August 2019
Mochamad Ridwan Fauzi
work experience |
competition
|
other works
ARCHITECTURE PORTFOLIO
SELECTED WORKS rdwn.fauzi@gmail.com
image is createed with photoshop
2
CONTENTS
I N T R O : Ab o u t m e
page 4
PAR T 1 : E x p e r ie n c e S u m mar y
page 6
PAR T 2 : S e le c t e d P r o je c t s
page 10
PAR T 3 : Co m p e t it io n S u m mar y
page 76
*click on the page to jump to the content� 3
about me
MOCHAMAD RIDWAN FAUZI october 9th ,1991
|
male
|
indonesian
|
gpa 3.31 (on a 4.00 scale)
|
rdwn.fauzi@gmail.com
People say that working in architecture is a pain in the neck. It is, but now I can see architecture and design as an enjoyable thing and make it my passion. What I love about working in this industry is people experiencing the space we designed and yet perceive different things. Seeing the client impressed by our work is another type of dopamine spike and having a great senior / colleague to have discussion with would help me to grow faster. Being aware of what I have achieved help me a lot to even develop myself further and bigger.
EDUCATION Senior High School SMA Negri 3 Bandung
2006
Architecture Undergraduate Institut Teknologi Bandung
2009
Bachelor of Science Institut Teknologi Bandung (architecture department)
2014
EXPERIENCE
4
Intern Pusat Studi Urban Desain, Indonesia
2012
Intern Djuhara + Djuhara Architects, Indonesia
2013
Intern CPG Consultants (Urban Planning), Singapore
2014
Architectural Assistant East 9 Architects & Planners, Singapore
2015 - 2017
Architectural Designer Design Alliance Workshop, Indonesia
2017 - 2018
Arhitectural Photographer Intern (on weekend) Fernando Gomulya Architectural Photography
2017 - 2018
Freelance Architect Personal Projects, Bandung
2018 - 2019
Certified Architect by Indonesian Institute of Architects
2019
PROFICIENCY Computer Proficiency
Other proficiency
Autocad 2D Sketch Up Archicad Lumion Revit Vray Sketch up Corel draw Adobe Photoshop Adobe In Design Adobe Premier Pro Adobe Lightroom Microsoft Power Point Microsoft Word Microsoft Excel
Hand sketch (design concept) Hand sketch (detailing) Project supervision Coordination with stakeholders Basic Singapore authority submisssion Site meeting Shopdrawing checking Conceptual thinking Masterplan Design Landscape Design Material selections Detail drawings Design Presentation Architectural photography
ACCOMPLISHMENTS
* 1
1
1
1
M
Most Favorite Final Project (by vote) Final Project Exhibition on April 2014 Sire Medana Resort 1st Winner of architecture competition Young Architect Competition 2014 by Sinarmasland A Welcoming CBD - Masterplan 1st Winner of architecture competition Sayembara Restoran Nusantara 2017 by Propan Oti Bubane - Restaurant 1st Winner of architecture competition Sayembara Restoran Nusantara 2017 by Propan Konteks.Toea.L - Restaurant 1st Winner of architecture competition Young Architect Competition 2017 by Sinarmasland The Equilibrium - Digital Working Space Merit Award architecture competition Futurearc 2018: Biophilic City Immunicity - City Intervention
15
2
3
25
21
6
Top 15 Design thinking competition Museo Marino Marini Italy Space in Space - Playable 2nd Winner of architecture competition Great mosque design in Bima 2018 Sigi Mena - Mosque for Everyone 3rd Winner of architecture competition Merchandise Centre 2018 by Propan Sombar Sinonako Top 25 of architecture competition Disaster-responsive housing by Jayaboard 2019 Bhumi Prashanti Top 21 of architecture competition Multipurpose Hall competition by Undip 2019 Bale Witana Top 6 of architecture competition Rest area competition by lixil 2019 Rest in Paradise
INVOLVEMENTS Senior High School Debate group (extracurricular) 2006
click the logo to visit Linkedin
Architecture Undergraduate Tennis club 2010 Head of documentation (proficio award) 2012 Head of communication-information division 2013 Member of Indonesian Institute of Architects
2019
click the logo to visit issuu
COURSE & SEMINAR 3-days archicad basic training by VNIX 2015 BIM: cross platform interoperability in practice 2015 SIA - XCS BIM management workshop 2016 Archicad basic training by Graphisoft 2016 Graphisoft user-group - BIM for submission 2016 BCA - BIM e-submission 2016 Architectural e-submission briefing 2016 Toyo Ito keynote speech 2016 Public lecture by Daniel Libeskind `2016
click the logo to send email
5
PART 1 : Experience Summary
PART 1
EXPERIENCE SUMMARY Followings are few quick look of projects that I was involved in and summary of my proficiency to give the whole picture of myself and what I am capable of. Selected projects with detailed explanation starts from page 8.
