, without prior of experience of working in an underground mine.

Cerro Negro es un sistema de vetas de alto grado que serán operadas bajo sistema de mina subterránea. Cerro Negro consists of a system of high-grade veins which will be exploited through underground mining techniques.

emprendimientos puedan abastecer no sólo a Cerro Negro, sino a otras empresas de la provincia de Santa Cruz como del país. -¿Realizan cursos de capacitación para los lugareños? Sí, realizamos junto con la Universidad de la Patagonia Austral un curso de ocho módulos -“Introducción a la Minería”-, destinado a personas procedentes o radicadas en la provincia de Santa Cruz, sin experiencia previa en trabajo en mina subterránea. -¿La empresa hace alguna autocrítica respecto al conflicto que se generó con el Sindicato de Camioneros? El pasado lunes 22 de octubre, en las instalaciones del proyecto Cerro Negro, un grupo de personas identificadas como miembros del gremio de camioneros se presentaron de forma violenta y no autorizada y bloquearon el ingreso al proyecto. Dichas personas no son ni fueron empleados de Goldcorp en ningún momento, sino personal de empresas contratistas cuyo contrato de servicios de prestaciones no continuas había expirado en días pasados. El 23 por la madrugada los manifestantes se retiraron del proyecto luego de que las autoridades declararan el hecho como ilegal y dictaran la conciliación obligatoria, que incluye la participación en ese proceso de los verdaderos empleadores, que son las empresas contratistas.

-What is the company’s analysis of the conflict that arose with the Truckers’ Union? On Monday October 22nd, a group of individuals identified as members of the truckers’ union turned up at the installations of the Cerro Negro project in a violent and unauthorized manner and blocked access to the project. These people are and were not at any time

En virtud de la significativa magnitud de los perjuicios materiales, incluyendo algunos daños físicos al personal de otros contratistas, Goldcorp presentó las denuncias correspondientes ante las autoridades judiciales competentes. La enseñanza es que debemos apuntar a la mejora continua de nuestros procesos con los contratistas de diversa índole. Es decir, que el proceso de gestión y gerenciamiento de los proveedores mejore. -¿Qué programas de desarrollo sustentable implementa la empresa en la provincia? El departamento de Relaciones Comunitarias es el responsable de identificar proyectos y propuestas que permitan a las comunidades cercanas al proyecto Cerro Negro un desarrollo sustentable, sin dependencia. La compañía apoya iniciativas que buscan el bienestar común de la sociedad y que permiten ser enmarcadas dentro de las políticas de Responsabilidad Social Empresaria. En este sentido, Goldcorp Cerro Negro colabora en la puesta en marcha de espacios culturales, deportivos, educativos y autogestionables. -¿Cómo evalúa el escenario argentino para las inversiones mineras? -Propicio, pero con desafíos grandes.

THOUSANDS OF HECTARES The Cerro Negro property covers 25,000 hectares and contains ten identified exploration areas with evidence of epithermal gold mineralization. The deposits are low-sulfidation, epithermal gold (and potentially silver) hosted within quartz veins and associated stockworks. Within the overall project, at least six zones of epithermal mineralization are now recognized: • Eureka Vein, located near the western margin of the tenement and has large outcropping quartz veins over some 4 kilometer of strike and has recorded significant gold grades. • Mariana Central & Mariana Norte, located north of the Eureka Vein area. • Bajo Negro, 2 kilometer to the south-west of the Vein Zone exploration. • San Marcos, 5 kilometer northeast of the Eureka Vein area. • Vein Zone, which was the previous focus of past exploration.

Goldcorp employees, but personnel of contractor companies whose non-continuous services contract had expired a few days earlier. Early on October 23rd, the protesters withdrew from the project after the authorities declared the strike illegal and ordered obligatory conciliation, which includes the participation in this process of the true employers, which are the contractor companies. As a result of the significant size of the material damage, including some physical damage to personnel from other contractors, Goldcorp presented the corresponding allegations to the relevant judicial authorities. The lesson is that we must seek continuous improvement of our processes with all kinds of contractors. This means improving our process of managing suppliers. -What Sustainable Development programs is the company implementing in the province? The department of Community Relations is responsible for identifying projects and proposals which allow communities living near the Cerro Negro project to achieve non-dependent sustainable development. The company supports initiatives which seek the common good of society and which fall within our policy of Corporate Social Responsibility. Goldcorp Cerro Negro collaborates with the start-up of cultural, sports, educational and self-governing spaces. -How do you evaluate the atmosphere in Argentina for mine investment? Propitious, but with huge challenges.

enero-febrero / january-february 2013 l Latinominería l

49


entrevista / interview

CHARLES JEANNES, PRESIDENTE Y CEO DE GOLDCORP:

“No sabemos cuándo EIA de El Morro será completado” CHARLES JEANNES, PRESIDENT AND CEO OF GOLCORP:

“ We don’t know when the Environmental Impact Study for El Morro will be finished” Courtesy of MINerIA CHILeNA, Grupo edItorIAL edIteC.

The mining executive describes the difficulties faced by the copper and gold project located in the Region of Atacama in the north of Chile.

D

uring his visit to the convention held by the International Council on Mining & Metals in Santiago, Goldcorp’s top executive Charles Jeannes talked exclusively to MINERIA CHILENA – LATINOMINERIA’s

50

El ejecutivo de la minera describe las dificultades que está teniendo el proyecto de cobre y oro ubicado en la Región de Atacama, en el norte de Chile. Gentileza de MINERÍA CHILENA, Grupo Editorial Editec.

E

n el marco de su visita a la convención que realizó el International Council on Mining & Metals en Santiago, Charles Jeannes, máximo ejecutivo de Goldcorp, habló en exclusiva para MINERÍA CHILENA -publicación hermana de LATINOMINERÍA- respecto del compás de espera en que está el proyecto cobre y oro El Morro. El desarrollo de este yacimiento, ubicado en la norteña Región de Atacama, fue paralizado luego que la Corte Suprema revirtiera la aprobación ambiental, por estimar que no se realizaron correctamente las consultas a comunidades indígenas de la zona, en el marco de la vigencia del Convenio 169 de la OIT. “No sabemos cuándo el estudio puede ser completado, porque es el Gobierno el que tiene que hacer la consulta con las

l Latinominería l enero-febrero / january-february 2013

comunidades locales, de acuerdo con la decisión de la Corte Suprema. Estamos esperando… No podemos saber cuándo ese proceso culminará, ni qué pasará con eso; nos podrían solicitar reconfigurar el proyecto, o puede ser que no se tengan que hacer cambios”. -En el intertanto, ¿cómo están trabajando en el proyecto? Continuamos haciendo ingeniería. Estamos mirando una variedad de alternativas de optimización que este retraso nos da la oportunidad de analizar con más profundidad. También estamos empezando de nuevo con nuestro propio programa de compromiso con la comunidad, para asegurarnos de construir buenas relaciones con ella, para que las personas sepan, de una mejor manera que en el pasado, cómo es nuestro proyecto y cuáles son los beneficios e impactos de la iniciativa para la gente.


Foto/Photo: Juan Carlos Recabal - LATINOMINERÍA

entrevista / interview

Charles Jeannes, máximo ejecutivo de Goldcorp.

sister publication – about the holding pattern adopted by its El Morro copper and gold project. Development of the mine, located in the northern region of Atacama, was halted after the Supreme Court overturned its environmental approval, ruling that local indigenous communities had not been properly consulted, as required by Convention No 169 of the ILO. “We do not know when the study could be finished because it’s up to the government to carry out the consultation with the local communities, according to the Supreme Court ruling. We are waiting… We do not know when this process will end, or what will happen; they could ask us to reconfigure the project, or it could be that we do not have to make any changes.” - Meanwhile, what work is being done on the project? We are continuing with the engineering. We are looking at a variety of alternative optimizations which this delay gives us the opportunity to analyze in greater depth. We are also starting again with our own program of commitments to the community, to ensure we

Goldcorp’s top executive, Charles Jeannes.

-¿Qué optimizaciones han detectado para el proyecto? Hemos mirado más en detalle cosas como la recuperación metalúrgica, y quizás en algunas zonas la reconfiguración del rajo, para mejorar el proyecto. -¿Cuándo esperan que El Morro pueda estar produciendo? Es muy difícil de determinar, porque no sabemos cuándo podremos empezar a construir. La construcción tomará aproximadamente cinco años. Esperamos tener la posibilidad de seguir adelante en algún momento de 2013, pero no conocemos realmente cuánto tiempo va a tomar, porque hay otra incertidumbre: la fuente de energía para el proyecto (una falencia que también está afectando a otras inversiones en la zona). La alternativa era una central de generación que iba a ser construida y que ahora está cuestionada, así que estamos mirando otras alternativas. -¿Existe la posibilidad de que construyan su propia central de generación? Seguro, hay una variedad de posibilidades que estamos apoyando, como que el Gobierno complete el trabajo de interconexión (entre los sistemas eléctricos del norte y centro de Chile), o nos podemos asociar con otros para construir una central. Estamos analizando muchas opciones.

PROYECTO CUPRÍFERO -El Morro fue primero concebido como un proyecto de cobre, ahora ustedes lo quieren desarrollar para obtener principalmente oro… Siempre se ha considerado que el 70% de los ingresos será de cobre y el 30% de oro. Eso puede cambiar un poco dependiendo de los precios de los metales, porque el oro ha aumentado más que el cobre en los últimos años, pero es principalmente un proyecto de cobre. Pero esas tendencias ¿han influido en un cambio de diseño del proyecto? No. Produciremos todo el cobre, no lo evitaremos por ningún motivo. Como compañía ya producimos cobre con nuestros socios en la Mina Alumbrera, en Argentina, la que se estaría agotando en algunos años, por lo que miramos el cobre de El Morro como una continuación para nosotros. ¿Están haciendo exploraciones en otras partes de Chile? Por ahora no podemos hacer nada en las proximidades de El Morro, por el tema del permiso. Estamos viendo algunas cosas en el sur, pero nada importante para informar por ahora.

build good relations with them, so that people understand, better than they did before, our projects and how it will benefit and impact them. - What optimizations have you detected in the project? We have looked more closely at things like the metallurgical recovery and perhaps, in some areas, the reconfiguration of the pit, to improve the project. - When do you expect that El Morro could enter production? It is very difficult to say because we do not know when we could begin construction. Construction will take approximately five years. We hope to have the chance to move ahead at some point in 2013, but we do not know really how much time it is going to take, because there is another unknown: where the energy for the project is going to come from? (a problem which is also affecting other investments in the area). One alternative was a power plant which was going to be built and now is being questioned, so we are looking at other options. - Is there any chance of you building your own power plant? Of course, we are studying a series of options, such as the government completing the interconnection (between the grids in northern and central Chile) or we could team up with others to build a power plant. We are analyzing lots of options.

COPPER PROJECT

- El Morro was first conceived as a copper project, but now you want to develop it largely to produce gold… It has always been considered that 70% of its revenue will come from copper and 30% from gold. This could change a little depending on metals prices because gold has risen more than copper in recent years, but it is largely a copper project. Have these trends led to a change in the design of the project? No. We will produce all the copper. We will not avoid it for any reason. As a company we already produce copper with our partners at the Alumbrera mine in Argentina, which is reaching the end of its life, so we look on the copper from El Morro as a continuation for us. Are you carrying out exploration in other parts of Chile? For now we cannot do anything around El Morro because of the permitting issue. We are looking at some things in the south, but we don’t have anything important for now.

enero-febrero / january-february 2013 l Latinominería l

51


reportaje / news report D E S I LV E R S TA N D A R D

Mina Pirquitas avanza en el cumplimiento de su plan de producción FROM SILVER STANDARD

Pirquitas Mine progresses in the completion of its production plan The worksite located in Argentine province of Jujuy, overcame the impact that meant the damage in ball mill, and aims to produce 8.5 million ounces of silver annually.

P

irquitas Mine seeks to consolidate a production of 8.5 million ounces of silver annually and lower their direct production costs. Thus, it aims to put behind the impact that the malfunction of a ball mill meant in 2011, in fact, already in the last months of 2012 the mining company has been posting a record production, as highlighted Francisco Almenzar, Deputy General Manager at the worksite, within the framework of a presentation made at the International Seminar Argentina Gold and Silver, in Buenos Aires. The operation is located 355 km from the capital of Jujuy, in the Argentine Puna. Its history dates back to the '30s, when a study began on gold that six years later led to discoveries of tin and silver mines. For a long time the deposit was mined underground and in 1995, due to bankruptcy of its owner, passed to the State. A company awarded it in a public auction and then Silver Standard begins to acquire the shares until owning 100% by 2004. In 2008 started the construction of the current worksite, while the first shipment of concentrate took place in December

52

La faena ubicada en la provincia argentina de Jujuy logró superar el impacto que le significó el desperfecto en su molino de bolas, y apunta a producir 8,5 millones de onzas anuales de plata.

M

ina Pirquitas busca consolidar una producción de 8,5 millones de onzas de plata anuales y bajar sus costos directos de producción. De esta forma, pretende dejar en el pasado el impacto que le significó el desperfecto en un molino de bolas ocurrido en 2011; de hecho, ya en los últimos meses de 2012 la minera ha venido registrando una producción récord, según destacó Francisco Almenzar, subgerente general en la faena, en el marco de una presentación hecha en el Seminario Argentina Oro y Plata, en Buenos Aires. La operación está ubicada a 355 km de la capital de Jujuy, en plena Puna argentina. Su historia se remonta a los años ‘30, cuando se inició un estudio sobre oro que seis años después dio lugar a descubrimientos de minas de estaño y plata. Durante mucho tiempo el yacimiento se explotó de manera subterránea y en 1995, por bancarrota de su propietaria, pasó a manos del Estado. Una compañía se la adjudicó en una subasta pública y luego Silver Stan-

l Latinominería l enero-febrero / january-february 2013

dard empezó a adquirir las acciones hasta ser propietaria del 100% en 2004. Fue en 2008 cuando comenzó la construcción de la actual faena, en tanto que el primer embarque de concentrado tuvo lugar en diciembre de 2009. La explotación, esta vez, se empezó a hacer a cielo abierto.

PRODUCCIÓN

“Nuestra mina tiene mucha diversidad de minerales y de contenido de leyes, por lo tanto, a la planta hay que alimentarla con un material lo más constante posible en ley y características -sulfurado, oxidado-, por lo tanto necesitamos, sí o sí, la presencia y la construcción de varios stock pile donde se producen mezclas de material para alimentar la planta”, indicó el ejecutivo. Actualmente, la minera está llegando al final de la Fase I, que concluirá en enero de 2013. Al mismo tiempo, está trabajando en la Fase II de apertura del rajo. “Tenemos asegurada toda la alimentación de 2012 y 2013 con material de la mina y de los stock pile que hay en este momento cerca de la planta”, señaló.


reportaje / news report

Foto cortesía de Mina Pirquitas / Photo courtesy of Mina Pirquitas

Según Almenzar, uno de los mayores riesgos que existen es encontrarse con las viejas labores de la mina. “Nosotros tenemos mensurado más del 80% de las labores antiguas y, además, tenemos todo un procedimiento para seguir detectando nuevas labores en el día a día de la operación. Después de cuatro años de explotación hemos adquirido una gran experiencia al respecto y da como resultado un nivel de seguridad altísimo”, dijo.

La operación está ubicada a 355 km de la capital de Jujuy, en plena Puna argentina. The operation is located 355 km from the capital of Jujuy, in the Argentine Puna.

La empresa reportó en 2011 una caída de rendimiento en toneladas diarias que se produjo en la segunda mitad del año como consecuencia de la rotura en la caja de engranaje del molino de bolas, lo que hizo bajar la producción y lograr solamente 7,1 millones de onzas de plata. En 2012 “hemos crecido por los cambios en la alimentación del molino, que nos permitió superar las 4.000 ton/día. En cuanto a la producción de plata, en el último trimestre hemos logrado superar los 2,2 millones onzas, lo que ha sido un récord en la producción de Mina Pirquitas desde su inicio”, detalló Francisco Almenzar. La expectativa para 2013 es cumplir con el plan de producción de planta. Es decir, alcanzar los 8,5 millones de onzas y bajar los costos directos, para que producir una onza cueste US$12,8 y no los US$13,20 actuales. “Necesitamos trabajar con el control de costos y la venta total del producto. La producción de la mina viene 100% acorde al plan de minado. La seguridad y el medio ambiente, y las comunidades, son para nosotros unos de nuestros principales objetivos para seguir trabajando en 2013”, expresó Almenzar. Asimismo, la empresa continúa con la construcción del dique de colas que costará US$20 millones. Además, la faena concretó en 2012 la compra de cuatro camiones nuevos que ya están operando en la mina. El ejecutivo sostuvo que esta compra era uno de los desafíos asumidos por la minera. Otra tarea era disminuir la dilución estéril minera a través de nuevos procesos de trabajo. “Hemos logrado mejorar la correlación del modelo a largo plazo con el de corto plazo, gracias al esfuerzo del equipo de geología

Datos relevantes • El proceso en Mina Pirquitas se hace por trituración primaria, trituración secundaria, preconcentración con jigs, molienda, concentración por flotación de plata, concentración por flotación de zinc. El producto final son las colas que se depositan en el dique de colas. La preconcentración se realiza con unos jigs Gekko que funcionan presurizados. • La mina tiene a seis comunidades como áreas de influencia, ubicadas en un radio de 50 km. De los empleados totales, 238 son de esas comunidades. En total, son 689 trabajadores directos, a los que hay que sumarles otros 500 de las empresas contratistas. • En la zona no existen caminos pavimentados, ni hay líneas eléctricas. Por lo tanto, la compañía genera su propia energía con tres grupos de 5 MW cada uno.

