The Project, developed with Balder Técnica, consists on the construction of 2 logistics warehouses located in industrial estates, near the urban centers of Parets del Vallés and Santa Perpetua de Mogoda, very close to the important road axes of international trade, the AP highway -7. Both projects have areas for loading and unloading through articulated trucks and office areas for administrative support and services to employees such as changing rooms, showers and Rest areas.
i.e.s. parets del valles office's west view
i.e.s parets loading dock
The structural system with precast concrete allows covering large surfaces and heights suitable for the activity and taking all the security measures against fire. The facades are resolved with a sandwich system with a white lacquered exterior metal sheet and an interior tray. The office area differs from the logistics area by using architectural panels lacquered in a darker color. Participation in this Project has been comprehensive, from administrative procedures, calculations, construction, project management, etc. getting a Breeam certification "Very Good"
i.e.s santa perpetua loading dock
i.e.s santa perpetua fire protection room and water tank
PARETS + STA.PERPETUA
TWO LOGISTIC FACILITIES - WITH BALDER TÉCNICA - 2020
N DN ro
Z Sala Bombas Protección Contra Incendios 43,07 m²
Re
DN 80
bos ade
Y
Va cia do
150
X
FP Room
FP WaterTank
6M
Boca
DN 80
Re
de homb
sis
cia ten
na Lle
de
re
Ma
W 3k o tro lde me no
ca
6c 0M
1
1a
1b 9,540
1c
2
8,640
2a
2c
2b
9,090
9,090
7M'
do
7M
3
4
0,700
4a 6,250
4b 6,250
4c 6,250
5 6,250
5a
5b
136,610 6,250
6,250
5c 6,245
6 6,250
6a 6,250
AM'
7
7a
6b
6,255
7b 6,250
6,250
6,250
6,250
7c
6,025
Battery ChargeStation
AM
AM'
8 6,025
AM
CARGA BATERIAS 2 73,98 m²
A
A
Battery ChargeStarion CARGA BATERIAS 1 47,92 m²
Ac
6M
7M
Aa
7M'
11,550
11,550
BALER
Ac
7b
Ab
2b B
B
12,000
12,000
Ba Bc
Bb
C
C
12,000
12,000
Ca Cc
10,000
Cb
D
D
12,000
12,000
Da Dc
Db
E
11,300
107,100
11,300
107,100
Ea
F 0,700
F
0,700
Ec
E
ZONE 3
G
G
12,000
12,000
Ga Gc
Gb
H
H
ZONE 1 Of1
12,000
12,000
Ha Hc
Of2
Hb
I
ZONE 2
6,000
PK.BIKE 8%
6,000
I
8%
I'
Ia I'
1e
2d
6,000
6,000
1d
I'a
10%
6,550
3 4 5 6 8 9 11
00
BALER
Of2
R1 2
LTGP
9,540
8,640
18,180
0,700
6,250
6,250
6,250
6,250
6,250
6,250
6,250
6,250
6,250
6,250
6,250
6,250
6,250
6,250
6,025
6,025
136,610
1
general ground plan
1b
2
J'a
K
.5
K
Of1
5,000
J' 5,000
J' Sala Cuadros Eléctricos BT 6,40 m²
Ja
7
TC
1 2
7b
10
RESIDUOS
Centro MT de Transformación 12,00 m²
J 6,550
J
3
4
4a
4b
4c
5
5a
5b
5c
6
6a
6b
6c
7
7a
7b
7c
8
Of1
Of2
3
4
Of1
Of2
3
4
Of1
I
Of2
3
4
I
I
ENTRY WAREHOUSE
-0.77m
LOCKER ROOM 1
8%
LOCKER ROOM 2
8%
I' CLEANING ROOM
I'
I'
HALLWAY ACCESS WAREHOUSE STORAGE WORKING ROOM
-1.20m
WORKING ROOM