List of project typology: Office tower // High-end apartment // Good class bungalow // Landed house // Elderly care centre // Archdiocese facility // Shopping centre // Shophouse // Preschool // Foodcourt // Restaurant interior // CBD masterplan // Riverfront landscape design // Islamic school // Learning centre // Slum area intervetion // Tourism village masterplan
! *click the architectural photography button on page 7 to access the document* 6
PROJECTS ST. JOHN ELDERLY HOME
Project type : Design Proposal (by E9AP) Typology : Assisted living home Involvement : 3d massing, facade design, coordination with 3d artist
CHINA SQUARE
Project type Typology Involvement
XIANYANG MASTERPLAN
Project type Typology Involvement
: Design Proposal (by CPG Consultants) : Masterplan : Siteplan development, Landscape design, perspectives
: Design Proposal (by E9AP) : Shopping Centre : Ceiling and spandrel treatment, 3d design, coordination with 3d artist
LENMARC TOWER
Project type Typology Involvement
: Design Proposal (by DAW architects) : Residential tower & Convention hall : Floor plan development, 3d design, perspectives
7
PROJECTS PART 1 : Experience Summary
KALIBATA HOUSE
Project type Typology Involvement
: Built project (by DAW architects) : Private house : Detail drawings, coordination, site supervision
SIGAPITON TOURISM VILLAGE
Project type Typology Involvement
GRIYA BINTARA ALAMI
Project type Typology Involvement
8
: Design Proposal (by DAW Architects) : Landed housing & landscape design : Landscape design, clubhouse and jogging track design, shophouse design
: Design Visioning (by DAW Architects) : Tourism village : Masterplanning, macro concept, micro concept, regular meeting, design presentation
E16B CRR
Project type Typology Involvement
: Built project (personal project) : Private house : Design development, detail drawings, project supervision
PROFICIENCY SAMPLE DESIGN BY SKETCH
SHOPDRAWING COMMENTS
Landscape design of The Equilibrium (competition)
Aerofoil shop drawing comments (on alignment and details)
DETAIL STUDY BY SKETCH
ARCHITECTURAL PHOTOGRAPHY
Interphasings of bar feature wall
boarding house by MVMNT architects ARCHITECTURAL PHOTOGRAPHY PORTFOLIO
9
PART 2 : Selected Projects
PART 2
SELECTED PROJECTS Displayed projects are to show the range of typology and scale of works that I have involved in. Design approach for every project would be unique and It is critical to have the ability to think in a bigger picture when it comes to masterplanning or landscape design and into the details when it comes to architecture or interior projects.
! *click the image to jump to the page* *click the video button on project’s first page to access the video* 10
MEKONG VIEW TOWER 5
Type : Design Proposal (E9AP) Typology : High-end residential tower
CATHOLIC ARCHDIOCESAN HUB
Type : Design Proposal (E9AP) Typology : Retreat centre & archdiocese facility
KOSGORO TOWER
Type : Design Proposal (DAW architects) Typology : Office tower
BANYUWANGI INFORMATION CENTRE
Type : Competition Typology : Information centre
THE EQUILIBRIUM
Type : Competition Typology : Digital working space (office)
A WELCOMING CBD
Type : Competition Typology : CBD Masterplan
16B LEEDON PARK
Type : Built project (E9AP) Typology : High Class Bungalow
SOMBAR SINONAKO
Type : Competition Typology : Souvenir centre (Architecture & Interior)
SIRE MEDANA RESORT
Type : Final Project Typology : Beach hotel resort
11
Perspective is generated by 3d artist
PART 2 : Selected Projects
01
MEKONG VIEW TOWER 5 typology size stage, status location company, supervisor role
// High-end residential tower // 24 storey; 30,124 sqm // Design proposal // Phnom Penh, Cambodia // E9AP Singapore, Jeff Imperial, Betsy Lau Chuk // Floor plan development, landscape & facility design, facade exploration, BIM model and detail drawings
Mekong View Tower V situated abreast the Mekong River, is a 24-storey residence favored with several vantage points to the river, cityscape, and the suburban expanse. The design is conceived from the inspiration of a metamorphic “tree� superimposed onto each other creating an ingenious dynamic facade design. A central courtyard concept was implemented to allow maximum exposure to natural sunlight and ventilation. Landscape softens the inner environs of the building infusing a natural and pleasant setting for the residents.
12
FLOOR PLANS ROOF TERRACE (24TH FLOOR)
SCULPTURE LOUNGE (20TH FLOOR)
BONSAI GARDEN (17TH FLOOR)
PLAY FANTASY (14TH FLOOR)
HOBBY GROVE (11TH FLOOR)
POOL & CLUB (7TH FLOOR)
FUNCTION ROOM (5TH FLOOR)
COMMERCIAL (GROUND FLOOR)
UNDERGROUND PARKING
Facilities on skygardens are distributed as such to create a high quality living and environment whilst it is forming the facade. The injected programs are expected to fulfill the needs of varied users. 13
Elevations & sections are generated with Archicad by Ridwan
SKYGARDEN
SKY GARDEN
SKYGARDEN
SKYGARDEN
SKYGARDEN
SKYGARDEN
SKYGARDEN
PARKING
FRONT ELEVATION
ROOFTOP
SIDE ELEVATION
ROOFTOP
SKY GARDEN SKY GARDEN SKY GARDEN SKY GARDEN
LANDSCAPE DECK
LANDSCAPE DECK
PARKING
FRONT - BACK SECTION
14
SIDE SECTION
Perspective is generated by 3d artist
Celebration of communal activity is located at 7th floor where 45m lap pool, clubhouse, and mini gardens are provided. This area also acts as viewpoint for the inner-side units.