• La empresa tiene derechos adquiridos por 31 lt/s de agua. La recuperación se hace a través de tanques, espesadores tanto en colas como en concentrados. El retorno de agua del dique de colas permite reutilizar 8,5 veces el líquido. • Silver Standard realiza monitoreos de agua, flora, aire y fauna. Ya hay una empresa consultora trabajando en el plan de cierre de mina y la compañía continúa retirando en el flujo de caja los fondos necesarios para realizar ese plan. • Seguridad: En eventos acumulados hubo una baja, comparando octubre 2011 y octubre 2012. Para Mina Pirquitas esto es una buena señal de que los controles y procedimientos están funcionando. • La producción de Pirquitas sale de Jujuy vía Chile (70%) y Puerto de Buenos Aires (30%).

2009. This time exploitation was conducted in open pit.

PRODUCTION

"Our mine has a great variety of minerals and content of grades, therefore, the plant has to be fed with a material, in grade and characteristics, as constant as possible- sulphide, oxide- thus is essential the presence and the construction of several stock pile where mixtures of material are produced to fed the plant", said the executive. Currently, the mining company is reaching the end of Phase I, which will be completed in January 2013. At the same time, Phase II is working on open pit commencement. "We have secured all power for 2012 and 2013 with material from the mine and stock piles existing at this time near the plant," said. According to Almenzar, one of the biggest risks is to encounter with and old mine entry. "We have measured over 80% of the old mine entries, and also we have a whole new method for detecting mine entries in the day-to-day operation. After four years of activities, we have considerably more experience with the process which results in a very high security level, "said. The company reported in 2011 a downturn in performance in tones per day, that occurred in the second half of 2011 due to breakage in ball mill gear box, which lowered production and only achieve 7.1 million ounces of silver. In 2012 "we have grown by changing mill feeding, that allowed us to overcome the 4,000 ton / day. As for silver production, in the last quarter we have achieved to exceed 2.2 million ounces, which has been a record in the production of Pirquitas Mine from its beginning, "explained Francisco Almenzar. The expectation for 2013 is to fulfill the production plan of the plant. That is, to reach 8.5 million ounces and lower direct costs, in order to produce one ounce cost US$12.8 and not the current US$13.20. "We need to work with cost control and product total sales. The mine production is 100% according to the mining plan. Safety and the environment, and communities are some of our main objectives to continue working in 2013" said Almenzar. Also the company continues to build the tailings dam that will cost $ 20 million. In addition, the worksite finalized in 2012 the purchase of four new trucks already operating in the mine. The executive said this purchase was one of the challenges taken by the mining company. Another task was to reduce the mining sterile dilution through new work processes. "We managed to improve the correlation of long-term model with the short-term, thanks to the efforts of the geology team we have in the mine. The challenges over-

enero-febrero / january-february 2013 l Latinominería l

53


reportaje / news report

come in the plant were mainly crushing problems: last year we could get to crush up to 3,000 tons/day, today we have recorded 7,000 tons/day, with operational improvements and equipment", said . Because of the issue faced with the ball mill, the company acquired a repair kit, another spare box, another mill motor and a set of crowns which we will receive in early 2013. As for the challenges facing the Argentine mining stage, the Deputy Manager indicated that "it is not necessary to discuss high inflation that forces us to cost control, greater efficiencies and optimizing our operators, in contractors and improvements in production rate to lower unit costs". Did you have problems with the import regulations? asked LATINOMINERÍA to Almenzar; the executive answered “we really had problems, and received great collaboration from the government of Jujuy. It should be noted that Governor Eduardo Fellner presides Ofemi (Federal Organization of Mining States) and has given us, through its work group, a great support to continue. Our teams of Institutional Relations, Logistics and Supply have made a great effort in order to enable authorities to understand the difficulties the regulation caused us, which ultimately was brought to a favorable conclusion, because today the issue is solved", said. Pirquitas Mine imports between 4% and 6% of consumables and spare parts.

EXPLORATION

Silver Standard is primarily an exploration company; Pirquitas is the first mine of the corporation. "Therefore, we give emphasis and primary importance to find more resources and reserves in the deposit. For this we have created some geophysical campaigns during 2011-2012 that indicated us some main objectives on where we could find more mineral and decide where we will drill. We found a very important target in Cortaderas that is approximately one kilometer north, within the Pirquitas Mine property. During 2012 exploration campaign ended with 54,000 meters of diamond drilling, which showed excellent resources that we hope to become short-time reserves", said the Deputy. On December 31, 2011, proven reserves were 57 million ounces/silver, which at the current production rate, means that there are still about 6.5 years of operation of the pit. To this we must add material that is likely, that is in the stock pile, as well as new resources that will be reserves. "We plan to continue drilling, possibly diamond drilling; we think there will be about 30,000 m in 2013 in an area north of Pirquitas Mine, but 700 or 800 meters of the current pit, which is practically within the same deposits "detailed the Deputy.

54

Relevant facts • The process in Pirquitas Mine is by primary crushing, secondary crushing, jigs preconcentration, grinding, silver flotation concentration, zinc flotation concentration. The final product are tails that are deposited in the tailings dam. The preconcentration is done with some jigs Gekko which operate pressurized. • The mine has six communities as areas of influence, located within 50 km. Of the total employees, 238 are from these communities. In total, there are 689 direct workers , plus another 500 from the contractors. • In the area there are no paved roads, nor power lines. Therefore, the company generates its own energy with three groups of 5 MW each. • The company has acquired rights for 31 lt/ s

que tenemos en mina. Los desafíos superados en planta principalmente fueron problemas de trituración: el año pasado podíamos llegar a triturar hasta 3.000 ton/ día, hoy estamos registrando jornadas de 7.000 ton, con mejoras operativas y de equipamiento”, mencionó. Debido al inconveniente que enfrentaron con el molino de bolas, la compañía adquirió un kit de reparación, otra caja de repuestos, otro motor del molino y un juego de coronas que recibirá a comienzos de 2013. En cuanto a los desafíos que enfrenta la minera en el escenario argentino, el subgerente indicó que “de más está hablar de una alta inflación que nos obliga a un control de costos, mayores eficiencias y optimización en nuestros operadores, en los contratistas y las mejoras de tasa de producción para bajar los costos por unidad”. ¿Tuvieron inconvenientes con la normativa sobre importaciones? consultó LATINOMINERÍA a Almenzar. El ejecutivo respondió que “realmente tuvimos problemas, y hemos recibido una gran colaboración del gobierno de Jujuy. Recordemos que el gobernador Eduardo Fellner preside la Ofemi (Organización Federal de Estados Mineros) y nos ha dado, a través de su grupo de trabajo, un gran apoyo para poder continuar. Nuestros equipos de Relaciones Institucionales, Logística y Abastecimiento han hecho un esfuerzo grande a fin de que las autoridades puedan entender las dificultades que la normativa nos ocasionaba, lo que finalmente nos ha llevado a buen puerto, pues hoy el tema está solucionado”, indicó. Mina

l Latinominería l enero-febrero / january-february 2013

of water. The recovery is done through tanks, thickeners both in tails as in concentrates. The water return from tailings dam allows 850% of water recycling. • Silver Standard carries monitoring of water, flora, air and fauna. There is already a consulting firm working on the mine closure plan and the company continues withdrawing in cash flow the funds needed to carry out that plan. • Safety: On accumulated events there were a decrease, comparing October 2011 and October 2012. For Pirquitas Mine this is a good sign that controls and procedures are working. • Pirquitas production leaves Jujuy via Chile (70%) and Buenos Aires Port (30%).

Pirquitas importa entre el 4% y 6% de los consumibles y repuestos.

EXPLORACIÓN

Silver Standard es, principalmente, una empresa de exploración; Pirquitas es la primera mina de la corporación. “Por lo tanto, damos hincapié y tenemos principal importancia por encontrar mayores recursos y reservas en el yacimiento. Para eso hemos generado algunas campañas de geofísica durante 2011-2012 que nos indicaron algunos objetivos principales donde pudiéramos encontrar más mineral y decidir los lugares donde vamos a perforar. Encontramos un target muy importante en Cortaderas que está más o menos un kilómetro al norte, dentro de la propiedad de Mina Pirquitas. Durante 2012 la campaña de exploración concluyó con 54.000 metros de perforación de diamantina, la cual arrojó excelentes recursos que esperamos que se transformen en reservas a corto tiempo”, precisó el subgerente. Al 31 de diciembre de 2011, las reservas probadas eran de 57 millones oz/ plata, lo que al ritmo de producción actual significa que aún quedan unos 6,5 años más de explotación del rajo. A eso hay que sumarle material que es probable, que esté en los stock pile, así como los nuevos recursos que serán reservas. “Tenemos previsto seguir perforando, posiblemente perforación con diamantina; pensamos que sean unos 30 mil metros en 2013 en un sector hacia el norte de Mina Pirquitas, pero a 700 u 800 metros del pit actual, o sea, que prácticamente está dentro del mismo yacimiento”, detalló el subgerente.


reportaje / news report PRODUCCIÓN DE CAL EN ARGENTINA

Apostando por el crecimiento en la demanda minera

CEFAS produce cal en San Juan, Buenos Aires y Córdoba. CEFAS produces lime in San Juan, Buenos Aires and Cordoba.

LIME PRODUCTION IN ARGENTINA

Wagering on a growth in mining demand The start of operations at the Pascua-Lama gold project and hopes that other metallic and lithium projects will be developed suggest a bright outlook for the Argentinean lime industry, a sector which has been hit by difficulties including fuel supplies and rising costs.

T

La entrada en operaciones del proyecto aurífero Pascua-Lama y las expectativas que generan otros emprendimientos metalíferos y de litio alientan un mejor escenario para la industria argentina de la cal, sector que se ha visto afectado por dificultades en el abastecimiento de combustibles y alzas de costos.

T

res son las provincias que lideran la producción de cales en Argentina: San Juan, Buenos Aires (Olavarría) y Córdoba, en ese orden. La producción en 2011 alcanzó casi los 2,7 millones de ton entre las tres jurisdicciones, siendo el 66,2% aportado por la primera. El mayor volumen en exportaciones es hacia Chile, en tanto que el incremento en la producción descansa en la demanda que generarán las futuras faenas metalíferas y de litio. En la provincia cuyana hay unas ocho caleras entre grandes y medianas, y alrededor de 45 pequeñas; en total se exportan

entre 300.000 y 400.000 ton/año, cifra que crece anualmente. El Ministerio de Minería de San Juan consigna que en 2013 la producción de cal rondará las 2.051.610 ton. El arranque del megaproyecto binacional Pascua-Lama (compartido con Chile), y las futuras minas de El Pachón (Xstrata Copper), Los Azules (Minera Andes) y Altar (Stillwater) elevarían significativamente la demanda de cal. “Con la incorporación de Pascua-Lama pensamos que el sector crecerá más rápido porque el consumo de esta mina será de unas 220.000 ton/año. Por eso, la mayoría de las caleras han invertido en nuevos hornos y están en condiciones de acompañar el crecimiento de la deman-

he three leading Argentinean provinces in lime production are San Juan, Buenos Aires (Olavarría) and Córdoba, in that order. The three provinces produced almost 2.7 million tons last year, with San Juan providing 66.2% of the total. The main overseas market was Chile. Future rises in production will depend on the development of new lithium and metallic mines. The western province of San Juan is home to eight large and medium-sized quarries and 45 small quarries. Argentina exports 300,000-400,000 tons a year of lime. The San Juan Ministry of Mines expects the province to produce 2,051,610 tons. The launch of the cross-border PascuaLama megaproject (also present in Chile) and new mines such as El Pachon (Xstrata Copper), Los Azules (Minera Andes), and Altar (Stillwater) should significantly increase demand for lime. “With the incorporation of Pascua-Lama, we believe that the sector will grow faster because this mine will consume around 220,000 tons a year. So the majority of lime producers have invested in new kilns and are preparing for the increase in demand,” says Jaime Berge, president of the San Juan Chamber of Mines. He says that profitability has fallen compared to the period 2008 to 2011, but the industry remains in the black: in 2008, margins were around 15% and have since fallen to close to 5%. According to the busi-

enero-febrero / january-february 2013 l Latinominería l

55


reportaje / news report

nessman, the main problems facing lime producers are the supply and price of its fuels (gas and coal) which have risen “faster than inflation. Other issues are infrastructure and transport costs,” he notes. Between 1,400 and 2,000 workers are directly employed lime production in the province of San Juan and around 5,000 are employed indirectly. There is little or no information about provinces where lime production is not a significant part of the economy. Salta is one example: “Lime producers own the ground and it is often difficult for us to obtain information,” states Ricardo Salas, Salta’s Mining Secretary. In Salta, lime is largely used in construction. “But the new mine projects which are going to be built will also consume lime. Lindero [a gold project owned by Mansfield Minerals Inc.] alone will lift consumption to around 70 tons a day,” the official explains. As a result, at least three new lime quarries will begin production to meet demand from extractive industries in the Andes, such as lithium brines. “We are also analysing the possibility of reactivating the old La Troja lime mines to produce lime and/or cement, it will be parly state-owned and partly privately-owned, but it has not been established how it would work,” the mining secretary explains. The new mines in development in Salta could lead to lime production to double. Salta’s lime producers are small and located

in the La Merced Department. Provincial mining data names just nine producers: El Cadillal I and II, Los Pinos I and II, El Algarrobal, La Cañadita, Los Tarcos, Bermejo I and II, Santa Elena, El Carmen and San Cayetano. Lime is also produced in the neighboring province of Jujuy by the companies Los Tilianes and Cooperativa Rio Grande. The latter produces less than 300 tons a month and markets the lime internally. “Los Tilianes meets demand from local industry and construction with around 70,000 tons a year. Production has grown little in the last two years but in 2012 will fall 5% less because a drop in public works. The mining industry consumes between 5% and 8% of production,” says Nilo Carrion, president of the Jujuy Chamber of Mines and manager of Los Tilianes. The company has around one hundred employees and exports 10% of its production to Bolivia. Five years ago the company installed a new kiln, boosting its production capacity by 30%. The company operates five coal-fired kilns which consume 600 tons a month and one gas-fired kiln. It plans to add another soon. “We plan within a year to add a vertical gas kiln which will increase production capacity by 50% and require an investment of US$2.6 million. We will have it operating by the end of 2013 because the lithium projects are going to increase demand for lime,” says Carrion.

da”, indica Jaime Bergé, presidente de la Cámara Minera de San Juan (CMSJ). Respecto a la rentabilidad, sostiene que cayó respecto al período 2008-2011, pero que aún es un sector con cifras positivas: en 2008 rondaba en torno al 15% anual y hoy está cerca del 5%. Según el empresario, el problema que atraviesan los caleros es fundamentalmente el abastecimiento de combustible (gas y carbón) y sus precios

El arranque del megaproyecto binacional Pascua-Lama (compartido con Chile), y las futuras minas de El Pachón (Xstrata Copper), Los Azules (Minera Andes) y Altar (Stillwater) elevarían significativamente la demanda de cal.

La producción anual de cal viva de Compañía Minera del Pacífico es de 72.000 ton y unas 14.400 ton/año se venden al sector minero. Compañía Minera del Pacífico produces 72,000 tons a year of lime, of which 14,400 tons are sold to the mining sector.

56

l Latinominería l enero-febrero / january-february 2013


reportaje / news report

El Ministerio de Minería de San Juan consigna que en 2013 la producción de cal rondará las 2.051.610 ton. The San Juan Ministry of Mines expects the province to produce 2,051,610 tons.

The launch of the crossborder Pascua-Lama megaproject (also present in Chile) and new mines such as El Pachon (Xstrata Copper), Los Azules (Minera Andes), and Altar (Stillwater) should significantly increase demand for lime.