-0.30m
ADAPTED BATHROOM
10%
RACK & sECURITY ROOM OFFICE
J
J
J
WASTE ROOM HALL/ ENTRY
TOILETTES
39
27 28
38
29
37
30
36
31
35
32
34
33
3 4 6 7 9 10 11
STAIRWAY
J'
Of1
J'
ground floor
Of2
TOILETTES
33
1 2 5 8
13 12
31
25 26
14
32
23 24
15
30
16
29
17
+7,92
27
41 40
28
43 42
Of1
CONFERENCE ROOM
LIFT RESERVE
STAIRWAY 44
25
18
26
19
DINNING ROOM
MEETING ROOM
+3.96m
21 20
23
ESCALERA
LIFT RESERVE
RELLANO 22
24
LIFT RESERVE
±0.00m
J'
1st floor
Of2
Of1
Of2
2nd floor
+7.92(+96.52)
+3.96(+92.56)
+0.00(+88.60) -0.40(+88.20) -1.62(+86.98)
A
north (street) elevation
B
C
D
E
G
H
I
+7.92(+96.52)
+3.96(+92.56) +0.00(+88.60) -0.40(+88.20) -1.62(+86.98)
1
1b
2
3
2b
west elevation
4
4a
4b
4c
5
5a
5b
5c
6
6a
6b
6c
7
7a
7b
7c
8
+7.92(+96.52)
+3.96(+92.56)
+0.00(+88.60) -0.40(+88.20)
K
south elevation
J'
J
I'
I
H
G
E
F
D
C
B
A
+7.92(+96.52)
+3.96(+92.56) +0.00(+88.60) -0.40(+88.20) -1.62(+86.98)
8
7c
7b
7a
7
6c
6b
6a
6
5c
5b
5a
5
4c
4b
4a
4
3
2b
2
1b
1
east elevation
PARETS + STA.PERPETUA
TWO LOGISTIC FACILITIES - WITH BALDER TÉCNICA - 2020
N X
Y
Z 11
FP Room
FP WaterTank
6M
10
6c 0M
1
1a
1b
1c
2
2a
2c
2b
3
4
1%
4a
4b
4c
5
1%
5a
5b
5c
6
1%
6a
AM'
7M
7
7M'
7a
8%
6b
7b
AM'
8
1%
Battery ChargeStation
AM
7c
1%
AM
A
A
Ac
Battery ChargeStarion
Ac
6M
7M
Aa
7M' 7b
Ab
2b B
B
Ba Bc Bb
C
C
1% Ca
1%
Cc Cb
D
D
Da Dc Db
1% E
E
1%
1% Ea
Ec
F
F
G
G
Ga Gc Gb RESIDUOS
H
H
Ha Of1
Hc
Of2 Hb
1%
5% I
I
I'
I'
1%
Ia
1d
1e
2d
I'a
PK.BIKE
J
J
Ja
TC
7b J'
J' J'a Of1
K
Of2 K
5%
5% 8%
5%
LTGP
4,7%
1
general roof plan
1b
2
3
4
4a
4b
4c
5
5a
5b
5c
6
6a
6b
6c
7
7a
7b
7c
8
1%
1%
a
b detail
Sala Bombas Protección Contra Incendios 43,07 m²
d
d'
CARGA BATERIAS 2 73,98 m²
CARGA BATERIAS 1 47,92 m²
+14.60(+111.30)
+7.92(+96.52)
+3.96(+92.56)
c
8%
c'
8%
10%
-0.40(+88.20) -1.62(+86.98)
1 2 3 4 5 6 7 8 9 10 11
Centro MT de Transformación 12,00 m²
+0.00(+88.60)
Sala Cuadros Eléctricos BT 6,40 m²
a'
A
B
C
D
E
F
G
H
I
I'
J
J'
K
A
B
C
D
E
F
G
H
I
I'
J
J'
K
section a-a'
b'
+14.60(+111.30)
+7.92(+96.52)
+3.96(+92.56)
+0.00(+88.60) -0.40(+88.20)
section b-b'
+7.92(+96.52)
+3.96(+92.56) +0.00(+88.60) -0.40(+88.20) -1.62(+86.98)
1
1b
2
Of1
1
1b
2
2b
Of2
3
4
4a
4b
4c
5
5a
5b
5c
6
6a
6b
6c
7
7a
7b
7c
8
3
4
4a
4b
4c
5
5a
5b
5c
6
6a
6b
6c
7
7a
7b
7c
8
section c-c'
+7.92(+96.52)
+3.96(+92.56) +0.00(+88.60) -0.40(+88.20) -1.62(+86.98)
section d-d'
PARETS + STA.PERPETUA
TWO LOGISTIC FACILITIES - WITH BALDER TÉCNICA - 2020
N
A
B
C
D
E
F
G
H
J
I
50 0
2.
R1
13
13
12,13
6,13
R1 2. 50 0
12
8,00
12
11
10
10
10,13
12,13
11
12,14
6,14
9
8
7,99
LOGISTIC WAREHOUSE 7
10,15
12,14
6
PS
4
12,13
5,86
5
M
9,09
BALER
FP ROOM
3
BATTERY Ch.St.
2
FC
FC
9,30
12,38
5
4
2
1
9
6
8
7
3
10
1 5,00
6,20
11,20
11,20
11,20
11,20
11,20
10,85
R
21
5.
TC
Ø1.50
PK.BIKE
50 0
general ground plan
2.