Perspective on 7th floor landscape
CLUB GARDEN
LAP POOL
PARKING
FUNCTION ROOM
PARKING
7TH FLOOR SECTION
15
UNIT TYPE S (STUDIO)
UNIT TYPE A (1 BEDROOM)
UNIT TYPE B2 (2 BEDROOMS)
UNIT TYPE B3 (2 BEDROOMS)
PENTHOUSE LOWER LEVEL
UNIT TYPE C (3 BEDROOMS)
PENTHOUSE UPPER LEVEL
BEDROOM TYPES
16
UNIT TYPE B1 (2 BEDROOMS)
Day perspective from South side
17 text keterangan foto, oleh siapa dibuat dengan apa
Perspective is generated by 3d artist
Perspective is generated by Lumion
PART 2 : Selected Projects
02
BANYUWANGI INFORMATION CENTRE competition, achievement brief size stage, status location role team
// Banyuwangi Information Centre // Information centre that represents locality // 3 storey, 8,200 sqm // Conceptual // Banyuwangi, East Java, Indonesia // Massing base concept, landscape design, macro concept, perspectives // Gratio Ray Sutanto
Aim to represent the Geopark tourism, the siteplanning is driven by existing contour and axis of 5 major geopark destinations: Ijen Crater, Mt. Raung, Merah Island, Purwo National park, and Banyuwangi. Soft leveling between floors and boundless indoor outdoor spaces are created in order to bring the sense of exploration. Its landscape programs enhance the presence of existing river and retained existing productive trees.
18
VIDEO
SITEPLANNING CONCEPT BANYUWANGI
IJEN CRATER
PURWO NATIONAL PARK
information centre workshop gallery souvenir centre
ETAN
AH W UMY
RAUNG MT.
INNER VIEW
MERAH ISLAND
AXIS
5 axis of geoparks were defined. These axis would act as base for the siteplanning. Later on, the geopark landmark is located here.
office mushala cafe & resto guesthouse
N
ULO
AH K UMY
GREEN SPILL
PROGRAM
GREENERY
SEMI OUTDOOR & TERRACES
FACADE & EXPRESSION
Massings are created to follow the contour and axis line. West part called Umyah Kulon and East part called Umyah Wetan
OUTER VIEW
Minimum intervention on the land to minimise the footprint. Existing trees and greenery is designed as such to retain the character of site’s nature
OUTER VIEW
VIEWPOINT
Massing configuration gives chance to appreciate the views. Designed landscape as inner view and existing river and forest as outer view.
MASSING CONCEPT
VOLUME & FUNCTION
ROOF & LOCALITY
Active Organic Farm
Geopark Sculpture
Productive farm managed by local serves ecological and economical purpose.
Main Landmark pointing to 5 different directions of other geopark tourism destinations
View deck
Functional Water Features
Varied deck to appreciate mesmerizing view of hill, farm, and the existing river
Water feature that serves not only for aesthetic purpose but also functioned as retention and reservation
Iconic Roof
Signature Mushala
Reinterpretation the traditional roof as method to highlight the local character of ‘Osing house’
‘Floating’ prayer room that celebrate the nature and give an unique experience
Floating Lobby
Soft Transition Space
Floating lobby as first impression and iconic feature at the entrance area
Gradual transition from indoor to outdoor as signature character of the building. It allows user to appreciate the nature
Site photo
DESIGN FEATURE
19
AXIS: IJEN CRATER
JALAN RAYA LICIN 3
AXIS: RAUNG MOUNTAIN
ROAD SETBACK
1 D 2
A
E 8
4
B 5
11
F
12
7 6
C
RIVER SETBACK
AXIS : BANYUWANGI
SITE BOUNDARY
9 10
AXIS: MERAH ISLAND AXIS: TAMAN NASIONAL PURWO
LEGEND
SITEPLAN 0
1. 2. 3. 4. 5. 6.
Porte cochere - drop off Car parking (33 lot) Bus parking (2 lot) Geopark sculpture Event plaza Floating Amphiteatre
7. Lawn 8. Organic local farm 9. Merah island deck 10. Purwo national park deck 11. Water terrace 12.. River deck
A. B. C. D. E. F.
5
25 m
10
Floating lobby (main lobby) Souvenir, Information centre Gallery, workshop, library Office, Prayer room Cafe, Guesthouse Restaurant and dining deck
PARTIAL PLAN: UMYAH KULON
FFL ± 0.00
SEMPADAN JALAN
3 1
ke parkir staff di L2
FFL - 2.00 dari L2
e FFL - 0.70
ramp ke L2
a
ramp ke L2
2
FFL - 1.85 FFL - 3.50
ramp ke L2
4
c
b
f
FFL - 3.35
SEMPADAN SUNGAI
ke L2
d BATAS LAHAN
LEGEND a. b. c. d. e. f.
20
Floating Lobby Foyer, Umyah Wetan Souvenir shop Tourism gallery Office (managerial) Toilet, nursing rm, difable toilet
PARTIAL PLAN: UMYAH WETAN
1. 2. 3. 4.