“que han crecido más que la inflación. También afecta la infraestructura y los precios del transporte”, señala. En la provincia de San Juan hay entre 1.400 y 2.000 trabajadores caleros directos y unos 5.000 en forma indirecta. Es recurrente que en las provincias donde la producción de cal no es relevante en la economía del sector, la información escasea o es casi nula. Salta ejemplifica lo mencionado: “Las caleras son del dueño del suelo y muchas veces nos cuesta obtener información”, indica Ricardo Salas, secretario de Minería de Salta. En esta provincia la cal industrial se usa principalmente para la construcción. “Los nuevos proyectos mineros que se van a construir demandarán más cal, solamente con Lindero (proyecto aurífero de Mansfield Minerals Inc.) el consumo será de unas 70 ton/día”, precisa el personero. Por este motivo, al menos unas tres nuevas canteras de cal entrarán en producción para cumplir con el requerimiento de las faenas extractivas instaladas en la Puna, por ejemplo las salmueras de litio. “También estamos analizando la posibilidad de reactivar el viejo proyecto de extracción de las calizas de La Troja para la producción de cal y/o cemento, allí hay una parte del Estado y una parte de un privado, pero aún no hay una formalidad de cómo funcionaría”, explica el titular de Minería. Lo cierto es que con los emprendimientos mineros que verían la luz en Salta, la producción de cales local podría más que duplicarse. Las empresas caleras de Salta son pequeñas y están ubicadas en el departamento de La Merced. Los datos de Minería provincial mencionan nueve productoras: El Cadillal I y II, Los Pinos I y II, El Algarrobal, La Cañadita, Los Tarcos, Bermejo I y II, Santa Elena, El Carmen y San Cayetano.

En la vecina provincia de Jujuy también se elabora cal; lo hacen la empresa Los Tilianes y la Cooperativa Río Grande. Esta última produce menos de 300 ton/mes y comercializa la cal internamente. “Los Tilianes sostiene la demanda de la industria local y de la construcción con unas 70.000 ton/año. La producción ha crecido un poco en los últimos dos años, pero en 2012 será un 5% menos, porque bajó la obra pública. Entre el 5% y el 8% de lo producido se destina al sector minero”, precisa Nilo Carrión, presidente de la Cámara Minera de Jujuy y gerente de Los Tilianes. La empresa tiene unos cien empleados y el 10% de lo producido lo exporta a Bolivia. La última inversión se hizo hace un lustro para instalar un nuevo horno que permitió subir un 30% la capacidad de producción. La calera funciona con cinco hornos a carbón residual (el consumo es de 600 ton/ mes), uno a gas y al cual próximamente se sumará otro. “Tenemos previsto, dentro de un año, incorporar un horno vertical a gas que aumentará un 50% la capacidad de producción y eso requerirá una inversión de US$2,6 millones. Lo tendremos funcionando a fines de 2013 porque los proyectos de litio van a aumentar la demanda de cales”, afirma Carrión.

BUENOS AIRES

Las empresas caleras de la Provincia de Buenos Aires, concentradas en Olavarría, están complicadas. En la zona se produce cal hidráulica y en total son siete los actores: las dos grandes productoras de cemento (Loma Negra, Cementos Avellaneda) que elaboran cal; la mediana CEFAS (también produce en Córdoba y San Juan); y cuatro caleras chicas. “Entre Calera Avellaneda y Loma Negra se producen unas 50.000 ton/ mes; Loma Negra aumentó la producción en

BUENOS AIRES

The lime producers in the Province of Buenos Aires, which are concentrated in Olavarría, are having a difficult year. The province has seven lime producers which produce hydraulic lime. There are two big cement producers (Loma Negra, Cementos Avellaneda) which produce lime; mediumsized CEFAS (which also produces Cordobda and San Juan); and four small lime producers. “Calera Avellaneda and Loma Negra produce a total of around 50,000 tons a month; Loma Negra significantly increased production through its takeover of Grupo Camargo Correa,” says Omar Bonsignore, president of the Olavarria Chamber of Small and Medium-Sized Mines. The small lime producers control between 20% and 30% of the market in the province and the Federal Capital, where they sell to construction firms and hardware stores. They directly employ 250 people and employ another 1,000 indirectly. The market has suffered from volatility. In recent months, demand has fallen by 30% due to a drop in the economy and climatic factors, the official explains. Asked about the state of lime industry today, Bonsignore notes that costs have risen rapidly over the last two years, while lime prices remain low. “Since 2001, all costs have increased by between 950% and 1,000%; labor by 1,000%;, gas oil by 969%, explosives by 1,050%, repairs and replacements by 1,000% while the price of lime has risen by 550%, implying a significant decline. This has caused precariousness and concern to the small businesses,” he warns. He notes that the idea has been discussed of implementing quotas, “meaning that there is quota of production for small lime producers in the province’s public works. If this situation continues, the consequence will be a fall in employment.”

enero-febrero / january-february 2013 l Latinominería l

57


reportaje / news report

The three leading Argentinean provinces in lime production are San Juan, Buenos Aires (Olavarría) and Córdoba, in that order.

Producción de cal en argentina LiME PRoDuCtioN iN ARGENtiNA Evolución producción nacional / Evolution domestic production

Ton 3.000.000 2.500.000 2.000.000

WESTERN PRODUCERS

Compañía Minera del Pacífico (CMP): this company is based in Jáchal, a district to the north of the capital of San Juan. The company produces 72,000 tons a year of lime, of which 14,400 tons are sold to the mining sector. “Since 2009, production has stabilized around this figure. The company has just one kiln which we operate at capacity. We produced less before because we used fuel oil and we were left out of the market because of fuel costs. We switched to petcoke and now we can complete,” says CMP manager Pedro Zarate. The kiln furnace has capacity for 200 tons a day and the company has plans to install another kiln which will require an investment of US$25 million. Everything will depend on the start of operations at the Pascua-Lama mine. “As Barrick Gold has delayed, our investments have been put back a little. Due to the situations which the country is going through, it is difficult to convince investors, but we must make a decision this year,” Zarate says. The aim is to supply 30% of the lime which the crossborder mine will require. Almost 25% of CMP’s production, or around 15,000 tons, is exported to Chile. “Chile further increased consumption. Our disadvantage with that country, as well as using petcoke, is a transport cost of around US$10 a ton. Lime is a commodity and when one markets to a mining company, the firm which is closer wins, because transport plays an important role in the price,” highlights Zarate. CEFAS: the company produces lime in San Juan, Buenos Aires and Cordoba. The largest plant is in San Juan. Out of annual production of 400,000 tons a year, 180,000 tons are produced in San Juan, 120,000 tons in Buenos Aires and 100,000 tons in Cordoba. “The plants in Cordoba and in the Province of Buenos Aires are fully dedicated to construction, while San Juan supplies construction and industry, including mining, which is the biggest local industry, followed by steelmaking,” says the company’s owner Pedro Brandi. The company’s latest investment was a second kiln furnace in Los Berros in the Department of Sarmiento in San Juan named Padro Bueno. “We are now completing an-

58

2.752.537 2.503.544

2.690.002

2.660.582

2.344.096

1.500.000 1.000.000 500.000 0

2007

2008

2009

San Juan

Olavarría (Buenos Aires)

2010

2011

Córdoba

Participación Provincial / Percentaje by provinces

Olavarría (Buenos Aires) 29,2%

Córdoba 4,6%

San Juan 66,2%

Fuente/Source: LATINOMINERÍA

forma significativa desde que se hizo cargo el Grupo Camargo Correa”, sostiene Omar Bonsignore, presidente de la Cámara de Pequeños y Medianos Mineros de Olavarría. Las caleras chicas tienen entre un 20% a 30% de la porción del mercado de la provincia y de la Capital Federal (venden a empresas constructoras y corralones) y, en su conjunto, poseen una mano de obra de 250 personas, lo cual significa unas mil en forma indirecta. El mercado ha oscilado y en los últimos meses bajó un 30% la demanda, debido al paro de la actividad y a factores climáticos, explica el directivo. Consultado sobre la realidad del sector calero hoy, Bonsignore comenta que los incrementos del costo en los últimos dos años han sido importantes, mientras que los aumentos del precio de la cal han sido muy bajos. “De 2001 a la fecha, todos los costos han aumentado

l Latinominería l enero-febrero / january-february 2013

entre el 950% al 1.000%: la mano de obra el 1.000%, el gasoil el 969%, los explosivos el 1.050%, todo lo que es reparaciones y repuestos el 1.000%, y el precio de la cal en ese período aumentó 550%, evidenciando un retraso significativo. Eso ha provocado una situación de precariedad y de preocupación de los pequeños empresarios”, advierte. Al respecto, señala que barajan la idea de ver si se puede hablar de cupos, “es decir, que en las obras públicas en la provincia haya un cupo de producción de las pequeñas caleras. Pero no ha tenido ningún avance. Si esta situación sigue, las consecuencias serán en la merma de mano de obra”.

EMPRESAS CUYANAS

Compañía Minera del Pacífico (CMP): Está ubicada en Jáchal, comuna al norte de la capital de San Juan. La producción anual de cal viva es de 72.000 ton y unas 14.400


reportaje / news report Tres son las provincias que lideran la producción de cales en Argentina: San Juan, Buenos Aires (Olavarría) y Córdoba, en ese orden. ton/año se venden al sector minero. “Desde 2009 la producción se ha estabilizado en esa cifra, la compañía tiene un horno solamente y le sacamos el mayor provecho. Antes producíamos menos porque usábamos fuel oil y quedamos fuera de mercado por el costo del combustible. Nos pasamos a carbón residual y ahora podemos competir”, precisa Pedro Zárate, gerente de CMP. El horno de la calera tiene una capacidad de 200 ton/día y está en los planes instalar otro horno que demandará recursos por US$25 millones. Todo dependerá de la puesta en marcha de la mina Pascua-Lama. “Como Barrick Gold se retrasó, nuestras inversiones están enfriándose o congeladas un poco. Por las situaciones que se viven en el país, cuesta convencer a los inversionistas, pero debemos definirlo este año”, indica Zárate. La intención es aportar un 30% de la cal que requiera el emprendimiento binacional. Casi el 25% de la producción de CMP se exporta a Chile, es decir, 15.000 ton. “Chile subió más el consumo. Nuestra desventaja con aquel país, además de usar carbón residual, es una diferencia de flete de unos US$10 por ton. La cal es un commodity y cuando uno postula a una minera gana el que está más cerca, porque el flete juega un papel importante en el precio”, subraya Zárate. CEFAS: La empresa produce cal en San Juan, Buenos Aires y Córdoba. La planta más grande está en la primera y, en total, la producción alcanza las 400.000 ton, de las cuales 180.000 ton salen de la provincia cuyana, 120.000 ton de Buenos Aires y 100.000 ton de Córdoba. “Las plantas de Córdoba y de la Provincia de Buenos Aires están dedicadas completamente a la construcción y la de San Juan a construcción e industria, incluida la minería, que es lo más fuerte dentro del área industrial, y en segundo lugar la siderurgia”, dice Pedro Brandi, propietario de la compañía. La última inversión de la empresa fue la de Padre Bueno, su segunda calera en Los Berros, departamento de Sarmiento, en San Juan. “Ahora estamos terminando otra ampliación de la fábrica y allí pondremos en marcha a fin de año una nueva planta de hidratación. Esto va a permitir crecer en volumen y mejorar los costos de nuestro sector en hidratación, cal destinada a construcción y a la industria. Esto fue una inversión de US$10 millones”, afirma Brandi. Para 2013 hay previstas inversiones menores en esta planta, como ampliar la capacidad de almacenamiento y las instalaciones de embolsado de cal viva para exportación.

En cuanto a las proyecciones, el ejecutivo sostiene que pueden producir más, porque la actividad minera está creciendo tanto en Argentina como en Chile: “La puesta en marcha de PascuaLama significará un mayor consumo de cal. Llegado el momento haríamos algún tipo de inversión adicional para cubrir la totalidad del cupo, pero no está totalmente definido”. Del total producido en San Juan, unas 120.000 ton/año se destinan a la minería. La cal que exportan, en tanto, es solamente la que proviene de San Juan y se envía a Chile y Uruguay. Lo exportado es el 30% de la producción sanjuanina y de ese porcentaje el 90% es lo que va a Chile. El Volcán: Calera ubicada en el departamento de Albardón. Marcelo Solorza, gerente Administrativo Financiero, indica que la empresa produce unas 11.000 ton/ mes y esto equivale a un 15% más respecto de 2010. “El volumen se incrementó por una mayor demanda e incluso para tener algunos clientes que necesitan una producción especial de cal dolomítica”, precisa. Actualmente, la calera tiene cinco hornos criollos (método tradicional, con carbón residual de petróleo cuyo consumo es de 450 ton/mes) funcionando con una capacidad de producción de 4.000 ton/ mes y cuatro hornos verticales a gas con una capacidad de producción de 9.000 ton/mes. La mano de obra directa es de 145 personas. “Principalmente nuestro mercado es el chileno. A Chile y Uruguay enviamos unas 7.000 ton/mes, es decir, un 64% de la producción. En Argentina el mercado que tenemos es principalmente el siderúrgico, el cual se viene manteniendo y los precios se vienen ajustando al ritmo argentino. Hoy no le vendemos a la minería, pero abastecer a Pascua-Lama es un desafío importante y la empresa tiene intenciones de seguir invirtiendo en estos hornos criollos para, por lo menos, mantener la demanda actual”, comenta Solorza. En Albardón hay otra empresa que se llama Sibelco Albardón (ex Minera Tea), perteneciente a la compañía belga homónima que adquirió en 2010 las dos caleras que Unimin tenía en San Juan. Según la Cámara Minera de San Juan, Sibelco tiene una capacidad de producción cercana a las 50.000 ton/mes, pero su producción actual es menor. La entidad estima que vende unas 400.000 ton/año y exporta a Chile casi el 50% del total de la cal que San Juan vende al exterior.

other expansion of the plant and we will begin operating a second hydration plant at the end of this year. This will allow us to increase volumes and improve the cost of our hydration operation, for lime which is used in construction and industry. This investment cost around US$10 million,” says Brandi. The company plans minor investments in the plant, for example, to expand storage capacity and installations to package for lime for export. Looking ahead, the executive believes that the company can produce more because the mining industry is expanding both in Argentina and in Chile: “The launch of the Pascua-Lama mine will increase demand for lime. When the time comes, we will make some sort of additional investment to cover the whole of the quota, but this is not totally defined.” Of the volume produced in San Juan, around 120,000 tons a year is sold to the mining industry. Meanwhile, all of Argentina’s lime exports come from San Juan and are sold in Chile and Uruguay. Thirty per cent of the lime produced in San Juan is exported and 90% is sold in Chile. El Volcán: lime kiln located in the department of Albardón. Marcelo Solorza, the company’s manager of administration and finance, indicates that it produces around 11,000 tons a month, an increase of 15% from 2010. “The volume was increased to meet higher demand and even for some clients which require special production of dolomitic lime,” he explains. The company operates five traditional kilns (which consume 450 tons a month of petcoke) which have capacity to produce 4,000 tons a month and four gas-fired vertical kilns which can produce 9,000 tons a month. The firm directly employs 145 people. “Our main market is the Chilean one. We send to Chile and Uruguay around 7,000 tons a month which represents 64% of our production. In Argentina, we supply the steel industry, which remains robust and prices are adjusting to Argentinean rates. We do not currently sell to the mining industry but supplying Pascua-Lama is a major challenge and the company plans to continue investing in traditional kilns in order to meet current demand,” Solorza notes. Another company, Sibelco Albardón (formerly known as Minera Tea), operates in Albardón. It belongs to the Belgian company of the same name which in 2010 acquired the lime kilns in San Juan from Unimin. According to the San Juan Chamber of Mines, Sibelco has capacity to produce close to 50,000 tons a month, but it currently produces less. The firm estimates that it sells around 400,000 tons a year and exports to Chile almost half the lime which San Juan sells abroad.

enero-febrero / january-february 2013 l Latinominería l

59


21 - 24

MAY 2013 NAEC

BEIJING, CHINA

1st INTERNATIONAL EXHIBITION AND CONGRESS FOR THE MINING AND METALLURGY INDUSTRY (MACHINERY, EQUIPMENT, PRODUCTS AND SERVICES)

SECTORING MINING EXPLOITATION

METALLURGY

WATER & FLUIDS

MINERAL PROCESSING

ENGINEERING CONTRACTORS CONSULTING

GENERAL

GEOLOGY & EXPLORATION

ENERGY &

ELECTRICAL DEVICES

COMMERCIAL CONTACT: sales@expominchina.com HOSTS

CHINA NONFERROUS METALS INDUSTRY ASSOCIATION

ORGANIZERS & PRODUCERS

CHINA NONFERROUS METALS INDUSTRY ASSOCIATION

A WORLD OF TECHNOLOGICAL SOLUTIONS FOR MINING, PROCESSING AND METALLURGY

SUPPORTERS

PARTNERS

STRATEGIC PARTNER

MEDIA PARTNER

CHINA COUNCIL FOR THE PROMOTION OF INTERNATIONAL TRADE MACHINERY SUB-COUNCIL

INTERNATIONAL EXHIBITORS


evento / event ROSS GALLINGER:

"PDAC 2013 ofrece oportunidades sin igual” ROSS GALLINGER:

Foto / Photo: Pablo Bravo - LATINOMINERÍA

"PDAC 2013 offers unparalleled opportunities” The executive director of the Prospectors and Developers Association of Canada highlights that Latin America has been one of the strongest partners of Canada’s mining industry.

La PDAC 2012 batió récord con más de 30.000 delegados y sobre mil expositores. PDAC 2012 brought a new record with more than 30,000 delegates ando ver 1,000 exhibitors.

El director ejecutivo de la Prospectors and Developers Association of Canada destaca que América Latina ha sido uno de los socios más fuertes de la industria minera canadiense.