A
B
C
D
E
F
G
H
I
J
R1
00
RESIDUOS
11,10
31
32
34
33
40
35
37
36
38
39
11
13
12
14
16
15
20
CARGA BATERIAS
30
29
28
27
26
25
24
23
22
22
30
29
28
27
26
25
24
23
±0.00m
STAIR +7.25m
TOILETS 22
10
4
9
5
8
7
2
1
6
3
RECEPTION
17
2 +3.60m
STAIR
21
LOCKER ROOM 1
±0.00m
ENTRY WAREHOUSE
19
2 RACK & SECURITY ROOM
18
2
+3.60m
STORAGE LIFT RESERVE VESTIBULE
LIFT RESERVE
WORKING ROOM
LIFT RESERVE
WASTE ROOM
±0.00m
VIDEO CONFERENCE ROOM
SERVICE TOILET
ADAPTED BATHROOM
LOCKER ROOM 2
HVAC ROOM
DINNING ROOM
OFFICE
1
1
A
B
1
C
A
ground floor
B
C
A
1st floor
B
C
2nd floor
+7.25
+3.60
+0.00 -0.40 -1.62
13
12
11
10
9
8
7
5
6
4
3
2
A
south-west elevation
+7.25
+3.60
+0.00 -0.40 -1.62
A
2
3
4
5
6
7
8
9
10
11
12
13
north-east elevation
+7.25
+3.60
+0.00 -0.40 -1.62
J
I
A
B
H
G
F
E
D
C
B
A
I
J
north-west elevation
+7.25
+3.60
+0.00 -0.40 -1.62
south-east (street) elevation
C
D
E
F
G
H
PARETS + STA.PERPETUA
TWO LOGISTIC FACILITIES - WITH BALDER TÉCNICA - 2020
RESIDUOS
N
Ø1.50
PK.BICI
general roof plan
a +14.60
9
8
7
1
6
5
4
b'
3
b
2
d' c'
10
d c
+0.00 -0.40
13
a'
5
9
1
section a-a' detail
+7.25
+3.60 +0.00 -0.40
section b-b'
D
E
F
G
H
I
J
B
D
E
F
G
H
I
J
B
D
E
F
G
H
I
J
A
B
A
A
C
+7.25
+0.00 -0.40 -1.62
section c-c'
+7.25
+0.00 -0.40 -1.62
section d-d'
PARETS + STA.PERPETUA
TWO LOGISTIC FACILITIES - WITH BALDER TÉCNICA - 2020
i.e.s parets del valles offices
i.e.s parets del valles logistic docks
i.e.s parets del valles rear view and fire protection water tank
i.e.s santa perpetua rear view
i.e.s santa perpetua offices
i.e.s santa perpetua logistic storage
PROJECT DIRECTORY Promotor:
I.E.S. Ingeniería de Encofrados y Servicios
Main Contractor
Balder Técnica
baldertecnica.com
Works Supervising
Master Plan
masterplanbarcelona.es cota100.es
Topographic
Cota100
Health and Security
SMDOS
smdos.es
Structural Analysis
Engia
engiasl.com
Certification and Control
BAC
bacecg.com
Breeam Certification
Exeleria
exceleria.com
Excavation
Talio
Taliosa.com
Steel Structure
Centrimetal
centrimetal.com
Concrete
Promsa
promsa.cemolins.es
Foundation chalice
Noxifer
noxifer.com
Precast Concrete Structure
Precon
precon.cemolins.es
Concrete Screed
Twinsoldecor
twinsoldecor.com
HVAC Contractor:
Obrelsa
obrelsa.com
Metal Sheets
Ingeperfil
ingeperfil.com
Façade Tray System
Hiansa
hiansa.com
Skylights and roof protection
Danosa
danosa.com
Façade Contractor
Montajes Latem
Office Façade Panel
Huure Ibérica
huurreiberica.com
Insolation
Ursa
uralita.com aplimec.com
Windows and Curtain Wall
Aplimec
Doors and Metal Carpentry:
Alfa Torres
alfatorres.com
Dock Elements:
Inkema
Inkema.com
Fire Protection System (Passive)
Cottes Life
cottesgroup.com
Fire Protection System (Active)
Cotein Fire
cotein.com
Construction Material
Gersal
gersal.com
Sewage Elements
Graf Ibérica
grafiberica.com
Protections:
Extmatra
exmatra.com
Signals
Proseñal
prosenal.es
Waste Control
Alberich
alberich.net
backcover: i.e.s. parets del valles façade corner detail
location: c/ vic 6. sta.perpetua de mogoda - c/mestral 1 parets del valles / barcelona / spain lot areas: 13,441.50 m² - 24,336.91 m² / gross floor area: 6,966,63 m² - 14,684.22 m² budgets: 2,733,159.91€ 6,123,606.72 €
PARETS + STA.PERPETUA
TWO LOGISTIC FACILITIES - WITH BALDER TÉCNICA - 2020
rafaelguirigayaparicio
architecture/ interior design + fit out/ urban planning/ management C/ Sant Ferriol 3-C. 1Âş3ÂŞ. Tordera (Barcelona). 08490. SPAIN t: +34 937 643 514 - m: +34 678 823 475 - e: rguirigay@gmail.com http://issuu.com/rgaarchitecture IG: the_godzillo www.baldertecnica.com