Porte cochere (drop off./ pick up) Car parking (33 lot) Bus parking (2 lot) Viewing deck (hill deck)
1ST STOREY PLAN 0
5
10
25 m
PARTIAL PLAN UMYAH WETAN - L2
a FFL - 6.05 dari L1 To Umyah Kulon
5 b
1
To plaza
FFL - 6.85
f
From L1
2
4
c
e e d
0
LEGEND a. Office (executive staff) b. Information Centre (Tourist centre) c. Workshop (can be joined) d. Library e. Storage
6
12
30 m
1. Event plaza 2. Floating Amphiteatre 3. Purwo national park deck 4. Lawn 5. Geopark sculpture 6. Merah island deck
PARTIAL PLAN UMYAH KULON - L2
c d to L1
5
f
b
a FFL - 4.05
from L1
FFL - 6.05
1
g
from L1
ramp to L2
3
4 2
e
to L3
LEGENDA
a. Foyer (umyah kulon) b. Office (executive staff) c. Floating prayer room d. Ablution e. Cafe and organic food display f. Toilet, nursing rm, difable toilet
g. Toilet h. Cottage i. Service area j. Restaurant and kitchen k. Toilet
1. 2. 3. 4. 5.
Tour start point Geopark sculpture Garden viewdeck Local organic farm Reflection pond
21
22
Perspective is generated by Lumion
Main lobby
Souvenir centre
Main Office Area
Perspective is generated by 3d artist
Tourism gallery Prayer room Cafe and Organic food display Water Terrace Cottage
text keterangan foto, oleh siapa dibuat dengan apa
EXPLODED AXONOMETRY
Information centre Workshop Library
Plaza Geopark landmark
Local Organic farm
Floating amphiteatre Restaurant
LOCAL MATERIAL
Exposed Vulcanic Concrete Stone
Mountain Wash Stone Pebble
Syntetic weave
Shingle roof
Bendo Wood
Coconut Wood
23
Restaurant
24
perspective
25
Perspective is generated by Lumion
Photo by Betsy Lau Chuk
PART 2 : Selected Projects
03
16B LEEDON PARK Typology size stage, status location company, supervisor role
// Good class bungalow // 2 storey, 1.140 sqm // built // Leedon Park, Bukit Timah, Singapore // E9AP Singapore, Nadia L Mustopo, Betsy Lau Chuk // Construction details, shopdrawing check, coordination, authority submission, supervision and meeting
The owner wanted a tranquil environment and a house that acts as an escape from hustle bustle of Singapore. The house programming was intended to cater the whole family needs, therefore entertainment room, prayer room, swimming pool, two types of dining area, roof terrace, and lift was provided. Concept of the house is simple, elegant, with rustic touch which integrating straightforward floor plan with various material such as metal, glass, marble, granites, and timber. Swimming pool as the main interaction area for the family was shaped as such looked like a paint palette as symbolization of the owner’s hobby: chinese painting.
26
BOUNDARY LINE
SETBACK LINE
SETBAC K LINE
E ARY LIN BOUND
SET
BOU
2ND STOREY PLAN 0
N
2
4
6
LINE SCALEBOUNDARY 1:100
8 METRES
G
SETBACK LINE
1st STOREY PLAN
SETBAC
BOUND
K LINE
ARY LIN E
2ND STOREY PLAN N
2nd STOREY PLAN
0
2
4
6
8 METRES
SCALE 1:100
27
Concept vs construction (front side)
28
Photo by Nadia L Mustopo
Perspective is created by 3d artist
FRONT ELEVATION
BUILT DESIGN
Pattern on Gate (timber & steel plate)
Sunken seat & finishes of swimming pool
Roof terrace design with canopy and bench
Finishes interphasing: timber, granite, pebble wash
29
DETAILING WORK SAMPLES MAIN DOOR
Elevation concept vs built on site
MAIN DOOR ELEVATION
MAIN DOOR AXONOME
The 3,6 meter high main door was made of stainless steel that has been cut into modules. The whole door was fabricated in Johor Bahru and then brought to Singapore for the corten steel finish works.
EAST 9 ARCHITECTS & PLANNERS PTE LTD
Corten steel effect sample
30
PROPOSED NEW ERECTION OF A 2-STOREY DETACHED DWELLING HOUSE WITH ROOF TERRACE AND SWIMMING POOL ON LOT 06961N MK 04 AT 16B LEEDON PARK (BUKIT TIMAH PLANNING AREA)
Sketch of main door frame detail
MAIN DOOR ELEVA
LIGHTING FEATURE AT BOUNDARY WALL
Elevation drawing vs built on site
Lighting feature is integrated with the signage of the house. In order to not creating glare for the passerby, laminated glass with tranclucent pvb was chosen. This glass then being overlayed with two types of metal mesh to create a pattern effect.
Two types of metal mesh
Signage detail & metal mesh - glass interphasing
31
STAIRCASE & WALL FEATURE
Cantilevered staircase and feature wall’s finishes interphasing
The staircase was intended to be elegant. 11,6 meter feature wall was made of granites combination: HKPL honed granite, metalicus honed granite and grooved park black honed granite.
Feature wall pattern
32
Staircase steps - granite interphasing
Concept vs construction (rear side)
33
Photo by Nadia L Mustopo
Perspective is created by 3d artist
Perspective is generated by 3d artist
PART 2 : Selected Projects
04
CATHOLIC ARCHDIOCESAN HUB typology size stage, status location company, supervisor role
// Mixed use development: retreat centre & archdiocese facility // 4 storey; 51,170 sqm // Proposal for tender // 49 Upper Thomson Road, Singapore // E9AP Singapore, Jeff Imperial, Nadia L Mustopo, Betsy Lau Chuk // Floor plan development, landscape design, facade exploration, 3D model, chapel design
The design approach for the Catholic Archdiocesan Hub is a humble and dignified interpretation of the brief and the site context. In optimising the existing site, the building functions and forms are articulated in synthesis with the land. The interplay of forms, land, and the mesh skin of the building simulates a “Cradle” protecting the people and creating an envelope which signifies God’s encompassing nature. The design also maximises natural light and ventilation as an approach towards sustainability.