"L

os delegados pueden esperar otra gran experiencia de aprendizaje y de networking en la convención de este año, incluyendo un programa ampliado, una impresionante lista de oradores en las sesiones técnicas, y avances innovadores como la aplicación del evento diseñada para equipos móviles”, afirma Ross Gallinger, director ejecutivo de la Prospectors and Developers Association of Canada, PDAC, que este año tendrá su cita entre los días 3 y 6 de marzo próximo, en Toronto. Gallinger adelanta a LATINOMINERÍA -media partner de PDAC 2013- las novedades que presentará este importante

encuentro de la industria minera global, y el rol que en ella tiene América Latina. -¿Cuán importante es América Latina para la PDAC y la industria minera canadiense? A medida que la Convención ha evolucionado de "Canadienses explorando en Canadá” a “Canadienses explorando en el mundo”, América Latina ha sido uno de nuestros socios globales más fuertes. Esto es un reflejo de lo que ha ocurrido con la exploración canadiense y con la industria minera en su conjunto. Las empresas canadienses siguen siendo líderes mundiales en exploración, desarrollo y explotación minera. Con un estima-

"D

elegates can expect another great learning and networking experience at this year’s convention, including an expanded program, an impressive list of speakers in the technical sessions and innovative developments, such as an app for the event designed for mobile devices,” says Ross Gallinger, executive director of the Prospectors and Developers Association of Canada, PDAC, which takes place this year on March 3rd-6th in Toronto. Gallinger tells LATINOMINERIA -PDAC´s media partner- of developments to be unveiled at this important meeting of the global mining industry and the role which Latin America will play.

-How important is Latin America to the PDAC and the Canadian mining industry? Why? As the Convention has grown from “Canadians exploring in Canada” to “Canadians exploring the world,” Latin America has been one of our strongest global partners. This is a reflection of what has happened with the Canadian exploration and mining industry as a whole. Canadian companies continue to be global leaders in exploration, development and mining. With an estimated 1,000 exploration projects in over 100 countries worldwide, it’s difficult to go anywhere in the world and not find a Canadian company exploring or mining. Canada and Latin America have a wellestablished, robust relationship when it comes to mineral exploration and mining. There is a strong Canadian presence in Mexico and South America; these jurisdictions offer excellent potential for world-class discoveries in gold, silver and copper, lithium and iron ore.

enero-febrero / january-february 2013 l Latinominería l

61


evento / event

-What will be the presence of Latin America at PDAC? Argentina, Brazil, Chile, Ecuador, Mexico, Nicaragua and Peru are participating in the Trade Show, and Brazil, Chile, Ecuador, Nicaragua and Peru have also rented Presentation Rooms. It is still early days for delegate registration; we won’t know the number of Latin American delegates until the Convention begins.

los cursos y talleres, además de los eventos paralelos como la Gala y los almuerzos, brindan a los asistentes la instancia para interactuar y aprender.

Foto cortesía de PDAC / Photo courtesy of PDAC

-What opportunities can PDAC 2013 offer to mining industries and projects in Latin America? PDAC 2013 offers unparalleled networking and educational opportunities for delegates due to the Convention’s size, international scope, and quality of programming. As it does each year, the Convention will foster information-sharing and relationshipbuilding that impacts the industry throughout the rest of the year. The networking that goes on during the four days of the Convention results in countless new relationships and ideas, reinforces current partnerships and sets the stage for a great many deals. In addition to the above-mentioned programming, the Trade Show, Investors Exchange, Technical Program, Short Courses and Workshops, and ticketed events such as the Gala and the Luncheons offer delegates the opportunity to network and learn.

“Hay una fuerte presencia de Canadá en México y América del Sur”, destaca Ross Gallinger. “There is a strong Canadian presence in Mexico and South America”, notes Ross Gallinger.

SCENARIO

-How do you see the current international scenario for mining and exploration activity? In terms of exploration activity, the current international scenario is one of the developing world increasingly becoming involved in resource development. Resource nationalism and resource rent discussions have been intensifying, but new legislation in the form of exploration and mining reform have clarified the rules (for example, in Uganda and Rwanda, and the proposed reforms in Kenya) and allowed for increased exploration interest in these regions. International exploration is suffering due to access to capital issues, however, with a restricted equity market adverse to risk. What we are starting to see is mergers of equals, that is, exploration companies joining together to combine human resources, project synergies, and finances to make stronger investment propositions. On the mining side, we continue to see strength in operations, but cost containment is key. Shareholders are expecting/demanding better margins, as investors seek operating returns versus a growth story. Projects with financing are going forward (for example, Inmet’s Cobre Panama); but again, cost containment is key to ensure construction projects are delivered on time and on budget. Meanwhile, projects with financing challenges are seeking alternate ways of accessing funds (off-take agreements, royalties, etc.). Further, while senior companies have curtailed capital spending, mid-tiers are doing the opposite as better pricing is emerging during this time of easing on new construction. More information: www.pdac.ca

62

do de mil proyectos de exploración en más de cien países de todo el mundo, es difícil ir a cualquier parte del globo y no encontrar a una compañía canadiense explorando o haciendo minería. Canadá y América Latina tienen una bien establecida y sólida relación en este ámbito. Hay una fuerte presencia de Canadá en México y América del Sur; estas jurisdicciones ofrecen un excelente potencial para descubrimientos de clase mundial en cobre, metales preciosos, litio y hierro. -¿Qué oportunidades puede ofrecer PDAC 2013 para la industria minera y los proyectos en América Latina? La convención PDAC 2013 ofrece oportunidades sin igual en materia de aprendizaje y de generación de redes de contacto para los delegados asistentes, debido al tamaño del encuentro, su enfoque internacional y la calidad de su programa. Como cada año, la Convención fomenta el intercambio de información y la construcción de redes de contacto que impactan a la industria en el transcurso del resto del ejercicio. El networking que se genera durante los cuatro días resulta en un sinnúmero de nuevas relaciones e ideas, refuerza las actuales alianzas y prepara el escenario para nuevos acuerdos. Además del programa ya mencionado, instancias como la exhibición, el Investors Exchange, el programa técnico, así como

l Latinominería l enero-febrero / january-february 2013

-¿Cuál será la presencia de Latinoamérica en esta PDAC? Argentina, Brasil, Chile, Ecuador, México, Nicaragua y Perú participan en la exhibición (Trade Show). Además, Brasil, Chile, Ecuador, Nicaragua y Perú también han reservado espacios de presentación. Todavía estamos realizando la inscripción de delegados, por lo que no sabremos el número total de representantes provenientes de América Latina hasta que comience la Convención.

ESCENARIO

-¿Cómo ve el actual escenario internacional para las actividades minera y de exploración? En términos de exploración, el actual escenario es uno en que los países emergentes están cada vez más involucrados en el desarrollo de los recursos. Temas como la propiedad de estos bienes básicos y las rentas o royalties que se obtienen por ellos se han estado intensificando, pero, al mismo tiempo, nuevas legislaciones están dando claridad al sector (por ejemplo, en las naciones africanas de Uganda y Ruanda, y la propuesta de reformas en Kenia). Esto ha contribuido a incrementar el interés por explorar en esas regiones. La exploración internacional se ha visto afectada debido a las dificultades para acceder al capital, con un mercado de valores restringido y adverso al riesgo. Lo que hemos comenzado a ver son fusiones entre iguales, vale decir, compañías de exploración uniéndose para combinar sus recursos humanos, sinergias en proyectos y finanzas, para hacer propuestas más sólidas en materia de inversión. En cuanto a la actividad minera, continuamos viendo fuertes las operaciones, pero el control de los costos es clave. Los accionistas están esperando y demandando mejores márgenes, mientras que los inversionistas buscan rendimientos operativos frente a la historia de crecimiento. Los proyectos con financiamiento continúan yendo adelante -por ejemplo Cobre Panamá, de Inmet-, pero nuevamente, el control de los costos es clave para asegurar que la construcción de éstos sea completada dentro del cronograma y del presupuesto previstos. En tanto, las iniciativas con dificultades para conseguir financiamiento están buscando vías alternativas para acceder a los recursos, como acuerdos Off-take, regalías, etc. Además, mientras las compañías senior están recortando sus gastos en capital, la medianas están haciendo lo opuesto aprovechando los mejores precios que suelen aparecer en este contexto. Más información: www.pdac.ca


actualidad / news

La Convención PDAC 2012 fue el lugar elegido para dar a conocer el proyecto Chile Engineering. PDAC Convention 2012 was the chosen scenario to introduce the Project Chile Engineering.

Foto / Photo: Pablo Bravo - LATINOMINERÍA

INITIATIVE CHILE ENGINEERING OF AIC

I N I C I AT I V A C H I L E E N G I N E E R I N G D E L A A I C

Chile busca ser centro regional de ingeniería

T

In 2012, the first step was to pursue initiatives in Canada. The second stage involves penetrating the Peruvian and Colombian markets.

T

En 2012 el primer paso fue buscar alianzas en Canadá, ahora la segunda etapa es abordar los mercados de Perú y Colombia. ransformar a Chile en hub de la ingeniería para América Latina, aprovechando el desarrollo que ha tenido el sector de la mano de la industria minera, es uno de los objetivos que persigue la iniciativa Chile Engineering, impulsada por la Asociación de Empresas Consultoras de Ingeniería (AIC) de este país. El primer paso en esta iniciativa se dio en 2012 y tuvo por foco promocionar la ingeniería chilena y la búsqueda de alianzas en el importante mercado canadiense. La gran vitrina que ofrece la Convención PDAC fue el lugar elegido para dar a conocer este proyecto, en un evento que convocó a cerca de 300 asistentes del más alto nivel y que contó con la presencia del ministro de

Chile wants to become the engineering hub of the region

Minería de Chile, Hernán de Solminihac, y la exposición de Roger Higgins, senior vice president de Teck en Canadá. Esta iniciativa fue apoyada por otras misiones empresariales al país del norte, más acotadas y orientadas a fines específicos. “Hoy en día Canadá tiene un peso significativo, más de un 50% de los proyectos de minería se mueven desde el lado canadiense. Entonces fue nuestra génesis ir a buscar esas empresas y organizaciones, para generar alianzas estratégicas con empresas chilenas (de ingeniería). Nuestra misión es ser operadores para Latinoamérica del mundo de la ingeniería”, señala Francisco Aracena, gerente general de AIC. Y el balance a la fecha es positivo, agrega: “Se lanzó la marca Chile Engineering y han venido empresas a hacer contacto con

he Chile Engineering initiative –generated by the Chilean Association of Engineering Consulting Firms (AIC)- pursues to transform the country into a hub of the discipline for Latin America, given the development achieved by the sector thanks to the mining industry. The first step of the initiative occurred in 2012: The idea was to promote Chilean engineering and pursue alliances within the valuable Canadian market. The platform offered by the PDAC Convention was the chosen scenario to introduce the project, in an event that congregated near 300 attendants of the highest level, including the Chilean Minister of Mining, Hernán de Solminihac, and a presentation by the senior vice-president of Teck Canada, Roger Higgins. The initiative was supported by other entrepreneurial missions up-north, more specifically oriented. “Today Canada has significant importance. More than fifty percent of mining projects start there. Our idea was to pursue the companies involved to create strategic alliances with Chilean (engineering) companies. Our mission is to become Latin America’s agents in the field” explains Francisco Aracena, general manager of AIC. So far, the balance is positive, Aracena estimates: “We launched the brand Chile Engineering and Canadian companies have made contact with our associates (…). The correlation is happening, but in this second stage we want to land more projects.”

enero-febrero / january-february 2013 l Latinominería l

63


This second phase –according to the AIC- aims to break in the Peruvian and Colombian markets. Both countries are ripe for joint venture efforts, focused on mining and constructions among others. “We are aware mining opened the door”, reveals Aracena referring to Chilean engineering strong suit, but he wants to point out today most projects involve all sort of fields, such as road construction, infrastructure, shipping and water treatment, for example. On this regard, the office manager of Chile Engineering, Francisco Guevara, underlines that just as they created a rapport with Canadian peers, they are not aiming to compete with Peruvian and Colombian firms, but supplement their work. The idea is for both parts to share experiences and benefit from the knowledge acquired from them. In fact, some Chilean firms are already attempting this undertaking individually. This, by opening offices and installing their own teams in both countries. In order to boost this plan, AIC and Chile Engineering expect to participate in the most important mining events in Peru and Colombia. Such is the case of Perumin, the International Gold Symposium -to take place in Lima- and the Colombia Mining trading fair. Also, there is an intention to approach the colleagues at the Institute of Mining Engineering of Peru and the Colombian Chamber of Infrastructure. To preserve the relations established with Canadian firms, Chile Engineering will be at the PDAC Convention in Toronto. The idea is to invite the organization’s new partners to participate of this effort of regional exposure. Why were Peru and Colombia chosen for this second phase? Aracena and Guevara highlight the accelerated development of the mining industry in Peru: “There is a lot of work to do and the Chilean experience is highly valued”, they explain. Regarding Colombia, Aracena and Guevara agree that while is a younger market, it has a lot to offer in the medium and long term. Plus, there are some major infrastructure opportunities in the country. “Both markets are particularly attractive, with growing economies”, remarks Aracena. Based on data from AIC, Peru has become in the main destination of Chilean engineering firms’ consulting work. During the second trimester of 2012, Peru has concentrated 60 percent of the total. Colombia is in third place with 5 percent. It must be noted in 2011, Chile generated US$ 257 millions in engineering consulting work. This AIC effort and the Chile Engineering project hopes to capitalize this potential, in alliance with Canadian peers and, in the near future, Peruvians and Colombians. The ultimate goal is to create business opportunities that benefit all the parts involved.

64

Foto gentileza de Xstrata Copper Perú / Photo courtesy of Xstrata Copper Peru

actualidad / news

Esta segunda fase del proyecto Chile Engineering apunta a abordar los mercados de Perú y Colombia, donde se observa un gran potencial de trabajo conjunto. This second phase of the Chile Engineering project aims to break in the Peruvian and Colombian markets. Both countries are ripe for joint venture efforts.

nuestros asociados (…) se está generando esa interrelación, pero en esta segunda etapa queremos lograr aterrizar más en proyectos”. Esta segunda fase -explican en la AICapunta a abordar los mercados de Perú y Colombia, donde se observa un gran potencial de trabajo conjunto en los ámbitos de minería y construcción, entre otros. “Sabemos que la minería fue la punta de lanza”, dice Aracena, en referencia al know how de la ingeniería chilena, pero puntualiza que hoy en día los proyectos involucran una amplia gama de campos, como el desarrollo de caminos y obras de infraestructura, puertos y tratamiento de agua, por citar algunos ejemplos. Al respecto, Francisco Guevara, Chile office manager de Chile Engineering subraya que al igual que el acercamiento construido con sus pares canadienses, lo que buscan en esta segunda etapa no es competir con las firmas de ingeniería de Perú y Colombia, sino complementarse, y aprovechar las experiencias que sean mutuamente beneficiosas. De hecho, algunas firmas chilenas ya están dando este paso en forma individual, abriendo oficinas e instalándose con equipos propios en ambos países. Para avanzar en este acercamiento, AIC y Chile Engineering estarán presentes en los principales eventos mineros realizados en estos mercados, como Perumin, el Simpo-

l Latinominería l enero-febrero / january-february 2013

sio Internacional del Oro de Lima y la feria Colombia Minera, además de trabajar el acercamiento con sus pares del Instituto de ingenieros de Minas del Perú y la Cámara Colombiana de Infraestructura. Esto, sin descuidar tampoco los contactos realizados con Canadá, por lo cual este año volverán a estar presentes con la marca Chile Engineering en la Convención PDAC de Toronto. E invitarán también a sus nuevos socios a participar en este esfuerzo de difusión regional. ¿Por que se eligió a Perú y Colombia como destinos de esta segunda fase? Aracena y Guevara subrayan en el primer caso el gran desarrollo que está teniendo la actividad minera en el Perú: “Hay mucho trabajo y la experiencia chilena es valorada”, comentan. Con respecto a Colombia, precisan que si bien es un mercado más incipiente en materia de minería, lo ven como una apuesta relevante a mediano y largo plazo. A lo que se suma las importantes oportunidades en obras de infraestructura que hay en ese país. “Son dos mercados muy atractivos, con economías que están creciendo”, remarca Aracena. De hecho, según los datos que maneja la AIC, Perú es el principal destino de las exportaciones de ingeniería de consulta de Chile, concentrando en el segundo trimestre de 2012 el 60% del total. Colombia, con el 5%, ocupó el tercer puesto. Cabe señalar que en 2011 Chile exportó US$257 millones en ingeniería de consulta. Con este esfuerzo que emprende AIC y su iniciativa Chile Engineering se busca ampliar ese potencial, en una alianza con sus pares de Canadá, y en un futuro próximo de Perú y Colombia, generando oportunidades de negocios que beneficien a todos en conjunto.


reportaje / news report THE OUTLOOK IN LATIN AMERICA Proyecto de cobre de Cementation.

The key role of engineering companies

Cementation’s copper project.

