THE SIS PROJECT
ANNYWERE 2 GO CO.,LTD
Renovation of the Renovation Asoke - Din Daeng Asoke Building area
5601837 Teera Anukul
Background Project Expectation Area of Study
Objective
TAGET GROUP
THE SIS PROJECT
STRATEGY
LOCATION LOCATION
ANNYWERE 2 GO CO.,LTD
FUTURE
5.0
LOGO
Poshtel
THEORY AND DESIGN CONCEPT
5.0 Poshtel
5.0 Poshtel
THEORY AND DESIGN CONCEPT CONCEPT
TYPOGRAPHY Palation
ABCDEF GHIJKLM NOPQRST UVWXYZ abcdef ghijklm nopqrst uvwxyz
12345 67890
DIN Condensed Bold ABCDEF GHIJKLM NOPQRST UVWXYZ abcdef ghijklm nopqrst uvwxyz
12345 67890
FACILITIES Air Conditioner
#FLOOR3 & TONE
& TONE
#FLOOR1 A
UP
B
C
D
1
2
3
4
6
7
8
9
11
12
13
#FLOOR1
PLAN A
#FLOOR2
UP
DW.
B
C
D
1
2
3
4
6
7
8
9
11
PLAN A
#FLOOR2
UP
DW
B
C
D
1
2
3
4
6
7
8
9
11
E L E V A T I O N
SECTION
APPPICATION DESIGN