34
GENERAL CONCEPT
Ventilations & Vistas
Green Corridors
CHAPEL
CHAPEL
Water is symbolic of Life. Mimicking the dynamic trait of water, nonlinear unimpeded vistas are generated along the green corridors. These sightlines are also translated into ventilation through the land between buildings, promoting breatheable cluster of spaces.
In the design of the landscape, a green spine meanders through the heart of the site, where the existing chapel sits as an extension of the lush nature reserves to the west. Density of vegetation is varied along the green spine to serve as a natural barrier for private areas.
0
A. B. C. D. E. F. G.
Retreat Centre Archdiocese Centre & Family Centre Youth Centre Rooms with Ensuite Toilets Dormitory Home for the Elderly Clergy Existing Chapel
1. 2. 3. 4. 5. 6. 7.
Drop-off Plaza Archdiocese and Family Retreat Drop-off Youth Centre Drop-off (B2 Level) Main Public Pedestrian Access B1 Carpark Entrance Bin Centre Access (B2 Level) Loading & Unloading Bay Access (B1 Level)
8. Substation & Transformers 9. Theatre Plaza 10. Gallery Plaza 11. B2 Carpark Entrance 12. Home for The Elderly Clergy Drop Off 13. Home for The Elderly Clergy Loading 14. Rooftop Plaza
40m
selected work — 03
SITEPLAN
15. Reflection Trails 16. Lawn Plaza 17. Reflective Ponds 18. Herb Garden
35
AERIAL VIEWS
LEGEND A. B. C. D. E. F. G.
Retreat Centre Archdiocese & Family Centre Youth Centre Rooms w/ Ensuite Toilets Dormitory Block Home for Elderly Clergy Existing Chapel
1. 2. 3. 4. 5. 6. 7. 8.
Drop off/ Pick up - Main Drop off/ Pick up - Archdiocese & Family Centre Drop off/ Pick up - Youth Centre Drop off/ Pick up - Home for Elderly Clergy Vehicular Entrance Pedestrian Entrance Substation (Transformer, Switchgear, MDF) Loading/ Unloading Bay
9. Bin Centre 10. Car Park Entrance 11. Car Park 12. Consumer Switchroom 13. Ejector Pump Room 14. Sprinkler Pump Room & Tank 15. Hydrant Pump Room & Tank 16. Domestic Water Pump Room & Tank
Perspective is generated by 3d artist
Chapel Interior Retrofitting
36
RETREAT CENTRE PLANS SECTION
ATTIC STOREY PLAN
2nd STOREY PLAN
B1STOREY PLAN
4th STOREY PLAN
3rd STOREY PLAN
1st STOREY PLAN
LEGEND: A1. F&B A2. SHOP A3. FCC A4. PASSENGER LIFT LOBBY A5. KIOSK A6. SERVICE LIFT LOBBY A7. FEMALE TOILET A8. MALE TOILET A9. NURSING ROOM A10. DISABLED TOILET A11. AUDITORIUM A12. STAGE
A13. BACK OF STAGE A14. STORAGE A15. AUDITORIUM PLAZA A16. FOYER A17. CONTROL ROOM A18. UPPER FOYER A19. AUDITORIUM BALCONY LEVEL A20. FOODCOURT A21. MINIMART A22. SEATING A23. LOADING/UNLOADING BAY A24. CAR PARK
37
ARCHDIOCESAN CENTRE & FAMILY CENTRE
STAY-IN FACILITIES & YOUTH CENTRE
4TH STOREY 4TH STOREY
3RD STOREY 3RD STOREY
2ND STOREY
1ST STOREY
38
2ND STOREY
1ST STOREY
HOME FOR THE ELDERLY CLERGY 4TH STOREY
3RD STOREY
2ND STOREY
1ST STOREY
B2 STOREY
39
Entrance Perspective
The humble choice of materials and colours stands for eternity and God's enduring, everlasting grace.
40
Perspective is generated by 3d artist
Natural light and ventilation play a significant role in the design. In the day, light infiltrates into the spaces. At night, the building stands as a beacon, guiding one along the right path, “through the darkest valley�. Courtyard spaces in the various buildings are oriented along the green spine and around the chapel, creating communal spaces for activities and personal reflection.
41
Perspective is generated by 3d artist
PART 2 : Selected Projects
05
THE EQUILIBRIUM competition, achievement brief size stage, status location role team
// Sinarmasland Young Architect 2017 , 1st winner (professional category) // Office for tech-related companies, leasing office, co-working space, commercial // 8 storey, 36.000 sqm // Conceptual // Digital Hub district, BSD, Indonesia // team leader, macro and micro concept, diagrams, floor plan, landscape design, night perspective // Steven Widyatmadja, Muhammad Hadyan, Daniel Caesar Pratama
Future generation of workforce, the millenials, seek more than paychecks. They seek values and purpose, skill development, and cohesion between work and life. Accordingly, future workplace should acommodate the demands from millenials. Keeping employees happy is no longer a choice. Happy employees means retained talent, improved performance, and more creativity, in other word: Progressive business. How do you keep your employees happy? the answer is by providing a balanced lifestyle and a balanced environment.