PA N O R A M A E N L AT I N O A M É R I C A

El rol clave de las empresas de ingeniería

Foto cortesía de Cementation / Photo courtesy of Cementation

Estimates of mine investments through 2020 suggest a busy time for the region’s engineering firms. However, changing market conditions and the cancelation of some energy and mining projects is leading to greater caution.

Las cifras estimadas en inversiones mineras hacia 2020 plantean un escenario dinámico para las empresas de ingeniería en la región. No obstante, ante la variabilidad de los mercados y la no concreción de algunos proyectos energéticos y mineros, existe una mayor cautela.

L

a inversión minera en América Latina sumaría unos US$300.000 millones hacia 2020, según la Sociedad Interamericana de Minería (SIM). En este escenario, el rol de las empresas de ingeniería asentadas en la región será clave para desarrollar proyectos que ya están en construcción o con aprobación ambiental. No obstante, y ante las señales de alerta de los distintos mercados, estas firmas han dado signos de una mayor cautela ante el impacto del retraso, suspensión y paralización de ciertos proyectos de energía y minería en la zona.

“WorleyParsons ve a Latinoamérica como un mercado en desarrollo con muchas oportunidades de crecimiento, especialmente cuando se le compara con mercados como Australia y Canadá”, señala a LATINOMINERÍA Claude D’Cruz, senior vice president Minerals, Metals & Chemicals – Americas de WorleyParsons. A pesar de la incertidumbre económica que prima en el escenario global, Latinoamérica sigue posicionándose para las empresas de ingeniería como un atractivo destino de negocios, principalmente Brasil (hierro), Perú y Chile (cobre), y más incipientemente Colombia, Ecuador y Argentina. “Sudamérica es una región sumamente

A

ccording to the regional industry body Sociedad InterAmericana de Mineria (SIM), around US$300 billion will be invested in mining through 2020. Engineering firms based in the region will play a key role in developing projects which are already in construction or have been granted environmental approval. However, in response to the warning signs in different markets, these companies are expressing greater caution about the impact which the delay, suspension and halting of some energy and mining projects in the continent could have. "Latin America is seen as a developing market for WorleyParsons with many growth opportunities, particularly when compared to developed markets such as Australia and Canada," said Claude D'Cruz to LATINOMINERIA, senior vice president Minerals, Metals & Chemicals - WorleyParsons Americas. Despite the economic uncertainty which exists around the world, Latin America remains an attractive business destination for engineering companies, led by Brazil (iron ore), Peru and Chile (both copper), but also followed by Colombia, Ecuador and Argentina. “South America is a highly attractive region for mine investment. One has to remember that the region contains the world’s largest copper reserves. Both Peru and Chile provide clear rules to investors and the two countries top the list in terms of investment in exploration,” says Rodrigo Muñoz, manager for South America at Sinclair Knight Merz (SKM). But not all countries have legislation or treaties which offer the political and social stability which major projects require. In these circumstances, “engineering and construction companies are sensitive, expectant and cautious; and indeed we are, in part, observant to these variables,” says Raul Chaparro, Business Development Manager at Cementation Sudamérica S.A. However, “emerging economies are playing an increasingly important role in the world,

enero-febrero / january-february 2013 l Latinominería l

65


reportaje / news report and despite international uncertainty, we see that major investments in the region are going to go ahead over the coming years,” says Hernan Bezamat, chief executive of Arcadis Chile. His forecast is confirmed by the study entitled Outlook for Investment in Chile and Latin America to the Third Quarter of 2012, published by Chile’s Corporacion de Bienes de Capital (CBC), a technical private non-profit organization which focuses on supporting technological and industrial development. According to the report, more than US$175 billion will be invested in mining and energy in Peru, Colombia, Ecuador and Argentina by the end of the decade. Meanwhile, investment in energy and mining projects in Chile will exceed US$70 billion through 2016. These figures suggest succulent opportunities for engineering companies in the region.

REGIONAL OUTLOOK

Latin America is a key market for engineering companies. "Chile is the largest producer of copper in the wolrd, requiring significant investment over a long timeframe , while Peru is another very attractive market. The same goes for Brazil, which is the third largest iron ore producer in the world. Meanwhile in Colombia, there is significant potential to develop existing coal reserves. So these are the key countries for us in Latin America," says Claude D'Cruz. “There is interest in the growth which countries like Peru and Chile could experience. There are major development opportunities in both mining and metallurgy,” Dale Clarke, Executive

66

atractiva para las inversiones mineras. Hay que recordar que las mayores reservas de cobre se encuentran en la región. Tanto Perú como Chile tienen reglas claras para los inversionistas y ambos países están a la cabeza de las exploraciones en términos de inversión”, señala Rodrigo Muñoz, gerente del Área Sudamérica de Sinclair Knight Merz (SKM). El contrapunto es que no todos los países cuentan con legislaciones o tratados que otorguen la estabilidad político-social requerida para grandes emprendimientos. En tales circunstancias, “las empresas de ingeniería y construcción están sensibles, a la expectativa y cautelosas; e indudablemente somos, en parte, observantes a estas variables”, sostiene Raúl Chaparro, Business Development Manager de Cementation Sudamérica S.A. No obstante, “en el contexto global las economías emergentes están jugando cada vez un rol más relevante, y a pesar de la incertidumbre internacional vemos importantes inversiones en la región que siguen en marcha en los próximos años”, sostiene Hernán Bezamat, gerente general de Arcadis Chile. Dicho pronóstico queda de manifiesto en el estudio Panorama de Inversiones en Chile y Latinoamérica al Tercer Trimestre 2012, que elabora la Corporación de Bienes de Capital (CBC) organismo técnico,

Desde Cementation ven con gran expectativa a Colombia, señala Raúl Chaparro, Business Development Manager de Cementation Sudamérica S.A.

“Hay un interés en el crecimiento que puedan experimentar países como Perú y Chile”, señala Dale Clarke, executive vicepresident Global Mining and Metallurgy SNC-Lavalin.

Cementation has great expectations for Colombia, says Raul Chaparro, Business Development Manager at Cementation Sudamérica S.A.

“There is interest in the growth which countries like Peru and Chile could experience,” notes Dale Clarke, executive vicepresident for Global Mining and Metallurgy at Canadian multinational SNC-Lavalin.

l Latinominería l enero-febrero / january-february 2013

“WorleyParsons ve a Latinoamérica como un mercado en desarrollo con muchas oportunidades de crecimiento, especialmente cuando se le compara con mercados como Australia y Canadá”.

privado y sin fines de lucro, enfocado directamente al apoyo del desarrollo tecnológico e industrial. Según este informe, en Perú, Colombia, Ecuador y Argentina se esperan inversiones en energía y minería por más de US$175.000 millones en esta década. Mientras que en el caso de Chile a 2016 las inversiones en ambos sectores sobrepasarían los US$70.000 millones en los próximos cinco años. En suma, las empresas de ingeniería cuentan con atractivas oportunidades en la región.

PANORAMA REGIONAL

Para las empresas de ingeniería, Latinoamérica es un mercado clave. “Chile es el

“En Perú hay una oportunidad bien significativa en términos de ingeniería y sustentabilidad”, sostiene Andrés Poch. “There is a very significant opportunity in Peru in terms of engineering and sustainability,” says Andres Poch.


reportaje / news report

Foto cortesía de Xstrata Copper / Photo courtesy of Xstrata Copper

Las empresas de ingeniería ven con buenos ojos el dinamismo minero que acontece en Perú. Engineering companies view positively the development of mining in Peru.

mayor productor de cobre en el mundo, y requiere una inversión significativa durante un largo período, mientras que Perú es otro mercado sumamente atractivo. Lo mismo ocurre con Brasil, que es el tercer mayor productor de acero en el mundo. Por su parte en Colombia existe gran potencial para desarrollar las reservas existentes de carbón. Por lo tanto, estos son los países claves para nosotros en Latinoamérica”, sostiene Claude D’Cruz.

Para la multinacional de origen canadiense SNC-Lavalin, “hay un interés en el crecimiento que puedan experimentar países como Perú y Chile, donde se observan importantes posibilidades de desarrollo en el ámbito de la minería y metalurgia”, señala Dale Clarke, executive vicepresident Global Mining and Metallurgy, en una reciente entrevista con Grupo Editorial Editec.

“Las empresas de ingeniería deben tener una doble mirada, tanto local como regional”, enfatiza Orlando Castillo.

“WorleyParsons ha establecido su oficina central en Santiago, pero reconoce la necesidad de atender sus otros negocios en Latinoamérica desde cada uno de los respectivos países”, dice Claude D’Cruz.

“Engineering companies should have a double outlook, both local and regional,” Orlando Castillo says.

"WorleyParsons has established its regional HQ in Santiago but recognises the need to service our other Latin American businesses within the respective countries," says Claude D'Cruz of WorleyParsons.

"Latin America is seen as a developing market for WorleyParsons with many growth opportunities, particularly when compared to developed markets such as Australia and Canada."

Vice-President for Global Mining and Metallurgy at Canadian multinational SNC-Lavalin told to Grupo Editorail Editec, in a recent interview. SNC-Lavalin International Co. also provides a good example of the opportunities which countries which have only recently begun to foment large-scale mining, such as Panama, can offer. The Canadian firm, in consortium with GyM S.A. and Techint International Construction Corp, was selected to continue with the detailed engineering, procurement and construction of the processing plant at Inmet Mining’s Cobre Panama project, says Fernando García, senior vicepresident Copper and Gold (Chile) SNC-Lavalin. While both the mining and energy sectors offer a variety of opportunities, their relative importance varies from country to country and year to year. “These days, for example, the mining industry in Chile has slowed down, and one of the reasons is the high cost of energy because the energy sector faces many challenges, not only because of the need for greater supply, but also because of the associated social and community considerations,” comments SKM’s Rodrigo Muñoz In Colombia, infrastructure for projects is thin on the ground so there is a rush to build highways, ports, airports and railroads so that promising mine prospects can be turned into projects, says the SKM’s executive. Peru is undergoing a mining boom, he adds, and there is demand for energy projects. “At the moment, the challenge for engineering companies in South America is to balance their capacities in order to provide what their clients need and where they need it,” Munoz explains. At Arcadis, executives say that they are focusing on Chile and Peru, with offices in both countries. “From our offices in Chile, we are present in mining and infrastructure. In mining, we have the capacity to cover practically all the critical aspects of the business, such as geological studies, tailings, risk management, mine closure, water management, integrated operation design, hydrometallurgy, concentration, EPCM projects, as well as environmental consulting and permitting,” says Hernan Bezamat. In Peru, “we are participating in mining projects, focusing on four areas: waste treatment, geological studies, processing, and tailings. And we will soon be adding

enero-febrero / january-february 2013 l Latinominería l

67


reportaje / news report

PERU

Engineering companies view positively the development of mining in Peru. According to data provided to LATINOMINERA by Peru’s National Association of Mining, Oil and Energy (SNMPE, from its initials in Spanish), the country’s portfolio of mine investments consists of 52 main projects, including expansions of existing operations, advanced exploration projects as well as projects which are undergoing environmental assessment or have been granted environmental approval. The portfolio is worth a total of US$53.423 billion. This is an interesting scenario for engineering companies. “Various projects are expected to receive environmental approval during 2013, such as the expansion of Cerro Verde (US$4.8 billion, Sociedad Minera Cerro Verde S.A.A.) and Quellaveco (US$3 billion, Anglo American Quellaveco S.A.), and we could see the resolution of the social and environmental conflict which has halted the Minas Conga project (Yanacocha Mining), which represents one of the largest investments in Peru’s mining industry (US$4.8 billion),” indicates CBC’s chief executive Orlando Castillo. “In Peru, we are opting for projects related to mining. There is a very significant opportunity in this country in terms of engineering and sustainability,” says Andres Poch, chairman of the company which shares his name and former president of AIC. The company already has some experience there, such as the development of the conceptual engineering for the civil, architectural, sanitary, mechanical, piping, electrical and instrumentation aspects of the Truck Shop for Hudbay Minerals’ future Constancia mine.

COLOMBIA

Colombia “is rich in coal, but also metals, which, following the current process of exploration, could be developed in the future,” notes SKM’s Rodrigo Muñoz. Andres Poch notes that the company already has an office with 50 employees, “but we should reach around 150 employees (just in the construction market) within a few years,” he says. During 2012, Colombia’s mining industry has focused on coal and gold projects. However, some are still undergoing environmental assessment and/or have been delayed, such as Cerrejon (BHP Billiton, Xstrata and Anglo American), El Descanso (Drummond) and La Colosa (AngloGold Ashanti). However, Cementation has great expectations for Colombia. “Colombia is coming out from internal issues, which have evolved positively. As this problem is resolved, investment and growth will increase, particularly in the areas of mining and energy,” says Raul Chaparro. He highlights CCX’s San Juan coal deposit, thought to be the fifth largest in the world and whose reserves have been calculated at 670 million tons. SNC-Lavalin is another company with interests in Colombia. The Canadian company recently acquired Colombian engineering firm Itansuca, allowing it to attend clients in the energy, infrastructure, oil and gas, and mining and metallurgical industries.

68

Asimismo, esta compañía también es un buen ejemplo de las oportunidades que ofrecen los países que recién están impulsando la minería a gran escala, como es el caso de Panamá. SNC-Lavalin International Co., en consorcio con GyM S.A. y Techint International Construction Corp. fueron seleccionados para continuar con la ingeniería de detalle, procuramiento y construcción de la planta de procesamiento en el proyecto Cobre Panamá, de Inmet Mining de Canadá, comenta Fernando García, senior vicepresident Copper and Gold (de Chile) de SNC-Lavalin. Si bien tanto en el sector minero como energético existen oportunidades diversas, éstas cambian de relevancia de acuerdo a las regiones específicas y a los momentos que se analizan. “En estos días en Chile, por ejemplo, se ha puesto más lento el sector minero y una de las razones se debe al alto costo de la energía, por lo que el sector energético tiene muchos desafíos, no solo por la necesidad de mayor oferta, sino que por consideraciones sociales y comunitarias asociadas”, comenta Rodrigo Muñoz de SKM. En Colombia, en tanto, “la infraestructura asociada a proyectos es muy esca-

ARA WorleyParsons ha mantenido una larga relación con SQM (15 años), brindando servicios complementarios de ingeniería de valor añadido a los activos existentes en la compañía. ARA WorleyParsons has had a long standing relationship with SQM (15 Years), providing value added engineering support services to SQM’s existing asset base.

l Latinominería l enero-febrero / january-february 2013

sa, por lo que todo lo referido a caminos, puertos, aeropuertos y ferrocarriles son una urgencia que da espacio para que las prospecciones mineras ocurran y más adelante se transformen en proyectos”, acota el ejecutivo de SKM. En Perú se vive un boom minero -añade- y los requerimientos de proyectos energéticos están bien aparejados y son de crecimiento similar. Es decir, “en este momento, para las empresas de ingeniería con presencia en Sudamérica el desafío es balancear sus capacidades para poder entregar lo que los clientes necesitan y dónde lo necesitan”, puntualiza Muñoz. Desde Arcadis Chile señalan que están enfocados en Chile y Perú, con sus dos oficinas en ambos países. “A través de la oficina en Chile, estamos presentes en los ámbitos de minería e infraestructura. En minería contamos con capacidades para cubrir prácticamente todos los aspectos críticos del negocio, tales como geoestudios, relaves, gestión de riesgos, cierre de minas, gestión de aguas, diseño integral de faenas, hidrometalurgia, concentración de minerales, proyectos EPCM, además de consultoría ambiental y permisos”, afirma Hernán Bezamat. En el caso de Perú, “estamos participando en proyectos mineros, con foco en cuatro áreas: tratamiento de efluentes, geoestudios, procesos y relaves. Y se está agregando en el corto plazo el área de Medio Ambiente”, complementa Luis Vergara, country manager de Arcadis Perú.

PERÚ

Las empresas de ingeniería ven con buenos ojos el dinamismo minero que acontece en Perú.

Foto cortesía de ARA WorleyParsons / Photo courtesy of ARA WorleyParsons

environmental consulting,” adds Luis Vergara, country manager at Arcadis Peru.


reportaje / news report

“Colombia es rica en carbón, pero también en otros metales que, tras el actual proceso de exploración, en un futuro podrán ser explotados”, subraya Rodrigo Muñoz de SKM.

Foto cortesía de SKM / Photo courtesy of SKM

“Colombia is rich in coal, but also metals, which, following the current process of exploration, could be developed in the future,” notes SKM’s Rodrigo Muñoz.

Según datos entregados por la Sociedad Nacional de Minería, Petróleo y Energía de Perú (SNMPE) a LATINOMINERÍA, a septiembre de 2012 la cartera estimada de inversión en minería se encontraba compuesta por 52 proyectos principales; incluyendo ampliación en unidades mineras, en exploración avanzada, así como con estudio ambiental aprobado o en proceso de evaluación, los que en conjunto ascendían a US$53.423 millones. Panorama interesante para las empresas de ingeniería, ya que “para 2013 se espera la aprobación ambiental de diversos proyectos, como es el caso de la Expansión de la Unidad Cerro Verde (US$4.800 millones, Sociedad Minera Cerro Verde S.A.A.), Quellaveco (US$3.000 millones, Angloamerican Quellaveco S.A.), además de la resolución del conflicto socio-ambiental que mantiene paralizado el proyecto Minas Conga (Minera Yanacocha S.R.L.), que representa una de las más grandes inversiones en la minería peruana (US$4.800 millones)”, indica Orlando Castillo, gerente general de la CBC. “En Perú estamos optando por proyectos relacionados con la minería, en este país hay una oportunidad bien significativa en términos de ingeniería y sustentabilidad”, sostiene Andrés Poch, presidente del directorio de la empresa que lleva su apellido y ex presidente de AIC. La firma

ya cuenta con experiencia en Perú, como es el desarrollo de la ingeniería de perfil para las especialidades civil, arquitectura, sanitaria, mecánica y piping, eléctrica e instrumentación para el Truck Shop de la futura mina Constancia (Hudbay Minerals).

COLOMBIA

El país cafetero “es rico en carbón, pero también en otros metales que, tras el actual proceso de exploración, en un futuro podrán ser explotados”, subraya Rodrigo Muñoz de SKM. Andrés Poch comenta que en Colombia ya cuentan con una oficina compuesta por 50 personas, “pero deberíamos llegar a unas 150 personas (solamente en el mercado de la edificación) en los próximos años”, adelanta. Durante 2012 la minería en este país se ha centrado en proyectos de carbón y oro. Sin embargo, algunos aún se encuentran en evaluación ambiental y/o han presentado retrasos, como Cerrejón (BHP Billiton, Xstrata y Anglo American), El Descanso (Drummond) y La Colosa (AngloGold Ashanti). No obstante, desde Cementation ven con gran expectativa al país cafetero: “Colombia está saliendo de de una problemática interna que ha evolucionado positivamente. En la medida que vayan resolviendo este problema, se van a ir generando

ECUADOR AND ARGENTINA

Both Ecuador and Argentina have potential. “Ecuador has some interesting copper deposits which could be developed,” says SKM’s Rodrigo Munoz. Similarly, CBC’s Orlando Castillo highlights the portfolio of mine investments. “They are largely open pit projects, distributed throughout the country. As Ecuador lacks a tradition of mining, the potential to supply this portfolio of projects is an interesting one,” he notes. Raul Chaparro is more cautious. “While the country saw a drive towards mining between 2008 and 2010, when four interesting projects were launched, largely to produce gold, the legislation sadly has not clarified various topics thet facilitate investment (royalty, among others), stopping almost all the projects. Until this issue is resolved, it is unlikely that companies are going to invest,” he notes. Argentina has a portfolio of around 32 projects, largely involving surface mining and requiring investments worth almost US$27 billion. “If they manage to make progress on the engineering work and the environmental and community approvals, they will imply a significant amount of mining for suppliers,” explains Castillo. CHILE Reflecting the country’s tradition of mining and the large number of projects in the sector, numerous engineering companies are based in Chile and many use the country as their regional

enero-febrero / january-february 2013 l Latinominería l

69


reportaje / news report

According to Arcadis Peru, the great challenge in engineering is “how to design large-scale infrastructure at low cost, while taking into account environmental variables, such as the lack of water, high energy costs and communities which are more demanding in terms of environmental protection and social responsibility”. headquarters. "WorleyParsons has established its regional HQ in Santiago but recognises the need to service our other Latin American businesses within the respective countries," says Claude D'Cruz of WorleyParsons. Another factor which favors this arrangement is the fact that the owners of many of the region’s biggest mine projects are also based in Chile. “So the possibilities for engineering companies to be able to connect during construction and later in the operation are high,” says Orlando Castillo. Executives based in Chile therefore believe it is important to recognize that the opportunities exist not only in Chile, but across South America. “We need to propose a more integrated vision…Engineering companies should have a double outlook, both local and regional,” Castillo says. This is even more important as the shortage of energy in Chile becomes a bottleneck which restricts the development of mine projects, especially in the Region of Atacama, forcing many companies to revise and/or put back their planned investments.

TRENDS

The mining industry’s new challenges and requirements concern SKM’s Rodrigo Muñoz. “We need to create a mining industry for the twenty-first century, implementing efficient solutions, in which traditional and alternative energy sources coexist; innovate with mining processes which use semi-treated or desalinated seawater; operate with solar energy and other renewable sources, as well as innovate in the management of materials to minimize risk and reduce the emission of CO2.” According to Luis Vergara at Arcadis Peru, the great challenge in engineering is “how to design large-scale infrastructure at low cost, while taking into account environmental variables, such as the lack of water, high energy costs and communities which are more demanding in terms of environmental protection and social responsibility.”

70

inversiones y crecimiento, particularmente en el área energética y minera”, asevera Raúl Chaparro. Destaca el yacimiento carbonífero San Juan (CCX), considerado el quinto más grande del mundo, y cuyas reservas han sido calculadas en 670 millones de toneladas. El interés en Colombia también es parte de la mirada global de SNC-Lavalin, donde la empresa canadiense adquirió Itansuca, firma de ingeniería colombiana, quedando posicionada para atender a los clientes en las áreas de energía, infraestructura, petróleo y gas, minería y metalurgia.

ECUADOR Y ARGENTINA

Ambos países tienen un atractivo potencial. “Ecuador presenta depósitos interesantes de cobre que podrían ser explotados”, señala Rodrigo Muñoz, de SKM. En la misma línea, Orlando Castillo de la CBC destaca la cartera de inversiones mineras: “Se trata de proyectos rajo fundamentalmente, distribuidos a lo largo de todo el país. Como en Ecuador la historia minera es menor, la potencialidad de abastecer esta cartera de proyectos es interesante”, puntualiza. Más cauto es Raúl Chaparro, quien advierte que “si bien el país tuvo un impulso minero entre los años 2008 y 2010, período en el cual se iniciaron cuatro proyectos interesantes, en particular de oro, lamentablemente la legislación aún no clarifica diversos temas que faciliten la inversión (royalty, entre otros), lo que ha detenido casi todos los proyectos. Mientras no se resuelva este tema, difícilmente las empresas van a invertir”, comenta. Argentina, en tanto, cuenta con un portafolio compuesto por unas 32 iniciativas, principalmente en minería de superficie, con una inversión de casi US$27.000 millones, “que si logran avanzar en sus ingenierías y tramitaciones ambientales y comunitarias, van a significar un nivel de minería importante para los proveedores”, adelanta Castillo.

CHILE

Por su tradición minera e importante volumen de negocios en este ámbito, en Chile están asentadas numerosas empresas de ingeniería orientadas a este rubro, muchas de ellas con sus sedes regionales. “WorleyParsons ha establecido su oficina central en Santiago, pero reconoce la necesidad de atender sus otros negocios en Latinoamérica desde cada uno de los respectivos países”, dice Claude D’Cruz. Otro elemento que favorece esta situación es el hecho que importantes proyectos mineros en la región están asociados a mandantes que están en Chile, “por lo que las probabilidades para las empresas de ingeniería de poder conectarse con los procesos de construcción y posteriormente de operación son amplias”, señala Orlando Castillo.

l Latinominería l enero-febrero / january-february 2013

Desde Arcadis señalan que el gran desafío para la ingeniería es “cómo diseñar infraestructuras de mayores dimensiones y menores costos, asumiendo variables ambientales como la escasez de recursos hídricos, los altos costos de energía y poblaciones más exigentes con los temas ambientales y de responsabilidad social”.

En este sentido, ejecutivos presentes en este país estiman que es fundemental reconocer que las oportunidades no solo están en Chile, sino en Latinoamérica. “Hay que propender hacia una visión más integradora. Las empresas de ingeniería deben tener una doble mirada, tanto local como regional”, enfatiza Castillo. Más aún considerando que a nivel interno el escenario de capacidad energética que enfrenta este país se ha transformado en “un cuello de botella” para el desarrollo de proyectos mineros, especialmente en la Región de Atacama, obligando a varias empresas a revisar y/o postergar sus cronogramas de inversiones.

TENDENCIAS

En cuanto a los nuevos desafíos y requerimientos que enfrenta el sector, especialmente vinculados a la actividad minera, Rodrigo Muñoz, de SKM, señala que “necesitamos entrar en la minería del siglo XXI implementando soluciones eficientes, en las que convivan fuentes energéticas tradicionales y alternativas; innovar en los procesos mineros que utilicen agua de mar, semitratada o desalinizada; operar con energía solar u otra fuente renovable; así como innovar en el manejo de materiales para minimizar riesgos y reducir el consumo de CO2”. Desde Arcadis señalan que el gran desafío para la ingeniería es “cómo diseñar infraestructuras de mayores dimensiones y menores costos, asumiendo variables ambientales como la escasez de recursos hídricos, los altos costos de energía y poblaciones más exigentes con los temas ambientales y de responsabilidad social”, concluye Luis Vergara.


Foto/Photo: Karina Jimenez - LATINOMINERÍA

evento / event

Rockwell Automation Fair 2012 congregó a cerca de diez mil personas. Rockwell Automation Fair 2012 gathered about ten thousand people.

FOR ROCKWELL AUTOMATION

Latin America leads growth Keith Nosbusch, CEO of the company, remarks the business potential offered by the natural resource sector.

PA R A R O C K W E L L A U T O M AT I O N

Latinoamérica lidera crecimiento Keith Nosbusch, CEO de la compañía, subraya el potencial de negocios que ofrece el sector de recursos naturales.

L

atinoamérica es la región donde Rockwell Automation ha presentado el más alto crecimiento -cercano al 10%-, en los últimos años. “La cifra es más alta que la de Asia-Pacífico, en la que se encuentra China”, precisó a LATINOMINERÍA el CEO de Rockwell Automation, Keith Nosbusch. Sostuvo que las oportunidades de negocios en la región siguen estando en las fábricas de todo tipo, especialmente las OEM (fabricantes de maquinarias), lideradas por Brasil y México, y en las industrias ligadas a los recursos naturales como la minería, oil and gas y la energía. El ejecutivo se refirió al tema en la Rockwell Automation Fair 2012, realizada en el Pennsylvania Convention Center de Filadelfia, Estados Unidos, evento al que asistieron alrededor de diez mil personas y al que fue invitada LATINOMINERÍA, como parte del Grupo Editorial Editec. Luis Gamboa, Commercial Marketing director para América Latina de la multinacional, aseveró que de la región llegaron a la feria cerca de 600 clientes.

“En Chile, en particular, donde hemos ido ganando cada vez más mercado, tenemos proyectado desarrollar, durante la primera semana de agosto de 2013, el tour Rockwell Automation on the Move (RAOTM), que será como esta feria, en escala menor, y especialmente enfocada a las soluciones que ofrecemos para la energía y minería”, aseveró el ejecutivo. Añadió que la Rockwell Automation Fair 2012 “refuerza nuestro optimismo sobre las oportunidades de negocio que se observan a futuro, especialmente en Latinoamérica, donde hemos tenido un crecimiento sostenido”. Durante la feria se presentaron alrededor de 80 nuevas soluciones Rockwell Automation y productos de las empresas socias de la estadounidense, en los más de cien stands instalados. Y como en versiones anteriores, se desarrollaron foros sobre la industria manufacturera, energía y medio ambiente, alimentos, OEM, agua y residuos líquidos, oil and gas (petróleo y gas), entre otros temas. Además, se llevaron a cabo charlas técnicas, y sesiones privadas y de laboratorio para conocer en detalle las aplicaciones de cada tecnología.

L

atin America is the region where Rockwell Automation has presented the highest growth-nearly 10% - in recent years. "The figure is higher than Asia-Pacific, which includes China," added to LATINOMINERIA Rockwell Automation CEO, Keith Nosbusch. Said the business opportunities in the region still are in factories of all kinds, especially the OEMs (machinery manufacturers), led by Brazil and Mexico, and in industries related to natural resources such as mining, oil and gas and energy. The executive referred to the issue in the Rockwell Automation Fair 2012, held at the Pennsylvania Convention Center, Philadelphia, United States; this event gathered about ten thousand people and LATINOMINERIA was invited, as part of Grupo Editorial Editec. Luis Gamboa, Commercial Marketing Director for Latin America, affirmed that nearly 600 clients from the region attended the fair. "In particular, in Chile, where we have been gaining more and more market, we plan to develop, during the first week of August 2013, the Rockwell Automation on the Move tour (RAOTM), which will be as this fair, on a smaller scale, and especially focused on the solutions we provide for energy and mining", said the executive. Added that Rockwell Automation Fair 2012 "reinforces our optimism about the business opportunities that are observed for the future, especially in Latin America, where we have had a sustained growth." During the fair, about 80 new Rockwell Automation solutions and products of partner companies were presented, in one hundred stands installed. And, as in previous versions, forums were developed over manufacturing, energy and environment, food, OEMs, water and liquid waste, oil and gas, between other topics. Moreover, technical lectures, and private and laboratory sessions for detailed applications of each technology were held.

enero-febrero / january-february 2013 l Latinominería l

71


DESAFÍO CRECIENTE

Matriz energética y Huella de Carbono GROWING CHALLENGE

Energy mix and Carbon Footprint The mining industry in Latin America can benefit from the hydroelectric potential of the region to reduce their CO2 emissions.

A

bout energy, the most relevant issues of discussion and concern at international level center around security of supply and the impact it has on climate change. Both are key for the mining industry, the first for its obvious implications for an activity that requires, for its processes, working continuously. The second has gained increasing importance, to the point that it is common for large mining companies to implement methodologies for measuring their carbon footprint. The adoption of this tool by mining companies in Latin America, arose because their parent companies began to design, at corporate level, climate change policies. Specialists in this area comment that although the implementation of this indicator responds to new environmental requirements of international markets, for now the driver in case of the mining companies, is related to investors and "reputation" targets, as explained by Mathieu Vallart, consultant of PWC Consulting. And even though the Carbon Footprint requirement for commodities is still incipient, according to expert opinion as Vallart "is to be expected to expand quickly". In a recent interview with Grupo Editorial Editec, Deputy Manager of Market Development of the Chilean copper company Codelco, Victor Perez, said European Union is the market with higher sustainable requirements on products. In fact, there are scoring sys-

72

La hidroelectricidad permite que la región tenga una de las matrices eléctricas con menos emisiones de CO2 del mundo. Hydropower makes the region has one of the electrical grids with less CO2 emissions in the world.

La industria minera en América Latina puede beneficiarse del potencial hidroeléctrico de la región para disminuir sus emisiones de CO2.

E

n torno a la energía, los temas de mayor discusión y preocupación a escala mundial se centran alrededor de la seguridad de suministro y el impacto que genera en el cambio climático. Ambos son claves para la industria minera; el primero por sus obvias implicancias para una actividad que en sus procesos requiere trabajar en forma continua. El segundo ha ido ganando cada vez mayor peso, al punto que ya es habitual que las grandes mineras implementen metodologías de medición de su huella de carbono.

l L a t i n o m i n e r í a l e n e r o - f e b r e r o / j a n u a r y - f e b r u a r y 2 0 1 3 l w w w. s u s t e n t a r e . c l

La adopción de esta herramienta por parte de las compañías mineras en América Latina surgió debido a que sus casas matrices comenzaron a diseñar, a nivel corporativo, políticas de cambio climático. Especialistas en esta materia comentan que si bien la puesta en marcha de este indicador responde a nuevas exigencias ambientales de los mercados internacionales, por ahora el driver en el caso de las mineras está relacionado con los inversionistas y con objetivos “reputacionales”, como lo explica Mathieu Vallart, consultor de PWC Consulting. Y si bien la exigencia de la Huella de Carbono para los commodities todavía es


Portafolio de Proyectos hidroeléctricos y energéticos en Colombia, Ecuador y Perú

Hidroeléctrica /(Hydroelectric) Nº Proyectos /(Projects No.)