42
VIDEO
BASIC CONCEPT
UserUser wellness Wellness by Biophilic by biophilic
Healthy mobility Green Lifestyle by Green Mobility
Design
Smart Smart Building building
Balanced Lifestyle Various Various Programs for programs Various Users
Green Standardized Green building building
Lifetime Lifetime Learning learning
HOW THE BUSINESS PROGRESS
Fail Fast Fail Fast Experiment Experiment
BALANCE LIFESTYLE
PROGRESSIVE BUSINESS
Seamless Seamless Work work experience Experience
Iconic Iconic gateway Gateway building
BALANCE ENVIRONMENT
Work life Work & & Life Cohesion cohesion
Where users and guests can learn and improve their skills. Filled with information about users data, on going event, building management, all integrated with an app
Balanced Environment
Giving back to Giving Back to Nature nature
SITE PARAMETER
Collaboration Collaboration
Building
District District’s signature Signature Parkpark
Formal and informal space to promote impromptu meetings that can lead to future collaboration Workshop and prototyping area for faster trial and error process. Connected to small gallery where passerby can give immediate feedback.
GREEN & BLUE CONNECTIVITY
PERMEABILITY
Continuing Green & Blue Connection
Introduce permeability
TWIN MASSING
OUTDOOR SPACES
Building Coverage: 50% Plot Ratio: 4 Green Coverage: 30% GFA: 25.000m2
Site Parameters Total Site Area 2Ha
BASIC PROGRAMS
Open Space Program
MASSING CONCEPT 43
44
45
Outdoor stage area-night perspective and main drop off area
46
Perspective is generated by 3d artist
Perspective is made with photoshop by Ridwan Perspective is generated by 3d artist
COMMON SPACES
Large Conference
Meeting Pod
Silent Room
Thematic Workstation
Small Conference Game Room
Squash Room
Impromptu Meetings
Discussion Space Movie Room
Phone Booth Music Room
Lazy Room
Nap Room
Open Semi EnclosedWorkstation
Small Studio
Health Sanctuary Room Assigned Semi Enclosed Workstation
Medium Studio Open Workstation
Assigned Workstation
Common spaces are provided to promote impromptu meetings and social interactions
SECTION
47
Interior perspective
48
e of main void area
49
Perspective is generated by 3d artist
Perspective is generated by ridwan
PART 2 : Selected Projects
06
MOROTAI SOUVENIR CENTRE competition, achievement brief size stage, status location role team
// Souvenir centre by Propan 2018 , 3rd winner // Souvenir centre with local character // 2 storey, 500 sqm // Conceptual // Morotai, North Maluku, Indonesia // team leader, massing concept, interior design, floor plan, landscape design, perspectives // Arif Rachman Hidayat, Adhietya Orlando, Pascal Abhijana
Souvenir centre in this remote area should level up to provide a community facility which serves the following functions: education, exhibition, and interaction. By involving visitors on these processes would help them to gauge the true value of a local merchandise product. Architecturally, the building adapts ‘baileo’ house Morotai’s traditional building with some modifications, whilst compromises its functionality.
50
GENERAL CONCEPT
Pearl & White steel as main branding
interactions
SOUVENIR
personalized items
WORKSHOP
MERCHANDISING low budget
authentic items
EXPLORER
involveness
exclusive offer
ELITE
USER BASED ON
tailor made experience
MOTIVES CAFE
SOCIAL INTERACTION
EVENT ENGAGEMENT
SPESIFIC
WORKSHOP
CAFE
OUTDOOR SPACE meeting event point participation
Morotai have its own spesific market: tourists that tend to explore (wanderlust), tourists that want to join spesific event (e.g: sail morotai, fishing morotai, etc), and tourists that into craftmanship and unique products (pearl, white steel, etc). This tendency would affect the programs in this facility, branding, even the marketing strategy.
MASSING CONCEPT
1000 m2 500 m 29
m
food
be a (5 ch s 0/ et 10 ba 0 m ck )
outside kiosk services workshop
2
‘people attract people’
m 33
cafe
parking
Site
Beach as the known character of Morotai is picked as proposed location. Outside the beach setback, site is elongated to follow the desired 1,000 sqm size.
crafts & jewelry
Massing
Circulation from road to beach is provided between two massings. Walk-in cafe and store on both end sides are created to attract people and give a strong visual connectivity.
Programs
toilet P to parking extention
Injected programs are serving following purposes: commercial, education, exhibition, and interactions. Hence, there are workshop, cafe, and main store.