Portfolio of hydroelectric and energy projects in Colombia, Ecuador and Peru

CORDOBA

656 2

Total Energía Colombia 6.743

ANTIOQUIA SANTANDER

Bogota

CAUCA HUILA

7

Subsector Sub-sector

2.362 1

Generación Hidroeléctrica Hydroelectric Generation Generación Termoeléctrica Thermoelectric Generation Generación Geo-Termoeléctrica Geo-Thermoelectric Generation Transmisión de Energía Eléctrica Electric Power Transmission Total general Overall total

963 2 837 1

COLOMBIA

CARCHI

2

ECUADOR

3.213 8 26 1 5.201 6 1.416 4

AZUAY

LOJA

AMAZONAS

304 4

5.877 (MW)

1.286

6

1.000,6 (MW)

190

1

50 (MW)

101

3

47 (km)

12.945

25

6.927,6 (MW)

Subsector Sub-sector Generación Hidroeléctrica Hydroelectric Generation Generación Eoloeléctrica Wind Power Generation Generación GeoTermoeléctrica GeoThermoelectric Generation Generación Termoeléctrica Thermoelectric Generation Trans. de Energía Eléc. No Urbana Electric Power Transmission Non-Urban Generación Solar Fotovoltaica Solar Photovoltaic Generation Total general Overall total

Inversión

Numero de Capacidad Proyectos Capacity Investment Number of Projects (USD MM)

14.585

42

11.437 (MW)

440

7

185 (MW)

348

2

568 (MW)

184

1

144 (MW)

48

1

155 (km)

7

1

0,375 (MW)

15.611

54

12.334 (MW)

4

2.570

2

Total Energía Perú Total Energy Peru

HUÁNUCO

1.278 2

LIMA

1.353 4

CUSCO HUANCAVELICA AREQUIPA

Fuente/Source Corporación de Bienes de Capital

15

307

PERÚ

Lima

11.368

Total Energy Ecuador 12

MORONA-SANTIAGO

ZAMORA

Proyectos Capacity Investment Number of Projects (USD MM)

Total Energía Ecuador 3.860

NAPO COTOPAXI

Inversión Número de Capacidad

55

PICHINCHA Quito

Total Energy Colombia

728 4 770,2 2 1.812 3

Subsector Sub-sector Generación Hidroeléctrica Hydroelectric Generation Transmisión de Energía Eléctrica Electric Power Generation Generación Termoeléctrica Thermoelectric Generation Generación Eoloeléctrica Wind Power Generation Infraestructura Hidráulica Hydraulic Infrastructure Total general Overall total

Inversión Número de Capacidad (USD MM) Proyectos Capacity Investment Number of Projects 12.669,5

22

7.020,3 (MW)

1.914,9

13

4.561,6 (km)

1.130

4

1.520 (MW)

572

1

260 (MW)

20,2

1

7 (MM m3)

16.306,6

41

8.800,3 (MW)

Revista Latinominería

w w w. s u s t e n t a r e . c l l e n e r o - f e b r e r o / j a n u a r y - f e b r u a r y 2 0 1 3 l L a t i n o m i n e r í a l

73


Adquiera el Compendio de la Minería Chilena 2012 y reciba de regalo la edición 2011*.

Más que un compendio,

una completa guía de la minería chilena CONTENIDOS • • • • •

$ 79.000 + IVA

Un Un profundo análisis de la industria minera. El balance de la Industria de los últimos El 10 años. 10 Desde la pequeña hasta la gran Minería. Desde Chile y todas sus operaciones. Chile Un completo directorio de proveedores Un de la Industria. de

CONTACTO

Macarena García Tel.: (56-2) 2757 4242 E-mail: mgarcia@editec.cl

Más información en www.mch.cl/compendio

(*) Compendio 2011 entrega inmediata Promoción hasta agotar stock

LA EDITORIAL TÉCNICA Y DE NEGOCIOS LíDER DE CHILE

estudios@editec.cl


DESARROLLO HÍDRICO

La adopción de la Huella de Carbono por parte de las compañías mineras en América Latina surgió debido a que sus casas matrices comenzaron a diseñar, a nivel corporativo, políticas de cambio climático. The adoption of the Carbon Footprint by mining companies in Latin America, arose because their parent companies began to design, at corporate level, climate change policies.

incipiente, en opinión de expertos como Vallart “cabe esperar que se masifique rápidamente”. En una reciente entrevista con Grupo Editorial Editec, el subgerente de Desarrollo de Mercados de la cuprífera chilena Codelco, Víctor Pérez, sostuvo que la Unión Europea es el mercado que presenta mayores exigencias sustentables en los productos. De hecho, indicó que existen sistemas de puntuación para evaluar la sustentabilidad de materiales, y el uso de materiales más “sustentables” es premiado en la adjudicación de propuestas competitivas. En este escenario, la composición de la matriz energética del país o sistema donde se encuentran las operaciones mineras tiene una incidencia directa. Por ejemplo, en el caso de la gran minería de Chile que se encuentra ubicada en la zona norte del país -en las regiones de Antofagasta y Tarapacáentre el 60% y 70% de sus emisiones provienen del sistema interconectado eléctrico, el cual opera, prácticamente en su totalidad con centrales termoeléctricas.

El potencial con que cuenta Sudamérica para la generación hídrica, sumado a las oportunidades de interconexión que ofrece la región, constituyen favorables pilares en este campo. Así lo reconoce la Comisión de Integración Energética Regional (Cier) en el último informe Nuevas Oportunidades de Interconexión Eléctrica en América Latina, en el cual subraya que la hidroelectricidad hace que la región tenga “una de las matrices eléctricas con menos emisiones de CO2 del mundo”. Asimismo, el Cier hace hincapié que el predominio de la hidroelectricidad en Latinoamérica facilita la inserción de otras fuentes renovables. La razón es que los embalses de las plantas hidroeléctricas funcionan como “almacenes energéticos”, que pueden absorber las fluctuaciones de la producción de las plantas eólicas, la estacionalidad de la producción de la biomasa y optimizar el uso del gas natural en la generación eléctrica. “También hay una complementariedad de las fuentes: algunos países tienen mayores reservas de gas, mientras otros poseen más recursos hidroeléctricos y/o eólicos. Por tanto, las posibilidades de interconexión entre naciones tienen una buena perspectiva”, añade el informe. Hoy en día Colombia, Ecuador y Perú destacan dentro del escenario sudamericano por el importante portafolio de proyectos hidroeléctricos que poseen. Perú cuenta con una cartera de proyectos energéticos cercana a los US$16.000 millones a desarrollarse en la presente década, de los cuales unos US$12.600 son hidroeléctricos, según un estudio realizado por la Corporación de Desarrollo Tecnológico de Bienes de Capital (CBC). Son 22 proyectos hidroeléctricos con una capacidad cercana a los 7.000 MW. Ecuador, en tanto, registra un total de 42 proyectos de generación hídrica, que de concretarse aportarían una capacidad cercana a los 11.500 MW. Mientras que en Colombia se contabilizan 15 proyectos hidroeléctricos, que permitirían ingresar a su sistema eléctrico unos 5.900 MW. Cabe señalar que el estudio del Cier sostiene que tanto Colombia como Ecuador han experimentado una reducción en las emisiones de CO2 “como resultado de la entrada de nuevas plantas hidroeléctricas”. El Perú, en tanto, evidencia aumento de las emisiones hacia 2010 producto del ingreso de plantas a gas, asociadas al campo de Camisea. “A mediano plazo -puntualiza el análisis- las emisiones se estabilizan” debido al desarrollo de centrales de generación hídrica.

tems to assess sustainability of materials, and the use of more "sustainable" materials is rewarded in awarding competitive proposals. In this scenario, the composition of the country's energy mix or system where mining operations are located, have a direct impact. For example, for large-scale mining of Chile, which is situated in the north of the country -in Antofagasta and Tarapacá regions- between 60% and 70% of their emissions come from the interconnected electrical system, which operates almost entirely with thermoelectric plants.

WATER DEVELOPMENT

The potential that South America has for water generation, plus interconnection opportunities offered by the region, are favorable pillars in this field. This is also recognized by the Regional Energy Integration Commission (CIER) in the last report New Opportunities of Electricity Interconnection in Latin America, which emphasizes that hydropower makes the region has "one of the electrical grids with less CO2 emissions in the world". Also, Cier emphasizes that the prevalence of hydropower in Latin America facilitates insertion of other renewable sources. The reason is that the dams of hydroelectric plants function as "energy storage", which can absorb fluctuations in the production of wind power plants, the seasonality of biomass production and optimize the use of natural gas in electricity generation. "There is also a complementarity of sources: some countries have higher gas reserves, while others have more hydroelectric and/or wind resources. Therefore, the interconnection possibilities between nations have a good perspective, "adds the report. Today, Colombia, Ecuador and Peru stand out within the South American scene because of the important hydroelectric projects portfolio they have. Peru has a portfolio of energy projects close to US$16,000 million to develop in this decade, of which about US$12,600 are hydroelectric, according to a study from Capital Goods Technology Development Corporation (CBC). There are 22 hydropower projects with a capacity of about 7,000 MW. Ecuador, meanwhile, recorded a total of 42 hydroelectric generation projects, which, if implemented would contribute a capacity of around 11,500 MW. Whilst in Colombia, 15 hydroelectric projects are counted, which would allow access to its electrical system, about 5,900 MW. It should be noted that Cier study argues that both Colombia and Ecuador have experienced a CO2 reduction "as a result of new hydroelectric plants entry". Meanwhile, Peru shows increased emissions to 2010 by the entry of gas plants, associated to Camisea field. "In medium term emissions are stabilized" -points out the analysis due to development of hydroelectric power plants.

w w w. s u s t e n t a r e . c l l e n e r o - f e b r e r o / j a n u a r y - f e b r u a r y 2 0 1 3 l L a t i n o m i n e r í a l

75


mercado latino / latin marketplace

Finning Sudamérica se adjudica tres grandes contratos mineros

Komatsu Holding South America reunió a distribuidores latinoamericanos

La operación en América del Sur de Finning International Inc. anunció que se adjudicó tres grandes contratos para proveer equipos y servicios de mantenimiento a empresas mineras de Chile. El valor combinado de los contratos suma cerca de US$500 millones, compuesto por US$247 millones en nuevos equipos y US$250 millones en servicios de mantenimiento. Entre las transacciones figura la realizada con CAP Minería para su mina de hierro El Romeral. Finning proveerá equipos por un monto de US$130 millones, y firmó una carta de intención de contrato de mantenimiento por cinco años,

En un taller de tres días participaron distribuidores de Komatsu Holding South America, cuyo objetivo fue fortalecer las relaciones y definir lineamientos estratégicos ante la creciente demanda de la región por equipos y servicios en el rubro minero y de construcción. Los asistentes al encuentro, que se realizó en Chile, provenían de Uruguay, Argentina, Perú,

valorado en US$120 millones. El paquete de equipamiento incluye 20 camiones CAT 793F, junto con tres palas hidráulicas 6060BH. Los equipos se entregarán durante 2013 y 2014. Además, la compañía firmó con Codelco un contrato de servicios de mantenimiento por ocho años, valorado en US$130 millones. En virtud de este acuerdo, la firma proporcionará piezas y servicios para los equipos vendidos para el Proyecto Rajo Sur de El Teniente. También la multinacional se adjudicó un contrato por US$62 millones, para proporcionar equipos móviles a una minera.

Finning South America awarded three major mining contracts The Finning International Inc. operation in South America announced that three major contracts to provide equipment and maintenance services to mining companies in Chile are awarded. The combined value of the contracts totals about US$500 million comprised of US$247 million in new equipment and US$250 million in maintenance services. CAP Mining for its El

Romeral iron ore mine is included between the transactions made. Finning will provide equipment for an amount of US$130 million, and signed a letter of intent to maintenance contract for five years, valued at US$120 million. The equipment package includes 20 CAT 793F trucks, along with three 6060BH hydraulic shovels. The equipment will be delivered throughout 2013 and 2014.

In addition, the company signed a maintenance services contract for eight-year valued at US$130 million with Codelco. Under this contract, the company will provide parts and services for equipment sold earlier for El Teniente's Rajo Sur Project. In addition, has been awarded a contract valued at US$62 million, to provide mobile equipment to a mining company.

Freyssinet Tierra Armada Perú se adjudica contrato para Toquepala

Freyssinet Tierra Armada Peru awarded contract for Toquepala

76

l Latinominería l enero-febrero / january-february 2013

México, Colombia, Ecuador, Venezuela, Paraguay y Bolivia. En el encuentro se planteó como meta lograr la estandarización de los procesos para alcanzar mayor eficiencia y establecer los requerimientos básicos de infraestructura que permitan darle mayor solidez a la marca en cada país. Además, se discutió sobre los soportes que el distribuidor requiere para entrenar a su personal de servicio y de ventas. Eduardo Agüero, gerente regional de Ventas Equipos Construcción y Repuestos, afirmó que “luego de este encuentro y mediante una encuesta nos percatamos de los buenos resultados y de la alta valoración que dieron los distribuidores a esta cita. La reunión permitió informar sobre los lineamientos para las regiones y generó una mayor integración entre los distribuidores”.

Komatsu Holding South America brought together Latin American distributors Komatsu Holding South America distributors attended a three-day workshop, , aimed to strengthen relations and define strategic guidelines to the growing regional demand for equipment and services in the mining and construction sector . The attendants of the meeting, which took place in Chile, were from Uruguay, Argentina, Peru, Mexico, Colombia, Ecuador, Venezuela, Paraguay and Bolivia. Achieving standardization of the processes to obtain greater efficiency and establish the basic infrastructure requirements to provi-

de more strength to the brand in each country were stated during the meeting. Furthermore, it was discussed the means required by the distributor to train their service and sales personnel. Eduardo Aguero, Regional Sales Manager of Construction Equipment and Parts, said that "after this meeting and through a survey, we become aware of the good results and the high value that distributors gave to this meeting. The meeting allowed to report on guidelines for regions and generated greater integration between distributors".

La empresa JJC Contratistas Generales, que tiene a cargo la construcción de las Obras civiles de las Mejoras Tecnológicas en la operación de la mina Toquepala, otorgó a Freyssinet Tierra Armada Perú el diseño, suministro y asistencia técnica de seis muros de contención por un total de 4.000 m2. Estos alcanzarán 28 m en su altura máxima y 12 m de talud en su corona. Con ello, se estabiliza un desnivel de 40 m de altura. Para la conformación de la estructura de contención se utilizarán paramentos del tipo TerraPlus, informó la compañía. La operación minera Toquepala, perteneciente a Southern Perú, está ubicada al sur del país en el departamento de Tacna.

The company JJC Contratistas Generales, which is responsible for the construction of Civil Works of technological improvements in the Toquepala mine operation, gave Freyssinet Tierra Armada Peru the design, supply and technical support of six retaining walls totaling 4,000 m2. Reaching 28 m in its maximum height and 12 m of crown height. With this, a slope of 40 m high is stabilized. Terraplus facing panels will be used for the containment structure, informed the company. Toquepala mining operation, owned by Southern Peru, is located in the southern part of the country in the department of Tacna


mercado latino / latin marketplace

SKM gana premio por crecimiento logrado en Sudamérica

SKM wins award for growth achieved in South America

En reconocimiento a su crecimiento en Sudamérica durante los últimos 14 años, la empresa especializada en ingeniería y ejecución de proyectos Sinclair Knight Merz (SKM) recibió el premio “AustraliaLatin America Business Excellence”. Es la segunda vez que SKM es distinguida por el Australia-Latin America Business Council, después que SKM Minmetal recibiera el Export Award en 2007. La actividad comercial de la firma en América del Sur ha crecido considera-

blemente desde que la empresa comenzó a investigar oportunidades en la región en 1998, y ahora estas actividades son una parte integral de los negocios globales de SKM, representando 8,6% del total de los ingresos de la compañía. SKM cuenta con oficinas en Chile, Perú, Colombia y Brasil. Sus servicios se han expandido a las áreas de agua, medio ambiente, energía, infraestructura, minería, y hoy existen planes de crecer en términos de geografía, número de clientes y capacidades.

TTM realizó exitosa misión tecnológica en Alemania Representantes de Minera Collahuasi, Codelco y SKM, entre otros, formaron parte de una inédita y exitosa misión tecnológica efectuada por TTM a Alemania, para asistir a eventos técnicos y realizar visitas en terreno a importantes compañías relacionadas con los sistemas de transporte de minerales. Los participantes de esta iniciativa, sin precedentes en el rubro, asistieron además en Essen a las III Jornadas Tecnológicas Alemania-Chile, organizadas por CAMCHAL (Cámara Chileno-Alemana de Comercio e Industria), con el patrocinio del Ministerio de Economía de Alemania, el Ministerio de Energía de Chile y ProChile, cuya temática central fue

“Chile-Alemania: Un partnership estratégico para una gestión sustentable de recursos naturales”. ANDINA En otro plano, TTM materializó con éxito la adopción, por parte de Codelco - División Andina, de rodillos Kuepper, especialmente diseñados para la faena. Estos rodillos responden a la necesidad de la compañía estatal de aumentar la vida útil de los utilizados en la actualidad, incrementar la productividad de sus transportadores y, por sobre todo, hacer más eficiente el consumo energético de los mismos, al aplicar tecnología de última generación.

In recognition of its growth in South America for the past 14 years, the company specialized in engineering and project delivery, Sinclair Knight Merz (SKM) was awarded with “Australia-Latin America Business Excellence”. This is the second time SKM is honored with Australia-Latin America Business Council, after SKM Minmetal received the Export Award in 2007. The company's commercial activity in South America has grown considerably since the firm began researching for opportunities in the region in 1998, and now these activities are an integral part of SKM's global businesses, representing 8.6% of total company revenues. SKM has offices in Chile, Peru, Colombia and Brazil. Their services have expanded to the areas of water, environment, energy, infrastructure, mining, and now there are plans of growing in terms of geography, number of clients and capabilities.

TTM conducted successful technology mission in Germany Representatives of Collahuasi Mining, Codelco and SKM, among others, were part of an unprecedented and successful technology mission to Germany performed by TTM, to attend technical events and conduct site visits to important minerals transport systems related companies. The participants of this initiative, unprecedented in the industry, also attended in Essen to III Jornadas Tecnológicas Alemania-Chile (III Technological Conferences Germay-Chile), organized by CAMCHAL (Chilean German Chamber of Commerce and Industry), sponsored by the Ministry of Economics and Technology of Germany, the Ministry of Energy of Chile and ProChile, whose central subject was "Chile-Germany: A strategic partnership for sustainable management of natural resources ".