Expression
cross pattern to adapt
Proportion and its roof expression adapting traditional building: Baileo. In the spesific case, massings are not elevated in order to create an easy movement to and from main circulation.
morotai island
51
KE PANTAI
FL +0.150 EVENTUAL DISPLAY
2
2
FL +0.150
C
B
FL +0.250
QUEUE AREA IMPULSIVE RACK
IMPULSIVE RACK
*
CASHIER
QUEUE AREA
To L2
umbrella
FL +0.150
E SPILL OUT AREA
FL +0.250
POWER WALL
*
H
FL +0.150
4
K
*
EVENTUAL DISPLAY
A
FL +0.250
I
EVENT WALL
COMPRESSION ZONE
G
FL +0.250
J FL +0.400
FL +0.250
SPILL OUT AREA
F
*
FL +0.150
FL +0.250
FL +0.150
3
1
FL ±0.000
1ST STOREY PLAN 0
2
4
10 m woven fabric
saloi
parang, salawaku
pearl
nutmeg
tolu
lopa-lopa
white steel
bacan stone
halua peanuts
Local products varied local products need to be elevated and adjusted in order to match the market
52
* From L1 FL +3.650
D
2ND STOREY PLAN 0
2
4
10 m
LEGEND
Sombar Sijum: A. Craft zone, woodcraft, rattan art B. Weapon replica, white steel craft, pearl and jewelry C. Outside kiosk (food, drink, signature snacks) D. Culinary zone E. Workshop area (Sombar Simote) F. Cafe (Sombar siboga) G. Staff room H. Storage I. ATM
OUTDOOR SPACES
*
: Fire Hydrant
: Lock for security
signature snack
batik fabric
woven fabric
rattan wicker
crafts
snacks
accessories
woven fabric
weapon replica
jewelry
DISPLAY MEDIA
1. Plaza (drop off / pick up) 2. Performance area, coffee break, local bazaar, event space 3. Carpark, motorbike, bike park 4. Loading / unloading
53
AXONOMETRIC SECTION
w (somba
ou kio cashier culinary & signature snacks
FL +3.650
FL +0.250
FL +0.150
Perspective is generated by ridwan
FL +0.250
Entrance (road side)
54
utside osk
FL +0.250
Perspective is generated by ridwan
toilet text keterangan foto, oleh siapa dibuat dengan apa
workshop ar simote)
FL +0.400
Performance area
55
Perspective is generated by 3d artist
PART 2 : Selected Projects
07
WISMA KOSGORO (OFFICE) typology size stage, status location company, supervisor role
// Office Tower // 21 storey; 19,249 sqm // Design concept // Sudirman, Jakarta, Indonesia // Design Alliance Workshop, Andi Anggoro, Patriot Negri, Khairul Umam, Fadhil Sadewo // Floor plan development, massing iteration, planning parameter adjustments
The new 20-storey office tower designed by expressing the curvy-linear silhouette to appear stand out among the rest sharp and straight edges neighbour. The slanted intrusion composition of which can be lighted up during night time aiming to be a showcase of the contemporary articulation and technology to move forward from the conventional repetitive rectangular module.
56
MASSING CONCEPT
CONTEXT
SITE
MAXIMIZING FLOOR PLATE
FINDING THE BEST FORM
CURVED VS STRAIGHT SILHOUETTE
AXONOMETRIC
VISUAL CONNECTIVITY
SECTION Roof Terrace ROOFTOP RESTAURANT ROOFTOPTerrace RESTAURANT Roof
2 floors
OfficeOffice
11 floors
SKY DECK
Sky Deck
Mosque/cafetaria
MSCPmscp ENTRANCE/EXIT Entrance / Exit
1 floor
Mosque, Cafeteria
6 floors
Lobbylobby
1 floor Double volume
basement Basement
2 floors
ToTObasement BASEMENT MRT STATION Future MRT Entrypoint
MSCP ToTO MSCP DROP OFF Drop Off
section 01
57
FLOOR PLANS B2 STOREY
B1 STOREY
Basement -1 33 lot parkir mobil
Basement -2 1ST STOREY
MEZZANINE STOREY
41 lot parkir & 75 Lot Parkir Motor
GSB
M/E
GSB
L-1.5 7 lot parkir mobil
Ground floor Grand Total Net Area (NA)
2ND STOREY
: 14,220 m2 (74 %) : 16,443 m2 (85 %) : 19,249 m2
Total SGFA (NA+COR) TYPICAL STOREYGrand Grand Total GFA (SGFA+MEP+OT)
GSB
GSB
GSB
GSB
L-2
L-8
21 lot parkir mobil
Office floor & lift overrun mscp
LOWER ROOF TERRACE
Total Net Architect (NA) : 1065,6 m2 (78,28%) Total SGFA (NA+COR) : 1224,6 m2 (89,96%) Total GFA (SGFA+MEP+OT) : 1361,16 m2
UPPER ROOF TERRACE
GSB
GSB
GSB
GSB
Rooftop l19
58
TYPICAL (with balcony)
Rooftop l20
MEP : 52 m2 Corridor (COR) : 159 m2 Others (OT) : 84,56
Aerial Perspective
Entrance Area
59
Perspective is generated by 3d artist
Rooftop Pe
60
erspective
61
Perspective is generated by 3d artist
illustration made with sketchup and photoshop by Dany
PART 2 : Selected Projects
08
A WELCOMING CBD competition, achievement brief size stage, status location role team
// Sinarmasland Young Architect 2014 , 1st winner (masterplanning category) // CBD masterplan // 25,000 sqm // Conceptual // BSD, Indonesia // parcel division, masterplan base design, landscape design, final presentation // Dany Nugroho, Patriot Negri, Aszafaika Ladidinanda, Hastito Rahmadhika
The project is positioned to be the New Extension of the Sunburst CBD of BSD City. The project is considered special as this is the last commercial parcel of land in BSD Phase 1 or East BSD. This project is also envisioned to be the gateway to the West BSD and the future Grand CBD. There are 5 keys of design that required: integration, connectivity, walkability, public open space, and identity.
62
VIDEO
CONCEPT
MASTERPLAN CONCEPT
1
Creating “pocket shaped” as ending of the shape of previous existing CBD
2
Main entrance is on the north side (primary road). Creating perimeter road along the site boundary to provide access for future development, then connecting the rest
3
Creating ‘green necklace’ by connecting the exiting green areas through the site
4
Parcel’s shape follows the road boundary
5
Creating pedestrian path connection, then provides nodes (as the public open space) for pedestrian (user or visitor)
6
The building masses shape follows the parcel’s shape, the skyline reach its highest point at the center (iconic building)
63
SITE PLAN
A. B. C. D. E.
SECTION
64
Mixed-Use Building Shopping Mall Hotel Office Apartment
a. b. c. d. e.
Festival Plaza Exhibition Plaza Art Plaza Cultural Plaza Social Plaza
f. g. h. i. j.
Educative Plaza Reservoir Nature Park Active Park Urban Park
EXPLODED AXONOMETRY
65
LANDSCAPE
66
Outdoor area perspective
67
illustration made with sketchup and photoshop by Dany & Hastito
Perspective is generated with sketchup and photoshop
PART 2 : Selected Projects
09
SIRE MEDANA RESORT typology size stage, status location supervisor achievement
// 3 star hotel // 1-3 storey; 3,400sqm // Design concept, Final Project // North Lombok, Indonesia // Firmansyah I Murad // Most favorite final project of graduation exhibition (April 2014)
The site located at sire medana, North Lombok. Its remote location would give a serene ambience and calmness. The most interesting part of this site is the view of the sea and the abundant amount of coconut palm trees. Objective of this project is to create a design that promotes interaction between guests and the nature. As for the building expression itself, traditional architecture character is being adapted.
68
Site photos Dense coconut trees as the main consideration for the siteplanning. The distance between trees will become the space for architecture.
Local materials to emphasize the local character of the design
Lobby
Public building, standard room building
Cottage, Villa
69
SITEPLAN
A. Lobby B. Public facility area C. Standard room area
D. Garden view cottage area E. Lobby F. Public facility area
G. H. I.
Standard room area Garden view cottage area Sire Indah beach
COTTAGE TYPES
area: 75 sqm capacity: 2 person
70
area: 85 sqm capacity: 4 person
area: 125 sqm capacity: 2 person
STANDARD ROOM BUILDING
GARDEN COTTAGE
RESTAURANT, BALLROOM, BAR & LOUNGE
71
GARDEN VIEW COTTAGE
72 72 Perspectives are generated with sketchup and photoshop
LAKE VIEW COTTAGE
Perspectives are generated with sketchup and photoshop
LOBBY
VILLA SUITE
73
Main outdoo
74 74
or event area
75
Perspectives are generated with sketchup and photoshop
PART 3 : Competition Summary
PART 3
COMPETITION SUMMARY Competition is one way to push the idea and do that creative jump. During the process I could learn lot of things such as how to lead, how to follow order, gauge the effort to give, how to floor the idea to the team and re-evaluate for our personal growth. Through this, the intense exercises, and the achievements, I have developed myself and build my confidence a lot further.
! *click the image to access the document* *click the video button to access the video* 76
A WELCOMING CBD
THE EQUILIBRIUM 1
By, year : Sinarmasland (2014) Typology : Central Business District Masterplan Team : Aszafaika L, Dany N, Hastito R, Patriot N
VIDEO
KONTEKS.TOEA.L
1
By, year : Sinarmasland (2017) Typology : Digital Working Space (Office) Team : Daniel C, M Hadyan, Steven W
OTI BUBANE 1
By, year : Propan (2017) Typology : Restaurant Team : Daniel C, M Hadyan, Steven W
VIDEO
1
By, year : Propan (2017) Typology : Restaurant Team : Daniel C, M Hadyan, Steven W
77
PART 3 : Competition Summary
IMMUNICITY
SOMBAR SINONAKO 3
MERIT
By, year : Futurearc prize (2018) Typology : Biophilic City Team : DAW Architects: Patriot N, Khairul U, Vinasthika M, Luthfi D
SIGI MENA
By, year : Propan (2018) Typology : Souvenir Centre Team : Arif R, Adhietya O, Pascal A
SPACE IN SPACE 2
By, year : Bima Local Government (2018) Typology : Great Mosque Team : Arif R, Adhietya O
78
VIDEO
TOP 15
By, year : Museum Marino Marini Italy (2018) Typology : Playable Museum Team : DAW Architects: Khairul U, Vinasthika M
REST IN PARADISE
BHUMI PRASHANTI
TOP 6
By, year : Lixil (2019) Typology : Rest Area Team : Steven W, M. Zakky
VIDEO
BALE WITANA
TOP 25
By, year : Jayaboard (2019) Typology : Disaster-Responsive Housing Team : Gratio R
THE TRANSIT (ION)
TOP 21
By, year : Dipenogoro University (2017) Typology : Multipurpose Hall Team : Aris A, Arif R, Adhietya O
TOP 24
By, year : MRT Jakarta (2018) Typology : Transit Hub Team : Arif R, Adhietya O
79
SELECTED WORKS
ARCHITECTURE PORTFOLIO
website: www.issuu.com/ridwanfauzi
email: rdwn.fauzi@gmail.com
linkedin: mochamad ridwan fauzi