ANDINA On another level, TTM successfully materialized the adoption, by Codelco - División Andina, of Kuepper rollers, specially designed for the worksite. These rollers meet the need of the state company to increment the lifetime of the currently used, increase the productivity of their transporters and, above all, make their energy consumption more efficient, by applying cutting edge technology.

agenda

Marzo 3-6 pDac 2013 Lugar: Metro Toronto Convention Centre, Canadá Organiza: Prospectors and Developers Association of Canada Informaciones: www.pdac.ca

Abril 8 Vi confErEncia DE Exploración cEsco 2013 Lugar: Santiago, Chile Organiza: Cesco - Editec Informaciones: explorationforum@editec.cl

8 - 12

13 - 15

Lugar: Santiago, Chile Organiza: Cesco Informaciones: www.cescoweek.com

Lugar: CasaPiedra, Santiago Organiza: Editec Informaciones: www.elecgas.cl

ElEcgas

sEmana cEsco

21 - 24

10

Expomin china

xVii cEna cEsco

Lugar: National Agriculture Exhibition Center, Beijing Organiza: Fisa – Nonferrous Metals Industry Association Informaciones: www.expominchina.com

Lugar: Santiago, Chile Organiza: Cesco Informaciones: www.cesco.cl

Mayo

Junio

7–9

17 - 21

arminEra Lugar: Centro Costa Salguero, Buenos Aires Organiza: Caem Informaciones: www.arminera.com.ar

Exponor 2013 Lugar: Antofagasta, Chile Organiza: Asociación de Industriales de Antofagasta Informaciones: www.exponor.cl

enero-febrero / january-february 2013 l Latinominería l

77


mercado latino / latin marketplace

Emerson presenta monitor de posición inalámbrico Fisher 4320 Con el objetivo de ampliar su oferta de soluciones de tecnología Smart Wireless Emerson Process Management lanzó el monitor de posición inalámbrico Fisher 4320, con la opción de salida de control de encendido/apagado. Además de sus ventajas inalámbricas, este monitor constituye la primera solución de automatización de válvulas WirelssHART, que incluye retroalimentación de posiciones sin empalmes para confirmación de comando.

La mayoría de las plantas de proceso tienen cientos de válvulas que no están conectadas al sistema de control. Las válvulas manuales en la posición incorrecta causan problemas al 90% de los clientes encuestados. Hasta ahora, automatizar las válvulas manuales no era una opción debido al alto costo del cableado. El 4320 pone más opciones a disposición de los usuarios, desde monitores simples hasta válvulas con problemas, totalmente automatizadas.

Wesco Inc. adquirió Eecol Electric Corporation Wesco International anunció que, mediante una filial de plena propiedad, celebró un acuerdo de compra para adquirir Eecol Electric Corporation, con sede en Calgary, Canadá, y a varias empresas asociadas. Fundada en 1919, Eecol Electric distribuye equipos eléctricos, productos y servicios de Canadá en Sudamérica, con más de 20.000 clientes. La firma presta servicios a usuarios industriales, petroleros, gasíferos, mineros, de servicios y de la construcción comercial y residencial.

El presidente y CEO de Wesco, John J. Engel, sostuvo que "Eecol es una empresa sólida con una larga y exitosa trayectoria, y ganancias en las ventas por sobre el nivel del mercado. Tenemos mucho respeto por su cultura de ventas y su excelente capacidad de servicio al cliente, como así también las asociaciones con los proveedores de Eecol. La adición de esta compañía expande la presencia de Wesco en Canadá y afianza nuestra huella y capacidad internacionales específicamente en Sudamérica".

Emerson presents Fisher 4320 wireless position monitor In order to expand its technological solutions range, Smart Wireless Emerson Process Management launched The Fisher 4320 Wireless Position Monitor with On/Off Control Output Option. Besides its wireless advantages, this monitor is the first WirelessHART valve automation solution that includes linkage-less position feedback and discrete valve control. Most processing plants have hundreds of valves that are not connected to the control system. Manual valves in the wrong position cause problems to 90% of clients surveyed. So far, to automate manual valves was not an option due to wiring high costs. The 4320 offers more options available to users, from simple monitors to valve with problems, fully automated.

Siemens recibe distinción en el Dow Jones Sustainability Index

Siemens earned distinction on Dow Jones Sustainability Index 78

Wesco Inc. acquired Eecol Electric Corporation Wesco International announced that through a wholly-owned subsidiary, entered into a purchase agreement to acquire Eecol Electric Corporation, headquartered in Calgary, Canada, various affiliated companies. Founded in 1919, Eecol Electric distributes electrical equipment, products and services from Canada in South America, with over 20,000 customers. The company focused on serving industrial, oil, gas, mining, utility, and commercial and residential construction customers.

Liderando la categoría “Bienes y Servicios Industriales”, la empresa Siemens recibió la distinción de Súper Sector Líder en el Dow Jones Sustainability Index (DJSI). La compañía también ganó el segundo lugar en la categoría “Industrias Diversificadas”, logrando su mayor resultado con 92 puntos de 100. Siemens fue asimismo honrada con el proyecto de Divulgación de Carbón (CDP), recibiendo 98 puntos de 100 en el ranking independiente. Barbara Kux, miembro del directorio de Siemens y gerente de la oficina de Sustentabilidad sostuvo que “ser un súper sector líder es el mayor premio que una compañía puede alcanzar. Nuestra estrategia es ser un ejemplo a seguir, entendiendo la sustentabilidad como modelo de negocio rentable. En un entorno difícil, el crédito se lo llevan los colaboradores alrededor del mundo, quienes transforman a Siemens en un líder en sustentabilidad”. En el año fiscal 2011 la compañía tecnológica disminuyó emisiones de CO² a sus clientes por cerca de 320 millones de toneladas.

l Latinominería l enero-febrero / january-february 2013

The president and CEO of Wesco, John J. Engel, stated that "Eecol is a strong company with a long and successful track record of delivering above-market sales growth and profitability. We have great respect for their sales culture and their excellent customer service capabilities, as well as their supplier Eecol partnerships. The addition of this company expands Wesco's presence in Canada and broadens our international footprint, specifically our capabilities in South America. "

Leading the category "Industrial Goods and Services", Siemens received the distinction of Supersector Leader in the Dow Jones Sustainability Index (DJSI). The company also won second place in the category "Diversified Industrials", achieving its best result with 92 points out of a possible 100. Siemens was also honored by the Carbon Disclosure Project (CDP), receiving 98 points out of a possible 100 in the independent ranking. Barbara Kux, mem-

ber of Siemens' Managing Board and the company's Chief Sustainability Officer said “being Supersector Leader is the highest possible award a company can achieve. Our strategy of being a role model and above all understanding sustainability as a business opportunity pays off. In a difficult environment, the credit goes above all to our employees worldwide, who are making Siemens a leader in sustainability". In fiscal 2011, the company's technologies cut CO² emissions at customers by nearly 320 million tons.


mercado latino / latin marketplace

ABB expone sobre mantenimiento predictivo de molinos GMD a distancia ABB expuso en la tercera versión del Congreso Internacional de Automatización en la Industria Minera, Automining 2012, la posibilidad de efectuar un monitoreo continuo orientado al mantenimiento predictivo de molinos Gearless Mill Drives (GMD) a distancia. Lo anterior, a través del paper que presentó Patricio Muñoz, ingeniero líder de Automatización y Control del área de servicios de la firma en Chile. “A través de un hardware se adquieren los datos y se almacenan históricos del funcionamiento y estados de operación del GMD, lo que está unido al servicio de

Empresarios sudafricanos visitan Chile

South African entrepreneurs visit Chile

ABB speaks on remotely predictive maintenance of GMD ABB exhibited in the third version of the International Congress on Automation in the Mining Industry, Automining 2012 the possibility to perform continuous monitoring oriented to remotely predictive maintenance of Gearless Mill Drives (GMD). The above, through the paper presented by Patricio Muñoz, Lead Automation and Control Engineer of the service area from the company in Chile. "Through a hardware data are acquired and historical performance and operating states of GMD are stored, which are attached to the remote mo-

monitoreo remoto, permitiendo que los especialistas de ABB puedan diagnosticar a distancia y dar alertas en caso de detectar fallas en etapas tempranas del molino, evitando las costosas paradas no programadas por fallas”, explicó Muñoz. Dentro de las funcionalidades del GMD que se pueden monitorear están el ciclo-conversor, estado del rotor y estator, además de los dispositivos o equipos auxiliares del molino. También permite el monitoreo de protecciones eléctricas y otras funciones auxiliares como el aire acondicionado y el colector de polvo de la sala eléctrica. Una misión sudafricana de empresarios del rubro de la minería visitó la Cámara Chileno-Sudafricana de Industria y Comercio, en Santiago. El objetivo fue conversar sobre temas de seguridad minera, elementos de la minería, participación en proyectos conjuntos y ofertas de financiamiento, entre otros. Durante un desayuno de bienvenida, que contó además con la presencia de representantes de la Embajada de Sudáfrica, el vicepresidente del Comité de Inversión Extranjera, Matías Mori, realizó una presentación sobre las inversiones extranjeras en Chile. Luego, se debatieron temas como la reciente firma

del acuerdo para evitar la doble tributación entre Chile y Sudáfrica, con lo que se facilitarán las decisiones de inversión en minería, principal sector del comercio bilateral entre ambos países. Entre las empresas sudafricanas visitantes se encontraban South African Capital Equipment Export Council, Axial Flow Fans, Brelko Conveyor Products, New Concept Mining, Horne Group y Crunchyard. Las compañías sostuvieron reuniones con Barrick, Codelco, Instituto de Ingenieros de Minas de Chile, Anglo American, Antofagasta Minerals, Knight and Merz, SKM, Consejo Minero de Chile, Hatch, Bechtel y Fluor.

nitoring service, allowing ABB specialists to remotely diagnose and give alerts if it detects failures in early stages of the mill, avoiding costly unscheduled downtime due to failures, " explained Muñoz. Within GMD functionalities that can be monitored are the cycloconverter, the rotor and stator condition, plus devices or ancillary equipment of the mill. It also allows electrical protection monitoring and other ancillary functions such as air conditioning and dust collector from the electrical room.

A South African mission of entrepreneurs of Mining Sector visited the Chilean South African Chamber of Industry and Commerce, in Santiago. The objective was to discuss mine safety issues, mining elements, participation in joint projects and financing offers, among others. During a welcome breakfast, which was also attended by representatives of the South African Embassy, Vice president of the Foreign Investment Committee, Matías Mori , made a presentation on foreign investment in Chile. Then, issues such as the recent signing of the agreement to avoid double taxation between Chile and South Africa were discussed, in order to facilitate investment decisions in mining, major bilateral trade sector between the two countries. Among the visiting South African companies were South African Capital Equipment Export Council; Axial Flow Fans; Brelko Conveyor Products; New Concept Mining; Horne Group and Crunchyard. The companies held meetings with Barrick; Codelco; the Institute of Mining Engineers of Chile. (IIMCh); Anglo American; Antofagasta Minerals; Knight and Merz, SKM; Chile's Mining Council; Hatch; Bechtel and Fluor.

calendar

March 3-6 pDac 2013 Venue: Metro Toronto Convention Centre, Canadá Organizer: Prospectors and Developers Association of Canada Information: www.pdac.ca

April 8 Vi confErEncia DE Exploración cEsco 2013 Venue: Santiago, Chile Organizer: Cesco - Editec Information: explorationforum@editec.cl

8 - 12

13 - 15

Venue: Santiago, Chile Organizer: Cesco Information: www.cescoweek.com

Venue: CasaPiedra, Santiago Organizer: Editec Information: www.elecgas.cl

ElEcgas

sEmana cEsco

21 - 24

10

Expomin china

xVii cEna cEsco

Venue: National Agriculture Exhibition Center, Beijing Organizer: Fisa – Nonferrous Metals Industry Association Information: www.expominchina.com

Venue: Santiago, Chile Organizer: Cesco Information: www.cesco.cl

May

June

7–9

arminEra

17 - 21

Venue: Centro Costa Salguero, Buenos Aires Organizer: Caem Information: www.arminera.com.ar

Venue: Antofagasta, Chile Organizer: Asociación de Industriales de Antofagasta Information: www.exponor.cl

Exponor 2013

enero-febrero / january-february 2013 l Latinominería l

79


mercado latino / latin marketplace

Representantes comerciales de Canadá en Editec Canadá es un país con un fuerte desarrollo en sectores económicos como el forestal, minero, acuícola y energético, entre otros. En todas estas industrias el Grupo Editorial Editec, a través de sus publicaciones LATINOMINERÍA, MINERÍA CHILENA, ELECTRICIDAD, AQUA y LIGNUM ha tenido históricamente una activa presencia. En este contexto, los agregados comerciales de la Embajada de Canadá en Chile, Patricio Cañete y Gonzalo Muñoz, visitaron recientemente las oficinas de

Ejecutivos de Imatesa visitaron filial de su marca representada Bonfiglioli en Brasil

Editec en Santiago para analizar ámbitos de colaboración entre su delegación diplomática y el grupo editorial. En la imagen: Felipe González, editor de revista LIGNUM; Jorge Goth, subdirector de revista ELECTRICIDAD; Rodrigo Infante, director de revista AQUA; Cristián Solís, subgerente general de Editec; Patricio Cañete; Gonzalo Muñoz; Pablo Bravo, gerente editorial de Editec y subdirector de MINERÍA CHILENA; y Eduardo Morales, director de revista LIGNUM.

Para conocer las últimas tecnologías en el área de transmisión de potencia para el mercado industrial y minero, ejecutivos de la compañía Imatesa de Chile, especializada en soluciones electromecánicas para la industria, realizaron un viaje a Brasil a una de las filiales más grandes de su marca representada Bonfiglioli en Sudamérica. El fabricante italiano ofreció una capacitación en la ciudad de Sao

Canadian commercial representatives in Editec Canada is a country with a strong development in economic sectors such as forestry, mining, aquaculture and energy, among others. In all these industries Editec Publishing Group, through its publications MINERÍA CHILENA, LATINOMINERÍA, ELECTRI-

CIDAD, AQUA and LIGNUM has historically had an active presence. In this context, commercial attaches of the Canadian Embassy in Chile, Patricio Cañete and Gonzalo Munoz, recently visited Editec offices in Santiago to analyze areas of

Paulo, referida a los diversos equipos de transmisión de potencia que ofrece la firma, las tendencias globales y sus estrategias a implementar. Los ejecutivos tuvieron la oportunidad de conocer el funcionamiento del suministro que se le entrega a la fábrica argentina de aerogeneradores Impsa, industria que promueve la eficiencia energética a través del uso de la energía eólica.

Imatesa Executives visited subsidiary of its represented brand Bonfiglioli in Brazil

collaboration between the diplomatic mission and the publishing group. In the picture: Felipe González, LIGNUM magazine publisher, Jorge Goth, ELECTRICIDAD magazine assistant editor; Rodrigo Infante, AQUA magazine editor; Cristian Solis, Editec assistant general manager; Patricio Cañete, Gonzalo Muñoz; Pablo Bravo, Editec managing editor and MINERÍA CHILENA assistant editor, and Eduardo Morales, LIGNUM magazine editor.

For the latest technologies in the area of power transmission to the industrial and mining company executives from Imatesa Chile, specializing in electromechanical solutions for industry, travelled to Brazil to one of the largest subsidiaries of their represented brand Bonfiglioli in South America. The Italian manufacturer offered training in the city of Sao Paulo, relating to the various power transmission equipment offered by the firm, global trends and strategies to implement. The executives had the opportunity to meet the functioning of supply that is delivered to the Argentinian factory of wind turbines Impsa, industry that promotes energy efficiency through the use of wind energy.

Indice de avisadores / summary of advertising Bertotto Boglione de Chile S.A. www.bertotto-boglione.com

Exploration Forum 2013 34

Calendario Conferencias 2013 www.editec.cl

20

T3

80

T2 - 1

10

20

www.metso.com

www.multipowerproducts.com

www.pdca.ca

l Latinominería l enero-febrero / january-february 2013

28

www.sherwin.cl/industrial

34

www.snclavalin.com

28

Weir Minerals South America 3

5

PDAC 2012 International Convention 14

www.runge.cl

SNC Lavalin Chile

Multi-Power Products Ltda.

CRU www.worldcopperconference.com

www.maserrazuriz.cl

32

Sherwin Williams Chile S.A.

Metso 74

Constructora Gardilcic Ltda. www.gardilcic.cl

www.komatsu.cl

www.pyrotech.cl Runge

60

Más Errazuriz S.A.

Compendio Minería Chilena www.mch.cl/compendio

www.expominchina.com Komatsu Holding South América

Christensen Chile S.A. www.diamantinachristensen.com

4

Expomin China 2013 26

Catálogo Exponor 2013 www.latinomineria.com/exponor

Pyrotech 2013

www.explorationforum.com

2

www.es.weirminerals.com

T4




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.